JP7804022B2 - Method for assembling a fluid control installation device - Google Patents
[go: Go Back, main page]

JP7804022B2 - Method for assembling a fluid control installation device - Google Patents

Method for assembling a fluid control installation device

Info

Publication number
JP7804022B2
JP7804022B2 JP2024161601A JP2024161601A JP7804022B2 JP 7804022 B2 JP7804022 B2 JP 7804022B2 JP 2024161601 A JP2024161601 A JP 2024161601A JP 2024161601 A JP2024161601 A JP 2024161601A JP 7804022 B2 JP7804022 B2 JP 7804022B2
Authority
JP
Japan
Prior art keywords
valve
housing
crane
mounting flange
lid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2024161601A
Other languages
Japanese (ja)
Other versions
JP2024178286A (en
Inventor
聡 玉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cosmo Koki Co Ltd
Original Assignee
Cosmo Koki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=66543178&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP7804022(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Cosmo Koki Co Ltd filed Critical Cosmo Koki Co Ltd
Priority to JP2024161601A priority Critical patent/JP7804022B2/en
Publication of JP2024178286A publication Critical patent/JP2024178286A/en
Application granted granted Critical
Publication of JP7804022B2 publication Critical patent/JP7804022B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Branch Pipes, Bends, And The Like (AREA)
  • Details Of Valves (AREA)
  • Pipe Accessories (AREA)

Description

本発明は、不断流状態で流体管を密封する筐体内に制流体を設置するための設置装置の組立方法に関する。 The present invention relates to a method for assembling an installation device for installing a flow regulator in a housing that seals a fluid pipe in an uninterrupted flow state.

流体管路に弁やプラグ等の制流体を配置する場合には、流体管路を構成する流体管の一部を切断し、その切断した箇所に制流体を設置することが一般的に行われている。流体管を切断する切断方法として、流体管に対し密封状に筐体を取付け、該筐体の開口部に筐体内を開閉可能な作業弁を取付けるとともに、作業弁にカッタと駆動部とを有する切断機を設置し、作業弁を開けた状態で駆動部によりカッタを進行させて筐体内において不断流状態で流体管の一部を切断することが知られている。 When installing a flow control device such as a valve or plug in a fluid pipeline, it is common to cut a portion of the fluid pipe that makes up the fluid pipeline and install a flow control device at the cut location. One known method for cutting a fluid pipe involves attaching a sealed housing to the fluid pipe, attaching a work valve that can open and close the interior of the housing to the opening of the housing, and installing a cutting machine with a cutter and a drive unit on the work valve. With the work valve open, the drive unit advances the cutter to cut a portion of the fluid pipe without interrupting the flow inside the housing.

また、上記のような方法で流体管が切断された箇所に制流体を設置する方法として、例えば、特許文献1に示されるように、筐体と、作業弁と、作業弁に取付けられる挿入機と、を用いる制流体設置方法があり、作業弁を開放した状態で挿入機により制流体を進行させることにより筐体内に不断流状態で制流体を設置するようになっている。このような制流体設置方法にあっては、筐体、作業弁、制流体等の各部材をクレーンにより吊り下げて設置位置まで運搬し、流体管に組み立てるようになっている(例えば、特許文献1参照)。 As another method for installing a fluid control valve at a location where a fluid pipe has been cut using the above-mentioned method, for example, as shown in Patent Document 1, there is a fluid control installation method that uses a housing, an operating valve, and an insertion machine attached to the operating valve. With the operating valve open, the insertion machine advances the fluid control valve, installing the fluid control valve in an uninterrupted flow state within the housing. In this type of fluid control installation method, each component, including the housing, operating valve, and fluid control valve, is suspended by a crane and transported to the installation location, where it is assembled onto the fluid pipe (see, for example, Patent Document 1).

特開2013-108594号公報(第11頁、第9図)JP 2013-108594 A (page 11, Figure 9)

しかしながら、特許文献1のような制流体の設置にあっては、特に流体管の管径が大きい場合には、当該流体管を外嵌する筐体、作業弁、そして筐体内に設置される制流体も大型化することから、吊上能力の高い大型のクレーンを用意する必要があり、クレーンの可動範囲や設置スペースが大きくなるため、制流体の設置作業に大きなスペースを確保しなければならないという問題があった。特に、特許文献1のように切断機としてホールソーを用いる場合には、流体管の外径よりも大径のホールソーを要するため、これに伴い当該ホールソーを収容する筐体やこの筐体内に密封状態で設置する制流体の重量が嵩み、クレーンの大型化が避けられなかった。 However, when installing a fluid control system as in Patent Document 1, particularly when the diameter of the fluid pipe is large, the casing that fits around the fluid pipe, the work valve, and the fluid control system installed within the casing must also be large. This necessitates the preparation of a large crane with high lifting capacity, which increases the crane's range of motion and installation space, posing the problem of requiring a large space for the fluid control system installation work. In particular, when using a hole saw as a cutting machine as in Patent Document 1, a hole saw with a diameter larger than the outer diameter of the fluid pipe is required. This increases the weight of the casing that houses the hole saw and the fluid control system that is installed in a sealed state within this casing, making it unavoidable to increase the size of the crane.

本発明は、このような問題点に着目してなされたもので、クレーンへの負荷を軽減できる制流体の設置装置の組立方法を提供することを目的とする。 The present invention was developed to address these issues, and aims to provide a method for assembling a fluid control installation device that reduces the load on the crane.

前記課題を解決するために、本発明の制流体の設置装置の組立方法は、
流体管に対し密封状に取付けられる筐体と、該筐体の開口部に取付けられ該筐体の内部を開閉可能な作業弁と、該作業弁に取付けられ、前記筐体の内部で流体管を切断するカッタ、及び該カッタを駆動する駆動部を有する切断機とを備え、前記流体管の流路を制御する制流体を不断流状態で前記筐体内に設置するための制流体の設置装置の組立方法であって、
前記作業弁、前記切断機、若しくは前記制流体の少なくともいずれかは、複数の分割体から構成されており、前記流体管に前記筐体を密封状に取付けた後、前記分割体を前記筐体に順次組み立てることを特徴としている。
この特徴によれば、作業弁、切断機、若しくは制流体を構成する複数の分割体を別々にクレーンで運搬でき、これらを吊支するクレーンへの負荷を軽減して該クレーンを小型化することができる。
In order to solve the above problems, the method for assembling a fluid control device of the present invention includes the steps of:
A method for assembling a fluid regulator installation device for installing a fluid regulator that controls a flow path of the fluid pipe in the housing in an uninterrupted state, the method comprising: a housing that is attached to a fluid pipe in a sealed manner; an operation valve that is attached to an opening of the housing and is capable of opening and closing the inside of the housing; a cutter that is attached to the operation valve and cuts the fluid pipe inside the housing; and a cutting machine that has a drive unit that drives the cutter, the method comprising:
At least one of the operating valve, the cutting machine, or the fluid control device is composed of a plurality of divided bodies, and after the housing is hermetically attached to the fluid pipe, the divided bodies are assembled to the housing in sequence.
According to this feature, the multiple divided bodies that make up the operating valve, cutting machine, or fluid control device can be transported separately by crane, reducing the load on the crane that suspends and supports them and allowing the crane to be made smaller.

前記複数の分割体のうち第1の分割体を前記筐体に設けられた係止部に係止させ、前記係止部に係止された前記第1の分割体に、残りの第2の分割体を組み立てることを特徴としている。
この特徴によれば、複数の分割体のうち第1の分割体を筐体の係止部に係止させた安定状態で、この第1の分割体に残りの第2の分割体を精度高く取付けることができる。
The method is characterized in that a first divided body among the plurality of divided bodies is engaged with a locking portion provided on the housing, and the remaining second divided body is assembled to the first divided body engaged with the locking portion.
According to this feature, in a stable state in which a first divided body among the plurality of divided bodies is engaged with the engaging portion of the housing, the remaining second divided body can be attached to this first divided body with high precision.

前記第2の分割体をクレーンに接続した状態で、該第2の分割体を前記第1の分割体に組み立てることを特徴としている。
この特徴によれば、第1の分割体に第2の分割体を組み立てる際に第2の分割体が落下することを防止できるため、安全性が高い。
The second divided body is assembled to the first divided body while the second divided body is connected to a crane.
This feature prevents the second divided body from falling when assembling the second divided body to the first divided body, thereby improving safety.

前記切断機は、前記複数の分割体として前記カッタと前記駆動部とから構成されており、前記駆動部は、前記制流体を前記筐体内に挿入可能に接続されることを特徴としている。
この特徴によれば、切断機を構成する駆動部とカッタとが分割されているため、カッタを駆動するための駆動部を制流体の挿入具として利用できる。
The cutting machine is characterized in that the plurality of divided bodies are composed of the cutters and the drive unit, and the drive unit is connected to the fluid control unit so that the fluid control unit can be inserted into the housing.
According to this feature, since the drive unit and the cutter that constitute the cutting machine are separated, the drive unit for driving the cutter can be used as a fluid control insertion tool.

実施例における筐体に作業弁の弁箱を取付ける様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing how the valve body of the working valve is attached to the housing in the embodiment. 弁箱に弁体及び弁棒を取付ける様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing how a valve body and a valve stem are attached to a valve body. 切断機を設置する工程において、作業弁に取付フランジ筒を取付ける様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing how a mounting flange cylinder is attached to a work valve in the process of installing the cutting machine. 切断機を設置する工程において、取付フランジ筒にカッタ及び蓋体を取付ける様子を示す側断面図である。10 is a side cross-sectional view showing how a cutter and a cover are attached to a mounting flange tube in the process of installing the cutting machine. FIG. 切断機を設置する工程において、取付フランジ筒に蓋体を固定した様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing the state in which the lid body is fixed to the mounting flange cylinder in the process of installing the cutting machine. 駆動機構の構造を示す説明図である。FIG. 2 is an explanatory diagram showing the structure of a drive mechanism. 切断機を設置する工程において、軸部材とカッタとを接続した様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing a state in which a shaft member and a cutter are connected in a step of installing the cutting machine. 切断機を設置する工程において、ジャッキ及び固定冶具を取外す様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing the state in which the jack and the fixing jig are removed in the process of installing the cutting machine. 切断機を設置する工程において、駆動機構のケース部と蓋体とを接続した様子を示す側断面図である。10 is a side cross-sectional view showing a state in which the case portion of the drive mechanism and the cover body are connected in the process of installing the cutting machine. FIG. 切断機により流体管を切断する様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing how a fluid pipe is cut by a cutting machine. 流体管の切片を回収した様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing the state in which the section of the fluid pipe has been collected. 弁導入機を設置する工程において、円筒部材を作業弁に取付ける様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing a state in which a cylindrical member is attached to an operating valve in the process of installing a valve introducer. 弁導入機を設置する工程において、バタフライ弁における仕切壁、開閉軸及び弁体を円筒部材に取付けた様子を示す側断面図である。10 is a side cross-sectional view showing a state in which a partition wall, an opening/closing shaft, and a valve body of a butterfly valve are attached to a cylindrical member in a process of installing a valve introducer. FIG. 弁導入機を設置する工程において、上蓋部を取付けてバタフライ弁を構成した様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing the butterfly valve constructed by attaching the upper cover in the process of installing the valve introducer. 弁導入機を設置する工程において、円筒部材に取付フランジ筒を取付けた様子を示す説明図である。FIG. 10 is an explanatory view showing a state in which a mounting flange cylinder is attached to a cylindrical member in a process of installing a valve introducer. 弁導入機を設置する工程において、弁吊金具及び蓋体を取付ける様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing the installation of a valve hanger and a cover in the process of installing a valve introducer. 弁導入機を設置する工程において、取付フランジ筒に蓋体を固定した様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing the state in which the lid body is fixed to the mounting flange cylinder in the process of installing the valve introducer. 弁導入機を設置する工程において、軸部材と弁吊金具とを接続した様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing the state in which the shaft member and the valve hanger are connected in the process of installing the valve introducer. 弁導入機を設置する工程において、ジャッキ及び固定冶具を取外す様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing the state in which the jack and the fixing jig are removed in the process of installing the valve introducer. 弁導入機を設置する工程において、バタフライ弁と弁吊金具とを接続した様子を示す側断面図である。FIG. 10 is a side cross-sectional view showing the butterfly valve and the valve hanger connected in the process of installing the valve introducer. 弁導入機によりバタフライ弁を流体管の切断箇所に設置した様子を示す側断面図である。10 is a side cross-sectional view showing a state in which a butterfly valve is installed at a cut portion of a fluid pipe by a valve introducer. FIG. 弁吊金具を円筒部材及び取付フランジ筒内に引き上げた様子を示す側断面図である。A side cross-sectional view showing the valve suspension fitting being pulled up into the cylindrical member and the mounting flange tube. 変形例1における作業弁を示す側断面図である。FIG. 10 is a side cross-sectional view showing the working valve in Modification 1. 変形例2における作業弁を示す側断面図である。FIG. 10 is a side cross-sectional view showing the working valve in Modification 2. 変形例3における切断機を示す側断面図である。FIG. 11 is a side cross-sectional view showing a cutting machine according to a third modified example. (a)は変形例4における切断機を示す側断面図、(b)はA矢視図、(c)はB-B断面図である。10A is a side cross-sectional view showing a cutting machine in Modification 4, FIG. 10B is a view taken along the arrow A, and FIG. 10C is a cross-sectional view taken along the line B-B.

本発明に係る制流体の設置装置の組立方法を実施するための形態を実施例に基づいて以下に説明する。 The following describes an embodiment of the assembly method for the fluid control installation device according to the present invention.

実施例においては、流路構成部材を構成する既設の流体管1の所定箇所を切断し、その切断箇所にバタフライ弁10(制流体)を設置するまでの一連の流れを図1から図26を参照して説明する。 In this example, the process of cutting a predetermined portion of an existing fluid pipe 1 that constitutes a flow path component and installing a butterfly valve 10 (fluid control) at the cut portion is described with reference to Figures 1 to 26.

図1に示されるように、地中に埋設された流体管1の所定箇所の周囲を掘削し、上方に開口する分岐部2aを有する2分割構造の筐体2を密封状に囲繞する。尚、流体管1内の流体は、例えば、上水や工業用水、下水等の他、ガスやガスと液体との気液混合体であっても構わない。更に尚、筐体2は、本実施例では2分割構造であるが、他の複数分割構造であってもよく、分割筐体同士の接合は、溶接若しくはパッキンを介しボルトにより取付けても構わない。 As shown in Figure 1, excavation is performed around a predetermined location of a fluid pipe 1 buried underground, and a two-part housing 2 having a branch portion 2a opening upward is sealed around the excavation. The fluid in the fluid pipe 1 may be, for example, tap water, industrial water, sewage, or a gas or a gas-liquid mixture of gas and liquid. Furthermore, while the housing 2 has a two-part structure in this embodiment, it may also have a multi-part structure, and the divided housings may be joined together by welding or bolts via gaskets.

流体管1は、鋼管であって、断面視略円形状に形成されている。尚、本発明に係る流体管は、ダクタイル鋳鉄、その他鋳鉄、その他の金属製、あるいはコンクリート製、塩化ビニール製、ポリエチレン製若しくはポリオレフィン製等であってもよい。さらに尚、流体管の内周面はエポキシ樹脂層、モルタル、めっき等により被覆されてもよく、若しくは適宜の材料を粉体塗装により流体管の内周面に被覆してもよい。 The fluid pipe 1 is a steel pipe formed into a generally circular cross section. The fluid pipe according to the present invention may be made of ductile cast iron, other cast iron, other metals, concrete, polyvinyl chloride, polyethylene, polyolefin, etc. Furthermore, the inner surface of the fluid pipe may be coated with an epoxy resin layer, mortar, plating, etc., or may be coated with an appropriate material using powder coating.

