Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7799595B2 - Overhead crane system - Google Patents
[go: Go Back, main page]

JP7799595B2 - Overhead crane system - Google Patents

Overhead crane system

Info

Publication number
JP7799595B2
JP7799595B2 JP2022157136A JP2022157136A JP7799595B2 JP 7799595 B2 JP7799595 B2 JP 7799595B2 JP 2022157136 A JP2022157136 A JP 2022157136A JP 2022157136 A JP2022157136 A JP 2022157136A JP 7799595 B2 JP7799595 B2 JP 7799595B2
Authority
JP
Japan
Prior art keywords
coil
information
height
map
overhead crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022157136A
Other languages
Japanese (ja)
Other versions
JP2024050324A (en
Inventor
光二 河村
峻介 野口
久之 古賀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Plant Mechanics Co Ltd
Original Assignee
Hitachi Plant Mechanics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Plant Mechanics Co Ltd filed Critical Hitachi Plant Mechanics Co Ltd
Priority to JP2022157136A priority Critical patent/JP7799595B2/en
Publication of JP2024050324A publication Critical patent/JP2024050324A/en
Application granted granted Critical
Publication of JP7799595B2 publication Critical patent/JP7799595B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control And Safety Of Cranes (AREA)

Description

本発明は、天井クレーンシステムの技術に関する。 The present invention relates to overhead crane system technology.

鋼板を巻いたコイルを天井クレーンシステムによって搬送することが行われている。このような天井クレーンシステムについて、特許文献1に記載されている技術が開示されている。 Coils wrapped with steel sheets are transported using overhead crane systems. Patent Document 1 discloses technology for such overhead crane systems.

特許文献1には、「複数のグリッドで表されたXZ平面内の出発位置(From)から目標位置(To)まで移動体1が移動する経路を探索する経路探索方法において、移動体1のX方向の速度Vx及びZ方向の速度Vzに基づいて、各グリッドに目標位置(To)から各グリッドまでの移動体1の移動時間に関連する評価値を設定する。設定した評価値に基づいて、出発位置(From)から目標位置(To)までの最短時間経路10を探索する」経路探索方法及びクレーンの動作パターンの作成方法が開示されている(要約参照)。 Patent Document 1 discloses a route search method for searching for a route for a moving object 1 to travel from a starting position (From) to a target position (To) in an XZ plane represented by multiple grids, in which an evaluation value related to the travel time of the moving object 1 from the target position (To) to each grid is set for each grid based on the X-direction velocity Vx and Z-direction velocity Vz of the moving object 1. The shortest time route 10 from the starting position (From) to the target position (To) is searched for based on the set evaluation value" and a method for creating a crane operation pattern (see abstract).

特開2020-21312号公報Japanese Patent Application Laid-Open No. 2020-21312

従来の技術では、コイル置場をメッシュに区切り、そのメッシュに対して定義されている絶対的な位置を基に搬送管理が行われている。しかし、そのような搬送管理では、搬送物の入出庫に対する柔軟な対応が困難であった。 In conventional technology, the coil storage area is divided into meshes, and transport management is performed based on absolute positions defined for those meshes. However, this type of transport management makes it difficult to flexibly respond to the inbound and outbound transport of transported items.

このような背景に鑑みて本発明がなされたのであり、本発明は、搬送物の入出庫に対して柔軟な対応を可能とすることを課題とする。 The present invention was made in light of this background, and its objective is to enable flexible response to the inbound and outbound transport of goods.

前記した課題を解決するため、本発明は、搬送物であり、鋼板を巻いたコイルを搬送する搬送領域において、前記コイルを上方に持ち上げて所定の方向及び当該方向と直角方向に搬送する天井クレーン装置と、前記搬送領域に載置されている前記コイルと干渉しないような前記天井クレーン装置の搬送経路を生成する天井クレーン制御装置と、を有し、前記天井クレーン制御装置は、少なくとも前記コイルの載置場所を特定するための載置場所情報と、前記コイルのサイズに関する情報である搬送物サイズ情報とを格納している置場管理情報と、前記搬送領域を所定のメッシュに区切った個々のメッシュ領域であるマップ要素の前記搬送領域での場所を特定するマップ要素特定情報と、前記載置場所情報とが対応付けられて格納されている3次元マップ情報と、前記搬送領域と、前記マップ要素とが対応付けられ、前記マップ要素を特定するためのマップ要素特定情報と、を記憶部に格納しており、前記コイルは、複数段で積載されており、前記置場管理情報には、前記コイルが積載されている段に関する情報が格納されており、前記置場管理情報における前記載置場所情報と、前記3次元マップ情報におけるマップ要素特定情報とを基に、前記マップ要素を特定し、特定した前記マップ要素に前記搬送物サイズ情報に基づく高さ情報を格納することを特徴とする。
その他の解決手段は実施形態中において適宜記載する。
In order to solve the above-mentioned problems, the present invention provides a method for transporting a coil of steel sheet, which is a transported object, comprising: an overhead crane device that lifts the coil upward and transports the coil in a predetermined direction and in a direction perpendicular to the predetermined direction in a transport area for transporting the coil ; and an overhead crane control device that generates a transport path for the overhead crane device that does not interfere with the coil placed in the transport area, wherein the overhead crane control device stores yard management information that stores at least placement location information for specifying a placement location of the coil and transported object size information that is information about the size of the coil ; and a map element that is an individual mesh area that divides the transport area into a predetermined mesh. The storage unit stores three-dimensional map information in which map element identification information that identifies a location in a transport area and the storage location information are stored in association with each other, and map element identification information that associates the transport area with the map elements and is used to identify the map elements, the coils are loaded in multiple tiers, and the storage location management information stores information regarding the tier on which the coils are loaded, the map elements are identified based on the storage location information in the storage location management information and the map element identification information in the three - dimensional map information, and height information based on the size information of the transported item is stored in the identified map elements.
Other solutions will be described as appropriate in the embodiments.

本発明によれば、搬送物の入出庫に対して柔軟な対応を可能とすることができる。 This invention allows for flexible handling of incoming and outgoing goods.

本実施形態に係る天井クレーンシステムの構成例を示す図である。1 is a diagram illustrating a configuration example of an overhead crane system according to an embodiment of the present invention. 本実施形態に係る管理装置の詳細な構成を示す図である。FIG. 2 is a diagram illustrating a detailed configuration of a management device according to the present embodiment. 第1実施形態に係る天井クレーン装置の概略図である。1 is a schematic diagram of an overhead crane device according to a first embodiment. 本実施形態で吊荷として用いられるコイルの例を示す図(その1)である。FIG. 1 is a diagram (part 1) showing an example of a coil used as a suspended load in this embodiment. 本実施形態で吊荷として用いられるコイルの例を示す図(その2)である。FIG. 2 is a diagram (part 2) showing an example of a coil used as a suspended load in this embodiment. 本実施形態で吊荷として用いられるコイルの例を示す図(その3)である。FIG. 10 is a diagram (part 3) showing an example of a coil used as a suspended load in this embodiment. 本実施形態で吊荷として用いられるコイルの例を示す図(その4)である。FIG. 4 is a diagram (part 4) showing an example of a coil used as a suspended load in this embodiment. コイルの積載高の計算を示す図(その1)である。FIG. 1 is a diagram (part 1) showing the calculation of the coil loading height. コイルの積載高の計算を示す図(その2)である。FIG. 2 is a diagram (part 2) showing the calculation of the coil loading height. 3次元経路地図を示す図(その1)である。FIG. 1 is a diagram (part 1) showing a three-dimensional route map. コイルの載置状態を示す図(その1)である。FIG. 1 is a diagram (part 1) showing the placement state of the coil. コイルの載置状態を示す図(その2)である。FIG. 2 is a diagram (part 2) showing the placement state of the coil. 3次元経路地図を示す図(その2)である。FIG. 2 is a diagram showing a three-dimensional route map (part 2). コイルの載置状態及び積載状態を示す図(その1)である。1 is a diagram (part 1) showing the placement and loading states of the coils; FIG. コイルの載置状態及び積載状態を示す図(その2)である。FIG. 10 is a diagram (part 2) showing the coil placement and loading states. 置場在庫情報の例を示す図である。FIG. 10 is a diagram illustrating an example of yard inventory information. 「列」、「行」、「段」の例を示す図である。FIG. 10 is a diagram showing examples of "columns," "rows," and "columns." 3次元マップ情報の例を示す図である。FIG. 10 is a diagram illustrating an example of three-dimensional map information. システム情報の例を示す図である。FIG. 10 is a diagram illustrating an example of system information. 本実施形態に係る在庫管理方法の全体処理手順を示すフローチャートである。1 is a flowchart showing the overall processing procedure of an inventory management method according to the present embodiment. 置場在庫情報の作成の処理手順を示すフローチャートである。10 is a flowchart showing a processing procedure for creating yard inventory information. 3次元経路地図の作成の処理手順を示すフローチャート(その1)である。10 is a flowchart (part 1) showing a processing procedure for creating a three-dimensional route map. 3次元経路地図の作成の処理手順を示すフローチャート(その2)である。10 is a flowchart (part 2) showing the processing procedure for creating a three-dimensional route map. 3次元経路地図の作成の具体例を示す図である。FIG. 10 is a diagram showing a specific example of creating a three-dimensional route map. 置場在庫情報及び3次元経路地図の更新処理の手順を示すフローチャートである。10 is a flowchart showing a procedure for updating yard inventory information and a three-dimensional route map.

次に、本発明を実施するための形態(「実施形態」という)について、適宜図面を参照しながら詳細に説明する。 Next, a mode for implementing the present invention (hereinafter referred to as "embodiment") will be described in detail, with reference to the drawings as appropriate.

(システム構成)
図1は、本実施形態に係る天井クレーンシステムZの構成例を示す図である。
天井クレーンシステムZは、管理装置1、上位システム2、制御装置3、天井クレーン装置6を有する。天井クレーン制御装置である管理装置1は上位システム2と通信を行い、上位システム2からの入庫/出庫指示により、搬送物であるコイルCの搬送を行うための指令を制御装置3へ送信する。なお、本実施形態において、コイルCとは鉄を薄く伸ばしたものである鋼板を巻いたものである。この際、管理装置1はコイルCの搬送時、置場在庫情報121(図2参照)から作成した3次元経路地図124(図2参照)を用い、搬送領域であるコイル置場において障害物に当たらない経路を決定し、コイルCの搬送を行うための指令を制御装置3へ送信する。すなわち、管理装置1は、コイル置場に載置されているコイルCと干渉しないような天井クレーン装置6の搬送経路を生成する。ちなみに、図1において、破線矢印A1は上位システム2から管理装置1へ送信される情報を示し、破線矢印A2は、管理装置1から上位システム2へ送信される情報を示す。上位システム2から管理装置1へ送信される情報(破線矢印A1)には、上位在庫情報21(詳細は後記)や、入庫指示や、出庫指示等が含まれる。入庫指示、及び、出庫指示は、上位システム2にオペレータが情報を入力することで作成される指示である。そして、管理装置1から上位システム2へ送信される情報(破線矢印A2)には、在庫要求の問い合わせや、入庫実績や、出庫実績が含まれる。入庫実績は、どのコイルCが、コイル置場のどこに入庫されたかに関する情報、出庫実績は、コイル置場のどこに載置されているコイルCが出庫されたかに関する情報である。
(System configuration)
FIG. 1 is a diagram showing an example of the configuration of an overhead crane system Z according to this embodiment.
The overhead crane system Z includes a management device 1, a host system 2, a control device 3, and an overhead crane device 6. The management device 1, which is an overhead crane control device, communicates with the host system 2 and, in response to a loading/unloading instruction from the host system 2, transmits a command to the control device 3 to transport the transported item, a coil C. In this embodiment, the coil C is a rolled steel sheet, which is a thinly rolled iron. When transporting the coil C, the management device 1 uses a three-dimensional route map 124 (see FIG. 2) created from storage area inventory information 121 (see FIG. 2) to determine a route that avoids obstacles in the coil storage area, which is the transport area, and transmits a command to the control device 3 to transport the coil C. In other words, the management device 1 generates a transport route for the overhead crane device 6 that does not interfere with the coil C placed in the coil storage area. In FIG. 1, the dashed arrow A1 indicates information transmitted from the host system 2 to the management device 1, and the dashed arrow A2 indicates information transmitted from the management device 1 to the host system 2. The information transmitted from the host system 2 to the management device 1 (dashed arrow A1) includes host inventory information 21 (details of which will be described later), storage instructions, shipping instructions, etc. The storage instructions and shipping instructions are instructions created by an operator entering information into the host system 2. The information transmitted from the management device 1 to the host system 2 (dashed arrow A2) includes inquiries about inventory requirements, storage records, and shipping records. The storage records are information regarding which coils C have been stored where in the coil storage area, and the shipping records are information regarding where in the coil storage area the coils C have been shipped.

制御装置3は、管理装置1から送信された指令に基づいて天井クレーン装置6を制御し、吊荷であるコイルCの搬送を行う。 The control device 3 controls the overhead crane device 6 based on commands sent from the management device 1, and transports the suspended load, the coil C.

なお、コイルCの在庫情報は上位システム2で上位在庫情報21(図2参照)として一元管理されている。管理装置1の業務開始時において、天井クレーンシステムZが自動運転モードに切り替えたられた後、管理装置1は上位システム2から上位在庫情報21を取得し、取得した上位在庫情報21を基に置場在庫情報121を作成する。また、管理装置1は、置場在庫情報121等を基に3次元経路地図124を作成する。3次元経路地図124については後記するが、天井クレーン装置6の搬送領域であるコイル置場に載置されているコイルCの高さ情報と場所情報とを対応付けているものである。そして、管理装置1はコイルCを搬送した都度、置場在庫情報121を更新するとともに、3次元経路地図124を更新する。なお、管理装置1の詳細及び動作については後記する。 Inventory information for coil C is centrally managed by the host system 2 as host inventory information 21 (see Figure 2). When the management device 1 starts operations and the overhead crane system Z is switched to automatic operation mode, the management device 1 acquires host inventory information 21 from the host system 2 and creates storage yard inventory information 121 based on the acquired host inventory information 21. The management device 1 also creates a three-dimensional route map 124 based on the storage yard inventory information 121, etc. The three-dimensional route map 124 will be described later, and associates height information and location information for coils C placed in the coil storage yard, which is the transport area of the overhead crane device 6. The management device 1 updates the storage yard inventory information 121 and the three-dimensional route map 124 each time a coil C is transported. The details and operation of the management device 1 will be described later.

