JP7788366B2 - injection molding equipment - Google Patents
injection molding equipmentInfo
- Publication number
- JP7788366B2 JP7788366B2 JP2022205024A JP2022205024A JP7788366B2 JP 7788366 B2 JP7788366 B2 JP 7788366B2 JP 2022205024 A JP2022205024 A JP 2022205024A JP 2022205024 A JP2022205024 A JP 2022205024A JP 7788366 B2 JP7788366 B2 JP 7788366B2
- Authority
- JP
- Japan
- Prior art keywords
- injection
- chamber
- flow path
- melting
- molding material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Injection Moulding Of Plastics Or The Like (AREA)
Description
本開示は、成形材料を溶融して金型に射出する射出成形装置の技術に関する。 This disclosure relates to technology for injection molding devices that melt molding material and inject it into a mold.
例えば、特許文献1には、溶融シリンダと射出シリンダとを連結する連結流路を備える射出成形装置が開示される。射出シリンダには、重力の作用によって、連結流路を介して溶融シリンダから溶湯が供給される。射出成形装置には、弁座、および、弁棒を含み、連結流路を閉じるための逆流防止構造が設けられる。 For example, Patent Document 1 discloses an injection molding device equipped with a connecting passage that connects a melting cylinder and an injection cylinder. Molten metal is supplied to the injection cylinder from the melting cylinder via the connecting passage by the action of gravity. The injection molding device is provided with a backflow prevention structure that includes a valve seat and a valve stem and closes the connecting passage.
従来の射出成形装置においては、連結路が常に溶湯によって満たされるため、逆流防止構造において溶損が発生する可能性がある。逆流防止構造において溶損が発生すると、射出シリンダから金型に溶湯が射出される際に、射出シリンダから溶融シリンダに溶湯が逆流し、射出圧力が低下する可能性がある。射出圧力が低下すると、成形品において巣が発生する可能性がある。 In conventional injection molding equipment, the connecting passage is constantly filled with molten metal, which can cause melt damage to the backflow prevention structure. If melt damage occurs in the backflow prevention structure, the molten metal can flow back from the injection cylinder into the melting cylinder when it is injected from the injection cylinder into the mold, causing a decrease in injection pressure. A decrease in injection pressure can cause porosity to form in the molded product.
本開示の目的の1つは、成形品における巣の発生を抑制できる射出成形装置を提供することである。 One of the objectives of this disclosure is to provide an injection molding apparatus that can suppress the occurrence of porosity in molded products.
本開示の第1側面に従う射出成形装置は、成形材料を溶融するように構成される溶融部と、溶融された前記成形材料を金型に射出するように構成される射出部と、前記溶融部と前記射出部とを連結する連結流路と、前記連結流路から前記射出部への前記成形材料の移動を選択的に遮断する遮断機構と、を備え、前記溶融部は、前記連結流路を介して前記射出部に前記成形材料を供給する供給機構と、前記射出部に向かって移動する前記成形材料を収容する溶融チャンバーと、を含み、前記射出部は、前記連結流路を介して前記溶融チャンバーから供給される前記成形材料を収容する射出チャンバーと、前記射出チャンバーに収容される前記成形材料を前記金型に射出する射出機構と、を含み、前記遮断機構は、前記連結流路から前記射出チャンバーへの前記成形材料の移動を遮断する遮断部材、を含み、前記連結流路は、前記遮断部材を受け入れる受入部と、前記溶融部の前記供給機構による前記成形材料の供給動作停止時に、前記成形材料と少なくとも前記受入部との接触を抑制する抑制構造と、を含み、前記連結流路は、前記溶融チャンバーと連結される第1連結部、および、前記射出チャンバーと連結される第2連結部を有し、前記連結流路の前記抑制構造は、前記第1連結部から重力作用方向における上流側に延出するように形成される第1延出部と、前記第1連結部の重力作用方向における上流側端部から、重力作用方向とは異なる方向に延出するように形成される第2延出部と、前記第2延出部のうち、前記溶融チャンバーの軸方向における前記第1延出部側とは反対側の端部から、重力作用方向における下流側に延出して前記第2連結部に達するように形成される第3延出部と、を含み、前記受入部は、前記連結流路の延出方向において前記第1連結部と前記第2連結部との間に設けられ、前記遮断部材は、前記受入部に対して接近する方向に移動して前記連結流路を閉じることで、前記連結流路から前記射出チャンバーへの前記成形材料の移動を遮断し、前記受入部に対して離れる方向に移動して前記連結流路を開くことで、前記連結流路から前記射出チャンバーへの前記成形材料の移動を許容する。
第1側面の射出成形装置によれば、連結流路において、特に遮断部材との接触部の溶損を抑制することによって、溶湯を適切に射出でき、成形品における巣の発生を抑制できる。
an injection molding apparatus according to a first aspect of the present disclosure, comprising: a melting section configured to melt a molding material; an injection section configured to inject the molten molding material into a mold; a connecting flow path connecting the melting section and the injection section; and a blocking mechanism selectively blocking movement of the molding material from the connecting flow path to the injection section, wherein the melting section includes a supply mechanism that supplies the molding material to the injection section via the connecting flow path, and a melt chamber that contains the molding material moving toward the injection section, the injection section includes an injection chamber that contains the molding material supplied from the melt chamber via the connecting flow path, and an injection mechanism that injects the molding material contained in the injection chamber into the mold, and the blocking mechanism includes a blocking member that blocks movement of the molding material from the connecting flow path to the injection chamber, and the connecting flow path includes a receiving section that receives the blocking member, and a suppressing structure that suppresses contact between the molding material and at least the receiving section when the supply operation of the supply mechanism of the melting section stops; the connecting flow path has a first connecting portion connected to the melting chamber and a second connecting portion connected to the injection chamber, and the suppression structure of the connecting flow path includes a first extension portion formed to extend upstream in the direction of gravity from the first connecting portion, a second extension portion formed to extend from the upstream end of the first connecting portion in the direction of gravity in a direction different from the direction of gravity, and a third extension portion formed to extend downstream in the direction of gravity from an end of the second extension portion opposite the first extension portion in the axial direction of the melting chamber to reach the second connecting portion, and the receiving portion is provided between the first connecting portion and the second connecting portion in the extension direction of the connecting flow path, and the blocking member moves in a direction toward the receiving portion to close the connecting flow path, thereby blocking the movement of the molding material from the connecting flow path to the injection chamber, and moves in a direction away from the receiving portion to open the connecting flow path, thereby allowing the movement of the molding material from the connecting flow path to the injection chamber .
According to the injection molding device of the first aspect, melt damage to the connecting flow path, particularly at the contact portion with the blocking member, can be suppressed, thereby enabling the molten metal to be injected appropriately and preventing porosity from occurring in the molded product.
第1側面に従う第2側面の射出成形装置において、前記連結流路の少なくとも前記受入部に、窒化珪素質材料が用いられる。
第2側面の射出成形装置によれば、効果的に、連結流路における遮断部材との接触部の溶損を抑制できる。
In the injection molding apparatus of a second aspect according to the first aspect, at least the receiving portion of the connecting channel is made of a silicon nitride material.
According to the injection molding device of the second aspect, melting damage of the contact portion between the connecting flow path and the blocking member can be effectively suppressed.
第1、または、第2側面に従う第3側面の射出成形装置において、前記連結流路の前記受入部は、前記射出部外に配置される。
第3側面の射出成形装置によれば、効果的に、連結流路における遮断部材との接触部の溶損を抑制できる。
In the injection molding apparatus of a third aspect according to the first or second aspect, the receiving portion of the connecting channel is disposed outside the injection portion.
