Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7787743B2 - Finishing material fixing structure and finishing material fixing hardware - Google Patents
[go: Go Back, main page]

JP7787743B2 - Finishing material fixing structure and finishing material fixing hardware - Google Patents

Finishing material fixing structure and finishing material fixing hardware

Info

Publication number
JP7787743B2
JP7787743B2 JP2022026577A JP2022026577A JP7787743B2 JP 7787743 B2 JP7787743 B2 JP 7787743B2 JP 2022026577 A JP2022026577 A JP 2022026577A JP 2022026577 A JP2022026577 A JP 2022026577A JP 7787743 B2 JP7787743 B2 JP 7787743B2
Authority
JP
Japan
Prior art keywords
diameter
finishing material
base material
small
material fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022026577A
Other languages
Japanese (ja)
Other versions
JP2023122838A (en
Inventor
智紀 津川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2022026577A priority Critical patent/JP7787743B2/en
Publication of JP2023122838A publication Critical patent/JP2023122838A/en
Application granted granted Critical
Publication of JP7787743B2 publication Critical patent/JP7787743B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Description

この発明は、仕上材固定構造および仕上材固定金具に関する。 This invention relates to a finishing material fixing structure and a finishing material fixing fixture.

例えば、厚手の下地材に薄手の仕上材を被せて、両者を上から締結固定する場合、薄手の仕上材に見合った小径のネジ部材を使って見栄え良く締結固定するのが仕上品質を向上する上で望ましい(例えば、特許文献1参照)。 For example, when covering a thick base material with a thin finishing material and fastening the two together from above, it is desirable to use small-diameter screw members that match the thin finishing material to fasten them together in a way that looks good, in order to improve the finish quality (see, for example, Patent Document 1).

特開2013-266566号公報Japanese Patent Application Laid-Open No. 2013-266566

薄手の仕上材の固定先となる下地材が厚手の場合、厚手の下地材に、小径のネジ部材のための小径の下穴を、工場で予め機械加工によって加工することは困難である。それは、小径の下穴の加工用の工具が細く小さくなるため、下地材が厚くなるほど、また、下穴が小径になるほど工具の耐久性が低くなるからである。 When the base material to which a thin finishing material is fixed is thick, it is difficult to pre-machine small pilot holes for small-diameter screw components in the thick base material at the factory. This is because the tools used to drill small pilot holes are thin and small, and the thicker the base material and the smaller the diameter of the pilot hole, the less durable the tools become.

そのため、例えば、現地で下穴加工が不要なドリルネジを用いて厚手の下地材に薄手の仕上材を直接固定したり、現地で厚手の下地材に手作業で下穴加工を行ってから厚手の下地材に薄手の仕上材を固定したりしていたが、取付作業性が悪かった。 As a result, for example, thin finishing materials were fixed directly to thick base materials using drill screws that did not require pilot holes on site, or pilot holes had to be manually drilled on site in the thick base material before the thin finishing material was fixed to the thick base material, but this method was difficult to install.

そこで、本発明は、上記した問題点の改善に寄与することを主な目的としている。 The main purpose of this invention is to contribute to improving the above-mentioned problems.

上記課題に対して、本発明は、
厚手の下地材に薄手の仕上材を被せて上から締結固定した仕上材固定構造であって、
前記下地材と前記仕上材との間に、前記下地材と前記仕上材との中間の肉厚を有する仕上材固定金具が介在され、
前記仕上材固定金具は、大径の第一ネジ用穴部と、小径の第二ネジ用穴部とを有しており、
前記仕上材固定金具は、大径の前記第一ネジ用穴部に大径の第一ネジ部材を通して、前記下地材の上に締結固定されており、
前記仕上材固定金具の上に被せた前記仕上材は、小径の第二ネジ部材で前記仕上材固定金具の小径の前記第二ネジ用穴部に締結固定されており、
前記下地材は、
大径の前記第一ネジ用穴部と合致する位置に、大径の前記第一ネジ部材を取付ける第一下穴を有し、
小径の前記第二ネジ用穴部と合致する位置に、小径の前記第二ネジ用穴部よりも大きい第二下穴を有していることを特徴とする。
In response to the above problems, the present invention provides:
A finishing material fixing structure in which a thin finishing material is placed on a thick base material and fastened from above,
A finishing material fixing metal fitting having a thickness intermediate between that of the base material and that of the finishing material is interposed between the base material and the finishing material,
The finishing material fixing fixture has a large-diameter first screw hole portion and a small-diameter second screw hole portion,
The finishing material fixing fixture is fastened and fixed onto the base material by passing a large-diameter first screw member through the large-diameter first screw hole portion,
The finishing material placed on the finishing material fixing fixture is fastened and fixed to the second small-diameter screw hole portion of the finishing material fixing fixture with a second small-diameter screw member ,
The base material is
a first pilot hole for attaching the first screw member having a large diameter at a position that matches the first screw hole portion having a large diameter;
The screw thread is characterized in that a second pilot hole having a larger diameter than the second small-diameter screw hole portion is provided at a position that coincides with the second small-diameter screw hole portion .

本発明によれば、上記構成によって、厚手の下地材に薄手の仕上材を締結固定する際の取付作業性を改善することなどができる。
また、下地材は、第一下穴、および、第二ネジ用穴部よりも大きい第二下穴を有している。これにより、下地材に、小径の第二ネジ用穴部と同径の下穴を設ける必要をなくすことができる。そのため、工場で、予め下地材に第一下穴と第二下穴とを加工することが可能になる。そして、第二下穴は、小径の第二ネジ部材が螺合せずに素通りする径となっているため、下地材に下穴があるのと同じ状態で、小径の第二ネジ部材の取付けを行うことができる。
According to the present invention, the above-mentioned configuration can improve the ease of installation when fastening and fixing a thin finishing material to a thick base material.
The base material also has a first pilot hole and a second pilot hole that is larger than the second screw hole portion. This eliminates the need to provide a pilot hole in the base material with the same diameter as the small-diameter second screw hole portion. This makes it possible to pre-machine the first pilot hole and the second pilot hole in the base material at the factory. The second pilot hole has a diameter that allows the small-diameter second screw member to pass through without being threaded, so the small-diameter second screw member can be installed in the same condition as if the base material had a pilot hole.

本実施の形態にかかる仕上材固定構造の全体斜視図である。1 is an overall perspective view of a finishing material fixing structure according to the present embodiment; 下地材に対する仕上材固定金具の取付状況を示す、図1の水上側の部分の拡大斜視図である。1 的上水面部分的大小图。 FIG. 1 shows the above-water side of the mounting bracket for the finishing material on the base material. 仕上材固定金具に対する仕上材の取付状況を示す、図1の水上側の部分の拡大斜視図である。1 的上水面部分的大小图。 FIG. 1 shows the above-water side of the finishing material fastening bracket. 仕上材固定金具の斜視図である。FIG. 仕上材固定金具の部品図である。このうち、(a)は平面図、(b)は側面図である。1A and 1B are component diagrams of a finishing material fixing fixture, in which (a) is a plan view and (b) is a side view. (a)は下地材に対する仕上材固定金具の取付状況を側方(図3の矢視方向)から見た図、(b)は仕上材固定金具に対する仕上材の取付状況を側方から見た図である。3A is a side view (in the direction of the arrow in FIG. 3) of the attachment of the finishing material fixing bracket to the base material, and FIG. 3B is a side view of the attachment of the finishing material to the finishing material fixing bracket. 下地材に対する仕上材の取付状況を示す、図1の水下側の部分の拡大斜視図である。1. FIG. 4 is an enlarged perspective view of the underwater portion of FIG. 1, showing the attachment of the finishing material to the base material.

