JP7804492B2 - Unloading device, control method for unloading device, and control program for unloading device - Google Patents
Unloading device, control method for unloading device, and control program for unloading deviceInfo
- Publication number
- JP7804492B2 JP7804492B2 JP2022036366A JP2022036366A JP7804492B2 JP 7804492 B2 JP7804492 B2 JP 7804492B2 JP 2022036366 A JP2022036366 A JP 2022036366A JP 2022036366 A JP2022036366 A JP 2022036366A JP 7804492 B2 JP7804492 B2 JP 7804492B2
- Authority
- JP
- Japan
- Prior art keywords
- cargo
- unit
- trajectory
- unloading
- shape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ship Loading And Unloading (AREA)
Description
本発明は船の積荷を荷下ろしする荷下ろし装置等に関する。 The present invention relates to an unloading device for unloading cargo from a ship.
船の積荷を荷下ろしする荷下ろし装置として、船に積まれた船荷を陸に荷揚げする荷揚げ装置が知られている。このような荷揚げ装置のうち、石炭や鉄鉱石等のばら積み貨物またはばら荷を荷役するものはアンローダ(Unloader)とも呼ばれる。また、船に積まれたばら荷を連続的に荷役するという意味で、連続アンローダまたは船舶用連続アンローダ(Continuous Ship Unloader)と呼ばれることもある。本明細書ではその略語であるCSUの表記を用いることがある。 Unloading equipment that unloads cargo from a ship onto land is known as unloading equipment for unloading cargo from a ship. Among such unloading equipment, those that handle bulk cargo or bulk materials such as coal or iron ore are also called unloaders. They are also sometimes called continuous unloaders or continuous ship unloaders, as they continuously unload bulk materials loaded on a ship. In this specification, the abbreviation CSU may be used.
CSUによる船庫外への積荷の搬出を支援するために、船庫内を移動可能なブルドーザが利用されることがある。ブルドーザは船庫内を移動しながら積荷を集め、CSUはブルドーザによって集められた積荷を効率的に船庫外に搬出できる。しかし、ブルドーザは搭乗するオペレータによってマニュアル操縦されるため、CSUの搬出効率に直結する積荷を集める効率(以下では集約効率または集荷効率ともいう)がオペレータの経験や技能によって大きく変わってしまう。 To assist the CSU in removing cargo from the shed, a bulldozer that can move around the shed is sometimes used. The bulldozer collects cargo as it moves around the shed, and the CSU can efficiently remove the cargo collected by the bulldozer from the shed. However, because bulldozers are manually operated by an operator on board, the efficiency of collecting cargo (hereinafter referred to as collection efficiency or cargo collection efficiency), which is directly linked to the CSU's removal efficiency, varies greatly depending on the operator's experience and skill.
本発明はこうした状況に鑑みてなされたものであり、その目的は、船庫内の積荷の搬出効率を安定的に高められる荷下ろし装置等を提供することにある。 The present invention was made in consideration of these circumstances, and its purpose is to provide an unloading device that can stably increase the efficiency of unloading cargo from a shipyard.
上記課題を解決するために、本発明のある態様の荷下ろし装置は、船庫内で積荷を集約する集約装置の位置を検知する集約装置位置検知部と、船庫内の積荷を搬出装置によって船庫外に搬出させる搬出装置制御部と、船庫内の積荷形状を検知する積荷形状検知部と、集約装置位置検知部によって検知された集約装置の位置および積荷形状検知部によって検知された積荷形状に応じて、集約装置の船庫内の軌道を生成する軌道生成部と、を備える。 To solve the above problem, one aspect of the present invention provides an unloading device that includes a consolidation device position detection unit that detects the position of a consolidation device that consolidates cargo within the warehouse; a discharge device control unit that causes the cargo within the warehouse to be discharged out of the warehouse by a discharge device; a cargo shape detection unit that detects the shape of the cargo within the warehouse; and a trajectory generation unit that generates a trajectory for the consolidation device within the warehouse based on the position of the consolidation device detected by the consolidation device position detection unit and the shape of the cargo detected by the cargo shape detection unit.
この態様によれば、ブルドーザ等の集約装置の位置および船庫内の積荷形状が検知され、それらに基づいて集約装置の船庫内の軌道が生成されるため、当該軌道に従って集約装置を運転することで船庫内の積荷の集約効率または集荷効率を高め、ひいては搬出装置による積荷の搬出効率を高められる。 In this aspect, the position of a consolidation device such as a bulldozer and the shape of the cargo inside the warehouse are detected, and a trajectory for the consolidation device inside the warehouse is generated based on these. By operating the consolidation device according to this trajectory, the efficiency of consolidating or collecting cargo inside the warehouse can be improved, and ultimately the efficiency of cargo removal by the removal device can be improved.