(管理装置1)
図2は、本実施形態に係る管理装置1の詳細な構成を示す図である。適宜、図1を参照する。
管理装置1は、PC(Personal Computer )等であり、揮発性メモリで構成されるメモリ11、CPU(Central Processing Unit)13、HD(Hard Disk)や、SSD(Solid State Drive)等で構成される記憶装置12を有する。また、管理装置1は、上位システム2や、制御装置3との通信を行う通信装置14を備えている。
(Management device 1)
2 is a diagram showing a detailed configuration of the management device 1 according to this embodiment, with reference to FIG. 1 as needed.
The management device 1 is a PC (Personal Computer) or the like, and includes a memory 11 configured as a volatile memory, a CPU (Central Processing Unit) 13, and a storage device 12 configured as an HD (Hard Disk), an SSD (Solid State Drive), etc. The management device 1 also includes a communication device 14 that communicates with the higher-level system 2 and the control device 3.

記憶部である記憶装置12には、置場在庫情報121、3次元マップ情報122、システム情報123、3次元経路地図124が格納されている。
置場管理情報である置場在庫情報121には、コイルCが載置されている場所や、コイルCによる積載高が格納されている。積載高とは、コイルCが複数積載されている場合における積載されているコイルCの高さである。置場在庫情報121の詳細については後記する。
3次元マップ情報122には、コイル置場を複数のメッシュで表現している場合、メッシュの1つ1つと、コイルCの情報とが対応付けられている。3次元マップ情報122の詳細については後記する。
The storage device 12, which is a storage unit, stores yard inventory information 121, three-dimensional map information 122, system information 123, and a three-dimensional route map 124.
The storage location inventory information 121, which is storage location management information, stores the location where the coils C are placed and the stack height of the coils C. The stack height is the height of the stacked coils C when multiple coils C are stacked. Details of the storage location inventory information 121 will be described later.
In the three-dimensional map information 122, when the coil placement area is expressed by a plurality of meshes, each mesh is associated with information on the coil C. Details of the three-dimensional map information 122 will be described later.

システム情報123には、天井クレーン装置6によって搬送されているコイルCと、コイル置場に載置されているコイルCとが干渉しないよう、予め設定されている高さである安全高が格納されている。 System information 123 stores a safety height, which is a preset height to prevent interference between the coil C being transported by the ceiling crane device 6 and the coil C placed in the coil storage area.

3次元経路地図124には、天井クレーン装置6の搬送領域(コイル置場)に載置されているコイルCの高さ情報と場所情報とが対応付けられている。3次元経路地図124はcsvファイル等で作成され、搬送領域上の障害物の高さ(数値)が、コイル置場に設定されているメッシュ毎に格納されている。なお、3次元経路地図124の詳細については後記する。 The three-dimensional route map 124 associates height information and location information for the coils C placed in the transport area (coil storage area) of the overhead crane device 6. The three-dimensional route map 124 is created as a CSV file or the like, and stores the heights (numerical values) of obstacles in the transport area for each mesh set in the coil storage area. Details of the three-dimensional route map 124 will be described later.

また、記憶装置12にはプログラムが格納されている。そして、記憶装置12に格納されているプログラムがメモリ11にロードされ、CPU13によって実行されることで、通信処理部111、モード制御部112、置場在庫情報処理部113、3次元経路地図処理部114、クレーン制御指令部115が具現化する。 In addition, programs are stored in the storage device 12. The programs stored in the storage device 12 are loaded into the memory 11 and executed by the CPU 13, thereby realizing the communication processing unit 111, mode control unit 112, yard inventory information processing unit 113, 3D route map processing unit 114, and crane control command unit 115.

通信処理部111は、上位システム2から、上位システム2に格納されている上位在庫情報21や、入庫指示、出庫指示を受信する。また、通信処理部111は、上位在庫情報21の問い合わせや、入庫実績や、出庫実績を上位システム2に送信する。
モード制御部112は、上位システム2から受信した指示に基づいて、天井クレーンシステムZの自動運転モードの切り替え等を行う。自動運転モードとは、天井クレーンシステムZが、コイルCの搬送を3次元経路地図124に基づいて行うモードである。
The communication processing unit 111 receives from the host system 2 the upper inventory information 21 stored in the host system 2, as well as warehousing instructions and shipping instructions. The communication processing unit 111 also transmits inquiries about the upper inventory information 21, as well as warehousing records and shipping records to the host system 2.
The mode control unit 112 switches the automatic operation mode of the overhead crane system Z based on instructions received from the higher-level system 2. The automatic operation mode is a mode in which the overhead crane system Z transports the coil C based on a three-dimensional route map 124.

置場在庫情報処理部113は、上位システム2から取得した上位在庫情報21を基に置場在庫情報121を作成する。
次元経路地図処理部114は、置場在庫情報121や、3次元マップ情報122、システム情報123を基に3次元経路地図124を作成する。
クレーン制御指令部115は、3次元経路地図124を基に、天井クレーン装置6の制御指令を作成し、制御装置3へ作成した制御指令を送信する。
The yard inventory information processing unit 113 creates yard inventory information 121 based on the upper inventory information 21 acquired from the upper system 2 .
The three- dimensional route map processing unit 114 creates a three-dimensional route map 124 based on the storage location inventory information 121 , the three-dimensional map information 122 , and the system information 123 .
The crane control command unit 115 creates a control command for the overhead crane device 6 based on the three-dimensional route map 124 and transmits the created control command to the control device 3 .

(天井クレーン装置6)
図3は、第1実施形態に係る天井クレーン装置6の概略図である。
天井クレーン装置6は、クラブトロリ601、ガーダ602、走行レール604を有している。
クラブトロリ601は、ガーダ602上を横行するための横行車輪612、ワイヤ605を巻き上げる又は巻き下げるための巻取装置611を有している。ワイヤ605の先端には吊荷Sを懸吊するための吊具606が備えられている。なお、吊荷Sは鉄板をロール状に巻いたコイルCである。
(Ceiling crane device 6)
FIG. 3 is a schematic diagram of the overhead crane device 6 according to the first embodiment.
The overhead crane device 6 has a crab trolley 601 , a girder 602 , and a traveling rail 604 .
The club trolley 601 has traversing wheels 612 for traversing on the girder 602, and a winding device 611 for winding up or down a wire 605. A hoisting tool 606 for suspending a load S is provided at the tip of the wire 605. The load S is a coil C made of a rolled iron plate.

ガーダ602には、クラブトロリ601が横行する横行レール603が備えられるとともに、走行レール604上をガーダ602が走行するための走行車輪613が備えられている。
クラブトロリ601の横行車輪612によって、クラブトロリ601がガーダ602の長手方向に横行する。また、ガーダ602の走行車輪613によって、ガーダ602が走行レール604の長手方向に走行する。
The girder 602 is provided with a lateral rail 603 along which the club trolley 601 travels, and is also provided with running wheels 613 for the girder 602 to travel on the running rails 604.
The traverse wheels 612 of the club trolley 601 cause the club trolley 601 to traverse in the longitudinal direction of the girder 602. In addition, the running wheels 613 of the girder 602 cause the girder 602 to travel in the longitudinal direction of the running rail 604.

ここで、ガーダ602の長手方向の移動を「横行」と称し、走行レール604の長手方向の移動を「走行」と称する。なお、「横行」、「走行」をあわせて「移動」と適宜称する。このように、本実施形態の天井クレーン装置6は、吊荷S(コイルC)を所定の方向である走行方向、及び、当該方向と直角方向である横行方向の同時制御によって搬送する。
ガーダ602が走行レール604上を走行し、かつ、クラブトロリ601がガーダ602上を横行することにより、吊荷Sが目的の位置まで運ばれる。そして、クラブトロリ601に備えられている巻取装置611がワイヤ605を巻き上げたり、巻き下げたりすることで、吊荷Sの上げ下げが行われる。
Here, the movement of the girder 602 in the longitudinal direction is referred to as "lateral movement," and the movement of the traveling rail 604 in the longitudinal direction is referred to as "traveling." Note that "lateral movement" and "traveling" will be collectively referred to as "movement" as appropriate. In this way, the ceiling crane device 6 of this embodiment transports the load S (coil C) by simultaneously controlling the traveling direction, which is a predetermined direction, and the lateral movement direction, which is a direction perpendicular to that direction.
The load S is transported to the target position by the girder 602 traveling on the traveling rails 604 and the club trolley 601 moving laterally on the girder 602. The winding device 611 provided on the club trolley 601 then winds up and down the wire 605, thereby raising and lowering the load S.

クラブトロリ601の走行制御や、巻取装置611によるワイヤ605の巻取制御は、制御システムZ1によって行われる。 The control system Z1 controls the travel of the club trolley 601 and the winding of the wire 605 by the winding device 611.

(コイルC)
図4A、図4B、図5A、図5Bは、本実施形態で吊荷として用いられるコイルCの例を示す図である。
図4A及び図4Bでは大きいコイルC11(C)の例を示し、図5A及び図5Bでは小さいコイルC21(C)の例を示している。
図4A及び図4Bに示されているコイルC11において、コイルC11の半径はR11であり、コイルC11の幅はW11である。従って、コイルC11の高さH11(H)はコイルC11の直径となり、2×R11で示される。
(Coil C)
4A, 4B, 5A, and 5B are diagrams showing examples of the coil C used as a suspended load in this embodiment.
4A and 4B show an example of a large coil C11(C), and FIGS. 5A and 5B show an example of a small coil C21(C).
4A and 4B, the coil C11 has a radius R11 and a width W11. Therefore, the height H11 (H) of the coil C11 is the diameter of the coil C11, which is expressed as 2×R11.

また、図5A及び図5Bに示されているコイルC21において、コイルC21の半径はR21であり、コイルC21の幅はW21である。従って、コイルC21の高さH21(H)はコイルC21の直径となり、2×R21で示される。 Furthermore, in the coil C21 shown in Figures 5A and 5B, the radius of the coil C21 is R21, and the width of the coil C21 is W21. Therefore, the height H21 (H) of the coil C21 is the diameter of the coil C21, which is expressed as 2 x R21.

なお、コイルCには、図4A及び図5Aに示すように吊具606(図3参照)でコイルCを懸吊するための貫通孔Eが設けられている。 In addition, as shown in Figures 4A and 5A, coil C has a through hole E for suspending coil C with a suspender 606 (see Figure 3).

(積載高LHの計算)
図6A及び図6Bは、コイルCの積載高LHの計算を示す図である。適宜、図1を参照する。
図6Aに示す図では、コイルC11(C)が2つ、コイルC11より直径が小さいコイルC12(C)が積載されている。コイルC11の半径をR11とし、コイルC12の半径をR12とする。例えば、R11=500mm、R12=450mmである。そして、コイルC11,C12は2段で積載されており、下段にコイルC11及びコイルC12、上段にコイルC11が積載されているものとする。なお、以降では、下段を1段目、上段を2段目と適宜称する場合がある。
(Calculation of loading height LH)
6A and 6B are diagrams showing calculation of the loading height LH of the coil C. Please refer to FIG. 1 as needed.
In the diagram shown in FIG. 6A, two coils C11(C) and a coil C12(C) having a smaller diameter than coil C11 are loaded. The radius of coil C11 is R11, and the radius of coil C12 is R12. For example, R11 = 500 mm, and R12 = 450 mm. Coils C11 and C12 are loaded in two tiers, with coils C11 and C12 loaded on the lower tier and coil C11 loaded on the upper tier. Note that hereinafter, the lower tier may be referred to as the first tier and the upper tier as appropriate.

ここで、(Y1)コイルC11とコイルC12の積載高LH10(LH)は、下段に積載されているコイルC11,C12のうち、大きい方を基準として計算される。これは、天井クレーン装置6によってコイルCが搬送される際、コイル置場に載置されているコイルCと、搬送されているコイルCとの干渉を避けるためである。また、(Y2)実際には下段のコイルC11及びコイルC12との間にすき間が生じるが、コイルCの積載高LH10を算出する際には密着した状態とする。下段のコイルC11及びコイルC12との間にすき間が生じていると、積載高LH10が低くなる。しかし、積載高LH10を算出する際には、コイル置場に載置されているコイルCと、搬送されているコイルCとの干渉を避けるため、下段のコイルC11及びコイルC12との間が密着したものとして計算が行われる。これらの算出条件(Y1,Y2)により、できるだけ高い積載高LH10が算出される。これにより、天井クレーン装置6によるコイルCの搬送において、コイル置場に載置されているコイルCと、搬送されているコイルCとの干渉を避けることができる。このため、天井クレーン装置6によるコイルCの搬送の安全性を確保することができる。 Here, (Y1) the stacking height LH10 (LH) of coils C11 and C12 is calculated based on the larger of the coils C11 and C12 stacked on the lower level. This is to avoid interference between the coil C placed in the coil storage area and the coil C being transported when the coil C is transported by the overhead crane device 6. Also, (Y2) Although a gap actually occurs between the coils C11 and C12 on the lower level, they are considered to be in close contact when calculating the stacking height LH10 of coil C. If a gap occurs between the coils C11 and C12 on the lower level, the stacking height LH10 will be lower. However, when calculating the stacking height LH10, the calculation is performed assuming that the coils C11 and C12 on the lower level are in close contact to avoid interference between the coil C placed in the coil storage area and the coil C being transported. These calculation conditions (Y1, Y2) allow the calculation to achieve the highest possible stacking height LH10. This makes it possible to avoid interference between the coil C placed in the coil storage area and the coil C being transported when the coil C is transported by the overhead crane device 6. This ensures the safety of the transport of the coil C by the overhead crane device 6.

図6Aに示す例では、コイルC12よりコイルC11の方が大きいため、管理装置1は、コイルC12の場所にコイルC11がコイル置場に載置されているものとして積載高LH10を計算する。図6Aにおいて、コイルC12の周辺に示される破線丸はコイルC11の外形を示している。 In the example shown in Figure 6A, coil C11 is larger than coil C12, so the management device 1 calculates the loading height LH10 by assuming that coil C11 is placed in the coil storage area at the location of coil C12. In Figure 6A, the dashed circle shown around coil C12 indicates the outline of coil C11.