According to the injection molding device of the third aspect, melting damage of the contact portion between the connecting flow path and the blocking member can be effectively suppressed.
第3側面に従う第4側面の射出成形装置において、前記連結流路の前記受入部は、前記溶融部外に配置される
第4側面の射出成形装置によれば、効果的に、連結流路における遮断部材との接触部の溶損を抑制できる。
In the injection molding device of the fourth aspect according to the third aspect, the receiving portion of the connecting flow path is arranged outside the melting portion. According to the injection molding device of the fourth aspect, melting damage of the contact portion with the blocking member in the connecting flow path can be effectively suppressed.
第1から第4側面のいずれか1つに従う第5側面の射出成形装置において、前記遮断機構の前記遮断部材は、前記射出部外に配置される。
第5側面の射出成形装置によれば、効果的に、連結流路における遮断部材との接触部の溶損を抑制できる。
In the injection molding apparatus of a fifth aspect according to any one of the first to fourth aspects, the blocking member of the blocking mechanism is disposed outside the injection section.
According to the injection molding device of the fifth aspect, melting damage to the contact portion between the connecting flow path and the blocking member can be effectively suppressed.
第5側面に従う第6側面の射出成形装置において、前記遮断機構の前記遮断部材は、前記溶融部外に配置される。
第6側面の射出成形装置によれば、効果的に、連結流路における遮断部材との接触部の溶損を抑制できる。
In the injection molding apparatus of a sixth aspect according to the fifth aspect, the blocking member of the blocking mechanism is disposed outside the melt zone.
According to the injection molding device of the sixth aspect, melting damage to the contact portion between the connecting flow path and the blocking member can be effectively suppressed.
第1から第6側面のいずれか1つに従う第7側面の射出成形装置において、前記連結流路の前記抑制構造は、前記連結流路の一部が前記溶融チャンバーよりも重力作用方向上流側に配置される流路形状を含む。
第7側面の射出成形装置によれば、効果的に、連結流路における遮断部材との接触部の溶損を抑制できる。
In an injection molding apparatus of a seventh aspect according to any one of the first to sixth aspects, the suppression structure of the connecting flow path includes a flow path shape in which a portion of the connecting flow path is positioned upstream of the melting chamber in the direction of gravity action.
According to the injection molding device of the seventh aspect, melting damage of the contact portion between the connecting flow path and the blocking member can be effectively suppressed.
第1側面に従う第8側面の射出成形装置において、前記供給部は、気体圧力によって前記成形材料を前記溶融チャンバーから前記射出チャンバーに供給する。
第8側面の射出成形装置によれば、効率的に、成形材料を溶融部から射出部に供給できる。
In the injection molding apparatus of the eighth aspect according to the first aspect , the supply section supplies the molding material from the melting chamber to the injection chamber by gas pressure.
According to the injection molding device of the eighth aspect, the molding material can be efficiently supplied from the melting portion to the injection portion.
本開示の射出成形装置によれば、成形品における巣の発生を抑制できる。 The injection molding apparatus disclosed herein can suppress the occurrence of porosity in molded products.
(第1実施形態)
第1実施形態に係る射出成形装置10が説明される。第1実施形態に係る射出成形装置10の説明には、図1、および、図2が用いられる。射出成形装置10は、成形材料1を溶融して金型3に射出するように構成される。成形材料1は、例えば、アルミニウム合金によって形成される。成形材料1は、アルミニウム合金とは異なる材料によって形成されてよい。
(First embodiment)
An injection molding apparatus 10 according to a first embodiment will be described. The injection molding apparatus 10 according to the first embodiment will be described with reference to FIGS. 1 and 2. The injection molding apparatus 10 is configured to melt a molding material 1 and inject it into a mold 3. The molding material 1 is made of, for example, an aluminum alloy. The molding material 1 may be made of a material other than an aluminum alloy.
図1に示されるように、射出成形装置10は、成形材料1を溶融するように構成される溶融部20と、溶融された成形材料1を金型3に射出するように構成される射出部30と、溶融部20と射出部30とを連結する連結流路60と、を備える。さらに、射出成形装置10は、連結流路60から射出部30への成形材料1の移動を選択的に遮断する遮断機構50と、を備える。本実施形態では、射出成形装置10は、溶融部20、射出部30、連結部材40、遮断機構50、および、連結流路60を含む。 As shown in FIG. 1, injection molding apparatus 10 includes a melting section 20 configured to melt molding material 1, an injection section 30 configured to inject the molten molding material 1 into a mold 3, and a connecting flow path 60 connecting melting section 20 and injection section 30. Furthermore, injection molding apparatus 10 includes a blocking mechanism 50 that selectively blocks the movement of molding material 1 from the connecting flow path 60 to injection section 30. In this embodiment, injection molding apparatus 10 includes melting section 20, injection section 30, connecting member 40, blocking mechanism 50, and connecting flow path 60.
溶融部20は、連結流路60を介して射出部30に成形材料1を供給する供給機構25と、射出部30に向かって移動する成形材料1を収容する溶融チャンバー21と、を含む。本実施形態では、溶融部20は、溶融チャンバー21、材料押込装置22、貯留部23、加熱ヒータ24、および、供給機構25を含む。 The melting section 20 includes a supply mechanism 25 that supplies the molding material 1 to the injection section 30 via the connecting flow path 60, and a melting chamber 21 that contains the molding material 1 moving toward the injection section 30. In this embodiment, the melting section 20 includes the melting chamber 21, a material pushing device 22, a storage section 23, a heater 24, and the supply mechanism 25.
溶融チャンバー21は、内周面21a、外周面21b、および、底面21cを有する円筒形状に形成される。溶融チャンバー21の軸方向は、射出成形装置10に対して重力が作用する重力作用方向Gに対して垂直な方向を向く。底面21cは、溶融チャンバー21の軸方向を向くように形成される。 The melt chamber 21 is formed in a cylindrical shape with an inner peripheral surface 21a, an outer peripheral surface 21b, and a bottom surface 21c. The axial direction of the melt chamber 21 is perpendicular to the gravitational force direction G, in which gravity acts on the injection molding apparatus 10. The bottom surface 21c is formed to face the axial direction of the melt chamber 21.
溶融チャンバー21は、内周面21a、および、底面21cによって定義される内部空間21dを有する。内部空間21dは、溶融チャンバー21の軸方向において、底面21cとは反対側の端部に達する。内部空間21dの底面21cとは反対側の端部には、溶融チャンバー21の内周面21aに対応する形状の成形材料1が配置される。溶融チャンバー21の形状は、射出部30に向かって移動する成形材料1を収容できる形状であれば、本実施形態に限定されない。 The melting chamber 21 has an internal space 21d defined by an inner peripheral surface 21a and a bottom surface 21c. The internal space 21d reaches the end opposite the bottom surface 21c in the axial direction of the melting chamber 21. At the end of the internal space 21d opposite the bottom surface 21c, a molding material 1 having a shape corresponding to the inner peripheral surface 21a of the melting chamber 21 is placed. The shape of the melting chamber 21 is not limited to that of the present embodiment, as long as it can accommodate the molding material 1 moving toward the injection section 30.
材料押込装置22は、溶融チャンバー21の底面21cに向かって成形材料1を押し込むように構成される。材料押込装置22によって押し込まれる成形材料1は、加熱ヒータ24によって加熱され、溶融チャンバー21の内部空間21dにおいて溶融される。本明細書においては、溶融される成形材料1が、溶湯2として記載される場合がある。 The material pushing device 22 is configured to push the molding material 1 toward the bottom surface 21c of the melting chamber 21. The molding material 1 pushed by the material pushing device 22 is heated by the heater 24 and melted in the internal space 21d of the melting chamber 21. In this specification, the molten molding material 1 may be referred to as molten metal 2.