本発明の別の態様は、荷下ろし装置の制御方法である。この方法は、船庫内で積荷を集約する集約装置の位置を検知する集約装置位置検知ステップと、船庫内の積荷を搬出装置によって船庫外に搬出させる搬出装置制御ステップと、船庫内の積荷形状を検知する積荷形状検知ステップと、集約装置位置検知ステップによって検知された集約装置の位置および積荷形状検知ステップによって検知された積荷形状に応じて、集約装置の船庫内の軌道を生成する軌道生成ステップと、を備える。 Another aspect of the present invention is a method for controlling an unloading device. This method includes a consolidation device position detection step for detecting the position of a consolidation device that consolidates cargo within a shipyard; a discharge device control step for causing a discharge device to discharge the cargo within the shipyard out of the shipyard; a cargo shape detection step for detecting the cargo shape within the shipyard; and a trajectory generation step for generating a trajectory for the consolidation device within the shipyard in accordance with the position of the consolidation device detected in the consolidation device position detection step and the cargo shape detected in the cargo shape detection step.
なお、以上の構成要素の任意の組合せ、本発明の表現を方法、装置、システム、記録媒体、コンピュータプログラムなどの間で変換したものもまた、本発明の態様として有効である。 In addition, any combination of the above components, and any transformation of the present invention into a method, device, system, recording medium, computer program, etc., are also valid aspects of the present invention.
本発明によれば、船庫内の積荷の搬出効率を安定的に高められる。 This invention enables stable improvement in the efficiency of unloading cargo from a shipyard.
以下、図面を参照しながら、本発明を実施するための形態について詳細に説明する。説明または図面において同一または同等の構成要素、部材、処理には同一の符号を付し、重複する説明は省略する。図示される各部の縮尺や形状は、説明を容易にするために便宜的に設定されており、特に言及がない限りは限定的に解釈されるものではない。実施形態は例示であり、本発明の範囲を何ら限定するものではない。実施形態に記載される全ての特徴やそれらの組合せは、必ずしも発明の本質的なものであるとは限らない。 Hereinafter, with reference to the drawings, a detailed description of the embodiments of the present invention will be given. In the description or drawings, the same or equivalent components, parts, and processes are designated by the same reference numerals, and duplicate explanations will be omitted. The scale and shape of each part shown in the drawings have been set for convenience to facilitate explanation, and should not be interpreted as limiting unless otherwise specified. The embodiments are illustrative and do not limit the scope of the present invention in any way. All features and combinations thereof described in the embodiments are not necessarily essential to the invention.
図1は、本発明の実施形態に係る荷下ろし装置としての荷揚げ装置1の全体的な構成を示す。荷揚げ装置1は船200に積まれた積荷または船荷としてのばら荷Mを陸に荷揚げする連続アンローダまたは船舶用連続アンローダである。以下、荷揚げ装置1をCSU1とも表記する。CSU1は港湾等の埠頭102の岸壁101に接岸された船200の船庫201内に格納されたばら荷Mを連続的に陸上へ搬出する。ばら荷Mとしては、石炭、コークス、鉱石等が例示される。CSU1は、その本体部に設けられる主操作室16内の操作者によって操作される。CSU1を操作する操作室は、CSU1の他の場所に設けてもよいし、CSU1外の陸地上の任意の場所に設けてもよい。 Figure 1 shows the overall configuration of a lifting device 1 as a cargo unloading device according to an embodiment of the present invention. The lifting device 1 is a continuous unloader or a continuous ship unloader that unloads bulk cargo M loaded on a ship 200 or as cargo to land. Hereinafter, the lifting device 1 will also be referred to as a CSU 1. The CSU 1 continuously transports bulk cargo M stored in a ship 201 of a ship 200 docked at a quay 101 of a wharf 102 at a port or the like to land. Examples of bulk cargo M include coal, coke, ore, etc. The CSU 1 is operated by an operator in a main control room 16 provided in its main body. The control room for operating the CSU 1 may be provided elsewhere within the CSU 1, or may be provided at any location on land outside the CSU 1.