上段のコイルC(C11)は、下段のコイルC11,C12の隙間に入りこむ。そのため、管理装置1は、下段のコイルCの中心と、上段のコイルC11の中心とで形成される三角形(図6Aの例では正三角形)を計算する。この際、下段のコイルC12はコイルC11より小さい。前記したように、大きさの異なるコイルCが積載されている場合、最も大きいコイルCでコイルCの大きさを揃える。このため、下段のコイルC12の箇所にはコイルC11が載置されているものとして(コイルC12の周囲の破線丸)、積載高LHが算出される。従って、下段のコイルCの中心は、下段にコイルC11が載置されているものと仮定した場合の中心が設定される。 The coil C (C11) on the upper tier fits into the gap between the coils C11 and C12 on the lower tier. Therefore, the management device 1 calculates the triangle formed by the center of the coil C on the lower tier and the center of the coil C11 on the upper tier (an equilateral triangle in the example of Figure 6A). In this case, the coil C12 on the lower tier is smaller than the coil C11. As mentioned above, when coils C of different sizes are loaded, the size of the coils C is adjusted to the largest coil C. For this reason, the stack height LH is calculated assuming that coil C11 is placed in the location of the coil C12 on the lower tier (dotted circle around coil C12). Therefore, the center of the coil C on the lower tier is set to the center when it is assumed that coil C11 is placed on the lower tier.

そして、管理装置1は形成される正三角形の高さである下段コイル差分DH12(DH)を計算する。そして、管理装置1は、計算された下段コイル差分DH12と、下段のコイルC11の直径であるH11とを加算することで、積載されたコイルCの高さ(積載高LH10)を算出する。すなわち、積載高LH10=H11(2×R11)+下段コイル差分DH12である。前記したように、R11=500mmとした場合、コイルC11の高さH11=1000mm、下段コイル差分DH12=867mmとなるため、積載高LH10=1867mmとなる。 Then, the management device 1 calculates the lower coil difference DH12 (DH), which is the height of the equilateral triangle that is formed. The management device 1 then calculates the height of the stacked coil C (loading height LH10) by adding the calculated lower coil difference DH12 to H11, which is the diameter of the lower coil C11. In other words, loading height LH10 = H11 (2 x R11) + lower coil difference DH12. As mentioned above, if R11 = 500 mm, then the height H11 of coil C11 = 1000 mm, and the lower coil difference DH12 = 867 mm, so the loading height LH10 = 1867 mm.

このように、コイルCが2段で積載されており、下段に載置されている、複数のコイルCの半径が異なる場合、管理装置1は、半径が大きいコイルCに基づいて積載高を計算する。つまり、管理装置1は、積載されているコイルCの大きさが異なる場合、最も大きいコイルCで大きさを揃えた上で積載高LHを算出する。このようにすることによって、天井クレーン装置6がコイルCを搬送する場合、積載されて置場に載置されているコイルCと、搬送しているコイルCとの干渉を防止することができる。 In this way, when coils C are stacked in two tiers and the radii of the multiple coils C placed on the lower tier are different, the management device 1 calculates the loading height based on the coil C with the largest radius. In other words, when the loaded coils C are of different sizes, the management device 1 adjusts the sizes to match using the largest coil C and then calculates the loading height LH. By doing this, when the overhead crane device 6 transports coils C, interference between the coils C that have been loaded and placed in the storage area and the coil C being transported can be prevented.

図6Bに示す図では、コイルC21(C)が2つ、コイルC21より直径が小さいコイルC22(C)が積載されている。コイルC21の半径をR21とし、コイルC22の半径をR22とする。例えば、R21=300mm、R22=250mmである。そして、コイルC21,C22は2段で積載されており、下段にコイルC21及びコイルC22、上段にコイルC21が積載されているものとする。ここで、図6Aと同様、算出条件(Y1,Y2)が適用されて積載高LH20(LH)が算出される。 In the diagram shown in Figure 6B, two coils C21 (C) and a coil C22 (C) with a smaller diameter than coil C21 are loaded. The radius of coil C21 is R21, and the radius of coil C22 is R22. For example, R21 = 300 mm, R22 = 250 mm. Coils C21 and C22 are loaded in two layers, with coils C21 and C22 on the lower layer and coil C21 on the upper layer. Here, as with Figure 6A, the calculation conditions (Y1, Y2) are applied to calculate the loading height LH20 (LH).

図6Bに示す例では、コイルC22よりコイルC21の方が大きいため、管理装置1は、コイルC22の場所にコイルC21がコイル置場に載置されているものとして積載高LH20(LH)を計算する。図6Bにおいて、コイルC22の周辺に示される破線丸はコイルC21の外形を示している。 In the example shown in Figure 6B, coil C21 is larger than coil C22, so the management device 1 calculates the loading height LH20 (LH) by assuming that coil C21 is placed in the coil storage area at the location of coil C22. In Figure 6B, the dashed circle shown around coil C22 indicates the outline of coil C21.

上段のコイルC(C21)は、下段のコイルC21,C22の隙間に入りこむ。そのため、管理装置1は、下段のコイルCの中心と、上段のコイルC21の中心とで形成される三角形(図6Bの例では正三角形)を計算する。この際、下段のコイルC22はコイルC21より小さい。前記したように、大きさの異なるコイルCが積載されている場合、最も大きいコイルCでコイルCの大きさを揃える。このため、下段のコイルC22の箇所にはコイルC21が載置されているものとして(コイルC22の周囲の破線丸)、積載高LHが算出される。従って、下段のコイルCの中心は、下段にコイルC21が載置されているものと仮定した場合の中心が設定される。 The coil C (C21) on the upper tier fits into the gap between the coils C21 and C22 on the lower tier. Therefore, the management device 1 calculates the triangle formed by the center of the coil C on the lower tier and the center of the coil C21 on the upper tier (an equilateral triangle in the example of Figure 6B). In this case, the coil C22 on the lower tier is smaller than the coil C21. As mentioned above, when coils C of different sizes are loaded, the size of the coils C is adjusted to the largest coil C. For this reason, the stack height LH is calculated assuming that coil C21 is placed in the location of the coil C22 on the lower tier (the dashed circle around coil C22). Therefore, the center of the coil C on the lower tier is set to the center when it is assumed that coil C21 is placed on the lower tier.

そして、管理装置1は、形成される正三角形の下段コイル差分DH22(DH)を計算する。そして、管理装置1は、計算された下段コイル差分DH22と、下段のコイルC21の直径であるH21とを加算することで、積載されたコイルCの高さ(積載高LH20)を算出する。すなわち、積載高LH20=H21(2×R21)+下段コイル差分DH22である。前記したように、R21=300mmとした場合、コイルC21の高さH21=600mm、下段コイル差分DH22=520mmとなるため、積載高LH20=1120mmとなる。 The management device 1 then calculates the lower coil difference DH22 (DH) of the formed equilateral triangle. The management device 1 then calculates the height of the stacked coil C (stack height LH20) by adding the calculated lower coil difference DH22 to H21, which is the diameter of the lower coil C21. That is, stack height LH20 = H21 (2 x R21) + lower coil difference DH22. As mentioned above, if R21 = 300 mm, then the height H21 of coil C21 = 600 mm, and the lower coil difference DH22 = 520 mm, resulting in stack height LH20 = 1120 mm.

[3次元経路地図124の概念図]
次に、図7~図10Bを参照して、3次元経路地図124によるコイルCの管理状態を示す概念図である。
(1段積み)
まず、図7~図8Bを参照して、コイルCがコイル置場に一段ずつ載置されている例を示す。
図7は、3次元経路地図124を示す図である。
図7において、走行方向をx軸方向、横行方向をy軸方向とする。また、図7に示す例では、コイル置場が、走行方向に8.5m(8500mm)、横行方向に6.5m(6500mm)の広さを有するものとする。また、走行方向、横行方向ともに50cm(500mm)毎にメッシュが設定されている。メッシュで区切られたマスの1つ1つをマップ要素と称する。マップ要素は、コイル置場を所定のメッシュに区切った個々のメッシュ領域である。マップ要素にはx軸方向及びy方向のそれぞれについて座標が対応付けされている。図7において、x軸方向に「0」~「8500」、y軸方向に「0」~「6500」で示されている数値は、原点からの距離を示している。そして、図7において、x軸方向に「0」~「16」、y軸方向に「0」~「12」の数値で示されているものがマップ要素の座標である。例えば、符号701に示されるマップ要素は、x軸「1」-y軸「2」の座標に対応付けられる。
[Conceptual diagram of three-dimensional route map 124]
Next, with reference to FIGS. 7 to 10B, there are shown conceptual diagrams illustrating the management state of the coil C according to the three-dimensional route map 124. FIG.
(1 layer stacked)
First, referring to FIGS. 7 to 8B, an example in which coils C are placed in a coil storage area one layer at a time is shown.
FIG. 7 is a diagram showing the three-dimensional route map 124. As shown in FIG.
In Figure 7, the running direction is the x-axis direction, and the lateral direction is the y-axis direction. In the example shown in Figure 7, the coil storage area is 8.5 m (8,500 mm) in the running direction and 6.5 m (6,500 mm) in the lateral direction. Meshes are set every 50 cm (500 mm) in both the running direction and the lateral direction. Each square divided by the meshes is called a map element. A map element is an individual mesh area obtained by dividing the coil storage area into a predetermined mesh. Coordinates are assigned to the map elements in the x-axis direction and the y-axis direction. In Figure 7, the numbers "0" to "8,500" in the x-axis direction and "0" to "6,500" in the y-axis direction indicate the distance from the origin. The numbers "0" to "16" in the x-axis direction and "0" to "12" in the y-axis direction indicate the coordinates of the map elements. For example, the map element indicated by the reference numeral 701 is associated with the coordinates of "1" on the x-axis and "2" on the y-axis.

また、図8Aは図7をx軸方向(走行方向の軸)からみたコイルCの載置状態を示す図である。また、図8Bは図7をy軸方向(横行方向の軸)からみたコイルCの載置状態を示す図である。 Figure 8A shows the placement of coil C as viewed from the x-axis direction (axis in the running direction) of Figure 7. Figure 8B shows the placement of coil C as viewed from the y-axis direction (axis in the traverse direction) of Figure 7.

なお、コイル置場は図7の例に示す大きさに限らない。例えば、走行方向が30m、横行方向が15mの大きさを有するものとしてもよい。また、図7に示す例では、50cm(500mm)毎にマップ要素が定義されているが、10cm毎や、70cm毎等、50cm毎に限らない。 Note that the size of the coil storage area is not limited to the example shown in Figure 7. For example, it may be 30 m in the running direction and 15 m in the lateral direction. Also, in the example shown in Figure 7, map elements are defined every 50 cm (500 mm), but they are not limited to every 50 cm, and may be every 10 cm, 70 cm, or other intervals.

そして、図7~図8Bにおいて、載置されているコイルCが破線で示されている。図8A及び図8Bに示すように、大きいコイルC11と、小さいコイルC21が載置されている。大きいコイルC11の半径R11は、例えば500mm(50cm)であり、小さいコイルC21の半径R21は、例えば300mm(30cm)である。 In Figures 7 to 8B, the mounted coil C is indicated by a dashed line. As shown in Figures 8A and 8B, a large coil C11 and a small coil C21 are mounted. The radius R11 of the large coil C11 is, for example, 500 mm (50 cm), and the radius R21 of the small coil C21 is, for example, 300 mm (30 cm).

また、図7において、コイルCが載置されているマップ要素はドットで示されており、各マップ要素にはマップコイル高MH(図8A及び図8B参照)が数値として示されている。マップコイル高MHとは、コイルCの積載高LHに安全高HS(図8A及び図8B参照)を加算したものである。例えば、コイルC11が載置されているマップ要素には、マップコイル高MHとして「1500」の数値が示されている。また、コイルC21が載置されているマップ要素には、マップコイル高MHとして「1100」の数値が示されている。なお、図7に示す例において、マップコイル高MHの単位は「mm」である。 In addition, in Figure 7, map elements on which coil C is placed are indicated by dots, and each map element shows the map coil height MH (see Figures 8A and 8B) as a numerical value. The map coil height MH is the coil C loading height LH plus the safety height HS (see Figures 8A and 8B). For example, the map element on which coil C11 is placed shows the map coil height MH as a numerical value of "1500". Furthermore, the map element on which coil C21 is placed shows the map coil height MH as a numerical value of "1100". In the example shown in Figure 7, the map coil height MH is shown in mm.

図8A及び図8Bに示すように、コイルC11が載置されているマップ要素のマップコイル高MH11(MH)は、コイルC11の高さH11(外径:=R11×2=1000mm)+安全高(HS=500mm)=1500mmとなる。なお、図7~図8Bに示す例のようにコイルC11が積載されていない場合、コイルC11の高さH11が、そのままコイルC11の積載高LHとなる。 As shown in Figures 8A and 8B, the map coil height MH11 (MH) of the map element on which the coil C11 is placed is the height H11 of the coil C11 (outer diameter: = R11 x 2 = 1000 mm) + safety height (HS = 500 mm) = 1500 mm. Note that when the coil C11 is not loaded, as in the examples shown in Figures 7 to 8B, the height H11 of the coil C11 becomes the loading height LH of the coil C11.

同様に、コイルC21が載置されているマップ要素のマップコイル高MH21は、コイルC21の高さH21(外径:=R21×2=600mm)+安全高HS(500mm)=1100mmとなる。 Similarly, the map coil height MH21 of the map element on which coil C21 is placed is the height H21 of coil C21 (outer diameter: = R21 x 2 = 600 mm) + safety height HS (500 mm) = 1100 mm.

なお、図7において、ドットが付されていないマップ要素の周囲が太線で示されている箇所はコイルCの載置予定箇所であることを示している。ただし、コイルCの載置予定箇所は設定されなくてもよい。 In Figure 7, areas where map elements without dots are surrounded by thick lines indicate the planned placement locations of coil C. However, the planned placement location of coil C does not have to be set.

このように3次元経路地図124では、コイル置場と、マップ要素とが対応付けられ、x軸、y軸で表されている座標が、マップ要素を特定するためのマップ要素特定情報として格納されている。 In this way, in the three-dimensional route map 124, coil locations are associated with map elements, and coordinates represented by the x-axis and y-axis are stored as map element identification information for identifying the map element.