貯留部23は、溶融チャンバー21の容量を超える溶湯2を貯留するように構成される。貯留部23は、本体部23a、蓋部23b、センサ23c、および、連結部材23dを含む。本体部23aは、溶融チャンバー21に対して、重力作用方向Gにおける上流側に間隔をあけて配置される。 The reservoir 23 is configured to store molten metal 2 in excess of the capacity of the melting chamber 21. The reservoir 23 includes a main body 23a, a lid 23b, a sensor 23c, and a connecting member 23d. The main body 23a is positioned upstream of the melting chamber 21 in the direction G of gravity.
本体部23aは、底面、内側面、および、開口部を有する。本体部23aは、底面、および、内側面によって定義される内部空間23eを有する。蓋部23bは、本体部23aの開口部を閉塞するように構成される。センサ23cは、本体部23aに貯留される溶湯2の液面の高さに関する情報を検出するように構成される。連結部材23dは、本体部23a、および、溶融チャンバー21を連結する。連結部材23dは、内周面、および、外周面を有する。本体部23aに貯留される溶湯2は、内部空間23eにおける気体圧力によって、連結部材23dを介して溶融チャンバー21の内部空間21dに移動される。 The main body 23a has a bottom surface, an inner surface, and an opening. The main body 23a has an internal space 23e defined by the bottom surface and the inner surface. The lid 23b is configured to close the opening of the main body 23a. The sensor 23c is configured to detect information related to the liquid level of the molten metal 2 stored in the main body 23a. The connecting member 23d connects the main body 23a and the melting chamber 21. The connecting member 23d has an inner circumferential surface and an outer circumferential surface. The molten metal 2 stored in the main body 23a is moved to the internal space 21d of the melting chamber 21 via the connecting member 23d by the gas pressure in the internal space 23e.
加熱ヒータ24は、溶融部20において、成形材料1を加熱するように構成される。加熱ヒータ24は、溶融部20に複数設けられる。加熱ヒータ24は、例えば、溶融チャンバー21の外周面21b、本体部23aの外周面、および、連結部材23dの外周面に設けられる。 The heater 24 is configured to heat the molding material 1 in the melting section 20. Multiple heaters 24 are provided in the melting section 20. The heaters 24 are provided, for example, on the outer peripheral surface 21b of the melting chamber 21, the outer peripheral surface of the main body 23a, and the outer peripheral surface of the connecting member 23d.
供給機構25は、溶融チャンバー21から射出チャンバー31に溶湯2を供給するように構成される。供給機構25は、貯留部23の蓋部23bを介して、本体部23aの内部空間23eに気体を供給するように構成される。本体部23aの内部空間23eに気体を供給することによって、供給機構25は、気体圧力によって成形材料1を溶融チャンバー21から射出チャンバー31に供給できる。 The supply mechanism 25 is configured to supply the molten metal 2 from the melting chamber 21 to the injection chamber 31. The supply mechanism 25 is configured to supply gas to the internal space 23e of the main body 23a via the lid 23b of the reservoir 23. By supplying gas to the internal space 23e of the main body 23a, the supply mechanism 25 can supply the molding material 1 from the melting chamber 21 to the injection chamber 31 by gas pressure.
供給機構25によって本体部23aに供給される気体は、例えば、不活性ガスを含む。本実施形態では、不活性ガスは、アルゴンガスを含む。不活性ガスは、溶湯2に対して反応しないガスであれば、アルゴンガスに限定されない。供給機構25は、気体圧力によって溶融チャンバー21から射出チャンバー31に溶湯2を供給できるのであれば、本体部23aとは異なる部材の内部空間に気体を供給してよい。 The gas supplied to the main body 23a by the supply mechanism 25 includes, for example, an inert gas. In this embodiment, the inert gas includes argon gas. The inert gas is not limited to argon gas, as long as it is a gas that does not react with the molten metal 2. The supply mechanism 25 may supply gas to the internal space of a member other than the main body 23a, as long as it can supply the molten metal 2 from the melting chamber 21 to the injection chamber 31 using gas pressure.
射出部30は、溶融部20に対して重力作用方向Gにおける下流側に間隔をあけて配置される。射出部30は、連結流路60を介して溶融チャンバー21から供給される成形材料1を収容する射出チャンバー31と、射出チャンバー31に収容される成形材料1を金型3に射出する射出機構32と、を含む。本実施形態では、射出部30は、射出チャンバー31、射出機構32、ノズル33、および、加熱ヒータ34を含む。 The injection unit 30 is disposed downstream of the melting unit 20 in the direction G of gravity with a gap therebetween. The injection unit 30 includes an injection chamber 31 that contains the molding material 1 supplied from the melting chamber 21 via the connecting flow path 60, and an injection mechanism 32 that injects the molding material 1 contained in the injection chamber 31 into the mold 3. In this embodiment, the injection unit 30 includes the injection chamber 31, the injection mechanism 32, a nozzle 33, and a heater 34.
射出チャンバー31は、内周面31a、および、外周面31bを有する円筒形状に形成される。射出チャンバー31は、内周面31aによって定義される内部空間31cを有する。射出チャンバー31の軸方向は、溶融チャンバー21の軸方向と同一方向を向く。射出チャンバー31は、射出チャンバー31の軸方向において、金型3に対して間隔をあけて配置される。射出チャンバー31の形状は、溶湯2を収容できる形状であれば、本実施形態に限定されない。 The injection chamber 31 is formed in a cylindrical shape having an inner peripheral surface 31a and an outer peripheral surface 31b. The injection chamber 31 has an internal space 31c defined by the inner peripheral surface 31a. The axial direction of the injection chamber 31 faces the same direction as the axial direction of the melting chamber 21. The injection chamber 31 is disposed at a distance from the mold 3 in the axial direction of the injection chamber 31. The shape of the injection chamber 31 is not limited to that of this embodiment, as long as it can accommodate the molten metal 2.
射出機構32は、プランジャ32a、および、駆動装置32bを含む。プランジャ32aは、射出チャンバー31の内周面31aと対応する形状に形成される。プランジャ32aは、射出チャンバー31の内周面31aのうち、金型3とは反対側の端部に挿通される。プランジャ32aは、射出チャンバー31の内周面31aに対して、射出チャンバー31の軸方向に摺動するように構成される。 The injection mechanism 32 includes a plunger 32a and a drive unit 32b. The plunger 32a is formed in a shape that corresponds to the inner circumferential surface 31a of the injection chamber 31. The plunger 32a is inserted into the end of the inner circumferential surface 31a of the injection chamber 31 opposite the mold 3. The plunger 32a is configured to slide in the axial direction of the injection chamber 31 relative to the inner circumferential surface 31a of the injection chamber 31.
駆動装置32bは、プランジャ32aに連結され、プランジャ32aを射出チャンバー31の軸方向に往復移動させるように構成される。プランジャ32aの往復移動によって、射出チャンバー31の内部空間31cに貯留可能な溶湯2の量は、増減される。 The drive unit 32b is connected to the plunger 32a and configured to reciprocate the plunger 32a in the axial direction of the injection chamber 31. The reciprocating movement of the plunger 32a increases or decreases the amount of molten metal 2 that can be stored in the internal space 31c of the injection chamber 31.
ノズル33は、金型3に向けて溶湯2を吐出するように構成される。ノズル33は、射出チャンバー31の軸方向において、金型3、および、射出チャンバー31の間に配置される。ノズル33は、射出チャンバー31の内部空間31cと連通される。 The nozzle 33 is configured to eject the molten metal 2 toward the mold 3. The nozzle 33 is positioned between the mold 3 and the injection chamber 31 in the axial direction of the injection chamber 31. The nozzle 33 is connected to the internal space 31c of the injection chamber 31.