船200が接岸する埠頭102は、ばら荷Mが荷揚げされる陸地を構成し、鉄筋コンクリート等の高強度の材料で構成される。図2の斜視図にも示されるように、埠頭102には、岸壁101に接岸して停泊中の船200の長手方向(図1の紙面に垂直な方向)に沿った線路としての一対の平行なレール3が設けられる。レール3はCSU1の移動部としての走行部2が移動可能または走行可能な軌道を構成する。このレール3によってCSU1は停泊中の船200に対して移動可能である。図2に示されるようにレール3の設置方向は停泊中の船200または岸壁101の長手方向と一致させるのが好ましいが、その他の任意の方向としてもよい。また、レール3は曲線部や屈曲部を含んでもよい。船200からの荷揚げの際は、CSU1がレール3上を移動して荷揚げ対象の船庫201の開口部21に接近した位置まで移動する。その後、走行部2、旋回フレーム5(旋回部)、荷揚げ部9(搬出部または搬出装置)を駆動して、船庫201からばら荷Mを荷揚げする。 The wharf 102 where the ship 200 docks constitutes the land where bulk cargo M is unloaded, and is constructed of high-strength materials such as reinforced concrete. As shown in the perspective view of Figure 2, the wharf 102 is provided with a pair of parallel rails 3 as tracks that run along the longitudinal direction (perpendicular to the plane of Figure 1) of the ship 200 docked and anchored at the quay 101. The rails 3 form a track along which the traveling unit 2, which serves as the mobile unit of the CSU 1, can move or run. These rails 3 enable the CSU 1 to move relative to the anchored ship 200. As shown in Figure 2, the installation direction of the rails 3 is preferably aligned with the longitudinal direction of the anchored ship 200 or the quay 101, but may be any other direction. The rails 3 may also include curved or bent portions. When unloading cargo from the ship 200, the CSU 1 moves on the rails 3 to a position close to the opening 21 of the shiphouse 201 from which the cargo is to be unloaded. The traveling section 2, the swivel frame 5 (swivel section), and the lifting section 9 (unloading section or unloading device) are then driven to unload the bulk goods M from the warehouse 201.
埠頭102には、荷揚げされたばら荷Mを一定方向に運搬するコンベアとしてのベルトコンベア45が一対のレール3の間に設けられる。図2に示されるようにベルトコンベア45の設置方向すなわち運搬方向はレール3の設置方向と一致させるのが好ましいが、その他の任意の方向としてもよい。また、ベルトコンベア45は曲線部や屈曲部を含んでもよい。ベルトコンベア45は、CSU1から荷揚げされたばら荷Mを受け取る場所では一対のレール3の間に設けられる必要があるが、それ以外の場所では一対のレール3の外側に設けられてもよい。 At the wharf 102, a belt conveyor 45 is installed between the pair of rails 3 as a conveyor that transports unloaded bulk goods M in a certain direction. As shown in Figure 2, the installation direction of the belt conveyor 45, i.e., the transport direction, preferably coincides with the installation direction of the rails 3, but may be any other direction. The belt conveyor 45 may also include curved or bent portions. The belt conveyor 45 must be installed between the pair of rails 3 at the location where the bulk goods M unloaded from the CSU 1 are received, but may be installed outside the pair of rails 3 at other locations.
CSU1は、船200に対して移動可能な移動部としての走行部2と、走行部2に対して旋回可能な旋回部を構成する旋回フレーム5と、旋回フレーム5の先端側に設けられ、ばら荷Mを搬出する搬出部または搬出装置としての荷揚げ部9を備える。旋回フレーム5は走行部2上に鉛直方向(図1の上下方向)の旋回軸の周りに旋回可能に支持される。旋回フレーム5には旋回軸に交差する横方向に延びるブーム7が設けられ、その先端部に荷揚げ部9の主要部を構成するバケットエレベータが支持される。 The CSU 1 comprises a traveling section 2 as a mobile section that can move relative to the ship 200, a swivel frame 5 that constitutes a swivel section that can swivel relative to the traveling section 2, and a lifting section 9 that is provided at the tip of the swivel frame 5 and serves as an unloading section or unloading device for unloading bulk cargo M. The swivel frame 5 is supported on the traveling section 2 so that it can swivel around a vertical (up and down in Figure 1) pivot axis. The swivel frame 5 is provided with a boom 7 that extends laterally and intersects the pivot axis, and a bucket elevator that constitutes the main part of the unloading section 9 is supported at the tip of the boom 7.
荷揚げ部9は、旋回フレーム5、ブーム7、平行リンク8との間で構成される平行リンク機構によって、ブーム7の起伏角度(図1の紙面に垂直な起伏軸の周りの回転角度)によらず鉛直姿勢を保つ。また、旋回フレーム5におけるブーム7の先端部とは反対側の後端部にはカウンタウエイト13が設けられる。カウンタウエイト13はバランシングレバー12を介してブーム7の先端部と接続される。このカウンタウエイト13の作用によって荷揚げ部9は実質的に無負荷の状態となり、安定した荷重バランスが実現される。なお、旋回フレーム5、ブーム7、バランシングレバー12、カウンタウエイト13等、旋回部を構成する主要な構成を以下では本体部と総称することがある。 The lifting unit 9 maintains a vertical position regardless of the boom 7's hoisting angle (the angle of rotation around the hoisting axis perpendicular to the plane of the page in Figure 1) thanks to a parallel link mechanism formed between the swivel frame 5, boom 7, and parallel link 8. A counterweight 13 is attached to the rear end of the swivel frame 5, opposite the tip of the boom 7. The counterweight 13 is connected to the tip of the boom 7 via a balancing lever 12. The action of this counterweight 13 places the lifting unit 9 in a substantially unloaded state, achieving stable load balance. The main components of the swivel unit, including the swivel frame 5, boom 7, balancing lever 12, and counterweight 13, may be collectively referred to below as the main body.
ブーム7の起伏角度を調整するためにシリンダ15が設けられる。シリンダ15が基準長の時は起伏角度が0°、すなわちブーム7は地面に平行または水平(図1の左右方向)である。シリンダ15を基準長より伸ばすとブーム7の先端部が上昇し、正の起伏角度が生じる。シリンダ15を基準長より縮めるとブーム7の先端部が下降し、負の起伏角度が生じる。ブーム7の先端部に支持された荷揚げ部9は、ブーム7の起伏角度が大きくなると鉛直姿勢を保ったまま上昇し、ブーム7の起伏角度が小さくなると鉛直姿勢を保ったまま下降する。 A cylinder 15 is provided to adjust the boom 7's hoisting angle. When the cylinder 15 is at its standard length, the hoisting angle is 0°, meaning the boom 7 is parallel or horizontal to the ground (left and right in Figure 1). When the cylinder 15 is extended beyond its standard length, the tip of the boom 7 rises, resulting in a positive hoisting angle. When the cylinder 15 is shortened beyond its standard length, the tip of the boom 7 descends, resulting in a negative hoisting angle. The lifting unit 9 supported at the tip of the boom 7 rises while maintaining a vertical position when the boom 7's hoisting angle increases, and descends while maintaining a vertical position when the boom 7's hoisting angle decreases.
CSU1を操作する主操作室16は本体部に設けられる。具体的には、旋回フレーム5の荷揚げ部9側に主操作室16が設けられる。主操作室16内の操作者は荷揚げ部9を視認しながら安全にCSU1を操作できる。主操作室16の操作に応じて、走行部2の位置、旋回フレーム5の旋回角度、ブーム7の起伏角度等のCSU1の位置や姿勢に関するパラメータが制御される。また、荷揚げ部9によるばら荷Mの搬出動作も主操作室16によって操作可能である。 The main control room 16 for operating the CSU 1 is located in the main body. Specifically, the main control room 16 is located on the lifting unit 9 side of the revolving frame 5. An operator in the main control room 16 can safely operate the CSU 1 while visually checking the lifting unit 9. Parameters related to the position and attitude of the CSU 1, such as the position of the traveling unit 2, the rotation angle of the revolving frame 5, and the elevation angle of the boom 7, are controlled by operating the main control room 16. The operation of the lifting unit 9 to transport bulk goods M can also be controlled from the main control room 16.
荷揚げ部9は、ばら荷Mを掻き取る掻き取り部11と、掻き取られたばら荷Mを上方に運搬するエレベータ部としてのバケットエレベータを備える。掻き取り部11は荷揚げ部9の下部に設けられ、その外周に沿って移動可能に設けられた多数のバケット27(図3参照)によって船庫201内のばら荷Mを連続的に掘削して掻き取る。掻き取られたばら荷Mは、バケットエレベータによってバケット27と共に上方に運搬される。 The unloading section 9 is equipped with a scraping section 11 that scrapes off bulk goods M, and a bucket elevator that serves as an elevator section that transports the scraped bulk goods M upward. The scraping section 11 is located below the unloading section 9, and continuously excavates and scrapes off the bulk goods M in the warehouse 201 using a number of buckets 27 (see Figure 3) that are movably mounted along its periphery. The scraped bulk goods M are transported upward together with the buckets 27 by the bucket elevator.