また、流体管1に筐体2を密封状に取付ける際には、筐体2の下方にコンクリート基礎9,9を形成し、筐体2周辺の重量を支持して流体管1の折れ曲がり等を防止する。尚、筐体2や後述する切断機5及び弁導入機6の重量を支持できるものであれば、コンクリート基礎9,9に限られず、ジャッキなどを用いてもよい。 Furthermore, when the housing 2 is attached to the fluid pipe 1 in a sealed manner, concrete foundations 9, 9 are formed below the housing 2 to support the weight around the housing 2 and prevent bending of the fluid pipe 1. Note that the concrete foundations 9, 9 are not the only options, and jacks or other similar devices may be used as long as they can support the weight of the housing 2 and the cutting machine 5 and valve introduction machine 6 described below.

次いで、筐体2の分岐部2a(開口部)に分岐部2aの開口を閉塞可能な作業弁4を取付ける工程について説明する。先ず、図1に示されるように、作業弁4を構成する弁箱41(第1の分割体)を上方から図示しないクレーンに吊支されるフックを備えた吊り具C及びワイヤWにより吊持して分岐部2aのフランジ2b上に載置し、フランジ2b上で弁箱41の位置調整をしながらフランジ2bと弁箱41とを図示しないボルトナットで固定する。なお、本実施例で使用されるクレーンは、例えば移動式のラフテレーンクレーンが好適であり、言うまでもなくその吊上能力に応じて大型化し、後述する各部材の中で最も重量の大きい部材を吊り上げ可能な仕様が、各旋回半径における許容吊り上げ荷重を検討しながら選択されるものである。またクレーンの設置面積は、アウトリガー等を含めると、流体管1の掘削面積よりも広い面積を要する場合が多い。 Next, we will explain the process of attaching the operating valve 4, which can close the opening of the branch portion 2a (opening), to the branch portion 2a (opening) of the housing 2. First, as shown in FIG. 1, the valve box 41 (first divided body) constituting the operating valve 4 is suspended from above using a hoisting tool C equipped with a hook and wire W, which is suspended from a crane (not shown), and placed on the flange 2b of the branch portion 2a. The position of the valve box 41 on the flange 2b is adjusted, and the flange 2b and the valve box 41 are secured with bolts and nuts (not shown). Note that the crane used in this embodiment is preferably a mobile rough-terrain crane, and it is naturally sized according to its lifting capacity. It is selected based on the allowable lifting load for each turning radius to ensure that the crane can lift the heaviest component (described below). Furthermore, the installation area for the crane, including outriggers, often requires an area larger than the excavated area of the fluid pipe 1.

尚、本実施例では、弁箱41を分岐部2aのフランジ2b上に載置した後も、安全性確保のために弁箱41にワイヤWを若干緩めた状態でクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを弁箱41から取外してもよい。また、弁箱41を位置調整しやすくするために、クレーンにより弁箱41を若干吊った状態でフランジ2bに対して位置調整を行うようにしてもよい。 In this embodiment, even after the valve box 41 is placed on the flange 2b of the branch section 2a, the valve box 41 is connected to the crane with the wire W slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the valve box 41. Furthermore, to make it easier to adjust the position of the valve box 41, the position may be adjusted relative to the flange 2b while the valve box 41 is slightly suspended by the crane.

この弁箱41は、上下方向に貫通する略筒状を成し、一方の側方に設けられた開口部41aから略水平方向に延びるスライド溝41bが形成されており、スライド溝41bの奥側(開口部41aと反対側)には、弁座部41cが形成されている。本実施例における弁箱41の重量は、本実施例では略4500kgとなっている。尚、フランジ2bと弁箱41との間には、図示しないOリングが圧接されるため、分岐部2aと弁箱41とが密封状に接続される。以降、各部材の重量はあくまでも一例に過ぎず、適宜の重量に変更可能である。 The valve box 41 is generally cylindrical and extends vertically. It has a slide groove 41b that extends horizontally from an opening 41a on one side, and a valve seat 41c formed at the back of the slide groove 41b (the side opposite the opening 41a). The weight of the valve box 41 in this embodiment is approximately 4,500 kg. An O-ring (not shown) is pressed between the flange 2b and the valve box 41, sealingly connecting the branch section 2a and the valve box 41. The weights of the components listed below are merely examples and can be changed as appropriate.

次に、図2に示されるように、作業弁4を構成する弁体42、弁蓋43及び弁棒44(第2の分割体)をユニット化した状態で吊り具C及びワイヤWにより吊持して弁箱41の開口部41aの側方まで下降させる。そして、この吊持状態で弁箱41の側方に弁蓋43を図示しないボルトナット等により固定する(図3参照)。詳しくは、弁体42は、弁棒44により弁蓋43内に収納される位置と弁蓋43から突出する位置との間で進退可能に取付けられており、弁蓋43内に収納される位置において、弁体42の一部(弁棒44とは反対側(弁箱41側)の端部)が弁蓋43の開口部43aから突出している。 Next, as shown in Figure 2, the valve disc 42, valve cover 43, and valve stem 44 (second divided body) that make up the working valve 4 are suspended as a unit using a hoisting device C and wire W and lowered to the side of the opening 41a of the valve box 41. Then, in this suspended state, the valve cover 43 is fixed to the side of the valve box 41 with bolts and nuts (not shown) or the like (see Figure 3). Specifically, the valve disc 42 is attached so that it can move back and forth between a position where it is housed within the valve cover 43 by the valve stem 44 and a position where it protrudes from the valve cover 43. When housed within the valve cover 43, a portion of the valve disc 42 (the end opposite the valve stem 44 (on the valve box 41 side)) protrudes from the opening 43a of the valve cover 43.

弁箱41の側方に弁蓋43を固定する際には、弁蓋43の開口部43aから突出した弁体42の突出部分を弁箱41の開口部41aに挿入し、弁箱41に当接するまで弁蓋43を水平方向にスライドさせ、弁蓋43と弁箱41とを図示しないボルトナットで固定する。本実施例における弁体42、弁蓋43及び弁棒44の重量は、ユニット化した状態において、略6000kgとなっている。 When fixing the valve cover 43 to the side of the valve box 41, the protruding portion of the valve disc 42 protruding from the opening 43a of the valve cover 43 is inserted into the opening 41a of the valve box 41, the valve cover 43 is slid horizontally until it abuts the valve box 41, and the valve cover 43 and valve box 41 are fixed together with bolts and nuts (not shown). In this embodiment, the weight of the valve disc 42, valve cover 43, and valve stem 44 when assembled as a unit is approximately 6,000 kg.

また、弁蓋43と弁箱41との間には、パッキンS1が周方向に亘って圧接されるため、弁蓋43と弁箱41との間の密封性を確保できる(図3の拡大部参照)。尚、本実施例では、弁蓋43側に設けられた凹溝にパッキンS1が圧入されている形態を例示したが、これに限られず、弁箱41側に凹溝を設け、該凹溝にパッキンS1が圧入されていてもよい。 In addition, since the packing S1 is pressed circumferentially between the valve cover 43 and the valve box 41, sealing between the valve cover 43 and the valve box 41 can be ensured (see the enlarged portion in Figure 3). While this embodiment illustrates a configuration in which the packing S1 is press-fitted into a groove provided on the valve cover 43 side, this is not limiting; a groove may be provided on the valve box 41 side, and the packing S1 may be press-fitted into this groove.

尚、本実施例では、ユニット化された弁体42、弁蓋43及び弁棒44を吊り具C及びワイヤWにより吊持した状態で弁箱41に取付ける形態を例示したが、これに限られず、例えば、弁箱41の近傍に載置台を配置し、該載置台に弁体42、弁蓋43及び弁棒44を載置した状態で弁箱41に取付けるようにしてもよい。 In this embodiment, the unitized valve disc 42, valve cover 43, and valve stem 44 are attached to the valve box 41 while suspended by the hoisting device C and wire W, but this is not limited to this. For example, a mounting base may be placed near the valve box 41, and the valve disc 42, valve cover 43, and valve stem 44 may be placed on the mounting base and attached to the valve box 41.

このように、作業弁4は、弁箱41から構成される第1の分割体(略4500kg)と、弁体42、弁蓋43及び弁棒44から構成される第2の分割体(略6000kg)と、で構成されており、筐体2の分岐部2aに対して、これらを順番に組み立てることで作業弁4を構成するようになっている。つまり、第1の分割体と第2の分割体とを別々に吊り具C及びワイヤWで運搬できることから、作業弁4を組み立てた状態で分岐部2aに設置する場合(総重量が10500kgの作業弁4)に比べて、クレーンへの負荷を分散して軽減できるため、クレーンを小型化することができ、作業弁4を設置する作業スペースを省スペース化できる。また、吊り具C及びワイヤWへの負荷も軽減されるため、太い吊り具C及びワイヤWを用意する必要がなく、使用する吊り具C及びワイヤWのコストも抑えることができる。 As such, the operating valve 4 is composed of a first segment (approximately 4,500 kg) consisting of the valve box 41 and a second segment (approximately 6,000 kg) consisting of the valve disc 42, valve cover 43, and valve stem 44. The operating valve 4 is constructed by assembling these segments in order to the branch section 2a of the housing 2. In other words, because the first and second segments can be transported separately using the hoisting fixture C and wire W, the load on the crane is distributed and reduced compared to when the operating valve 4 is installed in an assembled state at the branch section 2a (operating valve 4 with a total weight of 10,500 kg). This allows for a smaller crane and reduces the work space required to install the operating valve 4. Furthermore, because the load on the hoisting fixture C and wire W is reduced, there is no need to prepare thicker hoisting fixtures C and wires W, which also reduces the cost of the hoisting fixtures C and wires W used.

また、後述のように、流体管1を切断する手段として本実施例のカッタ52のようなホールソーを用いる場合、当該ホールソーが流体管1の外径よりも大径となるため、これに伴い作業弁4の構造も大きくなるが、このような場合でも第1の分割体と第2の分割体とを別々に吊り具C及びワイヤWで運搬できることから、クレーンを好適に小型化できる。 Furthermore, as will be described later, when a hole saw such as the cutter 52 of this embodiment is used as a means for cutting the fluid pipe 1, the hole saw will have a larger diameter than the outer diameter of the fluid pipe 1, which will result in a larger structure for the working valve 4. However, even in such cases, the first and second divided bodies can be transported separately using the lifting device C and wire W, allowing the crane to be suitably miniaturized.

尚、ここでは、作業性の観点から弁体42、弁蓋43及び弁棒44をユニット化した状態で弁箱41に固定する形態を例示したが、これに限られず、例えば、弁体42、弁蓋43、弁棒44の順に別々に弁箱41に取付けるようにして、クレーンへの負荷を更に分散して軽減するようにしてもよい。 Note that, from the perspective of workability, an example has been given in which the valve disc 42, valve cover 43, and valve stem 44 are fixed to the valve box 41 as a unit, but this is not limited to this. For example, the valve disc 42, valve cover 43, and valve stem 44 may be attached to the valve box 41 separately in this order, further distributing and reducing the load on the crane.

また、作業弁4は、分岐部2aの上方に設置される弁箱41と、弁箱41から側方に膨出される弁体42、弁蓋43及び弁棒44と、が分割されて構成されており、弁箱41を分岐部2aに固定した後、弁箱41に弁体42、弁蓋43及び弁棒44を固定するため、弁箱41を分岐部2aに設置するときに重量バランスにより吊荷が傾くことなく、弁箱41の分岐部2aへの設置が簡便になる。また、弁体42、弁蓋43及び弁棒44を弁箱41に接続する際も同様に重量バランスにより吊荷が傾くことなく、弁箱41への弁体42、弁蓋43及び弁棒44の接続が簡便になる。また、作業弁4の重量バランスを保つために、作業弁4の複数個所を吊支する必要がないため、作業弁4を設置するために必要な作業スペースを好適に省スペース化できる。 The operating valve 4 is composed of a valve box 41 installed above the branch section 2a, and a valve disc 42, valve cover 43, and valve stem 44 that bulge out laterally from the valve box 41. After the valve box 41 is fixed to the branch section 2a, the valve disc 42, valve cover 43, and valve stem 44 are fixed to the valve box 41. Therefore, when installing the valve box 41 in the branch section 2a, the weight balance does not cause the suspended load to tilt, simplifying installation of the valve box 41 in the branch section 2a. Similarly, when connecting the valve disc 42, valve cover 43, and valve stem 44 to the valve box 41, the weight balance does not cause the suspended load to tilt, simplifying the connection of the valve disc 42, valve cover 43, and valve stem 44 to the valve box 41. Furthermore, since there is no need to suspend the operating valve 4 at multiple points to maintain its weight balance, the working space required to install the operating valve 4 can be effectively reduced.

また、弁箱41に弁体42、弁蓋43及び弁棒44を接続するときには、弁体42を弁箱41の開口部41aに挿入し、弁箱41に当接するまで弁蓋43を側方からスライドさせることにより、弁体42が弁箱41にガイドされるため、弁体42、弁蓋43及び弁棒44を弁箱41に対し精度よく配置できる。 In addition, when connecting the valve disc 42, valve cover 43, and valve stem 44 to the valve box 41, the valve disc 42 is inserted into the opening 41a of the valve box 41, and the valve cover 43 is slid from the side until it abuts the valve box 41. This guides the valve disc 42 into the valve box 41, allowing the valve disc 42, valve cover 43, and valve stem 44 to be positioned accurately relative to the valve box 41.

尚、本実施例では、弁蓋43と弁箱41とがボルトナットにより固定される形態を例示したが、これに限られず、例えば、万力などの別の固定手段により固定されてもよいし、溶接などで固着されていてもよい。 In this embodiment, the valve cover 43 and valve box 41 are fixed to each other with bolts and nuts, but this is not limited to this. For example, they may be fixed to each other with other fixing means such as a vice, or they may be fastened by welding or the like.

次に、作業弁4の上方に流体管1を切断するための切断機5を設置する工程について説明する。図3に示されるように、先ず、上下方向に貫通する取付フランジ筒51(筒状体)を吊り具C及びワイヤWにより吊持して弁箱41の上方まで下降させ、弁箱41の上方に取付フランジ筒51を図示しないボルトナット等により固定する。本実施例における取付フランジ筒51の重量は、略2600kgとなっている。また、取付フランジ筒51と弁箱41との間には、図示しないOリングが圧接されるため、弁箱41と取付フランジ筒51とが密封状に接続される。 Next, we will explain the process of installing the cutting machine 5 for cutting the fluid pipe 1 above the working valve 4. As shown in Figure 3, first, the mounting flange tube 51 (cylindrical body) that penetrates vertically is suspended using a hoisting device C and wire W and lowered to above the valve box 41, and the mounting flange tube 51 is then fixed above the valve box 41 with bolts and nuts (not shown). In this embodiment, the weight of the mounting flange tube 51 is approximately 2,600 kg. Furthermore, an O-ring (not shown) is pressed between the mounting flange tube 51 and the valve box 41, so the valve box 41 and the mounting flange tube 51 are connected in a hermetic manner.

