Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7788985B2 - Connection structure and connection method - Google Patents
[go: Go Back, main page]

JP7788985B2 - Connection structure and connection method - Google Patents

Connection structure and connection method

Info

Publication number
JP7788985B2
JP7788985B2 JP2022172304A JP2022172304A JP7788985B2 JP 7788985 B2 JP7788985 B2 JP 7788985B2 JP 2022172304 A JP2022172304 A JP 2022172304A JP 2022172304 A JP2022172304 A JP 2022172304A JP 7788985 B2 JP7788985 B2 JP 7788985B2
Authority
JP
Japan
Prior art keywords
superstructure
batter
pipe
connecting pipe
connection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022172304A
Other languages
Japanese (ja)
Other versions
JP2024064024A (en
Inventor
志郎 大浦
秀夫 田中
完幸 秋山
樋江井 夕紀夫
剛 小倉
知佳 吉原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2022172304A priority Critical patent/JP7788985B2/en
Publication of JP2024064024A publication Critical patent/JP2024064024A/en
Application granted granted Critical
Publication of JP7788985B2 publication Critical patent/JP7788985B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Foundations (AREA)

Description

本発明は、斜杭とプレキャスト上部工の接続構造等に関する。 The present invention relates to a connection structure between a batter pile and a precast superstructure.

船舶の係留等に利用される桟橋は、上部工を杭によって支持する構造となっている。この杭として斜杭を用いることで、水平力に対して効果的に抵抗させることができ、ブレース等による杭の補強を省略することができる。 Piers used for mooring ships, etc., have a structure in which the superstructure is supported by piles. By using batter piles for these piles, horizontal forces can be effectively resisted, and reinforcement of the piles with braces, etc. can be omitted.

上部工はコンクリートの現場打設によって構築することもできるが、潮位や波浪等の気象・海象条件の影響を強く受けるため、工程遅延のリスクや、品質および環境面への影響リスクがある。また、操業中の民間施設における桟橋更新では工事期間が長くなることで、操業活動に支障が出る恐れがある。そのため、工期短縮、施工の合理化、品質向上や安全性確保を図る観点から、特許文献1のようにコンクリート製のプレキャスト上部工が用いられることがある。 The superstructure can be constructed by pouring concrete on-site, but this is heavily affected by meteorological and oceanographic conditions such as tide levels and waves, which poses the risk of delays to the project and impacts on quality and the environment. Furthermore, when renovating piers at private facilities currently in operation, the lengthening of construction time can potentially disrupt operational activities. For this reason, precast concrete superstructures, as in Patent Document 1, are sometimes used to shorten construction times, streamline construction, improve quality, and ensure safety.

特開2019-152089号公報Japanese Patent Application Publication No. 2019-152089

プレキャスト上部工による桟橋の施工時には、先行打設した杭の上からプレキャスト上部工を鉛直下方に吊り降ろし、プレキャスト上部工と杭とを接続するが、この際問題となるのが、斜杭とプレキャスト上部工の接続部である。通常、プレキャスト上部工には杭を挿入するため杭径に施工誤差を加えた程度の大きさの孔が設けられるが、斜杭の場合、杭が斜めになっている分、杭挿入用の孔を大きくする必要があり、孔が大きくなったことによる補強等の後施工で時間を要する。 When constructing a pier using a precast superstructure, the precast superstructure is lowered vertically from above the previously cast piles and connected to the piles, but the problem here is the connection between the batter piles and the precast superstructure. Normally, holes are made in the precast superstructure to accommodate the pile insertion, with the size of the pile diameter plus a construction tolerance. However, in the case of batter piles, the holes for inserting the piles must be larger because the piles are at an angle, and the larger holes require more time for post-construction work such as reinforcement.

一方、特許文献1では、屈曲形状の接合用部材を用いて斜杭とプレキャスト上部工の接続を行っており、接合用部材の傾斜部分を斜杭の杭頭部に挿入して固定した上で、プレキャスト上部工の孔に接合用部材の鉛直部分を挿入し、当該孔に充填材を充填した構造としている。これにより、斜杭とプレキャスト上部工の接続部においても、プレキャスト上部工の孔の径を小さくできる。 Meanwhile, in Patent Document 1, a curved connecting member is used to connect the batter pile to the precast superstructure. The inclined portion of the connecting member is inserted into the head of the batter pile and fixed in place, and then the vertical portion of the connecting member is inserted into a hole in the precast superstructure, which is then filled with filler material. This allows the diameter of the hole in the precast superstructure to be reduced, even at the connection between the batter pile and the precast superstructure.

しかしながら、特許文献1では、斜杭および接合用部材の傾斜部分が、プレキャスト上部工の下面近傍から下方に延びる構成となっている。斜杭の効果は、斜杭とプレキャスト上部工が成すトラス構造により実現される部分が大きいが、斜杭および接合用部材の傾斜部分がプレキャスト上部工の厚さ方向の中心から遠いと、完全なトラス構造とみなすことが難しく、水平力に対し杭頭部に余分な曲げモーメントが発生するなどして斜杭を設けた効果が低減する。 However, in Patent Document 1, the inclined portions of the batter piles and connecting members extend downward from near the underside of the precast superstructure. The effectiveness of the batter piles is largely achieved by the truss structure formed by the batter piles and the precast superstructure, but if the inclined portions of the batter piles and connecting members are far from the center of the thickness of the precast superstructure, it is difficult to consider it a complete truss structure, and excess bending moment occurs at the pile head in response to horizontal forces, reducing the effectiveness of the batter piles.

本発明は上記の問題に鑑みてなされたものであり、プレキャスト上部工の孔を細径化しつつ、水平力に対しても効果的に抵抗できる斜杭とプレキャスト上部工の接続構造等を提供することを目的とする。 The present invention was made in consideration of the above problems, and aims to provide a connection structure between a batter pile and a precast superstructure that can effectively resist horizontal forces while reducing the diameter of the holes in the precast superstructure.