以下、本実施の形態を、図面を用いて詳細に説明する。
図1~図7は、この実施の形態を説明するためのものである。
Hereinafter, this embodiment will be described in detail with reference to the drawings.
1 to 7 are provided to explain this embodiment.

<構成>以下、この実施例の構成について説明する。 <Configuration> The configuration of this example is explained below.

図1(~図3)に示すように、厚手の下地材1に薄手の仕上材2を被せて上から締結固定することで仕上材固定構造を形成する。 As shown in Figures 1 (through 3), a thin finishing material 2 is placed over a thick base material 1 and fastened from above to form a finishing material fixing structure.

ここで、下地材1は、仕上材2を取付けるための下地となる部材である。下地材1は、金属製の部材とされる。下地材1には、しっかりした厚手の部材が使用される。 Here, the base material 1 is a component that serves as a base for attaching the finishing material 2. The base material 1 is made of metal. A sturdy, thick component is used for the base material 1.

仕上材2は、外部に露出して仕上面(製品の表面)を形成する化粧部材である。仕上材2は、金属製の部材とされる。仕上材2には、比較的薄手の部材が使用される。下地材1と仕上材2との間には、必要とされる機能の違いによって、厚みの違いが生じる。この厚みの違い(特に、下地材1が厚手となること)が、固定時における作業性の悪化などの原因となる。 Finishing material 2 is a decorative component that is exposed to the outside and forms the finished surface (the surface of the product). Finishing material 2 is made of metal. Relatively thin components are used for finishing material 2. Differences in thickness occur between base material 1 and finishing material 2 due to differences in the required functions. This difference in thickness (particularly when base material 1 is thick) can cause problems such as poor workability during fastening.

仕上材固定構造は、下地材1に仕上材2を固定するための構造である。この実施例では、仕上材固定構造は、締結によって固定する構造とされる。 The finishing material fixing structure is a structure for fixing the finishing material 2 to the base material 1. In this embodiment, the finishing material fixing structure is a structure that fixes the material by fastening.

上記のような基本的な構成に対し、この実施例では、以下のような構成を備えても良い。 In addition to the basic configuration described above, this embodiment may also have the following configuration:

(1)仕上材固定構造では、
図2、図3に示すように、下地材1と仕上材2との間に、下地材1と仕上材2との中間の肉厚を有する仕上材固定金具11が介在される。
図4(図5)に示すように、仕上材固定金具11は、大径の第一ネジ用穴部12と、小径の第二ネジ用穴部13とを有している。
図2、図6(a)(b)に示すように、仕上材固定金具11は、大径の第一ネジ用穴部12に大径の第一ネジ部材14を通して、下地材1の上に締結固定されている。
図3、図6(b)に示すように、仕上材固定金具11の上に被せた仕上材2は、小径の第二ネジ部材15で仕上材固定金具11の小径の第二ネジ用穴部13に締結固定されている。
(1) In the finishing material fixing structure,
As shown in FIGS. 2 and 3, a finishing material fixing metal fitting 11 having a thickness intermediate between that of the base material 1 and the finishing material 2 is interposed between the base material 1 and the finishing material 2 .
As shown in FIG. 4 (FIG. 5), the finishing material fixing fixture 11 has a large-diameter first screw hole portion 12 and a small-diameter second screw hole portion 13.
As shown in Figures 2 and 6(a) and (b), the finishing material fixing bracket 11 is fastened and fixed onto the base material 1 by passing a large-diameter first screw member 14 through a large-diameter first screw hole portion 12.
As shown in Figures 3 and 6 (b), the finishing material 2 placed on the finishing material fixing bracket 11 is fastened and fixed to the small-diameter second screw hole portion 13 of the finishing material fixing bracket 11 with a small-diameter second screw member 15.

ここで、中間の肉厚は、仕上材固定金具11が、厚手の下地材1よりも薄く、薄手の仕上材2よりも厚い金具本体11aによって構成されていることである。 Here, the intermediate thickness means that the finishing material fixing bracket 11 is composed of a bracket body 11a that is thinner than the thick base material 1 and thicker than the thin finishing material 2.

仕上材固定金具11は、下地材1と仕上材2との間に設置されて、下地材1と仕上材2とを間接的に固定する金具である。この実施例の仕上材固定金具11は、厚手の下地材1に対して工場で加工形成することが困難な、小径の第二ネジ用穴部13を備えた下穴変換用金具とされる。 The finishing material fixing bracket 11 is a bracket that is installed between the base material 1 and the finishing material 2, indirectly fixing the base material 1 and the finishing material 2 together. In this embodiment, the finishing material fixing bracket 11 is a pilot hole conversion bracket equipped with a small-diameter second screw hole portion 13, which is difficult to machine and form in a factory for thick base material 1.

大径の第一ネジ用穴部12は、大径の第一ネジ部材14を通して下地材1に螺着させるための、大径の第一ネジ部材14とほぼ同径の貫通穴部である。大径の第一ネジ用穴部12は、大径の第一ネジ部材14が通れば良く、雌ネジを形成したネジ穴としても良いし、雌ネジのない単なる貫通穴としても良い。この実施例では、大径の第一ネジ用穴部12は、大径の第一ネジ部材14よりも僅かに径が大きい挿通穴となっている。 The large-diameter first screw hole 12 is a through-hole with approximately the same diameter as the large-diameter first screw member 14, and is used to thread the large-diameter first screw member 14 into the base material 1. The large-diameter first screw hole 12 only needs to be able to accommodate the large-diameter first screw member 14, and may be a screw hole with a female thread or a simple through-hole without a female thread. In this embodiment, the large-diameter first screw hole 12 is an insertion hole with a diameter slightly larger than the large-diameter first screw member 14.

小径の第二ネジ用穴部13は、小径の第二ネジ部材15を螺着させるための、小径の第二ネジ部材15とほぼ同径の貫通穴部である。小径の第二ネジ用穴部13は、小径の第二ネジ部材15が螺着できれば、雌ネジを形成したネジ穴としても良いし、雌ネジのない単なる貫通穴としても良い。この実施例では、小径の第二ネジ用穴部13は、小径の第二ネジ部材15よりも僅かに径が小さい固定穴となっている。 The small-diameter second screw hole 13 is a through-hole with approximately the same diameter as the small-diameter second screw member 15, for threading the small-diameter second screw member 15. The small-diameter second screw hole 13 may be a screw hole with a female thread, or a simple through-hole without a female thread, as long as it can threadably engage the small-diameter second screw member 15. In this embodiment, the small-diameter second screw hole 13 is a fixing hole with a diameter slightly smaller than the small-diameter second screw member 15.

仕上材固定金具11は、例えば、プレス成形などによって製造される。大径の第一ネジ用穴部12および小径の第二ネジ用穴部13は、プレス成形の際に形成される。 The finishing material fixing bracket 11 is manufactured, for example, by press molding. The large-diameter first screw hole 12 and the small-diameter second screw hole 13 are formed during press molding.

