JP7787673B2 - How to replace or reinforce construction structures - Google Patents

How to replace or reinforce construction structures

Info

Publication number
JP7787673B2
JP7787673B2 JP2021146862A JP2021146862A JP7787673B2 JP 7787673 B2 JP7787673 B2 JP 7787673B2 JP 2021146862 A JP2021146862 A JP 2021146862A JP 2021146862 A JP2021146862 A JP 2021146862A JP 7787673 B2 JP7787673 B2 JP 7787673B2
Authority
JP
Japan
Prior art keywords
seismic isolation
construction
replacing
isolation device
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021146862A
Other languages
Japanese (ja)
Other versions
JP2023039638A (en
Inventor
昌弘 上田
護 鹿野
秀章 飯島
浩幸 今野
祐 長谷川
勝人 大畑
日出夫 岡
恵美 牟田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2021146862A priority Critical patent/JP7787673B2/en
Publication of JP2023039638A publication Critical patent/JP2023039638A/en
Application granted granted Critical
Publication of JP7787673B2 publication Critical patent/JP7787673B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、建設構造体の交換・補強方法に関する。 The present invention relates to a method for replacing or reinforcing a construction structure.

従来から、建物に設置された複数の免震装置を交換するための技術の一つとして、各免震装置周辺に位置する上部構造と下部構造との間にジャッキ装置を設置して、ジャッキ装置の高さを変更しながら、各免震装置を交換する技術が提案されている(特許文献1参照)。 One conventional technique proposed for replacing multiple seismic isolation devices installed in a building involves installing a jack device between the upper and lower structures located around each seismic isolation device, and replacing each device while changing the height of the jack device (see Patent Document 1).

特開2018-084038号公報JP 2018-084038 A

ここで、上記従来の技術において、例えば、複数の免震装置のうち、2つ以上の免震装置を同時に交換する際に、当該2つ以上の免震装置の位置関係を無視して当該2つ以上の免震装置を交換しようとすると、建物全体の免震装置の免震機能に偏りが生じるため、当該交換中に地震や台風などで外力が建物に作用した際に、建物において構造設計で見込んでいないねじれ応答が生じることにより、複数の免震装置の免震機能を確保することが難しくなるおそれがあった。したがって、複数の免震装置の免震機能の如き複数の建設構造体の機能を確保しながら、建設構造体の交換又は補強を迅速に行う観点からは改善の余地があった。 Here, in the above-mentioned conventional technology, for example, when replacing two or more of a plurality of seismic isolation devices simultaneously, if the replacement is attempted without considering the relative positions of the two or more seismic isolation devices, an imbalance in the seismic isolation function of the seismic isolation devices throughout the building will occur. Therefore, if an external force, such as an earthquake or typhoon, acts on the building during the replacement, a torsional response that was not anticipated in the structural design will occur in the building, making it difficult to ensure the seismic isolation function of the multiple seismic isolation devices. Therefore, there is room for improvement in terms of quickly replacing or reinforcing a construction structure while ensuring the functions of multiple construction structures, such as the seismic isolation function of multiple seismic isolation devices.

本発明は、上記に鑑みてなされたものであって、建設構造体の機能を確保しながら、建設構造体の交換又は補強を迅速に行うことが可能となる、建設構造体の交換・補強方法を提供することを目的とする。 The present invention was made in consideration of the above, and aims to provide a method for replacing or reinforcing a construction structure that enables the construction structure to be quickly replaced or reinforced while maintaining its functionality.

上述した課題を解決し、目的を達成するために、請求項1に記載の建設構造体の交換・補強方法は、構造物に設置され、且つ少なくとも前記構造物の水平荷重を受けることが可能な複数の建設構造体を交換又は補強するための交換・補強方法であって、前記複数の建設構造体のうち、略点対称の位置関係にある一対の建設構造体を同時に交換又は補強する第1工程を含み、前記略点対称の中心は、前記構造物の重心又はその近傍位置である。 In order to solve the above-mentioned problems and achieve the objectives, the method for replacing/reinforcing a construction structure described in claim 1 is a method for replacing or reinforcing a plurality of construction structures that are installed on a structure and are capable of bearing at least the horizontal load of the structure, and includes a first step of simultaneously replacing or reinforcing a pair of construction structures among the plurality of construction structures that are positioned approximately symmetrically about a point, and the center of the approximately symmetrical point is the center of gravity of the structure or a position nearby.

請求項2に記載の建設構造体の交換・補強方法は、請求項1に記載の建設構造体の交換・補強方法において、前記第1工程において、前記略点対称の位置関係にある一対の建設構造体の組のうち、前記構造物の重心から最も遠い位置にある組を優先的に交換又は補強する。 The method for replacing or reinforcing a construction structure described in claim 2 is the method for replacing or reinforcing a construction structure described in claim 1, wherein, in the first step, of the pair of construction structures that are in the approximately point-symmetric positional relationship, the pair that is located farthest from the center of gravity of the structure is preferentially replaced or reinforced.

請求項3に記載の建設構造体の交換・補強方法は、請求項1又は2に記載の建設構造体の交換・補強方法において、前記第1工程において、前記略点対称の位置関係にある一対の建設構造体の組を、前記構造物の重心を中心軸とする軸回りに順次交換又は補強する。 The method for replacing or reinforcing a construction structure described in claim 3 is the method for replacing or reinforcing a construction structure described in claim 1 or 2, wherein in the first step, pairs of construction structures that are positioned approximately point-symmetrically are sequentially replaced or reinforced around an axis whose central axis is the center of gravity of the structure.

請求項4に記載の建設構造体の交換・補強方法は、請求項1から3のいずれか一項に記載の建設構造体の交換・補強方法において、前記第1工程の後に、前記複数の建設構造体のうち、略線対称の位置関係にある一対の建設構造体を同時に交換又は補強する第2工程をさらに含む。 The method for replacing or reinforcing a construction structure described in claim 4 is the method for replacing or reinforcing a construction structure described in any one of claims 1 to 3, and further includes, after the first step, a second step of simultaneously replacing or reinforcing a pair of construction structures that are positioned approximately line-symmetrically among the plurality of construction structures.

請求項5に記載の建設構造体の交換・補強方法は、請求項1から4のいずれか一項に記載の建設構造体の交換・補強方法において、前記建設構造体は、免震装置、制震装置、柱材、ブレース材、スラブ材、梁材、又は/及び杭材を含む。 The method for replacing or reinforcing a construction structure described in claim 5 is a method for replacing or reinforcing a construction structure described in any one of claims 1 to 4, wherein the construction structure includes a seismic isolation device, a seismic control device, a column material, a brace material, a slab material, a beam material, and/or a pile material.

請求項6に記載の建設構造体の交換・補強方法は、請求項5に記載の建設構造体の交換・補強方法において、前記免震装置は、滑り支承を含み、前記滑り支承を、他の前記免震装置との略点対称又は略線対称の位置関係のいずれにも左右されずに、個別に交換する第3工程を含む。 The method for replacing/reinforcing a construction structure described in claim 6 is the method for replacing/reinforcing a construction structure described in claim 5, wherein the seismic isolation devices include sliding bearings, and includes a third step of individually replacing the sliding bearings without being influenced by either the positional relationship of approximately point symmetry or approximately line symmetry with other seismic isolation devices.

請求項1に記載の建設構造体の交換・補強方法によれば、複数の建設構造体のうち、略点対称の位置関係にある一対の建設構造体を同時に交換又は補強する第1工程を含むので、一対の建設構造体を同時交換又は補強する際に、複数の建設構造体の機能に偏りが生じることを抑制でき、複数の建設構造体の機能を維持しながら、複数の建設構造体の交換又は補強を迅速に行うことが可能となる。 The method for replacing or reinforcing a construction structure described in claim 1 includes a first step of simultaneously replacing or reinforcing a pair of construction structures that are positioned approximately point-symmetrically among a plurality of construction structures. Therefore, when simultaneously replacing or reinforcing a pair of construction structures, imbalances in the functionality of the plurality of construction structures can be prevented, and the plurality of construction structures can be quickly replaced or reinforced while maintaining their functionality.

請求項2に記載の建設構造体の交換・補強方法によれば、第1工程において、略点対称の位置関係にある一対の建設構造体の組のうち、構造物の重心から最も遠い位置にある組を優先的に交換又は補強するので、構造物の重心から近い位置にある組を優先的に交換又は補強する場合に比べて、建設構造体の交換又は補強時における複数の建設構造体の機能に偏りが生じることを抑制でき、複数の建設構造体の機能を確保しやすくなる。 According to the method for replacing or reinforcing a construction structure described in claim 2, in the first step, of a pair of construction structures that are positioned approximately point-symmetrically, the pair that is located farthest from the center of gravity of the structure is replaced or reinforced preferentially. This makes it possible to prevent imbalances in the functionality of multiple construction structures when replacing or reinforcing them, and makes it easier to ensure the functionality of multiple construction structures, compared to when the pair that is closest to the center of gravity of the structure is replaced or reinforced preferentially.

請求項3に記載の建設構造体の交換・補強方法によれば、第1工程において、略点対称の位置関係にある一対の建設構造体の組を、構造物の重心を中心軸とする軸回りに順次交換又は補強するので、建設構造体の交換作業又は補強作業を効率的に行うことができ、当該交換作業又は補強作業の作業性を高めることが可能となる。 According to the method for replacing or reinforcing a construction structure described in claim 3, in the first step, a pair of construction structures that are positioned approximately point-symmetrically are replaced or reinforced sequentially around an axis whose central axis is the center of gravity of the structure, thereby enabling the replacement or reinforcement work of the construction structure to be carried out efficiently and improving the workability of the replacement or reinforcement work.

請求項4に記載の建設構造体の交換・補強方法によれば、第1工程の後に、複数の建設構造体のうち、略線対称の位置関係にある一対の建設構造体を同時に交換又は補強する第2工程をさらに含むので、第1工程後に一対の建設構造体を位置関係に左右されずに交換又は補強する場合に比べて、建設構造体の交換又は補強時における複数の建設構造体の機能に偏りが生じることを抑制でき、複数の建設構造体の機能を維持しながら、複数の建設構造体の交換又は補強を一層迅速に行うことが可能となる。 According to the method for replacing or reinforcing a construction structure described in claim 4, after the first step, a second step is further included in which a pair of construction structures that are positioned approximately line-symmetrically among the multiple construction structures are simultaneously replaced or reinforced. Therefore, compared to replacing or reinforcing a pair of construction structures after the first step without being influenced by their positional relationship, it is possible to prevent imbalances in the functionality of the multiple construction structures when replacing or reinforcing the construction structures, and it is possible to more quickly replace or reinforce the multiple construction structures while maintaining their functionality.