前述した課題を解決するための第1の発明は、管状の斜杭とコンクリート製のプレキャスト上部工との接続構造であって、前記プレキャスト上部工に、前記斜杭に沿った傾斜を有する孔が設けられ、前記斜杭の上に前記プレキャスト上部工が配置され、前記孔および前記斜杭の上端部の内側に、前記斜杭に沿った傾斜を有する接続管が挿入され、充填材が充填されたことを特徴とする接続構造である。 The first invention to solve the above-mentioned problems is a connection structure between a tubular batter pile and a concrete precast superstructure, characterized in that holes inclined to match the batter pile are formed in the precast superstructure, the precast superstructure is placed on top of the batter pile, and connecting pipes inclined to match the batter pile are inserted into the holes and the inside of the upper ends of the batter piles and filled with filler material.

本発明の接続構造では、プレキャスト上部工に設けられた、斜杭と同様の傾斜を有する孔に接続管が挿入され、その一部が斜杭の内側に埋設される。プレキャスト上部工の孔は、斜杭と同様の傾斜を有しており、接続管より多少大きい程度の径で良いので、プレキャスト上部工の孔を細径化できる。また、斜杭へと続く接続管の傾斜がプレキャスト上部工の内部から始まるので、斜杭とプレキャスト上部工の間で完全性の高いトラス構造を実現でき、水平力に対し斜杭によって効果的に抵抗できる。 In the connection structure of the present invention, a connecting pipe is inserted into a hole in the precast superstructure that has the same inclination as the batter pile, and part of it is buried inside the batter pile. The hole in the precast superstructure has the same inclination as the batter pile and only needs to be slightly larger in diameter than the connecting pipe, allowing the hole in the precast superstructure to be made smaller in diameter. Furthermore, because the inclination of the connecting pipe leading to the batter pile begins inside the precast superstructure, a highly complete truss structure can be achieved between the batter pile and the precast superstructure, and the batter pile can effectively resist horizontal forces.

また、前記孔の内面に鞘管が設けられ、前記接続管の上端部と、前記鞘管の内面とに、連結材が固定されることが望ましい。例えば、前記接続管の上端部に、前記接続管の軸方向に沿ったスリットが設けられ、前記鞘管の内面に固定された前記連結材である板材が、前記スリットに挿入され、前記板材が前記スリットに固定される。
上記の連結材により、接続管をプレキャスト上部工の孔内に確実に固定できる。また上記の板材を用いた固定方法は、接続管の位置や角度の多少のずれにも対応でき、斜杭やプレキャスト上部工等の設置誤差を吸収できる。
It is also desirable that a sleeve pipe be provided on the inner surface of the hole, and that a connecting member be fixed to the upper end of the connecting pipe and the inner surface of the sleeve pipe. For example, a slit is provided in the upper end of the connecting pipe along the axial direction of the connecting pipe, and a plate material, which is the connecting member fixed to the inner surface of the sleeve pipe, is inserted into the slit and fixed to the slit.
The connecting material allows the connecting pipe to be securely fixed in the hole in the precast superstructure. The fixing method using the plate material also accommodates slight deviations in the position or angle of the connecting pipe, absorbing installation errors of the batter piles and the precast superstructure.

また、前記斜杭の上端部に、仮受管が設けられ、前記仮受管の上端に、前記プレキャスト上部工を載置するフランジが設けられ、前記フランジの内縁部が前記孔の内側に突出し、前記接続管の外面に突出片が設けられ、前記突出片が、前記フランジの内縁部に載置されることも望ましい。
これにより、施工時に接続管を安定して配置することができる。
It is also desirable that a temporary support pipe be provided at the upper end of the inclined pile, that a flange be provided at the upper end of the temporary support pipe on which the precast superstructure is placed, that the inner edge of the flange protrude into the inside of the hole, and that a protruding piece be provided on the outer surface of the connecting pipe, and that the protruding piece be placed on the inner edge of the flange.
This allows the connecting pipe to be stably positioned during construction.

前記接続構造は、例えば港湾の桟橋における斜杭とプレキャスト上部工の接続構造である。
これにより、桟橋において、プレキャスト上部工の孔を細径化しつつ、斜杭を水平力に対して効果的に抵抗させることができる。
The connection structure is, for example, a connection structure between a batter pile and a precast superstructure in a pier at a port.
This allows the holes in the precast superstructure of the pier to be narrowed in diameter while the batter piles can effectively resist horizontal forces.

第2の発明は、第1の発明の接続構造による、管状の斜杭とコンクリート製のプレキャスト上部工との接続方法であって、前記斜杭の上に前記プレキャスト上部工を配置する工程と、前記孔および前記斜杭の上端部の内側に、前記斜杭に沿った傾斜を有する接続管を挿入し、充填材を充填する工程と、を有することを特徴とする接続方法である。
第2の発明は、第1の発明の接続構造を用いた斜杭とプレキャスト上部工との接続方法である。
The second invention is a method for connecting a tubular batter pile to a concrete precast superstructure using the connection structure of the first invention, characterized in that it includes the steps of placing the precast superstructure on top of the batter pile, and inserting a connecting pipe with an inclination that follows the batter pile into the hole and inside the upper end of the batter pile, and filling it with filler material.
The second invention is a method for connecting a batter pile to a precast superstructure using the connection structure of the first invention.

本発明により、プレキャスト上部工の孔を細径化しつつ、水平力に対しても効果的に抵抗できる斜杭とプレキャスト上部工の接続構造等を提供することができる。 This invention makes it possible to provide a connection structure between a batter pile and a precast superstructure that can effectively resist horizontal forces while reducing the diameter of the holes in the precast superstructure.