加熱ヒータ34は、射出部30において、成形材料1を加熱するように構成される。加熱ヒータ34は、射出部30に複数設けられる。加熱ヒータ34は、例えば、射出チャンバー31の外周面31b、および、ノズル33の外周面に設けられる。 The heater 34 is configured to heat the molding material 1 in the injection section 30. Multiple heaters 34 are provided in the injection section 30. The heaters 34 are provided, for example, on the outer peripheral surface 31b of the injection chamber 31 and the outer peripheral surface of the nozzle 33.
図2に示されるように、連結部材40は、第1連結部材41、第2連結部材42、および、加熱ヒータ43を含む。第1連結部材41は、重力作用方向Gにおいて、溶融チャンバー21、および、射出チャンバー31の間に配置される。第1連結部材41は、例えば、内周面41a、および、外周面41bを有する筒状に形成される。第1連結部材41の軸方向は、重力作用方向Gを向く。 As shown in FIG. 2, the connecting member 40 includes a first connecting member 41, a second connecting member 42, and a heater 43. The first connecting member 41 is disposed between the melting chamber 21 and the injection chamber 31 in the direction G of gravity. The first connecting member 41 is formed, for example, in a cylindrical shape having an inner circumferential surface 41a and an outer circumferential surface 41b. The axial direction of the first connecting member 41 faces the direction G of gravity.
第2連結部材42は、第1連結部材41に対して、重力作用方向Gにおける下流側に配置される。第2連結部材42は、射出チャンバー31に挿通される。第2連結部材42は、例えば、内周面42a、および、外周面42bを有する筒状に形成される。第2連結部材42の軸方向は、第1連結部材41の軸方向と同一方向を向く。 The second connecting member 42 is positioned downstream of the first connecting member 41 in the direction G of gravity. The second connecting member 42 is inserted into the injection chamber 31. The second connecting member 42 is formed, for example, in a cylindrical shape having an inner circumferential surface 42a and an outer circumferential surface 42b. The axial direction of the second connecting member 42 is oriented in the same direction as the axial direction of the first connecting member 41.
連結部材40は、第1連結部材41の内周面41a、および、第2連結部材42の内周面42aによって定義される内部空間40aを有する。連結部材40の内部空間40aの重力作用方向Gにおける下流側端部は、射出チャンバー31の内部空間31cに達する。加熱ヒータ43は、第1連結部材41の外周面41bに複数設けられる。 The connecting member 40 has an internal space 40a defined by the inner circumferential surface 41a of the first connecting member 41 and the inner circumferential surface 42a of the second connecting member 42. The downstream end of the internal space 40a of the connecting member 40 in the direction of gravity G reaches the internal space 31c of the injection chamber 31. Multiple heaters 43 are provided on the outer circumferential surface 41b of the first connecting member 41.
遮断機構50は、連結流路60から射出チャンバー31への成形材料1の移動を遮断する遮断部材51、を含む。本実施形態では、遮断機構50は、遮断部材51、および、駆動装置52を含む。遮断部材51は、射出部30外に配置される。遮断部材51は、溶融部20外に配置される。本実施形態では、遮断部材51は、重力作用方向Gにおいて、溶融チャンバー21、および、射出チャンバー31の間に配置される。 The blocking mechanism 50 includes a blocking member 51 that blocks the movement of the molding material 1 from the connecting flow path 60 to the injection chamber 31. In this embodiment, the blocking mechanism 50 includes the blocking member 51 and a drive unit 52. The blocking member 51 is disposed outside the injection section 30. The blocking member 51 is disposed outside the melting section 20. In this embodiment, the blocking member 51 is disposed between the melting chamber 21 and the injection chamber 31 in the direction G of gravity.
遮断部材51は、例えば、軸状に形成される。遮断部材51の軸方向は、溶融チャンバー21の軸方向と同一方向を向く。遮断部材51は、外周面51a、および、軸方向面51bを含む。外周面51aは、第1連結部材41に対して、遮断部材51の軸方向に摺動するように構成される。軸方向面51bは、遮断部材51の軸方向を向くように形成される。 The blocking member 51 is formed, for example, in a shaft shape. The axial direction of the blocking member 51 faces the same direction as the axial direction of the melting chamber 21. The blocking member 51 includes an outer peripheral surface 51a and an axial surface 51b. The outer peripheral surface 51a is configured to slide in the axial direction of the blocking member 51 relative to the first connecting member 41. The axial surface 51b is formed to face the axial direction of the blocking member 51.
駆動装置52は、連結流路60の受入部66に対して遮断部材51が接近する方向、および、受入部66に対して遮断部材51が離れる方向に、遮断部材51を移動させるように構成される。 The drive device 52 is configured to move the blocking member 51 in a direction in which the blocking member 51 approaches the receiving portion 66 of the connecting flow path 60, and in a direction in which the blocking member 51 moves away from the receiving portion 66.
図1、および、図2に示される連結流路60は、溶融チャンバー21の内部空間21d、および、射出チャンバー31の内部空間31cを連通するように構成される。連結流路60は、遮断部材51を受け入れる受入部66と、溶融部20の供給機構25による成形材料1の供給動作停止時に、成形材料1と少なくとも受入部66との接触を抑制する抑制構造63,64,65と、を含む。抑制構造63,64,65は、連結流路60の一部が溶融チャンバー21よりも重力作用方向上流側に配置される流路形状を含む。 The connecting flow path 60 shown in Figures 1 and 2 is configured to communicate between the internal space 21d of the melt chamber 21 and the internal space 31c of the injection chamber 31. The connecting flow path 60 includes a receiving portion 66 that receives the blocking member 51, and suppression structures 63, 64, and 65 that suppress contact between the molding material 1 and at least the receiving portion 66 when the supply mechanism 25 of the melting portion 20 stops supplying the molding material 1. The suppression structures 63, 64, and 65 include a flow path shape that positions a portion of the connecting flow path 60 upstream of the melt chamber 21 in the direction of gravity.
図2に示されるように、連結流路60は、溶融チャンバー21と連結される第1連結部61、および、射出チャンバー31と連結される第2連結部62を有し、第1連結部61から重力作用方向上流側に延びる。本実施形態では、連結流路60は、第1連結部61、第2連結部62、第1延出部63、第2延出部64、第3延出部65、および、受入部66を有する。 As shown in FIG. 2, the connecting flow path 60 has a first connecting portion 61 connected to the melting chamber 21 and a second connecting portion 62 connected to the injection chamber 31, and extends upstream from the first connecting portion 61 in the direction of gravity. In this embodiment, the connecting flow path 60 has a first connecting portion 61, a second connecting portion 62, a first extending portion 63, a second extending portion 64, a third extending portion 65, and a receiving portion 66.
第1連結部61は、溶融チャンバー21の内部空間21dにおいて開口するように形成される。第2連結部62は、射出チャンバー31の内部空間31cにおいて開口するように形成される。本実施形態では、第2連結部62は、第2連結部材42の内周面42aのうち、重力作用方向Gにおける下流側端部に形成される。 The first connecting portion 61 is formed to open into the internal space 21d of the melting chamber 21. The second connecting portion 62 is formed to open into the internal space 31c of the injection chamber 31. In this embodiment, the second connecting portion 62 is formed on the downstream end of the inner circumferential surface 42a of the second connecting member 42 in the direction G of gravity.