請求項5に記載の建設構造体の交換・補強方法によれば、建設構造体が、免震装置、制震装置、柱材、ブレース材、スラブ材、梁材、又は/及び杭材を含むので、一対の免震装置、制震装置、柱材、ブレース材、スラブ材、梁材、又は/及び杭材を同時交換又は補強する際に、複数の免震装置等の機能に偏りが生じることを抑制でき、複数の免震装置等の機能を維持しながら、複数の免震装置等の交換又は補強を迅速に行うことが可能となる。 According to the method for replacing or reinforcing a construction structure described in claim 5, the construction structure includes seismic isolation devices, seismic control devices, pillars, braces, slabs, beams, and/or piles. Therefore, when a pair of seismic isolation devices, seismic control devices, pillars, braces, slabs, beams, and/or piles are replaced or reinforced simultaneously, imbalances in the functionality of multiple seismic isolation devices, etc. can be prevented, and multiple seismic isolation devices, etc. can be quickly replaced or reinforced while maintaining their functionality.

請求項6に記載の建設構造体の交換・補強方法によれば、滑り支承を、他の免震装置との略点対称又は略線対称の位置関係のいずれにも左右されずに、個別に交換する第3工程を含むので、滑り支承を他の免震装置との位置関係に左右されずに交換でき、状況に応じた滑り支承の交換を行いやすくなる。 The construction structure replacement/reinforcement method described in claim 6 includes a third step in which sliding bearings are individually replaced without being influenced by their positional relationship with other seismic isolation devices, either approximately point-symmetric or approximately line-symmetric. This allows sliding bearings to be replaced without being influenced by their positional relationship with other seismic isolation devices, making it easier to replace sliding bearings according to the situation.

本発明の実施の形態に係る構造物の階層のうち、免震装置が設置される階層の平面図である(一部断面図で示す)。1 is a plan view (partially shown in cross section) of a floor of a structure according to an embodiment of the present invention, on which a seismic isolation device is installed. 図1のA-A矢視断面図である(一部図示省略)。2 is a cross-sectional view taken along the line AA in FIG. 1 (partially omitted). 建設構造体の交換・補強方法を示す図であって、図1に対応する領域を示す図である。FIG. 2 is a diagram showing a method for replacing and reinforcing a construction structure, showing an area corresponding to FIG. 1 .

以下に添付図面を参照して、この発明に係る建設構造体の交換・補強方法の実施の形態を詳細に説明する。まず、〔I〕実施の形態の基本的概念を説明した後、〔II〕実施の形態の具体的内容について説明し、最後に、〔III〕実施の形態に対する変形例について説明する。ただし、実施の形態によって本発明が限定されるものではない。 The following describes in detail an embodiment of the method for replacing and reinforcing a construction structure according to the present invention, with reference to the accompanying drawings. First, [I] the basic concept of the embodiment will be explained, followed by [II] specific details of the embodiment, and finally, [III] modified examples of the embodiment will be explained. However, the present invention is not limited to the embodiment.

〔I〕実施の形態の基本的概念
まず、実施の形態の基本的概念について説明する。実施の形態は、概略的に、構造物に設置され、且つ少なくとも構造物の水平荷重を受けることが可能な複数の建設構造体を交換又は補強するための交換・補強方法に関する。
[I] Basic Concept of the Embodiment First, the basic concept of the embodiment will be described. The embodiment generally relates to a replacement/reinforcement method for replacing or reinforcing a plurality of construction structures that are installed on a structure and are capable of bearing at least a horizontal load of the structure.

ここで、「構造物」の具体的な構造や種類は任意であるが、例えば、オフィスビル、商業施設、公共施設、及びアパートやマンションの如き集合住宅等の建築構造物や、橋やトンネル等の土木構造物等を含む概念であるが、実施の形態では、複数階を有する施工中のオフィスビルとして説明する。 Here, the specific structure and type of "structure" can be any, but the concept includes, for example, architectural structures such as office buildings, commercial facilities, public facilities, and apartment complexes such as apartment buildings and condominiums, as well as civil engineering structures such as bridges and tunnels. In this embodiment, however, we will describe it as a multi-story office building under construction.

また、「建設構造体」とは、構造物に設けられる構造体を意味し、例えば、免震装置、制震装置、柱材、ブレース材、スラブ材、梁材、又は/及び杭材を含む概念であるが、実施の形態では、構造物の水平荷重及び鉛直荷重を受けることが可能な免震装置(具体的には、積層ゴム支承)として説明する。 Furthermore, the term "construction structure" refers to a structure installed in a structure, and is a concept that includes, for example, seismic isolation devices, seismic control devices, pillar materials, brace materials, slab materials, beam materials, and/or pile materials. However, in the embodiment, it is described as a seismic isolation device (specifically, laminated rubber bearing) that can withstand the horizontal and vertical loads of a structure.

また、「交換」とは、既設の建設構造体を新たな建設構造体に置き換えることを意味する。 Also, "replacement" means replacing an existing construction structure with a new construction structure.

また、「補強」とは、建設構造体の欠陥を修繕又は補修すること、建設構造体の将来予測される欠陥を防止又は軽減すること、あるいは、建設構造体の強度を改善することを意味し、例えば、既設の建設構造体に新たな部材(一例として、補強部材等)を付加すること、既設の建設構造体の一部の部材(例えば、欠陥部材等)を他の部材に置き換えること等が該当する。 Furthermore, "reinforcement" means repairing or correcting defects in a construction structure, preventing or mitigating predicted future defects in a construction structure, or improving the strength of a construction structure. For example, this includes adding new members (such as reinforcing members) to an existing construction structure, or replacing some members (such as defective members) of an existing construction structure with other members.

以下、実施の形態では、交換・補強方法が、構造物に設けられた既設の免震装置に代えて新たな免震装置を交換することに適用される場合について説明する。 In the following embodiments, we will explain the case where the replacement/reinforcement method is applied to replacing an existing seismic isolation device installed in a structure with a new seismic isolation device.

〔II〕実施の形態の具体的内容
次に、実施の形態の具体的内容について説明する。
[II] Specific Contents of the Embodiment Next, specific contents of the embodiment will be described.

(構成)
最初に、実施の形態に係る交換・補強方法が適用される構造物の構成について説明する。
(composition)
First, the configuration of a structure to which the replacement/reinforcement method according to the embodiment is applied will be described.

図1は、本発明の実施の形態に係る構造物の階層のうち、免震装置が設置される階層の平面図である(一部断面図で示す)。図2は、図1のA-A矢視断面図である(一部図示省略)。 Figure 1 is a plan view (partially cross-sectional) of a floor of a structure according to an embodiment of the present invention, on which a seismic isolation device is installed. Figure 2 is a cross-sectional view taken along the line A-A in Figure 1 (partially omitted).

以下の説明では、図1のX方向を構造物の左右方向又は幅方向(-X方向を構造物の左方向、+X方向を構造物の右方向)、図1のY方向を構造物の前後方向(+Y方向を構造物の前方向、-Y方向を構造物の後方向)、図2のZ方向を構造物の上下方向(+Z方向を構造物の上方向、-Z方向を構造物の下方向)と称する。 In the following explanation, the X direction in Figure 1 will be referred to as the left-right or width direction of the structure (the -X direction will be the left direction of the structure, and the +X direction will be the right direction of the structure), the Y direction in Figure 1 will be referred to as the front-to-back direction of the structure (the +Y direction will be the front direction of the structure, and the -Y direction will be the rear direction of the structure), and the Z direction in Figure 2 will be referred to as the up-down direction of the structure (the +Z direction will be the top direction of the structure, and the -Z direction will be the bottom direction of the structure).

構造物1は、例えば鉄骨造(又は鉄筋コンクリート造)の建築構造物(具体的には、建設中の複数の階層を有するオフィスビル)であり、図1、図2に示すように、床材2、柱材(図示省略)、梁材4、壁材5、及び免震装置10を備えている。 The structure 1 is, for example, a steel-framed (or reinforced concrete) building structure (specifically, a multi-story office building under construction), and as shown in Figures 1 and 2, it comprises flooring 2, columns (not shown), beams 4, wall materials 5, and a seismic isolation device 10.

(構成-床材)
床材2は、構造物1の階層を構成するものであり、相互に間隔を隔てて上下方向に向けて複数並設される。
(Composition - Flooring)
The floor materials 2 constitute the floors of the structure 1, and a plurality of them are arranged side by side in the vertical direction at intervals from each other.

なお、以下では、複数の床材2のうち、免震装置10の直下に位置する図2の床材2aを「基礎床材2a」と称する。 In the following, of the multiple floor materials 2, the floor material 2a in Figure 2 located directly below the seismic isolation device 10 will be referred to as the "foundation floor material 2a."

また、図2に示すように、基礎床材2aには、第1躯体6が設けられている。第1躯体6は、免震装置10を設置するための下部基礎材である。この第1躯体6は、例えば公知の基礎材(一例として、コンクリート製の基礎材)を用いて構成され、基礎床材2aと一体に形成されており、基礎床材2aにおける各免震装置10に対応する部分にそれぞれ設けられている(すなわち、基礎床材2aに複数設けられている)。 As shown in FIG. 2, a first structure 6 is provided on the foundation floor material 2a. The first structure 6 is a lower foundation material for installing the seismic isolation devices 10. This first structure 6 is constructed, for example, using a known foundation material (for example, a concrete foundation material), is formed integrally with the foundation floor material 2a, and is provided in portions of the foundation floor material 2a corresponding to each seismic isolation device 10 (i.e., multiple structures are provided on the foundation floor material 2a).

(構成-柱材)
柱材は、床材2を支持するものであり、床材2同士の相互間(すなわち、構造物1の各階層の空間)に複数設けられる。
(Structure - pillar material)
The pillars support the floor materials 2, and a plurality of pillars are provided between the floor materials 2 (i.e., in the space between each floor of the structure 1).

(構成-梁材)
梁材4は、床材2を支持するものであり、各床材2の下面と当接可能な位置に複数設けられたり、又は同一階の床材2同士の相互間に設けられる。
(Composition - Beams)
The beams 4 support the floor materials 2, and are provided in multiple positions so as to be able to abut against the underside of each floor material 2, or are provided between floor materials 2 on the same floor.