図7に示す例では、マップ要素に対して、安全高HSがコイルCの高さHに加算された高さであるマップコイル高MHが搬送物サイズ情報に基づく高さ情報として格納されている。 In the example shown in Figure 7, the map coil height MH, which is the height obtained by adding the safety height HS to the height H of the coil C, is stored for the map element as height information based on the transported item size information.

(2段積み:複数段)
次に、図9~図10Bを参照して、コイルCがコイル置場に、2段積みされているコイルCが存在する例を示す。
図9は、3次元経路地図124を示す図である。図9において、走行方向をx軸方向、横行方向をy軸方向とする。なお、図9に示すマップ要素は、図7と同様の条件で作成されているため、図9における説明を省略する。
(2-tier: multiple tiers)
Next, referring to FIGS. 9 to 10B, an example will be shown in which the coils C are stacked in two layers in the coil storage area.
Fig. 9 is a diagram showing a three-dimensional route map 124. In Fig. 9, the traveling direction is the x-axis direction and the lateral direction is the y-axis direction. Note that the map elements shown in Fig. 9 are created under the same conditions as in Fig. 7, and therefore their explanation in Fig. 9 will be omitted.

また、図10Aは図9をx軸方向(走行方向の軸)からみたコイルCの載置状態及び積載状態を示す図である。また、図10Bは図9をy軸方向(横行方向の軸)からみたコイルCの載置状態及び積載状態を示す図である。 Figure 10A is a diagram showing the placement and stacking state of coil C when viewed from the x-axis direction (axis in the travel direction) of Figure 9. Figure 10B is a diagram showing the placement and stacking state of coil C when viewed from the y-axis direction (axis in the traverse direction) of Figure 9.

そして、図9~図10Bにおいて、1段目(下段)に載置されているコイルCが破線四角で示されている。また、2段目(上段)に載置されているコイルCが点線で示されている。このように、図9~図10Bに示す例では、コイルCが複数段(図9~図10Bに示す例では2段)で積載されている。 In Figures 9 to 10B, the coils C placed on the first tier (lower tier) are indicated by dashed rectangles. Furthermore, the coils C placed on the second tier (upper tier) are indicated by dotted lines. In this way, in the example shown in Figures 9 to 10B, the coils C are stacked in multiple tiers (two tiers in the example shown in Figures 9 to 10B).

図9の符号711で示す箇所では、2つのコイルC11の上に、下段のコイルCと同じ大きさを有するコイルC11が積載されている。なお、図9において、1段目のコイルCが載置されている箇所に相当するマップ要素はドットで示され、2段目のコイルCが載置されている箇所に対応するマップ要素は斜線で示されている。なお、図9の符号721では、点線で示すコイルC111がマップ要素を示す線と重複している。このような場合、図9の斜線部に示すように、当該線を含むマップ要素のすべてがコイルC111の載置場所に該当するマップ用となる。 At the location indicated by reference numeral 711 in Figure 9, a coil C11 of the same size as the coil C on the lower level is placed on top of two coils C11. Note that in Figure 9, the map element corresponding to the location where the first coil C is placed is indicated by a dot, and the map element corresponding to the location where the second coil C is placed is indicated by a diagonal line. Note that at reference numeral 721 in Figure 9, the coil C111 shown by a dotted line overlaps with the line indicating the map element. In such a case, as shown in the diagonal line in Figure 9, all of the map elements including that line are for the map corresponding to the location where coil C111 is placed.

また、図9の符号712で示す箇所では、2つのコイルC21の上に、下段のコイルC21と同じ大きさのコイルC21が積載されている。 Furthermore, at the location indicated by reference numeral 712 in Figure 9, a coil C21 of the same size as the coil C21 on the lower level is stacked on top of the two coils C21.

そして、図7~図8Bと同様、図9~図10Bでも、大きいコイルC11の半径(R1)は、例えば500mm(50cm)である。また、小さいコイルC21の半径(R2)は、例えば300mm(30cm)である。 As in Figures 7 to 8B, in Figures 9 to 10B, the radius (R1) of the large coil C11 is, for example, 500 mm (50 cm). Furthermore, the radius (R2) of the small coil C21 is, for example, 300 mm (30 cm).

図7と同様、図9においても、各マップ要素にはマップコイル高MH(図10A及び図10B参照)が数値として示されている。例えば、コイルC11の上にコイルC11が積載されているマップ要素には、マップコイル高MHとして「2367」の数値が示されている。また、コイルC21の上にコイルC21が積載されているマップ要素には、マップコイル高MHとして「1620」の数値が示されている。なお、図9に示す例において、マップコイル高MHの単位は「mm」である。マップコイル高MHは、載置されているコイルCの積載高LHに安全高HSを加算したものである。図9~図10Bに示す例では、図7と同様、安全高HSは500mmとして設定されているものとする。 As in Figure 7, in Figure 9, each map element shows the map coil height MH (see Figures 10A and 10B) as a numerical value. For example, the map element in which coil C11 is stacked on top of coil C11 shows the map coil height MH as a numerical value of "2367." Furthermore, the map element in which coil C21 is stacked on top of coil C21 shows the map coil height MH as a numerical value of "1620." In the example shown in Figure 9, the map coil height MH is measured in mm. The map coil height MH is calculated by adding the safety height HS to the stack height LH of the placed coil C. In the examples shown in Figures 9 to 10B, the safety height HS is set to 500 mm, as in Figure 7.

なお、符号712では、上段のコイルC21が下段のコイルC21に対して、若干ずれた状態で載置されている。 Note that in reference numeral 712, the upper coil C21 is placed slightly offset relative to the lower coil C21.

従って、図10A及び図10Bに示すように、コイルC11の上にコイルC11が積載されているマップ要素のマップコイル高MH12(MH)は、積載高LH10(1867mm)+安全高HS(=500mm)=2367mmとなる。同様に、コイルC21の上にコイルC21が積載されているマップ要素のマップコイル高MH22は、コイルC21の積載高LH20(図6B参照)1120(mm)+安全高HS(500mm)=1620mmとなる。コイルC11の積載高LH10(1867mm)の算出方法は図6Aで示した通りであり、コイルC21の積載高LH20(1120mm)の算出方法は、図6Bで示した通りである。 Therefore, as shown in Figures 10A and 10B, the map coil height MH12 (MH) of a map element in which coil C11 is stacked on top of coil C11 is the stacking height LH10 (1867 mm) + safety height HS (= 500 mm) = 2367 mm. Similarly, the map coil height MH22 of a map element in which coil C21 is stacked on top of coil C21 is the stacking height LH20 of coil C21 (see Figure 6B) 1120 (mm) + safety height HS (500 mm) = 1620 mm. The method for calculating the stacking height LH10 (1867 mm) of coil C11 is as shown in Figure 6A, and the method for calculating the stacking height LH20 (1120 mm) of coil C21 is as shown in Figure 6B.

そして、図2に示すクレーン制御指令部115は、天井クレーン装置6(図3参照)によって吊り下げられたコイルCの下端が、図7や、図9に示すコイル置場の床からマップコイル高MHより大きくなるよう経路作成を行う。 Then, the crane control command unit 115 shown in Figure 2 creates a path so that the lower end of the coil C suspended by the ceiling crane device 6 (see Figure 3) is greater than the map coil height MH from the floor of the coil storage area shown in Figures 7 and 9.

また、図7、図9において、ドットで示されているマップ以外は、コイル置場の床高さとして「0(mm)」が格納されているものとするが、コイルC以外の作業機械等といった据え付けの機械の高さ等が格納されてもよい。このような据え付けの機械の高さは、図示しない設備情報を基に3次元経路地図124に格納される。 In addition, in Figures 7 and 9, maps other than those indicated by dots are assumed to store "0 (mm)" as the floor height of the coil storage area, but the height of installed machinery such as work machinery other than coil C may also be stored. The height of such installed machinery is stored in the three-dimensional route map 124 based on equipment information (not shown).

[置場在庫情報121]
図11は、置場在庫情報121の具体例を示す図である。
図11に示すように、置場在庫情報121は「対象コイル」、「中心距離x軸」、「中心距離y軸」、「第1下段隣接」、「第2下段隣接」のフィールドを有する。また、置場在庫情報121は、「下段隣接2列」、「下段隣接2行」、「下段隣接2段」、「積載高」、「下段コイル差分」のフィールドを有する。さらに、置場在庫情報121は、「コイル番号」、「ロットNo」、「外径」、「内径」、「重量」のフィールドを有する。なお、図11に示す置場在庫情報121において、レコードは1つのコイルCに関する情報を示している。
[Storage space inventory information 121]
FIG. 11 is a diagram showing a specific example of the yard inventory information 121. As shown in FIG.
As shown in Figure 11, the yard inventory information 121 has fields for "Target Coil,""Center Distance x-Axis,""Center Distance y-Axis,""First Lower Adjacent," and "Second Lower Adjacent." The yard inventory information 121 also has fields for "Lower Adjacent 2 Columns,""Lower Adjacent 2 Rows,""Lower Adjacent 2 Rows,""StackingHeight," and "Lower Coil Difference." Furthermore, the yard inventory information 121 has fields for "Coil Number,""LotNo.,""OuterDiameter,""InnerDiameter," and "Weight." Note that in the yard inventory information 121 shown in Figure 11, each record indicates information about one coil C.

置場在庫情報121は、例えば、最初は上位システム2から取得された上位在庫情報21(図2参照)を基に作成される。そして、それ以降は、置場在庫情報処理部113(図2参照)が天井クレーンシステムZによるコイルCの移動を管理することで、置場在庫情報121の更新が行われる。なお、置場在庫情報121の更新については後記する。 For example, the storage yard inventory information 121 is initially created based on the upper inventory information 21 (see Figure 2) obtained from the upper system 2. Thereafter, the storage yard inventory information processing unit 113 (see Figure 2) manages the movement of the coil C by the overhead crane system Z, thereby updating the storage yard inventory information 121. The updating of the storage yard inventory information 121 will be described later.

「対象コイル」の欄には、レコードに格納される情報元となるコイルCの位置情報が格納される。
図11に示すように。「対象コイル」は、「列」、「行」、「段」のフィールドを有している。
「列」、「行」、「段」は、コイル置場に載置されているコイルCの整列状態に基づいてコイルCの載置場所が表現されているものである。これらのうち、「列」、「行」について、例えば、図12に示すように、コイル置場にコイルCが載置されている場合を想定する。図12の例において、細実線矢印A111は1段目の「1列」、細実線矢印A112は1段目の「2列」となる。同様に、細実線矢印A113は1段目の「3列」、細実線矢印A114は1段目の「4列」、細実線矢印A115は1段目の「5列」となる。また、太破線矢印A121は2段目の「1列」、太破線矢印A124は2段目の「4列」を示す。太破線矢印A124が「2列」とならない理由は、太破線矢印A121と、太破線矢印A124との間に、現在は載置されていないものの、2段目の2列目、3列目が載置可能であるためである。また、細実線矢印A211は「1行」、矢印A212は「2行」となる。同様に、細実線矢印A213は「3行」、細実線矢印A214は「4行」、細実線矢印A215は「5行」となる。このように「行」は1段目と2段目とにおいて共通となる。
The "target coil" field stores the position information of the coil C that is the source of the information stored in the record.
As shown in Figure 11. "Target coil" has fields for "column", "row", and "stage".
The terms "column,""row," and "tier" represent the placement locations of the coils C based on the alignment of the coils C placed in the coil placement area. Regarding "column" and "row," for example, assume that the coils C are placed in the coil placement area as shown in FIG. 12 . In the example of FIG. 12 , the thin solid arrow A111 indicates the "first column" of the first tier, and the thin solid arrow A112 indicates the "second column" of the first tier. Similarly, the thin solid arrow A113 indicates the "third column" of the first tier, the thin solid arrow A114 indicates the "fourth column" of the first tier, and the thin solid arrow A115 indicates the "fifth column" of the first tier. Furthermore, the thick dashed arrow A121 indicates the "first column" of the second tier, and the thick dashed arrow A124 indicates the "fourth column" of the second tier. The reason why the thick dashed arrow A124 does not indicate "two columns" is because, although not currently placed, the second and third columns of the second row can be placed between the thick dashed arrow A121 and the thick dashed arrow A124. Furthermore, the thin solid arrow A211 indicates "one row," and the arrow A212 indicates "two rows." Similarly, the thin solid arrow A213 indicates "three rows," the thin solid arrow A214 indicates "four rows," and the thin solid arrow A215 indicates "five rows." In this way, the "rows" are common to both the first and second rows.

図12に示すように、「列」、「行」は、マップ要素とは別に定義されるものである。なお、「列」、「行」はコイル置場に載置又は積載可能なコイルCの数に基づいて、予め決められ、固定されるものである。 As shown in Figure 12, "columns" and "rows" are defined separately from the map elements. Note that "columns" and "rows" are predetermined and fixed based on the number of coils C that can be placed or stacked in the coil storage area.

「段」は、コイルCが積載されている段に関する情報である。具体的には、「段」は、載置されているコイルCの上下関係を示すものであり、下段に載置されているコイルCには「1」が格納され、上段に配置されているコイルCには「2」が格納される。 "Layer" is information about the row on which the coil C is stacked. Specifically, "Layer" indicates the vertical relationship of the placed coils C, with "1" stored in the coil C placed on the lower row and "2" stored in the coil C placed on the upper row.

なお、コイルCが2段積みされている場合、「列」、「行」は、段毎に定義される。例えば、図12のようにコイルCが2段積みされている場合、前記したように、細実線矢印A111は下段の1列目であり、細実線矢印A112は下段の2列目である。また、太破線矢印A121は上段の1列目であり、太破線矢印A124は上段の4列目である。 Note that when coils C are stacked in two layers, "columns" and "rows" are defined for each layer. For example, when coils C are stacked in two layers as shown in Figure 12, as mentioned above, the thin solid arrow A111 indicates the first column of the lower row, and the thin solid arrow A112 indicates the second column of the lower row. Furthermore, the thick dashed arrow A121 indicates the first column of the upper row, and the thick dashed arrow A124 indicates the fourth column of the upper row.

つまり、図12に示す例では、コイルC11aは「1列」-「1行」-「2段」であり、コイルC11bは「1列」-「1行」-「1段」であり、コイルC11cは「2列」-「1行」-「1段」である。同様に、コイルC21aは「4列」-「1行」-「2段」であり、コイルC21bは「4列」-「1行」-「1段」であり、コイルC21cは「5列」-「1行」-「1段」である。 In other words, in the example shown in Figure 12, coil C11a is "1st column" - "1st row" - "2nd row," coil C11b is "1st column" - "1st row" - "1st row," and coil C11c is "2nd column" - "1st row" - "1st row." Similarly, coil C21a is "4th column" - "1st row" - "2nd row," coil C21b is "4th column" - "1st row" - "1st row," and coil C21c is "5th column" - "1st row" - "1st row."

このように、対象コイルの「列」、「行」、「段」は少なくとも前記搬送物の載置場所を特定するための載置場所情報である。特に、「列」、「行」はコイルC同士の相関位置であり、「段」は積載情報である。 In this way, the "column," "row," and "tier" of the target coil are placement location information for identifying at least the placement location of the transported item. In particular, the "column" and "row" indicate the relative positions of the coils C, and the "tier" is loading information.

「中心距離x軸」及び「中心距離y軸」は、対象となるコイルCの中心が存在するx軸の距離、y軸の距離である。距離は、図7及び図9で定義される距離である。 The "center distance x-axis" and "center distance y-axis" refer to the x-axis and y-axis distances at which the center of the target coil C is located. These distances are defined in Figures 7 and 9.

「第1下段隣接」、「第2下段隣接」のそれぞれは「列」、「行」、「段」のフィールドを有している。
例えば、図12に示すような状態でコイルC11a,C11b,C11cが2段積みされている場合、コイルC11b,C11cがコイルC11aの下段隣接のコイルCとなる。コイルC11bが第1下段隣接のコイルC、コイルC11cが第2下段隣接のコイルCとする。コイルC11aは、前記したように、「1列」-「1行」-「2段」のコイルCである。また、前記したように、コイルC11bは、「1列」-「1行」-「1段」であり、コイルC11cは、「2列」-「1行」-「1段」となる。従って、対象コイルの「列」-「行」-「段」の欄にコイルC11aの「1」-「1」-「2」が格納され、このレコードの第1下段隣接の「列」-「行」-「段」の欄に「1」-「1」-「1」が格納される。そして、当該レコードの第2下段隣接の「列」-「行」-「段」の欄に「2」-「1」-「1」が格納される。
Each of the "first lower adjacent" and "second lower adjacent" has fields for "column", "row", and "column".
For example, if coils C11a, C11b, and C11c are stacked in two tiers as shown in FIG. 12, coils C11b and C11c are the coils C adjacent to coil C11a in the tier below. Coil C11b is the first adjacent coil C below, and coil C11c is the second adjacent coil C below. As described above, coil C11a is the "1st column"-"1st row"-"2nd row" coil C. Also, as described above, coil C11b is "1st column"-"1st row"-"1st row," and coil C11c is "2nd column"-"1st row"-"1st row." Therefore, "1"-"1"-"2" for coil C11a is stored in the "column"-"row"-"tier" column of the target coil, and "1"-"1"-"1" is stored in the "column"-"row"-"tier" column of the first adjacent coil below of this record. Then, "2"-"1"-"1" are stored in the "column"-"row"-"column" fields of the second adjacent record below.

例えば、図12に示すような状態でコイルC21a,C21b,C21cが2段積みされている場合、コイルC21b,C21cがコイルC21aの下段隣接のコイルCとなる。コイルC21bが第1下段隣接のコイルC、コイルC21cが第2下段隣接のコイルCとする。コイルC21aは、前記したように、「4列」-「1行」-「2段」のコイルCである。また、コイルC21bは、前記したように、「4列」-「1行」-「1段」であり、コイルC21cは、「5列」-「1行」-「1段」となる。従って、対象コイルの「列」-「行」-「段」の欄にコイルC21aの「4」-「1」-「2」が格納され、このレコードの第1下段隣接の「列」-「行」-「段」の欄に「4」-「1」-「1」が格納される。そして、当該レコードの第2下段隣接の「列」-「行」-「段」の欄に「5」-「1」-「1」が格納される。 For example, if coils C21a, C21b, and C21c are stacked in two tiers as shown in Figure 12, coils C21b and C21c are the coils C adjacent to coil C21a in the tier below. Coil C21b is the first adjacent coil C below, and coil C21c is the second adjacent coil C below. As mentioned above, coil C21a is a "4th column" - "1st row" - "2nd tier" coil C. Also, as mentioned above, coil C21b is "4th column" - "1st row" - "1st tier," and coil C21c is "5th column" - "1st row" - "1st tier." Therefore, the "4" - "1" - "2" of coil C21a is stored in the "column" - "row" - "tier" column of the target coil, and "4" - "1" - "1" is stored in the "column" - "row" - "tier" column of the first adjacent coil below for this record. Then, "5"-"1"-"1" is stored in the "Column"-"Row"-"Column" fields of the second adjacent record below.

「積載高」は、マップ要素に対応付けられるコイルCの積載高LH(図6A、図6B参照)が格納される。
「下段コイル差分」は、図6Aに示す下段コイル差分DH12、図6Bに示す下段コイル差分DH22である。1段積み(コイルCが積載されていない)場合、下段コイル差分DHは0となる。
"Load height" stores the load height LH (see FIGS. 6A and 6B) of the coil C associated with the map element.
The "lower coil difference" is the lower coil difference DH12 shown in Fig. 6A and the lower coil difference DH22 shown in Fig. 6B. In the case of a single stack (coil C is not stacked), the lower coil difference DH is 0.

「コイル番号」には、コイルCに対して一意に付与されているコイルC番号が格納される。
「ロットNo」には、対象となるコイルCが含まれるロットの番号が格納される。
「外径」は、対象となるコイルCの外径が格納され、「内径」は対象となるコイルCの孔部の直径である。
「幅」は、コイルCの長さに相当するものである。
「重量」には、コイルCの重量が格納される。
In the "coil number" field, a coil C number that is uniquely assigned to the coil C is stored.
The "Lot No." stores the number of the lot that includes the target coil C.
The "outer diameter" stores the outer diameter of the target coil C, and the "inner diameter" stores the diameter of the hole of the target coil C.
The "width" corresponds to the length of the coil C.
In "weight", the weight of the coil C is stored.

なお、外径は、搬送物であるコイルCのサイズに関する情報である搬送物サイズ情報、搬送物高である。 The outer diameter is the item size information, which is information about the size of the coil C being transported, and the height of the item being transported.

[3次元マップ情報122]
図13は、本実施形態で用いられる3次元マップ情報122の例を示す図である。
図13で示すように、3次元マップ情報122は、「マップ要素ID」、「列」、「行」、「段」、「マップ座標x軸」、「マップ座標y軸」の各フィールドを有する。
「マップ要素ID」には、マップ要素毎に一意に付与されるIDが格納される。図7及び図9では図示していないが、それぞれのマップ要素にはマップ要素IDが一意に付与されている。このように、3次元マップ情報122のレコードは、マップ要素に関する情報が格納されている。
[3D map information 122]
FIG. 13 is a diagram showing an example of the three-dimensional map information 122 used in this embodiment.
As shown in FIG. 13, the three-dimensional map information 122 has fields for "map element ID,""column,""row,""tier,""map coordinate x-axis," and "map coordinate y-axis."
The "map element ID" stores an ID that is uniquely assigned to each map element. Although not shown in Figures 7 and 9, each map element is uniquely assigned a map element ID. In this way, the records of the three-dimensional map information 122 store information about map elements.

「列」、「行」、「段」には、設定されている「列」、「行」、「段」のうち、どれが対象となるマップ要素に対応付けられているかを示している。例えば、マップ要素ID「157」のマップ要素には「1列」-「1行」-「1段」のコイルCが対応付けられている。また、ドットで示すマップ要素ID「158」は、「1列」-「1行」-「1段」と、「1列」-「1行」-「2段」とが格納されている。これは、1段目のコイルCが載置されているとともに、その上の2段目のコイルCも、このマップ要素上に載置されていることを示す。 The "column," "row," and "tier" indicate which of the set "columns," "rows," and "tiers" correspond to the target map element. For example, the map element with map element ID "157" is associated with coil C in "column 1"-"row 1"-"tier 1." Furthermore, map element ID "158," indicated by a dot, stores "column 1"-"row 1"-"tier 1" and "column 1"-"row 1"-"tier 2." This indicates that the coil C in the first tier is placed, and the coil C in the second tier above it is also placed on this map element.

また、3次元マップ情報122において、「列」、「段」、「行」で同じ数値を有しているレコードが示すマップ要素には、同じコイルCが載置されていることを示す。例えば、マップ要素ID「251」、「252」、「282」、「283」のそれぞれには「1列」-「2行」-「1段」が格納されている。従って、これらのマップ要素には、「1列」-「2行」-「1段」に該当するコイルCが載置されていることを示している。 In addition, in the three-dimensional map information 122, map elements indicated by records having the same numerical values for "column," "row," and "tier" indicate that the same coil C is placed. For example, the map element IDs "251," "252," "282," and "283" each store "1st column" - "2nd row" - "1st tier." Therefore, these map elements indicate that the coil C corresponding to "1st column" - "2nd row" - "1st tier" is placed.

「マップ座標x軸」はマップ要素に対応するx軸の座標であり、「マップ座標y軸」はマップ要素に対応するy軸の座標である。ここで、座標とは図7、図9でx軸、y軸で示されている座標である。 The "map coordinate x-axis" is the x-axis coordinate corresponding to the map element, and the "map coordinate y-axis" is the y-axis coordinate corresponding to the map element. Here, the coordinates are those shown on the x-axis and y-axis in Figures 7 and 9.

マップ座標x軸、マップ座標y軸は、マップ要素の前記搬送領域での場所を特定するマップ要素特定情報である。また、「列」、「段」、「行」は、載置場所情報である。このように、3次元マップ情報122には、マップ要素特定情報と、載置場所情報とが対応付けられて格納されており、固定ロケーションのため載置場所情報が変化しても3次元マップ情報122は変化しない。 The map coordinate x-axis and map coordinate y-axis are map element identification information that identifies the location of the map element in the transport area. Furthermore, "column," "row," and "row" are placement location information. In this way, the three-dimensional map information 122 stores map element identification information and placement location information in association with each other, and because the locations are fixed, the three-dimensional map information 122 does not change even if the placement location information changes.

なお、置場在庫情報121において、下段→上段の順にデータが格納されている。 In addition, in the storage location inventory information 121, data is stored in the order of bottom row → top row.

[システム情報123]
図14は、本実施形態で用いられるシステム情報123の例を示す図である。
システム情報123には、システムパラメータとしての安全高HS(図8A、図8B、図10A、図10B参照)がパラメータ値として格納されている。図14では、安全高LSのパラメータ値として「500(mm)」が格納されている。
[System Information 123]
FIG. 14 is a diagram showing an example of the system information 123 used in this embodiment.
The safety height HS (see FIGS. 8A, 8B, 10A, and 10B) as a system parameter is stored as a parameter value in the system information 123. In FIG. 14, "500 (mm)" is stored as the parameter value of the safety height LS.

[フローチャート]
(全体処理)
図15は、本実施形態に係る在庫管理方法の全体処理手順を示すフローチャートである。適宜、図1、図2を参照する。
まず、天井クレーンシステムZの電源が入れられると、モード制御部112が、コイルC搬送モードを自動運転モードに切り替える(S1)。ステップS1では、オペレータが上位システム2でコイルC搬送モードを自動運転モードに切り替えたことをうけて、モード制御部112が、コイル搬送モードを自動運転モードに切り替える。
[flowchart]
(Overall processing)
15 is a flowchart showing the overall processing procedure of the inventory management method according to this embodiment, with reference to FIGS. 1 and 2 as needed.
First, when the power supply of the overhead crane system Z is turned on, the mode control unit 112 switches the coil C transport mode to the automatic operation mode (S1). In step S1, in response to the operator switching the coil C transport mode to the automatic operation mode in the upper system 2, the mode control unit 112 switches the coil transport mode to the automatic operation mode.

続いて、通信処理部111が上位システム2へ上位在庫情報21を問い合わせる(S2)。
そして、上位システム2は、管理装置1へ上位在庫情報21を送信し、管理装置1は送信された上位在庫情報21を受信する(S3)。
続いて、置場在庫情報処理部113は、受信した上位在庫情報21を基に置場在庫情報121を作成する(S4)。ステップS4の詳細は後記する。
そして、3次元経路地図処理部114が、ステップS4で作成した置場在庫情報121、3次元マップ情報122、システム情報123を基に3次元経路地図124を作成する(S5)。図2に示すように、3次元マップ情報122、システム情報123は、管理装置1の記憶装置12に格納されている情報である。また、ステップS5の詳細は後記する。
Next, the communication processing unit 111 inquires about the upper system 2 about the upper inventory information 21 (S2).
Then, the upper system 2 transmits the upper inventory information 21 to the management device 1, and the management device 1 receives the transmitted upper inventory information 21 (S3).
Next, the yard inventory information processing unit 113 creates yard inventory information 121 based on the received upper inventory information 21 (S4). Details of step S4 will be described later.
Then, the three-dimensional route map processing unit 114 creates a three-dimensional route map 124 based on the yard inventory information 121, three-dimensional map information 122, and system information 123 created in step S4 (S5). As shown in Fig. 2, the three-dimensional map information 122 and system information 123 are information stored in the storage device 12 of the management device 1. Details of step S5 will be described later.

続いて、オペレータによって、上位システム2に搬送指示や、入庫指示や、出庫指示(入出庫指示)が入力される。すると、上位システム2は搬送指示や、入出庫指示を管理装置1へ送信する。そして、通信処理部111が搬送指示や、入庫出庫指示を受信する(S6)。
そして、クレーン制御指令部115は、受信した搬送指示や、入庫出庫指示に従い、3次元経路地図124にも基づいて搬送経路の作成を行う。搬送経路は、機械学習等を用いて行われる。そして、クレーン制御指令部115は、作成した搬送経路を基に天井クレーン装置6に対する制御指令を作成する。その後、クレーン制御指令部115が制御装置3に制御指令を送信することで、制御装置3による天井クレーン装置6の制御が行われる。これにより、天井クレーン装置6が搬送経路に基づいてコイルCの搬送を行う(S7)。ちなみに、コイルCの巻上位置はエンコーダによって行われ、ガーダ602や、クラブトロリ601の現在位置はレーザ測距によって行われる。
Next, the operator inputs a transport instruction, a warehousing instruction, or a shipping instruction (shipping/shipping instruction) to the host system 2. The host system 2 then transmits the transport instruction or the shipping/shipping instruction to the management device 1. The communication processing unit 111 then receives the transport instruction or the shipping/shipping instruction (S6).
The crane control command unit 115 then creates a transport route based on the three-dimensional route map 124 in accordance with the received transport instructions and warehousing/retrieval instructions. The transport route is created using machine learning, etc. The crane control command unit 115 then creates a control command for the overhead crane device 6 based on the created transport route. The crane control command unit 115 then sends a control command to the control device 3, which then controls the overhead crane device 6. As a result, the overhead crane device 6 transports the coil C based on the transport route (S7). Incidentally, the hoisting position of the coil C is determined by an encoder, and the current positions of the girder 602 and the crab trolley 601 are determined by laser ranging.

続いて、3次元経路地図処理部114は、置場在庫情報121及び3次元経路地図124の更新を行う(S8)。ステップS8の詳細については後記する。
そして、通信処理部111は、実績情報を上位システム2へ送信し、上位システム2は送信された実績情報を受信する(S9)。実績情報には、入庫/出庫実績情報が含まれている。
その後、上位システム2は、実績情報で上位在庫情報21を更新する(S10)。
そして、天井クレーンシステムZは、ステップS6に処理を戻す。
Next, the three-dimensional route map processing unit 114 updates the storage location inventory information 121 and the three-dimensional route map 124 (S8). Details of step S8 will be described later.
Then, the communication processing unit 111 transmits the performance information to the host system 2, and the host system 2 receives the transmitted performance information (S9). The performance information includes warehousing/shipping performance information.
Thereafter, the host system 2 updates the host inventory information 21 with the performance information (S10).
Then, the overhead crane system Z returns the process to step S6.

(置場在庫情報121の作成)
次に、図16は、置場在庫情報121の作成の処理手順を示すフローチャートである。図16は図15のステップS4の詳細な処理手順を示すものである。
まず、置場在庫情報処理部113は、置場在庫情報121を初期化する(S41)。ステップS41で置場在庫情報処理部113は、置場在庫情報121の全レコードについて以下の項目をクリアする。具体的には、置場在庫情報処理部113は、置場在庫情報121の全レコードについて、「積載高」の欄に「0」を格納し、「下段コイル差分」の欄に「0」を格納する。また、置場在庫情報処理部113は、置場在庫情報121の全レコードについて、「コイル番号」、「ロットNo」の欄を空欄とする。さらに、置場在庫情報処理部113は、置場在庫情報121の全レコードについて、「外径」、「内径」、「幅」、「重量」、「積載高」、「下段コイル差分」の欄に「0」を格納する。また、置場在庫情報処理部113は、置場在庫情報121の全レコードについて、「コイル番号」、「ロットNo」を空欄とする。なお、置場在庫情報121の対象コイルの「列」、「行」、「段」、「中心距離x軸」、「中心距離y軸」、第1下段隣接の「列」、「行」、「段」、第2下段隣接の「列」、「行」、「段」はクリアされない。
(Creation of storage yard inventory information 121)
16 is a flowchart showing the processing procedure for creating the yard inventory information 121. FIG. 16 shows the detailed processing procedure of step S4 in FIG.
First, the yard inventory information processing unit 113 initializes the yard inventory information 121 (S41). In step S41, the yard inventory information processing unit 113 clears the following items for all records of the yard inventory information 121. Specifically, the yard inventory information processing unit 113 stores "0" in the "Stacking Height" column and stores "0" in the "Lower Coil Difference" column for all records of the yard inventory information 121. The yard inventory information processing unit 113 also leaves the "Coil Number" and "Lot No." columns blank for all records of the yard inventory information 121. Furthermore, the yard inventory information processing unit 113 stores "0" in the "Outer Diameter,""InnerDiameter,""Width,""Weight,""StackingHeight," and "Lower Coil Difference" columns for all records of the yard inventory information 121. The yard inventory information processing unit 113 also leaves the "Coil Number" and "Lot No." columns blank for all records of the yard inventory information 121. Note that the "column,""row,""tier,""center distance x-axis,""center distance y-axis" of the target coil in the storage inventory information 121, the "column,""row," and "tier" of the first adjacent lower tier, and the "column,""row," and "tier" of the second adjacent lower tier are not cleared.

次に、置場在庫情報処理部113は、上位在庫情報21の情報を置場在庫情報121に反映する(S42)。具体的には、置場在庫情報処理部113は、置場在庫情報121の「コイル番号」、「ロットNo」、「外径」、「内径」、「幅」、「重量」の各欄を上位在庫情報21に格納されている値で更新する。 Next, the yard inventory information processing unit 113 reflects the information in the upper inventory information 21 in the yard inventory information 121 (S42). Specifically, the yard inventory information processing unit 113 updates the "Coil Number," "Lot No.," "Outer Diameter," "Inner Diameter," "Width," and "Weight" columns in the yard inventory information 121 with the values stored in the upper inventory information 21.

続いて、置場在庫情報処理部113は、置場在庫情報121からレコードを1つ取得する(S43)。レコードは置場在庫情報121の上から順に取得される。
そして、置場在庫情報処理部113は、取得したレコードについてコイルCの在庫ありか否かを判定する(S44)。置場在庫情報処理部113は、置場在庫情報121の「コイル番号」が空欄でなければ在庫ありと判定する。また、置場在庫情報処理部113は、置場在庫情報121の「コイル番号」が空欄であれば在庫なしと判定する。
Next, the yard inventory information processing unit 113 acquires one record from the yard inventory information 121 (S43). The records are acquired from the yard inventory information 121 in order from the top.
Then, the yard inventory information processing unit 113 determines whether or not the coil C is in stock for the acquired record (S44). The yard inventory information processing unit 113 determines that the coil C is in stock if the "coil number" field in the yard inventory information 121 is not blank. Furthermore, the yard inventory information processing unit 113 determines that the coil C is out of stock if the "coil number" field in the yard inventory information 121 is blank.

在庫なしと判定された場合(S44→No)、置場在庫情報処理部113はステップS47に処理を進める。
在庫ありと判定された場合(S44→Yes)、置場在庫情報処理部113は、処理対象となっているレコードについて、積載高LH(図6A、図6B参照)及び下段コイル差分DH(図6A、図6B参照)を算出する(S45)。積載高LH及び下段コイル差分DHの算出方法は、図6A、図6Bで説明した手法で行われる。置場在庫情報121の在庫有りとなっているレコードとは、「コイル番号」の欄が空欄ではないレコードである。
If it is determined that there is no stock (S44→No), the yard stock information processing unit 113 proceeds to step S47.
If it is determined that the item is in stock (S44 → Yes), the yard inventory information processing unit 113 calculates the stack height LH (see FIGS. 6A and 6B) and the lower coil difference DH (see FIGS. 6A and 6B) for the record being processed (S45). The stack height LH and the lower coil difference DH are calculated using the method described in FIGS. 6A and 6B. Records in stock in the yard inventory information 121 are records in which the "coil number" column is not blank.

そして、置場在庫情報処理部113は、算出した積載高LH及び下段コイル差分DHを、処理対象となっているレコードの「積載高」及び「下段コイル差分」の欄に格納する(S46)。
そして、置場在庫情報処理部113は、置場在庫情報121のすべてのレコードについてステップS44~S46の処理が完了したか否かを判定する(S47)。
すべてのレコードについて処理が完了していない場合(S47→No)、置場在庫情報処理部113は、ステップS43へ処理を戻す。
また、すべてのレコードについて処理が完了している場合(S47→Yes)、天井クレーンシステムZは、図15のステップS5へ処理をリターンする。
Then, the storage yard inventory information processing unit 113 stores the calculated loading height LH and lower coil difference DH in the "loading height" and "lower coil difference" columns of the record being processed (S46).
Then, the yard inventory information processing unit 113 determines whether or not the processing of steps S44 to S46 has been completed for all records of the yard inventory information 121 (S47).
If the processing has not been completed for all records (S47→No), the yard inventory information processing unit 113 returns the processing to step S43.
Also, if the processing has been completed for all records (S47→Yes), the overhead crane system Z returns the processing to step S5 in FIG.

前記したように、置場在庫情報121では下段→上段の順にデータが格納されているため、ステップS44~S46の処理は下段→上段の順で行われる。 As mentioned above, data is stored in the yard inventory information 121 in the order of bottom row → top row, so steps S44 to S46 are performed in the order of bottom row → top row.

その後、置場在庫情報処理部113はステップS5へ処理をリターンする。 Then, the yard inventory information processing unit 113 returns processing to step S5.

(3次元経路地図124の作成)
図17は、3次元経路地図124の作成の処理手順を示すフローチャートである。図17は図15のステップS5の詳細な処理手順を示すものである。
まず、3次元経路地図処理部114は3次元経路地図124の高さ情報をすべて「0」に初期化する(S51)。
続いて、3次元経路地図処理部114は、置場在庫情報121を3次元経路地図124に反映する(S52)。
(Creation of 3D route map 124)
17 is a flowchart showing the processing procedure for creating the three-dimensional route map 124. FIG. 17 shows the detailed processing procedure of step S5 in FIG.
First, the three-dimensional route map processing unit 114 initializes all the altitude information of the three-dimensional route map 124 to "0" (S51).
Next, the three-dimensional route map processing unit 114 reflects the yard inventory information 121 on the three-dimensional route map 124 (S52).

ステップS52の詳細な処理について、図18及び図19を参照して説明する。
図18は、3次元経路地図124の作成の処理手順を示すフローチャートであり、図17のステップS52の詳細な処理を示している。
図19は、3次元経路地図124の作成の具体例を示す図である。図19では、置場在庫情報121、3次元マップ情報122、システム情報123、3次元経路地図124の一部が示されている。なお、図19に示される3次元経路地図124は、図7、図9とは異なるものが示されている。
The detailed process of step S52 will be described with reference to FIGS.
FIG. 18 is a flowchart showing the processing procedure for creating the three-dimensional route map 124, and shows the detailed processing of step S52 in FIG.
Fig. 19 is a diagram showing a specific example of creating a three-dimensional route map 124. Fig. 19 shows yard inventory information 121, three-dimensional map information 122, system information 123, and a part of the three-dimensional route map 124. Note that the three-dimensional route map 124 shown in Fig. 19 is different from those shown in Figs. 7 and 9.

3次元経路地図処理部114は、まず、置場在庫情報121から、レコードを1つ取得する(S521)。
続いて、3次元経路地図処理部114は、ステップS521で取得したレコードにおいて、「コイル番号」の欄が空欄となっているか否かを判定する(S522)。ステップS522において、「コイル番号」の欄が空欄であれば(S522→Yes)、3次元経路地図処理部114は、ステップS527へ処理を進める。
The three-dimensional route map processing unit 114 first acquires one record from the storage location inventory information 121 (S521).
Next, the three-dimensional route map processing unit 114 determines whether the "coil number" field is blank in the record acquired in step S521 (S522). If the "coil number" field is blank in step S522 (S522 → Yes), the three-dimensional route map processing unit 114 proceeds to step S527.

ステップS522において、「コイル番号」の欄が空欄でない場合(S522→No)、3次元経路地図処理部114は、取得したレコードの「列」、「行」、「段」に格納されている数値を取得する(S523)。取得したレコードの「列」、「行」、「段」に格納されている数値は、図19の符号801に該当する情報である。 In step S522, if the "Coil Number" field is not blank (S522 → No), the 3D route map processing unit 114 acquires the numerical values stored in the "Column," "Row," and "Column" of the acquired record (S523). The numerical values stored in the "Column," "Row," and "Column" of the acquired record are the information corresponding to reference numeral 801 in Figure 19.

続いて、3次元経路地図処理部114は、3次元マップ情報122を参照し、ステップS522で取得した「列」、「行」、「段」に格納されている数値と一致する、3次元マップ情報122のレコードを検索する(図19の太破線矢印811)。そして、3次元経路地図処理部114は、3次元マップ情報122から、ステップS523で取得した「列」、「行」、「段」に格納されている数値と一致するレコード(図19の符号802)を取得する。
そして、3次元経路地図処理部114は、図19の符号802で取得したレコードにおける「マップ座標x軸」、「マップ座標y軸」の座標に該当する3次元経路地図124のマップ要素を検索する(S524、図19の太実線矢印812)。検索されたマップ要素は、図19においてドットで示されている。
Next, the three-dimensional route map processing unit 114 refers to the three-dimensional map information 122 and searches for a record in the three-dimensional map information 122 that matches the numerical values stored in the "column,""row," and "column" acquired in step S522 (thick dashed arrow 811 in FIG. 19). Then, the three-dimensional route map processing unit 114 acquires from the three-dimensional map information 122 a record (reference numeral 802 in FIG. 19) that matches the numerical values stored in the "column,""row," and "column" acquired in step S523.
The three-dimensional route map processing unit 114 then searches for map elements on the three-dimensional route map 124 that correspond to the coordinates of the "map coordinate x-axis" and "map coordinate y-axis" in the record acquired at 802 in Fig. 19 (S524, thick solid arrow 812 in Fig. 19). The searched map elements are indicated by dots in Fig. 19.

ステップ523~S524の処理では、置場在庫情報121における「列」、「行」、「段」の情報と、3次元マップ情報122における「マップ座標x軸」、「マップ座標y軸」の座標とを基に、3次元経路地図124におけるマップ要素が特定される。また、コイルCが積載されている段に関する情報(後記する置場在庫情報121の「段」の情報)を基に、特定した3次元経路地図124におけるマップ要素には、コイルCが積載されている高さである積載高LHに関する情報(マップコイル高MH)が格納される。 In steps S523 to S524, map elements in the three-dimensional route map 124 are identified based on the "column," "row," and "tier" information in the storage yard inventory information 121 and the coordinates of the "map coordinate x-axis" and "map coordinate y-axis" in the three-dimensional map information 122. Furthermore, based on information about the tier on which the coil C is loaded (the "tier" information in the storage yard inventory information 121, described below), information about the loading height LH, which is the height at which the coil C is loaded (map coil height MH), is stored in the identified map element in the three-dimensional route map 124.

3次元経路地図処理部114は、マップコイル高MH(図8A、図8B、図10A、図10B参照)を算出する(S525)。ステップS525では、3次元経路地図処理部114が、ステップS522で取得したレコードの「積載高」に格納されている値(図19の符号821)に、システム情報123に格納されている安全高HSを加算(図19の符号822)することで、マップコイル高MHを算出する。
3次元経路地図処理部114は、ステップS525で算出したマップコイル高MHをステップS524で検索したマップ要素に格納する(S526、図19の細実線矢印823)。なお、ステップS526において、既にマップ要素にマップコイル高MHが格納されている場合、ステップS525で新たに算出された値でマップコイル高MHを更新する。例えば、現在、上段(「段」が「2」)のコイルCに関する処理を行っており、既に下段(「段」が「1」)のマップコイル高MHがマップ要素に格納されている場合、上段で新たに算出されたマップコイル高MHでマップ要素が更新される。
The three-dimensional route map processing unit 114 calculates the map coil height MH (see FIGS. 8A, 8B, 10A, and 10B) (S525). In step S525, the three-dimensional route map processing unit 114 calculates the map coil height MH by adding the safety height HS stored in the system information 123 (reference numeral 822 in FIG. 19) to the value stored in the "loading height" of the record acquired in step S522 (reference numeral 821 in FIG. 19).
The three-dimensional route map processing unit 114 stores the map coil height MH calculated in step S525 in the map element searched for in step S524 (S526, thin solid arrow 823 in FIG. 19 ). Note that, if the map coil height MH is already stored in the map element in step S526, the map coil height MH is updated with the newly calculated value in step S525. For example, if processing is currently being performed for the coil C in the upper row ("row" is "2") and the map coil height MH for the lower row ("row" is "1") has already been stored in the map element, the map element is updated with the newly calculated map coil height MH for the upper row.

ステップS526では、特定した3次元経路地図124におけるマップ要素に積載高LHに基づくマップコイル高MHが搬送物サイズ情報に基づく高さ情報に更新して格納される。 In step S526, the map coil height MH based on the load height LH is updated to height information based on the transported item size information and stored in the map element on the identified three-dimensional route map 124.

そして、3次元経路地図処理部114は、置場在庫情報121のすべてのレコードについて、ステップS522~S526の処理を行ったか否かを判定する(S527)。
置場在庫情報121のすべてのレコードについて、ステップS522~S526の処理を行っていない場合(S527→No)、3次元経路地図処理部114はステップS521へ処理を戻す。
置場在庫情報121のすべてのレコードについて、ステップS522~S526の処理が完了している場合(S527→Yes)、天井クレーンシステムZは図15のステップS6へ処理をリターンする。
なお、置場在庫情報121にはデータが下段→上段の順に格納されているため、ステップS521~S526の処理は、下段→上段の順に行われる。
Then, the three-dimensional route map processing unit 114 determines whether or not the processes of steps S522 to S526 have been performed for all records of the yard inventory information 121 (S527).
If the processes of steps S522 to S526 have not been performed for all records of the yard inventory information 121 (S527→No), the three-dimensional route map processing unit 114 returns the process to step S521.
If the processing of steps S522 to S526 has been completed for all records of the yard inventory information 121 (S527→Yes), the overhead crane system Z returns the processing to step S6 in FIG.
Since the data is stored in the yard inventory information 121 in the order of bottom row → top row, the processing of steps S521 to S526 is performed in the order of bottom row → top row.

(置場在庫情報121及び3次元経路地図124の更新)
図20は、置場在庫情報121及び3次元経路地図124の更新処理の手順を示すフローチャートである。図20では、図15のステップS8に示す処理の詳細な手順を示している。
まず、3次元経路地図処理部114は、3次元経路地図124のバックアップを行う(S801)。
続いて、置場在庫情報処理部113は、行われた動作が入庫であるか否かを判定する(S802)。
行われた動作が入庫である場合(S802→Yes)、置場在庫情報処理部113は、置場在庫情報121を更新する(S811)。具体的には、置場在庫情報処理部113は、入庫指示情報の「コイル番号」、「ロットNo」、「外径」、「内径」「幅」、「重量」の各値を置場在庫情報121において該当する欄に格納する。この時、置場在庫情報処理部113は、置場在庫情報121における対象コイルの「列」、「行」、「段」の位置情報を天井クレーン装置6(図3参照)に備えられている横行位置検出器(不図示)及び走行位置検出器(不図示)によってレーザ測距等で測定されたコイルCの載置位置を基に算出し更新する。
(Updating of the storage yard inventory information 121 and the three-dimensional route map 124)
20 is a flowchart showing the procedure for updating the yard inventory information 121 and the three-dimensional route map 124. In FIG. 20, the detailed procedure of the process shown in step S8 in FIG.
First, the three-dimensional route map processing unit 114 backs up the three-dimensional route map 124 (S801).
Next, the yard inventory information processing unit 113 determines whether the performed action is warehousing (S802).
If the performed action is storage (S802 → Yes), the yard inventory information processing unit 113 updates the yard inventory information 121 (S811). Specifically, the yard inventory information processing unit 113 stores the values of the "coil number,""lotnumber,""outerdiameter,""innerdiameter,""width," and "weight" in the storage instruction information in the corresponding columns of the yard inventory information 121. At this time, the yard inventory information processing unit 113 calculates and updates the position information of the "column,""row," and "tier" of the target coil in the yard inventory information 121 based on the placement position of the coil C measured by laser ranging or the like using a traverse position detector (not shown) and a travel position detector (not shown) provided in the ceiling crane device 6 (see FIG. 3).

続いて、置場在庫情報処理部113は、外径を基に積載高LH及び下段コイル差分DH(図6A、図6B参照)を算出する(S812)。積載高LH及び下段コイル差分DHの算出は図6A及び図6Bで示された手法で行なわれる。 Next, the storage yard inventory information processing unit 113 calculates the loading height LH and the lower coil difference DH (see Figures 6A and 6B) based on the outer diameter (S812). The loading height LH and the lower coil difference DH are calculated using the method shown in Figures 6A and 6B.

続いて、3次元経路地図処理部114は、置場在庫情報121を3次元経路地図124に反映する(S813)。ステップS813の具体的な手法は、図17のステップS521~S526に示す手法と同様であるため、ステップS813での詳細な説明を省略する。 Next, the three-dimensional route map processing unit 114 reflects the yard inventory information 121 in the three-dimensional route map 124 (S813). The specific method of step S813 is the same as the method shown in steps S521 to S526 in Figure 17, so a detailed explanation of step S813 will be omitted.

ステップS811~S813によって、管理装置1は、コイルCの入庫情報が入力されると、入庫情報に基づいて、置場在庫情報121、3次元経路地図124を更新する。 In steps S811 to S813, when the inventory information for coil C is input, the management device 1 updates the storage location inventory information 121 and the three-dimensional route map 124 based on the inventory information.

一方、ステップS802で入庫ではない(出庫である)場合(S802→No)、置場在庫情報処理部113は、置場在庫情報121を更新する(S821)。ステップS821において、まず、置場在庫情報処理部113は、出庫指示情報に格納されているコイル番号を取得する。続いて、置場在庫情報処理部113は、置場在庫情報121において、出庫指示情報から取得したコイル番号を有するレコードの各欄を更新する。具体的には、置場在庫情報処理部113は、置場在庫情報121において、出庫指示情報から取得したコイル番号を有するレコードの「積載高」、「下段コイル差分」の欄を「0」に更新する。また、置場在庫情報処理部113は、当該レコードの「コイル番号」、「ロットNo」の欄を空欄とする。さらに、置場在庫情報処理部113は、当該レコードの「外径」、「内径」、「幅」、「重量」、「積載高」、「下段コイル差分」の各欄を「0」に更新する。 On the other hand, if step S802 does not indicate an inbound shipment (a shipment is made) (S802 → No), the yard inventory information processing unit 113 updates the yard inventory information 121 (S821). In step S821, the yard inventory information processing unit 113 first obtains the coil number stored in the shipment instruction information. Next, the yard inventory information processing unit 113 updates each field in the yard inventory information 121 for the record that has the coil number obtained from the shipment instruction information. Specifically, the yard inventory information processing unit 113 updates the "Loading Height" and "Lower Coil Difference" fields in the yard inventory information 121 for the record that has the coil number obtained from the shipment instruction information to "0." The yard inventory information processing unit 113 also leaves the "Coil Number" and "Lot No." fields of the record blank. Furthermore, the yard inventory information processing unit 113 updates the "Outer Diameter," "Inner Diameter," "Width," "Weight," "Loading Height," and "Lower Coil Difference" fields of the record to "0."

その後、3次元経路地図処理部114は、更新した置場在庫情報121を基に3次元経路地図124の更新を行う(S822)。ステップS522の処理は、図17の処理と同様であるため、図20での説明を省略する。 Then, the three-dimensional route map processing unit 114 updates the three-dimensional route map 124 based on the updated storage location inventory information 121 (S822). The processing of step S522 is the same as the processing in Figure 17, so its description in Figure 20 will be omitted.

ステップS821~S822によって、管理装置1は、コイルCの出庫情報が入力されると、出庫情報に基づいて、置場在庫情報121、3次元経路地図124を更新する。 In steps S821 and S822, when the shipping information for coil C is input, the management device 1 updates the storage location inventory information 121 and the three-dimensional route map 124 based on the shipping information.

ステップS813又はステップS822の後、天井クレーンシステムZは図15のステップS9へ処理をリターンする。 After step S813 or step S822, the overhead crane system Z returns processing to step S9 in Figure 15.

本実施形態では、最高でも2段までの積載となっているが、これに限らず、3段以上、コイルCが積載されてもよい。 In this embodiment, the coils C are stacked in a maximum of two layers, but this is not limited to this and they may be stacked in three or more layers.

本実施形態では、管理装置1は、少なくともコイルCの載置場所を特定するための載置場所情報(「列」、「行」、「段」)と、コイルCのサイズに関する情報である搬送物サイズ情報(「外径」等)とを格納している置場在庫情報121を有している。また、管理装置1は、コイル置場を所定のメッシュに区切った個々のメッシュ領域であるマップ要素のコイル置場での場所を特定するマップ要素特定情報(座標)と、載置場所情報とが対応付けられて格納されている3次元マップ情報122とを有している。そして、置場在庫情報121と、3次元マップ情報122とを基に3次元経路地図124が作成される。置場在庫情報121と、3次元経路地図124とを結ぶ情報として3次元マップ情報122を有することによって、置場在庫情報121が変更されても3次元マップ情報122によって3次元経路地図124との対応付けが容易となる。従って、コイルCの入出庫に対して柔軟な対応が可能となる。 In this embodiment, the management device 1 has storage location information 121, which stores at least storage location information ("column," "row," "tier") for identifying the storage location of the coil C, and transported item size information (such as "outer diameter"), which is information related to the size of the coil C. The management device 1 also has three-dimensional map information 122, which stores map element identification information (coordinates) that identifies the location in the coil storage area of map elements, which are individual mesh areas obtained by dividing the coil storage area into a predetermined mesh, in association with the storage location information. A three-dimensional route map 124 is then created based on the storage location information 121 and the three-dimensional map information 122. By having the three-dimensional map information 122 as information linking the storage location information 121 and the three-dimensional route map 124, even if the storage location information 121 is changed, the three-dimensional map information 122 makes it easy to associate the storage location information 121 with the three-dimensional route map 124. This enables flexible response to the inbound and outbound shipments of coils C.

また、3次元経路地図124に格納される高さとして安全高さHSが積載高さLHに加算されたマップコイル高さMHが格納されることによって、搬送の安全性を高めることができる。 In addition, the map coil height MH, which is the height stored in the three-dimensional route map 124 and is calculated by adding the safety height HS to the loading height LH, can be stored, thereby improving the safety of transportation.

そして、本実施形態では、コイルCが、複数段で積載されており、置場在庫情報121には、コイルCが積載されている段に関する情報が格納されている。そして、コイルCが積載されている段に関する情報を基に、特定したマップ要素には、コイルCが積載されている高さである積載高LHに関する情報(具体的にはマップコイル高)が格納される。このようにすることで、コイルCが段積みされている場合でも対応できる。 In this embodiment, the coils C are stacked in multiple layers, and the storage location inventory information 121 stores information about the layer on which the coils C are stacked. Then, based on the information about the layer on which the coils C are stacked, the identified map element stores information about the stacking height LH, which is the height at which the coils C are stacked (specifically, the map coil height). In this way, it is possible to handle cases where the coils C are stacked in layers.

また、本実施形態では、入庫情報、出庫情報によって、置場在庫情報121、3次元経路地図124の更新を行う。これによって、コイルCの入出庫に対応することができる。 In addition, in this embodiment, the storage location inventory information 121 and the three-dimensional route map 124 are updated based on the incoming and outgoing information. This makes it possible to respond to the incoming and outgoing of coils C.

さらに、本実施形態において、置場在庫情報121及び3次元マップ情報122では、コイルCの載置場所が、コイル同士の相関位置(「列」、「行」)、及び、積載情報(「段」)で管理されている。このような管理が行われることで、コイルCの入出庫に対する柔軟な管理が可能となる。 Furthermore, in this embodiment, the storage location of coils C is managed in the storage location inventory information 121 and 3D map information 122 using the relative positions of the coils ("columns" and "rows") and loading information ("tiers"). This type of management enables flexible management of the inbound and outbound shipments of coils C.

本発明は前記した実施形態に限定されるものではなく、様々な変形例が含まれる。例えば、前記した実施形態は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明したすべての構成を有するものに限定されるものではない。 The present invention is not limited to the above-described embodiment and includes various modifications. For example, the above-described embodiment has been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to having all of the configurations described.

また、前記した各構成、機能、各部111~115、記憶装置12等は、それらの一部又はすべてを、例えば集積回路で設計すること等によりハードウェアで実現してもよい。また、図2に示すように、前記した各構成、機能等は、CPU13等のプロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル等の情報は、HD(Hard Disk)に格納すること以外に、メモリ11や、SSD(Solid State Drive)等の記録装置、又は、IC(Integrated Circuit)カードや、SD(Secure Digital)カード、DVD(Digital Versatile Disc)等の記録媒体に格納することができる。
また、各実施形態において、制御線や情報線は説明上必要と考えられるものを示しており、製品上必ずしもすべての制御線や情報線を示しているとは限らない。実際には、ほとんどすべての構成が相互に接続されていると考えてよい。
Furthermore, the above-described configurations, functions, units 111 to 115, storage device 12, etc. may be partially or entirely implemented in hardware, for example, by designing them as integrated circuits. As shown in FIG. 2 , the above-described configurations, functions, etc. may be implemented in software by a processor, such as CPU 13, interpreting and executing programs that implement the respective functions. Information such as programs, tables, and files that implement the respective functions can be stored in a recording device, such as memory 11 or an SSD (Solid State Drive), or in a recording medium, such as an IC (Integrated Circuit) card, an SD (Secure Digital) card, or a DVD (Digital Versatile Disc).
In addition, in each embodiment, the control lines and information lines shown are those that are considered necessary for explanation, and not all control lines and information lines in the product are necessarily shown. In reality, it can be considered that almost all components are interconnected.