尚、本実施例では、取付フランジ筒51を弁箱41の上に載置した後も、安全性確保のために取付フランジ筒51にワイヤWを若干緩めた状態で図示しないクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを取付フランジ筒51から取外してもよい。また、取付フランジ筒51を位置調整しやすくするために、クレーンにより取付フランジ筒51を若干吊った状態で弁箱41に対して位置調整を行うようにしてもよい。 In this embodiment, even after the mounting flange tube 51 is placed on the valve box 41, the mounting flange tube 51 is connected to a crane (not shown) with the wire W slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the mounting flange tube 51. Furthermore, to make it easier to adjust the position of the mounting flange tube 51, the position of the mounting flange tube 51 may be adjusted relative to the valve box 41 while the mounting flange tube 51 is slightly suspended by a crane.

次に、図4に示されるように、取付フランジ筒51に対してカッタ52を仮設置する。詳しくは、カッタ52の上方に取付フランジ筒51の蓋体53を接続した状態で吊り具C及びワイヤWにより吊持して取付フランジ筒51の上方まで下降させる。カッタ52は、周端に切断刃を備えた円筒部材52aと、この円筒部材52aに同軸に配設され穿孔刃よりも先方に突出したセンタードリル52bと、からなり、円筒部材52aとセンタードリル52bとは固定されている。また、円筒部材52aとセンタードリル52bとの上方には、上端に環状突部54aが形成されたアダプタ54が相対回転不能に取付けられている。 Next, as shown in Figure 4, the cutter 52 is temporarily installed on the mounting flange tube 51. Specifically, with the cover 53 of the mounting flange tube 51 connected to the top of the cutter 52, it is suspended by a hoist C and wire W and lowered to above the mounting flange tube 51. The cutter 52 consists of a cylindrical member 52a equipped with a cutting blade at its peripheral end, and a center drill 52b arranged coaxially with the cylindrical member 52a and protruding beyond the boring blade; the cylindrical member 52a and center drill 52b are fixed in place. Furthermore, an adapter 54 with an annular protrusion 54a formed at its upper end is attached above the cylindrical member 52a and center drill 52b so as not to rotate relative to each other.

また、蓋体53は、中心部に上下方向に貫通する貫通孔53aが形成されており、貫通孔53aにアダプタ54が挿通されている。また、蓋体53は、貫通孔53aの内周面から外径方向に凹設される凹部53bが周方向に複数形成されており、凹部53bには、貫通孔53aの径方向に進退可能な固定冶具55が配設されている。固定冶具55が貫通孔53aの内径方向に突出し、アダプタ54の環状突部54aの下面に係止することで、カッタ52と蓋体53とが一体化されている。 The lid 53 has a through-hole 53a formed in the center that penetrates vertically, and an adapter 54 is inserted into the through-hole 53a. The lid 53 also has multiple recesses 53b formed circumferentially, recessed from the inner surface of the through-hole 53a in the outer diameter direction, and a fixing jig 55 that can move forward and backward radially through the through-hole 53a is disposed in the recesses 53b. The fixing jig 55 protrudes radially inward from the through-hole 53a and engages with the underside of the annular protrusion 54a of the adapter 54, thereby integrating the cutter 52 and the lid 53.

本実施例におけるカッタ52の重量は、略2910kgとなっており、蓋体53の重量は、略1900kgとなっており、アダプタ54の重量は、略290kgとなっており、これらの総重量は略5100kgとなっている。 In this embodiment, the cutter 52 weighs approximately 2,910 kg, the lid 53 weighs approximately 1,900 kg, and the adapter 54 weighs approximately 290 kg, for a total weight of approximately 5,100 kg.

図5に示されるように、取付フランジ筒51の上方に蓋体53を載置した状態で取付フランジ筒51と蓋体53との位置合わせを行い、図示しないボルトナット等により固定する。このとき、カッタ52は、取付フランジ筒51の内部に収容されることとなる。 As shown in Figure 5, the lid 53 is placed on top of the mounting flange tube 51, and the mounting flange tube 51 and lid 53 are aligned and secured in place with bolts and nuts (not shown). At this point, the cutter 52 is housed inside the mounting flange tube 51.

また、図5の拡大部に示されるように、取付フランジ筒51と蓋体53との間には、パッキンS2が周方向に亘って圧接されるため、取付フランジ筒51と蓋体53との間の密封性を確保できる。尚、本実施例では、蓋体53側に設けられた凹溝にパッキンS2が圧入されている形態を例示したが、これに限られず、取付フランジ筒51側に凹溝を設け、該凹溝にパッキンS2が圧入されていてもよい。 Furthermore, as shown in the enlarged portion of Figure 5, a packing S2 is pressed circumferentially between the mounting flange tube 51 and the lid body 53, ensuring a tight seal between the mounting flange tube 51 and the lid body 53. While this embodiment illustrates a configuration in which the packing S2 is press-fit into a groove provided on the lid body 53 side, this is not limiting; a groove may be provided on the mounting flange tube 51 side, and the packing S2 may be press-fit into this groove.

尚、本実施例では、蓋体53を取付フランジ筒51の上に載置した後も、安全性確保のために蓋体53にワイヤWを若干緩めた状態でクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを蓋体53から取外してもよい。また、取付フランジ筒51を位置調整しやすくするために、クレーンにより取付フランジ筒51を若干吊った状態で弁箱41に対して位置調整を行うようにしてもよい。 In this embodiment, even after the lid body 53 is placed on the mounting flange tube 51, the lid body 53 is connected to the crane with the wire W slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the lid body 53. Furthermore, to make it easier to adjust the position of the mounting flange tube 51, the position may be adjusted relative to the valve box 41 while the mounting flange tube 51 is slightly suspended by the crane.

次に、切断機5の駆動機構8(駆動部)をカッタ52に接続する。先ず、駆動機構8の構造について図6に基づいて説明する。 Next, the drive mechanism 8 (drive unit) of the cutting machine 5 is connected to the cutter 52. First, the structure of the drive mechanism 8 will be explained with reference to Figure 6.

図6に示されるように、駆動機構8は、軸部材81と、軸部材81を把持若しくは把持解除可能な把持部材82と、把持部材82を軸部材81の軸方向の範囲内で進退移動させる進退部材83と、進退部材83よりも下方の位置で軸部材81を移動規制若しくは規制解除可能な規制部材84と、進退部材83及び規制部材84が取付けられる基部材85と、から主に構成されている。本実施例における駆動機構8の重量は、略6060kgとなっている。 As shown in Figure 6, the drive mechanism 8 is primarily composed of a shaft member 81, a gripping member 82 capable of gripping or releasing the grip of the shaft member 81, an advancing/retreating member 83 that moves the gripping member 82 back and forth within the axial range of the shaft member 81, a restricting member 84 that is positioned below the advancing/retreating member 83 and can restrict or release the movement of the shaft member 81, and a base member 85 to which the advancing/retreating member 83 and restricting member 84 are attached. The weight of the drive mechanism 8 in this embodiment is approximately 6,060 kg.

基部材85には、上方に立設する支柱部85aが複数設けられており、進退部材83は、支柱部85aに沿って上下方向にスライド移動可能に取付けられている。すなわち、軸部材81を把持部材82により把持し、その状態で進退部材83を支柱部85aに沿って移動させることにより、軸部材81を上下方向にスライドさせることができるようになっている。 The base member 85 is provided with multiple support columns 85a that stand upright, and the retractable member 83 is attached so that it can slide up and down along the support columns 85a. In other words, the shaft member 81 can be slid up and down by gripping the shaft member 81 with the gripping member 82 and moving the retractable member 83 along the support columns 85a.

また、基部材85の下方には、軸部材81を挿通可能な筒状のケース部86が設けられている。ケース部86の内周面には、軸部材81の外周面との間を密封するパッキンS3が設けられているとともに、ケース部86の下面には、環状に形成される環状溝86aが形成されており、環状溝86aに環状のパッキンS4が圧入されている。 Furthermore, a cylindrical case portion 86 is provided below the base member 85, through which the shaft member 81 can be inserted. A gasket S3 is provided on the inner peripheral surface of the case portion 86 to seal the space between it and the outer peripheral surface of the shaft member 81, and an annular groove 86a is formed in the underside of the case portion 86, into which an annular gasket S4 is press-fitted.

また、進退部材83の一部には、回転モータ87が固設されており、回転モータ87によって軸部材81を把持した状態の把持部材82に対して回転力を付与することによって軸部材81に回転を伝えることができるとともに、軸部材81が回転することにより、カッタ52を回転させることができるようになっている。尚、軸部材81は、複数用意することで、軸方向に継ぎ足して軸方向の長さを長くできるようになっており、このような継ぎ足し構造のため、重量と高さを軽減することができる。 A rotary motor 87 is fixed to a part of the reciprocating member 83. The rotary motor 87 applies a rotational force to the gripping member 82, which is gripping the shaft member 81, thereby transmitting rotation to the shaft member 81. The rotation of the shaft member 81 causes the cutter 52 to rotate. By providing multiple shaft members 81, it is possible to extend the axial length by connecting them together, and this extension structure allows for reduced weight and height.

図7に示されるように、駆動機構8をカッタ52と接続する際には、蓋体53の上部フランジ53cの周方向にジャッキ7(スペーサ)を複数配置しておき、軸部材81を予め所定長さ下方に進行させ、軸部材81の下端部がケース部86よりも下方に突出した状態とし、吊り具C及びワイヤWにより駆動機構8を吊り下げ、ケース部86をジャッキ7上に載置する。次いで、ジャッキ7により形成されるケース部86と蓋体53の上部フランジ53cとの隙間から作業者がアクセスして、軸部材81とアダプタ54とをボルトナットN1により接続する。 As shown in Figure 7, when connecting the drive mechanism 8 to the cutter 52, multiple jacks 7 (spacers) are placed around the periphery of the upper flange 53c of the lid 53, and the shaft member 81 is advanced downward a predetermined distance so that the lower end of the shaft member 81 protrudes downward beyond the case portion 86. The drive mechanism 8 is then suspended using the hoisting device C and wire W, and the case portion 86 is placed on the jacks 7. Next, an operator accesses the gap formed by the jacks 7 between the case portion 86 and the upper flange 53c of the lid 53, and connects the shaft member 81 to the adapter 54 with bolts and nuts N1.

尚、本実施例では、駆動機構8をジャッキ7の上に載置した後も、安全性確保のために駆動機構8にワイヤWを若干緩めた状態でクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを駆動機構8から取外してもよい。また、駆動機構8を位置調整しやすくするために、クレーンにより駆動機構8を若干吊った状態で軸部材81とアダプタ54との位置調整を行うようにしてもよい。 In this embodiment, even after the drive mechanism 8 is placed on the jack 7, the drive mechanism 8 is connected to the crane with the wire W slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the drive mechanism 8. Furthermore, to make it easier to adjust the position of the drive mechanism 8, the position of the shaft member 81 and the adapter 54 may be adjusted while the drive mechanism 8 is slightly suspended by the crane.

次に、図8に示されるように、駆動機構8、アダプタ54、カッタ52をクレーンにより僅かに上方に吊り上げ、ジャッキ7をケース部86と蓋体53の間から取外すとともに、固定冶具55を凹部53b内に退避させる。このときには、カッタ52(略2910kg)、アダプタ54(略290kg)、駆動機構8(略6060kg)をクレーンにより吊り上げるため、クレーンにかかる重量は、略9260kgとなっている。この際、蓋体53の下部フランジ53dの周方向にジャッキ7(スペーサ)を複数配置しておき、駆動機構8をジャッキ7の上に載置して、重量を受けるようにして、クレーンにかかる重量を軽減してもよい。 Next, as shown in Figure 8, the drive mechanism 8, adapter 54, and cutter 52 are lifted slightly upward by a crane, the jack 7 is removed from between the case portion 86 and the cover 53, and the fixture 55 is retracted into the recess 53b. At this time, the cutter 52 (approximately 2,910 kg), adapter 54 (approximately 290 kg), and drive mechanism 8 (approximately 6,060 kg) are lifted by the crane, so the weight on the crane is approximately 9,260 kg. At this time, multiple jacks 7 (spacers) may be placed circumferentially around the lower flange 53d of the cover 53, and the drive mechanism 8 may be placed on the jacks 7 to support its weight, thereby reducing the weight on the crane.

続いて、図9に示されるように、クレーンによりケース部86が蓋体53の上部フランジ53cに載置されるように駆動機構8を吊り降ろして図示しないボルトナットによりケース部86と蓋体53とを固定する。これにより、取付フランジ筒51、カッタ52、蓋体53、アダプタ54及び駆動機構8により切断機5が構成され、筐体2、作業弁4及び切断機5により切断装置が構成される。この際、センタードリル52bが弁体42と接触しないように調整されるのは言うまでもない。 Next, as shown in Figure 9, the drive mechanism 8 is lowered using a crane so that the case 86 is placed on the upper flange 53c of the lid 53, and the case 86 and lid 53 are secured together with bolts and nuts (not shown). The mounting flange tube 51, cutter 52, lid 53, adapter 54, and drive mechanism 8 thereby form the cutting machine 5, while the housing 2, work valve 4, and cutter 5 form the cutting device. Needless to say, the center drill 52b is adjusted so that it does not come into contact with the valve body 42.

また、ケース部86と蓋体53とを固定したときには、パッキンS4がケース部86と蓋体53の上部フランジ53cとの間で圧接されるため、ケース部86と蓋体53との間の密封性を確保できる。尚、本実施例では、ケース部86の下面に形成された環状溝86aにパッキンS4が圧入されている形態を例示したが、これに限られず、蓋体53の上部フランジ53c側に環状溝を設け、該環状溝にパッキンS4が圧入されていてもよい。 Furthermore, when the case portion 86 and the lid body 53 are fixed together, the packing S4 is pressed between the case portion 86 and the upper flange 53c of the lid body 53, ensuring a tight seal between the case portion 86 and the lid body 53. While this embodiment illustrates a configuration in which the packing S4 is press-fitted into the annular groove 86a formed on the underside of the case portion 86, this is not limiting, and an annular groove may be provided on the upper flange 53c side of the lid body 53, and the packing S4 may be press-fitted into the annular groove.

尚、本実施例では、ケース部86を蓋体53の上に載置した後も、安全性確保のために駆動機構8にワイヤWを若干緩めた状態でクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを駆動機構8から取外してもよい。また、駆動機構8を位置調整しやすくするために、クレーンにより駆動機構8を若干吊った状態でケース部86と蓋体53との位置調整を行うようにしてもよい。 In this embodiment, even after the case 86 is placed on the lid 53, the drive mechanism 8 is connected to the crane with the wire W slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the drive mechanism 8. Furthermore, to make it easier to adjust the position of the drive mechanism 8, the position of the case 86 and the lid 53 may be adjusted while the drive mechanism 8 is slightly suspended by the crane.

次に、切断機5により流体管1を切断する工程について説明する。図10に示されるように、先ず、作業弁4の弁体42を退避させて分岐部2aを開放するとともに、上述した把持部材82により軸部材81における後端側の外周面を把持する。次いで、回転モータ87を駆動させ、軸部材81及びカッタ52を回転させる。そして、軸部材81及びカッタ52が回転された状態で進退部材83を流体管1に向けて進行させる。これによると、先ずカッタ52のセンタードリル52bが流体管1の管壁を穿設する。 Next, the process of cutting the fluid pipe 1 using the cutting machine 5 will be described. As shown in Figure 10, first, the valve body 42 of the working valve 4 is retracted to open the branch portion 2a, and the outer peripheral surface of the rear end of the shaft member 81 is gripped by the gripping member 82 described above. Next, the rotary motor 87 is driven to rotate the shaft member 81 and cutter 52. Then, with the shaft member 81 and cutter 52 rotated, the advancing/retracting member 83 is advanced toward the fluid pipe 1. As a result, the center drill 52b of the cutter 52 first drills into the wall of the fluid pipe 1.

軸部材81及びカッタ52の進行移動は、把持部材82が軸部材81を把持位置から規制部材84に近接する位置までの範囲で行われ、軸部材81は、パッキンS3に摺動して進行移動され、進行移動完了後の軸部材81及びカッタ52は、規制部材84によって移動規制される。その後、回転モータ87による軸部材81の回転を停止し、軸部材81の上端に別の軸部材81’を連結し、上記工程を繰り返すことでカッタ52の円筒部材52aが流体管1を切断する。この際、必ずしも別の軸部材81’を連結するとは限らず、予め所定長さの軸部材81を用いて、切断を完了してもよい。 The shaft member 81 and cutter 52 move forward from the position where the gripping member 82 grips the shaft member 81 to a position close to the restricting member 84. The shaft member 81 slides against the packing S3 and moves forward. After completing its movement, the movement of the shaft member 81 and cutter 52 is restricted by the restricting member 84. The rotation of the shaft member 81 by the rotary motor 87 is then stopped, and another shaft member 81' is connected to the upper end of the shaft member 81. The above process is repeated, causing the cylindrical member 52a of the cutter 52 to cut the fluid pipe 1. At this time, it is not necessary to connect another shaft member 81'; the cutting may be completed using a shaft member 81 of a predetermined length.

図11に示されるように、カッタ52により流体管1が切断されると、流体管1が切断されることにより形成された切片1aが円筒部材52a内に保持された状態となる。そして、軸部材81及びカッタ52を上記工程と逆の手順で退行移動させることで、切片1aとともに取付フランジ筒51の内部に引き上げ、作業弁4の弁体42により分岐部2aを閉塞することで、流体管1の切断作業が完了する。 As shown in Figure 11, when the fluid pipe 1 is cut by the cutter 52, the piece 1a formed by the cut fluid pipe 1 is held within the cylindrical member 52a. Then, by retracting the shaft member 81 and cutter 52 in the reverse order of the above steps, the piece 1a is pulled up into the mounting flange tube 51, and the branch portion 2a is closed by the valve body 42 of the operating valve 4, completing the cutting of the fluid pipe 1.

以上説明したように、筐体2を流体管1に密封状に取付けるとともに、筐体2の分岐部2aに作業弁4を取付けた後、作業弁4にカッタ52、蓋体53及びアダプタ54をユニット化した状態で設置し、作業弁4に設置されたカッタ52、蓋体53及びアダプタ54に駆動機構8を取付けることで切断機5を構成している。これによれば、切断機5におけるカッタ52、蓋体53及びアダプタ54(略5100kg)と駆動機構8(略6060kg)とを別々に運搬できることから、切断機5を組み立てた状態で作業弁4に設置する場合(略11160kg)に比べて、クレーンへの負荷を分散して軽減できるため、クレーンを小型化することができ、切断機5を設置する作業スペースを省スペース化できる。 As explained above, the housing 2 is hermetically attached to the fluid pipe 1, and the working valve 4 is attached to the branching portion 2a of the housing 2. The cutter 52, lid 53, and adapter 54 are then installed as a unit on the working valve 4, and the drive mechanism 8 is attached to the cutter 52, lid 53, and adapter 54 installed on the working valve 4 to form the cutting machine 5. In this way, the cutter 52, lid 53, and adapter 54 (approximately 5,100 kg) and the drive mechanism 8 (approximately 6,060 kg) of the cutting machine 5 can be transported separately. This distributes and reduces the load on the crane compared to when the cutting machine 5 is installed assembled on the working valve 4 (approximately 11,160 kg). This allows the crane to be made smaller, thereby saving work space for installing the cutting machine 5.

特に、本実施例のようにカッタ52のようなホールソーを用いる場合には、少なくとも流体管1よりも大径の円筒部材52aを要するため、切断機5の構成も大型化するが、このような場合であっても、カッタ52、蓋体53及びアダプタ54と駆動機構8とを別々に設置することから、クレーンへの負荷を分散して、クレーンを好適に小型化することができる。 In particular, when using a hole saw such as the cutter 52 as in this embodiment, a cylindrical member 52a with a diameter at least larger than that of the fluid pipe 1 is required, which increases the size of the cutting machine 5. However, even in such cases, the cutter 52, lid 53, and adapter 54 are installed separately from the drive mechanism 8, which distributes the load on the crane and allows for the crane to be suitably miniaturized.

尚、ここでは、作業性の観点からカッタ52、蓋体53及びアダプタ54をユニット化した状態で取付フランジ筒51に固定する形態を例示したが、これに限られず、例えば、カッタ52、蓋体53及びアダプタ54を別々に且つ順番に取付フランジ筒51に取付けるようにしてクレーンへの負荷を更に分散して軽減するようにしてもよい。この場合には、カッタ52を取付フランジ筒51内で保持する保持手段を用意すればよい。 Note that, while the example shown here illustrates a configuration in which the cutter 52, lid 53, and adapter 54 are fixed to the mounting flange tube 51 as a unit from the perspective of workability, this is not limiting. For example, the cutter 52, lid 53, and adapter 54 may be attached to the mounting flange tube 51 separately and in order to further distribute and reduce the load on the crane. In this case, a holding means for holding the cutter 52 within the mounting flange tube 51 should be provided.

また、作業弁4にカッタ52を収容可能な取付フランジ筒51(略2600kg)を設置し、その取付フランジ筒51にカッタ52、蓋体53及びアダプタ54を設置するため、取付フランジ筒51にガイドされながらカッタ52が挿入されることとなり、カッタ52を位置決めしながら流体管1に対して精度よく設置できる。また、カッタ52、蓋体53、アダプタ54及び取付フランジ筒51をユニット化した状態で作業弁4に設置する場合(略7700kg)に比べて、クレーンへの負荷を軽減できる。 In addition, a mounting flange tube 51 (approximately 2,600 kg) capable of accommodating the cutter 52 is installed on the working valve 4, and the cutter 52, lid 53, and adapter 54 are then installed on the mounting flange tube 51. Therefore, the cutter 52 is inserted while being guided by the mounting flange tube 51, allowing the cutter 52 to be positioned and installed accurately on the fluid pipe 1. This also reduces the load on the crane compared to when the cutter 52, lid 53, adapter 54, and mounting flange tube 51 are installed as a unit on the working valve 4 (approximately 7,700 kg).

また、カッタ52と蓋体53とを固定冶具55により接続した状態で取付フランジ筒51内にカッタ52を収容するとともに、蓋体53と取付フランジ筒51とを固定するようになっているため、取付フランジ筒51を密封状に閉塞する蓋体53を利用してカッタ52を保持することができる。これによれば、カッタ52を保持するための特別な冶具を蓋体53とは別個に用意しなくて済み、構造を簡素化することができる。 In addition, the cutter 52 is housed inside the mounting flange tube 51 with the cutter 52 and lid 53 connected by a fixing jig 55, and the lid 53 and mounting flange tube 51 are fixed together. This allows the cutter 52 to be held using the lid 53, which hermetically closes the mounting flange tube 51. This eliminates the need to prepare a special jig for holding the cutter 52 separately from the lid 53, simplifying the structure.

また、駆動機構8のケース部86を蓋体53から離間させた状態で、蓋体53の貫通孔53aを介してカッタ52(アダプタ54)と駆動機構8の軸部材81とを連結した後、ケース部86を蓋体53に密封状に接続するようになっている。これによれば、駆動機構8のケース部86と蓋体53との隙間からカッタ52と軸部材81とを連結することができるため、カッタ52と軸部材81とを連結するための作業孔等をケース部86や蓋体53に形成しなくて済み構造を簡素化できる。また、カッタ52と軸部材81とが接続された後にケース部86と蓋体53とを接続するため、アダプタ54及び軸部材81によりケース部86と蓋体53とがガイドされ、且つ安定した状態で接続作業を行うことができる。 In addition, with the case 86 of the drive mechanism 8 separated from the lid 53, the cutter 52 (adapter 54) and the shaft member 81 of the drive mechanism 8 are connected via the through-hole 53a of the lid 53, and then the case 86 is hermetically connected to the lid 53. This allows the cutter 52 and the shaft member 81 to be connected through the gap between the case 86 of the drive mechanism 8 and the lid 53, eliminating the need to form access holes or the like in the case 86 or the lid 53 for connecting the cutter 52 and the shaft member 81, simplifying the structure. Furthermore, because the case 86 and the lid 53 are connected after the cutter 52 and the shaft member 81 are connected, the case 86 and the lid 53 are guided by the adapter 54 and the shaft member 81, allowing the connection work to be performed in a stable manner.

また、ケース部86と蓋体53との間にスペーサとしてのジャッキ7を配置した状態で、ジャッキ7により形成されるケース部86と蓋体53の上部フランジ53cとの隙間から作業者がアクセスして、軸部材81とアダプタ54とをボルトナットN1により接続するため、軸部材81とアダプタ54との連結作業時に駆動機構8が落下することを防止でき、安全性が高い。また、ジャッキ7にケース部86を載置することにより、吊り具C及びワイヤWで吊った状態に比べケース部86が安定するため、軸部材81とアダプタ54との連結作業を行いやすい。 In addition, with the jack 7 placed between the case 86 and the lid 53 as a spacer, an operator can access the gap formed by the jack 7 between the case 86 and the upper flange 53c of the lid 53 and connect the shaft member 81 and the adapter 54 with bolts and nuts N1. This prevents the drive mechanism 8 from falling when connecting the shaft member 81 and the adapter 54, ensuring high safety. Furthermore, by placing the case 86 on the jack 7, the case 86 is more stable than when it is suspended by the lifting device C and wire W, making it easier to connect the shaft member 81 and the adapter 54.

尚、特に図示しないが、作業弁4の弁体42により分岐部2aを閉塞した状態のまま、先ず、駆動機構8を蓋体53から取外し、蓋体53とカッタ52とを切片1aとともに取付フランジ筒51から取外し、取付フランジ筒51を作業弁4から取外すことで、切断機5の撤去作業が完了する。このように、切断機5を構成する各部材を別々にクレーンにより運搬できるため、切断機5の撤去作業時におけるクレーンへの負荷を軽減できる。 Although not specifically shown, while the branch section 2a remains closed by the valve body 42 of the work valve 4, the drive mechanism 8 is first removed from the cover 53, the cover 53 and cutter 52 together with the cutting piece 1a are removed from the mounting flange tube 51, and the mounting flange tube 51 is then removed from the work valve 4, completing the removal of the cutting machine 5. In this way, each component that makes up the cutting machine 5 can be transported separately by crane, reducing the load on the crane when removing the cutting machine 5.

次に、流体管1を切断した箇所にバタフライ弁10を設置するための弁導入機6を設置する工程について説明する。図12に示されるように、先ず、作業弁4の弁体42により分岐部2aを閉塞した状態のまま、上下方向に貫通する円筒部材61(筒状体)を吊り具C及びワイヤWにより吊持して作業弁4の上方まで下降させ、作業弁4の上方に円筒部材61を図示しないボルトナット等により固定する。本実施例における円筒部材61の重量は、略3000kgとなっている。また、円筒部材61と作業弁4(弁箱41)との間には、図示しないOリングが圧接されるため、円筒部材61と作業弁4とが密封状に接続される。 Next, we will explain the process of installing a valve introducer 6 to install a butterfly valve 10 at the cut location of the fluid pipe 1. As shown in Figure 12, first, while the branch section 2a is closed by the valve body 42 of the operating valve 4, a cylindrical member 61 (cylindrical body) penetrating vertically is suspended by a hoisting device C and wire W and lowered to above the operating valve 4, and the cylindrical member 61 is then fixed above the operating valve 4 with bolts and nuts (not shown). In this embodiment, the weight of the cylindrical member 61 is approximately 3,000 kg. Furthermore, an O-ring (not shown) is pressed between the cylindrical member 61 and the operating valve 4 (valve box 41), creating a hermetic connection between the cylindrical member 61 and the operating valve 4.

尚、本実施例では、円筒部材61を作業弁4の上に載置した後も、安全性確保のために円筒部材61にワイヤWを若干緩めた状態でクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを円筒部材61から取外してもよい。また、円筒部材61を位置調整しやすくするために、クレーンにより円筒部材61を若干吊った状態で弁箱41と円筒部材61との位置調整を行うようにしてもよい。 In this embodiment, even after the cylindrical member 61 is placed on the working valve 4, the wire W is connected to the crane with the cylindrical member 61 slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the cylindrical member 61. Furthermore, to make it easier to adjust the position of the cylindrical member 61, the position of the valve box 41 and the cylindrical member 61 may be adjusted while the cylindrical member 61 is slightly suspended by the crane.

次に、円筒部材61に対してバタフライ弁10を仮設置する工程を説明する。先ず、バタフライ弁10の構造について図14に基づいて説明する。 Next, we will explain the process of temporarily installing the butterfly valve 10 on the cylindrical member 61. First, we will explain the structure of the butterfly valve 10 with reference to Figure 14.

図14に示されるように、バタフライ弁10は、流体管1の流路を流体が通過可能状態と通過不能状態とに制御するものであり、ほぼ中央部に開口を有する仕切壁11と、仕切壁11の上端部に回動可能に取付けられる開閉軸12と、開閉軸12を中心に回動して仕切壁11の開口を開閉可能に設けられた弁体13と、仕切壁11の上端部に密封状に接続される略水平方向に延びる略円形の上蓋部14(蓋体部)と、を備える。仕切壁11には、その両側面及び底面に亘ってパッキンS5が固着され、上蓋部14には、その外周面の全周に亘ってパッキンS6が固着されており、パッキンS5,S6は連続するように接続される。尚、本実施例におけるバタフライ弁10の総重量は、略9540kgとなっている。更に尚、仕切壁11と上蓋部14との間がパッキン等で密封されていることは言うまでもない。 As shown in Figure 14, the butterfly valve 10 controls the flow path of the fluid pipe 1 between a fluid-passable state and a fluid-blocking state. It comprises a partition wall 11 with an opening approximately in the center, an opening/closing shaft 12 rotatably attached to the upper end of the partition wall 11, a valve element 13 that rotates around the opening/closing shaft 12 to open and close the opening in the partition wall 11, and a substantially circular upper cover 14 (cover body) extending substantially horizontally and connected to the upper end of the partition wall 11 in a sealed manner. Gaskets S5 are fixed to both side and bottom surfaces of the partition wall 11, and gasket S6 is fixed to the upper cover 14 around its entire outer periphery, with the gaskets S5 and S6 connected continuously. The total weight of the butterfly valve 10 in this embodiment is approximately 9,540 kg. It goes without saying that a packing or similar seal is provided between the partition wall 11 and the upper cover 14.

図13に示されるように、バタフライ弁10を円筒部材61に仮設置する際には、先ず、仕切壁11、開閉軸12及び弁体13(本体部)を一体化した状態で吊り具C及びワイヤWにより吊持して円筒部材61内に収容される位置まで下降させる。このとき、弁体13は、管軸方向と略平行(仕切壁11の開口を開放した状態)となるように配置する。 As shown in Figure 13, when temporarily installing the butterfly valve 10 in the cylindrical member 61, first, the partition wall 11, opening/closing shaft 12, and valve body 13 (main body) are suspended as a single unit using a suspender C and wire W and lowered to a position where they will be housed within the cylindrical member 61. At this time, the valve body 13 is positioned so that it is approximately parallel to the pipe axis direction (with the opening of the partition wall 11 open).

そして、円筒部材61の周方向に複数形成された窓部61aを介して外部から円筒部材61内に一部突出するように係止部材62(係止部、保持部)を挿入する。これにより、仕切壁11から外側に突出する突出片11aが係止部材62の先端部に載置(係止)されるようになり、仕切壁11、開閉軸12及び弁体13が円筒部材61に保持されることとなる。尚、係止部材62の先端側下部には、弁体13の一部を収容可能な凹部62aが形成されているため、係止部材62と弁体13とが干渉しない。 Then, a locking member 62 (locking portion, holding portion) is inserted from the outside through multiple windows 61a formed around the circumference of the cylindrical member 61 so that it partially protrudes into the cylindrical member 61. As a result, the protruding piece 11a protruding outward from the partition wall 11 is placed (locked) on the tip of the locking member 62, and the partition wall 11, opening/closing shaft 12, and valve body 13 are held in place by the cylindrical member 61. Furthermore, a recess 62a capable of accommodating part of the valve body 13 is formed in the lower part of the tip of the locking member 62, so that the locking member 62 and the valve body 13 do not interfere with each other.

次いで、図14に示されるように、上蓋部14を吊り具C及びワイヤWにより吊持して開閉軸12を挿通させた状態で仕切壁11の上部に載置する。そして、図示しない固定手段により上蓋部14と仕切壁11とを密封状に接続してバタフライ弁10を構成する。 Next, as shown in Figure 14, the upper cover 14 is suspended by the suspender C and wire W and placed on top of the partition wall 11 with the opening/closing shaft 12 inserted through it. The upper cover 14 and partition wall 11 are then hermetically connected by a fastening means (not shown) to form the butterfly valve 10.

尚、本実施例では、上蓋部14を仕切壁11の上に載置した後も、安全性確保のために上蓋部14にワイヤWを若干緩めた状態でクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを上蓋部14から取外してもよい。また、上蓋部14を位置調整しやすくするために、クレーンにより上蓋部14を若干吊った状態で上蓋部14と仕切壁11、開閉軸12及び弁体13との位置調整を行うようにしてもよい。 In this embodiment, even after the top cover 14 is placed on the partition wall 11, the wire W is still connected to the crane with the top cover 14 slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the top cover 14. Furthermore, to make it easier to adjust the position of the top cover 14, the position of the top cover 14 relative to the partition wall 11, opening/closing shaft 12, and valve body 13 may be adjusted while the top cover 14 is slightly suspended by the crane.

更に尚、本実施例では、一体化した仕切壁11、開閉軸12及び弁体13に対して上蓋部14を固定することでバタフライ弁10を円筒部材61上で構成する形態を例示したが、仕切壁11、開閉軸12、弁体13、上蓋部14をそれぞれ順番に別々に設置することでバタフライ弁10を構成してもよい。また、仕切壁11と弁体13を一体化し、開閉軸12と上蓋部14を一体化し、それらを組み立てることでバタフライ弁10を構成してもよい。つまり、少なくとも上蓋部14が他の部材(本体部)から分割されており、且つそれらを組み立てることでバタフライ弁10が構成される形態であれば自由に変更することができる。 Furthermore, in this embodiment, the butterfly valve 10 is constructed on the cylindrical member 61 by fixing the top cover 14 to the integrated partition wall 11, opening/closing shaft 12, and valve body 13. However, the butterfly valve 10 may also be constructed by separately installing the partition wall 11, opening/closing shaft 12, valve body 13, and top cover 14 in that order. Furthermore, the butterfly valve 10 may also be constructed by integrating the partition wall 11 and valve body 13, integrating the opening/closing shaft 12 and top cover 14, and assembling these together. In other words, any configuration is possible as long as at least the top cover 14 is separate from the other members (main body) and the butterfly valve 10 is constructed by assembling these together.

次に、図15に示されるように、上下方向に貫通する取付フランジ筒63を吊り具C及びワイヤWにより吊持して円筒部材61の上方まで下降させ、円筒部材61の上方に取付フランジ筒63を図示しないボルトナット等により固定する。本実施例における取付フランジ筒63の重量は、略2600kgとなっている。 Next, as shown in Figure 15, the mounting flange tube 63, which penetrates vertically, is suspended by a hoisting tool C and wire W and lowered to above the cylindrical member 61, and the mounting flange tube 63 is fixed to the top of the cylindrical member 61 with bolts and nuts (not shown). In this embodiment, the weight of the mounting flange tube 63 is approximately 2,600 kg.

尚、本実施例では、取付フランジ筒63を円筒部材61の上に載置した後も、安全性確保のために取付フランジ筒63にワイヤWを若干緩めた状態でクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを取付フランジ筒63から取外してもよい。また、取付フランジ筒63を位置調整しやすくするために、クレーンにより取付フランジ筒63を若干吊った状態で取付フランジ筒63と円筒部材61との位置調整を行うようにしてもよい。 In this embodiment, even after the mounting flange tube 63 is placed on the cylindrical member 61, the mounting flange tube 63 is connected to the crane with the wire W slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the mounting flange tube 63. Furthermore, to make it easier to adjust the position of the mounting flange tube 63, the position of the mounting flange tube 63 and the cylindrical member 61 may be adjusted while the mounting flange tube 63 is slightly suspended by the crane.

また、図15の拡大図に示されるように、取付フランジ筒63の下面には、環状溝63aが形成されており、該環状溝63aには、環状のパッキンS7が圧入されている。円筒部材61と取付フランジ筒63とを固定したときには、パッキンS7が円筒部材61と取付フランジ筒63との間で圧接されるため、円筒部材61と取付フランジ筒63との間の密封性を確保できる。尚、本実施例では、取付フランジ筒63の下面に形成された環状溝63aにパッキンS7が圧入されている形態を例示したが、これに限られず、円筒部材61側に環状溝を設け、該環状溝にパッキンS7が圧入されていてもよい。 As shown in the enlarged view of Figure 15, an annular groove 63a is formed on the underside of the mounting flange tube 63, and an annular gasket S7 is press-fitted into this annular groove 63a. When the cylindrical member 61 and the mounting flange tube 63 are fixed together, the gasket S7 is pressed between the cylindrical member 61 and the mounting flange tube 63, ensuring a tight seal between the cylindrical member 61 and the mounting flange tube 63. Note that this embodiment illustrates a configuration in which the gasket S7 is press-fitted into the annular groove 63a formed on the underside of the mounting flange tube 63, but this is not limited to this. An annular groove may be formed on the cylindrical member 61 side, and the gasket S7 may be press-fitted into this annular groove.

次に、図16に示されるように、取付フランジ筒63に対してバタフライ弁10と接続される弁吊金具64を仮設置する。詳しくは、弁吊金具64の上方に取付フランジ筒63の蓋体65を接続した状態で吊り具C及びワイヤWにより吊持して取付フランジ筒63の上方まで下降させる。弁吊金具64は、略水平方向を向く取付面部64aと、取付面部64aの略中心に設けられる貫通孔64bから上方に延びる筒状の軸部64cと、取付面部64aと軸部64cとの間に亘って設けられる補強用のリブ64dと、を備えている。また、軸部64cの上端部には、アダプタ66が接続されている。 Next, as shown in Figure 16, the valve hanger 64, which connects to the butterfly valve 10, is temporarily installed on the mounting flange tube 63. Specifically, with the cover 65 of the mounting flange tube 63 connected to the top of the valve hanger 64, it is suspended by a hanger C and wire W and lowered to above the mounting flange tube 63. The valve hanger 64 has a mounting surface 64a facing approximately horizontally, a cylindrical shaft 64c extending upward from a through hole 64b located approximately in the center of the mounting surface 64a, and a reinforcing rib 64d located between the mounting surface 64a and the shaft 64c. An adapter 66 is connected to the upper end of the shaft 64c.

また、蓋体65は、中心部に上下方向に貫通する貫通孔65aが形成されており、貫通孔65aにアダプタ66が挿通されている。また、蓋体65は、貫通孔65aの内周面から外径方向に凹設される凹部65bが周方向に複数形成されており、凹部65bには、貫通孔65aの径方向に進退可能な固定冶具67が配設されている。固定冶具67が貫通孔65aの内径方向に突出し、アダプタ66の環状突部66aの下面に係止することで、弁吊金具64と蓋体65とが一体化されている。 The lid 65 has a through-hole 65a formed in the center that penetrates vertically, and an adapter 66 is inserted into the through-hole 65a. The lid 65 also has multiple recesses 65b formed circumferentially, recessed radially outward from the inner surface of the through-hole 65a, and a fixing jig 67 that can move radially forward and backward through the through-hole 65a is disposed in the recesses 65b. The fixing jig 67 protrudes radially inward from the through-hole 65a and engages with the underside of the annular protrusion 66a of the adapter 66, thereby integrating the valve hanger 64 and the lid 65.

本実施例における弁吊金具64の重量は、略2000kgとなっており、蓋体65の重量は、略1900kgとなっており、アダプタ66の重量は、略270kgとなっており、これらの総重量は略4170kgとなっている。 In this embodiment, the weight of the valve hanger 64 is approximately 2,000 kg, the weight of the lid 65 is approximately 1,900 kg, and the weight of the adapter 66 is approximately 270 kg, for a total weight of approximately 4,170 kg.

図17に示されるように、取付フランジ筒63の上端に蓋体65を載置した状態で取付フランジ筒63と蓋体65との位置合わせを行い、図示しないボルトナット等により固定する。尚、本実施例では、蓋体65を取付フランジ筒63の上に載置した後も、安全性確保のために蓋体65にワイヤWを若干緩めた状態でクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを蓋体65から取外してもよい。また、蓋体65を位置調整しやすくするために、クレーンにより蓋体65を若干吊った状態で取付フランジ筒63と蓋体65との位置調整を行うようにしてもよい。 As shown in Figure 17, the lid body 65 is placed on the upper end of the mounting flange tube 63, and the mounting flange tube 63 and lid body 65 are aligned and secured with bolts and nuts (not shown). In this embodiment, even after the lid body 65 is placed on the mounting flange tube 63, the lid body 65 is connected to the crane with the wire W slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the lid body 65. Furthermore, to make it easier to adjust the position of the lid body 65, the position of the mounting flange tube 63 and the lid body 65 may be adjusted while the lid body 65 is slightly suspended by the crane.

図17の拡大部に示されるように、取付フランジ筒63と蓋体65との間には、パッキンS8が周方向に亘って圧接されるため、取付フランジ筒63と蓋体65との間の密封性を確保できる。尚、本実施例では、蓋体65側に設けられた凹溝にパッキンS8が圧入されている形態を例示したが、これに限られず、取付フランジ筒63側に凹溝を設け、該凹溝にパッキンS8が圧入されていてもよい。 As shown in the enlarged portion of Figure 17, a packing S8 is pressed circumferentially between the mounting flange tube 63 and the lid body 65, ensuring a tight seal between the mounting flange tube 63 and the lid body 65. While this embodiment illustrates a configuration in which the packing S8 is press-fit into a groove provided on the lid body 65 side, this is not limiting; a groove may be provided on the mounting flange tube 63 side, and the packing S8 may be press-fit into this groove.

次に、弁導入機6の挿入機としての駆動機構8を弁吊金具64に接続する。尚、駆動機構8は、流体管1の切断作業時に用いたものと同一のものを使用しているため、駆動機構8の構造の説明を省略する。 Next, the drive mechanism 8, which serves as the insertion mechanism for the valve introducer 6, is connected to the valve hanger 64. Note that the drive mechanism 8 is the same as the one used during the cutting work of the fluid pipe 1, so a description of the structure of the drive mechanism 8 will be omitted.

図18に示されるように、駆動機構8を弁吊金具64と接続させる際には、軸部材81を予め所定長さ下方に進行させ、軸部材81の下端部がケース部86よりも下方に突出した状態とするとともに、蓋体65の上部フランジ65cの周方向にジャッキ7(スペーサ)を複数配置し、クレーンにより駆動機構8を吊り下げ、ケース部86をジャッキ7上に載置する。次いで、ジャッキ7により形成されるケース部86と蓋体65の上部フランジ65cとの隙間から作業者がアクセスして、軸部材81とアダプタ66とをボルトナットN2により接続する。 As shown in Figure 18, when connecting the drive mechanism 8 to the valve hanging fitting 64, the shaft member 81 is first advanced downward a predetermined distance so that the lower end of the shaft member 81 protrudes downward beyond the case portion 86. Multiple jacks 7 (spacers) are then placed circumferentially around the upper flange 65c of the lid body 65, the drive mechanism 8 is suspended using a crane, and the case portion 86 is placed on the jacks 7. Next, an operator accesses the gap formed by the jacks 7 between the case portion 86 and the upper flange 65c of the lid body 65, and connects the shaft member 81 to the adapter 66 with bolts and nuts N2.

次に、図19に示されるように、駆動機構8、アダプタ66、弁吊金具64をクレーンにより僅かに上方に吊り上げ、ジャッキ7をケース部86と蓋体65の間から取外すとともに、固定冶具55を凹部53b内に退避させる。このときには、弁吊金具64(略2000kg)、アダプタ66(略270kg)、駆動機構8(略6060kg)を吊り具C及びワイヤWにより吊り上げるため、吊り具C及びワイヤWにかかる重量は、略8330kgとなっている。この際、蓋体65の下部フランジ65dの周方向にジャッキ7(スペーサ)を複数配置しておき、駆動機構8をジャッキ7の上に載置して、重量を受けるようにして、クレーンにかかる重量を軽減してもよい。 Next, as shown in Figure 19, the drive mechanism 8, adapter 66, and valve hoisting fixture 64 are lifted slightly upward using a crane, the jack 7 is removed from between the case portion 86 and the cover 65, and the fixture 55 is retracted into the recess 53b. At this time, the valve hoisting fixture 64 (approximately 2000 kg), adapter 66 (approximately 270 kg), and drive mechanism 8 (approximately 6060 kg) are lifted using the hoisting fixture C and wire W, so the weight on the hoisting fixture C and wire W is approximately 8330 kg. At this time, multiple jacks 7 (spacers) may be placed circumferentially around the lower flange 65d of the cover 65, and the drive mechanism 8 may be placed on the jacks 7 to support its weight, thereby reducing the weight on the crane.

次に、特に図示しないが、吊り具C及びワイヤWによりケース部86が蓋体65の上部フランジ65c載置されるように駆動機構8を吊り降ろして図示しないボルトナットによりケース部86と蓋体65とを固定する。また、ケース部86と蓋体65とを固定したときには、パッキンS4がケース部86と蓋体65の上部フランジ65cとの間で圧接されるため、ケース部86と蓋体65との間の密封性を確保できる。尚、本実施例では、ケース部86の下面にパッキンS4が配設されている形態を例示したが、これに限られず、蓋体65の上部フランジ65c側に環状溝を設け、該環状溝にパッキンS4が圧入されていてもよい。 Next, although not shown, the drive mechanism 8 is lowered using a hoisting tool C and wire W so that the case 86 rests on the upper flange 65c of the lid 65, and the case 86 and lid 65 are secured together with bolts and nuts (not shown). When the case 86 and lid 65 are secured together, the packing S4 is pressed against the case 86 and the upper flange 65c of the lid 65, ensuring a tight seal between the case 86 and the lid 65. While this embodiment illustrates a configuration in which the packing S4 is disposed on the underside of the case 86, this is not limiting. An annular groove may be provided on the upper flange 65c side of the lid 65, and the packing S4 may be press-fit into the annular groove.

尚、本実施例では、ケース部86を蓋体65の上に載置した後も、安全性確保のために駆動機構8にワイヤWを若干緩めた状態でクレーンに接続しているが、これに限られず、吊り具C及びワイヤWを駆動機構8から取外してもよい。また、駆動機構8を位置調整しやすくするために、クレーンにより駆動機構8を若干吊った状態でケース部86と蓋体65との位置調整を行うようにしてもよい。 In this embodiment, even after the case 86 is placed on the lid 65, the drive mechanism 8 is connected to the crane with the wire W slightly loosened to ensure safety. However, this is not limited to this, and the hoisting device C and wire W may be removed from the drive mechanism 8. Furthermore, to make it easier to adjust the position of the drive mechanism 8, the position of the case 86 and the lid 65 may be adjusted while the drive mechanism 8 is slightly suspended by the crane.

次いで、図20に示されるように、駆動機構8により弁吊金具64を下降させ、弁吊金具64の取付面部64aとバタフライ弁10の上蓋部14とを図示しないボルトナットにより接続する。これにより、円筒部材61、取付フランジ筒63、弁吊金具64、蓋体65、アダプタ66及び駆動機構8により弁導入機6が構成され、筐体2、作業弁4及び弁導入機6により弁設置装置が構成される。尚、このとき、バタフライ弁10の開閉軸12は、弁吊金具64の軸部64cに挿入される。 Next, as shown in Figure 20, the valve hanger 64 is lowered by the drive mechanism 8, and the mounting surface 64a of the valve hanger 64 is connected to the upper cover 14 of the butterfly valve 10 with bolts and nuts (not shown). As a result, the cylindrical member 61, mounting flange 63, valve hanger 64, cover 65, adapter 66, and drive mechanism 8 form the valve introducer 6, and the housing 2, working valve 4, and valve introducer 6 form the valve installation device. At this time, the opening/closing shaft 12 of the butterfly valve 10 is inserted into the shaft 64c of the valve hanger 64.

その後、駆動機構8により弁吊金具64及びバタフライ弁10を僅かに上方に吊り上げ、係止部材62を退行させて円筒部材61の窓部61aから引き抜く。尚、図示しないが、窓部61aには、密封状に閉塞するように栓がされる。この際、バタフライ弁10の下端部が弁体42と接触しないように調整されるのは言うまでもない。 Then, the drive mechanism 8 lifts the valve hoisting fitting 64 and butterfly valve 10 slightly upward, and the locking member 62 is retracted and pulled out of the window 61a of the cylindrical member 61. Although not shown, the window 61a is plugged to seal it. Needless to say, this is adjusted so that the bottom end of the butterfly valve 10 does not come into contact with the valve body 42.

次に、弁導入機6により流体管1の切断された箇所にバタフライ弁10を設置する工程について説明する。図21に示されるように、作業弁4の弁体42を退避させて分岐部2aを開放するとともに、上述した把持部材82により軸部材81における後端側の外周面を把持する。そして、進退部材83を流体管1に向けてスライドさせることで軸部材81及びバタフライ弁10を流体管1に向けて進行させる。 Next, we will explain the process of installing the butterfly valve 10 at the section of the fluid pipe 1 cut by the valve introducer 6. As shown in Figure 21, the valve body 42 of the working valve 4 is retracted to open the branch section 2a, and the outer peripheral surface of the rear end of the shaft member 81 is gripped by the gripping member 82 described above. Then, the advancing/retracting member 83 is slid toward the fluid pipe 1, thereby advancing the shaft member 81 and the butterfly valve 10 toward the fluid pipe 1.

軸部材81及びバタフライ弁10の進行移動は、把持部材82が軸部材81を把持位置から規制部材84に近接する位置までの範囲で行われ、進行移動完了後の軸部材81及びバタフライ弁10は、規制部材84によって移動規制される。その後、軸部材81の上端に別の軸部材81’,81’を連結し、上記工程を繰り返すことでバタフライ弁10を流体管1の切断箇所に配置する。バタフライ弁10を流体管1の切断箇所に配置した後、所定の固定手段によりバタフライ弁10を筐体2に固定する。この際、必ずしも別の軸部材81’を連結するとは限らず、予め所定長さの軸部材81を用いて、配置を完了してもよい。 The shaft member 81 and butterfly valve 10 move forward within a range from the gripping position of the gripping member 82 to a position close to the restricting member 84. After completing their forward movement, the movement of the shaft member 81 and butterfly valve 10 is restricted by the restricting member 84. Another shaft member 81', 81' is then connected to the upper end of the shaft member 81, and the above process is repeated to position the butterfly valve 10 at the cut location of the fluid pipe 1. After the butterfly valve 10 is positioned at the cut location of the fluid pipe 1, the butterfly valve 10 is fixed to the housing 2 by a predetermined fixing means. At this time, it is not necessary to connect another shaft member 81'; positioning may be completed using a shaft member 81 of a predetermined length in advance.

尚、バタフライ弁10を筐体2に固定した状態にあっては、仕切壁11のパッキンS5が筐体2の両内側面及び内底面に亘って圧接されるとともに、上蓋部14のパッキンS6が分岐部2aの内周面に亘って圧接されるため、流体管1を流れる流体が仕切壁11と筐体2との間から回り込むことが防止されるとともに、分岐部2aから流体が漏れることが防止される。 Furthermore, when the butterfly valve 10 is fixed to the housing 2, the packing S5 of the partition wall 11 is pressed against both inner surfaces and the inner bottom surface of the housing 2, and the packing S6 of the top cover 14 is pressed against the inner circumferential surface of the branch portion 2a. This prevents the fluid flowing through the fluid pipe 1 from leaking between the partition wall 11 and the housing 2 and from leaking from the branch portion 2a.

次いで、図22に示されるように、円筒部材61及び取付フランジ筒63内の流体を外部に排出するとともに、円筒部材61の作業孔部61bからアクセスして弁吊金具64の取付面部64aとバタフライ弁10の上蓋部14とのボルトナットによる接続を解除する。そして、軸部材81を上記工程と逆の手順で退行移動させ、弁吊金具64を円筒部材61及び取付フランジ筒63の内部に引き上げることで、バタフライ弁10を流体管1の切断箇所に設置する作業が完了する。 Next, as shown in Figure 22, the fluid inside the cylindrical member 61 and the mounting flange 63 is discharged to the outside, and the bolt and nut connection between the mounting surface 64a of the valve suspension fitting 64 and the top cover 14 of the butterfly valve 10 is released through the access hole 61b of the cylindrical member 61. The shaft member 81 is then moved backward in the reverse order of the above steps, and the valve suspension fitting 64 is pulled up into the cylindrical member 61 and the mounting flange 63, completing the installation of the butterfly valve 10 at the cut location of the fluid pipe 1.

尚、特に図示しないが、先ず、駆動機構8を蓋体65から取外し、蓋体65と弁吊金具64とを取付フランジ筒63から取外し、取付フランジ筒63を円筒部材61から取外し、円筒部材61を作業弁4から取外すことで、弁導入機6の撤去作業が完了する。このように、弁導入機6を構成する各部材を別々にクレーンにより運搬できるため、弁導入機6の撤去作業時におけるクレーンへの負荷を軽減できる。その後、作業弁4を筐体2の分岐部2aから取外すことで、流体管1の所定箇所を切断し、その切断箇所にバタフライ弁10を設置するまでの一連の作業が完了する。 Although not specifically shown, the valve introduction device 6 is removed by first removing the drive mechanism 8 from the cover 65, then removing the cover 65 and valve suspender 64 from the mounting flange tube 63, then removing the mounting flange tube 63 from the cylindrical member 61, and then removing the cylindrical member 61 from the working valve 4. In this way, each component of the valve introduction device 6 can be transported separately by crane, reducing the load on the crane during removal of the valve introduction device 6. The working valve 4 is then removed from the branching portion 2a of the housing 2, completing the series of steps up to cutting a predetermined portion of the fluid pipe 1 and installing the butterfly valve 10 at that cut portion.

このように、作業弁4に仕切壁11、開閉軸12及び弁体13を設置し、作業弁4に設置された仕切壁11、開閉軸12及び弁体13に上蓋部14を取付けることでバタフライ弁10を構成している。これによれば、バタフライ弁10の本体部である仕切壁11、開閉軸12及び弁体13と、蓋体部である上蓋部14と、を別々に運搬できることから、バタフライ弁10を組み立てた状態で円筒部材61に設置する場合(略9540kg)に比べて、クレーンへの負荷を分散して軽減できるため、クレーンを小型化することができ、バタフライ弁10を設置する作業スペースを省スペース化できる。 In this way, the butterfly valve 10 is constructed by installing the partition wall 11, opening/closing shaft 12, and valve element 13 on the working valve 4, and then attaching the top cover 14 to the partition wall 11, opening/closing shaft 12, and valve element 13 installed on the working valve 4. This allows the partition wall 11, opening/closing shaft 12, and valve element 13, which form the main body of the butterfly valve 10, and the top cover 14, which forms the cover body, to be transported separately. This distributes and reduces the load on the crane compared to installing the assembled butterfly valve 10 on the cylindrical member 61 (approximately 9,540 kg). This allows the crane to be made smaller, thereby saving work space for installing the butterfly valve 10.

本実施例のようにカッタ52のようなホールソーを用いる場合には、少なくとも流体管1よりも大径の円筒部材52aを要するため、筐体2の構成も大型化し、これに伴いバタフライ弁10、特に、分岐部2aを閉塞するための上蓋部14が大型化してしまうが、このような場合であっても、仕切壁11、開閉軸12及び弁体13と上蓋部14とを別々に設置することから、クレーンへの負荷を分散して、クレーンを好適に小型化することができる。 When using a hole saw such as the cutter 52 as in this embodiment, a cylindrical member 52a with a diameter at least larger than the fluid pipe 1 is required, which increases the size of the housing 2 and the butterfly valve 10, particularly the top cover 14 for closing the branch section 2a. However, even in such a case, the partition wall 11, opening/closing shaft 12, valve body 13, and top cover 14 are installed separately, which distributes the load on the crane and allows for the crane to be conveniently made smaller.

また、作業弁4にバタフライ弁10を収容可能な円筒部材61(略3000kg)を設置し、その円筒部材61内に仕切壁11、開閉軸12及び弁体13を設置するとともに、円筒部材61に設置された仕切壁11、開閉軸12及び弁体13に上蓋部14を取付けるため、作業弁4に設置した円筒部材61を用いて、バタフライ弁10を位置決めしながら精度よく設置できる。 In addition, a cylindrical member 61 (approximately 3,000 kg) capable of housing the butterfly valve 10 is installed on the operating valve 4, and the partition wall 11, opening/closing shaft 12, and valve body 13 are installed inside the cylindrical member 61.The upper cover 14 is then attached to the partition wall 11, opening/closing shaft 12, and valve body 13 installed on the cylindrical member 61.This allows the butterfly valve 10 to be positioned and installed with high precision using the cylindrical member 61 installed on the operating valve 4.

また、円筒部材61には、係止部材62が取付け可能となっており、この係止部材62に仕切壁11、開閉軸12及び弁体13を係止した安定状態で上蓋部14を精度よく取付けることができる。 In addition, a locking member 62 can be attached to the cylindrical member 61, and the upper lid portion 14 can be attached with high precision in a stable state with the partition wall 11, opening/closing shaft 12, and valve body 13 locked to this locking member 62.

また、係止部材62にバタフライ弁10を保持させた状態で、該バタフライ弁10に駆動機構8及び弁吊金具64(挿入機)を連結するため、バタフライ弁10を安定させた状態で、バタフライ弁10に駆動機構8及び弁吊金具64を精度よく取付けることができ、この駆動機構8及び弁吊金具64により筐体2内の所期の位置にバタフライ弁10を設置することができる。 In addition, because the drive mechanism 8 and valve hanger 64 (insertion machine) are connected to the butterfly valve 10 while it is held by the locking member 62, the drive mechanism 8 and valve hanger 64 can be attached to the butterfly valve 10 with high precision while the butterfly valve 10 is in a stable state, and the drive mechanism 8 and valve hanger 64 allow the butterfly valve 10 to be installed in the desired position within the housing 2.

さらに、バタフライ弁10を構成した後、駆動機構8及び弁吊金具64を接続して弁導入機6を構成することから、バタフライ弁10と駆動機構8及び弁吊金具64を一体的に組み立てた状態で作業弁4に設置することに比べて、クレーンの負荷を軽減できる。 Furthermore, after constructing the butterfly valve 10, the drive mechanism 8 and valve hoisting fitting 64 are connected to construct the valve introducer 6, which reduces the load on the crane compared to installing the butterfly valve 10, drive mechanism 8, and valve hoisting fitting 64 as a single unit on the working valve 4.

また、駆動機構8及び弁吊金具64とバタフライ弁10との間、具体的には、駆動機構8のケース部86と蓋体65の間にスペーサとしてのジャッキ7を配置し、ジャッキ7に載置された駆動機構8に接続される弁吊金具64の取付面部64aをバタフライ弁10の上蓋部14と連結する。これによれば、駆動機構8及び弁吊金具64の荷重をジャッキ7に預けた状態でバタフライ弁10に連結できるため、連結作業が容易となるばかりか、クレーンの負荷を軽減できる。 In addition, a jack 7 is placed as a spacer between the drive mechanism 8 and valve hoisting bracket 64 and the butterfly valve 10, specifically between the case 86 of the drive mechanism 8 and the lid 65, and the mounting surface 64a of the valve hoisting bracket 64, which is connected to the drive mechanism 8 placed on the jack 7, is connected to the upper lid 14 of the butterfly valve 10. This allows the drive mechanism 8 and valve hoisting bracket 64 to be connected to the butterfly valve 10 with their weights resting on the jack 7, making the connection work easier and reducing the load on the crane.

以上説明したように、作業弁4、切断機5、バタフライ弁10は、複数の分割体から構成されており、流体管1に筐体2を密封状に取付けた後、前記分割体を筐体2に順次組み立てるようになっている。具体的には、作業弁4の場合、弁箱41と、弁体42、弁蓋43及び弁棒44と、に分割されており、これらを筐体2に順次組み立てることにより作業弁4を構成している。また、切断機5の場合、取付フランジ筒51と、カッタ52及び蓋体53と、駆動機構8と、に分割されており、これらを筐体2に接続された作業弁4に順次組み立てることにより切断機5を構成している。また、バタフライ弁10の場合、仕切壁11、開閉軸12及び弁体13と、上蓋部14と、に分割されており、これらを筐体2に接続された作業弁4に順次組み立てることによりバタフライ弁10を構成している。これによれば、作業弁4、切断機5、バタフライ弁10を構成する複数の分割体を別々にクレーンで運搬できるため、クレーンへの負荷を軽減して該クレーンを小型化することができる。 As explained above, the operating valve 4, cutting machine 5, and butterfly valve 10 are each composed of multiple segments, and after the housing 2 is hermetically attached to the fluid pipe 1, the segments are sequentially assembled to the housing 2. Specifically, the operating valve 4 is divided into a valve box 41, valve disc 42, valve cover 43, and valve stem 44, and the operating valve 4 is constructed by assembling these components sequentially to the housing 2. The cutting machine 5 is also divided into a mounting flange tube 51, cutter 52, cover body 53, and drive mechanism 8, and the cutting machine 5 is constructed by assembling these components sequentially to the operating valve 4 connected to the housing 2. The butterfly valve 10 is also divided into a partition wall 11, opening/closing shaft 12, valve disc 13, and upper cover 14, and the butterfly valve 10 is constructed by assembling these components sequentially to the operating valve 4 connected to the housing 2. This allows the multiple segments that make up the working valve 4, cutting machine 5, and butterfly valve 10 to be transported separately by crane, reducing the load on the crane and allowing the crane to be made smaller.

また、複数の分割体のうち第1の分割体を筐体2に設けられた係止部に係止させ、前記係止部に係止された前記第1の分割体に、残りの第2の分割体を組み立てるようになっている。具体的には、作業弁4の場合、第1の分割体である弁箱41を筐体2の分岐部2a(係止部)に載置(係止)させ、その弁箱41に第2の分割体である弁体42及び弁蓋43を組み立てるようになっている。また、切断機5の場合、第1の分割体であるカッタ52を作業弁4を介して筐体2に接続される取付フランジ筒51の蓋体53に設けられる固定冶具55(係止部)に係止させ、そのカッタ52に第2の分割体である駆動機構8を組み立てるようになっている。また、バタフライ弁10の場合、第1の分割体である仕切壁11を作業弁4を介して筐体2に接続される円筒部材61に設けられる係止部材62(係止部)に係止させ、その仕切壁11に第2の分割体である上蓋部14を組み立てるようになっている。これによれば、複数の分割体のうち第1の分割体(弁箱41、カッタ52、仕切壁11)を筐体2の係止部(分岐部2a、固定冶具55、係止部材62)に係止させた安定状態で、この第1の分割体に残りの第2の分割体(弁体42及び弁蓋43、駆動機構8、上蓋部14)を精度高く取付けることができる。 Furthermore, the first of the multiple segments is locked onto a locking portion provided on the housing 2, and the remaining second segment is assembled to the first segment locked onto the locking portion. Specifically, in the case of the working valve 4, the valve box 41, which is the first segment, is placed (locked) onto the branch portion 2a (locking portion) of the housing 2, and the valve body 42 and valve cover 43, which are the second segment, are assembled to the valve box 41. Furthermore, in the case of the cutting machine 5, the cutter 52, which is the first segment, is locked onto a fixing jig 55 (locking portion) provided on the cover 53 of the mounting flange cylinder 51 connected to the housing 2 via the working valve 4, and the drive mechanism 8, which is the second segment, is assembled to the cutter 52. In the case of the butterfly valve 10, the partition wall 11, which is the first segment, is engaged with a locking member 62 (locking portion) provided on a cylindrical member 61 connected to the housing 2 via the working valve 4, and the top cover 14, which is the second segment, is assembled to the partition wall 11. This allows the first segment (valve box 41, cutter 52, partition wall 11) to be stably engaged with the locking portion (branch portion 2a, fixing jig 55, locking member 62) of the housing 2, and the remaining second segment (valve element 42 and valve cover 43, drive mechanism 8, top cover 14) can be attached to the first segment with high precision.

また、切断機5は、前記複数の分割体としてカッタ52と駆動機構8とから構成されており、駆動機構8は、バタフライ弁10を筐体2内に挿入可能に接続される。すなわち、切断機5を構成するカッタ52と駆動機構8とが分割されているため、カッタ52を駆動するための駆動機構8をバタフライ弁10の挿入具として利用できる。換言すれば、駆動機構8をカッタ52の駆動、進退移動用と、バタフライ弁10の挿入用として兼用できるため、構造を簡素化することができる。 The cutting machine 5 is also composed of cutters 52 and a drive mechanism 8 as the multiple segments, and the drive mechanism 8 is connected so that the butterfly valve 10 can be inserted into the housing 2. In other words, because the cutters 52 and drive mechanism 8 that make up the cutting machine 5 are separate, the drive mechanism 8 that drives the cutters 52 can be used as an insertion tool for the butterfly valve 10. In other words, the drive mechanism 8 can be used both to drive and move the cutters 52 back and forth, and to insert the butterfly valve 10, simplifying the structure.

尚、本実施例では、作業弁4、切断機5、バタフライ弁10がそれぞれ複数の分割体から構成される形態を例示したが、本発明はこれに限定されるものではなく、作業弁4、切断機5、バタフライ弁10のうち少なくとも1つが複数の分割体から構成されていればよい。また、不断流状態での切断や弁導入の際に全ての窓部や作業孔部などには蓋を密封状に取り付けるのは言うまでもない。 In this embodiment, the working valve 4, cutting machine 5, and butterfly valve 10 are each configured from multiple segments, but the present invention is not limited to this. At least one of the working valve 4, cutting machine 5, and butterfly valve 10 may be configured from multiple segments. It goes without saying that when cutting or installing valves in an uninterrupted flow state, all windows, working holes, etc. should be sealed with covers.

次に変形例1の作業弁について図23に基づいて説明する。尚、前記実施例と同一構成で重複する構成の説明を省略する。 Next, the working valve of Modification 1 will be described with reference to Figure 23. Note that explanations of components that are identical to those in the previous embodiment will be omitted.

図23に示されるように、変形例1における作業弁400は、上下方向に貫通する略筒状を成す弁箱401と、弁箱401における流体管1の管軸方向の両側に配設される弁体402A,402Bと、弁体402A,402Bを収容する弁蓋403A,403Bと、弁蓋403A,403Bに対し弁体402A,402Bを移動させる弁棒404A,404Bと、から構成されている。 As shown in Figure 23, the operating valve 400 in variant 1 is composed of a valve box 401 that is generally cylindrical and penetrates in the vertical direction, valve discs 402A and 402B that are arranged on both sides of the valve box 401 in the axial direction of the fluid pipe 1, valve covers 403A and 403B that house the valve discs 402A and 402B, and valve stems 404A and 404B that move the valve discs 402A and 402B relative to the valve covers 403A and 403B.

弁箱401は、流体管1の管軸方向に対向する開口部401a,401bが設けられており、開口部401a,401bを連通するようにスライド溝401cが形成されている。開口部401a,401bに対して弁体402A,402Bをそれぞれ挿入した状態で弁蓋403A,403Bを弁箱401に密封状に固定することで作業弁400が構成されるようになっている。弁体402A,402Bを弁箱401の両側から進行させることで、弁体402A,402Bの先端同士が当接して筐体2の分岐部2aを閉塞できるようになっている。 The valve box 401 has openings 401a and 401b that face each other in the axial direction of the fluid pipe 1, and a slide groove 401c is formed to connect the openings 401a and 401b. The valve covers 403A and 403B are hermetically fixed to the valve box 401 with the valve discs 402A and 402B inserted into the openings 401a and 401b, respectively, to form the working valve 400. By advancing the valve discs 402A and 402B from both sides of the valve box 401, the tips of the valve discs 402A and 402B come into contact with each other, blocking the branch section 2a of the housing 2.

このように弁体402A,402B、弁蓋403A,403B、弁棒404A,404Bを分割構造とし、これらを順に別々に設置することで、作業弁400を設置する際に用いるクレーンへの負荷を軽減できる。また、弁箱401には、対向する両側に開口部401a,401bを備えており、弁体402A,402B、弁蓋403A,403B、弁棒404A,404Bは、開口部401a,401bに取付けられるため、作業弁400の重量バランスを安定させることができ、作業弁400と筐体2との接続箇所に偏荷重がかかることを抑制できる。 In this way, by dividing the valve discs 402A, 402B, valve covers 403A, 403B, and valve stems 404A, 404B into separate structures and installing them separately in order, the load on the crane used to install the operating valve 400 can be reduced. Furthermore, the valve box 401 has openings 401a, 401b on opposite sides, and the valve discs 402A, 402B, valve covers 403A, 403B, and valve stems 404A, 404B are attached to the openings 401a, 401b, which stabilizes the weight balance of the operating valve 400 and prevents unbalanced loads from being applied to the connection points between the operating valve 400 and the housing 2.

次に変形例2の作業弁について図24に基づいて説明する。図24に示されるように、作業弁410は、半割部材411A(弁箱の分割体)、弁体402A、弁蓋403A、弁棒404Aがユニット化された第1分割体412と、半割部材411B(弁箱の分割体)、弁体402B、弁蓋403B、弁棒404Bがユニット化された第2分割体413と、を備え、第1分割体412と第2分割体413とを筐体2の分岐部2a上で組み立てることで構成されるようなものであってもよい。尚、筐体2の分岐部2aに各部材を組み立てて作業弁410を構成するようになっていてもよい。この場合、弁箱が複数の半割部材411A,411Bにより構成されているため、クレーンへの負荷を軽減できる。 Next, the operating valve of Modification 2 will be described with reference to Figure 24. As shown in Figure 24, the operating valve 410 may include a first divided body 412, which is a unit formed from a half member 411A (a divided body of the valve body), a valve disc 402A, a valve cover 403A, and a valve stem 404A, and a second divided body 413, which is a unit formed from a half member 411B (a divided body of the valve body), a valve disc 402B, a valve cover 403B, and a valve stem 404B. The first divided body 412 and the second divided body 413 may be assembled on the branch portion 2a of the housing 2. The operating valve 410 may also be constructed by assembling each component on the branch portion 2a of the housing 2. In this case, the valve body is constructed from multiple half members 411A, 411B, which reduces the load on the crane.

また、前記実施例では、カッタ52が円筒部材52aとセンタードリル52bとから構成されるホールソーである形態を例示したがこれに限られず、自由に変更することができる。例えば、図25に示されるように、変形例3における切断機500は、筐体20内で流体管1の所定箇所に外嵌されるカッタ機構501と、作業弁402の上方に取付けられる作業ケース502と、カッタ機構501を駆動させ且つ作業ケース502内に引き上げ可能な駆動機構800と、から構成されている。 In addition, while the above embodiment illustrates a form in which the cutter 52 is a hole saw composed of a cylindrical member 52a and a center drill 52b, this is not limited to this and can be freely modified. For example, as shown in Figure 25, the cutting machine 500 in variant 3 is composed of a cutter mechanism 501 fitted onto a predetermined location on the fluid pipe 1 inside the housing 20, a work case 502 attached above the work valve 402, and a drive mechanism 800 that drives the cutter mechanism 501 and can be raised into the work case 502.

カッタ機構501は、流体管1の外周方向に回転自在に設けられる2つのスプロケット501a,501aと、スプロケット501a,501aに駆動力を伝える駆動伝達部501bと、を備えており、スプロケット501a,501aには、流体管1を切削する切削バイト(図示略)が取付けられている。また、駆動機構800は、駆動伝達部501bに接続されるロッド801と、ロッド801を回転駆動させるモータ802と、ロッド801を引き上げ可能な引上機構803と、を備えている。 The cutter mechanism 501 includes two sprockets 501a, 501a that are rotatable around the circumference of the fluid pipe 1, and a drive transmission unit 501b that transmits driving force to the sprockets 501a, 501a. A cutting tool (not shown) that cuts the fluid pipe 1 is attached to the sprockets 501a, 501a. The drive mechanism 800 also includes a rod 801 connected to the drive transmission unit 501b, a motor 802 that rotates and drives the rod 801, and a lifting mechanism 803 that can lift the rod 801.

モータ802を駆動させることで、ロッド801及び駆動伝達部501bを介してスプロケット501a,501aが回転し流体管1を切断できる。また、スプロケット501a,501aが流体管1の切片を保持したまま、引上機構803によりカッタ機構501を作業ケース502内に引き上げることができるようになっている。 By driving the motor 802, the sprockets 501a, 501a rotate via the rod 801 and the drive transmission unit 501b, cutting the fluid pipe 1. Furthermore, while the sprockets 501a, 501a hold the cut piece of fluid pipe 1, the lifting mechanism 803 can lift the cutter mechanism 501 into the work case 502.

また、切断機の変形例として次のようなものもある。図26に示されるように、変形例4における切断機510は、筐体200の分岐部200aの上方に作業弁403を介して固定される筒状体511と、筒状体511の上部に接続されるベースプレート512と、ベースプレート512に対して相対移動可能に設けられた可動プレート513と、可動プレート513に駆動力を与える駆動手段514と、可動プレート513の上部に接続されるエンドミル515と、エンドミル515を回転させる駆動機構516と、筐体200を周方向に回転させる回転機構523と、を備えている。 Also, there is the following modified cutting machine. As shown in Figure 26, the cutting machine 510 in modified example 4 comprises a cylindrical body 511 fixed above the branching section 200a of the casing 200 via an operating valve 403, a base plate 512 connected to the top of the cylindrical body 511, a movable plate 513 movable relative to the base plate 512, a driving means 514 that applies a driving force to the movable plate 513, an end mill 515 connected to the top of the movable plate 513, a driving mechanism 516 that rotates the end mill 515, and a rotation mechanism 523 that rotates the casing 200 in the circumferential direction.

ベースプレート512の中央部には、スリット512aが開口形成されており、ベースプレート512の上面には、流体管1の管軸方向に沿って延びるレール517,517がスリット512aを挟んで並列して配置されている。尚、スリット512aの周囲には、パッキンが固着されている。 A slit 512a is formed in the center of the base plate 512, and rails 517, 517 extending along the axial direction of the fluid pipe 1 are arranged in parallel on the top surface of the base plate 512, sandwiching the slit 512a. Furthermore, a packing is fixed around the periphery of the slit 512a.

可動プレート513は、スリット513aと、レール517,517に嵌合された凹部518,518と、を有し、レール517,517上をスライド移動可能となっている。また、可動プレート513は、ネジ孔519を有する構造部520が上方に突出して形成されている。尚、可動プレート513は、ベースプレート512におけるスリット512aのパッキンに密封状に当接した状態でスライド移動するようになっている。 The movable plate 513 has a slit 513a and recesses 518, 518 that fit into the rails 517, 517, allowing it to slide along the rails 517, 517. The movable plate 513 also has a structural portion 520 that protrudes upward and has a screw hole 519. The movable plate 513 slides while in sealed contact with the packing of the slit 512a in the base plate 512.

駆動手段514は、ベースプレート512の上面に管軸方向に離間する2つの立設片521,521と、立設片521,521間に渡って回動自在且つ軸方向に移動不能に取付けられるネジ棒522と、を備え、ネジ棒522は、可動プレート513における構造部520のネジ孔519に螺挿されている。すなわち、ネジ棒522が軸回りに回動することにより可動プレート513が流体管1の管軸方向にスライドするようになる。尚、ネジ棒522の一端には、ハンドル522aが取付けられており、ハンドル522aを把持してネジ棒522の回動操作を行うことができるようになっている。 The driving means 514 comprises two standing pieces 521, 521 spaced apart in the pipe axial direction on the upper surface of the base plate 512, and a threaded rod 522 attached between the standing pieces 521, 521 so as to be rotatable but immovable in the axial direction. The threaded rod 522 is threaded into a threaded hole 519 in a structural portion 520 of the movable plate 513. In other words, rotation of the threaded rod 522 around its axis causes the movable plate 513 to slide in the pipe axial direction of the fluid pipe 1. A handle 522a is attached to one end of the threaded rod 522, and the threaded rod 522 can be rotated by grasping the handle 522a.

これによれば、エンドミル515を駆動機構516により回転させながら進行させることで流体管1を穿孔することができ、その状態で可動プレート513を流体管1の管軸方向にスライドさせることで、流体管1に管軸方向に延びる第1切削部(図示略)を形成することができる。また、第1切削部を形成した後、エンドミル515を第1切削部の軸方向中央部に位置させ、回転機構523により筐体200を回転させることで流体管1の周方向に沿って延びる第2切削部を形成することができる。 In this way, the fluid pipe 1 can be drilled by rotating and advancing the end mill 515 using the drive mechanism 516, and in this state, the movable plate 513 can be slid in the axial direction of the fluid pipe 1 to form a first cutting portion (not shown) in the fluid pipe 1 that extends in the axial direction. After forming the first cutting portion, the end mill 515 can be positioned in the axial center of the first cutting portion, and the housing 200 can be rotated by the rotation mechanism 523 to form a second cutting portion that extends circumferentially around the fluid pipe 1.

すなわち、前記第1切削部に弁体13を挿通させ、前記第2切削部に仕切壁11を挿通させることで、弁体13を開放した状態でバタフライ弁10を流体管1内に設置することができるため、流体管1を流れる流体による影響を抑制することができる。このように、少なくともバタフライ弁10等の制流体を挿入設置できる開口を形成できるものであれば、流体管1を切断することに限らない。 In other words, by inserting the valve disc 13 through the first cutout and the partition wall 11 through the second cutout, the butterfly valve 10 can be installed in the fluid pipe 1 with the valve disc 13 in an open state, thereby suppressing the effects of the fluid flowing through the fluid pipe 1. In this way, the fluid pipe 1 does not have to be cut, as long as it is possible to create an opening through which at least a fluid control device such as the butterfly valve 10 can be inserted and installed.

以上、本発明の実施例を図面により説明してきたが、具体的な構成はこれら実施例に限られるものではなく、本発明の要旨を逸脱しない範囲における変更や追加があっても本発明に含まれる。 Although embodiments of the present invention have been described above with reference to the drawings, the specific configuration is not limited to these embodiments, and modifications and additions that do not deviate from the gist of the present invention are also included in the present invention.

例えば、前記実施例では、制流体としてバタフライ弁10を用いる形態を例示したが、本発明はこれに限られず、例えば、制流体は、仕切弁、プラグ、または切換弁等であってもよい。例えば前記実施例では、バタフライ弁10を複数の分割体から構成される態様を例示したが、これに限らず制流体を一体に構成してもよい。 For example, while the above embodiment illustrates a configuration in which a butterfly valve 10 is used as a fluid control valve, the present invention is not limited to this. For example, the fluid control valve may be a gate valve, plug, or switching valve. For example, while the above embodiment illustrates a configuration in which the butterfly valve 10 is composed of multiple divided bodies, the present invention is not limited to this and the fluid control valve may be composed of a single body.

1 流体管
2 筐体
2a 分岐部(開口部)
2b フランジ(係止部)
4 作業弁
5 切断機
6 弁導入機
7 ジャッキ(スペーサ)
8 駆動機構(駆動部、挿入機、第2の分割体)
10 バタフライ弁(制流体)
11 仕切壁(本体部、第1の分割体)
12 開閉軸(本体部、第1の分割体)
13 弁体(本体部、第1の分割体)
14 上蓋部(蓋体部、第2の分割体)
20 筐体
41 弁箱(第1の分割体)
41c 弁座部
42 弁体(第2の分割体)
43 弁蓋(第2の分割体)
44 弁棒(第2の分割体)
51 取付フランジ筒(筒状体)
52 カッタ(第1の分割体)
53 蓋体(第1の分割体)
54 アダプタ(第1の分割体)
55 固定冶具(係止部)
61 円筒部材(筒状体)
62 係止部材(係止部)
63 取付フランジ筒(筒状体)
64 弁吊金具
65 蓋体
66 アダプタ
81,81’ 軸部材(駆動軸)
86 ケース部(ケース)
200 筐体
200a 分岐部(開口部)
400 作業弁
401 弁箱(第1の分割体)
402 作業弁
402A,402B 弁体(第2の分割体)
403 作業弁
403A,403B 弁蓋(第2の分割体)
404A,404B 弁棒(第2の分割体)
410 作業弁
411A,411B 半割部材
412 第1分割体
413 第2分割体
500 切断機
510 切断機
1 Fluid pipe 2 Housing 2a Branching portion (opening)
2b Flange (locking part)
4 Working valve 5 Cutting machine 6 Valve introduction machine 7 Jack (spacer)
8. Drive mechanism (drive unit, inserter, second divided body)
10. Butterfly valve (fluid control)
11 Partition wall (main body, first divided body)
12 Opening/closing shaft (main body, first divided body)
13 Valve body (main body, first divided body)
14 Upper lid portion (lid body portion, second divided body)
20 Housing 41 Valve box (first divided body)
41c Valve seat portion 42 Valve body (second divided body)
43 Opercle (second segment)
44 Valve stem (second divided body)
51 Mounting flange cylinder (cylindrical body)
52 Cutter (first divided body)
53 Lid body (first divided body)
54 Adapter (first divided body)
55 Fixing jig (locking part)
61 Cylindrical member (cylindrical body)
62 Locking member (locking part)
63 Mounting flange cylinder (cylindrical body)
64 Valve hanging fitting 65 Cover body 66 Adapter 81, 81' Shaft member (drive shaft)
86 Case part (case)
200 Housing 200a Branching portion (opening)
400 Working valve 401 Valve body (first divided body)
402 Working valve 402A, 402B Valve body (second divided body)
403 Working valve 403A, 403B Valve cover (second divided body)
404A, 404B Valve stem (second divided body)
410: Working valve 411A, 411B: Half-split member 412: First divided body 413: Second divided body 500: Cutting machine 510: Cutting machine

Claims (2)

流体管に対し密封状に取付けられる筐体と、該筐体の開口部に取付けられ該筐体の内部を開閉可能な作業弁と、該作業弁に取付けられる切断機とを備え、前記流体管の流路を制御する、弁本体部及び上蓋部を有する制流体を、前記切断機を用いて流体管が切断された前記筐体内に不断流状態で設置するために、前記切断機及び前記制流体を管内流体の存在しない状態の空間において吊持して設置する制流体の設置装置の組立方法であって、
前記制流体は、前記弁本体部と前記上蓋部の分割体から構成されており、前記流体管に前記筐体を密封状に取付けた後、前記分割体のうち第1の分割体である前記弁本体部を吊り下ろし、前記作業弁を介し前記筐体に接続された筒状体で支持された係止部の先端部に、前記弁本体部の上端部に形成された突出片を載置して係止させた状態とし、残りの第2の分割体である前記上蓋部を吊り下ろし、前記係止部に係止された前記弁本体部に対して、前記上蓋部を組み立てた後、前記係止部の係止を解除することを特徴とする制流体の設置装置の組立方法。
A method for assembling a fluid control device comprising: a housing to be attached to a fluid pipe in a sealed manner; an operation valve attached to an opening of the housing to open and close the inside of the housing; and a cutting machine attached to the operation valve, the fluid control device having a valve body and an upper cover that controls the flow path of the fluid pipe, the cutting machine and the fluid control device being suspended and installed in a space where there is no fluid in the pipe, in order to install the fluid control device in an uninterrupted flow state inside the housing where the fluid pipe has been cut using the cutting machine,
The fluid control device is composed of two divided parts: the valve main body and the top cover. After the housing is sealed to the fluid pipe, the valve main body, which is the first of the divided parts, is hung down, and a protruding piece formed on the upper end of the valve main body is placed on and engaged with the tip of a locking part supported by a cylindrical body connected to the housing via the working valve. The remaining second divided part, the top cover, is then hung down, and the top cover is assembled to the valve main body that is locked to the locking part. After that, the locking part is released.
前記第2の分割体をクレーンに接続した状態で、該第2の分割体を前記第1の分割体に組み立てることを特徴とする請求項1に記載の制流体の設置装置の組立方法。 The method for assembling a fluid control installation device described in claim 1, characterized in that the second divided body is assembled to the first divided body while the second divided body is connected to a crane.
JP2024161601A 2017-10-13 2024-09-19 Method for assembling a fluid control installation device Active JP7804022B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2024161601A JP7804022B2 (en) 2017-10-13 2024-09-19 Method for assembling a fluid control installation device

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2017199698A JP6952564B2 (en) 2017-10-13 2017-10-13 How to assemble the control fluid installation device
JP2021157107A JP7343558B2 (en) 2017-10-13 2021-09-27 How to assemble a fluid control installation device
JP2023140691A JP2023155435A (en) 2017-10-13 2023-08-31 Assembling method for installation device for straightening body
JP2024161601A JP7804022B2 (en) 2017-10-13 2024-09-19 Method for assembling a fluid control installation device

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2023140691A Division JP2023155435A (en) 2017-10-13 2023-08-31 Assembling method for installation device for straightening body

Publications (2)

Publication Number Publication Date
JP2024178286A JP2024178286A (en) 2024-12-24
JP7804022B2 true JP7804022B2 (en) 2026-01-21

Family

ID=66543178

Family Applications (6)

Application Number Title Priority Date Filing Date
JP2017199698A Active JP6952564B2 (en) 2017-10-13 2017-10-13 How to assemble the control fluid installation device
JP2021157107A Active JP7343558B2 (en) 2017-10-13 2021-09-27 How to assemble a fluid control installation device
JP2023140691A Pending JP2023155435A (en) 2017-10-13 2023-08-31 Assembling method for installation device for straightening body
JP2023184475A Pending JP2023178491A (en) 2017-10-13 2023-10-27 Assembly method of installation device of flow control body
JP2024161601A Active JP7804022B2 (en) 2017-10-13 2024-09-19 Method for assembling a fluid control installation device
JP2025044811A Pending JP2025090838A (en) 2017-10-13 2025-03-19 Method for assembling a flow control installation device

Family Applications Before (4)

Application Number Title Priority Date Filing Date
JP2017199698A Active JP6952564B2 (en) 2017-10-13 2017-10-13 How to assemble the control fluid installation device
JP2021157107A Active JP7343558B2 (en) 2017-10-13 2021-09-27 How to assemble a fluid control installation device
JP2023140691A Pending JP2023155435A (en) 2017-10-13 2023-08-31 Assembling method for installation device for straightening body
JP2023184475A Pending JP2023178491A (en) 2017-10-13 2023-10-27 Assembly method of installation device of flow control body

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2025044811A Pending JP2025090838A (en) 2017-10-13 2025-03-19 Method for assembling a flow control installation device

Country Status (1)

Country Link
JP (6) JP6952564B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6952564B2 (en) * 2017-10-13 2021-10-20 コスモ工機株式会社 How to assemble the control fluid installation device
JP7446366B2 (en) * 2021-06-29 2024-03-08 コスモ工機株式会社 How to install the work valve
JP7585388B2 (en) * 2022-02-10 2024-11-18 コスモ工機株式会社 How to install a flow control

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007309490A (en) 2006-05-22 2007-11-29 Waterworks Technology Development Organization Co Ltd Installation method of flow path switching valve for existing fluid pipe
JP2010196762A (en) 2009-02-24 2010-09-09 Cosmo Koki Co Ltd Water control body installing device and water control body installing method

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5942193B2 (en) * 1980-09-03 1984-10-13 矢野技研株式会社 Fluid control valve installation method
JPS60154692U (en) * 1984-03-24 1985-10-15 矢野技研株式会社 Fluid transport pipe connection structure
JPS6228596A (en) * 1985-07-26 1987-02-06 コスモ工機株式会社 Normal-water branching execution method of city water duct
JPH09155610A (en) * 1995-12-08 1997-06-17 Sekisui Chem Co Ltd Branching jig
JP4114774B2 (en) 2002-05-14 2008-07-09 コスモ工機株式会社 Chip recovery device in continuous water cutting device
US6776184B1 (en) * 2003-02-28 2004-08-17 Occlude Insertion valve and installation method
JP3963909B2 (en) 2004-07-01 2007-08-22 株式会社水道技術開発機構 Valve installation method for existing pipe and cutting device used therefor
JP4086838B2 (en) * 2004-11-08 2008-05-14 株式会社水道技術開発機構 Existing pipe valve installation equipment
JP4399421B2 (en) 2006-02-06 2010-01-13 株式会社水道技術開発機構 Non-water-based fluid control valve installation method
JP5019903B2 (en) 2007-02-14 2012-09-05 コスモ工機株式会社 Continuous water control body installation device
JP5153426B2 (en) * 2008-04-14 2013-02-27 コスモ工機株式会社 Branch port closing means and method
KR100983640B1 (en) * 2008-06-21 2010-09-24 한국건설기술연구원 Saddle fountain using the method of perforation and the number perforation
JP5484758B2 (en) * 2009-03-13 2014-05-07 コスモ工機株式会社 Pipe cutting device
JP5297296B2 (en) * 2009-08-10 2013-09-25 株式会社水道技術開発機構 Work gate valve
KR20110082887A (en) * 2010-01-12 2011-07-20 임명수 Unlimited number of pavilions
JP5764476B2 (en) * 2011-11-22 2015-08-19 コスモ工機株式会社 Work tool introduction method
US9789585B2 (en) * 2012-01-30 2017-10-17 Mitsubishi Heavy Industries, Ltd. WJP execution method for reactor vessel lid and jigs
JP5981207B2 (en) * 2012-04-24 2016-08-31 コスモ工機株式会社 Installation tool introduction method
JP6474579B2 (en) * 2014-10-01 2019-02-27 コスモ工機株式会社 Valve device
JP6405231B2 (en) 2014-12-26 2018-10-17 株式会社水道技術開発機構 Work tool introduction method and work tool introduction device
JP6952565B2 (en) * 2017-10-13 2021-10-20 コスモ工機株式会社 How to install the cutting device
JP7187201B2 (en) * 2017-10-13 2022-12-12 コスモ工機株式会社 How to install the work valve
JP6952564B2 (en) * 2017-10-13 2021-10-20 コスモ工機株式会社 How to assemble the control fluid installation device
JP7025882B2 (en) * 2017-10-13 2022-02-25 コスモ工機株式会社 How to install the control fluid

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007309490A (en) 2006-05-22 2007-11-29 Waterworks Technology Development Organization Co Ltd Installation method of flow path switching valve for existing fluid pipe
JP2010196762A (en) 2009-02-24 2010-09-09 Cosmo Koki Co Ltd Water control body installing device and water control body installing method

Also Published As

Publication number Publication date
JP6952564B2 (en) 2021-10-20
JP2021191978A (en) 2021-12-16
JP2024178286A (en) 2024-12-24
JP2023178491A (en) 2023-12-14
JP2025090838A (en) 2025-06-17
JP7343558B2 (en) 2023-09-12
JP2023155435A (en) 2023-10-20
JP2019074122A (en) 2019-05-16

Similar Documents

Publication Publication Date Title
JP7804022B2 (en) Method for assembling a fluid control installation device
JP7767518B2 (en) How to install the work valve
JP7475504B2 (en) How to install the disconnect device
JP7025882B2 (en) How to install the control fluid
JP7627729B2 (en) Fluid Control Device
JP6931314B2 (en) Control fluid
JP7284841B2 (en) Fluid control installation method
JP2025111798A (en) Removal method of cutting device
JP7585388B2 (en) How to install a flow control
JP2004286228A (en) Valve installation method for existing pipe and valve used for the method
JP6937221B2 (en) Flow control device
JP2024160540A (en) Method for assembling a flow control installation device
JP7538973B2 (en) How to remove the working valve
JP7511273B2 (en) How to install a gate valve
JP7778358B2 (en) Fluid tube drilling method
JP7223415B2 (en) Valve installation method and valve installation equipment and valve device used for it
JP2024048972A (en) Uninterrupted flow method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240919

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250418

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250422

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250612

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250826

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20251021

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20251021

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260106

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260108

R150 Certificate of patent or registration of utility model

Ref document number: 7804022

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150