なお、以下では、必要に応じて、複数の梁材4のうち、免震装置10の直上に位置する図2の梁材4aを「上側基礎梁材4a」と称し、免震装置10の直下に位置する図2の梁材4bであって、基礎床材2aと連結されている梁材4bを「下側基礎梁材4b」と称する。 In the following, where necessary, of the multiple beams 4, the beam 4a in Figure 2 located directly above the seismic isolation device 10 will be referred to as the "upper foundation beam 4a," and the beam 4b in Figure 2 located directly below the seismic isolation device 10 and connected to the foundation floor material 2a will be referred to as the "lower foundation beam 4b."

また、図2に示すように、上側基礎梁材4aには、第2躯体7が設けられている。第2躯体7は、免震装置10を設置するための上部基礎材である。この第2躯体7は、例えば公知の基礎材(一例として、コンクリート製の基礎材)を用いて構成され、上側基礎梁材4a及び柱材と一体に形成されており、上側基礎梁材4aにおける各免震装置10に対応する部分にそれぞれ設けられている(すなわち、上側基礎梁材4aに複数設けられている)。 As shown in Figure 2, a second structure 7 is provided on the upper foundation beam 4a. The second structure 7 is an upper foundation material for installing the seismic isolation devices 10. This second structure 7 is constructed using, for example, a known foundation material (for example, a concrete foundation material), is formed integrally with the upper foundation beam 4a and the column material, and is provided in the portions of the upper foundation beam 4a corresponding to each seismic isolation device 10 (i.e., multiple structures are provided on the upper foundation beam 4a).

(構成-壁材)
壁材5は、床材2同士の相互間を仕切るためのものであり、床材2同士の相互間等に複数設けられる。
(Composition - Wall material)
The wall material 5 is used to separate the floor materials 2 from one another, and a plurality of wall materials 5 are provided between the floor materials 2, etc.

(構成-免震装置)
図1に戻り、免震装置10は、構造物1に設置され、且つ構造物1の水平荷重及び鉛直荷重を受けることが可能な建設構造体であると共に、地震の揺れが構造物1に直接伝わらないようにするための装置である。この免震装置10は、各第1躯体6と各第2躯体7との間にそれぞれ設けられている(すなわち、複数設けられている)。
(Configuration - Seismic isolation device)
Returning to Fig. 1, the seismic isolation device 10 is a construction structure that is installed on the structure 1 and can withstand the horizontal and vertical loads of the structure 1, and is a device that prevents earthquake vibrations from being directly transmitted to the structure 1. This seismic isolation device 10 is provided between each of the first frames 6 and each of the second frames 7 (i.e., a plurality of such devices are provided).

具体的には、図1に示すように、左右方向及び前後方向に相互に間隔を隔てて複数列設けられている(図1では、左右方向に7列設けられると共に、前後方向に2列から4列設けられている)。 Specifically, as shown in Figure 1, multiple rows are provided at intervals in the left-right and front-to-back directions (in Figure 1, there are seven rows in the left-right direction and two to four rows in the front-to-back direction).

また、各免震装置10は、図2に示すように、免震装置本体20、上フランジプレート21a、下フランジプレート21b、上ベースプレート22a、下ベースプレート22b、及び基壇部23を備えている。 As shown in Figure 2, each seismic isolation device 10 includes a seismic isolation device main body 20, an upper flange plate 21a, a lower flange plate 21b, an upper base plate 22a, a lower base plate 22b, and a base portion 23.

なお、以下では、必要に応じて、複数の免震装置10のうち、図1の左から1列目の免震装置11aから11d(図1では、前方から後方に至る順に設けられた免震装置11aから11d。なお、他の列の免震装置についても同様とする)を「第1免震装置11a」、「第2免震装置11b」、「第3免震装置11c」、「第4免震装置11d」と称する。また、図1の左から2列目の免震装置12aから12cを「第5免震装置12a」、「第6免震装置12b」、「第7免震装置12c」と称する。また、図1の左から3列目の免震装置13aから13cを「第8免震装置13a」、「第9免震装置13b」、「第10免震装置13c」と称する。また、図1の左から4列目の免震装置14aから14bを「第11免震装置14a」、「第12免震装置14b」と称する。また、図1の左から5列目の免震装置15aから15bを「第13免震装置15a」、「第14免震装置15b」と称する。また、図1の左から6列目の免震装置16aから16cを「第15免震装置16a」、「第16免震装置16b」、「第17免震装置16c」と称する。また、図1の左から7列目の免震装置17aから17cを「第18免震装置17a」、「第19免震装置17b」、「第20免震装置17c」と称する。 In the following, where necessary, of the multiple seismic isolation devices 10, the seismic isolation devices 11a to 11d in the first row from the left in Figure 1 (seismic isolation devices 11a to 11d are arranged in order from front to rear in Figure 1; the same applies to the seismic isolation devices in the other rows) will be referred to as the "first seismic isolation device 11a," "second seismic isolation device 11b," "third seismic isolation device 11c," and "fourth seismic isolation device 11d." Furthermore, the seismic isolation devices 12a to 12c in the second row from the left in Figure 1 will be referred to as the "fifth seismic isolation device 12a," "sixth seismic isolation device 12b," and "seventh seismic isolation device 12c." Furthermore, the seismic isolation devices 13a to 13c in the third row from the left in Figure 1 will be referred to as the "eighth seismic isolation device 13a," "ninth seismic isolation device 13b," and "tenth seismic isolation device 13c." Furthermore, the seismic isolation devices 14a to 14b in the fourth row from the left in FIG. 1 will be referred to as the "eleventh seismic isolation device 14a" and "twelfth seismic isolation device 14b." Furthermore, the seismic isolation devices 15a to 15b in the fifth row from the left in FIG. 1 will be referred to as the "thirteenth seismic isolation device 15a" and "fourteenth seismic isolation device 15b." Furthermore, the seismic isolation devices 16a to 16c in the sixth row from the left in FIG. 1 will be referred to as the "fifteenth seismic isolation device 16a," "sixteenth seismic isolation device 16b," and "seventeenth seismic isolation device 16c." Furthermore, the seismic isolation devices 17a to 17c in the seventh row from the left in FIG. 1 will be referred to as the "eighteenth seismic isolation device 17a," "nineteenth seismic isolation device 17b," and "twentieth seismic isolation device 17c."

(構成-免震装置-免震装置本体)
免震装置本体20は、免震装置10の基本構造体であり、例えば公知の免震積層ゴム支承(一例として、直径が650mm程度である円柱状の免震積層支承)を用いて構成されている。
(Configuration - Seismic isolation device - Seismic isolation device body)
The seismic isolation device main body 20 is the basic structure of the seismic isolation device 10, and is constructed using, for example, a known seismic isolation laminated rubber bearing (for example, a cylindrical seismic isolation laminated bearing with a diameter of approximately 650 mm).

(構成-免震装置-上フランジプレート、下フランジプレート)
上フランジプレート21a及び下フランジプレート21bは、免震装置本体20に取り付けられるプレートである。これら上フランジプレート21a及び下フランジプレート21bは、例えば平面寸法が免震装置本体20よりも大きい鋼製の矩形状の板状体(一例として、直径が1000mm程度である略円形状の板状体等)にて形成されている。また、図2に示すように、上フランジプレート21aは、免震装置本体20の上端部に対して図示しない固定具等によって取り付けられており、下フランジプレート21bは、免震装置本体20の下端部に対して図示しない固定具等によって取り付けられている。
(Configuration - Seismic isolation device - Upper flange plate, lower flange plate)
The upper flange plate 21a and the lower flange plate 21b are plates attached to the seismic isolation device main body 20. The upper flange plate 21a and the lower flange plate 21b are formed, for example, from a rectangular steel plate (for example, a substantially circular plate with a diameter of about 1000 mm) whose planar dimensions are larger than those of the seismic isolation device main body 20. As shown in Fig. 2, the upper flange plate 21a is attached to the upper end of the seismic isolation device main body 20 by a fastener or the like (not shown), and the lower flange plate 21b is attached to the lower end of the seismic isolation device main body 20 by a fastener or the like (not shown).

(構成-免震装置-上ベースプレート、下ベースプレート)
上ベースプレート22aは、上フランジプレート21aを第2躯体7に取り付けるためのプレートであり、例えば平面寸法が上フランジプレート21aの平面寸法と略同一である鋼製の矩形状の板状体(一例として、直径が1000mm程度である略円形状の板状体等)にて形成され、図2に示すように、第2躯体7の下端部に対して図示しない固定具等によって取り付けられている。
(Configuration - Seismic isolation device - Upper base plate, lower base plate)
The upper base plate 22a is a plate for attaching the upper flange plate 21a to the second body 7, and is formed, for example, from a rectangular steel plate (e.g., a substantially circular plate with a diameter of about 1000 mm) whose planar dimensions are approximately the same as those of the upper flange plate 21a, and is attached to the lower end of the second body 7 by a fixing device or the like (not shown) as shown in Figure 2.

また、下ベースプレート22bは、下フランジプレート21bを第1躯体6に取り付けるためのプレートであり、例えば平面寸法が下フランジプレート21bの平面寸法よりも大きい鋼製の矩形状の板状体(一例として、直径が1200mm程度である略円形状の板状体等)にて形成され、図2に示すように、第1躯体6の上端部に対して図示しない固定具等によって取り付けられている。 The lower base plate 22b is a plate for attaching the lower flange plate 21b to the first body 6, and is formed, for example, from a rectangular steel plate (e.g., a substantially circular plate with a diameter of approximately 1200 mm) whose planar dimensions are larger than those of the lower flange plate 21b. As shown in Figure 2, the lower base plate 22b is attached to the upper end of the first body 6 using fasteners (not shown).

(構成-免震装置-基壇部)
基壇部23は、下フランジプレート21bと下ベースプレート22bとの間の隙間を埋めるためのものである。この基壇部23は、例えば平面寸法が下フランジプレート21bの平面寸法と略同一であるコンクリート製の矩形状の板状体(一例として、一辺が1000mm程度である略正方形状の板状体等)にて形成され、図2に示すように、下フランジプレート21bと下ベースプレート22bとの相互間に設けられている。
(Configuration - Seismic isolation device - Base)
The base 23 is intended to fill the gap between the lower flange plate 21 b and the lower base plate 22 b, and is formed, for example, from a rectangular concrete plate (e.g., a substantially square plate with sides of about 1000 mm) whose planar dimensions are substantially the same as those of the lower flange plate 21 b, and is provided between the lower flange plate 21 b and the lower base plate 22 b as shown in FIG.

(構成-免震装置-その他の構成)
また、免震装置10の固定方法については任意であるが、実施の形態では、図2に示すように、上フランジプレート21a及び上ベースプレート22aに形成された挿通孔(図示省略)を介して第2躯体7に形成される取付穴(図示省略)に上側固定具24a(例えば、二重偏心リング付きのボルト等)によって固定していると共に、下フランジプレート21b、下ベースプレート22b、及び基壇部23に形成された挿通孔(図示省略)を介して第1躯体6に形成される取付穴(図示省略)に下側固定具24b(例えば、ボルト等)によって固定している。
(Configuration - Seismic isolation device - Other configurations)
Furthermore, the method of fixing the seismic isolation device 10 is arbitrary, but in the embodiment, as shown in Figure 2, it is fixed to a mounting hole (not shown) formed in the second body 7 by an upper fixing device 24a (e.g., a bolt with a double eccentric ring, etc.) via insertion holes (not shown) formed in the upper flange plate 21a and the upper base plate 22a, and is fixed to a mounting hole (not shown) formed in the first body 6 by a lower fixing device 24b (e.g., a bolt, etc.) via insertion holes (not shown) formed in the lower flange plate 21b, the lower base plate 22b, and the base portion 23.

(建設構造体の交換・補強方法)
次に、建設構造体(具体的には、免震装置)の交換・補強方法について説明する。
(Methods for replacing and reinforcing construction structures)
Next, a method for replacing and reinforcing a construction structure (specifically, a seismic isolation device) will be described.

図3は、建設構造体の交換・補強方法を示す図であって、図1に対応する領域を示す図である。実施の形態に係る交換・補強方法は、第1工程及び第2工程を含んでいる。 Figure 3 is a diagram showing a method for replacing or reinforcing a construction structure, and shows the area corresponding to Figure 1. The replacement or reinforcing method according to the embodiment includes a first step and a second step.

(建設構造体の交換・補強方法-第1工程)
まず、第1工程について説明する。
(Method for replacing and reinforcing construction structures - Step 1)
First, the first step will be described.

第1工程は、複数の免震装置10のうち、略点対称の位置関係にある一対の免震装置10を同時に交換又は補強する工程である。 The first step is to simultaneously replace or reinforce a pair of seismic isolation devices 10 that are positioned approximately point-symmetrically among multiple seismic isolation devices 10.

ここで、「略点対称の位置関係」とは、実施の形態では、一対の免震装置10の一方を構造物1の重心CG(又はその近傍位置)を回転中心として180度程度回転させた際の当該一方の位置が、一対の免震装置10の他方の位置と略一致する位置関係を意味する。 Here, "substantially point-symmetric positional relationship" in the embodiment means a positional relationship in which the position of one of the pair of seismic isolation devices 10 when rotated approximately 180 degrees around the center of gravity CG of the structure 1 (or a position nearby) as the center of rotation approximately coincides with the position of the other of the pair of seismic isolation devices 10.

具体的には、図3に示すように、上記略点対称の位置関係にある一対の免震装置10の組のうち、第4免震装置11dと第18免震装置17aとの組PG1(以下、「第1点対称組PG1」と称する)、第1免震装置11aと第20免震装置17cとの組PG2(以下、「第2点対称組PG2」と称する)、第3免震装置11cと第15免震装置16aとの組PG3(以下、「第3点対称組PG3」と称する)、第7免震装置12cと第13免震装置15aとの組PG4(以下、「第4点対称組PG4」と称する)、第2免震装置11bと第19免震装置17bとの組PG5(以下、「第5点対称組PG5」と称する)、及び、第5免震装置12aと第17免震装置16cとの組PG6(以下、「第6点対称組PG6」と称する)を交換する。 Specifically, as shown in FIG. 3, among the pairs of seismic isolation devices 10 that are positioned approximately point-symmetrically as described above, there are a pair PG1 of the fourth seismic isolation device 11d and the eighteenth seismic isolation device 17a (hereinafter referred to as the "first point-symmetric group PG1"), a pair PG2 of the first seismic isolation device 11a and the twentieth seismic isolation device 17c (hereinafter referred to as the "second point-symmetric group PG2"), and a pair PG3 of the third seismic isolation device 11c and the fifteenth seismic isolation device 16a (hereinafter referred to as the "fifteenth point-symmetric group PG3"). , referred to as the "third point symmetric group PG3"), the group PG4 of the seventh seismic isolation device 12c and the thirteenth seismic isolation device 15a (hereinafter referred to as the "fourth point symmetric group PG4"), the group PG5 of the second seismic isolation device 11b and the nineteenth seismic isolation device 17b (hereinafter referred to as the "fifth point symmetric group PG5"), and the group PG6 of the fifth seismic isolation device 12a and the seventeenth seismic isolation device 16c (hereinafter referred to as the "sixth point symmetric group PG6") are exchanged.

また、第1点対称組PG1から第6点対称組PG6の交換方法については任意であるが、実施の形態では、上記略点対称の位置関係にある一対の免震装置10の組のうち、構造物1の重心CGから最も遠い位置にある組を優先的に交換する。 Furthermore, the method for replacing the first point-symmetric group PG1 to the sixth point-symmetric group PG6 is arbitrary, but in this embodiment, of the pairs of seismic isolation devices 10 that are in the above-mentioned approximately point-symmetric positional relationship, the group that is located farthest from the center of gravity CG of the structure 1 is replaced preferentially.

具体的には、第1点対称組PG1、第2点対称組PG2、第3点対称組PG3、第4点対称組PG4、第5点対称組PG5、及び第6点対称組PG6の順に、これらの組を交換する。 Specifically, these pairs are exchanged in the following order: first point symmetric pair PG1, second point symmetric pair PG2, third point symmetric pair PG3, fourth point symmetric pair PG4, fifth point symmetric pair PG5, and sixth point symmetric pair PG6.

これにより、構造物1の重心CGから近い位置にある組を優先的に交換する場合に比べて、免震装置10の交換時における複数の免震装置10の機能に偏りが生じることを抑制でき、複数の免震装置10の機能を確保しやすくなる。 This makes it possible to prevent imbalances in the functionality of multiple seismic isolation devices 10 when replacing them, compared to when priority is given to replacing the set closest to the center of gravity CG of the structure 1, making it easier to ensure the functionality of multiple seismic isolation devices 10.

ただし、これに限らず、例えば、上記略点対称の位置関係にある一対の免震装置10の組を、構造物1の重心CGを中心軸とする軸回りに順次交換してもよい。一例として、第3点対称組PG3、第1点対称組PG1、第4点対称組PG4、第6点対称組PG6、第2点対称組PG2、及び第5点対称組PG5の順に、これらの組を交換してもよい。 However, this is not limiting, and for example, pairs of seismic isolation devices 10 that are positioned approximately point-symmetrically as described above may be exchanged sequentially around an axis whose central axis is the center of gravity CG of the structure 1. As an example, these sets may be exchanged in the order of the third point-symmetric set PG3, the first point-symmetric set PG1, the fourth point-symmetric set PG4, the sixth point-symmetric set PG6, the second point-symmetric set PG2, and the fifth point-symmetric set PG5.

あるいは、上記略点対称の位置関係にある一対の免震装置10の組を、構造物1の重心CGから最も遠い位置にある組を優先的に交換しながら、構造物1の重心CGを中心軸とする軸回りに順次交換してもよい。一例として、第1点対称組PG1、第4点対称組PG4、第6点対称組PG6、第2点対称組PG2、第5点対称組PG5、及び第3点対称組PG3の順に、これらの組を交換してもよい。 Alternatively, pairs of seismic isolation devices 10 that are positioned approximately point-symmetrically as described above may be replaced sequentially around an axis whose central axis is the center of gravity CG of the structure 1, with priority given to the pair that is farthest from the center of gravity CG of the structure 1. As an example, these pairs may be replaced in the order of the first point-symmetric pair PG1, the fourth point-symmetric pair PG4, the sixth point-symmetric pair PG6, the second point-symmetric pair PG2, the fifth point-symmetric pair PG5, and the third point-symmetric pair PG3.

これにより、免震装置10の交換作業を効率的に行うことができ、当該交換作業の作業性を高めることが可能となる。 This allows the replacement work of the seismic isolation device 10 to be carried out efficiently, improving the workability of the replacement work.

また、各免震装置10の交換方法については任意であるが、例えば以下の通りに交換してもよい(なお、第2工程における各免震装置10の交換方法についても同様とする)。 Furthermore, the method for replacing each seismic isolation device 10 is arbitrary, but for example, it may be replaced as follows (the same applies to the method for replacing each seismic isolation device 10 in the second step).

すなわち、まず、既設の免震装置10を固定する上側固定具24a及び下側固定具24bを取り外す。次に、既設の免震装置10の周辺に図示しない荷重受け部(例えば、油圧ジャッキ等)を複数設置して、第2躯体7から免震装置10が受ける支圧力(すなわち、免震装置10の軸力)がゼロになるように、荷重受け部をジャッキアップすることにより、上側基礎梁材4aの荷重(具体的には、上側基礎梁材4aの自重)を荷重受け部で受ける。この場合には、上側基礎梁材4aの高さ位置が所定量(例えば、1mm程度)上がるので、上側基礎梁材4aに直接又は間接に連結されている部材(例えば、柱材や床材2等)の高さ位置も上記所定量だけ上がることになる。次いで、図示しない冷却部(例えば、液体窒素を射出可能な冷却器)を用いて、既設の免震装置10のゴム部を冷却することにより、既設の免震装置10の上下方向の長さを低くする。その後、図示しない移動部(例えば、チェーンブロック等)を用いて、既設の免震装置10(具体的には、免震装置本体20、上フランジプレート21a、及び下フランジプレート21b)を第1躯体6と第2躯体7との間から所定位置まで移動させることにより、当該既設の免震装置10を取り外す。次に、移動部を用いて、新設の免震装置10(具体的には、免震装置本体20、上フランジプレート21a、及び下フランジプレート21b)を第1躯体6と第2躯体7との間に配置した後、新設の免震装置10を上側固定具24a及び下側固定具24bによって第1躯体6及び第2躯体7に対して固定する。次いで、荷重受け部の除荷を行うことで、新設の免震装置10が第2躯体7から支圧力が受けられるようにする。この場合には、上側基礎梁材4aの高さ位置が所定量(例えば、1mm程度)下がるので、上側基礎梁材4aに直接又は間接に連結されている部材(例えば、柱材や床材2等)の高さ位置も上記所定量だけ下がることになる。よって、上側基礎梁材4a、及び上記連結されている部材の高さ位置を、既設の免震装置10が取り外される前の位置にほぼ戻すことができる。その後、荷重受け部を所定位置に撤去する。 That is, first, the upper fixing device 24a and the lower fixing device 24b that secure the existing seismic isolation device 10 are removed. Next, multiple load-receiving parts (e.g., hydraulic jacks, etc.) (not shown) are installed around the existing seismic isolation device 10, and the load-receiving parts are jacked up so that the bearing pressure (i.e., the axial force of the seismic isolation device 10) received by the second structure 7 on the seismic isolation device 10 is zero, thereby supporting the load of the upper foundation beam 4a (specifically, the weight of the upper foundation beam 4a). In this case, the height position of the upper foundation beam 4a is raised by a predetermined amount (e.g., approximately 1 mm), and therefore the height positions of components (e.g., pillars, flooring 2, etc.) directly or indirectly connected to the upper foundation beam 4a are also raised by the same predetermined amount. Next, a cooling unit (e.g., a cooler capable of injecting liquid nitrogen) not shown is used to cool the rubber portion of the existing seismic isolation device 10, thereby reducing the vertical length of the existing seismic isolation device 10. After that, a moving unit (e.g., a chain block, etc.) not shown is used to move the existing seismic isolation device 10 (specifically, the seismic isolation device main body 20, the upper flange plate 21a, and the lower flange plate 21b) from between the first body 6 and the second body 7 to a predetermined position, thereby removing the existing seismic isolation device 10. Next, the moving unit is used to position the new seismic isolation device 10 (specifically, the seismic isolation device main body 20, the upper flange plate 21a, and the lower flange plate 21b) between the first body 6 and the second body 7, and the new seismic isolation device 10 is then fixed to the first body 6 and the second body 7 by the upper fixing device 24a and the lower fixing device 24b. Next, the load-receiving portion is unloaded so that the new seismic isolation device 10 can receive bearing pressure from the second body 7. In this case, the height position of the upper foundation beam 4a is lowered by a predetermined amount (for example, about 1 mm), and the height positions of the components directly or indirectly connected to the upper foundation beam 4a (for example, columns and flooring 2) are also lowered by the same predetermined amount. This allows the height positions of the upper foundation beam 4a and the connected components to be returned to approximately the positions they were in before the existing seismic isolation device 10 was removed. The load-receiving portion is then removed to its predetermined position.

このような第1工程により、一対の免震装置10を同時交換する際に、複数の免震装置10の機能に偏りが生じることを抑制でき、複数の免震装置10の機能を維持しながら、複数の免震装置10の交換を迅速に行うことが可能となる。 This first step prevents imbalances in the functionality of multiple seismic isolation devices 10 when a pair of seismic isolation devices 10 are replaced simultaneously, making it possible to quickly replace multiple seismic isolation devices 10 while maintaining their functionality.

(建設構造体の交換・補強方法-第2工程)
次に、第2工程について説明する。
(Method for replacing and reinforcing construction structures - Step 2)
Next, the second step will be described.

第2工程は、第1工程の後に、複数の免震装置10のうち、略線対称の位置関係にある一対の免震装置10を同時に交換又は補強する工程である。 The second step is a step that follows the first step and involves simultaneously replacing or reinforcing a pair of seismic isolation devices 10 that are positioned approximately symmetrically among the multiple seismic isolation devices 10.

ここで、「略線対称の位置関係」とは、実施の形態では、一対の免震装置10の一方を図3の第1対称軸AS1又は第2対称軸AS2を回転軸として反転させた際の当該一方の位置が、一対の免震装置10の他方の位置と略一致する位置関係を意味する。 Here, "substantially line-symmetrical positional relationship" in this embodiment means a positional relationship in which the position of one of the pair of seismic isolation devices 10 when flipped around the first axis of symmetry AS1 or the second axis of symmetry AS2 in Figure 3 as the rotation axis substantially coincides with the position of the other of the pair of seismic isolation devices 10.

また、「第1対称軸AS1」は、構造物1の重心CG(又はその近傍位置)と重なる水平軸であり、図3では、左右方向に沿った水平軸として説明する。また、「第2対称軸AS2」は、構造物1の重心CG(又はその近傍位置)と重なり、且つ第1対称軸AS1と略直交する水平軸であり、図3では、前後方向に沿った水平軸として説明する。 The "first axis of symmetry AS1" is a horizontal axis that overlaps with the center of gravity CG of the structure 1 (or a position nearby), and is described in Figure 3 as a horizontal axis extending in the left-right direction. The "second axis of symmetry AS2" is a horizontal axis that overlaps with the center of gravity CG of the structure 1 (or a position nearby) and is approximately perpendicular to the first axis of symmetry AS1, and is described in Figure 3 as a horizontal axis extending in the front-to-rear direction.

具体的には、図3に示すように、上記略線対称の位置関係にある一対の免震装置10の組のうち、第6免震装置12bと第16免震装置16bとの組LG1(以下、「第1線対称組LG1」と称する)、第10免震装置13cと第11免震装置14aとの組LG2(以下、「第2線対称組LG2」と称する)、第9免震装置13bと第14免震装置15bとの組LG3(以下、「第3線対称組LG3」と称する)、及び、第8免震装置13aと第12免震装置14bとの組LG4(以下、「第4線対称組LG4」と称する)を交換する。 Specifically, as shown in FIG. 3, of the pairs of seismic isolation devices 10 that are positioned approximately axisymmetrically as described above, the following are exchanged: the pair LG1 of the sixth seismic isolation device 12b and the sixteenth seismic isolation device 16b (hereinafter referred to as the "first axisymmetric group LG1"), the pair LG2 of the tenth seismic isolation device 13c and the eleventh seismic isolation device 14a (hereinafter referred to as the "second axisymmetric group LG2"), the pair LG3 of the ninth seismic isolation device 13b and the fourteenth seismic isolation device 15b (hereinafter referred to as the "third axisymmetric group LG3"), and the pair LG4 of the eighth seismic isolation device 13a and the twelfth seismic isolation device 14b (hereinafter referred to as the "fourth axisymmetric group LG4").

また、第1線対称組LG1から第4線対称組LG4の交換方法については任意であるが、実施の形態では、上記略線対称の位置関係にある一対の免震装置10の組のうち、構造物1の重心CGから最も遠い位置にある組を優先的に交換する。 Furthermore, the method for replacing the first axisymmetric group LG1 to the fourth axisymmetric group LG4 is arbitrary, but in this embodiment, of the pairs of seismic isolation devices 10 that are in the above-mentioned approximately axisymmetric positional relationship, the pair that is located farthest from the center of gravity CG of the structure 1 is replaced preferentially.

具体的には、第1線対称組LG1、第2線対称組LG2、第3線対称組LG3、及び第4線対称組LG4の順に、これらの組を交換する。 Specifically, these pairs are exchanged in the order of the first axisymmetric pair LG1, the second axisymmetric pair LG2, the third axisymmetric pair LG3, and the fourth axisymmetric pair LG4.

これにより、構造物1の重心CGから近い位置にある組を優先的に交換する場合に比べて、免震装置10の交換時における複数の免震装置10の機能に偏りが生じることを抑制でき、複数の免震装置10の機能を確保しやすくなる。 This makes it possible to prevent imbalances in the functionality of multiple seismic isolation devices 10 when replacing them, compared to when priority is given to replacing the set closest to the center of gravity CG of the structure 1, making it easier to ensure the functionality of multiple seismic isolation devices 10.

このような第2工程により、第1工程後に一対の免震装置10を位置関係に左右されずに交換する場合に比べて、免震装置10の交換時における複数の免震装置10の機能に偏りが生じることを抑制でき、複数の免震装置10の機能を維持しながら、複数の免震装置10の交換を一層迅速に行うことが可能となる。 This second step prevents imbalances in the functionality of multiple seismic isolation devices 10 when they are replaced, compared to replacing a pair of seismic isolation devices 10 after the first step without being influenced by their relative positions. This makes it possible to replace multiple seismic isolation devices 10 more quickly while maintaining their functionality.

(実施の形態の効果)
このように実施の形態によれば、複数の建設構造体のうち、略点対称の位置関係にある一対の建設構造体を同時に交換する第1工程を含むので、一対の建設構造体を同時交換する際に、複数の建設構造体の機能に偏りが生じることを抑制でき、複数の建設構造体の機能を維持しながら、複数の建設構造体の交換を迅速に行うことが可能となる。
(Effects of the embodiment)
According to this embodiment, the method includes a first step of simultaneously replacing a pair of construction structures that are positioned approximately point-symmetrically among the multiple construction structures.This prevents imbalances in the functions of the multiple construction structures when simultaneously replacing a pair of construction structures, and makes it possible to quickly replace the multiple construction structures while maintaining their functions.

また、第1工程において、略点対称の位置関係にある一対の建設構造体の組のうち、構造物1の重心CGから最も遠い位置にある組を優先的に交換するので、構造物1の重心CGから近い位置にある組を優先的に交換する場合に比べて、建設構造体の交換時における複数の建設構造体の機能に偏りが生じることを抑制でき、複数の建設構造体の機能を確保しやすくなる。 In addition, in the first step, of the pairs of construction structures that are positioned approximately point-symmetrically, the pair that is located farthest from the center of gravity CG of structure 1 is replaced preferentially. This makes it possible to prevent imbalances in the functions of multiple construction structures when replacing the construction structures, making it easier to ensure the functions of multiple construction structures, compared to when the pair that is closest to the center of gravity CG of structure 1 is replaced preferentially.

また、第1工程において、略点対称の位置関係にある一対の建設構造体の組を、構造物1の重心CGを中心軸とする軸回りに順次交換するので、建設構造体の交換作業を効率的に行うことができ、当該交換作業の作業性を高めることが可能となる。 In addition, in the first step, a pair of construction structures that are positioned approximately point-symmetrically are sequentially replaced around an axis whose central axis is the center of gravity CG of the structure 1, which allows the construction structure replacement work to be carried out efficiently and improves the workability of the replacement work.

また、第1工程の後に、複数の建設構造体のうち、略線対称の位置関係にある一対の建設構造体を同時に交換する第2工程をさらに含むので、第1工程後に一対の建設構造体を位置関係に左右されずに交換する場合に比べて、建設構造体の交換時における複数の建設構造体の機能に偏りが生じることを抑制でき、複数の建設構造体の機能を維持しながら、複数の建設構造体の交換を一層迅速に行うことが可能となる。 Furthermore, the method further includes a second step after the first step of simultaneously replacing a pair of construction structures that are positioned approximately line-symmetrically among the multiple construction structures. This prevents imbalances in the functionality of the multiple construction structures when they are replaced, compared to replacing a pair of construction structures after the first step without being influenced by their positional relationship, and makes it possible to more quickly replace the multiple construction structures while maintaining their functionality.

また、建設構造体が、免震装置10を含むので、一対の免震装置10を同時交換する際に、複数の免震装置10の機能に偏りが生じることを抑制でき、複数の免震装置10の機能を維持しながら、複数の免震装置10の交換を迅速に行うことが可能となる。 Furthermore, because the construction structure includes seismic isolation devices 10, it is possible to prevent imbalances in the functionality of multiple seismic isolation devices 10 when a pair of seismic isolation devices 10 are replaced simultaneously, making it possible to quickly replace multiple seismic isolation devices 10 while maintaining their functionality.

〔III〕実施の形態に対する変形例
以上、本発明の実施の形態について説明したが、本発明の具体的な構成及び手段は、特許請求の範囲に記載した各発明の技術的思想の範囲内において、任意に改変及び改良することができる。以下、このような変形例について説明する。
[III] Modifications to the Embodiments The embodiments of the present invention have been described above, but the specific configurations and means of the present invention can be modified and improved as desired within the scope of the technical ideas of each invention as set forth in the claims. Such modifications will be described below.

(解決しようとする課題や発明の効果について)
まず、発明が解決しようとする課題や発明の効果は、前記した内容に限定されるものではなく、本発明によって、前記に記載されていない課題を解決したり、前記に記載されていない効果を奏することもでき、また、記載されている課題の一部のみを解決したり、記載されている効果の一部のみを奏することがある。
(About the problem to be solved and the effects of the invention)
First, the problems that the invention aims to solve and the effects of the invention are not limited to those described above, and the present invention may solve problems that are not described above or achieve effects that are not described above, or may solve only some of the problems that are described or achieve only some of the effects that are described.

(形状、数値、構造、時系列について)
実施の形態や図面において例示した構成要素に関して、形状、数値、又は複数の構成要素の構造若しくは時系列の相互関係については、本発明の技術的思想の範囲内において、任意に改変及び改良することができる。
(shape, numbers, structure, time series)
The components illustrated in the embodiments and drawings may be modified and improved as desired within the scope of the technical concept of the present invention in terms of shape, numerical value, or the structure or chronological relationship of multiple components.

(建設構造体について)
上記実施の形態では、建設構造体が、構造物1の水平荷重及び鉛直荷重を受けることが可能な免震装置10であると説明したが、これに限らない。例えば、構造物1の水平荷重のみを受けることが可能な制震装置(一例として、オイルダンパー)であってもよい。
(About construction structures)
In the above embodiment, the construction structure is described as the seismic isolation device 10 capable of receiving both the horizontal load and the vertical load of the structure 1, but is not limited to this. For example, the construction structure may be a seismic control device (an oil damper, for example) capable of receiving only the horizontal load of the structure 1.

また、上記実施の形態では、建設構造体が、交換対象となる免震装置10であると説明したが、これに限らない。例えば、補強対象となる構造体(一例として、柱材、ブレース材、スラブ材、梁材4、又は/及び杭材)であってもよい。 In addition, in the above embodiment, the construction structure was described as the seismic isolation device 10 to be replaced, but this is not limited to this. For example, it may be a structure to be reinforced (for example, a column, brace, slab, beam 4, and/or pile).

この場合において、例えば、建設構造体が柱材である場合には、建設構造体の交換・補強方法の第1工程において、略点対称の位置関係にある一対の柱材を同時に補強してもよい(一例として、既設の柱材に補強部材を取り付けたり、又は/及び、既設の柱材の一部の部材を他の部材に置き換えてもよい)。また、建設構造体の交換・補強方法の第2工程において、略線対称の位置関係にある一対の柱材を同時に補強してもよい。このような交換・補強方法により、一対の柱材を同時補強する際に、複数の柱材の機能に偏りが生じることを抑制でき、複数の柱材の機能を維持しながら、柱材の補強を迅速に行うことが可能となる。 In this case, for example, if the construction structure is a pillar, a pair of pillars that are positioned approximately point-symmetrically may be reinforced simultaneously in the first step of the construction structure replacement/reinforcement method (for example, reinforcing members may be attached to the existing pillars and/or some of the existing pillars may be replaced with other members). Furthermore, a pair of pillars that are positioned approximately line-symmetrically may be reinforced simultaneously in the second step of the construction structure replacement/reinforcement method. This replacement/reinforcement method can prevent imbalances in the functionality of multiple pillars when simultaneously reinforcing a pair of pillars, making it possible to quickly reinforce the pillars while maintaining their functionality.

(免震装置について)
上記実施の形態では、免震装置10が、上フランジプレート21a、下フランジプレート21b、上ベースプレート22a、下ベースプレート22b、及び基壇部23を備えていると説明したが、これに限らない。例えば、上フランジプレート21a又は上ベースプレート22aのいずれか一方を省略してもよい。あるいは、下フランジプレート21b、下ベースプレート22b、又は基壇部23のいずれか1つ又は2つを省略してもよい。
(Regarding seismic isolation devices)
In the above embodiment, the seismic isolation device 10 has been described as including the upper flange plate 21 a, the lower flange plate 21 b, the upper base plate 22 a, the lower base plate 22 b, and the base portion 23, but this is not limitative. For example, either the upper flange plate 21 a or the upper base plate 22 a may be omitted. Alternatively, either one or two of the lower flange plate 21 b, the lower base plate 22 b, or the base portion 23 may be omitted.

(建設構造体の交換・補強方法について)
上記実施の形態では、建設構造体の交換・補強方法が、第1工程及び第2工程を含むと説明したが、これに限らない。例えば、第1工程によって交換対象となる免震装置10をすべて交換できる場合には、第2工程を省略してもよい。
(Methods for replacing and reinforcing construction structures)
In the above embodiment, the method for replacing and reinforcing a construction structure has been described as including the first and second steps, but is not limited thereto. For example, if all of the seismic isolation devices 10 to be replaced can be replaced by the first step, the second step may be omitted.

また、複数の免震装置10の中に、少なくとも1つ以上の滑り支承が含まれる場合には、第1工程及び第2工程に加えて、滑り支承を、他の免震装置10との略点対称又は略線対称の位置関係のいずれにも左右されずに、個別に交換する第3工程を含んでもよい。一例として、図1に示す免震装置10のうち、第2免震装置11b及び第19免震装置17bが滑り支承である場合には、第1工程の前、第1工程の後、又は第2工程の後に、第2免震装置11b及び第19免震装置17bを同時又は異なるタイミングでそれぞれ個別に交換してもよい。このような第3工程により、滑り支承を他の免震装置10との位置関係に左右されずに交換でき、状況に応じた滑り支承の交換を行いやすくなる。 Furthermore, if the multiple seismic isolation devices 10 include at least one sliding bearing, in addition to steps 1 and 2, a third step may be included in which the sliding bearings are individually replaced without being affected by their positional relationship with the other seismic isolation devices 10, which is approximately point-symmetric or approximately line-symmetric. As an example, if the second seismic isolation device 11b and the 19th seismic isolation device 17b of the seismic isolation devices 10 shown in FIG. 1 are sliding bearings, the second seismic isolation device 11b and the 19th seismic isolation device 17b may be individually replaced at the same time or at different times before step 1, after step 1, or after step 2. This third step allows the sliding bearings to be replaced without being affected by their positional relationship with the other seismic isolation devices 10, making it easier to replace the sliding bearings according to the situation.

また、第1工程及び第2工程が行われた後も、交換されていない免震装置10が存在する場合には、当該免震装置10のうち構造物1の重心CGから最も遠い位置にある免震装置10を優先的に交換し、又は当該免震装置10をランダムに交換する第4工程を含んでもよい。 Furthermore, if there are any seismic isolation devices 10 that have not been replaced even after steps 1 and 2 have been performed, a fourth step may be included in which the seismic isolation device 10 that is located farthest from the center of gravity CG of the structure 1 is replaced preferentially, or the seismic isolation devices 10 are replaced randomly.

また、上記実施の形態では、建設構造体の交換・補強方法において、複数の免震装置10のすべてを交換すると説明したが、これに限らず、例えば、複数の免震装置10のうち一部の免震装置10(一例として、第1線対称組LG1、第2線対称組LG2、及び第3線対称組LG3の免震装置10)のみを交換してもよい。 Furthermore, in the above embodiment, the method for replacing and reinforcing a construction structure was described as replacing all of the multiple seismic isolation devices 10, but this is not limited to this. For example, it is also possible to replace only some of the multiple seismic isolation devices 10 (as an example, the seismic isolation devices 10 of the first axisymmetric group LG1, the second axisymmetric group LG2, and the third axisymmetric group LG3).

(第1工程について)
上記実施の形態では、第1工程において、略点対称の位置関係にある一対の免震装置10の組のうち、構造物1の重心CGから最も遠い位置にある組を優先的に交換すると説明したが、これに限らない。例えば、構造物1の重心CGから最も近い位置にある組を優先的に交換してもよく、あるいは、略点対称の位置関係にある一対の免震装置10の組をランダムに交換してもよい(なお、第2工程についても略同様とする)。
(Regarding the first step)
In the above embodiment, it has been described that in the first step, of a pair of seismic isolation devices 10 positioned in a substantially point-symmetric relationship, the pair farthest from the center of gravity CG of the structure 1 is preferentially replaced, but this is not limiting. For example, the pair closest to the center of gravity CG of the structure 1 may be preferentially replaced, or a pair of seismic isolation devices 10 positioned in a substantially point-symmetric relationship may be replaced randomly (note that the same applies to the second step).

また、上記実施の形態では、第1工程において、新設の免震装置10が、免震装置本体20、上フランジプレート21a、及び下フランジプレート21bを備えていると説明したが、これに限らない。例えば、新設の免震装置10の設置性を高める観点から、第1躯体6又は第2躯体7と新設の免震装置10との隙間を埋めるための充填体(具体的には、グラウト材が充填された充填体等)と、充填体を保持するための目止め部とをさらに備えてもよい。 In addition, in the above embodiment, the newly installed seismic isolation device 10 is described as comprising the seismic isolation device main body 20, upper flange plate 21a, and lower flange plate 21b in the first step, but this is not limited to this. For example, from the perspective of improving the ease of installation of the newly installed seismic isolation device 10, it may further comprise a filler (specifically, a filler filled with grout, etc.) for filling the gap between the first body 6 or second body 7 and the newly installed seismic isolation device 10, and a sealing portion for holding the filler in place.

(付記)
付記1の建設構造体の交換・補強方法は、構造物に設置され、且つ少なくとも前記構造物の水平荷重を受けることが可能な複数の建設構造体を交換又は補強するための交換・補強方法であって、前記複数の建設構造体のうち、略点対称の位置関係にある一対の建設構造体を同時に交換又は補強する第1工程を含む。
(Additional Note)
The method for replacing or reinforcing a construction structure of Appendix 1 is a method for replacing or reinforcing a plurality of construction structures that are installed on a structure and are capable of bearing at least the horizontal load of the structure, and includes a first step of simultaneously replacing or reinforcing a pair of construction structures that are positioned approximately point-symmetrically among the plurality of construction structures.

付記2の建設構造体の交換・補強方法は、付記1に記載の建設構造体の交換・補強方法において、前記第1工程において、前記略点対称の位置関係にある一対の建設構造体の組のうち、前記構造物の重心から最も遠い位置にある組を優先的に交換又は補強する。 The construction structure replacement/reinforcement method of Appendix 2 is the construction structure replacement/reinforcement method described in Appendix 1, in which, in the first step, of the pair of construction structures that are in the approximately point-symmetric positional relationship, the pair that is located farthest from the center of gravity of the structure is preferentially replaced or reinforced.

付記3の建設構造体の交換・補強方法は、付記1又は2に記載の建設構造体の交換・補強方法において、前記第1工程において、前記略点対称の位置関係にある一対の建設構造体の組を、前記構造物の重心を中心軸とする軸回りに順次交換又は補強する。 The construction structure replacement/reinforcement method of Appendix 3 is the construction structure replacement/reinforcement method described in Appendix 1 or 2, in which, in the first step, pairs of construction structures that are positioned approximately point-symmetrically are sequentially replaced or reinforced around an axis whose central axis is the center of gravity of the structure.

付記4の建設構造体の交換・補強方法は、付記1から3のいずれか一項に記載の建設構造体の交換・補強方法において、前記第1工程の後に、前記複数の建設構造体のうち、略線対称の位置関係にある一対の建設構造体を同時に交換又は補強する第2工程をさらに含む。 The construction structure replacement/reinforcement method of Supplementary Note 4 is a construction structure replacement/reinforcement method described in any one of Supplementary Notes 1 to 3, which further includes, after the first step, a second step of simultaneously replacing or reinforcing a pair of construction structures that are positioned approximately line-symmetrically among the plurality of construction structures.

付記5の建設構造体の交換・補強方法は、付記1から4のいずれか一項に記載の建設構造体の交換・補強方法において、前記建設構造体は、免震装置、制震装置、柱材、ブレース材、スラブ材、梁材、又は/及び杭材を含む。 The construction structure replacement/reinforcement method of Appendix 5 is a construction structure replacement/reinforcement method described in any one of Appendixes 1 to 4, in which the construction structure includes a seismic isolation device, a seismic control device, a column material, a brace material, a slab material, a beam material, and/or a pile material.

付記6の建設構造体の交換・補強方法は、付記5に記載の建設構造体の交換・補強方法において、前記免震装置は、滑り支承を含み、前記滑り支承を、他の前記免震装置との略点対称又は略線対称の位置関係のいずれにも左右されずに、個別に交換する第3工程を含む。 The construction structure replacement/reinforcement method of Appendix 6 is the construction structure replacement/reinforcement method described in Appendix 5, wherein the seismic isolation devices include sliding bearings, and includes a third step of individually replacing the sliding bearings without being affected by either the approximately point-symmetric or approximately line-symmetric positional relationship with other seismic isolation devices.

(付記の効果)
付記1に記載の建設構造体の交換・補強方法によれば、複数の建設構造体のうち、略点対称の位置関係にある一対の建設構造体を同時に交換又は補強する第1工程を含むので、一対の建設構造体を同時交換又は補強する際に、複数の建設構造体の機能に偏りが生じることを抑制でき、複数の建設構造体の機能を維持しながら、複数の建設構造体の交換又は補強を迅速に行うことが可能となる。
(Effect of supplementary notes)
According to the method for replacing or reinforcing a construction structure described in Appendix 1, a first step is included in which a pair of construction structures among a plurality of construction structures that are positioned approximately point-symmetrically is simultaneously replaced or reinforced. Therefore, when a pair of construction structures is simultaneously replaced or reinforced, imbalances in the functions of the plurality of construction structures can be suppressed, and the plurality of construction structures can be quickly replaced or reinforced while maintaining their functions.

付記2に記載の建設構造体の交換・補強方法によれば、第1工程において、略点対称の位置関係にある一対の建設構造体の組のうち、構造物の重心から最も遠い位置にある組を優先的に交換又は補強するので、構造物の重心から近い位置にある組を優先的に交換又は補強する場合に比べて、建設構造体の交換又は補強時における複数の建設構造体の機能に偏りが生じることを抑制でき、複数の建設構造体の機能を確保しやすくなる。 According to the method for replacing or reinforcing a construction structure described in Appendix 2, in the first step, of a pair of construction structures that are positioned approximately point-symmetrically, the pair that is farthest from the center of gravity of the structure is replaced or reinforced preferentially. This makes it possible to prevent imbalances in the functionality of multiple construction structures when replacing or reinforcing them, and makes it easier to ensure the functionality of multiple construction structures, compared to when the pair that is closest to the center of gravity of the structure is replaced or reinforced preferentially.

付記3に記載の建設構造体の交換・補強方法によれば、第1工程において、略点対称の位置関係にある一対の建設構造体の組を、構造物の重心を中心軸とする軸回りに順次交換又は補強するので、建設構造体の交換作業又は補強作業を効率的に行うことができ、当該交換作業又は補強作業の作業性を高めることが可能となる。 According to the method for replacing or reinforcing a construction structure described in Appendix 3, in the first step, a pair of construction structures that are positioned approximately point-symmetrically are replaced or reinforced sequentially around an axis whose central axis is the center of gravity of the structure, thereby enabling the replacement or reinforcement work of the construction structure to be carried out efficiently and improving the workability of the replacement or reinforcement work.

付記4に記載の建設構造体の交換・補強方法によれば、第1工程の後に、複数の建設構造体のうち、略線対称の位置関係にある一対の建設構造体を同時に交換又は補強する第2工程をさらに含むので、第1工程後に一対の建設構造体を位置関係に左右されずに交換又は補強する場合に比べて、建設構造体の交換又は補強時における複数の建設構造体の機能に偏りが生じることを抑制でき、複数の建設構造体の機能を維持しながら、複数の建設構造体の交換又は補強を一層迅速に行うことが可能となる。 The method for replacing or reinforcing a construction structure described in Appendix 4 further includes, after the first step, a second step of simultaneously replacing or reinforcing a pair of construction structures that are positioned approximately line-symmetrically among the multiple construction structures. This makes it possible to prevent imbalances in the functionality of the multiple construction structures when replacing or reinforcing the construction structures, compared to when the pair of construction structures are replaced or reinforced after the first step without being influenced by their positional relationship, and makes it possible to replace or reinforce the multiple construction structures more quickly while maintaining their functionality.

付記5に記載の建設構造体の交換・補強方法によれば、建設構造体が、免震装置、制震装置、柱材、ブレース材、スラブ材、梁材、又は/及び杭材を含むので、一対の免震装置、制震装置、柱材、ブレース材、スラブ材、梁材、又は/及び杭材を同時交換又は補強する際に、複数の免震装置等の機能に偏りが生じることを抑制でき、複数の免震装置等の機能を維持しながら、複数の免震装置等の交換又は補強を迅速に行うことが可能となる。 According to the method for replacing or reinforcing a construction structure described in Appendix 5, the construction structure includes seismic isolation devices, seismic control devices, pillars, braces, slabs, beams, and/or piles. Therefore, when a pair of seismic isolation devices, seismic control devices, pillars, braces, slabs, beams, and/or piles are replaced or reinforced simultaneously, imbalances in the functionality of multiple seismic isolation devices, etc. can be prevented, and multiple seismic isolation devices, etc. can be quickly replaced or reinforced while maintaining their functionality.

付記6に記載の建設構造体の交換・補強方法によれば、滑り支承を、他の免震装置との略点対称又は略線対称の位置関係のいずれにも左右されずに、個別に交換する第3工程を含むので、滑り支承を他の免震装置との位置関係に左右されずに交換でき、状況に応じた滑り支承の交換を行いやすくなる。 The construction structure replacement/reinforcement method described in Appendix 6 includes a third step in which sliding bearings are individually replaced without being affected by their positional relationship with other seismic isolation devices, either approximately point-symmetric or approximately line-symmetric. This allows sliding bearings to be replaced without being affected by their positional relationship with other seismic isolation devices, making it easier to replace sliding bearings according to the situation.

1 構造物
2 床材
2a 基礎床材
4 梁材
4a 上側基礎梁材
4b 下側基礎梁材
5 壁材
6 第1躯体
7 第2躯体
10 免震装置
11a 第1免震装置
11b 第2免震装置
11c 第3免震装置
11d 第4免震装置
12a 第5免震装置
12b 第6免震装置
12c 第7免震装置
13a 第8免震装置
13b 第9免震装置
13c 第10免震装置
14a 第11免震装置
14b 第12免震装置
15a 第13免震装置
15b 第14免震装置
16a 第15免震装置
16b 第16免震装置
16c 第17免震装置
17a 第18免震装置
17b 第19免震装置
17c 第20免震装置
20 免震装置本体
21a 上フランジプレート
21b 下フランジプレート
22a 上ベースプレート
22b 下ベースプレート
23 基壇部
24a 上側固定具
24b 下側固定具
CG 重心
LG1 第1線対称組
LG2 第2線対称組
LG3 第3線対称組
LG4 第4線対称組
PG1 第1点対称組
PG2 第2点対称組
PG3 第3点対称組
PG4 第4点対称組
PG5 第5点対称組
PG6 第6点対称組
REFERENCE SIGNS LIST 1 Structure 2 Floor material 2a Foundation floor material 4 Beam material 4a Upper foundation beam material 4b Lower foundation beam material 5 Wall material 6 First body 7 Second body 10 Seismic isolation device 11a First seismic isolation device 11b Second seismic isolation device 11c Third seismic isolation device 11d Fourth seismic isolation device 12a Fifth seismic isolation device 12b Sixth seismic isolation device 12c Seventh seismic isolation device 13a Eighth seismic isolation device 13b Ninth seismic isolation device 13c Tenth seismic isolation device 14a Eleventh seismic isolation device 14b Twelfth seismic isolation device 15a Thirteenth seismic isolation device 15b Fourteenth seismic isolation device 16a Fifteenth seismic isolation device 16b Sixteenth seismic isolation device 16c Seventeenth seismic isolation device 17a Eighteenth seismic isolation device 17b 19th seismic isolation device 17c 20th seismic isolation device 20 Seismic isolation device body 21a Upper flange plate 21b Lower flange plate 22a Upper base plate 22b Lower base plate 23 Base portion 24a Upper fixing fixture 24b Lower fixing fixture CG Center of gravity LG1 First line symmetrical set LG2 Second line symmetrical set LG3 Third line symmetrical set LG4 Fourth line symmetrical set PG1 First point symmetrical set PG2 Second point symmetrical set PG3 Third point symmetrical set PG4 Fourth point symmetrical set PG5 Fifth point symmetrical set PG6 Sixth point symmetrical set

Claims (6)

構造物に設置され、且つ少なくとも前記構造物の水平荷重を受けることが可能な複数の建設構造体を交換又は補強するための交換・補強方法であって、
前記複数の建設構造体のうち、略点対称の位置関係にある一対の建設構造体を同時に交換又は補強する第1工程を含み、
前記略点対称の中心は、前記構造物の重心又はその近傍位置である、
建設構造体の交換・補強方法。
A replacement/reinforcement method for replacing or reinforcing a plurality of construction structures that are installed on a structure and are capable of bearing at least a horizontal load of the structure, comprising:
A first step of simultaneously replacing or reinforcing a pair of construction structures that are positioned approximately point-symmetrically among the plurality of construction structures ,
The center of the approximate point symmetry is the center of gravity of the structure or a position near the center of gravity.
How to replace or reinforce construction structures.
前記第1工程において、前記略点対称の位置関係にある一対の建設構造体の組のうち、前記構造物の重心から最も遠い位置にある組を優先的に交換又は補強する、
請求項1に記載の建設構造体の交換・補強方法。
In the first step, of the pair of construction structures that are in a positional relationship of approximately point symmetry, the pair that is located farthest from the center of gravity of the structure is preferentially replaced or reinforced.
The method for replacing or reinforcing a construction structure according to claim 1.
前記第1工程において、前記略点対称の位置関係にある一対の建設構造体の組を、前記構造物の重心を中心軸とする軸回りに順次交換又は補強する、
請求項1又は2に記載の建設構造体の交換・補強方法。
In the first step, the pair of construction structures in the substantially point-symmetrical positional relationship are sequentially replaced or reinforced around an axis having the center of gravity of the structure as a central axis.
The method for replacing or reinforcing a construction structure according to claim 1 or 2.
前記第1工程の後に、前記複数の建設構造体のうち、略線対称の位置関係にある一対の建設構造体を同時に交換又は補強する第2工程をさらに含む、
請求項1から3のいずれか一項に記載の建設構造体の交換・補強方法。
The method further includes, after the first step, a second step of simultaneously replacing or reinforcing a pair of construction structures that are in a substantially line-symmetrical positional relationship among the plurality of construction structures.
The method for replacing or reinforcing a construction structure according to any one of claims 1 to 3.
前記建設構造体は、免震装置、制震装置、柱材、ブレース材、スラブ材、梁材、又は/及び杭材を含む、
請求項1から4のいずれか一項に記載の建設構造体の交換・補強方法。
The construction structure includes a seismic isolation device, a seismic control device, a column material, a brace material, a slab material, a beam material, and/or a pile material.
The method for replacing or reinforcing a construction structure according to any one of claims 1 to 4.
前記免震装置は、滑り支承を含み、
前記滑り支承を、他の前記免震装置との略点対称又は略線対称の位置関係のいずれにも左右されずに、個別に交換する第3工程を含む、
請求項5に記載の建設構造体の交換・補強方法。
The seismic isolation device includes a sliding bearing,
and a third step of individually replacing the sliding bearings without being affected by the positional relationship of the sliding bearings with other seismic isolation devices that is approximately point symmetric or line symmetric.
The method for replacing or reinforcing a construction structure according to claim 5.
JP2021146862A 2021-09-09 2021-09-09 How to replace or reinforce construction structures Active JP7787673B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021146862A JP7787673B2 (en) 2021-09-09 2021-09-09 How to replace or reinforce construction structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021146862A JP7787673B2 (en) 2021-09-09 2021-09-09 How to replace or reinforce construction structures

Publications (2)

Publication Number Publication Date
JP2023039638A JP2023039638A (en) 2023-03-22
JP7787673B2 true JP7787673B2 (en) 2025-12-17

Family

ID=85614012

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021146862A Active JP7787673B2 (en) 2021-09-09 2021-09-09 How to replace or reinforce construction structures

Country Status (1)

Country Link
JP (1) JP7787673B2 (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000080753A (en) 1998-09-07 2000-03-21 Misawa Homes Co Ltd Eaves ceiling panel and installation method therefor
JP2000291736A (en) 1999-04-09 2000-10-20 Daido Seimitsu Kogyo Kk Base isolation device
JP2002155641A (en) 2000-11-21 2002-05-31 Shimizu Corp Seismic isolation method
JP2011182707A (en) 2010-03-09 2011-09-22 Komoro Nunobiki Strawberry Farm Co Ltd Framed panel, and roof structure of agricultural greenhouse
JP2017036560A (en) 2015-08-07 2017-02-16 前田建設工業株式会社 Seismic isolator replacement method
JP2017203297A (en) 2016-05-11 2017-11-16 鹿島建設株式会社 Base-isolation construction and method of designing base-isolation construction
JP2018009399A (en) 2016-07-15 2018-01-18 株式会社大林組 Extension method of seismic isolation building
JP2019132728A (en) 2018-01-31 2019-08-08 株式会社ブリヂストン Inspection system for seismic isolation device and method for inspecting seismic isolation device
JP2021032008A (en) 2019-08-28 2021-03-01 東京瓦斯株式会社 How to dismantle the tank

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11125306A (en) * 1997-10-23 1999-05-11 Bridgestone Corp Base isolation system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000080753A (en) 1998-09-07 2000-03-21 Misawa Homes Co Ltd Eaves ceiling panel and installation method therefor
JP2000291736A (en) 1999-04-09 2000-10-20 Daido Seimitsu Kogyo Kk Base isolation device
JP2002155641A (en) 2000-11-21 2002-05-31 Shimizu Corp Seismic isolation method
JP2011182707A (en) 2010-03-09 2011-09-22 Komoro Nunobiki Strawberry Farm Co Ltd Framed panel, and roof structure of agricultural greenhouse
JP2017036560A (en) 2015-08-07 2017-02-16 前田建設工業株式会社 Seismic isolator replacement method
JP2017203297A (en) 2016-05-11 2017-11-16 鹿島建設株式会社 Base-isolation construction and method of designing base-isolation construction
JP2018009399A (en) 2016-07-15 2018-01-18 株式会社大林組 Extension method of seismic isolation building
JP2019132728A (en) 2018-01-31 2019-08-08 株式会社ブリヂストン Inspection system for seismic isolation device and method for inspecting seismic isolation device
JP2021032008A (en) 2019-08-28 2021-03-01 東京瓦斯株式会社 How to dismantle the tank

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"オイルダンパーの出荷試験データの改ざんが免震・制振建築物の応答に与える影響と対策",免震・制振材料問題対応委員会 免震建築物・制振建築物 の応答対策部会 報告書,日本,一般社団法人日本免震構造協会,2021年04月26日,p.4-61, 5-41,[online], [2025年6月25日取得], <https://www.jssi.or.jp/temp3/dumperreport.pdf>
"免震材料の交換改修工事中の建築物の安全性のガイドライン",免震材料に関する第三者委員会(第6回),日本,国土交通省,2015年07月17日,p.1-2,[online], [2025年6月25日取得], <https://www.mlit.go.jp/common/001097547.pdf>

Also Published As

Publication number Publication date
JP2023039638A (en) 2023-03-22

Similar Documents

Publication Publication Date Title
JP7787673B2 (en) How to replace or reinforce construction structures
CN110821517A (en) Tunnel internal double-layer structure prefabrication and assembly construction method
CN222183364U (en) Inclined support temporary support replacing device for basement foundation pit
JP2020060000A (en) Body building method
JP5191191B2 (en) Extension construction method of extension building
KR20210090100A (en) In a building where the underground structure is a wall structure, the shortened construction type top down construction method and structure that enables early ground frame start using temporary transfer structures
KR102614628B1 (en) Reinforcement structure for building remodeling construction, building remodeling construction structure and method for building remodeling construction
JP2010270478A (en) Floor structure system for steel construction building
JP4873981B2 (en) Seismic reinforcement structure for existing buildings
CN211113725U (en) Construction elevator foundation based on basement structure
JP7825451B2 (en) Movement restriction device for jack-up and bearing replacement method
CN112376690A (en) Beam column joint of support-free horizontal prefabricated floor and construction method of beam column joint
CN111058476A (en) Beam lowering construction method of underground structure in reverse construction method
JP7692286B2 (en) Seismic isolation device installation structure
JP7462475B2 (en) How to build a building
JP2007308979A (en) Seismic isolation method for existing buildings
JP2006200361A (en) Seismic isolation method for existing buildings
JP5375174B2 (en) Construction method of column beam frame
JP2018123468A (en) Composite suspended structure and construction method thereof
JP2025024881A (en) Seismic isolation structure and its construction method
JP2008057189A (en) Seismic isolation method for existing buildings
JP2025071499A (en) Building Foundations
JP2024021893A (en) How to extend a seismically isolated building
JP3880341B2 (en) Construction method of steel plate concrete structure
JP2021116528A (en) How to build a building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240620

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241211

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250312

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250708

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251202

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251205

R150 Certificate of patent or registration of utility model

Ref document number: 7787673

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150