1 管理装置(天井クレーン制御装置)
2 上位システム
3 制御装置
6 天井クレーン装置
111 通信処理部
112 モード制御部
113 置場在庫情報処理部
114 3次元経路地図処理部
115 クレーン制御指令部
121 置場在庫情報(置場管理情報:載置場所情報、搬送物サイズ情報、段に関する情報、コイル同士の相対位置、積載情報を含む)
122 3次元マップ情報(マップ要素特定情報、載置場所情報を含む)
123 システム情報
124 3次元経路地図(マップ要素、搬送物サイズ情報を含む)
C,C11,C12,C11a~C11c,C21,C21a~C21c,C22,C111 コイル(搬送物)
LH,LH10,LH20 積載高
H,H11,H21 高さ(搬送物高)
DH,DH12,DH22 下段コイル差分
HS 安全高
MH,MH11,MH12,MH21,MH22 マップコイル高(搬送物サイズ情報に基づく高さ情報)
Z 天井クレーンシステム
1. Management device (overhead crane control device)
2 Upper system 3 Control device 6 Ceiling crane device 111 Communication processing unit 112 Mode control unit 113 Storage yard inventory information processing unit 114 Three-dimensional route map processing unit 115 Crane control command unit 121 Storage yard inventory information (storage yard management information: including placement location information, transported item size information, information on tiers, relative positions of coils, and loading information)
122 Three-dimensional map information (including map element identification information and placement location information)
123 System information 124 3D route map (including map elements and transported item size information)
C, C11, C12, C11a to C11c, C21, C21a to C21c, C22, C111 Coil (carried object)
LH, LH10, LH20 Loading height H, H11, H21 Height (height of transported object)
DH, DH12, DH22 Lower coil difference HS Safety height MH, MH11, MH12, MH21, MH22 Map coil height (height information based on transported item size information)
Z Ceiling Crane System

Claims (8)

搬送物であり、鋼板を巻いたコイルを搬送する搬送領域において、前記コイルを上方に持ち上げて所定の方向及び当該方向と直角方向に搬送する天井クレーン装置と、
前記搬送領域に載置されている前記コイルと干渉しないような前記天井クレーン装置の搬送経路を生成する天井クレーン制御装置と、
を有し、
前記天井クレーン制御装置は、
少なくとも前記コイルの載置場所を特定するための載置場所情報と、前記コイルのサイズに関する情報である搬送物サイズ情報とを格納している置場管理情報と、
前記搬送領域を所定のメッシュに区切った個々のメッシュ領域であるマップ要素の前記搬送領域での場所を特定するマップ要素特定情報と、前記載置場所情報とが対応付けられて格納されている3次元マップ情報と、
前記搬送領域と、前記マップ要素とが対応付けられ、前記マップ要素を特定するためのマップ要素特定情報と
を記憶部に格納しており、
前記コイルは、複数段で積載されており、
前記置場管理情報には、前記コイルが積載されている段に関する情報が格納されており、
前記置場管理情報における前記載置場所情報と、前記3次元マップ情報におけるマップ要素特定情報とを基に、前記マップ要素を特定し、
特定した前記マップ要素に前記搬送物サイズ情報に基づく高さ情報を格納する
ことを特徴とする天井クレーンシステム。
an overhead crane device that lifts the coil upward and transports it in a predetermined direction and in a direction perpendicular to the predetermined direction in a transport area where the coil is transported, the coil being an object to be transported and having a steel plate wound thereon;
an overhead crane control device that generates a transport path for the overhead crane device so as not to interfere with the coil placed in the transport area;
and
The overhead crane control device includes:
storage location management information that stores at least placement location information for identifying a placement location of the coil and transported item size information that is information about the size of the coil ;
three-dimensional map information in which map element identification information that identifies the location in the transport area of map elements, which are individual mesh areas obtained by dividing the transport area into predetermined meshes, and the storage location information are stored in association with each other;
map element identification information that associates the transport area with the map element and is used to identify the map element;
is stored in the storage unit,
The coils are stacked in multiple stages,
The storage location management information stores information about the level on which the coil is loaded,
Identifying the map element based on the storage location information in the storage location management information and the map element identification information in the three-dimensional map information;
and storing height information based on the size information of the transported object in the identified map element.
前記搬送物サイズ情報は、前記コイルの高さである搬送物高であり、
前記天井クレーン装置によって搬送されている前記コイルと、前記搬送領域に載置されている前記コイルとが干渉しないよう、予め設定されている高さである安全高が設定されており、
前記天井クレーン制御装置は、
前記安全高が前記搬送物高に加算された高さを前記搬送物サイズ情報に基づく高さ情報として、前記マップ要素に格納する
ことを特徴とする請求項1に記載の天井クレーンシステム。
the size information of the transported object is a height of the transported object, which is the height of the coil ;
a safety height is set as a preset height so that the coil being transported by the overhead crane device does not interfere with the coil placed in the transport area;
The overhead crane control device includes:
2. The overhead crane system according to claim 1, wherein the height obtained by adding the safety height to the height of the transported object is stored in the map element as height information based on the transported object size information .
前記搬送物サイズ情報は、前記コイルの高さである搬送物高であり、
前記天井クレーン装置によって搬送されている前記コイルと、前記搬送領域に載置されている前記コイルとが干渉しないよう、予め設定されている高さである安全高が設定されており、
前記天井クレーン制御装置は、
前記コイルが積載されている段に関する情報と、前記搬送物高を基に、前記コイルが積載されている高さである積載高を算出し、
前記安全高が前記積載高に加算された高さを、前記搬送物サイズ情報に基づく高さ情報として、特定した前記マップ要素に格納する
ことを特徴とする請求項1に記載の天井クレーンシステム。
the size information of the transported object is a height of the transported object, which is the height of the coil ;
a safety height is set as a preset height so that the coil being transported by the overhead crane device does not interfere with the coil placed in the transport area;
The overhead crane control device includes:
calculating a loading height, which is the height at which the coil is loaded, based on information about the level at which the coil is loaded and the height of the transported object;
The overhead crane system according to claim 1, characterized in that the height obtained by adding the safety height to the load height is stored in the identified map element as height information based on the transported object size information.
前記天井クレーン制御装置は、
前記コイルの入庫情報が入力されると、
前記入庫情報に基づいて、前記置場管理情報、前記マップ要素を更新する
ことを特徴とする請求項1に記載の天井クレーンシステム。
The overhead crane control device includes:
When the coil inventory information is entered,
The overhead crane system according to claim 1, wherein the storage yard management information and the map elements are updated based on the storage information.
前記天井クレーン制御装置は、
前記コイルの出庫情報が入力されると、
前記出庫情報に基づいて、前記置場管理情報、前記マップ要素を更新する
ことを特徴とする請求項1に記載の天井クレーンシステム。
The overhead crane control device includes:
When the coil shipping information is input,
The overhead crane system according to claim 1, wherein the storage yard management information and the map elements are updated based on the delivery information.
前記置場管理情報には、前記載置場所情報として、コイル置場に載置されている前記コイルの整列状態に基づいて前記コイルの載置場所が表現されている「列」、「行」、「段」が格納されているThe storage location management information stores, as the storage location information, "columns," "rows," and "tiers" that represent the locations where the coils are placed based on the alignment of the coils placed in the coil storage location.
ことを特徴とする請求項1に記載の天井クレーンシステム。2. The overhead crane system according to claim 1.
前記置場管理情報及び3次元マップ情報では、前記コイルの載置場所が、前記コイル同士の相関位置、及び、積載情報で管理されている
ことを特徴とする請求項に記載の天井クレーンシステム。
2. The overhead crane system according to claim 1 , wherein the storage location management information and the three-dimensional map information manage the placement locations of the coils based on relative positions of the coils and loading information.
搬送物であり、鋼板を巻いたコイルを搬送する搬送領域において、前記コイルを上方に持ち上げて所定の方向及び当該方向と直角方向に搬送する天井クレーン装置と、
前記搬送領域に載置されている前記コイルと干渉しないような前記天井クレーン装置の搬送経路を生成する天井クレーン制御装置と、
を有し、
前記天井クレーン制御装置は、
少なくとも前記コイルの載置場所を特定するための載置場所情報と、前記コイルのサイズに関する情報である搬送物サイズ情報とを格納している置場管理情報と、
前記搬送領域を所定のメッシュに区切った個々のメッシュ領域であるマップ要素の前記搬送領域での場所を特定するマップ要素特定情報と、前記載置場所情報とが対応付けられて格納されている3次元マップ情報と、
前記搬送領域と、前記マップ要素とが対応付けられ、前記マップ要素を特定するためのマップ要素特定情報と
を記憶部に格納しており、
前記コイルは、複数段で積載されており、
前記置場管理情報には、前記コイルが積載されている段に関する情報が格納されており、
前記置場管理情報における前記載置場所情報と、前記3次元マップ情報におけるマップ要素特定情報とを基に、前記マップ要素を特定し、
特定した前記マップ要素に前記搬送物サイズ情報に基づく高さ情報を格納し、
前記マップ要素に基づいて、前記天井クレーン装置の搬送経路を作成し、
前記天井クレーン装置が、
前記搬送経路に基づいて前記コイルを搬送する
ことを特徴とする天井クレーンシステム。
an overhead crane device that lifts the coil upward and transports it in a predetermined direction and in a direction perpendicular to the predetermined direction in a transport area where the coil is transported, the coil being an object to be transported and having a steel plate wound thereon;
an overhead crane control device that generates a transport path for the overhead crane device so as not to interfere with the coil placed in the transport area;
and
The overhead crane control device includes:
storage location management information that stores at least placement location information for identifying a placement location of the coil and transported item size information that is information about the size of the coil ;
three-dimensional map information in which map element identification information that identifies the location in the transport area of map elements, which are individual mesh areas obtained by dividing the transport area into predetermined meshes, and the storage location information are stored in association with each other;
map element identification information that associates the transport area with the map element and is used to identify the map element;
is stored in the storage unit,
The coils are stacked in multiple stages,
The storage location management information stores information about the level on which the coil is loaded,
Identifying the map element based on the storage location information in the storage location management information and the map element identification information in the three-dimensional map information;
storing height information based on the size information of the transported object in the identified map element;
creating a transport route for the overhead crane device based on the map elements ;
The overhead crane device is
An overhead crane system that transports the coil based on the transport path.
JP2022157136A 2022-09-29 2022-09-29 Overhead crane system Active JP7799595B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022157136A JP7799595B2 (en) 2022-09-29 2022-09-29 Overhead crane system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022157136A JP7799595B2 (en) 2022-09-29 2022-09-29 Overhead crane system

Publications (2)

Publication Number Publication Date
JP2024050324A JP2024050324A (en) 2024-04-10
JP7799595B2 true JP7799595B2 (en) 2026-01-15

Family

ID=90622088

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022157136A Active JP7799595B2 (en) 2022-09-29 2022-09-29 Overhead crane system

Country Status (1)

Country Link
JP (1) JP7799595B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020021312A (en) 2018-08-01 2020-02-06 Jfe物流株式会社 Route search method and crane operation pattern producing method
JP2020183288A (en) 2019-04-26 2020-11-12 株式会社三井E&Sマシナリー Searching method of moving route, searching program of moving route, and crane control system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2518176B2 (en) * 1987-03-31 1996-07-24 株式会社安川電機 Control method for overhead traveling crane

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020021312A (en) 2018-08-01 2020-02-06 Jfe物流株式会社 Route search method and crane operation pattern producing method
JP2020183288A (en) 2019-04-26 2020-11-12 株式会社三井E&Sマシナリー Searching method of moving route, searching program of moving route, and crane control system

Also Published As

Publication number Publication date
JP2024050324A (en) 2024-04-10

Similar Documents

Publication Publication Date Title
JP6878505B2 (en) Methods, systems and equipment to control the movement of transport devices
CN108438689B (en) Intelligent stereoscopic warehouse-based zero-stripping cache method and warehousing system
JP7706601B2 (en) Method and system for autonomous control of container handling vehicle movements operating within an automated warehouse system - Patents.com
JPWO2015052830A1 (en) Transport vehicle control device and transport vehicle control method
KR20230034394A (en) Controller and method for transport device
JP6296003B2 (en) Cargo handling operation determination device and cargo handling operation determination method
CN111646082A (en) Container storage system, warehousing system, robot control method and robot
Wiese et al. An analytical model for designing yard layouts of a straddle carrier based container terminal
CN119175706B (en) Robot scheduling system, method and storage medium
JP7267907B2 (en) Management system and management method of entering and leaving goods
CN106826820A (en) The control method and system of Cartesian robot
JP7182698B6 (en) Cargo handling work creation device and cargo handling work creation method
JP7799595B2 (en) Overhead crane system
CN113449906B (en) A storage location optimization method, device, inventory management equipment and system
JP5294147B2 (en) Dolly monitoring system and monitoring method
CN118485373A (en) Warehouse system and abnormal warehouse position management method, warehouse control system and medium thereof
JP5141974B2 (en) Dolly monitoring system and monitoring method
CN121002521A (en) Controlling the vehicle
EP4589501A1 (en) Method and system for scheduling orders in an automated storage and retrieval system
KR20260025371A (en) Route planning to determine routes for container handling carriers
JP2025030986A (en) Driving system, driving method, and driving program
JP2025176323A (en) Item placement system and warehouse system for logistics systems
JP2025030984A (en) Driving system, driving method, and driving program
JP2025030987A (en) Driving system, driving method, and driving program
JP2025030985A (en) Driving system, driving method, and driving program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241216

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250930

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20251007

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20251201

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251223

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251226

R150 Certificate of patent or registration of utility model

Ref document number: 7799595

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150