第1延出部63は、溶融チャンバー21に形成される。第1延出部63は、第1連結部61から重力作用方向Gにおける上流側に延出するように形成される。第2延出部64は、溶融チャンバー21に形成される。第2延出部64は、第1連結部61の重力作用方向Gにおける上流側端部から、溶融チャンバー21の軸方向に延出するように形成される。 The first extension portion 63 is formed on the melting chamber 21. The first extension portion 63 is formed to extend from the first connecting portion 61 upstream in the direction of gravity G. The second extension portion 64 is formed on the melting chamber 21. The second extension portion 64 is formed to extend in the axial direction of the melting chamber 21 from the upstream end of the first connecting portion 61 in the direction of gravity G.
第3延出部65は、第2延出部64のうち、溶融チャンバー21の軸方向における第1延出部63側とは反対側の端部から、重力作用方向Gにおける下流側に延出するように形成される。第3延出部65は、連結部材40の内部空間40aを含み、第2連結部62に達する。本実施形態では、第1延出部63、第2延出部64、および、第3延出部65によって、連結流路60は、第1連結部61から重力作用方向上流側に延びた後、重力作用方向下流側に延びて第2連結部62に達するように構成される。 The third extension portion 65 is formed to extend downstream in the direction of gravity G from the end of the second extension portion 64 opposite the first extension portion 63 in the axial direction of the melting chamber 21. The third extension portion 65 includes the internal space 40a of the connecting member 40 and reaches the second connecting portion 62. In this embodiment, the first extension portion 63, the second extension portion 64, and the third extension portion 65 configure the connecting flow path 60 to extend upstream in the direction of gravity from the first connecting portion 61, and then extend downstream in the direction of gravity to reach the second connecting portion 62.
受入部66は、遮断部材51の形状に対応するように形成される。受入部66は、射出部30外に配置される。受入部66は、溶融部20外に配置される。本実施形態では、受入部66は、第1連結部材41に形成され、重力作用方向Gにおいて、溶融部20、および、射出部30の間に配置される。 The receiving portion 66 is formed to correspond to the shape of the blocking member 51. The receiving portion 66 is positioned outside the injection portion 30. The receiving portion 66 is positioned outside the melting portion 20. In this embodiment, the receiving portion 66 is formed in the first connecting member 41 and is positioned between the melting portion 20 and the injection portion 30 in the direction G of gravity.
受入部66は、第1連結部材41の外周面41bから、遮断部材51の軸方向に延出する穴によって形成される。受入部66は、連結部材40の内部空間40aと連通される。遮断部材51は、受入部66に挿入される。受入部66は、内周面66a、および、底面66bを含む。 The receiving portion 66 is formed by a hole extending from the outer peripheral surface 41b of the first connecting member 41 in the axial direction of the blocking member 51. The receiving portion 66 is in communication with the internal space 40a of the connecting member 40. The blocking member 51 is inserted into the receiving portion 66. The receiving portion 66 includes an inner peripheral surface 66a and a bottom surface 66b.
内周面66aは、遮断部材51の外周面51aの形状に対応するように形成される。遮断部材51の外周面51aは、遮断部材51の軸方向において、内周面66aに対して摺動するように構成される。底面66bは、遮断部材51の軸方向面51bの形状に対応するように形成される。底面66bは、遮断部材51の軸方向において、軸方向面51bと対向するように配置される。 The inner peripheral surface 66a is formed to correspond to the shape of the outer peripheral surface 51a of the blocking member 51. The outer peripheral surface 51a of the blocking member 51 is configured to slide against the inner peripheral surface 66a in the axial direction of the blocking member 51. The bottom surface 66b is formed to correspond to the shape of the axial surface 51b of the blocking member 51. The bottom surface 66b is positioned so as to face the axial surface 51b in the axial direction of the blocking member 51.
駆動装置52によって遮断部材51が受入部66の底面66bに接近する方向に移動され、遮断部材51の外周面51aによって連結部材40の内部空間40aが閉塞されると、連結流路60が閉じられる。連結流路60が閉じられることによって、溶融チャンバー21の内部空間21d、および、射出チャンバー31の内部空間31cの間における溶湯2の移動が遮断される。 When the driver 52 moves the shutoff member 51 toward the bottom surface 66b of the receiving section 66 and the outer surface 51a of the shutoff member 51 closes the internal space 40a of the connecting member 40, the connecting flow path 60 is closed. Closing the connecting flow path 60 blocks the movement of molten metal 2 between the internal space 21d of the melting chamber 21 and the internal space 31c of the injection chamber 31.
駆動装置52によって遮断部材51が受入部66の底面66bに対して離れる方向に移動され、連結部材40の内部空間40aが開放されると、連結流路60が開かれる。連結流路60が開かれることによって、溶融チャンバー21の内部空間21d、および、射出チャンバー31の内部空間31cの間における溶湯2の移動が許容される。遮断機構50は、溶湯2の移動を選択的に遮断するように構成されるのであれば、本実施形態の構成に限定されない。 When the drive unit 52 moves the shutoff member 51 away from the bottom surface 66b of the receiving portion 66 and the internal space 40a of the connecting member 40 is opened, the connecting flow path 60 is opened. Opening the connecting flow path 60 allows the movement of the molten metal 2 between the internal space 21d of the melting chamber 21 and the internal space 31c of the injection chamber 31. The shutoff mechanism 50 is not limited to the configuration of this embodiment, as long as it is configured to selectively shut off the movement of the molten metal 2.
連結流路60の少なくとも一部には、窒化珪素質材料が用いられる。本実施形態では、連結流路60の少なくとも受入部66に、窒化珪素質材料が用いられる。本実施形態では、受入部66の表面に窒化珪素質セラミックスがコーティングされることによって、窒化珪素質材料が用いられた受入部66が形成される。窒化珪素質材料が用いられた受入部66の構成は、本実施形態に限定されない。例えば、窒化珪素質セラミックスとは異なる窒化系素質材料によって受入部66が形成されてよい。受入部66に窒化珪素質材料が用いられることによって、受入部66の耐食性、および、耐摩耗性を向上できるため、受入部66における溶損の発生を抑制できる。 A silicon nitride material is used for at least a portion of the connecting flow path 60. In this embodiment, a silicon nitride material is used for at least the receiving portion 66 of the connecting flow path 60. In this embodiment, the surface of the receiving portion 66 is coated with a silicon nitride ceramic, thereby forming the receiving portion 66 using the silicon nitride material. The configuration of the receiving portion 66 using the silicon nitride material is not limited to this embodiment. For example, the receiving portion 66 may be formed from a nitride-based material other than silicon nitride ceramic. Using a silicon nitride material for the receiving portion 66 improves the corrosion resistance and wear resistance of the receiving portion 66, thereby suppressing the occurrence of melting damage in the receiving portion 66.
連結流路60において窒化珪素質材料が用いられる部分は、本実施形態に限定されない。例えば、連結流路60のうち、受入部66よりも重力作用方向Gにおける上流側、および、受入部66よりも重力作用方向Gにおける下流側の流路に窒化珪素質材料が用いられてよい。窒化珪素質材料は、連結流路60、および、遮断部材51の少なくとも一方に用いられてよい。例えば、遮断部材51の先端部に、窒化珪素質材料が用いられてよい。 The portion of the connecting flow path 60 in which the silicon nitride material is used is not limited to this embodiment. For example, the silicon nitride material may be used in the connecting flow path 60 upstream of the receiving portion 66 in the direction of gravity G, and downstream of the receiving portion 66 in the direction of gravity G. The silicon nitride material may be used in at least one of the connecting flow path 60 and the blocking member 51. For example, the silicon nitride material may be used in the tip portion of the blocking member 51.