大径の第一ネジ部材14は、大径の第一ネジ用穴部12とほぼ同径の胴部14aを有する締結固定部材である。大径の第一ネジ部材14には、例えば、穿孔やネジ加工ができるドリルネジなどが使われる。ドリルネジは、外周が雄ネジ部とされると共に、先端がドリルビットとされたネジである。 The large-diameter first screw member 14 is a fastening member having a body portion 14a with approximately the same diameter as the large-diameter first screw hole portion 12. The large-diameter first screw member 14 is, for example, a drill screw that can be used for drilling and threading. A drill screw is a screw with a male thread on the outer periphery and a drill bit at the tip.

小径の第二ネジ部材15は、小径の第二ネジ用穴部13とほぼ同径の胴部15aを有する締結固定部材である。小径の第二ネジ部材15には、例えば、穿孔やネジ加工ができるドリルネジなどが使われる。ドリルネジは、外周が雄ネジ部とされると共に、先端がドリルビットとされたネジである。 The small-diameter second screw member 15 is a fastening member having a body portion 15a with approximately the same diameter as the small-diameter second screw hole portion 13. The small-diameter second screw member 15 is, for example, a drill screw that can be used for drilling and threading. A drill screw is a screw with a male thread on the outer periphery and a drill bit at the tip.

仕上材2は、小径の第二ネジ用穴部13と合致する位置に、小径の第二ネジ部材15を通す下穴2aを予め形成しても良い。仕上材2は、小径の第二ネジ部材15の胴部15aを通して、頭部15bを通さない径にする。この実施例では、下穴2aは、小径の第二ネジ用穴部13よりも若干径が大きくなっている。 The finishing material 2 may be pre-formed with a pilot hole 2a for passing the small-diameter second screw member 15 at a position that coincides with the small-diameter second screw hole portion 13. The finishing material 2 has a diameter that allows the body portion 15a of the small-diameter second screw member 15 to pass through but not the head portion 15b. In this embodiment, the pilot hole 2a has a diameter slightly larger than the small-diameter second screw hole portion 13.

(2)仕上材固定構造では、
仕上材固定金具11は、
大径の第一ネジ用穴部12を設けた第一部分21が、小径の第二ネジ用穴部13を設けた第二部分22に対して、
大径の第一ネジ部材14の頭部14bよりも低くなっていても良い。
(2) In the finishing material fixing structure,
The finishing material fixing bracket 11 is
The first portion 21 having the large diameter first screw hole 12 is provided with respect to the second portion 22 having the small diameter second screw hole 13.
It may be lower than the head 14 b of the large-diameter first screw member 14 .

ここで、第一部分21は、仕上材固定金具11における、下地材1に取付ける部分である。第一部分21は、下地材1の上面に当接配置する平坦な当接面とされる。第一部分21は、下面が下地材1の上面に当接される。 Here, the first portion 21 is the portion of the finishing material fixing bracket 11 that is attached to the base material 1. The first portion 21 is a flat contact surface that is placed in contact with the top surface of the base material 1. The bottom surface of the first portion 21 is in contact with the top surface of the base material 1.

第二部分22は、仕上材固定金具11における、仕上材2を取付ける部分である。第二部分22は、仕上材2の下面を当接配置する平坦な当接面とされる。第二部分22は、上面に仕上材2の下面が当接される。第二部分22は、下面が下地材1の上面から離間される。 The second portion 22 is the portion of the finishing material fixing bracket 11 where the finishing material 2 is attached. The second portion 22 is a flat abutment surface against which the underside of the finishing material 2 abuts. The underside of the finishing material 2 abuts against the upper surface of the second portion 22. The lower surface of the second portion 22 is spaced apart from the upper surface of the base material 1.

頭部14bは、大径の第一ネジ部材14の一端部(上端部)に設けられた膨らんだ操作部分である。頭部14bには、例えば、工具で操作するための+や-の溝部が形成される。頭部14bは、胴部14aに対して横へ張出すことにより、被締結物(仕上材固定金具11や下地材1)に対する係止機能を有している。 The head 14b is a bulging operating portion located at one end (upper end) of the large-diameter first screw member 14. The head 14b is formed with a + or - groove for operation with a tool, for example. The head 14b protrudes laterally from the body 14a, providing a locking function for the fastened object (the finishing material fixing bracket 11 or the base material 1).

なお、小径の第二ネジ部材15も、同様の頭部15bを有している。なお、小径の第二ネジ部材15の頭部15bは、目立たないように平らな形状のものとするのが好ましい。 The small-diameter second screw member 15 also has a similar head 15b. It is preferable that the head 15b of the small-diameter second screw member 15 be flat so that it is not noticeable.

(3)仕上材固定構造では、
下地材1は、大径の第一ネジ用穴部12と合致する位置に、大径の第一ネジ部材14を取付ける第一下穴31を有しても良い。
また、下地材1は、小径の第二ネジ用穴部13と合致する位置に、小径の第二ネジ用穴部13よりも大きい第二下穴32を有しても良い。
(3) In the finishing material fixing structure,
The base material 1 may have a first pilot hole 31 for attaching a large-diameter first screw member 14 at a position that coincides with the large-diameter first screw hole portion 12.
In addition, the base material 1 may have a second pilot hole 32 larger than the small-diameter second screw hole portion 13 at a position that coincides with the small-diameter second screw hole portion 13.

ここで、第一下穴31は、大径の第一ネジ部材14を螺着させるための、大径の第一ネジ部材14とほぼ同径の貫通穴部である。第一下穴31は、大径の第一ネジ用穴部12に連通される。第一下穴31は、第一ネジ部材14が螺着できれば、雌ネジを形成したネジ穴としても良いし、雌ネジのない単なる貫通穴としても良い。この実施例では、第一下穴31は、大径の第一ネジ部材14よりも僅かに径が小さい固定穴となっている。第一下穴31は、大径の第一ネジ用穴部12よりも僅かに径が小さくなっている。 Here, the first pilot hole 31 is a through-hole portion with approximately the same diameter as the large-diameter first screw member 14, for threading the large-diameter first screw member 14. The first pilot hole 31 is connected to the large-diameter first screw hole portion 12. The first pilot hole 31 may be a screw hole with a female thread formed therein, or may be a simple through-hole without a female thread, as long as it can threadably engage the first screw member 14. In this embodiment, the first pilot hole 31 is a fixing hole with a diameter slightly smaller than the large-diameter first screw member 14. The first pilot hole 31 has a diameter slightly smaller than the large-diameter first screw hole portion 12.

第二下穴32は、小径の第二ネジ部材15を素通りさせるための、小径の第二ネジ部材15よりも大径の貫通穴部である。第二下穴32は、小径の第二ネジ用穴部13に連通される。第二下穴32は、雌ネジのない単なる貫通穴とされる。この実施例では、第二下穴32は、小径の第二ネジ部材15よりも径が大きい挿通穴となっている。第二下穴32は、小径の第二ネジ用穴部13よりも径が大きくなっている。 The second pilot hole 32 is a through-hole with a larger diameter than the small-diameter second screw member 15, allowing the small-diameter second screw member 15 to pass through without any trouble. The second pilot hole 32 is connected to the small-diameter second screw hole 13. The second pilot hole 32 is simply a through-hole without a female thread. In this embodiment, the second pilot hole 32 is an insertion hole with a larger diameter than the small-diameter second screw member 15. The second pilot hole 32 has a larger diameter than the small-diameter second screw hole 13.