桟橋1を示す図。FIG. プレキャスト上部工2の上面を示す図。A diagram showing the top surface of the precast superstructure 2. 接続構造10を示す図。FIG. プレート111の配置を示す図。FIG. 3 is a diagram showing the arrangement of a plate 111. 斜杭4の鋼管と接続管13の間の隙間を拡大して示す図。FIG. 10 is an enlarged view showing the gap between the steel pipe of the batter pile 4 and the connecting pipe 13. 斜杭4とプレキャスト上部工2の接続方法を示す図。A diagram showing the method of connecting the batter piles 4 and the precast superstructure 2. 接続管13の上端部を示す図。FIG. 4 is a diagram showing the upper end of the connecting pipe 13. 接続管13と鞘管11の連結方法の例。10 shows an example of a method for connecting the connecting pipe 13 and the sheath pipe 11. 接続構造10aを示す図。FIG. 鞘管11と接続管13の間の隙間を拡大して示す図。FIG. 4 is an enlarged view showing the gap between the sleeve pipe 11 and the connecting pipe 13.

以下、図面に基づいて本発明の好適な実施形態について詳細に説明する。 The following describes in detail a preferred embodiment of the present invention with reference to the drawings.

(1.桟橋1)
図1は、本発明の実施形態に係る接続構造10を有する桟橋1を示す図であり、後述する図2の線a-aによる鉛直断面を示したものである。桟橋1は港湾の沿岸部等に設置される桟橋であり、船舶の係留等に用いられる。
(1. Pier 1)
Fig. 1 is a diagram showing a pier 1 having a connection structure 10 according to an embodiment of the present invention, and shows a vertical cross section taken along line a-a in Fig. 2. The pier 1 is a pier installed in the coastal area of a port or the like, and is used for mooring ships, etc.

桟橋1は、プレキャスト上部工2を、水底の地盤に打設した鉛直杭3と斜杭4によって支持した構成となっている。プレキャスト上部工2はコンクリート製の板状部材であり、鉛直杭3および斜杭4の上に配置される。鉛直杭3と斜杭4は鋼管による管状の杭である。なお、桟橋1は鉛直杭3と斜杭4を有するものに限定されず、斜杭4のみ有する場合もある。 The pier 1 is constructed with a precast superstructure 2 supported by vertical piles 3 and batter piles 4 driven into the ground at the bottom of the water. The precast superstructure 2 is a concrete plate-like member placed on top of the vertical piles 3 and batter piles 4. The vertical piles 3 and batter piles 4 are tubular piles made of steel pipes. Note that the pier 1 is not limited to having vertical piles 3 and batter piles 4, and may have only batter piles 4.

図2はプレキャスト上部工2を上から見た図である。プレキャスト上部工(以下、単に上部工という)2の平面は矩形状である。上部工2は、床版の下面に、長辺方向の梁21と、短辺方向の梁22を格子状に設けたものである。上部工2の長辺方向、短辺方向はそれぞれ図2の上下方向、左右方向に対応する。 Figure 2 is a top view of the precast superstructure 2. The precast superstructure (hereinafter simply referred to as the superstructure) 2 has a rectangular planar shape. The superstructure 2 has beams 21 in the long side direction and beams 22 in the short side direction arranged in a grid pattern on the underside of the deck slab. The long side direction and short side direction of the superstructure 2 correspond to the up-down direction and left-right direction in Figure 2, respectively.

鉛直杭3と斜杭4は、梁21、22の交差部で上部工2に接続される。斜杭4が接続される交差部には、当該交差部を上下に貫通する孔24が設けられる。斜杭4は当該孔24を用いて接続され、孔24には、モルタルやコンクリート等のセメント系材料による充填材Fが充填される。斜杭4には、上部工2の短辺方向の中央部から短辺方向の一方の端部に向かって延びるものと、他方の端部に向かって延びるものがあり、これら一対の斜杭4のそれぞれに対応して、一対の孔24が設けられる。 The vertical piles 3 and batter piles 4 are connected to the superstructure 2 at the intersections of the beams 21 and 22. At the intersections where the batter piles 4 are connected, holes 24 are provided that penetrate the intersections vertically. The batter piles 4 are connected using these holes 24, which are filled with filler F made of a cement-based material such as mortar or concrete. Some of the batter piles 4 extend from the center of the superstructure 2's short side toward one end of the short side, and others extend toward the other end. A pair of holes 24 is provided corresponding to each pair of batter piles 4.

(2.接続構造10)
図3は接続構造10を示す図であり、図2の線b-bによる鉛直断面を示したものである。図3に示すように、接続構造10は、鞘管11、仮受管12、接続管13等を有する。
(2. Connection structure 10)
Fig. 3 is a diagram showing the connection structure 10, and is a vertical cross section taken along line b-b in Fig. 2. As shown in Fig. 3, the connection structure 10 includes a sheath pipe 11, a temporary receiving pipe 12, a connecting pipe 13, etc.

鞘管11は、プレキャスト上部工2の孔24の内面に沿って配置される鋼管であり、一対の孔24のそれぞれに設けられる。孔24は、斜杭4の傾斜方向に沿った傾斜を有し、鞘管11も同様の傾斜を有する。鞘管11の周囲には鍔状のプレート111が上下2段に設けられる。これらのプレート111は、上部工2のコンクリートに埋設される。 The sheath pipes 11 are steel pipes that are placed along the inner surface of the holes 24 in the precast superstructure 2, and are provided in each of the pair of holes 24. The holes 24 are inclined in the same direction as the inclination of the batter piles 4, and the sheath pipes 11 also have a similar inclination. Two flange-shaped plates 111 are provided around the sheath pipe 11, one above the other. These plates 111 are embedded in the concrete of the superstructure 2.

図4は、上部工2内のプレート111の配置を上から見た図である。プレート111は、各孔24の鞘管11に共通して設けられる。このプレート111には、上部工2の長辺方向および短辺方向の主筋23が溶接等によって固定される。なお、主筋23は鞘管11の外面に直接固定することも可能である。 Figure 4 shows the arrangement of plates 111 inside the superstructure 2 as viewed from above. The plates 111 are installed in common to the sheath pipes 11 of each hole 24. The main reinforcement bars 23 in the long and short side directions of the superstructure 2 are fixed to these plates 111 by welding or other means. The main reinforcement bars 23 can also be fixed directly to the outer surface of the sheath pipe 11.