図1から図5が用いられ、射出成形装置10の動作が説明される。本明細書においては、連結流路60、射出チャンバー31、ノズル33、および、金型3に溶湯2が供給されていない状態が、初期状態として記載される。図1、および、図2には、初期状態の一例が示される。初期状態において、溶融チャンバー21は、溶湯2によって満たされる。初期状態において、連結流路60は、開かれる。 The operation of the injection molding apparatus 10 will be explained using Figures 1 to 5. In this specification, the state in which molten metal 2 is not supplied to the connecting flow path 60, injection chamber 31, nozzle 33, and mold 3 is described as the initial state. Figures 1 and 2 show an example of the initial state. In the initial state, the melting chamber 21 is filled with molten metal 2. In the initial state, the connecting flow path 60 is open.
射出成形装置10の動作が開始されると、図3に示される供給機構25は、貯留部23の本体部23aの内部空間23eにアルゴンガスを供給する。アルゴンガスの供給によって、溶融チャンバー21の溶湯2は、連結流路60に向けて押し出される。溶湯2は、連結流路60を介して、射出チャンバー31の内部空間31cに移動される。 When the injection molding apparatus 10 begins operation, the supply mechanism 25 shown in FIG. 3 supplies argon gas to the internal space 23e of the main body 23a of the reservoir 23. The supply of argon gas pushes the molten metal 2 in the melting chamber 21 toward the connecting flow path 60. The molten metal 2 is moved via the connecting flow path 60 to the internal space 31c of the injection chamber 31.
射出チャンバー31に予め定める量の溶湯2が供給されると、図4に示されるように、供給機構25は、アルゴンガスの供給を停止する。図2に示されるように、本実施形態では、第1延出部63が、第1連結部61から重力作用方向Gにおける上流側に延びるように形成されるため、供給機構25がアルゴンガスの供給を停止すると、溶融チャンバー21から連結流路60に溶湯2が移動しない。第3延出部65が、第2延出部64から第2連結部62に向けて重力作用方向Gにおける下流側に延びるように形成されるため、供給機構25がアルゴンガスの供給を停止すると、第3延出部65を流通する溶湯2は、自重によって、射出チャンバー31の内部空間31cに移動される。 As shown in FIG. 4, when a predetermined amount of molten metal 2 has been supplied to the injection chamber 31, the supply mechanism 25 stops the supply of argon gas. As shown in FIG. 2, in this embodiment, the first extension portion 63 is formed to extend upstream from the first connecting portion 61 in the direction of gravity G. Therefore, when the supply mechanism 25 stops the supply of argon gas, the molten metal 2 does not move from the melting chamber 21 to the connecting flow path 60. Because the third extension portion 65 is formed to extend downstream in the direction of gravity G from the second extension portion 64 toward the second connecting portion 62, when the supply mechanism 25 stops the supply of argon gas, the molten metal 2 flowing through the third extension portion 65 moves by its own weight into the internal space 31c of the injection chamber 31.
供給機構25がアルゴンガスの供給を停止すると、溶融チャンバー21から連結流路60に溶湯2が移動せず、かつ、第3延出部65を流通する溶湯2が射出チャンバー31に移動されるため、図4に示されるように、連結流路60には、溶湯2と接触しない非接触部分67が形成される。本実施形態では、非接触部分67は、少なくとも受入部66を含む。非接触部分67は、受入部66だけではなく、例えば、第1延出部63の少なくとも一部、第2延出部64の少なくとも一部、および、第3延出部65の少なくとも一部を含んでよい。 When the supply mechanism 25 stops supplying argon gas, the molten metal 2 does not move from the melting chamber 21 to the connecting flow path 60, and the molten metal 2 flowing through the third extension portion 65 moves to the injection chamber 31. As a result, as shown in FIG. 4, a non-contact portion 67 that does not come into contact with the molten metal 2 is formed in the connecting flow path 60. In this embodiment, the non-contact portion 67 includes at least the receiving portion 66. The non-contact portion 67 may include not only the receiving portion 66, but also, for example, at least a portion of the first extension portion 63, at least a portion of the second extension portion 64, and at least a portion of the third extension portion 65.
図5に示されるように、供給機構25がアルゴンガスの供給を停止すると、駆動装置52によって遮断部材51が受入部66の底面66bに向けて移動され、連結流路60が閉じられる。連結流路60が閉じられると、射出機構32の駆動装置32bは、ノズル33に対してプランジャ32aが接近する方向に、プランジャ32aを移動させる。 As shown in FIG. 5, when the supply mechanism 25 stops supplying argon gas, the driver 52 moves the blocking member 51 toward the bottom surface 66b of the receiving portion 66, closing the connecting flow path 60. Once the connecting flow path 60 is closed, the driver 32b of the injection mechanism 32 moves the plunger 32a in a direction that brings the plunger 32a closer to the nozzle 33.
プランジャ32aの移動によって射出チャンバー31の内部空間31cの圧力が増加するため、連結流路60において遮断部材51まで溶湯2が逆流し、かつ、ノズル33から金型3に向けて溶湯2が射出され、金型3に溶湯2が充填される。本実施形態では、図4において射出チャンバー31に充填される溶湯2の一部が、金型3に充填される。溶湯2の一部が金型3に充填されるため、図5に示される金型3に溶湯2が充填された状態において、射出チャンバー31には、予め定める量の溶湯2が存在する。金型3に溶湯2が充填された状態において、射出チャンバー31に存在する溶湯2の量は、特に限定されない。 The movement of the plunger 32a increases the pressure in the internal space 31c of the injection chamber 31, causing the molten metal 2 to flow back up the connecting flow path 60 to the shutoff member 51, and the molten metal 2 is injected from the nozzle 33 toward the mold 3, filling the mold 3 with the molten metal 2. In this embodiment, a portion of the molten metal 2 filling the injection chamber 31 in FIG. 4 also fills the mold 3. Because a portion of the molten metal 2 fills the mold 3, a predetermined amount of molten metal 2 is present in the injection chamber 31 when the mold 3 is filled with the molten metal 2 as shown in FIG. 5. There are no particular limitations on the amount of molten metal 2 present in the injection chamber 31 when the mold 3 is filled with the molten metal 2.
金型3に充填される溶湯2は、金型3において冷却されることによって、予め定める形状の成形品に成形される。成形品が成形されると、金型3が開いて成形品が取り出される。遮断機構50の駆動装置52は、金型3が開いて成形品が取り出される間に、受入部66の底面66bから離れる方向に遮断部材51を移動させ、連結流路60を開く。 The molten metal 2 filled into the mold 3 is cooled in the mold 3 and formed into a molded product of a predetermined shape. Once the molded product is formed, the mold 3 opens and the molded product is removed. While the mold 3 opens and the molded product is being removed, the drive device 52 of the shutoff mechanism 50 moves the shutoff member 51 away from the bottom surface 66b of the receiving section 66, opening the connecting flow path 60.
金型3が開いて成形品が取り出されると、射出機構32の駆動装置32bは、ノズル33に対してプランジャ32aが離れる方向に、プランジャ32aを移動させる。供給機構25は、プランジャ32aが移動される際に稼働し、貯留部23の本体部23aの内部空間23eにアルゴンガスを供給する。供給機構25が稼働することによって、射出チャンバー31の内部空間31cには、溶湯2が充填される。 When the mold 3 is opened and the molded product is removed, the drive device 32b of the injection mechanism 32 moves the plunger 32a in a direction away from the nozzle 33. The supply mechanism 25 operates when the plunger 32a is moved, supplying argon gas to the internal space 23e of the main body 23a of the reservoir 23. As the supply mechanism 25 operates, the internal space 31c of the injection chamber 31 is filled with the molten metal 2.
