Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7784652B2 - Work equipment - Google Patents
[go: Go Back, main page]

JP7784652B2 - Work equipment - Google Patents

Work equipment

Info

Publication number
JP7784652B2
JP7784652B2 JP2024046486A JP2024046486A JP7784652B2 JP 7784652 B2 JP7784652 B2 JP 7784652B2 JP 2024046486 A JP2024046486 A JP 2024046486A JP 2024046486 A JP2024046486 A JP 2024046486A JP 7784652 B2 JP7784652 B2 JP 7784652B2
Authority
JP
Japan
Prior art keywords
unit
work
operation unit
component mounting
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2024046486A
Other languages
Japanese (ja)
Other versions
JP2024074825A (en
Inventor
健二 森
洋 松村
雅弘 大蘆
慎弥 小沼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Publication of JP2024074825A publication Critical patent/JP2024074825A/en
Application granted granted Critical
Publication of JP7784652B2 publication Critical patent/JP7784652B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Supply And Installment Of Electrical Components (AREA)
  • Digital Computer Display Output (AREA)

Description

本開示は、作業部を操作する複数の操作部を備える作業装置に関する。 This disclosure relates to a working device equipped with multiple operating units for operating working units.

実装基板を生産する部品搭載装置などの作業装置には、基板に部品を搭載する部品搭載作業を行う作業部と、作業部を制御する制御部に接続された入力部と表示部を有するタッチパネルなどの操作部を複数備えるものが知られている(例えば、特許文献1参照)。特許文献1には、上位から入力される画像信号を表示部に表示すると共に下位の装置に出力する画像信号処理回路と、選択スイッチがオンとなると自装置のタッチパネルの位置信号をホスト側に伝達し、オフとなると下位からの位置信号をホスト側に伝達する位置信号処理回路を備える部品搭載装置が開示されている。これにより、ホスト機器に接続された複数台のタッチパネルのうち選択された任意のタッチパネルから部品搭載装置を優先操作することができる。 Working devices, such as component mounting devices used to produce printed circuit boards, are known to include a work unit that mounts components onto the board, and multiple operation units, such as touch panels with an input unit and display unit connected to a control unit that controls the work unit (see, for example, Patent Document 1). Patent Document 1 discloses a component mounting device that includes an image signal processing circuit that displays image signals input from a higher-level device on the display unit and outputs them to a lower-level device, and a position signal processing circuit that transmits position signals from the device's touch panel to the host side when a selection switch is turned on, and transmits position signals from the lower-level device to the host side when the selection switch is turned off. This allows the component mounting device to be operated preferentially from any selected touch panel of multiple touch panels connected to the host device.

特開2006-261237号公報Japanese Patent Application Laid-Open No. 2006-261237

しかしながら、特許文献1を含む従来技術では、複数の操作部の表示部には同じ画像が表示され、また、並行して作業を行うことができる複数の作業部を備えた作業装置であっても、一の操作部から優先操作されている作業部とは異なる作業部は、いずれの操作部からも操作をすることができないという問題点があった。 However, in prior art including Patent Document 1, the same image is displayed on the display units of multiple operation units, and even in a work device equipped with multiple work units that can perform work in parallel, there is a problem in that a work unit other than the one being operated preferentially from one operation unit cannot be operated from any of the operation units.

本開示は、作業部に対する複数の操作部からの操作を適切に行うことができる作業装置を提供することを目的とする。 The present disclosure aims to provide a working device that allows appropriate operation of a working unit from multiple operating units.

本開示の一態様の作業装置は、作業を行う作業部と、前記作業部を制御する制御部と、前記制御部に接続された複数の操作部とを備えた作業装置であって、前記複数の操作部の各々は入力部と表示部を有し、前記制御部は、前記複数の操作部の各々からの操作情報を受信するとともに、受信した操作情報が前記複数の操作部のうちいずれの操作部からの入力であるかを識別し、前記操作情報に基づく命令を出力する入力処理部と、前記命令に基づいて処理を実行する処理部と、前記識別によって特定された前記操作部の前記表示部に前記命令の実行結果を表示させる出力処理部と、を有し、一方の操作部において前記作業が実行中である場合に、前記一方の操作部から所定の操作がなされたとき、他方の操作部が備える表示部に前記一方の操作部において所定の操作が行われたことを示す通知を表示させ、前記通知を表示中の前記他方の操作部から所定の操作がなされたとき前記一方の操作部が備える表示部に前記他方の操作部において所定の操作が行われたことを示す通知を表示させる A work device according to one aspect of the present disclosure is a work device comprising a work unit that performs work, a control unit that controls the work unit, and a plurality of operation units connected to the control unit, each of the plurality of operation units having an input unit and a display unit, and the control unit receives operation information from each of the plurality of operation units, identifies which of the plurality of operation units the received operation information is from, and outputs a command based on the operation information, has an input processing unit that executes processing based on the command, and an output processing unit that displays the execution result of the command on the display unit of the operation unit identified by the identification, and when the work is being performed on one operation unit, if a predetermined operation is performed from the one operation unit, the display unit of the other operation unit displays a notification indicating that the predetermined operation has been performed on the one operation unit , and when a predetermined operation is performed from the other operation unit while the notification is being displayed, the display unit of the one operation unit displays a notification indicating that the predetermined operation has been performed on the other operation unit .

本開示によれば、作業部に対する複数の操作部からの操作を適切に行うことができる。 This disclosure allows for proper operation of the working unit from multiple operating units.

図1は、本開示の一実施の形態の実装基板製造ラインの要部平面図である。FIG. 1 is a plan view of a main part of a mounting substrate manufacturing line according to an embodiment of the present disclosure. 図2は、本開示の一実施の形態の実装基板製造ラインが備える2ステージ/2ヘッドの部品搭載装置の概略構造を示す平面図である。FIG. 2 is a plan view showing a schematic structure of a two-stage/two-head component mounting device provided in a mounting board manufacturing line according to an embodiment of the present disclosure. 図3は、本開示の一実施の形態の実装基板製造ラインが備える2ステージ/2ヘッドの部品搭載装置の概略構造を示す側面図である。FIG. 3 is a side view showing a schematic structure of a two-stage/two-head component mounting device provided in a mounting board manufacturing line according to an embodiment of the present disclosure. 図4は、本開示の一実施の形態の実装基板製造ラインが備える4ステージ/4ヘッドの部品搭載装置の概略構造を示す平面図である。FIG. 4 is a plan view showing a schematic structure of a four-stage/four-head component mounting device provided in a mounting board manufacturing line according to an embodiment of the present disclosure. 図5は、本開示の一実施の形態の2ステージ/2ヘッドの部品搭載装置の制御系の構成を示すブロック図である。FIG. 5 is a block diagram showing the configuration of a control system of a two-stage/two-head component mounting device according to an embodiment of the present disclosure. 図6は、本開示の一実施の形態の2ステージ/2ヘッドの部品搭載装置の入力処理部の処理を示すフロー図である。FIG. 6 is a flowchart showing the processing of the input processing unit of the two-stage/two-head component mounting device according to the embodiment of the present disclosure. 図7は、本開示の一実施の形態の2ステージ/2ヘッドの部品搭載装置が備える操作部の表示部に表示される表示画面の例の説明図である。FIG. 7 is an explanatory diagram of an example of a display screen displayed on a display unit of an operation unit included in the two-stage/two-head component mounting device according to an embodiment of the present disclosure. 図8は、本開示の一実施の形態の2ステージ/2ヘッドの部品搭載装置が備える操作部の表示部に表示される表示画面の例の説明図である。FIG. 8 is an explanatory diagram of an example of a display screen displayed on a display unit of an operation unit included in the two-stage/two-head component mounting device according to an embodiment of the present disclosure. 図9は、本開示の一実施の形態の2ステージ/2ヘッドの部品搭載装置が備える操作部の表示部に表示される表示画面の例の説明図である。FIG. 9 is an explanatory diagram of an example of a display screen displayed on a display unit of an operation unit included in the two-stage/two-head component mounting device according to an embodiment of the present disclosure. 図10Aは、本開示の一実施の形態の2ステージ/2ヘッドの部品搭載装置の第1の変形例の制御系の構成を示すブロック図である。FIG. 10A is a block diagram showing the configuration of a control system of a first modified example of a two-stage/two-head component mounting device according to an embodiment of the present disclosure. 図10Bは、本開示の一実施の形態の2ステージ/2ヘッドの部品搭載装置の第1の変形例の入力処理部の処理を示すフロー図である。FIG. 10B is a flowchart showing the processing of the input processing unit of the first modified example of the two-stage/two-head component mounting device according to the embodiment of the present disclosure. 図11は、本開示の一実施の形態の2ステージ/2ヘッドの部品搭載装置の第2の変形例の制御系の構成を示すブロック図である。FIG. 11 is a block diagram showing the configuration of a control system of a second modified example of a two-stage/two-head component mounting device according to an embodiment of the present disclosure.

以下に図面を用いて、本開示の一実施の形態を詳細に説明する。以下で述べる構成、形状等は説明のための例示であって、実装基板製造ライン、部品搭載装置などの仕様に応じ、適宜変更が可能である。以下では、全ての図面において対応する要素には同一符号を付し、重複する説明を省略する。図1、及び後述する一部の図では、水平面内で互いに直交する2軸として、基板搬送方向のX軸(図1における上下方向)、基板搬送方向に直交するY軸(図1における左右方向)が示される。図3、及び後述する一部の図では、水平面と直交する高さ方向としてZ軸(図3における上下方向)が示される。 An embodiment of the present disclosure will be described in detail below using the drawings. The configurations, shapes, etc. described below are examples for explanatory purposes and can be modified as appropriate depending on the specifications of the mounting board production line, component mounting device, etc. In the following, corresponding elements in all drawings will be given the same reference numerals, and duplicate explanations will be omitted. In Figure 1 and some of the drawings described below, two axes that are orthogonal to each other in the horizontal plane are shown: the X axis in the substrate transport direction (the up-down direction in Figure 1) and the Y axis that is orthogonal to the substrate transport direction (the left-right direction in Figure 1). In Figure 3 and some of the drawings described below, the Z axis (the up-down direction in Figure 3) is shown as the height direction that is orthogonal to the horizontal plane.

まず図1を参照して、本開示の一実施の形態の実装基板製造ライン1の構成を説明する。図1は、実装基板製造ライン1の要部を模式的に示している。実装基板製造ライン1は、複数の部品搭載装置M1~M6を直列に連結して構成されており、基板に部品を搭載した実装基板を製造する機能を有している。各々の部品搭載装置M1~M6には、上流(紙面上方)から下流(紙面下方)に向けて基板2をX軸に沿って搬送する第1基板搬送レーンL1と第2基板搬送レーンL2がY軸方向に離れて配置されている。以下、Y軸方向において、第1基板搬送レーンL1が配置された側を前(紙面左側)、第2基板搬送レーンL2が配置された側を後(紙面右側)と称する。 First, referring to Figure 1, the configuration of a mounted board production line 1 according to one embodiment of the present disclosure will be described. Figure 1 schematically illustrates the main components of the mounted board production line 1. The mounted board production line 1 is configured by connecting multiple component mounting devices M1-M6 in series and has the function of manufacturing mounted boards with components mounted on them. Each of the component mounting devices M1-M6 has a first board transport lane L1 and a second board transport lane L2 spaced apart in the Y-axis direction. These lane lanes transport the board 2 along the X-axis from upstream (upper side of the page) to downstream (lower side of the page). Hereinafter, in the Y-axis direction, the side where the first board transport lane L1 is located will be referred to as the front (left side of the page), and the side where the second board transport lane L2 is located will be referred to as the rear (right side of the page).

各々の部品搭載装置M1~M6が備える第1基板搬送レーンL1と第2基板搬送レーンL2は、それぞれ隣接する装置と連結されており、上流から下流に向けて基板2をそれぞれ搬送して隣接する装置に受け渡しする。このように、部品搭載装置M1~M6は、水平方向に伸びたX軸(一の軸)に沿って基板2を搬送する第1基板搬送レーンL1と、第1基板搬送レーンL1からY軸(X軸と水平面内で直交する他の軸)に沿った方向に離れた位置に配置され、X軸に沿って基板2を搬送する第2基板搬送レーンL2と、を備えている。 The first board transport lane L1 and second board transport lane L2 equipped on each component mounting device M1-M6 are connected to the adjacent device, and transport boards 2 from upstream to downstream and hand them over to the adjacent device. Thus, component mounting devices M1-M6 are equipped with a first board transport lane L1 that transports boards 2 along the X-axis (one axis) extending horizontally, and a second board transport lane L2 that is positioned away from the first board transport lane L1 in the direction along the Y-axis (another axis perpendicular to the X-axis in the horizontal plane) and transports boards 2 along the X-axis.

図1において、各々の部品搭載装置M1~M6には、第1基板搬送レーンL1の前に第1部品供給部S1が、第2基板搬送レーンL2の後に第2部品供給部S2が配置されている。さらに、部品搭載装置M5と部品搭載装置M6には、第1部品供給部S1の下流に第3部品供給部S3が、第2部品供給部S2の下流に第4部品供給部S4が配置されている。第1部品供給部S1、第2部品供給部S2、第3部品供給部S3、第4部品供給部S4には、それぞれ部品を供給する複数の部品供給ユニット3がX軸に沿って並列に配置されている。 In FIG. 1, each of component mounting devices M1 to M6 has a first component supply section S1 located before the first board transport lane L1 and a second component supply section S2 located after the second board transport lane L2. Furthermore, component mounting devices M5 and M6 have a third component supply section S3 located downstream of the first component supply section S1 and a fourth component supply section S4 located downstream of the second component supply section S2. The first component supply section S1, second component supply section S2, third component supply section S3, and fourth component supply section S4 each have multiple component supply units 3 arranged in parallel along the X axis that supply components.

このように、部品搭載装置M1~M6は、第1基板搬送レーンL1からY軸に沿った方向であって第2基板搬送レーンL2側とは反対側(前)に離れた位置に配置され、X軸に沿って並列に配置された複数の部品供給ユニット3を有する第1部品供給部S1を備えている。また、部品搭載装置M1~M6は、第2基板搬送レーンL2からY軸に沿った方向であって第1基板搬送レーンL1側とは反対側(後)に離れた位置に配置され、X軸に沿って並列に配置された複数の部品供給ユニット3を有する第2部品供給部S2を備えている。 As such, component mounting devices M1-M6 are equipped with a first component supply section S1 that is located away from the first board transport lane L1 in the direction along the Y axis on the opposite side (front) of the second board transport lane L2, and has a plurality of component supply units 3 arranged in parallel along the X axis. Furthermore, component mounting devices M1-M6 are equipped with a second component supply section S2 that is located away from the second board transport lane L2 in the direction along the Y axis on the opposite side (rear) of the first board transport lane L1, and has a plurality of component supply units 3 arranged in parallel along the X axis.

図1において、各々の部品搭載装置M1~M6において、第1基板搬送レーンL1、第2基板搬送レーンL2、部品供給ユニット3の上方には、前に第1作業ユニットU1が、後に第2作業ユニットU2が配置されている。さらに、部品搭載装置M5と部品搭載装置M6には、第1作業ユニットU1の下流に第3作業ユニットU3が、第2作業ユニットU2の下流に第4作業ユニットU4が配置されている。 In Figure 1, in each of the component mounting devices M1 to M6, a first work unit U1 is located in front of the first board transport lane L1, a second board transport lane L2, and a second work unit U2 is located behind the component supply unit 3. Furthermore, in the component mounting devices M5 and M6, a third work unit U3 is located downstream of the first work unit U1, and a fourth work unit U4 is located downstream of the second work unit U2.

第1作業ユニットU1は、部品を保持して基板2に搭載する第1部品搭載ヘッドH1(第1作業ヘッド)と、第1部品搭載ヘッドH1を少なくとも第1部品供給部S1の上方から第2基板搬送レーンL2の上方の第1領域A1内で移動させる第1作業ヘッド移動機構F1と、第1作業ヘッド移動機構F1によって第1部品搭載ヘッドH1とともに移動する第1ヘッドカメラC1(第1撮像部)と、を含んでいる。すなわち、第1作業ユニットU1は、第1基板搬送レーンL1に保持されている基板2の他、第2基板搬送レーンL2に保持されている基板2にも部品を搭載可能な構成になっている。 The first work unit U1 includes a first component mounting head H1 (first work head) that holds components and mounts them on the board 2, a first work head movement mechanism F1 that moves the first component mounting head H1 at least from above the first component supply section S1 within a first area A1 above the second board transport lane L2, and a first head camera C1 (first imaging unit) that moves together with the first component mounting head H1 by the first work head movement mechanism F1. In other words, the first work unit U1 is configured to be able to mount components not only on boards 2 held in the first board transport lane L1, but also on boards 2 held in the second board transport lane L2.

図1において、第2作業ユニットU2は、部品を保持して基板に搭載する第2部品搭載ヘッドH2(第2作業ヘッド)と、第2部品搭載ヘッドH2を少なくとも第2部品供給部S2の上方から第1基板搬送レーンL1の上方の第2領域A2内で移動させる第2作業ヘッド移動機構F2と、第2作業ヘッド移動機構F2によって第2部品搭載ヘッドH2とともに移動する第2ヘッドカメラC2(第2撮像部)と、を含んでいる。すなわち、第2作業ユニットU2は、第2基板搬送レーンL2に保持されている基板2の他、第1基板搬送レーンL1に保持されている基板2にも部品を搭載可能な構成になっている。 In FIG. 1, the second work unit U2 includes a second component mounting head H2 (second work head) that holds components and mounts them on a board; a second work head moving mechanism F2 that moves the second component mounting head H2 from at least above the second component supply section S2 within the second area A2 above the first board transport lane L1; and a second head camera C2 (second imaging unit) that moves together with the second component mounting head H2 by the second work head moving mechanism F2. In other words, the second work unit U2 is configured to be able to mount components on boards 2 held in the first board transport lane L1 as well as boards 2 held in the second board transport lane L2.

同様に、第3作業ユニットU3は、第3部品搭載ヘッドH3(第3作業ヘッド)と、第3部品搭載ヘッドH3を第3領域A3内で移動させる第3作業ヘッド移動機構F3と、第3ヘッドカメラC3(第3撮像部)と、を含んでいる。また、第4作業ユニットU4は、第4部品搭載ヘッドH4(第4作業ヘッド)と、第4部品搭載ヘッドH4を第4領域A4内で移動させる第4作業ヘッド移動機構F4と、第4ヘッドカメラC4(第4撮像部)と、を含んでいる。 Similarly, the third work unit U3 includes a third component mounting head H3 (third work head), a third work head moving mechanism F3 that moves the third component mounting head H3 within the third area A3, and a third head camera C3 (third imaging unit). Furthermore, the fourth work unit U4 includes a fourth component mounting head H4 (fourth work head), a fourth work head moving mechanism F4 that moves the fourth component mounting head H4 within the fourth area A4, and a fourth head camera C4 (fourth imaging unit).

図1において、各々の部品搭載装置M1~M6は、前側にいる作業者が操作可能な位置に第1操作部P1が配置され、後側にいる作業者が操作可能な位置に第2操作部P2が配置されている。第1操作部P1と第2操作部P2は、各種情報や画面を表示するモニタ14(表示部)と、各種情報の入力を受け付けるタッチスクリーン13(入力部)を備えるタッチパネルなどの装置である(図5参照)。 In Figure 1, each of component mounting devices M1-M6 has a first operation unit P1 located in a position that can be operated by a worker at the front, and a second operation unit P2 located in a position that can be operated by a worker at the rear. The first operation unit P1 and the second operation unit P2 are devices such as touch panels that include a monitor 14 (display unit) that displays various information and screens, and a touch screen 13 (input unit) that accepts input of various information (see Figure 5).

このように、部品搭載装置M1~M4は、部品供給部(第1部品供給部S1、第2部品供給部S2)、作業ユニット(第1作業ユニットU1、第2作業ユニットU2)を2つずつ備える2ステージ/2ヘッドの部品搭載装置である。また、部品搭載装置M5,M6は、部品供給部(第1部品供給部S1、第2部品供給部S2、第3部品供給部S3、第4部品供給部S4)、作業ユニット(第1作業ユニットU1、第2作業ユニットU2、第3作業ユニットU3、第4作業ユニットU4)を4つずつ備える4ステージ/4ヘッドの部品搭載装置である。 In this way, component mounting devices M1 to M4 are two-stage/two-head component mounting devices equipped with two component supply units (first component supply unit S1, second component supply unit S2) and two working units (first working unit U1, second working unit U2). Furthermore, component mounting devices M5 and M6 are four-stage/four-head component mounting devices equipped with four component supply units (first component supply unit S1, second component supply unit S2, third component supply unit S3, fourth component supply unit S4) and four working units (first working unit U1, second working unit U2, third working unit U3, fourth working unit U4).

図1に示す例では、実装基板製造ライン1は、4台の2ステージ/2ヘッドの部品搭載装置M1~M4と2台の4ステージ/4ヘッドの部品搭載装置M5,M6を備えているが、実装基板製造ライン1は、この構成に限定されることはない。例えば、実装基板製造ライン1は、2ステージ/2ヘッドの部品搭載装置M1~M4または4ステージ/4ヘッドの部品搭載装置M5,M6のいずれか1台を備える構成であってもよい。 In the example shown in Figure 1, the mounted substrate production line 1 is equipped with four two-stage/two-head component mounting devices M1-M4 and two four-stage/four-head component mounting devices M5 and M6, but the mounted substrate production line 1 is not limited to this configuration. For example, the mounted substrate production line 1 may be configured to include either one of the two-stage/two-head component mounting devices M1-M4 or one of the four-stage/four-head component mounting devices M5 and M6.

また、2ステージ/2ヘッドの部品搭載装置M1~M4を2台、3台、5台以上、4ステージ/4ヘッドの部品搭載装置M5,M6を3台以上備える構成であってもよい。また、2ステージ/2ヘッドの部品搭載装置M1~M4と4ステージ/4ヘッドの部品搭載装置M5,M6の配置順番は、任意に設定可能である。さらに、部品搭載装置M1~M6は物理的に連結されている必要もない。 Also, the system may be configured with two, three, five or more two-stage/two-head component placement devices M1-M4, or three or more four-stage/four-head component placement devices M5, M6. The placement order of the two-stage/two-head component placement devices M1-M4 and the four-stage/four-head component placement devices M5, M6 can be set arbitrarily. Furthermore, the component placement devices M1-M6 do not need to be physically connected.

次に図2、図3を参照して、2ステージ/2ヘッドの部品搭載装置M1~M4の詳細な構成について説明する。図2は、実装基板製造ライン1が備える2ステージ/2ヘッドの部品搭載装置(M1~M4の各々)の概略構造を示す平面図である。図3は、実装基板製造ライン1が備える2ステージ/2ヘッドの部品搭載装置(M1~M4の各々)の概略構造を示す側面図である。基台4の上部中央には、前に第1基板搬送レーンL1が、後に第2基板搬送レーンL2が配置されている。第1基板搬送レーンL1は、基板2を搬送する一対の基板搬送コンベアK1を備えている。第2基板搬送レーンL2は、基板2を搬送する一対の基板搬送コンベアK2を備えている。 Next, the detailed configuration of the two-stage/two-head component mounting devices M1-M4 will be described with reference to Figures 2 and 3. Figure 2 is a plan view showing the general structure of each of the two-stage/two-head component mounting devices (M1-M4) provided in the printed circuit board production line 1. Figure 3 is a side view showing the general structure of each of the two-stage/two-head component mounting devices (M1-M4) provided in the printed circuit board production line 1. A first board transport lane L1 is located at the front and a second board transport lane L2 is located at the rear in the center of the upper part of the base 4. The first board transport lane L1 is equipped with a pair of board transport conveyors K1 that transport boards 2. The second board transport lane L2 is equipped with a pair of board transport conveyors K2 that transport boards 2.

第1基板搬送レーンL1の前には第1部品供給部S1が、第2基板搬送レーンL2の後には第2部品供給部S2が配置されている。第1部品供給部S1および第2部品供給部S2には、上部に予め複数の部品供給ユニット3(テープフィーダ)が装着された台車5がセットされている。台車5には、部品を保持したキャリアテープ6を巻回状態で収納するリール7が保持されている。リール7から引き出されたキャリアテープ6は部品供給ユニット3によってピッチ送りされ、キャリアテープ6が保持する部品が部品供給位置に供給される。 A first component supply unit S1 is located in front of the first board transport lane L1, and a second component supply unit S2 is located behind the second board transport lane L2. A trolley 5 with multiple component supply units 3 (tape feeders) already attached to the top is set up at the first component supply unit S1 and the second component supply unit S2. The trolley 5 holds a reel 7 that stores a wound carrier tape 6 holding components. The carrier tape 6 pulled out from the reel 7 is pitch-fed by the component supply unit 3, and the components held by the carrier tape 6 are supplied to the component supply position.

図2、図3において、基台4の上面のX軸における両端部には、上流にY軸テーブル8が配置され、下流にY軸支持部9が配置されている。Y軸テーブル8およびY軸支持部9には、対向する位置にY軸に沿って伸びたガイド部10がそれぞれ配置されている。また、Y軸テーブル8には、Y軸に沿って伸びたY軸リニアモータ11が配置されている。Y軸テーブル8とY軸支持部9の間には、前に第1ビームB1が配置され、後に第2ビームB2が配置されている。第1ビームB1および第2ビームB2は、Y軸リニアモータ11によって駆動されてガイド部10に沿って前後に移動する。 In Figures 2 and 3, at both ends of the X axis on the top surface of the base 4, a Y-axis table 8 is arranged upstream and a Y-axis support unit 9 is arranged downstream. A guide unit 10 extending along the Y axis is arranged at an opposing position on each of the Y-axis table 8 and Y-axis support unit 9. A Y-axis linear motor 11 extending along the Y axis is also arranged on the Y-axis table 8. A first beam B1 is arranged in front between the Y-axis table 8 and the Y-axis support unit 9, and a second beam B2 is arranged in the rear. The first beam B1 and second beam B2 are driven by the Y-axis linear motor 11 to move back and forth along the guide unit 10.

第1ビームB1には、X軸に沿って伸びた第1リニアモータD1が配置されている。また、第1ビームB1には、第1リニアモータD1によって駆動され、X軸に沿って左右に移動する第1移動部材E1が結合されている。第1移動部材E1には、第1部品搭載ヘッドH1と第1ヘッドカメラC1が装着されている。第2ビームB2には、X軸に沿って伸びた第2リニアモータD2が配置されている。また、第2ビームB2には、第2リニアモータD2によって駆動され、X軸に沿って左右に移動する第2移動部材E2が結合されている。第2移動部材E2には、第2部品搭載ヘッドH2と第2ヘッドカメラC2が装着されている。 A first linear motor D1 extending along the X-axis is disposed on the first beam B1. A first movable member E1, which is driven by the first linear motor D1 and moves left and right along the X-axis, is also connected to the first beam B1. A first component mounting head H1 and a first head camera C1 are attached to the first movable member E1. A second linear motor D2 extending along the X-axis is disposed on the second beam B2. A second movable member E2, which is driven by the second linear motor D2 and moves left and right along the X-axis, is also attached to the second beam B2. A second component mounting head H2 and a second head camera C2 are attached to the second movable member E2.

図3において、第1部品搭載ヘッドH1および第2部品搭載ヘッドH2には、下端部に部品を保持する複数の部品保持ノズル12が装着されている。第1部品搭載ヘッドH1および第2部品搭載ヘッドH2は、部品保持ノズル12をZ軸に沿って昇降させ、Z軸回りに回転させる。 In Figure 3, the first component mounting head H1 and the second component mounting head H2 are equipped with multiple component holding nozzles 12 that hold components at their lower ends. The first component mounting head H1 and the second component mounting head H2 raise and lower the component holding nozzles 12 along the Z axis and rotate them around the Z axis.

図2、図3において、第1部品搭載ヘッドH1は、Y軸リニアモータ11および第1リニアモータD1によって水平方向(X軸方向、Y軸方向)に移動する。すなわち、Y軸テーブル8並びに第1ビームB1は、第1部品搭載ヘッドH1と第1ヘッドカメラC1を第1領域A1内で移動させる第1作業ヘッド移動機構F1を構成する。第2部品搭載ヘッドH2は、Y軸リニアモータ11および第2リニアモータD2によって水平方向に移動する。すなわち、Y軸テーブル8並びに第2ビームB2は、第2部品搭載ヘッドH2と第2ヘッドカメラC2を第2領域A2内で移動させる第2作業ヘッド移動機構F2を構成する。 In Figures 2 and 3, the first component mounting head H1 moves horizontally (X-axis direction, Y-axis direction) by the Y-axis linear motor 11 and the first linear motor D1. That is, the Y-axis table 8 and the first beam B1 constitute a first work head moving mechanism F1 that moves the first component mounting head H1 and the first head camera C1 within the first area A1. The second component mounting head H2 moves horizontally by the Y-axis linear motor 11 and the second linear motor D2. That is, the Y-axis table 8 and the second beam B2 constitute a second work head moving mechanism F2 that moves the second component mounting head H2 and the second head camera C2 within the second area A2.

第1ヘッドカメラC1および第2ヘッドカメラC2は、第1基板搬送レーンL1の搭載作業位置または第2基板搬送レーンL2の搭載作業位置に保持された基板2の上方に移動し、基板2に設けられた基板マーク(図示省略)を撮像する。撮像結果は画像認識されて、基板2の位置が認識される。また、特定作業である第1の供給位置ティーチングでは、第1作業ユニットU1の第1ヘッドカメラC1(第1撮像部)で第1部品供給部S1の部品供給ユニット3が撮像されて部品供給位置が検出される。また、特定作業である第2の供給位置ティーチングでは、第2作業ユニットU2の第2ヘッドカメラC2(第2撮像部)で第2部品供給部S2の部品供給ユニット3が撮像されて部品供給位置が検出される。 The first head camera C1 and second head camera C2 move above the board 2 held at the loading position of the first board transport lane L1 or the loading position of the second board transport lane L2, and capture images of board marks (not shown) on the board 2. The captured image is then recognized, and the position of the board 2 is determined. Furthermore, in the specific task of first supply position teaching, the first head camera C1 (first imaging unit) of the first work unit U1 captures an image of the component supply unit 3 of the first component supply unit S1, thereby detecting the component supply position. Furthermore, in the specific task of second supply position teaching, the second head camera C2 (second imaging unit) of the second work unit U2 captures an image of the component supply unit 3 of the second component supply unit S2, thereby detecting the component supply position.

図2、図3において、基台4の上面において、第1部品供給部S1と第1基板搬送レーンL1の間には、上方を撮像する第1部品カメラG1が配置されている。また、第2部品供給部S2と第2基板搬送レーンL2の間には、上方を撮像する第2部品カメラG2が配置されている。第1部品供給部S1から部品を取り出した第1部品搭載ヘッドH1が第1部品カメラG1の上方を移動する際に、第1部品カメラG1は部品保持ノズル12に保持された部品を撮像する。第2部品供給部S2から部品を取り出した第2部品搭載ヘッドH2が第2部品カメラG2の上方を移動する際に、第2部品カメラG2は部品保持ノズル12に保持された部品を撮像する。撮像結果は画像認識されて、部品保持ノズル12に保持された部品の姿勢が認識される。 In Figures 2 and 3, a first component camera G1 that captures images above is located on the top surface of the base 4 between the first component supply unit S1 and the first board transport lane L1. Furthermore, a second component camera G2 that captures images above is located between the second component supply unit S2 and the second board transport lane L2. As the first component mounting head H1, which has removed a component from the first component supply unit S1, moves above the first component camera G1, the first component camera G1 captures an image of the component held by the component holding nozzle 12. As the second component mounting head H2, which has removed a component from the second component supply unit S2, moves above the second component camera G2, the second component camera G2 captures an image of the component held by the component holding nozzle 12. The captured image is then recognized, and the orientation of the component held by the component holding nozzle 12 is determined.

第1部品搭載ヘッドH1による基板2への部品搭載作業では、第1ヘッドカメラC1による基板位置の認識結果と、第1部品カメラG1による部品の認識結果を加味して部品の搭載位置の補正が行われる。同様に、第2部品搭載ヘッドH2による基板2への部品搭載作業では、第2ヘッドカメラC2による基板位置の認識結果と、第2部品カメラG2による部品の認識結果を加味して部品の搭載位置の補正が行われる。 When the first component mounting head H1 mounts components on the board 2, the component mounting positions are corrected taking into account the results of board position recognition by the first head camera C1 and the results of component recognition by the first component camera G1. Similarly, when the second component mounting head H2 mounts components on the board 2, the component mounting positions are corrected taking into account the results of board position recognition by the second head camera C2 and the results of component recognition by the second component camera G2.

図2、図3において、第1領域A1内であって部品が搭載される基板2が第1基板搬送レーンL1に保持される搭載作業位置の周囲には、複数の第1基準点J1が配置されている。ここでは、第1基板搬送レーンL1の後に1つ、第1部品カメラG1の横に1つ、合計2つの第1基準点J1が配置されている。このように、第1領域A1内には、第1作業ヘッド移動機構F1の基準点となる少なくとも一つの第1基準点J1が配置されている。特定作業である第1のキャリブレーションでは、第1ヘッドカメラC1(第1撮像部)で第1基準点J1を撮像し、撮像した画像より特定された第1基準点J1の位置に基づいて第1作業ユニットU1が校正される。 In Figures 2 and 3, multiple first reference points J1 are located within the first area A1 around the mounting position where the board 2 on which components are mounted is held in the first board transport lane L1. Here, two first reference points J1 are located: one behind the first board transport lane L1 and one next to the first component camera G1. In this way, at least one first reference point J1 is located within the first area A1, serving as a reference point for the first work head movement mechanism F1. In the first calibration, which is a specific task, the first reference point J1 is imaged by the first head camera C1 (first imaging unit), and the first work unit U1 is calibrated based on the position of the first reference point J1 identified from the captured image.

第2領域A2内であって部品が搭載される基板2が第2基板搬送レーンL2に保持される搭載作業位置の周囲には、複数の第2基準点J2が配置されている。ここでは、第2基板搬送レーンL2の前に1つ、第2部品カメラG2の横に1つ、合計2つの第2基準点J2が配置されている。このように、第2領域A2内には、第2作業ヘッド移動機構F2の基準点となる少なくとも一つの第2基準点J2が配置されている。特定作業である第2のキャリブレーションでは、第2ヘッドカメラC2(第2撮像部)で第2基準点J2を撮像し、撮像された画像より特定された第2基準点J2の位置に基づいて第2作業ユニットU2が校正される。 A number of second reference points J2 are positioned within the second area A2 around the mounting position where the board 2 on which components are mounted is held in the second board transport lane L2. Here, two second reference points J2 are positioned: one in front of the second board transport lane L2 and one next to the second component camera G2. In this way, at least one second reference point J2 is positioned within the second area A2, serving as the reference point for the second work head movement mechanism F2. In the second calibration, which is a specific task, the second reference point J2 is imaged by the second head camera C2 (second imaging unit), and the second work unit U2 is calibrated based on the position of the second reference point J2 identified from the captured image.

図2、図3において、部品搭載装置M1~M4の前の上部には第1操作部P1が配置され、後の上部には第2操作部P2が配置されている。基台4には、制御部20が配置されている。制御部20には、第1操作部P1、第2操作部P2の他、部品搭載装置M1~M4の各部が接続されている(図5参照)。これにより、入力部(タッチスクリーン13)と表示部(モニタ14)を有する複数の操作部(第1操作部P1および第2操作部P2)は、制御部20と通信可能である。 In Figures 2 and 3, a first operation unit P1 is located above the front of each of the component mounting devices M1 to M4, and a second operation unit P2 is located above the rear of each of the component mounting devices. A control unit 20 is located on the base 4. The first operation unit P1, second operation unit P2, and each of the component mounting devices M1 to M4 are connected to the control unit 20 (see Figure 5). This allows multiple operation units (first operation unit P1 and second operation unit P2), each of which has an input unit (touch screen 13) and a display unit (monitor 14), to communicate with the control unit 20.

制御部20は、第1作業ユニットU1、第1部品供給部S1の部品供給ユニット3を制御して、第1基板搬送レーンL1の搭載作業位置または第2基板搬送レーンL2の搭載作業位置に保持された基板2に部品を搭載する部品搭載作業を実行させる。また、制御部20は、第2作業ユニットU2、第2部品供給部S2の部品供給ユニット3を制御して、第2基板搬送レーンL2の搭載作業位置または第1基板搬送レーンL1の搭載作業位置に保持された基板2に部品を搭載する部品搭載作業を実行させる。 The control unit 20 controls the first work unit U1 and the component supply unit 3 of the first component supply unit S1 to perform component mounting work to mount components onto a board 2 held at the mounting work position of the first board transport lane L1 or the mounting work position of the second board transport lane L2. The control unit 20 also controls the second work unit U2 and the component supply unit 3 of the second component supply unit S2 to perform component mounting work to mount components onto a board 2 held at the mounting work position of the second board transport lane L2 or the mounting work position of the first board transport lane L1.

また、制御部20は、第1作業ユニットU1を制御して、特定作業として第1のキャリブレーションまたは第1の供給位置ティーチングを実行させる。また、制御部20は、第2作業ユニットU2を制御して、特定作業として第2のキャリブレーションまたは第2の供給位置ティーチングを実行させる。 The control unit 20 also controls the first work unit U1 to perform a first calibration or a first supply position teaching as a specific task. The control unit 20 also controls the second work unit U2 to perform a second calibration or a second supply position teaching as a specific task.

上記のように、部品搭載装置M1~M4は、第1基板搬送レーンL1と、第2基板搬送レーンL2と、第1部品供給部S1と、第2部品供給部S2と、第1部品搭載ヘッドH1(第1作業ヘッド)と第1作業ヘッド移動機構F1と第1ヘッドカメラC1(第1撮像部)を含む第1作業ユニットU1と、第2部品搭載ヘッドH2(第2作業ヘッド)と第2作業ヘッド移動機構F2と第2ヘッドカメラC2(第2撮像部)を含む第2作業ユニットU2と、第1部品カメラG1と、第2部品カメラG2と、第1基準点J1と、第2基準点J2と、制御部20と、複数の操作部(第1操作部P1、第2操作部P2)と、を含んでいる。 As described above, component mounting devices M1-M4 include a first board transport lane L1, a second board transport lane L2, a first component supply unit S1, a second component supply unit S2, a first work unit U1 including a first component mounting head H1 (first work head), a first work head movement mechanism F1, and a first head camera C1 (first imaging unit), a second work unit U2 including a second component mounting head H2 (second work head), a second work head movement mechanism F2, and a second head camera C2 (second imaging unit), a first component camera G1, a second component camera G2, a first reference point J1, a second reference point J2, a control unit 20, and multiple operation units (first operation unit P1, second operation unit P2).

第1基板搬送レーンL1と、第1部品供給部S1と、第1作業ユニットU1と、第1部品カメラG1と、第1基準点J1は、部品搭載作業と特定作業を行う第1作業部W1を構成する。また、第2基板搬送レーンL2と、第2部品供給部S2と、第2作業ユニットU2と、第2部品カメラG2と、第2基準点J2は、部品搭載作業と特定作業を行う第2作業部W2を構成する。また、部品搭載装置M1~M4は、作業部(第1作業部W1、第2作業部W2)と、作業部を制御する制御部20と、制御部に接続された複数の操作部(第1操作部P1、第2操作部P2)とを備えた作業装置である。 The first board transport lane L1, the first component supply unit S1, the first work unit U1, the first component camera G1, and the first reference point J1 constitute the first work unit W1, which performs component mounting and specific tasks. The second board transport lane L2, the second component supply unit S2, the second work unit U2, the second component camera G2, and the second reference point J2 constitute the second work unit W2, which performs component mounting and specific tasks. The component mounting devices M1-M4 are work devices that include work units (first work unit W1, second work unit W2), a control unit 20 that controls the work units, and multiple operation units (first operation unit P1, second operation unit P2) connected to the control unit.

次に図4を参照して、4ステージ/4ヘッドの部品搭載装置M5,M6の詳細な構成について説明する。図4は、実装基板製造ライン1が備える4ステージ/4ヘッドの部品搭載装置(M5、M6の各々)の概略構造を示す平面図である。部品搭載装置M5,M6は、上流に第1作業部W1と第2作業部W2を備えるところは、上述した2ステージ/2ヘッドの部品搭載装置M1~M4と同様である。部品搭載装置M5,M6は、さらに下流の前に第3作業部W3を備え、下流の後に第4作業部W4を備えているところが部品搭載装置M1~M4と異なる。また、部品搭載装置M5,M6は、第1操作部P1が第1作業部W1と第3作業部W3の間に配置され、第2操作部P2が第2作業部W2と第4作業部W4の間に配置されているところが部品搭載装置M1~M4と異なる。以下、部品搭載装置M1~M4と同じ部分には同じ符号を付して、詳細な説明を省略する。 Next, the detailed configuration of the four-stage/four-head component mounting devices M5 and M6 will be described with reference to Figure 4. Figure 4 is a plan view showing the schematic structure of each of the four-stage/four-head component mounting devices (M5 and M6) provided in the printed circuit board production line 1. Like the two-stage/two-head component mounting devices M1-M4 described above, component mounting devices M5 and M6 have a first working unit W1 and a second working unit W2 upstream. Component mounting devices M5 and M6 differ from component mounting devices M1-M4 in that they have a third working unit W3 located upstream and a fourth working unit W4 located downstream. Component mounting devices M5 and M6 also differ from component mounting devices M1-M4 in that a first operating unit P1 is located between the first working unit W1 and the third working unit W3, and a second operating unit P2 is located between the second working unit W2 and the fourth working unit W4. Below, parts that are the same as those in component mounting devices M1 to M4 are given the same reference numerals, and detailed explanations will be omitted.

図4において、Y軸に沿って伸びたY軸支持部9は、基台4の上面の中央部に配置されている。基台4の上面の上流に配置されたY軸に沿って伸びたY軸テーブル8とは反対側(下流)の端部には、Y軸に沿って伸びた第2Y軸テーブル8Bが配置されている。第2Y軸テーブル8BおよびY軸支持部9には、対向する位置にY軸に沿って伸びたガイド部10がそれぞれ配置されている。また、第2Y軸テーブル8Bには、Y軸に沿って伸びた第2Y軸リニアモータ11Bが配置されている。以下、第2Y軸テーブル8Bと区別する場合は、Y軸テーブル8を第1Y軸テーブル8Aと称する。また、第2Y軸リニアモータ11Bと区別する場合は、Y軸リニアモータ11を第1Y軸リニアモータ11Aと称する。 In Figure 4, the Y-axis support unit 9, which extends along the Y-axis, is located in the center of the upper surface of the base 4. A second Y-axis table 8B, which also extends along the Y-axis, is located at the opposite (downstream) end of the upper surface of the base 4 from the Y-axis table 8, which extends along the Y-axis and is located upstream. A guide unit 10, which also extends along the Y-axis, is located opposite the second Y-axis table 8B and the Y-axis support unit 9. A second Y-axis linear motor 11B, which also extends along the Y-axis, is located on the second Y-axis table 8B. Hereinafter, when distinguishing it from the second Y-axis table 8B, the Y-axis table 8 will be referred to as the first Y-axis table 8A. When distinguishing it from the second Y-axis linear motor 11B, the Y-axis linear motor 11 will be referred to as the first Y-axis linear motor 11A.

第2Y軸テーブル8BとY軸支持部9の間には、前に第3ビームB3が配置され、後に第4ビームB4が配置されている。第3ビームB3および第4ビームB4は、第2Y軸リニアモータ11Bによって駆動されてガイド部10に沿って前後に移動する。第3ビームB3には、X軸に沿って伸びた第3リニアモータD3が配置されている。第4ビームB4には、X軸に沿って伸びた第4リニアモータD4が配置されている。 A third beam B3 is positioned in front and a fourth beam B4 is positioned behind the second Y-axis table 8B and the Y-axis support section 9. The third beam B3 and fourth beam B4 are driven by a second Y-axis linear motor 11B to move back and forth along the guide section 10. A third linear motor D3 extending along the X-axis is positioned on the third beam B3. A fourth linear motor D4 extending along the X-axis is positioned on the fourth beam B4.

図4において、第2Y軸テーブル8B並びに第3ビームB3は、第3部品搭載ヘッドH3と第3ヘッドカメラC3を第3領域A3内で移動させる第3作業ヘッド移動機構F3を構成する。また、第2Y軸テーブル8B並びに第4ビームB4は、第4部品搭載ヘッドH4と第4ヘッドカメラC4を第4領域A4内で移動させる第4作業ヘッド移動機構F4を構成する。 In Figure 4, the second Y-axis table 8B and the third beam B3 constitute a third work head moving mechanism F3 that moves the third component mounting head H3 and the third head camera C3 within the third area A3. Furthermore, the second Y-axis table 8B and the fourth beam B4 constitute a fourth work head moving mechanism F4 that moves the fourth component mounting head H4 and the fourth head camera C4 within the fourth area A4.

第3ヘッドカメラC3および第4ヘッドカメラC4は、第1基板搬送レーンL1の搭載作業位置または第2基板搬送レーンL2の搭載作業位置に保持された基板2の上方に移動し、基板2に設けられた基板マーク(図示省略)を撮像する。撮像結果は画像認識されて、基板2の位置が認識される。また、特定作業である第3の供給位置ティーチングでは、第3作業ユニットU3の第3ヘッドカメラC3(第3撮像部)で第3部品供給部S3の部品供給ユニット3が撮像されて部品供給位置が検出される。また、特定作業である第4の供給位置ティーチングでは、第4作業ユニットU4の第4ヘッドカメラC4(第4撮像部)で第4部品供給部S4の部品供給ユニット3が撮像されて部品供給位置が検出される。 The third head camera C3 and fourth head camera C4 move above the board 2 held at the loading work position of the first board transport lane L1 or the loading work position of the second board transport lane L2, and capture images of board marks (not shown) on the board 2. The captured image is then recognized, and the position of the board 2 is determined. Furthermore, in the specific task of third supply position teaching, the third head camera C3 (third imaging unit) of the third work unit U3 captures an image of the component supply unit 3 of the third component supply unit S3, thereby detecting the component supply position. Furthermore, in the specific task of fourth supply position teaching, the fourth head camera C4 (fourth imaging unit) of the fourth work unit U4 captures an image of the component supply unit 3 of the fourth component supply unit S4, thereby detecting the component supply position.

図4において、基台4の上面において、第3部品供給部S3と第1基板搬送レーンL1の間には、上方を撮像する第3部品カメラG3が配置されている。また、第4部品供給部S4と第2基板搬送レーンL2の間には、上方を撮像する第4部品カメラG4が配置されている。 In Figure 4, a third component camera G3 that captures images above is located on the top surface of the base 4 between the third component supply unit S3 and the first board transport lane L1. Additionally, a fourth component camera G4 that captures images above is located between the fourth component supply unit S4 and the second board transport lane L2.

第3領域A3内には、第3作業ヘッド移動機構F3の基準点となる少なくとも一つの第3基準点J3が配置されている。特定作業である第3のキャリブレーションでは、第3ヘッドカメラC3(第3撮像部)で第3基準点J3を撮像し、撮像した画像より特定された第3基準点J3の位置に基づいて第3作業ユニットU3が校正される。また、第4領域A4内には、第4作業ヘッド移動機構F4の基準点となる少なくとも一つの第4基準点J4が配置されている。特定作業である第4のキャリブレーションでは、第4ヘッドカメラC4(第4撮像部)で第4基準点J4を撮像し、撮像した画像より特定された第4基準点J4の位置に基づいて第4作業ユニットU4が校正される。 At least one third reference point J3 is located within the third area A3, serving as a reference point for the third work head movement mechanism F3. In the third calibration, which is a specific task, the third reference point J3 is imaged by the third head camera C3 (third imaging unit), and the third work unit U3 is calibrated based on the position of the third reference point J3 identified from the captured image. Furthermore, at least one fourth reference point J4 is located within the fourth area A4, serving as a reference point for the fourth work head movement mechanism F4. In the fourth calibration, which is a specific task, the fourth reference point J4 is imaged by the fourth head camera C4 (fourth imaging unit), and the fourth work unit U4 is calibrated based on the position of the fourth reference point J4 identified from the captured image.

上記のように、部品搭載装置M5,M6は、第1基板搬送レーンL1と、第2基板搬送レーンL2と、第1部品供給部S1と、第2部品供給部S2と、第3部品供給部S3と、第4部品供給部S4と、第1作業ユニットU1と、第2作業ユニットU2と、第3部品搭載ヘッドH3(第3作業ヘッド)と第3作業ヘッド移動機構F3と第3ヘッドカメラC3(第3撮像部)を含む第3作業ユニットU3と、第4部品搭載ヘッドH4(第4作業ヘッド)と第4作業ヘッド移動機構F4と第4ヘッドカメラC4(第4撮像部)を含む第4作業ユニットU4と、第1部品カメラG1と、第2部品カメラG2と、第3部品カメラG3と、第4部品カメラG4と、第1基準点J1と、第2基準点J2と、第3基準点J3と、第4基準点J4と、制御部20と、複数の操作部(第1操作部P1、第2操作部P2)と、を含んでいる。 As described above, the component mounting devices M5 and M6 include the first board transport lane L1, the second board transport lane L2, the first component supply unit S1, the second component supply unit S2, the third component supply unit S3, the fourth component supply unit S4, the first work unit U1, the second work unit U2, the third work unit U3 including the third component mounting head H3 (third work head), the third work head moving mechanism F3, and the third head camera C3 (third imaging unit), and the fourth It includes a fourth work unit U4 including a component mounting head H4 (fourth work head), a fourth work head moving mechanism F4, and a fourth head camera C4 (fourth imaging unit), a first component camera G1, a second component camera G2, a third component camera G3, a fourth component camera G4, a first reference point J1, a second reference point J2, a third reference point J3, a fourth reference point J4, a control unit 20, and multiple operation units (first operation unit P1, second operation unit P2).

第1基板搬送レーンL1と、第3部品供給部S3と、第3作業ユニットU3と、第3部品カメラG3と、第3基準点J3は、部品搭載作業と特定作業を行う第3作業部W3を構成する。また、第2基板搬送レーンL2と、第4部品供給部S4と、第4作業ユニットU4と、第4部品カメラG4と、第4基準点J4は、部品搭載作業と特定作業を行う第4作業部W4を構成する。このように、部品搭載装置M5,M6は、作業部(第1作業部W1、第2作業部W2、第3作業部W3、第4作業部W4)と、作業部を制御する制御部20と、制御部に接続された複数の操作部(第1操作部P1、第2操作部P2)とを備えた作業装置である。 The first board transport lane L1, the third component supply unit S3, the third work unit U3, the third component camera G3, and the third reference point J3 constitute the third work unit W3, which performs component mounting and specific tasks. The second board transport lane L2, the fourth component supply unit S4, the fourth work unit U4, the fourth component camera G4, and the fourth reference point J4 constitute the fourth work unit W4, which performs component mounting and specific tasks. In this way, component mounting devices M5 and M6 are work devices equipped with work units (first work unit W1, second work unit W2, third work unit W3, fourth work unit W4), a control unit 20 that controls the work units, and multiple operation units (first operation unit P1, second operation unit P2) connected to the control unit.

次に図5を参照して、2ステージ/2ヘッドの部品搭載装置M1~M4の制御系の構成を複数の作業ユニット(第1作業ユニットU1、第2作業ユニットU2)または複数の作業部(第1作業部W1、第2作業部W2)に対する複数の操作部(第1操作部P1、第2操作部P2)からの操作を適切に処理する機能を中心に説明する。図5は、2ステージ/2ヘッドの部品搭載装置M1~M4の各々の制御系の構成を示すブロック図である。 Next, referring to Figure 5, the configuration of the control system for the two-stage/two-head component mounting devices M1-M4 will be explained, focusing on the function of appropriately processing operations from multiple operating units (first operating unit P1, second operating unit P2) for multiple working units (first working unit U1, second working unit U2) or multiple working sections (first working section W1, second working section W2). Figure 5 is a block diagram showing the configuration of the control system for each of the two-stage/two-head component mounting devices M1-M4.

部品搭載装置M1~M4が備える制御部20は、入力処理部21、処理部22、排他処理部23、出力処理部24、記憶部25を備えている。入力処理部21は、複数の操作部(第1操作部P1、第2操作部P2)からの操作情報を受信するとともに、受信した操作情報がいずれの操作部からの入力であるかを識別し、操作情報に基づく命令を出力する。入力処理部21は内部処理部として、入力受信部26、操作部識別部27、出力部28を備えている。 The control unit 20 provided in each of the component mounting devices M1 to M4 includes an input processing unit 21, a processing unit 22, an exclusive processing unit 23, an output processing unit 24, and a memory unit 25. The input processing unit 21 receives operation information from multiple operation units (first operation unit P1, second operation unit P2), identifies which operation unit the received operation information came from, and outputs a command based on the operation information. The input processing unit 21 includes an input receiving unit 26, an operation unit identification unit 27, and an output unit 28 as internal processing units.

処理部22は、命令に基づいて後述する各種の処理を実行し、作業部(第1作業部W1、第2作業部W2)に所定の作業(部品搭載作業)と特定作業を行わせる。処理部22は内部処理部として、部品搭載処理部29、第1校正処理部30、第1教示処理部31、第2校正処理部32、第2教示処理部33を備えている。記憶部25は記憶装置であり、生産プログラム34、教示・校正データ35、稼働実績データ36、装置状態データ37などが記憶されている。 The processing unit 22 executes various processes described below based on commands, causing the working units (first working unit W1, second working unit W2) to perform predetermined tasks (component mounting tasks) and specific tasks. The processing unit 22 includes internal processing units, a component mounting processing unit 29, a first calibration processing unit 30, a first teaching processing unit 31, a second calibration processing unit 32, and a second teaching processing unit 33. The memory unit 25 is a storage device that stores a production program 34, teaching/calibration data 35, operational performance data 36, device status data 37, etc.

図5において、第1校正処理部30は、第1作業部W1を制御し、第1基準点J1の位置に基づいて第1作業ユニットU1を校正する第1のキャリブレーションを実行させる。第2校正処理部32は、第2作業部W2を制御し、第2基準点J2の位置に基づいて第2作業ユニットU2を校正する第2のキャリブレーションを実行させる。第1のキャリブレーションまたは第2のキャリブレーションによって取得された情報(補正値など)は、教示・校正データ35として記憶部25に記憶される。 In FIG. 5, the first calibration processing unit 30 controls the first working unit W1 to perform a first calibration that calibrates the first working unit U1 based on the position of the first reference point J1. The second calibration processing unit 32 controls the second working unit W2 to perform a second calibration that calibrates the second working unit U2 based on the position of the second reference point J2. Information (such as correction values) obtained by the first calibration or the second calibration is stored in the memory unit 25 as teaching/calibration data 35.

第1教示処理部31は、第1作業部W1を制御し、第1部品供給部S1の部品供給位置を検出して第1部品搭載ヘッドH1の部品保持ノズル12が部品供給ユニット3から部品を取り出す位置を教示する第1の供給位置ティーチングを実行させる。第2教示処理部33は、第2作業部W2を制御し、第2部品供給部S2の部品供給位置を検出して第2部品搭載ヘッドH2の部品保持ノズル12が部品供給ユニット3から部品を取り出す位置を教示する第2の供給位置ティーチングを実行させる。第1の供給位置ティーチングまたは第2の供給位置ティーチングによって取得された情報(部品吸着位置データなど)は、教示・校正データ35として記憶部25に記憶される。 The first teaching processing unit 31 controls the first working unit W1 to perform first supply position teaching, which detects the component supply position of the first component supply unit S1 and teaches the position from which the component holding nozzle 12 of the first component mounting head H1 will pick up a component from the component supply unit 3. The second teaching processing unit 33 controls the second working unit W2 to perform second supply position teaching, which detects the component supply position of the second component supply unit S2 and teaches the position from which the component holding nozzle 12 of the second component mounting head H2 will pick up a component from the component supply unit 3. Information acquired by the first supply position teaching or second supply position teaching (such as component suction position data) is stored in the memory unit 25 as teaching/calibration data 35.

図5において、生産プログラム34には、実装基板の種類毎に、基板2のサイズ、搭載される部品の種類と搭載位置(XY座標)など、部品搭載作業に必要な情報や制御プログラムが記憶されている。部品搭載処理部29は、生産プログラム34、教示・校正データ35に基づいて第1作業部W1および第2作業部W2を制御し、基板2の搬送作業、部品を基板に搭載する部品搭載作業を実行させる。部品搭載作業において部品搭載処理部29は、教示・校正データ35(各種補正値、部品吸着位置データ等)を参照して、第1部品搭載ヘッドH1および第2部品搭載ヘッドH2の位置を制御する。 In Figure 5, the production program 34 stores, for each type of mounting board, information and control programs required for component mounting, such as the size of the board 2, the type of component to be mounted, and the mounting position (XY coordinates). The component mounting processing unit 29 controls the first working unit W1 and the second working unit W2 based on the production program 34 and teaching/calibration data 35, causing them to transport the board 2 and perform the component mounting operation of mounting components onto the board. During the component mounting operation, the component mounting processing unit 29 controls the positions of the first component mounting head H1 and the second component mounting head H2 by referencing the teaching/calibration data 35 (various correction values, component pickup position data, etc.).

処理部22は、各々の部品供給ユニット3が供給可能な部品の残数、実装基板の生産枚数、部品搭載ミスの回数、吸着ミスの回数などの稼働実績を逐次取得して、稼働実績データ36として記憶部25に記憶させる。また、処理部22は、作業部(第1作業部W1、第2作業部W2)の状態、部品搭載作業の進捗状況、キャリブレーションや供給位置ティーチングなどの特定作業の進捗状況、制御部20に対する操作を行った操作部(第1操作部P1、第2操作部P2)の情報などを逐次取得して、装置状態データ37として記憶部25に記憶させる。 The processing unit 22 sequentially acquires operational performance data such as the remaining number of components that each component supply unit 3 can supply, the number of mounting boards produced, the number of component mounting errors, and the number of pickup errors, and stores this data in the memory unit 25 as operational performance data 36. The processing unit 22 also sequentially acquires the status of the work units (first work unit W1, second work unit W2), the progress of component mounting work, the progress of specific tasks such as calibration and supply position teaching, and information on the operation units (first operation unit P1, second operation unit P2) that performed operations on the control unit 20, and stores this data in the memory unit 25 as device status data 37.

図5において、第1操作部P1は制御部20に設けられた第1接続ポートT1に接続されている。第2操作部P2は制御部20に設けられた第2接続ポートT2に接続されている。作業者がタッチスクリーン13に対して行った操作の内容を意味する操作イベントと、操作が行われた位置を示す座標データを含む操作情報は、接続ポート(第1接続ポートT1、第2接続ポートT2)を経由して入力処理部21に伝達される。操作イベントとしては、タップ、ロングタップ、フリック、スライド、ペンアップ、ペンダウン、ピッチイン、ピッチアウト等が挙げられる。 In FIG. 5, the first operation unit P1 is connected to a first connection port T1 provided on the control unit 20. The second operation unit P2 is connected to a second connection port T2 provided on the control unit 20. Operation events indicating the content of operations performed by the operator on the touch screen 13 and operation information including coordinate data indicating the position where the operation was performed are transmitted to the input processing unit 21 via the connection ports (first connection port T1, second connection port T2). Operation events include tap, long tap, flick, slide, pen up, pen down, pitch in, pitch out, etc.

ここで図6を参照して、入力処理部21の処理について説明する。図6は、2ステージ/2ヘッドの部品搭載装置M1~M4の各々の入力処理部21で行う処理を示すフロー図である。入力受信部26は、タッチスクリーン13から出力された操作情報(操作イベント、座標データ)を受信する(ST1)。操作情報を受信すると(ST1において“受信”)、入力処理部21は、入力受信部26が受信した操作情報に基づいて、作業者がタッチスクリーン13に入力した命令を判別する(ST2)。次いで操作部識別部27は、いずれの操作部(第1操作部P1、第2操作部P2)から操作情報が送信されたかを識別する(ST3)。この例では、いずれの接続ポート(第1接続ポートT1、第2接続ポートT2)を経由して操作情報が送信されたかに基づいて操作部を識別する。 Now, referring to Figure 6, the processing of the input processing unit 21 will be described. Figure 6 is a flow diagram showing the processing performed by the input processing unit 21 of each of the two-stage/two-head component mounting devices M1-M4. The input receiving unit 26 receives operation information (operation event, coordinate data) output from the touch screen 13 (ST1). Upon receiving the operation information ("Receive" in ST1), the input processing unit 21 determines the command entered by the operator on the touch screen 13 based on the operation information received by the input receiving unit 26 (ST2). Next, the operation unit identification unit 27 identifies from which operation unit (first operation unit P1, second operation unit P2) the operation information was transmitted (ST3). In this example, the operation unit is identified based on which connection port (first connection port T1, second connection port T2) the operation information was transmitted via.

第1接続ポートT1と識別した場合(ST3において“第1接続ポート”)、出力部28は、第1接続ポートT1の操作部識別情報と命令を関連付けて出力する(ST4)。また、第2接続ポートT2と識別した場合(ST3において“第2接続ポート”)、出力部28は、第2接続ポートT2の操作部識別情報と命令を関連付けて出力する(ST5)。このように、出力部28は、入力処理部21によって判別された命令と、操作部識別部27によって認識されたいずれの操作部に対する操作であるかを特定する識別結果(操作部識別情報)とを関連付けて処理部22と出力処理部24に出力する。 If the first connection port T1 is identified ("first connection port" in ST3), the output unit 28 associates the operation unit identification information of the first connection port T1 with a command and outputs it (ST4). Furthermore, if the second connection port T2 is identified ("second connection port" in ST3), the output unit 28 associates the operation unit identification information of the second connection port T2 with a command and outputs it (ST5). In this way, the output unit 28 associates the command determined by the input processing unit 21 with the identification result (operation unit identification information) that specifies which operation unit recognized by the operation unit identification unit 27 is the target of the operation, and outputs them to the processing unit 22 and the output processing unit 24.

例えば、作業者が第1操作部P1のモニタ14に表示された停止ボタンをタップすると、操作イベント「タップ」とタッチスクリーン13における操作位置を示す座標データとを含む操作情報が、第1接続ポートT1を経由して制御部20に伝達される。入力処理部21は、入力受信部26が受信した操作情報に基づいて、タップされた位置がモニタ14に表示された停止ボタンの表示領域内と認識し(ST2)、停止命令と操作部識別部27が識別した第1操作部P1を示す識別結果とを関連付けて、処理部22と出力処理部24に出力する(ST4)。 For example, when a worker taps the stop button displayed on the monitor 14 of the first operation unit P1, operation information including the operation event "tap" and coordinate data indicating the operation position on the touch screen 13 is transmitted to the control unit 20 via the first connection port T1. Based on the operation information received by the input receiving unit 26, the input processing unit 21 recognizes that the tapped position is within the display area of the stop button displayed on the monitor 14 (ST2), associates the stop command with the identification result indicating the first operation unit P1 identified by the operation unit identification unit 27, and outputs the association result to the processing unit 22 and the output processing unit 24 (ST4).

このように、入力処理部21は、複数の操作部(第1操作部P1、第2操作部P2)からの操作情報を受信するとともに、受信した操作情報がいずれの操作部からの入力であるかを識別し、操作情報に基づく命令を出力する。また、複数の操作部は、制御部20に設けた複数の接続ポート(第1接続ポートT1、第2接続ポートT2)に個別に接続され、入力処理部21は、操作情報がいずれの接続ポートを経由したものかを検出して操作情報を出力した操作部を識別する。 In this way, the input processing unit 21 receives operation information from multiple operation units (first operation unit P1, second operation unit P2), identifies which operation unit the received operation information came from, and outputs a command based on the operation information. The multiple operation units are individually connected to multiple connection ports (first connection port T1, second connection port T2) provided in the control unit 20, and the input processing unit 21 detects which connection port the operation information came from and identifies the operation unit that output the operation information.

図5において、排他処理部23は、入力処理部21から出力された操作部の識別結果と、装置状態データ37に含まれる作業部(第1作業部W1、第2作業部W2)の状態に基づいて、作業部で特定作業が実行されている時に、その作業部での特定作業を指示した操作部からの操作は許可するが、他の操作部からの操作は禁止にする排他処理を実行する。これにより、特定作業が実行されている作業部に対して、他の操作部から抵触する操作がされることが防止できる。 In FIG. 5, the exclusive processing unit 23 executes exclusive processing based on the operation unit identification result output from the input processing unit 21 and the status of the work units (first work unit W1, second work unit W2) included in the device status data 37. When a specific task is being performed in a work unit, it permits operations from the operation unit that instructed the specific task in that work unit, but prohibits operations from other operation units. This prevents other operation units from performing operations that conflict with the work unit in which the specific task is being performed.

例えば、第1操作部P1から第1作業部W1(または、第1作業ユニットU1)に対して特定作業であるキャリブレーションを実行するように操作され、第1校正処理部30が第1作業部W1に第1のキャリブレーションを実行させている間は、排他処理部23は第1操作部P1からの操作は許可するが、第2操作部P2からの操作は禁止にする。 For example, when the first operating unit P1 is operated to perform a specific task, calibration, on the first working unit W1 (or the first working unit U1), and the first calibration processing unit 30 is causing the first working unit W1 to perform the first calibration, the exclusion processing unit 23 permits operation from the first operating unit P1 but prohibits operation from the second operating unit P2.

すなわち、排他処理部23は、入力処理部21による操作部の識別結果を参照し、一の作業部(第1作業部W1)または一の作業ユニット(第1作業ユニットU1)に特定作業(キャリブレーション)を実行させるために一の操作部(第1操作部P1)が一の作業部に割り当てられているときは、一の作業部のための操作を一の操作部には許可するが他の操作部(第2操作部P2)には禁止し、他の作業部(第2作業部W2)または他の作業ユニット(第2作業ユニットU2)のための操作は他の操作部に許可する。これによって、複数の作業部または作業ユニットに対して複数の操作部から操作が同時に行われた場合であっても、各々の操作部から操作を適切に行うことができる。 In other words, the exclusive processing unit 23 refers to the operation unit identification result by the input processing unit 21, and when one operation unit (first operation unit P1) is assigned to one operation unit (first operation unit W1) or one operation unit (first operation unit U1) to have that unit perform a specific task (calibration), the exclusive processing unit 23 permits the one operation unit to perform operations for the one operation unit but prohibits the other operation unit (second operation unit P2), and permits the other operation unit to perform operations for the other operation unit (second operation unit W2) or other operation unit (second operation unit U2). This allows appropriate operations to be performed from each operation unit even when operations are simultaneously performed from multiple operation units on multiple operation units or operation units.

図5において、出力処理部24は、入力処理部21によって特定された操作部(第1操作部P1、第2操作部P2)の識別結果に基づいて、処理部22によって実行された命令の実行結果を特定された操作部のモニタ14に表示させる。例えば、第1操作部P1からの操作によって第1作業部W1がキャリブレーションを実行している場合は、出力処理部24は第1操作部P1のモニタ14に第1作業部W1におけるキャリブレーションの途中経過を含む実行結果を表示させる。すなわち、出力処理部24は、入力処理部21による識別によって特定された操作部の表示部(モニタ14)に命令の実行結果を表示させる。 In FIG. 5, the output processing unit 24 displays the execution results of the command executed by the processing unit 22 on the monitor 14 of the specified operation unit (first operation unit P1, second operation unit P2) based on the identification result of the operation unit specified by the input processing unit 21. For example, if the first working unit W1 is performing calibration in response to an operation from the first operation unit P1, the output processing unit 24 displays the execution results, including the progress of the calibration in the first working unit W1, on the monitor 14 of the first operation unit P1. In other words, the output processing unit 24 displays the execution results of the command on the display unit (monitor 14) of the operation unit specified by identification by the input processing unit 21.

次に図7~図9を参照して、部品搭載装置M1~M4の第1操作部P1のモニタ14と第2操作部P2のモニタ14に表示されるモニタ画面の例について説明する。図7~図9は、2ステージ/2ヘッドの部品搭載装置M1~M4の各々が備える操作部(P1,P2)の表示部(モニタ14)に表示される表示画面の例の説明図である。 Next, examples of monitor screens displayed on the monitor 14 of the first operation unit P1 and the monitor 14 of the second operation unit P2 of component mounting devices M1-M4 will be described with reference to Figures 7-9. Figures 7-9 are explanatory diagrams of examples of display screens displayed on the display unit (monitor 14) of the operation unit (P1, P2) provided on each of the two-stage/two-head component mounting devices M1-M4.

図7の状態Aは、部品搭載装置M1~M4の第1作業部W1と第2作業部W2のそれぞれで異なる種類の実装基板に対する部品搭載作業が実行中であり、かつ、所定時間(例えば、5分間)以上、第1操作部P1と第2操作部P2のいずれも操作されていない状態を示している。すなわち、出力処理部24は、装置状態データ37に基づいて、第1基板搬送レーンL1および第2基板搬送レーンL2において搬送される基板2の位置と、生産中の実装基板の基板種名、部品搭載作業済みの基板2の枚数、生産が計画されている基板2の枚数を、第1操作部P1のモニタ14と第2操作部P2のモニタ14にそれぞれ表示させる。 State A in Figure 7 shows a state in which component mounting operations are being performed on different types of mounting boards at the first work unit W1 and the second work unit W2 of each of component mounting devices M1 to M4, and neither the first operation unit P1 nor the second operation unit P2 has been operated for a predetermined period of time (e.g., five minutes). That is, based on the device status data 37, the output processing unit 24 causes the monitor 14 of the first operation unit P1 and the monitor 14 of the second operation unit P2 to display, respectively, the positions of boards 2 being transported in the first board transport lane L1 and the second board transport lane L2, the board type of the mounting board being produced, the number of boards 2 on which component mounting operations have been completed, and the number of boards 2 planned for production.

また、出力処理部24は、第1操作部P1のモニタ14には第1基板搬送レーンL1に関する情報を下側に表示させ、第2操作部P2のモニタ14には第2基板搬送レーンL2に関する情報を下側に表示させる。すなわち、各モニタ14には、モニタ14から見て手前側にある基板搬送レーンが下側に表示される。これにより、モニタ14を見た作業者が部品搭載装置M1~M4内の状態を容易に把握することができる。 The output processing unit 24 also displays information about the first board transport lane L1 on the bottom side of the monitor 14 of the first operation unit P1, and information about the second board transport lane L2 on the bottom side of the monitor 14 of the second operation unit P2. That is, on each monitor 14, the board transport lane that is closest to the monitor 14 is displayed on the bottom side. This allows workers looking at the monitor 14 to easily understand the status within component mounting devices M1 to M4.

図7の状態Bは、状態Aにおける第1操作部P1のモニタ14を作業者がタッチ(画面のいずれかをタップ)した後の状態を示している。第1操作部P1のモニタ14に作業者がタッチすると第1操作部P1のタッチスクリーン13から操作情報(タップ、タップされた座標)が出力される。入力処理部21(操作部識別部27)は、操作情報が第1接続ポートT1を経由したものであることを検出して、操作情報を出力したのが第1操作部P1であることを識別する。出力処理部24は、第1操作部P1のモニタ14に命令を受け付けるためのメインメニューを表示させる。すなわち、出力処理部24は、入力処理部21による識別によって特定された第1操作部P1のモニタ14に命令(メインメニュー表示)の実行結果を表示させる。 State B in Figure 7 shows the state after the operator touches the monitor 14 of the first operation unit P1 (tap anywhere on the screen) in State A. When the operator touches the monitor 14 of the first operation unit P1, operation information (tap, tapped coordinates) is output from the touch screen 13 of the first operation unit P1. The input processing unit 21 (operation unit identification unit 27) detects that the operation information has passed through the first connection port T1 and identifies that the first operation unit P1 is the one that output the operation information. The output processing unit 24 displays a main menu for accepting commands on the monitor 14 of the first operation unit P1. In other words, the output processing unit 24 displays the execution result of the command (main menu display) on the monitor 14 of the first operation unit P1 identified by the input processing unit 21.

また、出力処理部24は、第2操作部P2のモニタ14に第1操作部P1において操作が行われたことを示す通知を表示させる。この例では、モニタ14に表示させる画面の縁の色を変えて通知させている。なお、通知方法は画面の縁の色の変更に限定されることはなく、画面全体の色を変えても、画面に第1操作部P1において操作が行われた旨のコメントを表示するようにしてもよい。 The output processing unit 24 also displays a notification on the monitor 14 of the second operation unit P2 indicating that an operation has been performed on the first operation unit P1. In this example, the notification is made by changing the color of the border of the screen displayed on the monitor 14. Note that the notification method is not limited to changing the color of the border of the screen; it is also possible to change the color of the entire screen, or to display a comment on the screen indicating that an operation has been performed on the first operation unit P1.

図7の状態Cは、状態Bで第1操作部P1のモニタ14に表示されているメインメニューの中から、作業者が「部品残数表示」ボタンを選択(「部品残数表示」ボタンの表示領域内をタップ)した後の状態を示している。作業者が「部品残数表示」ボタンを選択すると、第1操作部P1のタッチスクリーン13から操作情報(タップ、タップされた座標)が出力される。出力処理部24は、稼働実績データ36に含まれる各々の部品供給ユニット3が供給可能な部品の残数に基づいて、第1操作部P1のモニタ14に部品残数を示す画面を表示させる。なお、出力処理部24は、第2操作部P2のモニタ14の表示は変更しない。 State C in Figure 7 shows the state after the worker selects the "Display Remaining Parts Quantity" button (tap within the display area of the "Display Remaining Parts Quantity" button) from the main menu displayed on the monitor 14 of the first operation unit P1 in state B. When the worker selects the "Display Remaining Parts Quantity" button, operation information (tap, tapped coordinates) is output from the touch screen 13 of the first operation unit P1. The output processing unit 24 displays a screen showing the remaining parts quantity on the monitor 14 of the first operation unit P1 based on the remaining number of parts that can be supplied by each part supply unit 3 included in the operation performance data 36. Note that the output processing unit 24 does not change the display on the monitor 14 of the second operation unit P2.

図7の状態Dは、状態Cにおける第2操作部P2のモニタ14を作業者がタッチして表示させたメインメニューの中から、「稼働実績データ(吸着ノズル)」ボタンを選択した後の状態を示している。すなわち、出力処理部24は、稼働実績データ36に含まれる部品保持ノズル12の稼働実績データに基づいて、第2操作部P2のモニタ14に稼働実績を示す画面を表示させている。さらに、出力処理部24は、第1操作部P1のモニタ14に第2操作部P2において操作が行われたことを示す通知を表示させている。なお、出力処理部24は、第1操作部P1のモニタ14の表示は変更しない。 State D in Figure 7 shows the state after the operator selects the "Operation History Data (Suction Nozzle)" button from the main menu displayed by touching the monitor 14 of the second operation unit P2 in state C. That is, the output processing unit 24 displays a screen showing operation history on the monitor 14 of the second operation unit P2 based on the operation history data of the component holding nozzle 12 included in the operation history data 36. Furthermore, the output processing unit 24 displays a notification on the monitor 14 of the first operation unit P1 indicating that an operation has been performed on the second operation unit P2. Note that the output processing unit 24 does not change the display on the monitor 14 of the first operation unit P1.

図8の状態Eは、第1作業部W1と第2作業部W2のいずれも特定作業が実行可能な状態で、第1操作部P1のモニタ14に表示されているメインメニューの中から、作業者が「キャリブレーション」ボタンを選択した後の状態を示している。すなわち、第1作業部W1と第2作業部W2のいずれも部品搭載作業を実行しておらず、第2操作部P2のモニタ14には、部品搭載作業に関する情報が表示されていない。 State E in Figure 8 shows the state after the worker selects the "Calibration" button from the main menu displayed on the monitor 14 of the first operation unit P1, when both the first operation unit W1 and the second operation unit W2 are able to perform specific tasks. In other words, neither the first operation unit W1 nor the second operation unit W2 is performing component placement work, and no information related to component placement work is displayed on the monitor 14 of the second operation unit P2.

「キャリブレーション」ボタンが選択されると、出力処理部24は、第1操作部P1のモニタ14にキャリブレーション選択メニューを表示させる。キャリブレーション選択メニューには、キャリブレーションを実行させる作業部を選択するための「手前」ボタンと「奥」ボタン、および「開始」ボタンと部品搭載装置M1~M4の作業部を模式的に表示する図が表示されている。 When the "Calibration" button is selected, the output processing unit 24 displays a calibration selection menu on the monitor 14 of the first operation unit P1. The calibration selection menu displays "Front" and "Back" buttons for selecting the work unit on which calibration will be performed, as well as a "Start" button and a diagram that schematically shows the work units of component mounting devices M1 to M4.

図8の状態Fは、状態Eで第1操作部P1のモニタ14に表示されているキャリブレーション選択メニューにおいて、作業者が「手前」ボタン(作業部選択ボタン)をタップして手前を選択した状態で、「開始」ボタンをタップした後の状態を示している。すなわち、第1操作部P1のタッチスクリーン13から出力された操作情報に基づいて、第1校正処理部30が第1作業部W1に第1のキャリブレーションを実行させている。出力処理部24は、第1操作部P1のモニタ14にキャリブレーション状況画面を表示させる。キャリブレーション状況画面には、第1作業部W1においてキャリブレーションが実行されている旨を模式的に表示する図と、キャリブレーションの進行状況(ここでは、5%)を示す文字およびグラフと、「停止」ボタンが表示されている。 State F in Figure 8 shows the state after the operator taps the "Start" button in the calibration selection menu displayed on the monitor 14 of the first operation unit P1 in state E, after tapping the "Front" button (operation unit selection button) to select "Front." That is, based on the operation information output from the touch screen 13 of the first operation unit P1, the first calibration processing unit 30 causes the first operation unit W1 to perform the first calibration. The output processing unit 24 displays a calibration status screen on the monitor 14 of the first operation unit P1. The calibration status screen displays a diagram that schematically indicates that calibration is being performed on the first operation unit W1, text and a graph indicating the progress of the calibration (here, 5%), and a "Stop" button.

また、出力処理部24は、第2操作部P2のモニタ14に、第1作業部W1においてキャリブレーションが実行されている旨を表示させる。この例では、第1基板搬送レーンL1を示す位置に「キャリブレーション実行中」のテキスト情報を表示させている。排他処理部23は、第1操作部P1のタッチスクリーン13から出力された操作情報に基づいて、第1操作部P1を第1作業部W1に割り当てて、その後、第1のキャリブレーションが終了するまでその状態を維持する。 The output processing unit 24 also displays on the monitor 14 of the second operation unit P2 a message indicating that calibration is being performed in the first work unit W1. In this example, the text information "Calibration in progress" is displayed in the position indicating the first board transport lane L1. The exclusion processing unit 23 assigns the first operation unit P1 to the first work unit W1 based on the operation information output from the touch screen 13 of the first operation unit P1, and then maintains this state until the first calibration is completed.

すなわち、排他処理部23は、第1のキャリブレーションが終了するまで、第1作業部W1のための操作を第1操作部P1には許可するが、第2操作部P2には禁止する。そのため、第1操作部P1のモニタ14には第1作業部W1のキャリブレーションの停止を受け付ける「停止」ボタンが表示されるが、第2操作部P2のモニタ14には第1作業部W1を操作するためのボタン等は表示されない。第1操作部P1のモニタ14に表示されている「停止」ボタンが操作されると、第1作業部W1のキャリブレーションが停止される。 In other words, the exclusive processing unit 23 allows the first operation unit P1 to operate the first working unit W1 but prohibits the second operation unit P2 from doing so until the first calibration is completed. Therefore, a "Stop" button that accepts stopping the calibration of the first working unit W1 is displayed on the monitor 14 of the first operation unit P1, but no buttons or the like for operating the first working unit W1 are displayed on the monitor 14 of the second operation unit P2. When the "Stop" button displayed on the monitor 14 of the first operation unit P1 is operated, the calibration of the first working unit W1 is stopped.

図8の状態Gは、状態Fにおける第2操作部P2のモニタ14を作業者がタッチして表示させたメインメニューの中から、「ティーチング」ボタンを選択した後の状態を示している。すなわち、排他処理部23が第1操作部P1を第1作業部W1に割り当てている状態で、出力処理部24が、第2操作部P2のモニタ14にティーチング選択メニューを表示させている。ティーチング選択メニューには、キャリブレーションを実行する作業部を選択するための「手前」ボタンと「奥」ボタン、および「開始」ボタンと部品搭載装置M1~M4の作業部を模式的に表示する図が表示されている。 State G in Figure 8 shows the state after the operator selects the "Teaching" button from the main menu displayed by touching the monitor 14 of the second operation unit P2 in state F. That is, while the exclusive processing unit 23 has assigned the first operation unit P1 to the first work unit W1, the output processing unit 24 displays a teaching selection menu on the monitor 14 of the second operation unit P2. The teaching selection menu displays "Front" and "Back" buttons for selecting the work unit on which calibration will be performed, as well as a "Start" button and a diagram that schematically shows the work units of component mounting devices M1 to M4.

第1作業部W1では第1のキャリブレーションが実行中であり、第1作業部W1のための操作を第2操作部P2は禁止されている。そのため、出力処理部24は、ティーチング選択メニューにおいて「奥」ボタンを操作不可能な状態で表示させる。また、模式図では第1作業部W1を点線で表示して選択できない旨を明示している。また、出力処理部24は、第1操作部P1のモニタ14に表示されるキャリブレーションの進行状況(ここでは、10%)を最新の状況に更新させる。 The first calibration is being performed in the first working unit W1, and the second operating unit P2 is prohibited from operating the first working unit W1. Therefore, the output processing unit 24 displays the "Back" button in the teaching selection menu in an inoperable state. Furthermore, in the schematic diagram, the first working unit W1 is displayed with a dotted line to clearly indicate that it cannot be selected. The output processing unit 24 also updates the calibration progress (here, 10%) displayed on the monitor 14 of the first operating unit P1 to the latest status.

図8の状態Hは、状態Gで第2操作部P2のモニタ14に表示されているティーチング選択メニューにおいて、作業者が「手前」ボタンをタップして手前を選択した状態で、「開始」ボタンをタップした後の状態を示している。すなわち、第2操作部P2のタッチスクリーン13から出力された操作情報に基づいて、第2教示処理部33が第2作業部W2に第2の供給位置ティーチングを実行させている。出力処理部24は、第2操作部P2のモニタ14にティーチング状況画面を表示させる。ティーチング状況画面には、第2作業部W2において供給位置ティーチングが実行されている旨を模式的に表示する図と、ティーチングの進行状況(ここでは、0%)を示す文字およびグラフと、「停止」ボタンが表示されている。 State H in Figure 8 shows the state after the operator taps the "Start" button in the teaching selection menu displayed on the monitor 14 of the second operation unit P2 in state G, after tapping the "Front" button to select "Front." That is, based on the operation information output from the touch screen 13 of the second operation unit P2, the second teaching processing unit 33 causes the second working unit W2 to perform second supply position teaching. The output processing unit 24 displays a teaching status screen on the monitor 14 of the second operation unit P2. The teaching status screen displays a diagram that schematically indicates that supply position teaching is being performed on the second working unit W2, text and a graph indicating the progress of teaching (here, 0%), and a "Stop" button.

また、出力処理部24は、第1操作部P1のモニタ14に表示されているキャリブレーションの進行状況(ここでは、20%)を最新の状況に更新させる。排他処理部23は、第2操作部P2のタッチスクリーン13から出力された操作情報に基づいて、第2操作部P2を第2作業部W2に割り当てて、第2の供給位置ティーチングが終了するまでその状態を維持する。すなわち、排他処理部23は、第2の供給位置ティーチングが終了するまで、第2作業部W2のための操作を第2操作部P2には許可するが、第1操作部P1には禁止する。 The output processing unit 24 also updates the calibration progress (20% in this case) displayed on the monitor 14 of the first operation unit P1 to the latest status. The exclusion processing unit 23 assigns the second operation unit P2 to the second working unit W2 based on the operation information output from the touch screen 13 of the second operation unit P2, and maintains this state until the second supply position teaching is completed. In other words, the exclusion processing unit 23 permits the second operation unit P2 to perform operations for the second working unit W2 but prohibits the first operation unit P1 from performing such operations until the second supply position teaching is completed.

そのため、第2操作部P2のモニタ14には第2作業部W2の供給位置ティーチングの停止を受け付ける「停止」ボタンが表示されるが、第1操作部P1のモニタ14には第2作業部W2を操作するためのボタン等は表示されない。第2操作部P2のモニタ14に表示されている「停止」ボタンが操作されると、第2作業部W2の部品供給位置ティーチングが停止される。 For this reason, the monitor 14 of the second operation unit P2 displays a "Stop" button that accepts the stopping of supply position teaching of the second working unit W2, but the monitor 14 of the first operation unit P1 does not display any buttons for operating the second working unit W2. When the "Stop" button displayed on the monitor 14 of the second operation unit P2 is operated, the component supply position teaching of the second working unit W2 is stopped.

図9の状態Kは、第1作業部W1と第2作業部W2のいずれも特定作業が実行可能な状態で、第1操作部P1のモニタ14に表示されたメインメニューの中から作業者が「キャリブレーション」ボタンを選択し、第2操作部P2のモニタ14に表示されたメインメニューの中から別の作業者が「キャリブレーション」ボタンを選択した後の状態を示している。すなわち、出力処理部24は、第1操作部P1のモニタ14にキャリブレーション選択メニューを表示させ、第2操作部P2のモニタ14にもキャリブレーション選択メニューを表示させている。 State K in Figure 9 shows a state in which both the first working unit W1 and the second working unit W2 are capable of performing specific tasks, and after a worker selects the "Calibration" button from the main menu displayed on the monitor 14 of the first operating unit P1 and another worker selects the "Calibration" button from the main menu displayed on the monitor 14 of the second operating unit P2. In other words, the output processing unit 24 displays a calibration selection menu on the monitor 14 of the first operating unit P1, and also displays a calibration selection menu on the monitor 14 of the second operating unit P2.

図9の状態Lは、状態Kで第1操作部P1のモニタ14で作業者が「手前」ボタンをタップして手前(第1作業部W1)を選択し、第2操作部P2のモニタ14で別の作業者が「手前」ボタンをタップして手前(第2作業部W2)を選択した後の状態を示している。すなわち、排他処理部23は、第1操作部P1を第1作業部W1に割り当てて、第2操作部P2を第2作業部W2に割り当てている。 State L in Figure 9 shows the state after a worker taps the "Foreground" button on the monitor 14 of the first operation unit P1 in state K to select the foreground (first work unit W1), and another worker taps the "Foreground" button on the monitor 14 of the second operation unit P2 to select the foreground (second work unit W2). In other words, the exclusive processing unit 23 assigns the first operation unit P1 to the first work unit W1 and the second operation unit P2 to the second work unit W2.

そして、排他処理部23は、第1作業部W1のための操作を第1操作部P1には許可するが第2操作部P2には禁止し、第2作業部W2のための操作を第2操作部P2には許可するが第1操作部P1には禁止する。出力処理部24は、第1操作部P1のモニタ14の第2作業部W2を操作するための「奥」ボタンを操作不可能な状態で表示させ、第2操作部P2のモニタ14の第1作業部W1を操作するための「奥」ボタンを操作不可能な状態で表示させる。 The exclusive processing unit 23 then permits the first operation unit P1 to operate the first working unit W1 but prohibits the second operation unit P2 from operating it, and permits the second operation unit P2 to operate the second working unit W2 but prohibits the first operation unit P1 from operating it. The output processing unit 24 displays the "Back" button for operating the second working unit W2 on the monitor 14 of the first operation unit P1 in an inoperable state, and displays the "Back" button for operating the first working unit W1 on the monitor 14 of the second operation unit P2 in an inoperable state.

図9の状態Mは、状態Lで第1操作部P1のモニタ14で作業者が「開始」ボタンをタップし、第2操作部P2のモニタ14で別の作業者が「開始」ボタンをタップした後の状態を示している。すなわち、第1校正処理部30により第1のキャリブレーションが実行され、第2校正処理部32により第2のキャリブレーションが実行されている。そして、出力処理部24は、第1操作部P1のモニタ14に第1作業部W1のキャリブレーション状況画面を表示させ、第2操作部P2のモニタ14に第2作業部W2のキャリブレーション状況画面を表示させている。 State M in Figure 9 shows the state after an operator taps the "Start" button on the monitor 14 of the first operation unit P1 in state L, and another operator taps the "Start" button on the monitor 14 of the second operation unit P2. In other words, the first calibration is performed by the first calibration processing unit 30, and the second calibration is performed by the second calibration processing unit 32. The output processing unit 24 then displays a calibration status screen for the first operation unit W1 on the monitor 14 of the first operation unit P1, and a calibration status screen for the second operation unit W2 on the monitor 14 of the second operation unit P2.

第1操作部P1のモニタ14には、第1作業部W1のキャリブレーションの停止を受け付ける「停止」ボタンが表示されている。また、第2操作部P2のモニタ14には、第2作業部W2のキャリブレーションの停止を受け付ける「停止」ボタンが表示されている。すなわち、第1操作部P1からは第1作業部W1のための操作は許可されているが、第2作業部W2のための操作は不可(禁止)である排他的な状態となっている。同様に、第2操作部P2からは第2作業部W2のための操作は許可されているが、第1作業部W1のための操作は不可(禁止)である排他的な状態となっている。 A "Stop" button is displayed on the monitor 14 of the first operation unit P1 to stop the calibration of the first working unit W1. Furthermore, a "Stop" button is displayed on the monitor 14 of the second operation unit P2 to stop the calibration of the second working unit W2. In other words, an exclusive state is established in which operations for the first working unit W1 are permitted from the first operation unit P1, but operations for the second working unit W2 are not permitted (prohibited). Similarly, an exclusive state is established in which operations for the second working unit W2 are permitted from the second operation unit P2, but operations for the first working unit W1 are not permitted (prohibited).

次に図10A、図10Bを参照して、部品搭載装置M1~M4の第1の変形例について説明する。図10Aは、2ステージ/2ヘッドの部品搭載装置(M1~M4の各々)の第1の変形例の制御系の構成を示すブロック図である。図10Bは、2ステージ/2ヘッドの部品搭載装置の第1の変形例の入力処理部21の処理を示すフロー図である。 Next, a first modified example of component mounting devices M1 to M4 will be described with reference to Figures 10A and 10B. Figure 10A is a block diagram showing the configuration of the control system of the first modified example of the two-stage/two-head component mounting devices (each of M1 to M4). Figure 10B is a flow diagram showing the processing of the input processing unit 21 of the first modified example of the two-stage/two-head component mounting device.

第1の変形例は、第1操作部P1および第2操作部P2に固有の操作部識別情報15がそれぞれ設定されているところが図5に示す部品搭載装置M1~M4と異なる。以下、図5に示す部品搭載装置M1~M4との差異点について説明する。第1操作部P1および第2操作部P2は、制御部20に操作情報を出力する際に、それぞれに設定された操作部識別情報15を出力する。入力受信部26は、操作情報と操作部識別情報15を受信する(ST11においてYes)。 The first variant differs from the component mounting devices M1 to M4 shown in FIG. 5 in that unique operation unit identification information 15 is set for each of the first operation unit P1 and second operation unit P2. The differences from the component mounting devices M1 to M4 shown in FIG. 5 are explained below. When outputting operation information to the control unit 20, the first operation unit P1 and second operation unit P2 output the operation unit identification information 15 set for each. The input receiving unit 26 receives the operation information and the operation unit identification information 15 (Yes in ST11).

次いで入力処理部21は操作情報に基づいてタッチスクリーン13に入力された命令を判別する(ST12)。次いで出力部28は、判別された命令および受信された操作部識別情報15または操作部識別部27による識別結果を関連付けて出力する(ST13)。このように、複数の操作部には固有の操作部識別情報15が設定されており、入力処理部21は、操作情報ともに受信した操作部識別情報15に基づいて操作情報を出力した操作部を識別する。これによって、誤って第1操作部P1を第2接続ポートT2に接続した場合であっても、操作情報を出力した操作部を正しく識別することができる。 The input processing unit 21 then determines the command entered on the touch screen 13 based on the operation information (ST12). The output unit 28 then associates the determined command with the received operation unit identification information 15 or the identification result by the operation unit identification unit 27 and outputs them (ST13). In this way, unique operation unit identification information 15 is set for multiple operation units, and the input processing unit 21 identifies the operation unit that output the operation information based on the operation unit identification information 15 received together with the operation information. This makes it possible to correctly identify the operation unit that output the operation information even if the first operation unit P1 is mistakenly connected to the second connection port T2.

次に図11を参照して、部品搭載装置M1~M4の第2の変形例について説明する。図11は、2ステージ/2ヘッドの部品搭載装置(M1~M4の各々)の第2の変形例の制御系の構成を示すブロック図である。第2の変形例は、第1操作部P1および第2操作部P2と制御部20が無線により情報の送受信を行うところが第1の変形例と異なる。以下、第1の実施例との差異点について説明する。第1操作部P1および第2操作部P2は、操作部側通信部16をそれぞれ備えている。制御部20は、制御部側通信部38を備えている。操作部側通信部16と制御部側通信部38は、無線により各種の情報を送受信する。すなわち、第1操作部P1から出力される操作情報と操作部識別情報15は、操作部側通信部16から無線で制御部側通信部38を経由して制御部20に送信される。 Next, a second modified example of the component mounting devices M1 to M4 will be described with reference to FIG. 11. FIG. 11 is a block diagram showing the configuration of the control system of the second modified example of the two-stage/two-head component mounting devices (M1 to M4). The second modified example differs from the first modified example in that the first operation unit P1, the second operation unit P2, and the control unit 20 wirelessly transmit and receive information. The differences from the first embodiment will be described below. The first operation unit P1 and the second operation unit P2 each include an operation unit-side communication unit 16. The control unit 20 includes a control unit-side communication unit 38. The operation unit-side communication unit 16 and the control unit-side communication unit 38 wirelessly transmit and receive various information. In other words, the operation information and operation unit identification information 15 output from the first operation unit P1 are transmitted wirelessly from the operation unit-side communication unit 16 to the control unit 20 via the control unit-side communication unit 38.

また、出力処理部24から出力された操作部のモニタ14に表示させる実行結果は、制御部側通信部38から識別結果で特定された操作部(第1操作部P1または第2操作部P2)の操作部側通信部16に無線で送信される。これによって、第1操作部P1または第2操作部P2を携帯する作業者は、部品搭載装置M1~M4から離れた位置から部品搭載装置M1~M4の複数の作業ユニット(作業部)に対する操作を適切に行うことができる。なお、制御部側通信部38の代わりに部品搭載装置M1~M4が配置された工場内に操作部側通信部16と無線で通信可能なアクセスポイントを設置し、アクセスポイントと部品搭載装置M1~M4の制御部20を有線の通信ネットワークで接続する構成であってもよい。 Furthermore, the execution results output from the output processing unit 24 and displayed on the monitor 14 of the operation unit are wirelessly transmitted from the control unit communication unit 38 to the operation unit communication unit 16 of the operation unit (first operation unit P1 or second operation unit P2) identified in the identification result. This allows an operator carrying the first operation unit P1 or second operation unit P2 to appropriately operate the multiple operation units (operation units) of the component mounting devices M1-M4 from a location away from the component mounting devices M1-M4. Instead of the control unit communication unit 38, an access point capable of wirelessly communicating with the operation unit communication unit 16 may be installed in the factory where the component mounting devices M1-M4 are located, and the access point may be connected to the control units 20 of the component mounting devices M1-M4 via a wired communication network.

上記説明したように、本実施の形態の部品搭載装置M1~M4(作業装置)は、第1作業ユニットU1と第2作業ユニットU2(第1作業部W1、第2作業部W2)に部品を基板2に搭載する部品搭載作業(所定の作業)と特定作業を実行させる制御部20と、制御部20に接続された複数の操作部(第1操作部P1、第2操作部P2)を備えている。そして、制御部20は、入力処理部21、処理部22、排他処理部23、出力処理部24を有している。これによって、複数の作業ユニットまたは作業部に対して複数の操作部から操作が同時に行われた場合であっても、各々の操作部から操作を適切に行うことができる。 As explained above, the component mounting devices M1-M4 (working devices) of this embodiment include a control unit 20 that causes the first work unit U1 and the second work unit U2 (first work unit W1, second work unit W2) to perform a component mounting task (predetermined task) of mounting components on a board 2 and a specific task, and multiple operation units (first operation unit P1, second operation unit P2) connected to the control unit 20. The control unit 20 also includes an input processing unit 21, a processing unit 22, an exclusive processing unit 23, and an output processing unit 24. This allows appropriate operations to be performed from each operation unit even when operations are simultaneously performed from multiple operation units on multiple work units or work units.

なお、上記は2ステージ/2ヘッドの部品搭載装置M1~M4の制御系の構成について説明したが、4ステージ/4ヘッドの部品搭載装置M5,M6の制御系の構成も同様である。すなわち、部品搭載装置M5,M6(作業装置)は、第1作業ユニットU1(第1作業部W1)、第2作業ユニットU2(第2作業部W2)、第3作業ユニットU3(第3作業部W3)、および第4作業ユニットU4(第4作業部W4)に部品を基板2に搭載する部品搭載作業(所定の作業)と特定作業を実行させる制御部20と、制御部20に接続された複数の操作部(第1操作部P1、第2操作部P2)を備えている。 While the above describes the control system configuration of two-stage/two-head component mounting devices M1-M4, the control system configuration of four-stage/four-head component mounting devices M5 and M6 is similar. That is, component mounting devices M5 and M6 (working devices) are equipped with a control unit 20 that causes the first work unit U1 (first work section W1), second work unit U2 (second work section W2), third work unit U3 (third work section W3), and fourth work unit U4 (fourth work section W4) to perform a component mounting task (predetermined task) of mounting components on a board 2 and a specific task, and multiple operation units (first operation section P1, second operation section P2) connected to the control unit 20.

そして、制御部20は、入力処理部21、処理部22、排他処理部23、出力処理部24を有している。これによって、複数の作業ユニット(第1作業ユニットU1、第2作業ユニットU2、第3作業ユニットU3、第4作業ユニットU4)に対する複数の操作部(第1操作部P1、第2操作部P2)からの操作を適切に行うことができる。 The control unit 20 has an input processing unit 21, a processing unit 22, an exclusive processing unit 23, and an output processing unit 24. This allows appropriate operations to be performed from multiple operation units (first operation unit P1, second operation unit P2) on multiple work units (first work unit U1, second work unit U2, third work unit U3, fourth work unit U4).

本開示の作業装置は、作業部に対する複数の操作部からの操作を適切に行うことができるという効果を有し、部品を基板に搭載する分野において有用である。 The working device disclosed herein has the advantage of being able to appropriately control the working unit from multiple operating units, making it useful in fields where components are mounted on circuit boards.

1 実装基板製造ライン
2 基板
3 部品供給ユニット(テープフィーダ)
4 基台
5 台車
6 キャリアテープ
7 リール
8 Y軸テーブル
8A 第1Y軸テーブル
8B 第2Y軸テーブル
9 Y軸支持部
10 ガイド部
11 Y軸リニアモータ
11A 第1Y軸リニアモータ
11B 第2Y軸リニアモータ
12 部品保持ノズル
13 タッチスクリーン
14 モニタ
20 制御部
21 入力処理部
22 処理部
23 排他処理部
24 出力処理部
25 記憶部
26 入力受信部
27 操作部識別部
28 出力部
29 部品搭載処理部
30 第1校正処理部
31 第1教示処理部
32 第2校正処理部
33 第2教示処理部
34 生産プログラム
35 教示・校正データ
36 稼働実績データ
37 装置状態データ
A1 第1領域
A2 第2領域
A3 第3領域
A4 第4領域
B1 第1ビーム
B2 第2ビーム
B3 第3ビーム
B4 第4ビーム
C1 第1ヘッドカメラ(第1撮像部)
C2 第2ヘッドカメラ(第2撮像部)
C3 第3ヘッドカメラ(第3撮像部)
C4 第4ヘッドカメラ(第4撮像部)
D1 第1リニアモータ
D2 第2リニアモータ
D3 第3リニアモータ
D4 第4リニアモータ
E1 第1移動部材
E2 第2移動部材
F1 第1作業ヘッド移動機構
F2 第2作業ヘッド移動機構
F3 第3作業ヘッド移動機構
F4 第4作業ヘッド移動機構
G1 第1部品カメラ
G2 第2部品カメラ
G3 第3部品カメラ
G4 第4部品カメラ
H1 第1部品搭載ヘッド
H2 第2部品搭載ヘッド
H3 第3部品搭載ヘッド
H4 第4部品搭載ヘッド
J1 第1基準点
J2 第2基準点
J3 第3基準点
J4 第4基準点
K1,K2 基板搬送コンベア
L1 第1基板搬送レーン
L2 第2基板搬送レーン
M1~M6 部品搭載装置(作業装置)
P1 第1操作部(操作部)
P2 第2操作部(操作部)
S1 第1部品供給部
S2 第2部品供給部
S3 第3部品供給部
S4 第4部品供給部
T1 第1接続ポート(接続ポート)
T2 第2接続ポート(接続ポート)
U1 第1作業ユニット
U2 第2作業ユニット
U3 第3作業ユニット
U4 第4作業ユニット
W1 第1作業部(作業部)
W2 第2作業部(作業部)
W3 第3作業部(作業部)
W4 第4作業部(作業部)
1 Mounting board production line 2 Board 3 Component supply unit (tape feeder)
DESCRIPTION OF REFERENCE NUMERALS 4 Base 5 Cart 6 Carrier tape 7 Reel 8 Y-axis table 8A First Y-axis table 8B Second Y-axis table 9 Y-axis support section 10 Guide section 11 Y-axis linear motor 11A First Y-axis linear motor 11B Second Y-axis linear motor 12 Component holding nozzle 13 Touch screen 14 Monitor 20 Control section 21 Input processing section 22 Processing section 23 Exclusive processing section 24 Output processing section 25 Memory section 26 Input receiving section 27 Operation section identification section 28 Output section 29 Component mounting processing section 30 First calibration processing section 31 First teaching processing section 32 Second calibration processing section 33 Second teaching processing section 34 Production program 35 Teaching/calibration data 36 Operation performance data 37 Device status data A1 First area A2 Second area A3 Third area A4 Fourth area B1 First beam B2 Second beam B3 Third beam B4 Fourth beam C1 First head camera (first imaging unit)
C2 Second head camera (second imaging unit)
C3 Third head camera (third imaging unit)
C4 4th head camera (4th imaging unit)
D1 First linear motor D2 Second linear motor D3 Third linear motor D4 Fourth linear motor E1 First moving member E2 Second moving member F1 First work head moving mechanism F2 Second work head moving mechanism F3 Third work head moving mechanism F4 Fourth work head moving mechanism G1 First component camera G2 Second component camera G3 Third component camera G4 Fourth component camera H1 First component mounting head H2 Second component mounting head H3 Third component mounting head H4 Fourth component mounting head J1 First reference point J2 Second reference point J3 Third reference point J4 Fourth reference point K1, K2 Board transport conveyor L1 First board transport lane L2 Second board transport lane M1 to M6 Component mounting device (working device)
P1 First operation section (operation section)
P2 Second operation section (operation section)
S1 First component supply unit S2 Second component supply unit S3 Third component supply unit S4 Fourth component supply unit T1 First connection port (connection port)
T2 Second connection port (connection port)
U1 First working unit U2 Second working unit U3 Third working unit U4 Fourth working unit W1 First working section (working section)
W2 Second working section (working section)
W3 Third working section (working section)
W4 4th working section (working section)

Claims (3)

作業を行う作業部と、前記作業部を制御する制御部と、前記制御部に接続された複数の操作部とを備えた作業装置であって、
前記複数の操作部の各々は入力部と表示部を有し、
前記制御部は、
前記複数の操作部の各々からの操作情報を受信するとともに、受信した操作情報が前記複数の操作部のうちいずれの操作部からの入力であるかを識別し、前記操作情報に基づく命令を出力する入力処理部と、
前記命令に基づいて処理を実行する処理部と、
前記識別によって特定された前記操作部の前記表示部に前記命令の実行結果を表示させる出力処理部と、を有し、
一方の操作部において前記作業が実行中である場合に、前記一方の操作部から所定の操作がなされたとき、他方の操作部が備える表示部に前記一方の操作部において所定の操作が行われたことを示す通知を表示させ、前記通知を表示中の前記他方の操作部から所定の操作がなされたとき前記一方の操作部が備える表示部に前記他方の操作部において所定の操作が行われたことを示す通知を表示させる、作業装置。
A work device comprising a work unit that performs work, a control unit that controls the work unit, and a plurality of operation units connected to the control unit,
each of the plurality of operation units has an input unit and a display unit;
The control unit
an input processing unit that receives operation information from each of the plurality of operation units, identifies which of the plurality of operation units the received operation information is input from, and outputs a command based on the operation information;
a processing unit that executes processing based on the instruction;
an output processing unit that displays an execution result of the command on the display unit of the operation unit specified by the identification,
A work device that, when the work is being performed on one operation unit, causes a display unit provided on the other operation unit to display a notification indicating that the specified operation has been performed on the one operation unit , and when the specified operation is performed on the other operation unit while the notification is being displayed, causes a display unit provided on the one operation unit to display a notification indicating that the specified operation has been performed on the other operation unit .
前記複数の操作部は、前記制御部に設けた複数の接続ポートに個別にそれぞれ接続され、
前記入力処理部は、前記操作情報が前記複数の接続ポートのうちいずれの接続ポートを経由したものかを検出して前記操作情報を出力した操作部を識別する、請求項1記載の作業装置。
the plurality of operation units are individually connected to a plurality of connection ports provided in the control unit,
The work device according to claim 1 , wherein the input processing unit detects which of the plurality of connection ports the operation information has passed through, and identifies the operation unit that has output the operation information.
前記複数の操作部の各々には固有の操作部識別情報が設定されており、
前記入力処理部は、前記操作情報とともに受信した操作部識別情報に基づいて前記操作情報を出力した操作部を識別する、請求項1記載の作業装置。
unique operation unit identification information is set for each of the plurality of operation units,
The work device according to claim 1 , wherein the input processing unit identifies the operation unit that has output the operation information based on operation unit identification information received together with the operation information.
JP2024046486A 2021-06-08 2024-03-22 Work equipment Active JP7784652B2 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2021095571 2021-06-08
JP2021095571 2021-06-08
PCT/JP2022/016772 WO2022259747A1 (en) 2021-06-08 2022-03-31 Work device
JP2023527544A JP7507424B2 (en) 2021-06-08 2022-03-31 Working Equipment

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2023527544A Division JP7507424B2 (en) 2021-06-08 2022-03-31 Working Equipment

Publications (2)

Publication Number Publication Date
JP2024074825A JP2024074825A (en) 2024-05-31
JP7784652B2 true JP7784652B2 (en) 2025-12-12

Family

ID=84425224

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2023527544A Active JP7507424B2 (en) 2021-06-08 2022-03-31 Working Equipment
JP2024046486A Active JP7784652B2 (en) 2021-06-08 2024-03-22 Work equipment

Family Applications Before (1)

Application Number Title Priority Date Filing Date
JP2023527544A Active JP7507424B2 (en) 2021-06-08 2022-03-31 Working Equipment

Country Status (3)

Country Link
JP (2) JP7507424B2 (en)
CN (1) CN117356176A (en)
WO (1) WO2022259747A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2024171557A1 (en) * 2023-02-17 2024-08-22

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4343257B2 (en) 2008-09-30 2009-10-14 パナソニック株式会社 Component mounter control method and component mounter
JP4815956B2 (en) 2005-09-06 2011-11-16 オムロン株式会社 Work monitoring device, filtering method, work time measuring system, control program, and recording medium
WO2012077782A1 (en) 2010-12-10 2012-06-14 パナソニック株式会社 Door opening/closing control system and door opening/closing control device
JP5322570B2 (en) 2008-10-10 2013-10-23 株式会社東芝 Medical image processing device
JP2019070998A (en) 2017-10-11 2019-05-09 アズビル株式会社 Field equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9805528B1 (en) * 2016-07-20 2017-10-31 Fisher-Rosemount Systems, Inc. Authentication and authorization to control access to process control devices in a process plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4815956B2 (en) 2005-09-06 2011-11-16 オムロン株式会社 Work monitoring device, filtering method, work time measuring system, control program, and recording medium
JP4343257B2 (en) 2008-09-30 2009-10-14 パナソニック株式会社 Component mounter control method and component mounter
JP5322570B2 (en) 2008-10-10 2013-10-23 株式会社東芝 Medical image processing device
WO2012077782A1 (en) 2010-12-10 2012-06-14 パナソニック株式会社 Door opening/closing control system and door opening/closing control device
JP2019070998A (en) 2017-10-11 2019-05-09 アズビル株式会社 Field equipment

Also Published As

Publication number Publication date
JP2024074825A (en) 2024-05-31
CN117356176A (en) 2024-01-05
WO2022259747A1 (en) 2022-12-15
JP7507424B2 (en) 2024-06-28
JPWO2022259747A1 (en) 2022-12-15

Similar Documents

Publication Publication Date Title
JP5440486B2 (en) Component mounting apparatus and model switching method in component mounting apparatus
JP5440518B2 (en) Component mounting apparatus and model switching method in component mounting apparatus
JP5909643B2 (en) Tape feeder and setting information display method in tape feeder
US20020022895A1 (en) System configuration editor with an iconic function sequencer
JP4803152B2 (en) Electronic component mounting system and operation instruction method in electronic component mounting system
JP7784652B2 (en) Work equipment
JP7664553B2 (en) Parts mounting equipment
JP5516446B2 (en) Component mounting apparatus and component mounting method
JP6484802B2 (en) Component mounting apparatus and setting method of operation parameter setting values
JP2016201430A (en) Operation parameter setting support system for component mounting equipment
US20160116898A1 (en) Production management method of substrate in component mounting system
US10765048B2 (en) Component mounting system, component sorting method, and component mounter
US12298747B2 (en) Operation state display device and operation state display method for setup changing in board manufacturing
US20120167380A1 (en) Electronic component mounting system and electronic component mounting machine
JP2023129769A (en) Component mounting equipment and component mounting method
JP5083103B2 (en) Electronic component mounting system and display method of reference screen in electronic component mounting system
JP7580041B2 (en) Working device and working system
WO2024171557A1 (en) Component mounting device
JP6528079B2 (en) Component mounting device
JP2024014177A (en) Work equipment and screen display method
JP6300814B2 (en) Board work system
JP2024141064A (en) TRAY DATA CREATION DEVICE, TRAY DATA CREATION METHOD, AND TRAY DATA CREATION PROGRAM
JP2001042911A (en) Display device and display method in FA device
JP4888609B2 (en) Electronic component mounting system and electronic component mounting apparatus
JP4891290B2 (en) Mounting condition determination method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240322

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250513

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250709

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251028

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251120

R150 Certificate of patent or registration of utility model

Ref document number: 7784652

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150