図3の説明に戻る。仮受管12は、斜杭4の上端部に外嵌される鋼管であり、斜杭4の傾斜方向に沿った傾斜を有する。仮受管12の上端には、環状の水平板であるフランジ121が仮受管12の周方向に沿って設けられる。フランジ121の上面は上部工2の孔24の周囲の下面に当接し、フランジ121の内縁部が孔24の内側に突出する。図中符号122は、フランジ121を補強するためのリブであり、フランジ121の下面と仮受管12の外面に溶接等で固定される。リブ122は、仮受管12の周方向に間隔を空けて複数設けられる。 Returning to the explanation of Figure 3, the temporary support pipe 12 is a steel pipe fitted onto the upper end of the batter pile 4, and has an inclination that follows the inclination direction of the batter pile 4. A flange 121, which is an annular horizontal plate, is attached to the upper end of the temporary support pipe 12 along the circumferential direction of the temporary support pipe 12. The upper surface of the flange 121 abuts against the underside of the periphery of the hole 24 in the superstructure 2, and the inner edge of the flange 121 protrudes inside the hole 24. Reference numeral 122 in the figure denotes a rib for reinforcing the flange 121, which is fixed to the underside of the flange 121 and the outer surface of the temporary support pipe 12 by welding or the like. Multiple ribs 122 are attached at intervals around the circumferential direction of the temporary support pipe 12.

仮受管12の内面には、仮受管12の内側に突出する水平板状のプレート123が設けられ、斜杭4の上端がプレート123の下面に溶接等で固定される。プレート123は、仮受管12の周方向に間隔を空けて複数設けられる。図中符号124は各プレート123を補強するためのリブであり、プレート123の上面と仮受管12の内面に溶接等で固定される。 A horizontal plate 123 that protrudes inward is attached to the inner surface of the temporary support pipe 12, and the upper ends of the batter piles 4 are fixed to the underside of the plate 123 by welding or other means. Multiple plates 123 are provided at intervals around the circumference of the temporary support pipe 12. Reference numeral 124 in the figure denotes ribs for reinforcing each plate 123, which are fixed to the upper surface of the plate 123 and the inner surface of the temporary support pipe 12 by welding or other means.

接続管13は、孔24(鞘管11)および斜杭4の上端部の内側に挿入される鋼管である。接続管13は、斜杭4の傾斜方向に沿った傾斜を有する。接続管13の上端部にはスリット131が設けられており、当該スリット131に、鞘管11の内面に溶接等で固定されたシムプレート112が挿入される。 The connecting pipe 13 is a steel pipe that is inserted into the hole 24 (sheath pipe 11) and the inside of the upper end of the batter pile 4. The connecting pipe 13 has an inclination that follows the inclination direction of the batter pile 4. A slit 131 is provided at the upper end of the connecting pipe 13, and a shim plate 112 fixed to the inner surface of the sheath pipe 11 by welding or the like is inserted into this slit 131.

シムプレート112は、板面を鉛直方向として配置した板材であり、鋼板が用いられる。シムプレート112は、スリット131に溶接等で固定され、接続管13の上端部と鞘管11の内面とを連結する連結材として機能し、斜杭4に発生する押込力または引抜力に対して抵抗する。 The shim plate 112 is a plate material arranged with its plate surface oriented vertically, and is made of steel plate. The shim plate 112 is fixed to the slit 131 by welding or other means, and functions as a connecting member connecting the upper end of the connecting pipe 13 to the inner surface of the sheath pipe 11, providing resistance to pushing or pulling forces generated in the batter pile 4.

接続管13の軸方向の中間部では、接続管13の外面に突出片132が設けられる。突出片132は、板面を鉛直方向として配置した板材であり、突出片132の下端がフランジ121の内縁部の上面に載置される。突出片132は、溶接等により接続管13の外面に固定され、接続管13の周方向に間隔を空けて複数設けられる。 A protruding piece 132 is provided on the outer surface of the connecting pipe 13 in the axial middle portion. The protruding piece 132 is a plate member arranged with its plate surface oriented vertically, and the lower end of the protruding piece 132 rests on the upper surface of the inner edge of the flange 121. The protruding pieces 132 are fixed to the outer surface of the connecting pipe 13 by welding or the like, and multiple protruding pieces 132 are provided at intervals around the circumferential direction of the connecting pipe 13.

上部工2の孔24および斜杭4の上端部の内側には前記の充填材Fが充填される。図3の符号133は、接続管13の充填材Fへの定着のため、接続管13の下端部に設けられる係止片である。 The holes 24 in the superstructure 2 and the inside of the upper ends of the batter piles 4 are filled with the aforementioned filler material F. Reference numeral 133 in Figure 3 denotes a locking piece provided at the lower end of the connecting pipe 13 to secure the connecting pipe 13 to the filler material F.

図5は、斜杭4の上端部の内側における、斜杭4の鋼管と接続管13の間の隙間を拡大して示す図である。斜杭4の上端部では鋼管の内面に丸鋼等によるシアキー41が固定され、当該鋼管に挿入された接続管13の下部の外面にも、丸鋼等によるシアキー134が固定される。これらのシアキー41、134により斜杭4の鋼管と接続管13の間で充填材Fを介したせん断力の伝達が可能になり、斜杭4と接続管13が一体化される。シアキー41、134は、斜杭4や接続管13の軸方向に間隔を空けて複数段設けられる。 Figure 5 is an enlarged view of the gap between the steel pipe of the batter pile 4 and the connecting pipe 13 inside the upper end of the batter pile 4. A shear key 41 made of a round bar or the like is fixed to the inner surface of the steel pipe at the upper end of the batter pile 4, and a shear key 134 made of a round bar or the like is fixed to the outer surface of the lower part of the connecting pipe 13 inserted into the steel pipe. These shear keys 41, 134 enable the transmission of shear force via the filler material F between the steel pipe of the batter pile 4 and the connecting pipe 13, integrating the batter pile 4 and the connecting pipe 13. The shear keys 41, 134 are provided in multiple rows spaced apart in the axial direction of the batter pile 4 and the connecting pipe 13.