射出チャンバー31の内部空間31cに溶湯2が充填されると、連結流路60が閉じられ、溶湯2が金型3に充填され、金型3から成形品が取り出され、射出チャンバー31の内部空間31cに溶湯2が充填される動作が繰り返される。繰り返しの動作において、非接触部分67は、射出チャンバー31の内部空間31cに溶湯2が充填されてから、溶湯2が金型3に充填されるまでの間に、連結流路60に形成される。 Once the internal space 31c of the injection chamber 31 is filled with the molten metal 2, the connecting flow path 60 is closed, the molten metal 2 is filled into the mold 3, the molded product is removed from the mold 3, and the molten metal 2 is filled into the internal space 31c of the injection chamber 31. This operation is repeated. During this repeated operation, a non-contact portion 67 is formed in the connecting flow path 60 between the time the internal space 31c of the injection chamber 31 is filled with the molten metal 2 and the time the molten metal 2 is filled into the mold 3.
本実施形態では、連結流路60は、成形材料1を溶融チャンバー21から射出チャンバー31に間欠的に供給することにより、連結流路60において、少なくとも部分的に連結流路60と成形材料1との非接触部分67を形成するように構成される。連結流路60に非接触部分67が形成されることによって、受入部66に溶湯2が接触しない時間を作ることができるため、受入部66における溶損の発生を抑制できる。受入部66における溶損の発生を抑制できることによって、金型3に溶湯2が射出される場合に、溶湯2が射出チャンバー31から溶融チャンバー21に逆流することを抑制でき、射出圧力の低下を抑制できる。射出圧力の低下を抑制できることによって、成形品における巣の発生を抑制できる。 In this embodiment, the connecting flow path 60 is configured to intermittently supply the molding material 1 from the melt chamber 21 to the injection chamber 31, thereby forming at least a partial non-contact portion 67 between the connecting flow path 60 and the molding material 1. By forming the non-contact portion 67 in the connecting flow path 60, a period of time can be created during which the molten metal 2 does not come into contact with the receiving portion 66, thereby suppressing the occurrence of melt damage in the receiving portion 66. By suppressing the occurrence of melt damage in the receiving portion 66, it is possible to suppress the backflow of the molten metal 2 from the injection chamber 31 to the melt chamber 21 when the molten metal 2 is injected into the mold 3, thereby suppressing a decrease in injection pressure. By suppressing a decrease in injection pressure, it is possible to suppress the occurrence of porosity in the molded product.
連結流路60に非接触部分67が形成されることによって、受入部66、および、溶湯2を反応し難くできる。例えば、受入部66が形成される第1連結部材41が鉄によって形成される場合に、鉄とアルミニウムが反応することによるFe-Al系金属間化合物の生成を防ぎ、Fe-Al系金属間化合物が溶湯2に含まれることを抑制できる。Fe-Al系金属間化合物が溶湯2に含まれることを抑制できることによって、清浄度を向上できる。本実施形態では、受入部66に窒化珪素質材料が用いられることによって、受入部66、および、溶湯2をより反応し難くできる。 By forming a non-contact portion 67 in the connecting flow path 60, the receiving portion 66 and the molten metal 2 can be made less susceptible to reaction. For example, if the first connecting member 41 in which the receiving portion 66 is formed is made of iron, the reaction between iron and aluminum can be prevented from forming Fe-Al intermetallic compounds, and the inclusion of Fe-Al intermetallic compounds in the molten metal 2 can be suppressed. By suppressing the inclusion of Fe-Al intermetallic compounds in the molten metal 2, cleanliness can be improved. In this embodiment, the receiving portion 66 is made of a silicon nitride material, making the receiving portion 66 and the molten metal 2 even less susceptible to reaction.
(変形例)
本実施形態に関する説明は、本発明が取り得る形態の例示であり、本発明を制限することを意図していない。本発明は、例えば以下に示す本実施形態の変形例、および、相互に矛盾しない少なくとも2つの変形例が組み合わされた形態を取り得る。
(Modification)
The description of the present embodiment is merely an example of a form that the present invention can take, and is not intended to limit the present invention. For example, the present invention can take the following modified form of the present embodiment, or a form that combines at least two modified forms that are not mutually contradictory.
例えば、本実施形態における射出成形装置10の構成は一例であり、射出成形装置10は、本実施形態において示されない各種装置を含んでいてもよく、本実施形態において示す各種装置のうち一部を含まない構成としてもよい。例えば、射出成形装置10は、図6に示されるように、本実施形態の遮断機構50とは、異なる位置に設けられる遮断機構70を含んでよい。 For example, the configuration of the injection molding apparatus 10 in this embodiment is an example, and the injection molding apparatus 10 may include various devices not shown in this embodiment, or may not include some of the various devices shown in this embodiment. For example, as shown in FIG. 6, the injection molding apparatus 10 may include a blocking mechanism 70 that is provided in a different position from the blocking mechanism 50 of this embodiment.
図6に示される遮断機構70は、射出部30に設けられる。遮断機構70の遮断部材71の少なくとも一部は射出チャンバー31の内部空間31cに配置される。遮断部材71は、駆動装置72によって、重力作用方向Gにおける上流側、および、重力作用方向Gにおける下流側に往復移動するように形成される。図6に示される変形例において、第2連結部材42の重力作用方向Gにおける下流側端部に、受入部66が形成される。遮断機構70は、射出部30ではなく、溶融部20に設けられてよい。 The shutoff mechanism 70 shown in Figure 6 is provided in the injection section 30. At least a portion of the shutoff member 71 of the shutoff mechanism 70 is disposed in the internal space 31c of the injection chamber 31. The shutoff member 71 is configured to move reciprocally between the upstream side in the direction of gravity G and the downstream side in the direction of gravity G by a drive device 72. In the modified example shown in Figure 6, a receiving section 66 is formed at the downstream end of the second connecting member 42 in the direction of gravity G. The shutoff mechanism 70 may be provided in the melting section 20 instead of the injection section 30.
本明細書において使用される「少なくとも1つ」という表現は、所望の選択肢の「1つ以上」を意味する。一例として、本明細書において使用される「少なくとも1つ」という表現は、選択肢の数が2つであれば「1つの選択肢のみ」、または、「2つの選択肢の双方」を意味する。他の例として、本明細書において使用される「少なくとも1つ」という表現は、選択肢の数が3つ以上であれば「1つの選択肢のみ」、または、「2つ以上の任意の選択肢の組み合わせ」を意味する。 As used herein, the phrase "at least one" means "one or more" of the desired options. As an example, when the number of options is two, the phrase "at least one" means "only one option" or "both of two options." As another example, when the number of options is three or more, the phrase "at least one" means "only one option" or "any combination of two or more options."
