Tunnel lining method and tunnel lining structure

Info

Publication number
JP7802284B2
JP7802284B2 JP2022112768A JP2022112768A JP7802284B2 JP 7802284 B2 JP7802284 B2 JP 7802284B2 JP 2022112768 A JP2022112768 A JP 2022112768A JP 2022112768 A JP2022112768 A JP 2022112768A JP 7802284 B2 JP7802284 B2 JP 7802284B2
Authority
JP
Japan
Prior art keywords
tunnel
precast
axial direction
precast slab
slabs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022112768A
Other languages
Japanese (ja)
Other versions
JP2024011074A (en
Inventor
泰文 内藤
慎八 藤原
賢 小嶋
恒司 八木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Concrete Industries Co Ltd
Original Assignee
Nippon Concrete Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Concrete Industries Co Ltd filed Critical Nippon Concrete Industries Co Ltd
Priority to JP2022112768A priority Critical patent/JP7802284B2/en
Publication of JP2024011074A publication Critical patent/JP2024011074A/en
Application granted granted Critical
Publication of JP7802284B2 publication Critical patent/JP7802284B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、トンネル軸方向所定箇所に施工目地部を有するトンネルの覆工版の施工に用いるトンネル覆工方法及びトンネル覆工構造に関するものである。 The present invention relates to a tunnel lining method and tunnel lining structure used to construct lining plates for tunnels that have construction joints at predetermined locations in the tunnel axial direction.

一般に、トンネルの施工においては、掘削したトンネルの内周面に吹付けコンクリートによって一次覆工を形成した後、一次覆工に沿って型枠を設置し、型枠にコンクリートを打設することにより二次覆工を構築する施工方法が一般的である。しかしながら、このような工法では型枠の設置及び撤去等に多くの工数を要する。 Typically, tunnel construction involves forming a primary lining on the inner surface of the excavated tunnel using shotcrete, then installing formwork along the primary lining and pouring concrete into the formwork to construct a secondary lining. However, this method requires a lot of man-hours for installing and removing the formwork.

また、他の覆工方法として、予め工場等で製作した湾曲形状のプレキャスト版を用いて覆工版を構築するようにした工法が知られている(例えば、特許文献1参照。)。この工法では、現場に搬入したプレキャスト版をフォークリフトやエレクター等の架設機を用いてトンネル周方向及び軸方向に並べて設置することにより覆工版を構築することができるので、覆工コンクリートを現場で打設する必要がなく、効率よく施工を行うことができる。 Another known lining method is to construct a lining using curved precast slabs fabricated in advance in a factory or similar facility (see, for example, Patent Document 1). With this method, the lining can be constructed by transporting precast slabs to the site and then lining them up in the circumferential and axial directions of the tunnel using erection equipment such as a forklift or an erector. This eliminates the need to pour the lining concrete on-site, allowing for efficient construction.

更に、前記プレキャスト版を用いて覆工版を構築する場合は、トンネル幅方向両側にそれぞれ配置されるプレキャスト版を互いにトンネル軸方向に半分の長さずつずらして上端部同士を突き合わせながらトンネル幅方向両側に交互に設置する、いわゆる千鳥組の割付けによる覆工構造を用いる場合がある。これにより、先行して設置したトンネル幅方向一方のプレキャスト版を別途フォークリフト等で仮支持することなくトンネル幅方向他方に新たなプレキャスト版を設置することができる。 Furthermore, when constructing a lining using the above-mentioned precast slabs, a lining structure using a staggered arrangement may be used, in which precast slabs are placed on both sides of the tunnel width, offset by half their length in the tunnel axis direction and installed alternately on both sides of the tunnel width with their upper ends butting against each other. This allows a new precast slab to be installed on the other side of the tunnel width without having to temporarily support the previously installed precast slab on one side of the tunnel width with a forklift or other device.

特開2002-89200号公報Japanese Patent Application Laid-Open No. 2002-89200

ところで、トンネルの覆工版には、トンネル軸方向の所定区間ごと、或いはカーブ区間ごとに施工目地部(覆工版が構造的に連結されていない部分)が設けられる場合があるが、施工目地部ではプレキャスト版を千鳥配置できないため、トンネル幅方向一方にトンネル軸方向半分の長さのプレキャスト版(ハーフパネル)を配置して覆工版の端面に凹凸がないようにしている。このため、施工目地部以降の施工では、新たなハーフパネルの設置から開始されるが、その際にハーフパネルを支持するトンネル幅方向他方のプレキャスト版が存在しないため、ハーフパネルをフォークリフト等で仮支持した状態でトンネル幅方向他方に新たなプレキャスト版を設置することになる。従って、フォークリフト等によるハーフパネルの仮支持が施工目地部ごとに必要となり、その分だけトンネル全体の施工を効率よく行うことができないという問題点があった。 Incidentally, tunnel lining slabs may have construction joints (sections where the lining slab is not structurally connected) at predetermined sections along the tunnel axis or at each curve. Because precast slabs cannot be staggered at construction joints, precast slabs (half panels) half the length of the slab in the direction of the tunnel axis are placed on one side of the tunnel width to ensure that the end surfaces of the lining slab are smooth. For this reason, construction after the construction joints begins with the installation of a new half panel. However, since there is no precast slab on the other side of the tunnel width to support the half panel, the new precast slab must be installed on the other side of the tunnel width while the half panel is temporarily supported by a forklift or similar device. Therefore, temporary support of the half panel by a forklift or similar device is required for each construction joint, which poses a problem of inefficient construction of the entire tunnel.

本発明は前記問題点に鑑みてなされたものであり、その目的とするところは、施工目地部においてトンネル軸方向半分の長さのプレキャスト版を仮支持する必要がなく、プレキャスト版を効率よく設置することのできるトンネル覆工方法及びトンネル覆工構造を提供することにある。 The present invention was made in consideration of the above-mentioned problems, and its purpose is to provide a tunnel lining method and tunnel lining structure that allows for efficient installation of precast slabs without the need to temporarily support precast slabs that are half the length of the tunnel axial direction at the construction joints.

本発明は前記目的を達成するために、トンネル幅方向両側にそれぞれ配置される湾曲形状のプレキャスト版を互いにトンネル軸方向にずらして上端部を突き合わせるようにトンネル幅方向両側に交互に設置して覆工版を形成するトンネル覆工方法において、トンネル軸方向所定箇所の施工目地部に端面が位置するトンネル軸方向所定長さの第1のプレキャスト版をトンネル幅方向一方に設置するとともに、第1のプレキャスト版に対してそれぞれトンネル軸方向半分の長さに形成された一対の第2のプレキャスト版をトンネル軸方向に仮接合した状態でトンネル軸方向一方の第2のプレキャスト版がトンネル幅方向一方の第1のプレキャスト版に突き合わされるようにトンネル幅方向他方に設置し、他方の第2のプレキャスト版に突き合わされるようにトンネル幅方向一方に新たな第1のプレキャスト版を設置した後、各第2のプレキャスト版同士の仮接合を解除することにより各第2のプレキャスト版の間に施工目地部を形成するようにしている。 To achieve the above-mentioned objectives, the present invention provides a tunnel lining method in which curved precast slabs are alternately installed on both sides of the tunnel width direction, offset in the tunnel axis direction and with their upper ends abutting against each other, to form lining slabs. In this method, a first precast slab of a predetermined length in the tunnel axis direction is installed on one side of the tunnel width direction, with its end face positioned in a construction joint at a predetermined location in the tunnel axis direction. A pair of second precast slabs, each formed to half the length in the tunnel axis direction, are temporarily joined in the tunnel axis direction to the first precast slab, and the second precast slab on one side of the tunnel axis direction is installed on the other side of the tunnel width direction so that it abuts against the first precast slab on one side of the tunnel width direction. A new first precast slab is installed on one side of the tunnel width direction so that it abuts against the other second precast slab, and the temporary joint between the second precast slabs is then released to form a construction joint between the second precast slabs.

また、本発明は前記目的を達成するために、トンネル幅方向両側にそれぞれ配置される湾曲形状のプレキャスト版を互いにトンネル軸方向にずらして上端部を突き合わせるようにトンネル幅方向両側に交互に設置して覆工版を形成するトンネル覆工構造において、トンネル軸方向所定箇所の施工目地部に端面が位置するようにトンネル幅方向一方に設置されるトンネル軸方向所定長さの第1のプレキャスト版と、互いにトンネル軸方向に仮接合可能に形成され、第1のプレキャスト版に対してそれぞれトンネル軸方向半分の長さに形成された一対の第2のプレキャスト版とを備え、トンネル軸方向一方の第2のプレキャスト版がトンネル幅方向一方の第1のプレキャスト版に突き合わされるようにトンネル幅方向他方に配置されるとともに、トンネル軸方向他方の第2のプレキャスト版がトンネル幅方向一方の他の第1のプレキャスト版に突き合わされるようにトンネル幅方向他方に配置され、各第2のプレキャスト版の間に施工目地部が形成されるように構成している。 In order to achieve the above-mentioned objective, the present invention provides a tunnel lining structure in which curved precast slabs are placed alternately on both sides of the tunnel width direction, offset in the tunnel axis direction and with their upper ends abutting each other. The structure includes: a first precast slab of a predetermined length in the tunnel axis direction that is placed on one side of the tunnel width direction so that its end face is positioned at a construction joint at a predetermined location in the tunnel axis direction; and a pair of second precast slabs that are formed so that they can be temporarily joined to each other in the tunnel axis direction and are each formed to half the length of the first precast slab in the tunnel axis direction; the second precast slab on one side of the tunnel axis direction is placed on the other side of the tunnel width direction so that it abuts against the first precast slab on one side of the tunnel width direction, and the second precast slab on the other side of the tunnel axis direction is placed on the other side of the tunnel width direction so that it abuts against the other first precast slab on one side of the tunnel width direction, so that a construction joint is formed between each of the second precast slabs.

これにより、施工目地部の位置に設置されるトンネル軸方向半分の長さの一対の第2のプレキャスト版がトンネル軸方向に仮接合されていることから、第2のプレキャスト版をフォークリフト等で仮支持する必要がない。 As a result, a pair of second precast slabs, each half the length of the tunnel axial direction, installed at the construction joint location are temporarily joined in the tunnel axial direction, eliminating the need to temporarily support the second precast slabs with a forklift or similar device.

本発明によれば、施工目地部においてトンネル軸方向半分の長さの第2のプレキャスト版を仮支持する必要がないので、プレキャスト版を効率よく設置することができ、トンネル全体の施工を効率よく行うことができる。また、第2のプレキャスト版をフォークリフト等で仮支持する必要がないことにより、トンネル幅方向一方を架設機の作業用に交通規制しても、トンネル幅方向他方の車線を交通開放することができるので、全面通行止めをすることなく施工を行うことができるという利点もある。 According to the present invention, there is no need to temporarily support the second precast slab, which is half the length of the tunnel axial direction, at the construction joint. This allows the precast slab to be installed efficiently, and construction of the entire tunnel can be carried out efficiently. Furthermore, because there is no need to temporarily support the second precast slab with a forklift or similar, even if traffic is restricted on one side of the tunnel width for construction equipment work, the other lane on the other side of the tunnel width can be opened to traffic, which has the advantage that construction can be carried out without a full road closure.

本発明の一実施形態を示す覆工版の部分斜視図FIG. 1 is a partial perspective view of a covering plate showing one embodiment of the present invention. 覆工版の部分平面図Partial plan view of the lining 第1のプレキャスト版の斜視図A perspective view of the first precast plate 第2のプレキャスト版の斜視図Perspective view of the second precast plate 仮接合状態を示す第2のプレキャスト版の斜視図A perspective view of the second precast slab showing the temporary joint state スペーサの斜視図Perspective view of the spacer 第2のプレキャスト版の要部側面断面図Side cross-sectional view of the main part of the second precast slab 仮接合状態を示す第2のプレキャスト版の要部側面断面図A cross-sectional side view of the main part of the second precast slab showing the temporary joint state プレキャスト版の設置工程を示す覆工版の部分平面図A partial plan view of the lining plate showing the precast plate installation process プレキャスト版の設置工程を示す覆工版の部分平面図A partial plan view of the lining plate showing the precast plate installation process プレキャスト版の設置工程を示す覆工版の部分平面図A partial plan view of the lining plate showing the precast plate installation process プレキャスト版の設置工程を示す覆工版の部分平面図A partial plan view of the lining plate showing the precast plate installation process 第2のプレキャスト版の設置工程を示す覆工版の部分斜視図A partial perspective view of the covering plate showing the installation process of the second precast plate 第2のプレキャスト版の設置状態を示す覆工版の部分斜視図FIG. 10 is a partial perspective view of the covering plate showing the installation state of the second precast plate. 仮接合解除状態を示す第2のプレキャスト版の要部側面断面図A cross-sectional side view of the main part of the second precast slab showing the temporary joint release state 本発明の他の実施形態を示す覆工版の部分平面図FIG. 10 is a partial plan view of a lining plate showing another embodiment of the present invention.

図1乃至図15は本発明の一実施形態を示すもので、トンネル軸方向所定箇所に施工目地部が設けられる覆工版の施工に用いるトンネル覆工方法及びトンネル覆工構造を示すものである。 Figures 1 to 15 show one embodiment of the present invention, illustrating a tunnel lining method and tunnel lining structure used to construct a lining plate in which construction joints are provided at predetermined locations in the tunnel axial direction.

本実施形態の覆工版1は、例えば山岳部の道路や鉄道、或いは水路用のトンネルの二次覆工として構築されるもので、トンネル幅方向両側にそれぞれ配置される湾曲形状のプレキャスト版を互いにトンネル軸方向にずらして上端部を突き合わせるようにトンネル幅方向両側に交互に設置することによりアーチ状に形成される。 The lining plate 1 of this embodiment is constructed as a secondary lining for tunnels, for example, roads, railways, or waterways in mountainous areas, and is formed in an arch shape by alternately installing curved precast plates on both sides of the tunnel width, offset in the tunnel axis direction and with their upper ends butting together.

覆工版1の施工には、トンネル幅方向一方または他方に配置される第1のプレキャスト版10と、第1のプレキャスト版10のトンネル軸方向半分の長さに形成された第2のプレキャスト版20が用いられ、各プレキャスト版10,20は工場等で製作されるパネル状のコンクリートからなる。 The construction of the lining slab 1 uses a first precast slab 10 placed on one side or the other of the tunnel width, and a second precast slab 20 formed to half the length of the first precast slab 10 in the tunnel axial direction. Each precast slab 10, 20 is made of panel-shaped concrete manufactured in a factory, etc.

第1のプレキャスト版10は、上端部のトンネル軸方向中央側に台形状の凸部11が設けられ、トンネル軸方向に並べると、覆工版1の天頂部でトンネル軸方向に連続する凹凸が形成され、トンネル幅方向一方に配列される第1のプレキャスト版10と、トンネル幅方向他方に配列される第1のプレキャスト版10とが互いにトンネル軸方向半分の長さだけずれた状態で前記凹凸が隙間なく噛み合うようになっている。 The first precast slabs 10 have a trapezoidal convex portion 11 at the top end, toward the center in the tunnel axial direction. When they are lined up in the tunnel axial direction, continuous irregularities are formed in the tunnel axial direction at the top of the lining slab 1. The first precast slabs 10 arranged on one side of the tunnel width and the first precast slabs 10 arranged on the other side of the tunnel width are offset from each other by half the length in the tunnel axial direction, and the irregularities fit together without any gaps.

第2のプレキャスト版20は、第1のプレキャスト版10をトンネル軸方向半分に分割した形状に形成され、上端部のトンネル軸方向一端側に半割形状の凸部21を有する一方の第2のプレキャスト版20Aと、上端部のトンネル軸方向他端側に半割形状の凸部21を有する他方の第2のプレキャスト版20Bとをトンネル軸方向に連結すると、第1のプレキャスト版10と同一形状のプレキャスト版10が一対の第2のプレキャスト版20A,20Bによって形成されるようになっている。 The second precast slab 20 is formed in a shape obtained by dividing the first precast slab 10 in half in the tunnel axis direction. When one second precast slab 20A has a half-shaped convex portion 21 at one end of its upper end in the tunnel axis direction, and the other second precast slab 20B has a half-shaped convex portion 21 at the other end of its upper end in the tunnel axis direction, a precast slab 10 having the same shape as the first precast slab 10 is formed by the pair of second precast slabs 20A, 20B.

各第2のプレキャスト版20A,20B同士は、ボルト22によって連結することにより互いに仮接合されるように構成されている。即ち、図7に示すように、一方の第2のプレキャスト版20Aのトンネル軸方向の端面にはトンネル周方向複数箇所にインサート23が埋設され、他方の第2のプレキャスト版20Bの端面にはトンネル周方向複数箇所にボルト挿通孔24が設けられており、図8に示すように他方の第2のプレキャスト版20Bのボルト挿通孔23に挿通したボルト22を一方の第2のプレキャスト版20Aのインサート23に螺合することにより、各第2のプレキャスト版20A,20B同士が連結されるようになっている。この場合、各第2のプレキャスト版20A,20Bの端面間にスペーサ25を介在させることにより、各第2のプレキャスト版20A,20Bの端面間に隙間が形成されるようになっている。スペーサ25は、ゴム等の弾性部材によって形成された円筒状の部材からなり、ボルト22が挿通する孔25aを有している。各第2のプレキャスト版20A,20Bの端面のボルト挿通部分にはテーパ状の凹部26がそれぞれ設けられ、各凹部26にはスペーサ25が係合するようになっている。 The second precast slabs 20A and 20B are temporarily joined together by connecting them with bolts 22. Specifically, as shown in FIG. 7, inserts 23 are embedded in multiple locations around the tunnel circumferentially on the end face of one of the second precast slabs 20A in the tunnel axial direction, and bolt insertion holes 24 are provided in multiple locations around the tunnel circumferentially on the end face of the other second precast slab 20B. As shown in FIG. 8, the second precast slabs 20A and 20B are connected to each other by threading bolts 22 inserted into the bolt insertion holes 23 of the other second precast slab 20B into the inserts 23 of the one second precast slab 20A. In this case, a spacer 25 is interposed between the end faces of the second precast slabs 20A and 20B to form a gap between the end faces of the second precast slabs 20A and 20B. The spacer 25 is a cylindrical member made of an elastic material such as rubber, and has holes 25a through which the bolts 22 are inserted. A tapered recess 26 is provided in the bolt insertion portion of the end face of each second precast slab 20A, 20B, and a spacer 25 is designed to engage with each recess 26.

次に、図9乃至図12を参照し、本実施形態の覆工方法について説明する。尚、図中のプレキャスト版上に記した番号は設置の順番を示すものである。 Next, the lining method of this embodiment will be explained with reference to Figures 9 to 12. Note that the numbers written on the precast slabs in the figures indicate the installation order.

図9に示すように、まず第2のプレキャスト版20を1枚目のプレキャスト版として図示しないフォークリフト等によってトンネル幅方向一方に仮支持した状態で、2枚目のプレキャスト版としての第1のプレキャスト版10を図示しない架設機によってトンネル幅方向他方に設置する。その際、第2のプレキャスト版20の上端部と第1のプレキャスト版10の上端部のトンネル軸方向半分とが突き合わされる。続いて、フォークリフト等による第2のプレキャスト版20の仮支持を解除すると、第1のプレキャスト版10と第2のプレキャスト版20とが互いに支え合うようにアーチ状に保持される。 As shown in Figure 9, the second precast slab 20 is first temporarily supported as the first precast slab on one side of the tunnel width direction by a forklift or similar device (not shown), and the first precast slab 10, as the second precast slab, is then installed on the other side of the tunnel width direction by an erection machine (not shown). At this time, the upper end of the second precast slab 20 is butted against the tunnel axial half of the upper end of the first precast slab 10. Next, when the temporary support of the second precast slab 20 by the forklift or similar device is released, the first precast slab 10 and the second precast slab 20 are held in an arch shape so that they support each other.

次に、3枚目の第1のプレキャスト版10を2枚目の第1のプレキャスト版10とトンネル軸方向半分だけずれるように架設機によってトンネル幅方向一方に設置する。この場合も2枚目の第1のプレキャスト版10と3枚目の第1のプレキャスト版10とが互いに支え合うようにアーチ状に保持される。このようにして4枚目以降の第1のプレキャスト版10をトンネル幅方向両側に交互に設置する。 Next, the third first precast slab 10 is installed by an erection machine on one side of the tunnel width so that it is offset from the second first precast slab 10 by half the distance in the tunnel axial direction. In this case, the second first precast slab 10 and the third first precast slab 10 are held in an arch shape so that they support each other. In this way, the fourth and subsequent first precast slabs 10 are installed alternately on both sides of the tunnel width.

ここで、トンネル軸方向の所定区間ごとに設けられる施工目地部2の位置に達すると、互いに仮接合された一対の第2のプレキャスト版20A,20Bを第1のプレキャスト版10の代わりにトンネル軸方向他方に設置する。その際、一方の第2のプレキャスト版20Aには他方の第2のプレキャスト版20Bがボルト22により仮接合した状態で連結されているので、他方の第2のプレキャスト版20Bをフォークリフト等で仮支持する必要がない。 When the construction joints 2, which are provided at predetermined intervals in the tunnel axis direction, are reached, a pair of second precast slabs 20A, 20B, which are temporarily joined together, are installed in the other direction of the tunnel axis in place of the first precast slab 10. At this time, one second precast slab 20A is connected to the other second precast slab 20B in a temporarily joined state with bolts 22, so there is no need to temporarily support the other second precast slab 20B with a forklift or the like.

続いて、図10に示すように、トンネル幅方向一方に新たな第1のプレキャスト版10を設置し、その上端部のトンネル軸方向半分を一方の第2のプレキャスト版20Aの上端部に突き合わせる。 Next, as shown in Figure 10, a new first precast slab 10 is installed on one side of the tunnel width, and the tunnel axial half of its upper end is butted against the upper end of one of the second precast slabs 20A.

この後、図11に示すように、各第2のプレキャスト版20A,20Bからボルト22を取り外し、各第2のプレキャスト版20A,20Bの仮接合を解除する。これにより、各第2のプレキャスト版20A,20Bが互いに構造的に連結されていない状態となり、各第2のプレキャスト版20A,20Bの端面間と、トンネル幅方向一方の互いに隣り合う第1のプレキャスト版10の端面間に、トンネル周方向に連続した施工目地部2が形成される。その際、図13に示すように、各第2のプレキャスト版20A,20Bの端面間にはスペーサ25が残置される。 After this, as shown in Figure 11, the bolts 22 are removed from each of the second precast slabs 20A, 20B, releasing the temporary connection between each of the second precast slabs 20A, 20B. This leaves the second precast slabs 20A, 20B structurally unconnected to each other, and a continuous construction joint 2 is formed around the tunnel between the end faces of each of the second precast slabs 20A, 20B and between the end faces of the adjacent first precast slabs 10 on one side of the tunnel width. At this time, spacers 25 are left between the end faces of each of the second precast slabs 20A, 20B, as shown in Figure 13.

そして、2枚目以降の第1のプレキャスト版10と同様にして、図12に示すように新たな第1のプレキャスト版10をトンネル幅方向両側に交互に設置するとともに、次の施工目地部2の位置に達したときは、前述と同様、互いに仮接合された一対の第2のプレキャスト版20A,20Bを用いることにより、トンネル軸方向に延びる覆工版1が構築される。 Then, in the same manner as the second and subsequent first precast slabs 10, new first precast slabs 10 are installed alternately on both sides of the tunnel width direction as shown in Figure 12, and when the position of the next construction joint section 2 is reached, a pair of second precast slabs 20A, 20B temporarily joined to each other is used, as described above, to construct a lining slab 1 extending in the tunnel axial direction.

このように、本実施形態によれば、覆工版1の施工目地部2に端面が位置する第1のプレキャスト版10をトンネル幅方向一方に設置するとともに、トンネル軸方向半分の長さの二枚の第2のプレキャスト版20A,20Bをトンネル軸方向に仮接合した状態で一方の第2のプレキャスト版20Aがトンネル幅方向一方の第1のプレキャスト版10に突き合わされるようにトンネル幅方向他方に設置し、他方の第2のプレキャスト版20Bに突き合わされるようにトンネル幅方向一方に新たな第1のプレキャスト版10を設置した後、各第2のプレキャスト版20A,20B同士の仮接合を解除することにより各第2のプレキャスト版20A,20Bの間に施工目地部2を形成するようにしたので、施工目地部2において各第2のプレキャスト版20A,20Bを設置する際、他方の第2のプレキャスト版20Bをフォークリフト等で仮支持する必要がなく、プレキャスト版10,20を効率よく設置することができる。また、トンネル幅方向他方の第2のプレキャスト版20Bをフォークリフト等で仮支持する必要がないことにより、トンネル幅方向一方を架設機の作業用に交通規制しても、トンネル幅方向他方の車線を交通開放することができるので、全面通行止めをすることなく施工を行うことができるという利点もある。 In this way, according to this embodiment, a first precast slab 10 with its end face located at the construction joint portion 2 of the lining slab 1 is installed on one side of the tunnel width direction, and two second precast slabs 20A, 20B, each half the length in the tunnel axial direction, are temporarily joined in the tunnel axial direction. One of the second precast slabs 20A is then installed on the other side of the tunnel width direction so that it abuts against the first precast slab 10 on one side of the tunnel width direction. A new first precast slab 10 is then installed on one side of the tunnel width direction so that it abuts against the other second precast slab 20B. After that, the temporary joining of the second precast slabs 20A, 20B is released, thereby forming the construction joint portion 2 between the second precast slabs 20A, 20B. Therefore, when installing each second precast slab 20A, 20B at the construction joint portion 2, there is no need to temporarily support the other second precast slab 20B with a forklift or the like, and the precast slabs 10, 20 can be installed efficiently. Furthermore, because there is no need to temporarily support the second precast slab 20B on the other side of the tunnel width with a forklift or similar, even if traffic is restricted on one side of the tunnel width for construction work, the other lane on the other side of the tunnel width can be opened to traffic, which has the advantage that construction can be carried out without a full road closure.

更に、第2のプレキャスト版20A,20B同士を、トンネル軸方向の端面間に弾性変形可能なスペーサ25を介在させてボルト22で連結することにより仮接合し、各第2のプレキャスト版20A,20Bの端面間にスペーサ25を残置した状態でボルト22を取り外すことにより各第2のプレキャスト版20A,20Bの仮接合を解除するようにしたので、各第2のプレキャスト版20A,20Bの仮接合を解除した後も、スペーサ25によって各第2のプレキャスト版20A,20Bの端面間に施工目地部2用の隙間を形成することができる。 Furthermore, the second precast slabs 20A, 20B are temporarily joined together by connecting them with bolts 22, with elastically deformable spacers 25 interposed between the end faces in the tunnel axis direction. The temporary joining of the second precast slabs 20A, 20B is released by removing the bolts 22, with the spacers 25 remaining between the end faces of the second precast slabs 20A, 20B. Therefore, even after the temporary joining of the second precast slabs 20A, 20B is released, the spacers 25 can still form gaps for the construction joints 2 between the end faces of the second precast slabs 20A, 20B.

この場合、スペーサ25はボルト22を挿通可能な筒状の部材からなるので、仮接合時にスペーサ25にボルト22が挿通された状態では、ボルト22の剛性によりスペーサ25が各第2のプレキャスト版20A,20B同士の位置ずれを防止し、仮接合解除後はスペーサ25のみの弾性により各第2のプレキャスト版20A,20B同士の変位が許容されて施工目地部2としての機能を確保することができる。 In this case, the spacer 25 is made of a cylindrical member through which the bolt 22 can be inserted. Therefore, when the bolt 22 is inserted into the spacer 25 during temporary joining, the rigidity of the bolt 22 prevents the spacer 25 from misaligning the second precast slabs 20A, 20B relative to each other. After the temporary joining is released, the elasticity of the spacer 25 alone allows the second precast slabs 20A, 20B to move relative to each other, ensuring their function as a construction joint portion 2.

尚、前記実施形態では、直線区間の覆工版1を示したが、図16の他の実施形態に示すようにカーブ区間の覆工版1に本発明を適用することも可能である。 In the above embodiment, a lining plate 1 for a straight section was shown, but the present invention can also be applied to a lining plate 1 for a curved section, as shown in another embodiment in Figure 16.

また、前記各実施形態は本発明の一実施例であり、本発明は前記各実施形態に記載されたものに限定されない。 Furthermore, each of the above embodiments is merely an example of the present invention, and the present invention is not limited to what is described in each of the above embodiments.

1…覆工版、2…施工目地部、10…第1のプレキャスト版、20,20A,20B…第2のプレキャスト版、22…ボルト、25…スペーサ。 1...Covering plate, 2...Construction joint, 10...First precast plate, 20, 20A, 20B...Second precast plate, 22...Bolt, 25...Spacer.

Claims (6)

トンネル幅方向両側にそれぞれ配置される湾曲形状のプレキャスト版を互いにトンネル軸方向にずらして上端部を突き合わせるようにトンネル幅方向両側に交互に設置して覆工版を形成するトンネル覆工方法において、
トンネル軸方向所定箇所の施工目地部に端面が位置するトンネル軸方向所定長さの第1のプレキャスト版をトンネル幅方向一方に設置するとともに、
第1のプレキャスト版に対してそれぞれトンネル軸方向半分の長さに形成された一対の第2のプレキャスト版をトンネル軸方向に仮接合した状態でトンネル軸方向一方の第2のプレキャスト版がトンネル幅方向一方の第1のプレキャスト版に突き合わされるようにトンネル幅方向他方に設置し、
他方の第2のプレキャスト版に突き合わされるようにトンネル幅方向一方に新たな第1のプレキャスト版を設置した後、
各第2のプレキャスト版同士の仮接合を解除することにより各第2のプレキャスト版の間に施工目地部を形成する
ことを特徴とするトンネル覆工方法。
In this tunnel lining method, curved precast slabs are placed on both sides of the tunnel width direction, and are alternately installed on both sides of the tunnel width direction so that their upper ends are butted against each other in the tunnel axial direction,
A first precast slab having a predetermined length in the tunnel axial direction and having an end face located in a construction joint portion at a predetermined location in the tunnel axial direction is installed on one side in the tunnel width direction,
A pair of second precast slabs, each formed to be half the length in the tunnel axial direction, are temporarily joined to the first precast slab in the tunnel axial direction, and are installed on the other side of the tunnel width direction so that the second precast slab on one side in the tunnel axial direction is abutted against the first precast slab on one side in the tunnel width direction;
After installing a new first precast slab on one side of the tunnel width so that it is abutted against the other second precast slab,
A tunnel lining method, characterized by forming a construction joint between each of the second precast slabs by releasing the temporary joints between the second precast slabs.
前記各第2のプレキャスト版同士を、トンネル軸方向の端面間に弾性変形可能なスペーサを介在させてボルトで連結することにより仮接合し、
各第2のプレキャスト版の端面間にスペーサを残置した状態でボルトを取り外すことにより各第2のプレキャスト版同士の仮接合を解除する
ことを特徴とする請求項1記載のトンネル覆工方法。
The second precast slabs are temporarily joined together by connecting them with bolts with elastically deformable spacers interposed between the end faces in the tunnel axial direction,
2. A tunnel lining method according to claim 1, characterized in that the temporary joints between the second precast slabs are released by removing the bolts while leaving spacers between the end faces of the second precast slabs.
前記スペーサは前記ボルトを挿通可能な筒状の部材からなる
ことを特徴とする請求項2記載のトンネル覆工方法。
3. The tunnel lining method according to claim 2, wherein the spacer is a cylindrical member through which the bolt can be inserted.
トンネル幅方向両側にそれぞれ配置される湾曲形状のプレキャスト版を互いにトンネル軸方向にずらして上端部を突き合わせるようにトンネル幅方向両側に交互に設置して覆工版を形成するトンネル覆工構造において、
トンネル軸方向所定箇所の施工目地部に端面が位置するようにトンネル幅方向一方に設置されるトンネル軸方向所定長さの第1のプレキャスト版と、
互いにトンネル軸方向に仮接合可能に形成され、第1のプレキャスト版に対してそれぞれトンネル軸方向半分の長さに形成された一対の第2のプレキャスト版とを備え、
トンネル軸方向一方の第2のプレキャスト版がトンネル幅方向一方の第1のプレキャスト版に突き合わされるようにトンネル幅方向他方に配置されるとともに、
トンネル軸方向他方の第2のプレキャスト版がトンネル幅方向一方の他の第1のプレキャスト版に突き合わされるようにトンネル幅方向他方に配置され、
各第2のプレキャスト版の間に施工目地部が形成されている
ことを特徴とするトンネル覆工構造。
In a tunnel lining structure in which curved precast slabs are placed on both sides of the tunnel width direction, and are alternately installed on both sides of the tunnel width direction so that their upper ends are butted against each other in the tunnel axial direction,
a first precast slab having a predetermined length in the tunnel axial direction and installed on one side in the tunnel width direction so that its end face is located in a construction joint portion at a predetermined location in the tunnel axial direction;
a pair of second precast slabs formed so as to be temporarily joinable to each other in the tunnel axial direction, and each formed to have a length half the length of the first precast slab in the tunnel axial direction;
The second precast slab on one side of the tunnel axial direction is arranged on the other side of the tunnel width direction so as to abut against the first precast slab on one side of the tunnel width direction,
The second precast slab on the other side of the tunnel axial direction is arranged on the other side of the tunnel width direction so as to abut against the other first precast slab on the one side of the tunnel width direction;
A tunnel lining structure characterized in that construction joints are formed between each of the second precast slabs.
前記各第2のプレキャスト版は、トンネル軸方向の端面間に弾性変形可能なスペーサを介在させてボルトで連結することにより仮接合可能に形成されている
ことを特徴とする請求項4記載のトンネル覆工構造。
The tunnel lining structure according to claim 4, characterized in that each of the second precast slabs is formed so as to be temporarily joined by interposing an elastically deformable spacer between the end faces in the tunnel axial direction and connecting them with bolts.
前記スペーサは前記ボルトを挿通可能な筒状の部材からなる
ことを特徴とする請求項5記載のトンネル覆工構造。
The tunnel lining structure according to claim 5, wherein the spacer is a cylindrical member through which the bolt can be inserted.
JP2022112768A 2022-07-13 2022-07-13 Tunnel lining method and tunnel lining structure Active JP7802284B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022112768A JP7802284B2 (en) 2022-07-13 2022-07-13 Tunnel lining method and tunnel lining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022112768A JP7802284B2 (en) 2022-07-13 2022-07-13 Tunnel lining method and tunnel lining structure

Publications (2)

Publication Number Publication Date
JP2024011074A JP2024011074A (en) 2024-01-25
JP7802284B2 true JP7802284B2 (en) 2026-01-20

Family

ID=89622199

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022112768A Active JP7802284B2 (en) 2022-07-13 2022-07-13 Tunnel lining method and tunnel lining structure

Country Status (1)

Country Link
JP (1) JP7802284B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD1099133S1 (en) * 2024-02-01 2025-10-21 Apple Inc. Display screen or portion thereof showing a graphical user interface

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002089200A (en) 2000-09-18 2002-03-27 Ishikawajima Constr Materials Co Ltd Joining structure for curved slab for arched tunnel
JP2002089193A (en) 2000-09-18 2002-03-27 Ishikawajima Constr Materials Co Ltd Curved slab for arched tunnel and joining structure therefor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03474Y2 (en) * 1985-09-19 1991-01-09
JPH02136497A (en) * 1988-11-16 1990-05-25 Daisan Bussan Kk Flexible segment
JP3273495B2 (en) * 1996-09-05 2002-04-08 中部電力株式会社 Flexible joint for earthquake resistance of shield segment and its construction method
EP3751095A1 (en) * 2020-07-31 2020-12-16 Soletanche Freyssinet Method for installing tunnel segments inside an existing tunnel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002089200A (en) 2000-09-18 2002-03-27 Ishikawajima Constr Materials Co Ltd Joining structure for curved slab for arched tunnel
JP2002089193A (en) 2000-09-18 2002-03-27 Ishikawajima Constr Materials Co Ltd Curved slab for arched tunnel and joining structure therefor

Also Published As

Publication number Publication date
JP2024011074A (en) 2024-01-25

Similar Documents

Publication Publication Date Title
US10443228B2 (en) Method of manufacturing and assembly of a series of prefabricated prefinished volumetric construction (PPCV) modules
JP2872346B2 (en) Prefab slab installation method
JP2012077471A (en) Joint structure of precast members and concrete precast members
KR101167511B1 (en) Underpass using precast concrete pile and method for constructing the same
JP7802284B2 (en) Tunnel lining method and tunnel lining structure
JP7169152B2 (en) Joint structure of precast concrete members
CN112813790A (en) Prefabricated bridge deck, composite beam and construction method thereof
JPH07292783A (en) Connective structure of prestressed concrete members
JP2002161603A (en) Method for fixing full pc floor board
CN215482224U (en) Prefabricated bridge deck and combination beam
JP7157092B2 (en) Construction method of precast concrete structure
JP2020066871A (en) Joining member of steel segment and RC member, joining structure and joining method
JP7213154B2 (en) Top slab construction method for shaft and top slab structure
JP2019157550A (en) Construction method of underground structure
JP7374607B2 (en) Road slabs and their construction methods
JP7274123B2 (en) Connection structure and connection method for precast concrete members
SU1328419A1 (en) Method of reconstructing beam span structure of bridge
JP7275368B2 (en) Composite structure
JP4537795B2 (en) How to build a box culvert
JP3031185B2 (en) Connection structure between steel beam and PC slab and connection method
JP7452284B2 (en) Floor slab replacement method
JP5214902B2 (en) Steel / concrete composite slabs and composite slab bridges using steel sheet piles
JP2021066999A (en) Junction structure for precast steel concrete composite floor slab, and floor slab replacing method
JP2024142924A (en) Method and structure for reducing stress acting on main beam
CN115324606B (en) Prefabricated assembly part for internal lane structure of shield tunnel and assembly construction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250205

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20251017

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251208

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251223

R150 Certificate of patent or registration of utility model

Ref document number: 7802284

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531