以上は、上部工2の短辺方向の両端部に向かって延びる斜杭4のうち一方について説明したものであるが、他方の斜杭4についても、図3等と同様の接続構造10により上部工2と接続される。 The above describes one of the batter piles 4 extending toward both ends of the superstructure 2 in the short side direction, but the other batter pile 4 is also connected to the superstructure 2 using a connection structure 10 similar to that shown in Figure 3, etc.

(3.斜杭4と上部工2の接続方法)
図6は、斜杭4と上部工2の接続方法について説明する図である。本実施形態では、まず、図6(a)に示すように先行打設された斜杭4の上端部に、図6(b)に示すように仮受管12を設置する。仮受管12は斜杭4の上端部に外嵌され、斜杭4の鋼管の上端が、仮受管12の内面のプレート123に溶接等で固定される。
(3. Method of connecting the batter piles 4 and the superstructure 2)
6A and 6B are diagrams illustrating a method for connecting the batter piles 4 and the superstructure 2. In this embodiment, a temporary support pipe 12 is first installed on the upper end of the batter pile 4, which has been previously installed as shown in Fig. 6A, as shown in Fig. 6B. The temporary support pipe 12 is fitted onto the upper end of the batter pile 4, and the upper end of the steel pipe of the batter pile 4 is fixed to the plate 123 on the inner surface of the temporary support pipe 12 by welding or the like.

その後、上部工2を斜杭4の上から吊り降ろして鉛直下方に下降させ、図6(c)に示すように仮受管12のフランジ121の上に上部工2を載置する。この時、フランジ121は上部工2の孔24の周囲の下面に当接し、フランジ121の内縁部は孔24の内側に突出する。 Then, the superstructure 2 is lowered vertically from the batter piles 4 and placed on the flange 121 of the temporary support pipe 12, as shown in Figure 6(c). At this time, the flange 121 abuts against the underside of the hole 24 in the superstructure 2, with the inner edge of the flange 121 protruding into the hole 24.

その後、図6(d)に示すように斜杭4の鋼管内にコンクリートConを充填し、接続管13を上部工2の孔24および斜杭4の内側に挿入する。コンクリートConは斜杭4の上端部の下方まで充填され、接続管13の下部は、斜杭4の上端部の内側に配置される。この時、接続管13の外面の突出片132は、孔24の内側に突出したフランジ121の内縁部に載置される。 Then, as shown in Figure 6(d), concrete Con is filled into the steel pipe of the batter pile 4, and the connecting pipe 13 is inserted into the hole 24 of the superstructure 2 and into the inside of the batter pile 4. The concrete Con is filled up to below the upper end of the batter pile 4, and the lower part of the connecting pipe 13 is placed inside the upper end of the batter pile 4. At this time, the protruding piece 132 on the outer surface of the connecting pipe 13 rests on the inner edge of the flange 121 protruding inside the hole 24.

また、シムプレート112を鞘管11の内面と接続管13のスリット131に溶接等で固定する。これにより接続管13が孔24内に固定される。 The shim plate 112 is then fixed to the inner surface of the sleeve tube 11 and the slit 131 of the connecting tube 13 by welding or other means. This fixes the connecting tube 13 within the hole 24.

図7(a)、(b)は、接続管13の上端部を示したものであり、図7(a)はシムプレート112の設置前、図7(b)はシムプレート112の設置後の状態である。なお図7(a)、(b)では鞘管11のプレート111や上部工2の図示を省略している。 Figures 7(a) and (b) show the upper end of the connecting pipe 13, with Figure 7(a) showing the state before the shim plate 112 is installed and Figure 7(b) showing the state after the shim plate 112 is installed. Note that the plate 111 of the sheath pipe 11 and the superstructure 2 are not shown in Figures 7(a) and (b).

スリット131は接続管13の周方向に間隔を空けて複数設けられ、本実施形態では8つのスリット131が接続管13の上端部に等間隔で形成されている。これらのスリット131は、接続管13の上端から接続管13の軸方向に沿って下方に延びるように設けられる。 A plurality of slits 131 are provided at intervals around the circumference of the connecting pipe 13, and in this embodiment, eight slits 131 are formed at equal intervals at the upper end of the connecting pipe 13. These slits 131 are provided to extend downward from the upper end of the connecting pipe 13 along the axial direction of the connecting pipe 13.

シムプレート112も、スリット131の位置に対応して、鞘管11の周方向に間隔を空けて複数設けられる。シムプレート112は、当該シムプレート112内のどの位置でもスリット131に溶接固定することができ、また後付けされるものであるため、接続管13の位置や角度の多少のずれにも対応でき、斜杭4や上部工2等の設置誤差を吸収できる。 Multiple shim plates 112 are also provided at intervals around the circumferential direction of the sheath pipe 11, corresponding to the positions of the slits 131. The shim plates 112 can be welded to the slits 131 at any position within the shim plate 112, and because they are retrofitted, they can accommodate slight deviations in the position or angle of the connecting pipe 13, absorbing installation errors of the batter piles 4, superstructure 2, etc.

この後、図3に示すように、上部工2の孔24および斜杭4の上端部の内側に充填材Fを充填する。仮受管12のフランジ121は、充填材Fの充填時の底型枠としても機能し、型枠の設置作業を軽減できる。フランジ121の上面にシール材(不図示)を予め設け、上部工2とフランジ121の間から充填材Fが漏れるのを確実に防止することもできる。また充填材Fは、仮受管12の内側にも充填され、仮受管12の設置時(図6(b)参照)には、仮受管12と斜杭4の間の隙間の下端を塞ぐ詰物等の閉止材(不図示)も設けられる。 After this, as shown in Figure 3, filler material F is filled inside the holes 24 in the superstructure 2 and the upper ends of the batter piles 4. The flange 121 of the temporary support pipe 12 also functions as a bottom formwork when filling with filler material F, reducing the work required to set up the formwork. A sealant (not shown) can be applied in advance to the top surface of the flange 121 to reliably prevent filler material F from leaking between the superstructure 2 and the flange 121. Filler material F is also filled inside the temporary support pipe 12, and when the temporary support pipe 12 is installed (see Figure 6(b)), a sealing material (not shown) such as a filler is also applied to close the bottom end of the gap between the temporary support pipe 12 and the batter pile 4.

以上の工程により、図3等に示す接続構造10が形成される。本実施形態では上部工2をプレキャスト部材とすることで工期短縮、施工の合理化等が可能になり、また上部工2の設置後の工程のほぼ全てが上部工2の上面での作業により実施できるため、上部工2の下方での潮間作業が軽減され、施工が容易になる。 Through the above process, the connection structure 10 shown in Figure 3 etc. is formed. In this embodiment, the superstructure 2 is made of precast members, which shortens the construction period and streamlines construction. Furthermore, almost all of the processes after the installation of the superstructure 2 can be carried out by work on the top surface of the superstructure 2, reducing the amount of intertidal work below the superstructure 2 and facilitating construction.

以上説明したように、本実施形態の接続構造10では、上部工2に設けられた、斜杭4と同様の傾斜を有する孔24に接続管13が挿入され、その一部が斜杭4の内側に埋設される。上部工2の孔24は、斜杭4と同様の傾斜を有しており、接続管13より多少大きい程度の径で良いので、上部工2の孔24を細径化できる。また、斜杭4へと続く接続管13の傾斜が上部工2の内部から始まるので、斜杭4と上部工2の間で完全性の高いトラス構造を実現でき、水平力に対し斜杭4によって効果的に抵抗できる。 As explained above, in the connection structure 10 of this embodiment, the connecting pipe 13 is inserted into a hole 24 provided in the superstructure 2, which has the same slope as the batter pile 4, and a portion of it is buried inside the batter pile 4. The hole 24 in the superstructure 2 has the same slope as the batter pile 4, and only needs to be slightly larger in diameter than the connecting pipe 13, allowing the diameter of the hole 24 in the superstructure 2 to be narrower. Furthermore, because the slope of the connecting pipe 13 leading to the batter pile 4 begins inside the superstructure 2, a highly complete truss structure can be achieved between the batter pile 4 and the superstructure 2, and the batter pile 4 can effectively resist horizontal forces.

また本実施形態では、シムプレート112が鞘管11の内面と接続管13のスリット131に固定されるので、接続管13を上部工2の孔24内に確実に固定できる。またシムプレート112を用いた固定方法は、接続管13の位置や角度の多少のずれにも対応でき、斜杭4や上部工2等の設置誤差を吸収できる。さらに、シムプレート112の溶接等は上部工2の上面から手の届く範囲で行えるので、作業も容易である。 In addition, in this embodiment, the shim plate 112 is fixed to the inner surface of the sheath pipe 11 and the slit 131 of the connecting pipe 13, so the connecting pipe 13 can be securely fixed within the hole 24 of the superstructure 2. The fixing method using the shim plate 112 can also accommodate slight deviations in the position or angle of the connecting pipe 13, absorbing installation errors of the batter piles 4 and superstructure 2. Furthermore, welding of the shim plate 112 can be performed within reach from the top surface of the superstructure 2, making the work easier.

また本実施形態では、接続管13の外面の突出片132が、上部工2の孔24の内側に突出する仮受管12のフランジ121の内縁部に載置される構成となっており、施工時に接続管13を安定して配置することができる。 In addition, in this embodiment, the protruding piece 132 on the outer surface of the connecting pipe 13 is configured to rest on the inner edge of the flange 121 of the temporary support pipe 12 that protrudes inside the hole 24 in the superstructure 2, allowing the connecting pipe 13 to be stably positioned during construction.

また本実施形態の接続構造10は港湾の桟橋1における斜杭4と上部工2の接続構造であり、桟橋1において、上部工2の孔24を細径化しつつ、斜杭4を水平力に対して効果的に抵抗させることができる。 The connection structure 10 of this embodiment is a connection structure between the batter piles 4 and the superstructure 2 of a pier 1 at a port, and allows the batter piles 4 to effectively resist horizontal forces while reducing the diameter of the holes 24 in the superstructure 2 of the pier 1.

しかしながら、本発明は以上の実施形態に限定されない。例えば本実施形態では接続構造10を港湾の桟橋1に適用しているが、接続構造10の適用対象はこれに限らない。 However, the present invention is not limited to the above embodiments. For example, in this embodiment, the connection structure 10 is applied to a pier 1 at a port, but the application of the connection structure 10 is not limited to this.

また仮受管12や接続管13の構成等も前記に限定されない。例えば仮受管12のプレート123を斜杭4の鋼管の上端に溶接等で固定する代わりに、仮受管12と斜杭4の鋼管の間に楔状の金物を挿入するなどして仮受管12を固定することも可能である。また本実施形態では仮受管12を斜杭4の鋼管に外嵌しているが、仮受管12は当該鋼管の内側に挿入されるものであってもよい。さらに、仮受管12の上に上部工2を載置する代わりに、上部工2側から下方に仮受部材を突出させて、この仮受部材を斜杭4の上端部に設置する可能性もあり、この場合では前記の仮受管12が省略される。 The configuration of the temporary support pipe 12 and connecting pipe 13 is also not limited to the above. For example, instead of fixing the plate 123 of the temporary support pipe 12 to the upper end of the steel pipe of the batter pile 4 by welding, etc., it is also possible to fix the temporary support pipe 12 by inserting a wedge-shaped metal piece between the temporary support pipe 12 and the steel pipe of the batter pile 4. Also, in this embodiment, the temporary support pipe 12 is fitted onto the steel pipe of the batter pile 4, but the temporary support pipe 12 may also be inserted inside the steel pipe. Furthermore, instead of placing the superstructure 2 on top of the temporary support pipe 12, it is also possible to protrude a temporary support member downward from the superstructure 2 and install this temporary support member at the upper end of the batter pile 4, in which case the temporary support pipe 12 described above would be omitted.