1…成形材料、3…金型、10…射出成形装置、20…溶融部、21…溶融チャンバー、25…供給機構、30…射出部、31…射出チャンバー、32…射出機構、50…遮断機構、51…遮断部材、60…連結流路、61…第1連結部、62…第2連結部、63,64,65…抑制構造、66…受入部、67…非接触部 1... Molding material, 3... Mold, 10... Injection molding apparatus, 20... Melting section, 21... Melting chamber, 25... Supply mechanism, 30... Injection section, 31... Injection chamber, 32... Injection mechanism, 50... Shut-off mechanism, 51... Shut-off member, 60... Connecting flow path, 61... First connecting section, 62... Second connecting section, 63, 64, 65... Suppression structure, 66... Receiving section, 67... Non-contact section
Claims (8)
溶融された前記成形材料を金型に射出するように構成される射出部と、
前記溶融部と前記射出部とを連結する連結流路と、
前記連結流路から前記射出部への前記成形材料の移動を選択的に遮断する遮断機構と、を備え、
前記溶融部は、前記連結流路を介して前記射出部に前記成形材料を供給する供給機構と、前記射出部に向かって移動する前記成形材料を収容する溶融チャンバーと、を含み、
前記射出部は、前記連結流路を介して前記溶融チャンバーから供給される前記成形材料を収容する射出チャンバーと、前記射出チャンバーに収容される前記成形材料を前記金型に射出する射出機構と、を含み、
前記遮断機構は、前記連結流路から前記射出チャンバーへの前記成形材料の移動を遮断する遮断部材、を含み、
前記連結流路は、前記遮断部材を受け入れる受入部と、前記溶融部の前記供給機構による前記成形材料の供給動作停止時に、前記成形材料と少なくとも前記受入部との接触を抑制する抑制構造と、を含み、
前記連結流路は、前記溶融チャンバーと連結される第1連結部、および、前記射出チャンバーと連結される第2連結部を有し、
前記連結流路の前記抑制構造は、
前記第1連結部から重力作用方向における上流側に延出するように形成される第1延出部と、
前記第1連結部の重力作用方向における上流側端部から、重力作用方向とは異なる方向に延出するように形成される第2延出部と、
前記第2延出部のうち、前記溶融チャンバーの軸方向における前記第1延出部側とは反対側の端部から、重力作用方向における下流側に延出して前記第2連結部に達するように形成される第3延出部と、を含み、
前記受入部は、前記連結流路の延出方向において前記第1連結部と前記第2連結部との間に設けられ、
前記遮断部材は、
前記受入部に対して接近する方向に移動して前記連結流路を閉じることで、前記連結流路から前記射出チャンバーへの前記成形材料の移動を遮断し、
前記受入部に対して離れる方向に移動して前記連結流路を開くことで、前記連結流路から前記射出チャンバーへの前記成形材料の移動を許容する、
射出成形装置。 a melting portion configured to melt the molding material;
an injection unit configured to inject the molten molding material into a mold;
a connecting flow path connecting the melting portion and the injection portion;
a blocking mechanism that selectively blocks the movement of the molding material from the connecting channel to the injection section,
the melting section includes a supply mechanism that supplies the molding material to the injection section through the connecting flow path, and a melting chamber that accommodates the molding material moving toward the injection section,
the injection unit includes an injection chamber that accommodates the molding material supplied from the melting chamber through the connecting flow path, and an injection mechanism that injects the molding material accommodated in the injection chamber into the mold,
the blocking mechanism includes a blocking member that blocks movement of the molding material from the connecting channel to the injection chamber,
The connecting flow path includes a receiving portion that receives the blocking member, and a suppression structure that suppresses contact between the molding material and at least the receiving portion when the supply operation of the supply mechanism of the melting portion stops.
the connecting channel has a first connecting portion connected to the melting chamber and a second connecting portion connected to the injection chamber,
The suppression structure of the connecting flow path is
a first extending portion formed to extend from the first connecting portion to an upstream side in a gravity acting direction;
a second extending portion formed to extend in a direction different from the gravity acting direction from an upstream end portion of the first connecting portion in the gravity acting direction;
a third extension portion formed to extend from an end of the second extension portion opposite to the first extension portion in the axial direction of the melting chamber to a downstream side in a gravity acting direction and reach the second connecting portion,
the receiving portion is provided between the first connecting portion and the second connecting portion in the extension direction of the connecting flow path,
The blocking member is
the nozzle moves in a direction approaching the receiving portion to close the connecting passage, thereby blocking the movement of the molding material from the connecting passage to the injection chamber;
and moving in a direction away from the receiving portion to open the connecting passage, thereby allowing the molding material to move from the connecting passage to the injection chamber.
Injection molding equipment.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022205024A JP7788366B2 (en) | 2022-12-22 | 2022-12-22 | injection molding equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022205024A JP7788366B2 (en) | 2022-12-22 | 2022-12-22 | injection molding equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2024089688A JP2024089688A (en) | 2024-07-04 |
| JP7788366B2 true JP7788366B2 (en) | 2025-12-18 |
Family
ID=91715141
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022205024A Active JP7788366B2 (en) | 2022-12-22 | 2022-12-22 | injection molding equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7788366B2 (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015037796A (en) | 2013-08-19 | 2015-02-26 | 助川電気工業株式会社 | Die casting sleeve molten metal supply apparatus and die casting sleeve molten metal supply method |
| US20170246681A1 (en) | 2014-09-26 | 2017-08-31 | Pyrotek, Inc. | Mold pump |
| JP2020059029A (en) | 2018-10-05 | 2020-04-16 | 株式会社ソディック | Injection device of light metal injection molding machine and injection control method therefor |
| CN211679935U (en) | 2020-02-21 | 2020-10-16 | 东莞捷劲机械设备有限公司 | Intermittent liquid inlet device of hot chamber die casting machine |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07290223A (en) * | 1994-04-22 | 1995-11-07 | Ube Ind Ltd | Transfer pipe type hot water supply apparatus and molten metal transfer method |
-
2022
- 2022-12-22 JP JP2022205024A patent/JP7788366B2/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015037796A (en) | 2013-08-19 | 2015-02-26 | 助川電気工業株式会社 | Die casting sleeve molten metal supply apparatus and die casting sleeve molten metal supply method |
| US20170246681A1 (en) | 2014-09-26 | 2017-08-31 | Pyrotek, Inc. | Mold pump |
| JP2020059029A (en) | 2018-10-05 | 2020-04-16 | 株式会社ソディック | Injection device of light metal injection molding machine and injection control method therefor |
| CN211679935U (en) | 2020-02-21 | 2020-10-16 | 东莞捷劲机械设备有限公司 | Intermittent liquid inlet device of hot chamber die casting machine |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2024089688A (en) | 2024-07-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7137435B2 (en) | Enhanced cold chamber die casting molding machine | |
| RU2371281C2 (en) | Batching device for suspension of metal alloy | |
| JP7788366B2 (en) | injection molding equipment | |
| KR101854968B1 (en) | Hot chamber caster for aluminum alloy | |
| JP5576732B2 (en) | Sprue bushing and manufacturing method thereof | |
| CN110576184A (en) | Injection unit of light metal injection molding machine | |
| JP2008540128A5 (en) | ||
| CN100503088C (en) | caster | |
| KR102695284B1 (en) | Injection device of light metal injection molding machine | |
| KR20070037630A (en) | Injection Molding Cooled Shooting Port Cylinder | |
| JP3544305B2 (en) | Deaerator for metal injection molding machine | |
| JP4229935B2 (en) | Cooling mechanism | |
| EP3150839B1 (en) | Fuel injector | |
| JP7451261B2 (en) | Hot runner nozzle, injection molding equipment, and method for manufacturing resin molded products | |
| KR101582328B1 (en) | Apparatus for feeding fixed amount of molten material using vacuum | |
| TWI445582B (en) | Method for preventing leaking of molten metal in injection molding of metal material | |
| JP2004042479A (en) | Nozzle mechanism of injection-molding machine | |
| JP2005161375A (en) | Metal melt feeder for metal injection molding machine | |
| JPS5917487Y2 (en) | die casting machine mold equipment | |
| JP3357302B2 (en) | Metal material injection equipment | |
| JP7067840B2 (en) | Valve nozzle with rear pressure receiving piston | |
| JP2005199335A (en) | Back-flow preventive device in injection apparatus of light metal injection-molding machine | |
| JPS5917488Y2 (en) | die casting machine mold equipment | |
| JP3914054B2 (en) | Cylinder device and resin piston manufacturing method | |
| JP2022170594A (en) | Hot chamber casting equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20241224 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250910 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250924 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20251113 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20251202 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20251208 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7788366 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |