JP7787682B2 - Tip support structure for hollow concrete piles - Google Patents
[go: Go Back, main page]

JP7787682B2 - Tip support structure for hollow concrete piles - Google Patents

Tip support structure for hollow concrete piles

Info

Publication number
JP7787682B2
JP7787682B2 JP2021163813A JP2021163813A JP7787682B2 JP 7787682 B2 JP7787682 B2 JP 7787682B2 JP 2021163813 A JP2021163813 A JP 2021163813A JP 2021163813 A JP2021163813 A JP 2021163813A JP 7787682 B2 JP7787682 B2 JP 7787682B2
Authority
JP
Japan
Prior art keywords
hollow concrete
tip
concrete pile
pile
support structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021163813A
Other languages
Japanese (ja)
Other versions
JP2023054867A (en
Inventor
篤史 村山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tenox Corp
Original Assignee
Tenox Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tenox Corp filed Critical Tenox Corp
Priority to JP2021163813A priority Critical patent/JP7787682B2/en
Publication of JP2023054867A publication Critical patent/JP2023054867A/en
Application granted granted Critical
Publication of JP7787682B2 publication Critical patent/JP7787682B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、根固め部で支持されるPHC杭、SC杭、中空RC杭などの中空コンクリート杭の先端支持構造に関するものである。 The present invention relates to a tip support structure for hollow concrete piles, such as PHC piles, SC piles, and hollow RC piles, which are supported by a foot protection section.

埋込み杭については、埋込み杭の先端に現場打ちコンクリートなどによる拡大根固め部を造成し、上部構造物から埋込み杭に作用する荷重を杭本体と根固め部を介して支持地盤に伝える構成としている。 For buried piles, an expanded base protection section is created at the tip of the pile using cast-in-place concrete or similar, and the load acting on the buried pile from the superstructure is transmitted to the supporting ground via the pile body and base protection section.

このような埋込み杭としては、PHC杭、SC杭、あるいは遠心成形による中空のRC杭など、高強度の中空コンクリート杭が多用されている。特に中空コンクリート杭の場合、中空部に掘削機の掘削軸を通して掘削を行う中掘り工法により効率的な施工を行うことができる。 High-strength hollow concrete piles, such as PHC piles, SC piles, or centrifugally formed hollow reinforced concrete piles, are often used for these buried piles. Hollow concrete piles in particular can be efficiently constructed using the core excavation method, in which the shaft of an excavator is passed through the hollow part to excavate.

ところで、従来の中空コンクリート杭の先端支持力の算定においては、中空コンクリート杭の先端面の支圧力によって荷重を根固め部へ伝達するものとしていた。しかしながら埋込み杭の高支持力化に伴い、中空コンクリート杭の先端面の支圧力のみでは、十分な荷重伝達が出来なくなったため、高支持力杭では中空コンクリート杭の先端部が閉塞された状態、例えば施工において根固め部のコンクリートが杭先端部の内側に入り込んで中空杭の先端部が閉塞された状態について、中空コンクリート杭の先端面の閉塞部を含めた全断面の面積の支圧力によって杭本体から根固め部へ荷重を伝達しているものとして、先端支持力を算定するのが一般的である。 In the past, calculations of the tip bearing capacity of hollow concrete piles assumed that the load was transmitted to the base protection section via the bearing pressure at the tip surface of the hollow concrete pile. However, as the bearing capacity of embedded piles has increased, the bearing pressure at the tip surface of the hollow concrete pile alone is no longer sufficient to transmit the load. Therefore, for high-bearing-capacity piles, when the tip of the hollow concrete pile is blocked, for example, when the concrete in the base protection section seeps into the inside of the tip of the pile during construction, blocking the tip of the hollow concrete pile, the tip bearing capacity is generally calculated by assuming that the load is transmitted from the pile body to the base protection section via the bearing pressure of the entire cross-sectional area of the hollow concrete pile, including the blocked section at the tip surface.

高支持力杭における、中空コンクリート杭の先端面の内側を含めた全断面で十分な支圧力が得られているかという点については、FEM解析や模型試験、実大杭の押込み試験などで得られる支持力と対比して検討が行われる場合が多い。 In the case of high-bearing-capacity piles, whether sufficient bearing pressure is obtained across the entire cross section, including the inside of the tip surface of the hollow concrete pile, is often examined by comparing the bearing capacity obtained through FEM analysis, model tests, and full-scale pile compression tests.

また、中空コンクリート杭の先端面の内側を含めた全断面を算定の根拠とするためには、中空コンクリート杭の先端部と根固め部の一体性を高め、できるだけ荷重伝達がスムーズとなるようにする必要があるので、通常は中空コンクリート杭の先端部の内面に凹凸を設けることが多い。 In addition, in order to use the entire cross section of the hollow concrete pile, including the inside of its tip surface, as the basis for calculation, it is necessary to increase the unity between the tip of the hollow concrete pile and the base protection section and ensure as smooth a load transfer as possible, so the inner surface of the tip of the hollow concrete pile is usually made uneven.

例えば、特許文献1には、中空既製杭の先端に硬化材からなる拡径部を形成した先端根固め杭について、既製杭の外周面、あるいは外周面および内周面に突起を設けた先端根固め杭が記載されている。 For example, Patent Document 1 describes a tip-foot protection pile in which an enlarged diameter section made of hardening material is formed at the tip of a hollow precast pile, and the tip-foot protection pile has protrusions on the outer surface, or on both the outer and inner surfaces of the precast pile.

また、特許文献2には、杭本体の先端側の内周面に、内周側へ張り出す突部が形成され、この突部のみがコンクリート面より突出していることで根固め部のコンクリートとの一体性が高められるようにした内面突部付き既製コンクリート杭が記載されている。 Patent Document 2 also describes a precast concrete pile with an internal protrusion, in which a protrusion that projects inward is formed on the inner peripheral surface of the tip of the pile body, and only this protrusion protrudes above the concrete surface, thereby enhancing the integrity of the base protection section with the concrete.

特開平06-280261号公報Japanese Patent Application Publication No. 06-280261 特開2007-247335号公報Japanese Patent Application Laid-Open No. 2007-247335

前述のように、高支持力杭の中空コンクリート杭の先端支持力の算定においては、中空杭の先端面の閉塞部を含めた面積で支圧力を与えているものとして、先端支持力を算定するのが一般的である。 As mentioned above, when calculating the end bearing capacity of a high-bearing-capacity hollow concrete pile, it is common to calculate the end bearing capacity by assuming that the bearing pressure is applied over the area including the closed portion of the tip face of the hollow pile.

図2は、従来の高支持力杭の中掘り工法で施工されるPHC杭の先端部と根固め部との関係を一例として示したものであり、この例ではPHC杭の先端部2の外周面にずれ止め鉄筋22を設け、内面側には前述した特許文献2に記載される突起としてのずれ止めプレート21を突出させ、根固め部3との一体性を高めるようにしている。 Figure 2 shows an example of the relationship between the tip of a PHC pile and the base protection section when constructed using a conventional high-bearing-capacity pile excavation method. In this example, a shear-stopping reinforcing bar 22 is provided on the outer surface of the tip 2 of the PHC pile, and a shear-stopping plate 21, which serves as a protrusion as described in Patent Document 2 mentioned above, protrudes from the inner surface to enhance the unity with the base protection section 3.

また、PHC杭の先端部2の外周には中空円盤状の端板を介してフリクションカッターが取り付けられている。この場合、根固め部3には水セメント比(W/C)が60%程度で、強度が15~20N/mm2程度のコンクリートが用いられるのが一般的であり、PHC杭の根固め部3への根入れ長Lは、杭径Dに対し、0.5~2D程度、根固め部の径は1.2~2D程度で設計されている。 A friction cutter is attached via a hollow disk-shaped end plate to the outer periphery of the tip 2 of the PHC pile. In this case, concrete with a water-cement ratio (W/C) of about 60% and a strength of about 15 to 20 N/ mm2 is generally used for the foot protection section 3, and the embedded length L of the PHC pile into the foot protection section 3 is designed to be about 0.5 to 2D relative to the pile diameter D, and the diameter of the foot protection section is designed to be about 1.2 to 2D.

この場合の中空のPHC杭の先端面における支圧力については、中空部が閉塞されている場合を想定した全断面に支圧力が作用しているものとして算定しているので、中空部を閉塞させるためには前述のように杭内面にずれ止めプレートを設ける必要があり、また外周面にもずれ止め鉄筋を設ける必要があるので、杭製造コストの増大や施工性が低下するなどの問題がある。 In this case, the bearing pressure at the tip of the hollow PHC pile is calculated assuming that the bearing pressure acts on the entire cross section when the hollow is blocked. Therefore, in order to block the hollow, it is necessary to install a shear stop plate on the inner surface of the pile, as mentioned above, and it is also necessary to install shear stop rebar on the outer surface, which results in problems such as increased pile manufacturing costs and reduced workability.

本発明は、従来技術における上述のような課題の解決を図ったものであり、中空コンクリート杭の先端支持力の算定については、合理的な設計が可能であり、かつ経済的な中空コンクリート杭の先端支持構造を提供することを目的としている。 The present invention aims to solve the above-mentioned problems with conventional technology, and aims to provide an economical tip support structure for hollow concrete piles that allows for rational design when calculating the tip bearing capacity of hollow concrete piles.

本発明の中空コンクリート杭の先端支持構造は、地盤中に建て込まれた中空コンクリート杭の先端部が、前記中空コンクリート杭の外径よりも径の大きい根固め部で支持される中空コンクリート杭の先端支持構造において、前記根固め部の強度が15~30N/mm2、より好ましくは20~30N/mm2であり、前記中空コンクリート杭の先端部が開放断面となっており、前記中空コンクリート杭の先端部から前記根固め部への杭軸方向の応力伝達が、実質的に前記中空コンクリート杭の先端面の支圧力によって行われるようにしたことを特徴とするものである。 The tip support structure for a hollow concrete pile of the present invention is a tip support structure for a hollow concrete pile in which the tip of a hollow concrete pile erected in the ground is supported by a base fixing portion whose diameter is larger than the outer diameter of the hollow concrete pile, characterized in that the strength of the base fixing portion is 15 to 30 N/ mm2 , more preferably 20 to 30 N/ mm2 , the tip of the hollow concrete pile has an open cross-section, and stress transmission in the pile axial direction from the tip of the hollow concrete pile to the base fixing portion is essentially carried out by the bearing pressure at the tip surface of the hollow concrete pile.

本発明でいう中空コンクリート杭は、杭本体がコンクリートだけ形成されるということではなく、例えばPHC杭、SC杭または遠心成形による中空のRC杭などが含まれる。 The hollow concrete pile referred to in this invention does not mean a pile whose body is formed solely from concrete, but also includes, for example, PHC piles, SC piles, or hollow RC piles formed by centrifugation.

根固め部の強度を、15~30N/mm2、より好ましくは20~30N/mm2というように高強度化することで、中空コンクリート杭下端面からの荷重を、実質的に根固め部の中空コンクリート杭下端面に接する部分で直接受けることができ、根固め部への荷重伝達を杭下端面の支圧力のみで算定することが可能となる。 By increasing the strength of the base fixing portion to 15 to 30 N/mm 2 , and more preferably 20 to 30 N/mm 2 , the load from the lower end surface of the hollow concrete pile can be directly borne by the part of the base fixing portion that contacts the lower end surface of the hollow concrete pile, making it possible to calculate the load transmission to the base fixing portion based solely on the bearing pressure at the lower end surface of the pile.

そのため、従来の杭先端部の外周面や内周面に突起を設ける必要がなくなる。 This eliminates the need to provide protrusions on the outer or inner surfaces of the tip of the conventional pile.

また、本発明では杭先端部の外周面や内周面に突起を設けなくても、中空コンクリート杭の杭下端面の支圧力で算定すればよいため、市販の中空コンクリート既製杭をそのまま用いることができる。 Furthermore, with this invention, there is no need to provide protrusions on the outer or inner surfaces of the pile tip; instead, calculations can be made using the bearing pressure at the bottom end surface of the hollow concrete pile, allowing commercially available prefabricated hollow concrete piles to be used as is.

根固め部の材料としては、セメント量の多い富配合のセメントミルクを土砂と混合した高強度のソイルセメントを用いることができ、セメントの種類や使用する混和剤等によっても異なるが、根固め部の強度を15~30N/mm2、より好ましくは20~30N/mm2とするためには、セメントミルクの水セメント比を40~50%として高濃度化することが望ましい。 The material for the base protection section can be high-strength soil cement, which is made by mixing a rich cement milk with soil and sand.Although this will vary depending on the type of cement and the admixtures used, in order to achieve a strength of 15 to 30 N/ mm2 , more preferably 20 to 30 N/ mm2 , it is desirable to increase the water-cement ratio of the cement milk to 40 to 50%, thereby increasing the concentration.

また、高性能AE減水剤などの混和剤の使用や、高強度コンクリートで用いられている各種混和材の配合等によっても根固め部の高強度化を図ることができる。 The strength of the base protection area can also be increased by using admixtures such as high-performance air-entraining water-reducing agents, or by blending various admixtures used in high-strength concrete.

また、本発明の中空コンクリート杭の先端支持構造において、コンクリートに炭酸マグネシウムを添加することで、コンクリートの均質性を高め、ブリーディング抑制効果により、根固め部が中空コンクリート杭の先端面と接する部分などに強度的な弱部が生じるのを防止することができる。 Furthermore, in the tip support structure for hollow concrete piles of the present invention, adding magnesium carbonate to the concrete improves the homogeneity of the concrete, and the bleeding suppression effect prevents the occurrence of weak spots in areas such as where the base protection portion comes into contact with the tip surface of the hollow concrete pile.

炭酸マグネシウムの配合量としては、セメントに対する質量比で概ね0.1~4.0%程度が好ましい。 The preferred amount of magnesium carbonate is approximately 0.1 to 4.0% by mass relative to the cement.

上述のような構成において、中空コンクリート杭の先端部から前記根固め部への杭軸方向の応力伝達が実質的に中空コンクリート杭の肉厚の幅に相当する先端面の支圧力によって行われるようにすることができる。 With the above-described configuration, stress transmission in the axial direction of the pile from the tip of the hollow concrete pile to the base protection section can be achieved by a bearing pressure at the tip surface that is essentially equivalent to the width of the wall thickness of the hollow concrete pile.

杭の先端支持力は根固め部底面における地盤の支持力で決まるため、先端支持力を上げるためには、根固め部の径は大きい方がよいとも言えるが、その場合、上述のような中空コンクリート杭の肉厚の幅に相当するドーナツ状の面積での荷重伝達において、根固め部が壊れないことが前提となる。 Since the tip bearing capacity of a pile is determined by the bearing capacity of the ground at the bottom of the base, it can be said that in order to increase the tip bearing capacity, it is better to have a larger diameter base, but in that case, the premise is that the base will not break when the load is transmitted over a donut-shaped area equivalent to the width of the wall thickness of the hollow concrete pile as described above.

中空コンクリート杭の肉厚の幅に相当するドーナツ状の面積の根固め部の耐力の上限から、根固め部の径は中空コンクリート杭の外径の1.5倍程度までとなる。 Due to the upper limit of the bearing capacity of the donut-shaped base protection section, which has an area equivalent to the width of the hollow concrete pile's wall thickness, the diameter of the base protection section must be approximately 1.5 times the outer diameter of the hollow concrete pile.

一方、先端支持力を上げるためには、根固め部の径を大きくする観点からは、中空コンクリート杭の内側にずれ止めプレートなどを設けなくても、中詰め材を杭先端から上方に杭内径の4倍程度以上の範囲に充填することで、中空コンクリート杭の先端部の開放断面を閉塞することができるので、中空コンクリート杭先端の閉塞断面積での荷重伝達が可能となり根固め部の耐力を向上させることができる。 On the other hand, in order to increase the tip bearing capacity, from the perspective of increasing the diameter of the base protection section, it is possible to fill the filler material from the tip of the pile upward to an area at least four times the pile's inner diameter without installing a shear stopper plate or the like inside the hollow concrete pile. This closes the open cross-section at the tip of the hollow concrete pile, making it possible to transmit load across the closed cross-sectional area at the tip of the hollow concrete pile and improving the bearing strength of the base protection section.

その場合の根固め部の径を中空コンクリート杭の外径の1.5倍より大きく、1.75倍程度まで大きく、あるいは条件によってそれ以上とすることができる。 In this case, the diameter of the base protection section can be greater than 1.5 times the outer diameter of the hollow concrete pile, up to approximately 1.75 times, or even larger depending on the conditions.

中詰め材としては、ソイルセメントなど配合および強度が根固め部の配合および強度と実質的に同じものを使用することができるが、必ずしも根固め部と同じ配合および強度としなくてもよく、根固め部より強度の高いソイルセメントあるいはセメントミルクを用いてもよい。 The filling material can be soil cement or other materials with substantially the same composition and strength as the base protection section, but it does not necessarily have to be the same composition and strength as the base protection section; soil cement or cement milk with higher strength than the base protection section can also be used.

また、中詰め材は中空コンクリート杭の先端部の所定区間のみ充填するようにしてもよい。 Filling material may also be filled only in a specified section at the tip of the hollow concrete pile.

本発明の中空コンクリート杭の先端支持構造における中空コンクリート杭の施工方法としては、主として中掘り杭工法が用いられるが、必ずしも中掘り杭工法に限定されず、プレボーリング工法によって中空コンクリート杭を後から建て込むこともできる。 The construction method for the hollow concrete piles in the hollow concrete pile tip support structure of the present invention is primarily the core excavation pile construction method, but this is not necessarily limited to the core excavation pile construction method, and the hollow concrete piles can also be erected later using the pre-boring method.

特に中掘り杭工法によって施工される中空コンクリート杭の場合、従来と同様、中空コンクリート杭の先端部外周位置には、地盤中への前記中空コンクリート杭の建て込みの際に地盤からの摩擦抵抗を軽減するためのフリクションカッターを設けることが望ましい。 In particular, in the case of hollow concrete piles constructed using the core pile construction method, as in the past, it is desirable to provide friction cutters around the outer periphery of the tip of the hollow concrete pile to reduce frictional resistance from the ground when the hollow concrete pile is erected into the ground.

その場合、フリクションカッターの内側に土砂が付着して残るという問題があるが、従来の中掘り杭工法によって施工される中空コンクリート杭の場合と同様、アースオーガーの軸に取り付けた拡径式の土砂除去プレートで付着土砂を取り除いたり、従来の中掘り杭工法によって施工される中空コンクリート杭の場合と同様にアースオーガーの先端部より水など高圧噴射して付着土砂を取り除くことが考えられる。 In this case, there is the problem of soil remaining stuck to the inside of the friction cutter, but as with hollow concrete piles constructed using the conventional core-drilling pile method, the stuck soil can be removed using an expandable soil removal plate attached to the shaft of the earth auger, or by spraying water or other high-pressure material from the tip of the earth auger, as with hollow concrete piles constructed using the conventional core-drilling pile method.

その他、フリクションカッターの内側に上方に向かってすぼむテーパー面を有するリング状部材を設け、付着土砂が生じないようにすることも可能である。リング状部材としては、例えば、テーパー付きのリング状に加工したあるいは成型した金物を溶接することができるが、材質や製法、取付け方法などは特に限定されない。 In addition, it is possible to provide a ring-shaped member with an upwardly tapered surface on the inside of the friction cutter to prevent soil and sand from adhering. For example, the ring-shaped member can be a metal piece that has been machined or molded into a tapered ring and welded, but there are no particular restrictions on the material, manufacturing method, or installation method.

また、フリクションカッターとリング状部材を一体ものとして加工したあるいは成形したものを用いてもよい。 Alternatively, a friction cutter and a ring-shaped member may be processed or molded as a single unit.

根固め部の強度を、15~30N/mm2、より好ましくは20~30N/mm2というように高強度化することで、中空コンクリート杭下端面からの応力を、実質的に根固め部の中空コンクリート杭下端面に接する部分で直接受けることができ、根固め部への荷重伝達を杭下端面の支圧力のみで算定することが可能となる。 By increasing the strength of the base fixing portion to 15 to 30 N/mm 2 , and more preferably 20 to 30 N/mm 2 , the stress from the lower end surface of the hollow concrete pile can be directly borne by the part of the base fixing portion that contacts the lower end surface of the hollow concrete pile, making it possible to calculate the load transmission to the base fixing portion based solely on the bearing pressure at the lower end surface of the pile.

この場合、杭先端部の外周面や内周面に突起を設けなくても、中空コンクリート杭の杭下端面の支圧力で算定すればよいため、市販の中空コンクリート既製杭をそのまま用いることができる。 In this case, since the calculation only requires the bearing pressure at the bottom end surface of the hollow concrete pile, even if no protrusions are provided on the outer or inner surfaces of the pile tip, commercially available prefabricated hollow concrete piles can be used as is.

根固め部の径が杭径の1.5倍程度までであれば、根固め部の強度を15~30N/mm2、好ましくは20N/mm2以上とすることで、杭製造コストの縮減や施工性の向上などの面でもメリットが大きい。 If the diameter of the base protection portion is up to about 1.5 times the pile diameter, setting the strength of the base protection portion to 15 to 30 N/mm 2 , preferably 20 N/mm 2 or more, will have significant benefits in terms of reducing pile manufacturing costs and improving workability.

また、根固め部の強度を15~30N/mm2、好ましくは20N/mm2以上とし、かつ中空コンクリート杭の内側に中詰め材を充填して、中空コンクリート杭の先端部の開放断面を閉塞する構成とすれば、根固め部の径を杭径の1.75倍程度まで大きくすることができるので、先端支持力を高めることができる。 Furthermore, if the strength of the base fixing portion is set to 15 to 30 N/mm 2 , preferably 20 N/mm 2 or more, and if a filler material is filled inside the hollow concrete pile to block the open cross section at the tip of the hollow concrete pile, the diameter of the base fixing portion can be increased to about 1.75 times the pile diameter, thereby increasing the tip bearing capacity.

本発明の中空コンクリート杭の先端支持構造の基本概念を示す鉛直断面図である。FIG. 1 is a vertical cross-sectional view showing the basic concept of the tip support structure of a hollow concrete pile of the present invention. 従来の中掘り工法で施工されるPHC杭の先端部と根固め部との関係を一例として示した鉛直断面図である。FIG. 1 is a vertical cross-sectional view showing an example of the relationship between the tip and the base of a PHC pile constructed using a conventional excavation method. 図1の形態における中空コンクリート杭下端面の土砂除去方法の説明図であり、(a)は杭下端面に土砂が付着している様子を示す鉛直断面図、(b)は土砂除去プレートによる土砂の除去方法を示す鉛直断面図、(c)は高圧噴射による土砂の除去方法を示す鉛直断面図である。2A and 2B are explanatory diagrams of a method for removing soil from the bottom end surface of a hollow concrete pile in the form of FIG. 1, in which (a) is a vertical cross-sectional view showing soil adhering to the bottom end surface of the pile, (b) is a vertical cross-sectional view showing a method for removing soil using a soil removal plate, and (c) is a vertical cross-sectional view showing a method for removing soil using a high-pressure jet. 本発明の中空コンクリート杭の先端支持構造の他の実施形態として杭下端部の先端形状の変形例を示したものであり、(a)は図1の形態で懸念される土砂の取り残しの説明図、(b)は図1の形態で懸念されるブリーディングによる弱部の説明図、(c)は杭下端部の先端形状の変形例を示す鉛直断面図である。1A and 1B show modified tip shapes of the lower end of the pile as another embodiment of the tip support structure of the hollow concrete pile of the present invention, where (a) is an explanatory diagram of the concern of soil being left behind in the form of FIG. 1, (b) is an explanatory diagram of the concern of weak parts due to bleeding in the form of FIG. 1, and (c) is a vertical cross-sectional view showing modified tip shapes of the lower end of the pile. 図4(c)の実施形態に関する杭下端部の先端形状の形態例を示したものであり、(a)はフリクションカッターとテーパー部を有するリング状部材が別体である場合の断面図、(b)はテーパー部を有するリング状部材がフリクションカッターを兼ねる場合の断面図、(c)は中空コンクリート杭の杭先端部に杭本体と一体のテーパー部を設けている場合の断面図、(d)は中空コンクリート杭の杭先端部に杭本体と一体のテーパー部を設け、さらにその外周部を張り出させて、フリクションカッターを兼ねさせている場合の断面図である。4(c) shows examples of the tip shape of the lower end of the pile for the embodiment of FIG. 4(c), where (a) is a cross-sectional view when the friction cutter and the ring-shaped member having a tapered portion are separate, (b) is a cross-sectional view when the ring-shaped member having a tapered portion also serves as the friction cutter, (c) is a cross-sectional view when a tapered portion integral with the pile body is provided at the tip of the hollow concrete pile, and (d) is a cross-sectional view when a tapered portion integral with the pile body is provided at the tip of the hollow concrete pile, and the outer periphery of the tapered portion is further extended to also serve as a friction cutter. 本発明の中空コンクリート杭の先端支持構造における中空コンクリート杭の先端部から根固め部への応力方向および破壊イメージの破壊線を概念的に示した図であり、(a)は図1の実施形態に対応する概念図、(b)は図4(c)の実施形態に対応する概念図である。4(a) and 4(b) are conceptual diagrams showing the stress direction from the tip of the hollow concrete pile to the base reinforcement part and the fracture line of the fracture image in the tip support structure of the hollow concrete pile of the present invention, where (a) is a conceptual diagram corresponding to the embodiment of FIG. 1, and (b) is a conceptual diagram corresponding to the embodiment of FIG. 4(c). 本発明の中空コンクリート杭の先端支持構造における中空コンクリート杭の先端部の根固め部への埋込み長に関する説明図であり、(a)は図1の実施形態に対応する概念図、(b)は図4(c)の実施形態に対応する概念図である。1(a) and 1(b) are explanatory diagrams showing the embedding length of the tip of a hollow concrete pile into the base protection portion in the tip support structure of a hollow concrete pile of the present invention, where (a) is a conceptual diagram corresponding to the embodiment of FIG. 1, and (b) is a conceptual diagram corresponding to the embodiment of FIG. 4(c). 本発明の中空コンクリート杭の先端支持構造における杭基礎全体としての支持力機構の説明図である。FIG. 2 is an explanatory diagram of the bearing capacity mechanism of the entire pile foundation in the tip support structure of the hollow concrete pile of the present invention. 本発明の中空コンクリート杭の先端支持構造における荷重伝達機構と根固め杭の径との関係を示したものであり、(a)は中空コンクリート杭の先端部が閉塞されない場合の説明図、(b)は中詰め材により中空コンクリート杭の先端部が閉塞された場合の説明図である。This shows the relationship between the load transfer mechanism and the diameter of the foot reinforcement pile in the tip support structure of the hollow concrete pile of the present invention, where (a) is an explanatory diagram of the case where the tip of the hollow concrete pile is not blocked, and (b) is an explanatory diagram of the case where the tip of the hollow concrete pile is blocked by a filler material.

以下、本発明の実施形態を添付図面に基づいて説明する。
図1は、本発明の中空コンクリート杭の先端支持構造の基本概念を示す鉛直断面図である。
Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings.
FIG. 1 is a vertical cross-sectional view showing the basic concept of the tip support structure of a hollow concrete pile according to the present invention.

本発明の中空コンクリート杭の先端支持構造において、地盤中に建て込まれた中空コンクリート杭1の先端部2が、中空コンクリート杭1の外径よりも径の大きい根固め部3で支持される先端支持構造において、根固め部3の強度が15~30N/mm2、より好ましくは20~30N/mm2となるようにする。 In the tip support structure of the hollow concrete pile of the present invention, the tip 2 of the hollow concrete pile 1 erected in the ground is supported by a base fixing portion 3 having a diameter larger than the outer diameter of the hollow concrete pile 1, and the strength of the base fixing portion 3 is set to 15 to 30 N/mm 2 , more preferably 20 to 30 N/mm 2 .

また、根固め部3の径は中空コンクリート杭の外径の1.5倍以内とし、中空コンクリート杭1の先端部2は閉塞されない開放断面とする。この場合、根固め部3の掘削径が小さくなるため、コンクリートの使用量も少なく抑えることができる。 In addition, the diameter of the base protection section 3 is set to within 1.5 times the outer diameter of the hollow concrete pile, and the tip 2 of the hollow concrete pile 1 has an open cross-section that is not blocked. In this case, the excavation diameter of the base protection section 3 is smaller, so the amount of concrete used can be reduced.

このように根固め部3を高強度とすることにより、中空コンクリート杭1の先端部2から根固め部3への杭軸方向の応力伝達は、実質的に中空コンクリート杭1の肉厚の幅に相当する先端面の支圧力によって行われるようにすることができる。 By making the base protection section 3 strong in this way, stress transmission in the axial direction from the tip 2 of the hollow concrete pile 1 to the base protection section 3 can be achieved by the bearing pressure at the tip surface, which is essentially equivalent to the width of the wall thickness of the hollow concrete pile 1.

図3は、本発明の中空コンクリート杭の先端支持構造の他の実施形態として杭下端部の先端形状の変形例を示したものであるが、従来の中掘り杭工法によって施工される中空コンクリート杭の場合と同様、図3(a)に示すように、フリクションカッター5の内側に土砂sが付着して残るという問題が考えられる。 Figure 3 shows a modified tip shape at the bottom end of the pile as another embodiment of the tip support structure for a hollow concrete pile of the present invention. However, as with hollow concrete piles constructed using the conventional core pile construction method, there is a potential problem of soil and sand (s) adhering to and remaining inside the friction cutter (5), as shown in Figure 3(a).

これに対しては、例えば図3(b)に示すように、アースオーガー23の軸に取り付けた拡径式の土砂除去プレート24の上面突起部で付着土砂sを取り除いたり、従来の中掘り杭工法によって施工される中空コンクリート杭の場合と同様に、図3(c)に示すように、アースオーガー23の先端部の噴出口25より水など高圧噴射して付着土砂sを取り除くことが考えられる。 To address this issue, for example, as shown in Figure 3(b), the adhering sediment s can be removed using the upper protrusion of an expandable sediment removal plate 24 attached to the shaft of the earth auger 23, or, as in the case of hollow concrete piles constructed using the conventional core pile construction method, as shown in Figure 3(c), water or other high-pressure spray can be used to remove the adhering sediment s from the nozzle 25 at the tip of the earth auger 23.

図4は、本発明の中空コンクリート杭の先端支持構造の他の実施形態として杭下端部の先端形状の変形例を示したものであり、具体的には図4(c)の形態が変形例としての実施形態である。 Figure 4 shows a modified tip shape of the lower end of the pile as another embodiment of the tip support structure for a hollow concrete pile of the present invention. Specifically, the configuration shown in Figure 4(c) is an embodiment of the modified tip.

図4(a)は、図1の形態で懸念される土砂sの取り残しによる取り残し土砂31の状況を示したものであり、図4(b)は図1の形態で懸念されるブリーディングによる弱部32の発生の状況を示したものである。 Figure 4(a) shows the condition of remaining soil 31 due to the soil s being left behind, which is a concern in the configuration of Figure 1, and Figure 4(b) shows the condition of weak parts 32 due to bleeding, which is a concern in the configuration of Figure 1.

これらの問題に対し、図4(c)に示すように、フリクションカッター5の内側に、上方に向かってすぼむテーパー面を有するリング状部材6を設けることで、図4(a)のような取り残し土砂31が生じないようにすることが可能であり、また図4(b)のようなブリーディングによる弱部32の発生を防止することができる。 To address these issues, as shown in Figure 4(c), a ring-shaped member 6 with an upwardly tapered surface is provided inside the friction cutter 5. This prevents the generation of residual soil 31 as shown in Figure 4(a), and also prevents the creation of weak spots 32 due to bleeding as shown in Figure 4(b).

図5は、上述の図4(c)の実施形態に関する杭下端部の先端形状の形態例を示したものであり、図5(a)はフリクションカッター5とテーパー部を有するリング状部材6としての金物が別体となっており、これらを溶接により取り付けた場合である。 Figure 5 shows an example of the shape of the tip of the lower end of the pile for the embodiment shown in Figure 4(c) above. Figure 5(a) shows a case in which the friction cutter 5 and the metal fittings in the form of a ring-shaped member 6 with a tapered portion are separate and attached by welding.

図5(b)は、テーパー部を有するリング状部材6aがフリクションカッターを兼ね、リング状部材6aの外周面が中空コンクリート杭の先端部2より外側に突出するようにした場合である。 Figure 5(b) shows a case in which a ring-shaped member 6a with a tapered portion doubles as a friction cutter, and the outer surface of the ring-shaped member 6a protrudes outward beyond the tip 2 of the hollow concrete pile.

図5(c)は、テーパー部を有するリング状部材が金物ではなく、中空コンクリート杭の杭本体と一体のコンクリートなどで形成されている場合である。すなわち、中空コンクリート杭の先端部2に、リング状部材6bとして、上方に向かってすぼむテーパー面を有する、杭本体と一体のテーパー部を形成したものである。 Figure 5(c) shows a case where the ring-shaped member with a tapered portion is not made of metal, but is formed from concrete or other material that is integral with the main body of the hollow concrete pile. In other words, the tip 2 of the hollow concrete pile is formed with a tapered portion that is integral with the main body of the pile, and has a tapered surface that tapers upward, as the ring-shaped member 6b.

図5(d)は、図5(c)の杭本体と一体のテーパー部を形成したリング状部材6bに対し、さらにその外周部を杭径方向外側に張り出させて、フリクションカッターを兼ねるリング状部材6cとした場合である。 Figure 5(d) shows a ring-shaped member 6c that also functions as a friction cutter, with the outer periphery of the ring-shaped member 6b in Figure 5(c) extending radially outward from the pile, forming a tapered portion integral with the pile body.

図6は、本発明の中空コンクリート杭の先端支持構造における中空コンクリート杭の先端部から根固め部への応力方向および破壊イメージの破壊線を概念的に示した図である。 Figure 6 is a conceptual diagram showing the stress direction from the tip of the hollow concrete pile to the base protection section and the fracture line of the fracture image in the tip support structure of the hollow concrete pile of the present invention.

図6(a)は図1の実施形態に対応する中空コンクリート杭1の先端部2から根固め部3への応力方向および破壊イメージの破壊線を示した図であり、先端部2下面の端板4から根固め部3にほぼ垂直に応力が伝達される。 Figure 6(a) shows the stress direction from the tip 2 to the base protection section 3 of the hollow concrete pile 1 corresponding to the embodiment in Figure 1, as well as the fracture line of the fracture image. Stress is transmitted almost perpendicularly from the end plate 4 on the underside of the tip 2 to the base protection section 3.

これに対し、図6(b)は図4(c)の実施形態に対応する中空コンクリート杭1の先端部2から根固め部3への応力方向および破壊イメージの破壊線を示した図であり、先端部2にリング状部材6が設けられていることで、リング状部材6のテーパー面から根固め部3にほぼ直角に応力が伝達される。この場合、テーパー面から根固め部3に対する若干のコンファインド効果による耐力向上も期待できる。 In contrast, Figure 6(b) shows the stress direction from the tip 2 to the base protection section 3 of the hollow concrete pile 1 corresponding to the embodiment in Figure 4(c), as well as the fracture line of the fracture image. By providing a ring-shaped member 6 at the tip 2, stress is transmitted from the tapered surface of the ring-shaped member 6 to the base protection section 3 at an almost right angle. In this case, a slight confining effect from the tapered surface on the base protection section 3 can also be expected, improving the bearing capacity.

図7は、本発明の中空コンクリート杭の先端支持構造における中空コンクリート杭の先端部の根固め部への埋込み長に関する説明図である。 Figure 7 is an explanatory diagram showing the embedding length of the tip of a hollow concrete pile into the base protection section in the tip support structure of a hollow concrete pile of the present invention.

図2に例示した、従来の中掘り工法で施工される中空コンクリート杭の場合、埋込み長Lをある程度長く設定する必要があるが、本発明の場合、中空コンクリート杭1の先端部2下端面からの応力を、実質的に支圧力のみで伝達する構造であるため、図7(a)、(b)に示すように、埋込み長Lを短く抑えることができ、根固め部3築造後の杭定着工程が省略でき、施工時間の短縮や杭の高止まりリスクの低減が図れる。 In the case of a hollow concrete pile constructed using the conventional excavation method, as shown in Figure 2, the embedded length L must be set to a certain length. However, in the case of the present invention, the stress from the lower end surface of the tip 2 of the hollow concrete pile 1 is transmitted essentially by bearing pressure alone. As shown in Figures 7(a) and (b), the embedded length L can be kept short, and the pile fixing process after constructing the foot protection section 3 can be omitted, shortening construction time and reducing the risk of the pile remaining high.

図7(a)は、図1の実施形態に対応する概念図であり、図7(b)は図4(c)の実施形態に対応する概念図である。図7(b)の場合、上述の図6(b)で説明したように、先端部2にリング状部材6が設けられていることで、リング状部材6のテーパー面から根固め部3にほぼ直角に応力が伝達されるため、埋込み長Lをより短くすることができ、実質的に0に近い埋込み長とすることも考えられる。 Figure 7(a) is a conceptual diagram corresponding to the embodiment of Figure 1, and Figure 7(b) is a conceptual diagram corresponding to the embodiment of Figure 4(c). In the case of Figure 7(b), as explained above in Figure 6(b), a ring-shaped member 6 is provided at the tip 2, and stress is transmitted from the tapered surface of the ring-shaped member 6 to the root protection portion 3 at a nearly right angle, making it possible to further shorten the embedded length L, and it is even possible to make the embedded length essentially close to zero.

図8は、本発明の中空コンクリート杭の先端支持構造における杭基礎全体としての支持力機構の説明図であり、杭基礎全体としての先端支持力は根固め部3の底面における地盤の支持力Rで決まる。 Figure 8 is an explanatory diagram of the bearing capacity mechanism of the entire pile foundation in the tip support structure of the hollow concrete pile of the present invention, and the tip bearing capacity of the entire pile foundation is determined by the bearing capacity Re of the ground at the bottom surface of the foot protection portion 3.

そのため、先端支持力を上げるためには、根固め部3の径は大きい方がよいとも言えるが、その場合、中空コンクリート杭1の先端部2の肉厚の幅に相当するドーナツ状の面積での荷重伝達(支圧)において、根固め部3が壊れないことが前提となる。 For this reason, it can be said that a larger diameter for the base protection section 3 is better for increasing tip bearing capacity, but in that case, the premise is that the base protection section 3 will not break when load is transmitted (bearing pressure) over a doughnut-shaped area equivalent to the width of the wall thickness of the tip section 2 of the hollow concrete pile 1.

図9は、図8の支持力機構を考慮した場合の根固め部3における荷重伝達機構と根固め杭3の径との関係の説明図である。 Figure 9 is an explanatory diagram of the relationship between the load transfer mechanism in the foot protection section 3 and the diameter of the foot protection pile 3 when taking into account the bearing capacity mechanism in Figure 8.

図9(a)は中空コンクリート杭1の先端部2が閉塞されない場合であり、先端面の支圧のみで設計することから、荷重伝達部Tが壊れない条件のもと、根固め部3の径Df1は中空コンクリート杭1の外径Dの1.5倍程度まであることが望ましい。 Figure 9(a) shows the case where the tip 2 of the hollow concrete pile 1 is not blocked. Since the design is based only on the bearing pressure at the tip surface, it is desirable that the diameter Df1 of the base protection section 3 be approximately 1.5 times the outer diameter D of the hollow concrete pile 1, provided that the load transfer section T does not break.

図9(b)は中詰め材7により中空コンクリート杭1の先端部2が閉塞される場合であり、荷重伝達部Tの耐力が向上することで、根固め部3の径Df2を中空コンクリート杭1の外径の1.75倍程度まで対応させることができる。 Figure 9(b) shows the case where the tip 2 of the hollow concrete pile 1 is blocked by filling material 7. By improving the strength of the load transmission section T, the diameter D f2 of the base fixing section 3 can be made to accommodate up to approximately 1.75 times the outer diameter of the hollow concrete pile 1.

1…中空コンクリート杭、2…杭先端部、3…根固め部、4…端板、5…フリクションカッター、6…リング状部材、7…中詰め材、
21…ずれ止めプレート、22…ずれ止め鉄筋、23…アースオーガー、24…土砂除去プレート、25…噴射口、
31…取り残し土砂、32…ブリーディングによる弱部、
L…埋込み長、
p…支圧力、P…荷重、R…地盤の支持力、T…荷重伝達部、
s…付着土砂、h…高圧噴射
1... Hollow concrete pile, 2... Pile tip, 3... Foot protection portion, 4... End plate, 5... Friction cutter, 6... Ring-shaped member, 7... Filling material,
21... Shear stop plate, 22... Shear stop rebar, 23... Earth auger, 24... Soil removal plate, 25... Injection nozzle,
31... Leftover soil and sand, 32... Weak areas due to bleeding,
L: embedded length,
p...bearing pressure, P...load, R e ...bearing capacity of the ground, T...load transmission part,
s...adherent soil, h...high pressure injection

Claims (6)

地盤中に建て込まれた中空コンクリート杭の先端部が、前記中空コンクリート杭の外径よりも径の大きい根固め部で支持される中空コンクリート杭の先端支持構造において、前記根固め部の強度が20~30N/mm2であり、前記中空コンクリート杭の先端部が開放断面となっており、かつ前記中空コンクリート杭の先端部の内外面にはソイルセメントによる根固め部との一体化のための突起または凹凸またはずれ止めがなく、前記中空コンクリート杭の先端部外周位置には、地盤中への前記中空コンクリート杭の建て込みの際に地盤からの摩擦抵抗を軽減するためのフリクションカッターが設けられており、かつ前記フリクションカッターの内側には上方に向かってすぼむテーパー面を有する金物のリング状部材が設けられており、前記中空コンクリート杭の先端部から前記根固め部への杭軸方向の応力伝達が、実質的に前記中空コンクリート杭の先端面の支圧力によって行われるようにしたことを特徴とする中空コンクリート杭の先端支持構造。 a hollow concrete pile having a tip support structure in which the tip of the hollow concrete pile erected in the ground is supported by a base protection section with a diameter larger than the outer diameter of the hollow concrete pile, the strength of the base protection section is 20 to 30 N/ mm2 , the tip of the hollow concrete pile has an open cross-section, and the inner and outer surfaces of the tip of the hollow concrete pile are free of protrusions, irregularities, or stoppers for integrating it with the base protection section made of soil cement , a friction cutter is provided on the outer periphery of the tip of the hollow concrete pile to reduce frictional resistance from the ground when the hollow concrete pile is erected in the ground, and a metal ring-shaped member with a tapered surface that narrows upward is provided on the inside of the friction cutter, so that stress in the pile axial direction from the tip of the hollow concrete pile to the base protection section is substantially carried out by the bearing pressure of the tip surface of the hollow concrete pile. 請求項記載の中空コンクリート杭の先端支持構造において、前記フリクションカッターと前記リング状部材が一体となっていることを特徴とする中空コンクリート杭の先端支持構造。 2. The tip support structure for a hollow concrete pile according to claim 1 , wherein the friction cutter and the ring-shaped member are integral with each other. 請求項1記載の中空コンクリート杭の先端支持構造において、前記中空コンクリート杭がPHC杭、SC杭または遠心成形による中空のRC杭であることを特徴とする中空コンクリート杭の先端支持構造。 The tip support structure for a hollow concrete pile according to claim 1, wherein the hollow concrete pile is a PHC pile, a SC pile, or a centrifugally formed hollow RC pile. 請求項1記載の中空コンクリート杭の先端支持構造において、前記根固め部は水セメント比が40~50%のセメントミルクを土砂と混合したソイルセメントによって形成されていることを特徴とする中空コンクリート杭の先端支持構造。 2. The tip support structure of a hollow concrete pile according to claim 1 , wherein the base fixing portion is formed of soil cement, which is a mixture of cement milk having a water-cement ratio of 40 to 50% and soil and sand. 請求項記載の中空コンクリート杭の先端支持構造において、前記セメントミルクには炭酸マグネシウムが添加されていることを特徴とする中空コンクリート杭の先端支持構造。 5. The tip support structure for a hollow concrete pile according to claim 4 , wherein the cement milk contains magnesium carbonate. 請求項1~の何れかに記載の中空コンクリート杭の先端支持構造において、前記根固め部の径が中空コンクリート杭の外径の1.5倍以内であることを特徴とする中空コンクリート杭の先端支持構造。 6. The tip support structure for a hollow concrete pile according to claim 1 , wherein the diameter of the base fixing portion is within 1.5 times the outer diameter of the hollow concrete pile.
JP2021163813A 2021-10-05 2021-10-05 Tip support structure for hollow concrete piles Active JP7787682B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021163813A JP7787682B2 (en) 2021-10-05 2021-10-05 Tip support structure for hollow concrete piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021163813A JP7787682B2 (en) 2021-10-05 2021-10-05 Tip support structure for hollow concrete piles

Publications (2)

Publication Number Publication Date
JP2023054867A JP2023054867A (en) 2023-04-17
JP7787682B2 true JP7787682B2 (en) 2025-12-17

Family

ID=85986141

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021163813A Active JP7787682B2 (en) 2021-10-05 2021-10-05 Tip support structure for hollow concrete piles

Country Status (1)

Country Link
JP (1) JP7787682B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000110160A (en) 1998-10-01 2000-04-18 Sumitomo Metal Ind Ltd Construction method of embedded pile using expanded steel pipe pile and expanded steel pipe pile
JP2001059219A (en) 1999-06-17 2001-03-06 Sumitomo Metal Ind Ltd Embedded pile
US20060147274A1 (en) 2004-11-12 2006-07-06 Jinliang Ding Construction process for composite pile foundation
JP2006200190A (en) 2005-01-19 2006-08-03 Nippon Concrete Ind Co Ltd Pile for medium digging
JP2008095502A (en) 2001-02-16 2008-04-24 Mitani Sekisan Co Ltd Pile hole drilling method and foundation pile constructing method
JP2016205129A (en) 2014-11-11 2016-12-08 隆夫 中野 Precast pile embedding method
JP2019183510A (en) 2018-04-11 2019-10-24 株式会社トーヨーアサノ Foundation pile and foundation construction method using the foundation pile

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5457704U (en) * 1977-09-30 1979-04-21
JPS613953Y2 (en) * 1978-08-23 1986-02-06
JPS62170614A (en) * 1986-01-22 1987-07-27 Nippon Steel Corp Construction work of steel pipe pile
JPS62228523A (en) * 1986-03-28 1987-10-07 Asahi Chem Ind Co Ltd Inner drilling work for ready made pile
JPH09125389A (en) * 1995-11-06 1997-05-13 Asahi Chem Ind Co Ltd Pile construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000110160A (en) 1998-10-01 2000-04-18 Sumitomo Metal Ind Ltd Construction method of embedded pile using expanded steel pipe pile and expanded steel pipe pile
JP2001059219A (en) 1999-06-17 2001-03-06 Sumitomo Metal Ind Ltd Embedded pile
JP2008095502A (en) 2001-02-16 2008-04-24 Mitani Sekisan Co Ltd Pile hole drilling method and foundation pile constructing method
US20060147274A1 (en) 2004-11-12 2006-07-06 Jinliang Ding Construction process for composite pile foundation
JP2006200190A (en) 2005-01-19 2006-08-03 Nippon Concrete Ind Co Ltd Pile for medium digging
JP2016205129A (en) 2014-11-11 2016-12-08 隆夫 中野 Precast pile embedding method
JP2019183510A (en) 2018-04-11 2019-10-24 株式会社トーヨーアサノ Foundation pile and foundation construction method using the foundation pile

Also Published As

Publication number Publication date
JP2023054867A (en) 2023-04-17

Similar Documents

Publication Publication Date Title
JP5265500B2 (en) Pile digging method, foundation pile structure
JPS60500875A (en) Method and device for constructing reinforced concrete walls underground
KR101081566B1 (en) Steel pipe pile for foundation work using seismic isolation device and the construction method
JP7787682B2 (en) Tip support structure for hollow concrete piles
JP4672209B2 (en) Soil-cement pillars having a small-diameter steel pipe as a core material and construction method
JP6860381B2 (en) Reinforcement method and structure of steel pipe pile using multiple fine crack type fiber reinforced cement composite material
CN206090547U (en) Strength nature composite pile of dysmorphism
JP4171470B2 (en) Method for reinforcing concrete structures
JP4054896B2 (en) Foundation pile construction method and foundation pile structure
JP4378752B2 (en) Ready-made piles for large-diameter ready-made concrete pile foundations
JP2020200600A (en) Suppression structure of rotation of column pile
KR102650570B1 (en) Phc pile with shear groove and head reinforcement structure of phc pile using the same
JP2017057637A (en) Pile foundation structure, device for burying precast pile and method for constructing pile foundation structure by device for burying precast pile
KR102650575B1 (en) Phc pile with shear key and head reinforcement structure of phc pile using the same
JP2000154540A (en) Embedded pile, its construction method, construction equipment and existing pile for embedded pile
KR102875488B1 (en) Eco-friendly sewage treatment maintenance and reinforcement method
JP3678290B2 (en) High earthquake resistance foundation
JP3168197B2 (en) Caisson anchor structure and construction method
KR100374200B1 (en) Reinforcement method fot tip of still pile
JP7477733B1 (en) Reinforcement structure and method
CN223269227U (en) A grouting device for the end of a bored pile
JP2000045295A (en) Existing pile mixed type pile foundation structure and construction method
JP4576768B2 (en) Composite type underground continuous wall and construction method of the same wall
JP2008150910A (en) Ready-made concrete piles
JP2025012531A (en) Reinforcement structure of stone retaining wall and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240716

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250110

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250121

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250319

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20250319

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20250701

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250930

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251202

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251205

R150 Certificate of patent or registration of utility model

Ref document number: 7787682

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150