また本実施形態では接続管13のスリット131にシムプレート112を溶接固定し、シムプレート112により接続管13と鞘管11を連結しているが、図8(a)に示すように、シムプレート112を、内側の端部が下方に折れ曲がるL字状のものとし、その折れ曲がり部分を接続管13に溶接等で固定することも可能である。また図8(b)に示すように、接続管13から上方に突出する一対のプレート135(引抜抵抗プレート)を溶接等によって接続管13に固定し、一対のプレート135の間の隙間にシムプレート112を挿入し、当該シムプレート112とこれらのプレート135とを溶接等により固定することも可能である。図8(a)、(b)のシムプレート112および図8(b)の一対のプレート135の組は、鞘管11や接続管13の周方向に間隔を空けて複数設けられ、図8(a)、(b)の例ではスリット131を省略することが可能である。これに対し、図7のようなスリット131を用いた連結方法は、部材数の少なさ、施工誤差への対応の容易さ等の点で優れている。 In this embodiment, the shim plate 112 is welded to the slit 131 of the connecting pipe 13, connecting the connecting pipe 13 and the sleeve pipe 11. However, as shown in FIG. 8(a), the shim plate 112 can be L-shaped with its inner end bent downward, and the bent portion can be fixed to the connecting pipe 13 by welding or other means. Also, as shown in FIG. 8(b), a pair of plates 135 (pull-out resistance plates) protruding upward from the connecting pipe 13 can be fixed to the connecting pipe 13 by welding or other means, and the shim plate 112 can be inserted into the gap between the pair of plates 135 and fixed to the shim plate 112 and the plates 135 by welding or other means. The shim plates 112 in FIGS. 8(a) and 8(b) and the pair of plates 135 in FIG. 8(b) can be provided in multiple sets spaced apart around the circumferential direction of the sleeve pipe 11 or the connecting pipe 13. In the example of FIGS. 8(a) and 8(b), the slit 131 can be omitted. In contrast, the connection method using slits 131 as shown in Figure 7 is superior in that it requires fewer components and is easier to accommodate construction errors.

また、図9の接続構造10aに示すようにシムプレート112を省略し、孔24を更に細径化することもできる。この場合も、接続管13には前記のスリット131が設けられない。 Also, as shown in the connection structure 10a in Figure 9, the shim plate 112 can be omitted and the hole 24 can be made even smaller in diameter. In this case, the connecting pipe 13 also does not have the slit 131 described above.

図10は、鞘管11と接続管13の間の隙間を拡大して示す図である。この例では、鞘管11の内面に丸鋼等によるシアキー113が上下複数段に固定されており、鞘管11内に配置される接続管13の上部の外面にも、前記と同様のシアキー134が上下複数段に固定される。これらのシアキー113、134により鞘管11と接続管13の間で充填材Fを介したせん断力の伝達が可能になり、上部工2と接続管13が一体化される。 Figure 10 is an enlarged view of the gap between the sheath pipe 11 and the connecting pipe 13. In this example, shear keys 113 made of round steel bars or the like are fixed in multiple rows, one above the other, to the inner surface of the sheath pipe 11, and similar shear keys 134 are fixed in multiple rows, one above the other, to the outer surface of the upper part of the connecting pipe 13 placed inside the sheath pipe 11. These shear keys 113, 134 enable the transmission of shear force via the filler material F between the sheath pipe 11 and the connecting pipe 13, integrating the superstructure 2 and the connecting pipe 13.

以上、添付図面を参照して、本発明の好適な実施形態について説明したが、本発明は係る例に限定されない。当業者であれば、本願で開示した技術的思想の範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。 Preferred embodiments of the present invention have been described above with reference to the accompanying drawings, but the present invention is not limited to these examples. It is clear that those skilled in the art will be able to conceive of various modifications and alterations within the scope of the technical ideas disclosed in this application, and it is understood that these also naturally fall within the technical scope of the present invention.

1:桟橋
2:プレキャスト上部工
3:鉛直杭
4:斜杭
10、10a:接続構造
11:鞘管
12:仮受管
13:接続管
24:孔
111、123、135:プレート
112:シムプレート
131:スリット
132:突出片
1: Pier 2: Precast superstructure 3: Vertical pile 4: Batter pile 10, 10a: Connection structure 11: Sheath pipe 12: Temporary support pipe 13: Connection pipe 24: Holes 111, 123, 135: Plate 112: Shim plate 131: Slit 132: Protruding piece

Claims (6)