第一下穴31および第二下穴32は、下地材1に対して予め工場で加工形成される。第二下穴32は、工場で無理なく加工できる径とされる。第二下穴32は、例えば、第一下穴31とほぼ同径か、よれよりも若干小径にすることができる。 The first pilot hole 31 and the second pilot hole 32 are pre-machined in the base material 1 at a factory. The second pilot hole 32 has a diameter that can be easily machined at the factory. The second pilot hole 32 can be, for example, approximately the same diameter as the first pilot hole 31 or slightly smaller.

この実施例では、第二下穴32は、下地材1に工場で機械加工できる最小の大きさになっている。また、第二下穴32は、第一下穴31と同径とされている。 In this embodiment, the second pilot hole 32 is the smallest size that can be machined into the base material 1 in a factory. The second pilot hole 32 also has the same diameter as the first pilot hole 31.

より具体的な実施例として、例えば、下地材1の肉厚を4.5mm、仕上材2の肉厚を0.3~0.5mm、仕上材固定金具11の肉厚を1.2mmとする。第一ネジ部材14にM6のドリルネジ、第二ネジ部材15にM5のドリルネジを使う。第一下穴31の径を6.5Φ、第二下穴32の径を4Φ、第一下穴31の径を5Φ、第二下穴32の径を5Φにすることなどができる。ただし、寸法関係は上記に限るものではない。なお、下地材1の肉厚が4.5mmの場合、工場で機械加工できる穴の最小の大きさは5Φとなる。 As a more specific example, suppose the thickness of the base material 1 is 4.5 mm, the thickness of the finishing material 2 is 0.3-0.5 mm, and the thickness of the finishing material fixing bracket 11 is 1.2 mm. An M6 drill screw is used for the first screw member 14, and an M5 drill screw is used for the second screw member 15. The diameter of the first pilot hole 31 can be 6.5Φ, the diameter of the second pilot hole 32 can be 4Φ, the diameter of the first pilot hole 31 can be 5Φ, and the diameter of the second pilot hole 32 can be 5Φ. However, the dimensional relationships are not limited to the above. If the thickness of the base material 1 is 4.5 mm, the smallest size of the hole that can be machined in a factory is 5Φ.

(4)仕上材固定構造では、
図1(図2、図3)に示すように、下地材1は、屋根パネル41のサイドフレーム42であっても良い。
仕上材2は、屋根パネル41間の目地部43を覆う目地カバー44であっても良い。
仕上材固定金具11は、サイドフレーム42および目地カバー44の水上側45に取付けられても良い。
(4) In the finishing material fixing structure,
As shown in FIG. 1 (FIGS. 2 and 3), the base material 1 may be a side frame 42 of a roof panel 41.
The finishing material 2 may be a joint cover 44 that covers the joints 43 between the roof panels 41.
The finishing material fixing bracket 11 may be attached to the above-water side 45 of the side frame 42 and the joint cover 44 .

ここで、屋根パネル41は、建物の屋根を構成するパネルである。屋根パネル41は、建物の本体の上に並べて設置するだけで、屋根を直接構築することができる建築資材とされる。屋根パネル41は、細長い矩形状とされる。 Here, the roof panels 41 are panels that make up the roof of a building. The roof panels 41 are construction materials that can be used to directly construct a roof by simply placing them side by side on top of the main body of the building. The roof panels 41 are in the shape of a long, narrow rectangle.

屋根パネル41は、一対のサイドフレーム42と下地鋼板46とで主に構成される。一対のサイドフレーム42は、屋根パネル41の長手方向47の両側部を形成する縦枠部材である。下地鋼板46は、一対のサイドフレーム42の間に架設される。 The roof panel 41 is primarily composed of a pair of side frames 42 and a base steel plate 46. The pair of side frames 42 are vertical frame members that form both sides of the roof panel 41 in the longitudinal direction 47. The base steel plate 46 is installed between the pair of side frames 42.

サイドフレーム42は、内向きC字断面の金属製の部材とされる。サイドフレーム42は、縦向きのウェブ部42aと、ウェブ部42aの上縁部および下縁部から屋根パネル41の内側へ向けて横に延びる上下のフランジ部42bと、を有する厚肉の部材とされる。 The side frame 42 is a metal member with an inward C-shaped cross section. The side frame 42 is a thick member with a vertically oriented web portion 42a and upper and lower flange portions 42b that extend laterally from the upper and lower edges of the web portion 42a toward the inside of the roof panel 41.

下地鋼板46は、屋根パネル41の面を形成する金属製の薄板材である。下地鋼板46は、屋根パネル41の面となる平面部46aと、平面部46aの両側縁から上に立ち上がる立上部46bと、立上部46bの上端縁から外方へ延びるフランジ部46cと、を有している。下地鋼板46のフランジ部46cは、サイドフレーム42のフランジ部42bの上に当接状態で配置される。下地鋼板46のフランジ部46cは、サイドフレーム42のフランジ部42bとほぼ同じ幅とされる。 The base steel plate 46 is a thin metal plate that forms the surface of the roof panel 41. The base steel plate 46 has a flat portion 46a that forms the surface of the roof panel 41, raised portions 46b that rise from both side edges of the flat portion 46a, and flange portions 46c that extend outward from the upper edge of the raised portions 46b. The flange portions 46c of the base steel plate 46 are positioned in abutting contact with the flange portions 42b of the side frames 42. The flange portions 46c of the base steel plate 46 are approximately the same width as the flange portions 42b of the side frames 42.

第一下穴31および第二下穴32は、サイドフレーム42の上側のフランジ部42bと、下地鋼板46のフランジ部42bとの両方の合致する位置にほぼ同じ径で形成される。このうち、サイドフレーム42が厚手であることによって、第二下穴32の径に対する制限が生じることになる。 The first pilot hole 31 and the second pilot hole 32 are formed with approximately the same diameter at positions that match both the upper flange portion 42b of the side frame 42 and the flange portion 42b of the base steel plate 46. However, the thickness of the side frame 42 places restrictions on the diameter of the second pilot hole 32.

下地鋼板46の上には、太陽の光によって発電を行う太陽光発電パネル48を設置することができる。 A solar panel 48 that generates electricity using sunlight can be installed on top of the base steel plate 46.

目地部43は、屋根パネル41どうしの合わせ目にできる隙間である。目地部43は、隣接する屋根パネル41の長手方向47の両側部間に形成される。 The joints 43 are gaps formed at the joints between the roof panels 41. The joints 43 are formed between both sides of adjacent roof panels 41 in the longitudinal direction 47.

目地カバー44は、目地部43を塞ぐ金属製のカバー部材である。目地カバー44は、現場で建物の屋根に取付けることで、目地部43を塞いで屋根の防水を行うと共に、屋根を完成して、屋根の外観品質を向上することで仕上材2となる。目地カバー44は、下地鋼板46と同じ素材で同じ板厚の薄板材を使うのが好ましい。 The joint cover 44 is a metal cover member that covers the joints 43. When attached to the roof of a building on-site, the joint cover 44 seals the joints 43, waterproofing the roof, completing the roof and improving the appearance quality of the roof, thereby becoming the finishing material 2. It is preferable that the joint cover 44 be made of a thin plate material of the same material and thickness as the base steel plate 46.

目地カバー44は、目地部43とほぼ同じ幅で、サイドフレーム42とほぼ同じ長さを有する長尺部材とされる。目地カバー44は、屋根パネル41の立上部46b間に上から被せる下向きのC字断面の部材とされる。目地カバー44は、目地部43を覆う幅の上面部44aと、上面部44aの両側縁部ら下方へ延びる左右一対の側面部44bとを有している。 The joint cover 44 is a long member that is approximately the same width as the joint portion 43 and approximately the same length as the side frame 42. The joint cover 44 is a downward-facing C-shaped cross-section member that is placed over the rising portions 46b of the roof panel 41. The joint cover 44 has an upper surface 44a that is wide enough to cover the joint portion 43, and a pair of left and right side surfaces 44b that extend downward from both side edges of the upper surface 44a.

目地カバー44は、緩い排水勾配を形成するように僅かに傾斜させた状態で、目地部43の上に取付けられる。この場合、水上側45を高い側とし、水下側49を低くする。 The joint cover 44 is attached to the joint 43 at a slight incline to create a gentle drainage gradient. In this case, the above-water side 45 is the higher side, and the below-water side 49 is the lower side.

目地カバー44は、水上側45の部分に、仕上材固定金具11を設置することで、水上側45を高くする。これにより、仕上材固定金具11は、高さ調整用のスペーサとして機能する。 The joint cover 44 raises the above-water side 45 by installing a finishing material fixing bracket 11 on the above-water side 45. This allows the finishing material fixing bracket 11 to function as a height adjustment spacer.

また、図7に示すように、目地カバー44は、水下側49の端部に、軒先見切水返部材51が取付けられる。軒先見切水返部材51は、下地鋼板46の端面に形成された立下部46dに、水下側49から横方向に係止されて、リベット52で立下部46dに水下側49から横方向に固定される。 As shown in Figure 7, a water-repellent eaves edge trimming member 51 is attached to the end of the underwater side 49 of the joint cover 44. The water-repellent eaves edge trimming member 51 is engaged laterally from the underwater side 49 to a rising portion 46d formed on the end surface of the base steel plate 46, and is fixed laterally from the underwater side 49 to the rising portion 46d with rivets 52.

(5)厚手の下地材1と薄手の仕上材2との間に介在される仕上材固定金具11は、
下地材1と仕上材2との中間の肉厚を有する金具本体11aを有している。
金具本体11aは、下地材1の上面に当接する第一部分21と、仕上材2の下面に当接する第二部分22とを有している。
第一部分21は大径の第一ネジ用穴部12を有し、第二部分22は小径の第二ネジ用穴部13を有している。
第一部分21は、第二部分22に対し、大径の第一ネジ部材14の頭部14bよりも低くなっている。
(5) The finishing material fixing metal fittings 11 interposed between the thick base material 1 and the thin finishing material 2 are
It has a metal fitting body 11a with a thickness intermediate between that of the base material 1 and the finishing material 2.
The metal fitting body 11 a has a first portion 21 that abuts the upper surface of the base material 1 and a second portion 22 that abuts the lower surface of the finishing material 2 .
The first portion 21 has a first screw hole 12 with a large diameter, and the second portion 22 has a second screw hole 13 with a small diameter.
The first portion 21 is lower than the head 14 b of the large-diameter first screw member 14 relative to the second portion 22 .

ここで、仕上材固定金具11は、仕上材固定構造で使われる金具である。仕上材固定金具11は、例えば、プレス加工された金具本体11aによって形成される。仕上材固定金具11は、2つの山部分を有すると共に、2つの山部分の間に谷部分を有する、ほぼM字状をした角型の金具とされる。 Here, the finishing material fixing bracket 11 is a bracket used in a finishing material fixing structure. The finishing material fixing bracket 11 is formed, for example, from a pressed bracket body 11a. The finishing material fixing bracket 11 is a roughly M-shaped, rectangular bracket with two peaks and a valley between them.

2つの山部分は、第二部分22をそれぞれ形成する。谷部分は、2つの第二部分22の間に位置する第一部分21を形成する。第一部分21は第二部分22と平行になっている。2つの第二部分22は、それぞれ同じ大きさ、および、同じ高さとすることができる。2つの第二部分22は、一方または両方を使って仕上材2を固定できるようになっている。 The two peaks each form a second portion 22. The valleys each form a first portion 21 located between the two second portions 22. The first portion 21 is parallel to the second portion 22. The two second portions 22 can each be the same size and height. One or both of the two second portions 22 can be used to secure the finishing material 2.

第一部分21と第二部分22との間には、段差部61が形成される。段差部61は、大径の第一ネジ部材14の頭部14bよりも高い段差量を有する(段差部61の段差量>大径の第一ネジ部材14の頭部14b)。 A step portion 61 is formed between the first portion 21 and the second portion 22. The step portion 61 has a height greater than the head portion 14b of the large-diameter first screw member 14 (the height of the step portion 61 is greater than the head portion 14b of the large-diameter first screw member 14).

また、2つの第二部分22の段差部61と反対側の端部は、段差部61とほぼ同じ高さの支持脚部62となっている。仕上材固定金具11は、第一部分21の下面を下地材1(および下地鋼板46)の上面に当接したときに、支持脚部62の下端部が下地材1の上面に当たることで安定して支持できるようになっている。 The ends of the two second sections 22 opposite the step sections 61 form support legs 62 that are approximately the same height as the step sections 61. When the underside of the first sections 21 abuts against the top surface of the base material 1 (and the base steel plate 46), the lower ends of the support legs 62 abut against the top surface of the base material 1, providing stable support for the finishing material fixing bracket 11.

段差部61および支持脚部62は、第一部分21および第二部分22と直角に形成しても良い。段差部61および支持脚部62と、第一部分21および第二部分22とのコーナー部分にはアール部を形成しても良い。 The step portion 61 and the support leg portion 62 may be formed at a right angle to the first portion 21 and the second portion 22. Rounded portions may be formed at the corners between the step portion 61 and the support leg portion 62 and the first portion 21 and the second portion 22.

<作用>以下、この実施例の作用について説明する。 <Function> The function of this embodiment is explained below.

厚手の下地材1に薄手の仕上材2を被せて上から締結固定する。この場合、薄手の仕上材2に見合った小径のネジ部材によって見栄え良く締結固定するのが仕上品質を向上する上で望ましい。 A thick base material 1 is covered with a thin finishing material 2 and fastened from above. In this case, it is desirable to fasten it in an attractive manner using small-diameter screws that match the thin finishing material 2 in order to improve the finish quality.

しかし、薄手の仕上材2の固定先となる下地材1が厚手の場合、厚手の下地材1に、小径のネジ部材のための下穴を、工場で予め機械加工によって加工することは困難である。それは、下穴の加工用の工具が細く小さくなるため、下地材1が厚くなるほど、また、下穴が小径になるほど工具の耐久性が低くなってしまい、実用的でないからである。 However, if the base material 1 to which the thin finishing material 2 is fixed is thick, it is difficult to pre-machine pilot holes for small-diameter screw members in the thick base material 1 at the factory. This is because the tools used to drill the pilot holes become thinner and smaller, and the thicker the base material 1 and the smaller the diameter of the pilot holes, the lower the durability of the tools, making this impractical.

このように、下地材1には小径の下穴を予め形成できないことで、厚手の下地材1に薄手の仕上材2を被せて上から締結固定する作業は手間がかかっている。よって、この場合の取付作業性などを改善するための工夫が必要になる。 As a result, because it is not possible to pre-drill small-diameter pilot holes in the base material 1, the process of covering the thick base material 1 with the thin finishing material 2 and fastening them from above is time-consuming. Therefore, some ingenuity is needed to improve the ease of installation in this case.

この実施例では、上記した構成とすることによって取付作業性などを改善している。 In this embodiment, the above-mentioned configuration improves installation workability, etc.

即ち、仕上材固定金具11を用いる構成や、下地材1に第二下穴32を設ける構成などが有効となる。 In other words, configurations such as using a finishing material fixing bracket 11 or drilling a second pilot hole 32 in the base material 1 are effective.

例えば、工場で、屋根パネル41を製造して、屋根パネル41に予め仕上材固定金具11を取付ける。 For example, the roof panel 41 is manufactured in a factory, and the finishing material fixing brackets 11 are attached to the roof panel 41 in advance.

屋根パネル41は、一対のサイドフレーム42の間に野地板を取付けて、野地板とサイドフレーム42の上に下地鋼板46を被せるなどして製造する。仕上材固定金具11は、屋根パネル41の水上側45の位置に取付ける。この実施例では、サイドフレーム42と下地鋼板46(主にサイドフレーム42)が下地材1になる。 The roof panel 41 is manufactured by attaching a sheathing board between a pair of side frames 42, and then covering the sheathing board and side frames 42 with a base steel plate 46. The finishing material fixing brackets 11 are attached to the abovewater side 45 of the roof panel 41. In this embodiment, the side frames 42 and the base steel plate 46 (mainly the side frames 42) form the base material 1.

具体的には、仕上材固定金具11は、サイドフレーム42の上側のフランジ部42bおよび下地鋼板46のフランジ部46cの上に第一部分21を上から設置する。そして、大径の第一ネジ部材14を、上から大径の第一ネジ用穴部12を通して第一下穴31にネジ込むことによって固定する。 Specifically, the first portion 21 of the finishing material fixing bracket 11 is installed from above on the upper flange portion 42b of the side frame 42 and the flange portion 46c of the base steel plate 46. The first large-diameter screw member 14 is then fastened by threading it from above through the first large-diameter screw hole portion 12 and into the first pilot hole 31.

そして、現場で、建物の本体の上に屋根パネル41を並べて設置して、屋根パネル41間の目地部43に仕上材2となる目地カバー44を取付ける。 Then, at the construction site, the roof panels 41 are lined up and installed on top of the main body of the building, and joint covers 44, which serve as the finishing material 2, are attached to the joints 43 between the roof panels 41.

具体的には、目地カバー44は、水下側49については、軒先見切水返部材51をリベット52で下地鋼板46の端面の立下部46dに固定する。目地カバー44は、水上側45については、小径の第二ネジ部材15で、上から仕上材固定金具11に締結固定する。この際、小径の第二ネジ部材15は、サイドフレーム42の上側のフランジ部42bおよび下地鋼板46のフランジ部46cに形成された第二下穴32の内部に通される。 Specifically, on the belowwater side 49 of the joint cover 44, the eaves edge water return member 51 is fixed to the rising portion 46d of the end face of the base steel plate 46 with rivets 52. On the abovewater side 45, the joint cover 44 is fastened from above to the finish material fixing bracket 11 with small-diameter second screw members 15. At this time, the small-diameter second screw members 15 are passed through second pilot holes 32 formed in the upper flange portion 42b of the side frame 42 and the flange portion 46c of the base steel plate 46.

以上により、簡単に、目地カバー44が屋根パネル41に固定される。そして、小径の第二ネジ部材15の使用が可能になることにより、目地カバー44の取付部分および屋根全体の外観品質を向上することができる。 As a result, the joint cover 44 is easily fixed to the roof panel 41. Furthermore, by making it possible to use a small-diameter second screw member 15, the appearance quality of the joint cover 44 attachment area and the entire roof can be improved.

<効果>この実施例によれば、以下のような効果が得られる。 <Effects> This embodiment provides the following effects:

(効果 1)仕上材固定構造では、厚手の下地材1の上に、下地材1と仕上材2との中間の肉厚を有する仕上材固定金具11が、大径の第一ネジ用穴部12を通して大径の第一ネジ部材14で締結固定される。この状態で、下地材1および仕上材固定金具11の上に仕上材2を被せる。これにより、仕上材固定金具11および大径の第一ネジ部材14は、外部から見えないように仕上材2で隠される。そして、仕上材2が、小径の第二ネジ部材15を小径の第二ネジ用穴部13に螺着することで、仕上材固定金具11に締結固定される。これにより、仕上材2は、仕上材固定金具11を介して下地材1に間接的に固定される。 (Effect 1) In the finishing material fixing structure, a finishing material fixing bracket 11, which has a thickness intermediate between that of the base material 1 and the finishing material 2, is fastened to the thick base material 1 with a large-diameter first screw member 14 through a large-diameter first screw hole 12. In this state, the finishing material 2 is placed over the base material 1 and the finishing material fixing bracket 11. As a result, the finishing material fixing bracket 11 and the large-diameter first screw member 14 are hidden by the finishing material 2 so that they are not visible from the outside. The finishing material 2 is then fastened to the finishing material fixing bracket 11 by threading a small-diameter second screw member 15 into the small-diameter second screw hole 13. As a result, the finishing material 2 is indirectly fixed to the base material 1 via the finishing material fixing bracket 11.

仕上材固定金具11は、下地材1と仕上材2との中間の肉厚を有しているので、下地材1に仕上材固定金具11を、大径の第一ネジ部材14によって、容易確実かつ強固に締結固定できる。また、仕上材2を仕上材固定金具11に、小径の第二ネジ部材15によって、容易確実かつ強固に締結固定できる。そのため、厚手の下地材1に薄手の仕上材2を締結固定する際の取付作業性を改善でき、取付の強度や信頼性を確保できる。 The finishing material fixing bracket 11 has a thickness intermediate between that of the base material 1 and the finishing material 2, so it can be easily, reliably, and firmly fastened to the base material 1 using the large-diameter first screw member 14. Furthermore, the finishing material 2 can be easily, reliably, and firmly fastened to the finishing material fixing bracket 11 using the small-diameter second screw member 15. This improves the ease of installation when fastening a thin finishing material 2 to a thick base material 1, ensuring installation strength and reliability.

この際、仕上材固定金具11は、大径の第一ネジ部材14を通す大径の第一ネジ用穴部12と、小径の第二ネジ部材15を螺着する小径の第二ネジ用穴部13とを有しても良い。これにより、下地材1に仕上材固定金具11を、大径の第一ネジ用穴部12を通して大径の第一ネジ部材14で固定し、また、仕上材固定金具11に仕上材2を、小径の第二ネジ部材15を小径の第二ネジ用穴部13に螺着して固定することが、より簡単にできる。仕上材固定金具11は、比較的小型の金具であるため、例えば、プレス加工などよって、第一ネジ用穴部12と、第二ネジ用穴部13を容易に形成することができる。 In this case, the finishing material fixing bracket 11 may have a large-diameter first screw hole 12 for passing a large-diameter first screw member 14, and a small-diameter second screw hole 13 for threading a small-diameter second screw member 15. This makes it easier to fix the finishing material fixing bracket 11 to the base material 1 with the large-diameter first screw member 14 through the large-diameter first screw hole 12, and to fix the finishing material 2 to the finishing material fixing bracket 11 by threading the small-diameter second screw member 15 into the small-diameter second screw hole 13. Because the finishing material fixing bracket 11 is a relatively small bracket, the first screw hole 12 and the second screw hole 13 can be easily formed, for example, by press working.

しかも、予め工場で、仕上材固定金具11を下地材1に締結固定しておくようにすれば、現場では、仕上材2を固定金具の小径の第二ネジ用穴部13に小径の第二ネジ部材15で固定するだけとなるので、手間がかからない。また、仕上材2の仕上材固定金具11への取付けに、仕上材2に見合った小径の第二ネジ部材15が使えることで、仕上品質も確保向上できる。 Furthermore, if the finishing material fixing bracket 11 is fastened to the base material 1 in advance at the factory, then all that is required at the site is to fix the finishing material 2 to the fixing bracket's small-diameter second screw hole 13 with a small-diameter second screw member 15, which saves time and effort. Furthermore, by using a small-diameter second screw member 15 that matches the finishing material 2 to attach the finishing material 2 to the finishing material fixing bracket 11, the quality of the finish can be ensured and improved.

(効果 2)仕上材固定構造では、仕上材固定金具11は、大径の第一ネジ用穴部12を設けた第一部分21が、小径の第二ネジ用穴部13を設けた第二部分22に対して、大径の第一ネジ部材14の頭部14bよりも低くなるようにしても良い。これにより、仕上材2は、大径の第一ネジ部材14の頭部14bよりも位置の高い第二部分22に取付けられることになる。よって、大径の第一ネジ部材14の頭部14bが、仕上材2の固定の邪魔になるのが防止される。そのため、仕上材固定金具11を用いても、仕上材2を支障なく取付けることができる。 (Effect 2) In the finishing material fixing structure, the finishing material fixing bracket 11 may be configured so that the first portion 21, which has the large-diameter first screw hole 12, is lower than the head 14b of the large-diameter first screw member 14 relative to the second portion 22, which has the small-diameter second screw hole 13. This allows the finishing material 2 to be attached to the second portion 22, which is higher than the head 14b of the large-diameter first screw member 14. This prevents the head 14b of the large-diameter first screw member 14 from interfering with the fixing of the finishing material 2. Therefore, the finishing material 2 can be attached without any problems even when using the finishing material fixing bracket 11.

(効果 3)仕上材固定構造では、下地材1は、大径の第一ネジ用穴部12と合致する位置に、大径の第一ネジ部材14を取付ける第一下穴31を有し、小径の第二ネジ用穴部13と合致する位置に、小径の第二ネジ用穴部13よりも大きい第二下穴32を有しても良い。これにより、下地材1に、小径の第二ネジ用穴部13と同径の下穴を設ける必要をなくすことができる。そのため、工場で、予め下地材1に第一下穴31と第二下穴32とを加工することが可能になる。そして、第二下穴32は、小径の第二ネジ部材15が螺合せずに素通りする径となっているため、下地材1に下穴があるのと同じ状態で、小径の第二ネジ部材15の取付けを行うことができる。 (Effect 3) In the finishing material fixing structure, the base material 1 may have a first pilot hole 31 for attaching the large-diameter first screw member 14 at a position that coincides with the large-diameter first screw hole 12, and a second pilot hole 32 larger than the small-diameter second screw hole 13 at a position that coincides with the small-diameter second screw hole 13. This eliminates the need to drill a pilot hole in the base material 1 with the same diameter as the small-diameter second screw hole 13. This makes it possible to pre-machine the first pilot hole 31 and second pilot hole 32 in the base material 1 at the factory. Furthermore, because the second pilot hole 32 has a diameter that allows the small-diameter second screw member 15 to pass through without threading, the small-diameter second screw member 15 can be attached in the same condition as if the base material 1 had a pilot hole.

(効果 4)仕上材固定構造は、下地材1を、屋根パネル41のサイドフレーム42とし、仕上材2を、屋根パネル41間の目地部43を覆う目地カバー44としても良い。これにより、屋根パネル41間の目地部43を目地カバー44で覆った状態にして、目地カバー44を目地部43に仕上材固定金具11を介して小径のネジ部材で固定することができる。 (Effect 4) The finishing material fixing structure may use the base material 1 as the side frame 42 of the roof panel 41, and the finishing material 2 as a joint cover 44 that covers the joints 43 between the roof panels 41. This allows the joints 43 between the roof panels 41 to be covered with the joint cover 44, and the joint cover 44 can be fixed to the joints 43 with small-diameter screw members via the finishing material fixing brackets 11.

仕上材固定構造では、仕上材固定金具11は、サイドフレーム42および目地カバー44の水上側45に取付けても良い。これにより、仕上材固定金具11によって水上側45を高くして目地カバー44に勾配を付けることができる。 In the finishing material fixing structure, the finishing material fixing brackets 11 may be attached to the above-water side 45 of the side frame 42 and joint cover 44. This allows the above-water side 45 to be elevated by the finishing material fixing brackets 11, creating a slope in the joint cover 44.

(効果 5)仕上材固定金具11では、上記した構成により、上記した仕上材固定構造と同様の効果を得ることができる。 (Effect 5) With the above-described configuration, the finishing material fixing bracket 11 can achieve the same effects as the above-described finishing material fixing structure.

1 下地材
2 仕上材
11 仕上材固定金具
11a 金具本体
12 大径の第一ネジ用穴部
13 小径の第二ネジ用穴部
14 大径の第一ネジ部材
14b 頭部
15 小径の第二ネジ部材
15b 頭部
21 第一部分
22 第二部分
31 第一下穴
32 第二下穴
41 屋根パネル
42 サイドフレーム
43 目地部
44 目地カバー
45 水上側
REFERENCE SIGNS LIST 1 Base material 2 Finishing material 11 Finishing material fixing metal fitting 11a Metal fitting body 12 Large diameter first screw hole 13 Small diameter second screw hole 14 Large diameter first screw member 14b Head 15 Small diameter second screw member 15b Head 21 First part 22 Second part 31 First pilot hole 32 Second pilot hole 41 Roof panel 42 Side frame 43 Joint part 44 Joint cover 45 Above water side

Claims (4)

厚手の下地材に薄手の仕上材を被せて上から締結固定した仕上材固定構造であって、
前記下地材と前記仕上材との間に、前記下地材と前記仕上材との中間の肉厚を有する仕上材固定金具が介在され、
前記仕上材固定金具は、大径の第一ネジ用穴部と、小径の第二ネジ用穴部とを有しており、
前記仕上材固定金具は、大径の前記第一ネジ用穴部に大径の第一ネジ部材を通して、前記下地材の上に締結固定されており、
前記仕上材固定金具の上に被せた前記仕上材は、小径の第二ネジ部材で前記仕上材固定金具の小径の前記第二ネジ用穴部に締結固定されており、
前記下地材は、
大径の前記第一ネジ用穴部と合致する位置に、大径の前記第一ネジ部材を取付ける第一下穴を有し、
小径の前記第二ネジ用穴部と合致する位置に、小径の前記第二ネジ用穴部よりも大きい第二下穴を有していることを特徴とする仕上材固定構造。
A finishing material fixing structure in which a thin finishing material is placed on a thick base material and fastened from above,
A finishing material fixing metal fitting having a thickness intermediate between that of the base material and that of the finishing material is interposed between the base material and the finishing material,
The finishing material fixing fixture has a large-diameter first screw hole portion and a small-diameter second screw hole portion,
The finishing material fixing fixture is fastened and fixed onto the base material by passing a large-diameter first screw member through the large-diameter first screw hole portion,
The finishing material placed on the finishing material fixing fixture is fastened and fixed to the second small-diameter screw hole portion of the finishing material fixing fixture with a second small-diameter screw member ,
The base material is
a first pilot hole for attaching the first screw member having a large diameter at a position that matches the first screw hole portion having a large diameter;
A finishing material fixing structure characterized by having a second pilot hole larger than the small diameter second screw hole portion at a position that coincides with the small diameter second screw hole portion .
請求項1に記載の仕上材固定構造であって、
前記仕上材固定金具は、
大径の前記第一ネジ用穴部を設けた第一部分が、小径の前記第二ネジ用穴部を設けた第二部分に対して、
大径の前記第一ネジ部材の頭部よりも低くなっていることを特徴とする仕上材固定構造。
The finishing material fixing structure according to claim 1,
The finishing material fixing bracket is
A first portion having a large diameter first screw hole is provided with respect to a second portion having a small diameter second screw hole,
A finishing material fixing structure characterized in that it is lower than the head of the first screw member with a large diameter.
請求項1または請求項2に記載の仕上材固定構造であって、
前記下地材は、屋根パネルのサイドフレームであり、
前記仕上材は、前記屋根パネル間の目地部を覆う目地カバーであり、
前記仕上材固定金具は、前記サイドフレームおよび前記目地カバーの水上側に取付けられることを特徴とする仕上材固定構造。
The finishing material fixing structure according to claim 1 or 2 ,
The base material is a side frame of a roof panel,
The finishing material is a joint cover that covers the joints between the roof panels,
A finishing material fixing structure characterized in that the finishing material fixing fittings are attached to the above-water side of the side frame and the joint cover.
厚手の下地材と薄手の仕上材との間に介在される仕上材固定金具であって、
前記下地材と前記仕上材との中間の肉厚を有する金具本体を有し、
前記金具本体は、前記下地材の上面に当接する1つの谷状の第一部分と、前記第一部分の両側に位置して前記仕上材の下面に当接する2つの山状の第二部分とを有すると共に、
前記第一部分は前記下地材に設けられた大径の第一ネジ部材を上から取付ける第一下穴と合致する位置に大径の第一ネジ用穴部を有し、前記第二部分は前記下地材に設けられて小径の第二ネジ部材が上から挿通される第二下穴と合致する頂部の位置に、前記第二下穴よりも小径で前記第二ネジ部材を取付ける第二ネジ用穴部を有しており、
前記第一部分は、前記第二部分に対し、大径の前記第一ネジ部材の頭部よりも低くなっていることを特徴とする仕上材固定金具。
A finishing material fixing bracket interposed between a thick base material and a thin finishing material,
The metal fitting body has a thickness intermediate between that of the base material and that of the finishing material,
The metal fitting body has one valley-shaped first portion that contacts the upper surface of the base material, and two mountain-shaped second portions that are located on both sides of the first portion and contact the lower surface of the finishing material,
the first portion has a large-diameter first screw hole at a position that matches a first pilot hole that is provided in the base material and through which a large-diameter first screw member is attached from above , and the second portion has a second screw hole at a top position that matches a second pilot hole that is provided in the base material and through which a small-diameter second screw member is inserted from above, the second screw hole having a smaller diameter than the second pilot hole and through which the second screw member is attached ,
A finishing material fixing bracket characterized in that the first portion is lower than the head of the first screw member, which has a larger diameter, relative to the second portion.
JP2022026577A 2022-02-24 2022-02-24 Finishing material fixing structure and finishing material fixing hardware Active JP7787743B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022026577A JP7787743B2 (en) 2022-02-24 2022-02-24 Finishing material fixing structure and finishing material fixing hardware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022026577A JP7787743B2 (en) 2022-02-24 2022-02-24 Finishing material fixing structure and finishing material fixing hardware

Publications (2)

Publication Number Publication Date
JP2023122838A JP2023122838A (en) 2023-09-05
JP7787743B2 true JP7787743B2 (en) 2025-12-17

Family

ID=87885574

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022026577A Active JP7787743B2 (en) 2022-02-24 2022-02-24 Finishing material fixing structure and finishing material fixing hardware

Country Status (1)

Country Link
JP (1) JP7787743B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022029317A (en) 2020-08-04 2022-02-17 積水化学工業株式会社 Roof structure

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022029317A (en) 2020-08-04 2022-02-17 積水化学工業株式会社 Roof structure

Also Published As

Publication number Publication date
JP2023122838A (en) 2023-09-05

Similar Documents

Publication Publication Date Title
JP7787743B2 (en) Finishing material fixing structure and finishing material fixing hardware
KR102824129B1 (en) Architectural Exterior Panel Assembly Including Connection Joints and Cover Members, and Its Construction Method
CN204662748U (en) Ceiling decoration assembly and use ceiling structure, the box-type integration house room of this assembly
JP4993922B2 (en) Solar cell module and its mounting structure
JP6787377B2 (en) Handrail mounting structure and handrail mounting method
JP2966791B2 (en) Opening reinforcement structure for folded roof
JP6128947B2 (en) Deck foundation roof equipment installation foundation and construction method
JP3807693B2 (en) Joint drainage fitting for vertical outer wall plate and its connection structure
JP3717596B2 (en) Makeup body drainage structure
JPH07279393A (en) Horizontal joint waterproof structure for outer wall
JP7779316B2 (en) Support member, support structure and exterior wall structure
JP7594716B2 (en) Waterproofing of roof
JP7665988B2 (en) Decorative trim
JP7752854B2 (en) Roof structure
JPH0874434A (en) Bathroom unit connected to juxtaposed unit
JP6777128B2 (en) Waterproof structure of handrail
JP7444699B2 (en) Balcony installation structure
JP3130403B2 (en) Roof edge decorative panel connection structure
JP2006299775A (en) Wall surface panel connecting structure
JP7150559B2 (en) roof structure
JP3976327B2 (en) Waist drainage mounting structure and metal fittings used in external insulation buildings
JPH034644Y2 (en)
JPS6214247Y2 (en)
JP2024050117A (en) Guide jig for connecting fittings
JPS6343292Y2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241113

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250731

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250805

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250917

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251205

R150 Certificate of patent or registration of utility model

Ref document number: 7787743

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150