管状の斜杭とコンクリート製のプレキャスト上部工との接続構造であって、
前記プレキャスト上部工に、前記斜杭に沿った傾斜を有する孔が設けられ、
前記斜杭の上に前記プレキャスト上部工が配置され、
前記孔および前記斜杭の上端部の内側に、前記斜杭に沿った傾斜を有する接続管が挿入され、充填材が充填されたことを特徴とする接続構造。
A connection structure between a tubular batter pile and a concrete precast superstructure,
The precast superstructure is provided with holes having an inclination along the batter piles,
The precast superstructure is placed on the batter piles,
A connection structure characterized in that a connecting pipe having an inclination along the batter pile is inserted into the hole and inside the upper end of the batter pile, and is filled with filler material.
前記孔の内面に鞘管が設けられ、
前記接続管の上端部と、前記鞘管の内面とに、連結材が固定されたことを特徴とする請求項1記載の接続構造。
a sheath tube is provided on the inner surface of the hole;
2. The connection structure according to claim 1, wherein a connecting member is fixed to an upper end of the connecting pipe and an inner surface of the sleeve pipe.
前記接続管の上端部に、前記接続管の軸方向に沿ったスリットが設けられ、
前記鞘管の内面に固定された前記連結材である板材が、前記スリットに挿入され、前記板材が前記スリットに固定されたことを特徴とする請求項2記載の接続構造。
a slit extending along the axial direction of the connecting pipe is provided at the upper end of the connecting pipe;
3. The connection structure according to claim 2, wherein a plate material serving as the connecting member fixed to the inner surface of the sleeve pipe is inserted into the slit and fixed to the slit.
前記斜杭の上端部に、仮受管が設けられ、
前記仮受管の上端に、前記プレキャスト上部工を載置するフランジが設けられ、
前記フランジの内縁部が前記孔の内側に突出し、
前記接続管の外面に突出片が設けられ、
前記突出片が、前記フランジの内縁部に載置されたことを特徴とする請求項1記載の接続構造。
A temporary support pipe is provided at the upper end of the batter pile,
A flange on which the precast superstructure is placed is provided at the upper end of the temporary support pipe,
an inner edge of the flange protruding into the hole;
A protruding piece is provided on the outer surface of the connecting pipe,
2. The connection structure according to claim 1, wherein the protruding piece is placed on an inner edge of the flange.
前記接続構造は、港湾の桟橋における斜杭とプレキャスト上部工の接続構造であることを特徴とする請求項1から請求項4のいずれかに記載の接続構造。 A connection structure according to any one of claims 1 to 4, characterized in that the connection structure is a connection structure between a batter pile and a precast superstructure in a pier at a port. 請求項1記載の接続構造による、管状の斜杭とコンクリート製のプレキャスト上部工との接続方法であって、
前記斜杭の上に前記プレキャスト上部工を配置する工程と、
前記孔および前記斜杭の上端部の内側に、前記斜杭に沿った傾斜を有する接続管を挿入し、充填材を充填する工程と、
を有することを特徴とする接続方法。
A method for connecting a tubular batter pile to a concrete precast superstructure using the connection structure according to claim 1,
placing the precast superstructure on the batter piles;
A step of inserting a connecting pipe having a slope along the baffle into the hole and the inside of the upper end of the baffle and filling it with a filler material;
A connection method comprising:
JP2022172304A 2022-10-27 2022-10-27 Connection structure and connection method Active JP7788985B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022172304A JP7788985B2 (en) 2022-10-27 2022-10-27 Connection structure and connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022172304A JP7788985B2 (en) 2022-10-27 2022-10-27 Connection structure and connection method

Publications (2)

Publication Number Publication Date
JP2024064024A JP2024064024A (en) 2024-05-14
JP7788985B2 true JP7788985B2 (en) 2025-12-19

Family

ID=91034788

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022172304A Active JP7788985B2 (en) 2022-10-27 2022-10-27 Connection structure and connection method

Country Status (1)

Country Link
JP (1) JP7788985B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002294653A (en) 2001-04-02 2002-10-09 Taisei Corp Construction members and construction methods for floating structures
JP2004324342A (en) 2003-04-28 2004-11-18 Shimizu Corp Joint structure and joining method between concrete filled steel pipe and cast-in-place concrete pile
JP2019152089A (en) 2018-02-28 2019-09-12 五洋建設株式会社 Pile head joint structure for pile supporting structural object
US20200392688A1 (en) 2019-06-17 2020-12-17 Ojjo, Inc. Screw anchor foundations and related interfaces for modular, manufactured and prefabricated structures

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4642000A (en) * 1985-07-22 1987-02-10 The United States Of America As Represented By The Secretary Of The Navy Anchoring system for concrete floating pier
JP3099709B2 (en) * 1995-12-20 2000-10-16 株式会社大林組 Repairing offshore structures

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002294653A (en) 2001-04-02 2002-10-09 Taisei Corp Construction members and construction methods for floating structures
JP2004324342A (en) 2003-04-28 2004-11-18 Shimizu Corp Joint structure and joining method between concrete filled steel pipe and cast-in-place concrete pile
JP2019152089A (en) 2018-02-28 2019-09-12 五洋建設株式会社 Pile head joint structure for pile supporting structural object
US20200392688A1 (en) 2019-06-17 2020-12-17 Ojjo, Inc. Screw anchor foundations and related interfaces for modular, manufactured and prefabricated structures

Also Published As

Publication number Publication date
JP2024064024A (en) 2024-05-14

Similar Documents

Publication Publication Date Title
JP5308116B2 (en) How to build a tunnel
US7150584B2 (en) Steel-pipe sheet pile and coupling structure of steel-pipe sheet piles
KR20110103000A (en) Steel composite hollow precast pier joint structure using concrete filling unit and construction method
JP7017541B2 (en) Improvement structure and improvement method of existing sheet pile type quay
TW202221198A (en) Wind power plant foundation structure
JP6799287B2 (en) Pile support structure and its pile head joining method
JP2006104747A (en) Joint structure and joining method of pedestal
JP2004183324A (en) Repair structure and repair method of existing pile pier
JP7788985B2 (en) Connection structure and connection method
JP6166072B2 (en) Earth retaining structure and earth retaining method
JP6201929B2 (en) Abutment scour prevention structure
JP7093942B2 (en) Connected structure
JP2025155419A (en) Connection method and connection structure
CN221721668U (en) Surrounding purlin supporting structure for foundation pit construction
CN212296365U (en) Corrugated plate shaft supporting structure and subway shaft
JP4429784B2 (en) How to install underwater structures
JP7186657B2 (en) Construction method of steel pipe sheet pile foundation
JP2025137124A (en) Connection method and connection structure
JP7649764B2 (en) Connection structure and connection method
JP3648646B2 (en) Structure liquefaction countermeasure structure
JP2006316495A (en) Foundation structure of bridge pier and its construction method
JP4634829B2 (en) Base structure of base-isolated building
CN212772373U (en) Assembled bearing structure of foundation ditch
JPH1077644A (en) Earthquake resisting pile foundation construction method
JP2007315136A (en) Foundation structure using existing and new piles

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250513

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251202

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20251205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251209

R150 Certificate of patent or registration of utility model

Ref document number: 7788985

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150