図3は、荷揚げ部9の詳細な構成を示す。バケットエレベータは、鉛直方向に延伸する筒状のエレベータ本体14と、エレベータ本体14に対して周回運動するチェーンバケット29を備える。チェーンバケット29は、それぞれが無端チェーンで構成される一対のローラチェーン25と、当該一対のローラチェーン25によって両側が支持される複数のバケット27を備える。具体的には、一対のローラチェーン25は図3(B)の紙面に垂直な方向に並設され、各バケット27は一対のローラチェーン25の間に吊り下げられるように取り付けられる。 Figure 3 shows the detailed configuration of the lifting section 9. The bucket elevator comprises a cylindrical elevator body 14 extending vertically and a chain bucket 29 that moves in circles relative to the elevator body 14. The chain bucket 29 comprises a pair of roller chains 25, each of which is an endless chain, and a plurality of buckets 27 supported on both sides by the pair of roller chains 25. Specifically, the pair of roller chains 25 are arranged side by side in a direction perpendicular to the plane of the paper in Figure 3 (B), and each bucket 27 is attached so that it is suspended between the pair of roller chains 25.
バケットエレベータは、架け渡されたローラチェーン25をガイドする駆動ローラ31aと、従動ローラ31b、31cと、転向ローラ33を備える。駆動ローラ31aは、バケットエレベータの最上部9aに設けられ、図示しないモータ等によって回転駆動されることでチェーンバケット29を周回運動させる。従動ローラ31bは掻き取り部11の前方(図3(B)の左方)に設けられ、従動ローラ31cは掻き取り部11の後方(図3(B)の右方)に設けられ、それぞれ周回運動するチェーンバケット29をガイドする。転向ローラ33は駆動ローラ31aの下方に設けられる従動ローラであり、周回運動するチェーンバケット29をガイドすると共に、その運動方向を転換する。従動ローラ31bと従動ローラ31cの間には伸縮可能なシリンダ35が設けられる。このシリンダ35が伸縮すると、両従動ローラ31b、31cの軸間距離が変わり、チェーンバケット29の周回運動の軌道が変わる。シリンダ35の伸縮制御は、主操作室16の操作で行ってもよいし、CSU1に組み込まれたコンピュータがプログラムに従って自動的に行ってもよい。なお、ローラチェーン25が2本設けられることに対応して、駆動ローラ31a、従動ローラ31b、31c、転向ローラ33も、それぞれ2個設けられ、図3(B)の紙面に垂直な方向に並設される。 The bucket elevator is equipped with a drive roller 31a, driven rollers 31b and 31c, and a diverting roller 33 that guide the roller chain 25 that is stretched across it. The drive roller 31a is located at the top 9a of the bucket elevator and is driven to rotate by a motor (not shown) or similar device, causing the chain bucket 29 to move in an orbital motion. The driven roller 31b is located in front of the scraping section 11 (left side of Figure 3(B)), and the driven roller 31c is located behind the scraping section 11 (right side of Figure 3(B)), and each guides the orbiting chain bucket 29. The diverting roller 33 is a driven roller located below the drive roller 31a, and guides the orbiting chain bucket 29 and changes its direction of movement. An extendable cylinder 35 is located between the driven rollers 31b and 31c. When this cylinder 35 extends or retracts, the distance between the axes of the driven rollers 31b and 31c changes, changing the trajectory of the orbital motion of the chain bucket 29. The extension and retraction of the cylinder 35 can be controlled by operating the main operation room 16, or automatically by a computer built into the CSU 1 according to a program. Since two roller chains 25 are provided, two drive rollers 31a, two driven rollers 31b and 31c, and two deflection rollers 33 are also provided, and are arranged side by side in a direction perpendicular to the plane of the paper in Figure 3(B).
駆動ローラ31aの回転駆動によって、チェーンバケット29はエレベータ本体14に対して周回運動する。例えば、チェーンバケット29は図3(B)に示される矢印Wに沿って反時計回りに周回運動する。この時、チェーンバケット29は、バケットエレベータの最下部に設けられる掻き取り部11と、バケットエレベータの最上部9aに設けられる駆動ローラ31aの間で往復する。 The rotational drive of the drive roller 31a causes the chain bucket 29 to move in an orbit relative to the elevator body 14. For example, the chain bucket 29 moves in an orbital motion counterclockwise along the arrow W shown in Figure 3(B). At this time, the chain bucket 29 moves back and forth between the scraping unit 11 located at the bottom of the bucket elevator and the drive roller 31a located at the top 9a of the bucket elevator.
チェーンバケット29の各バケット27は、その開口部を上方に向けた姿勢を保ってエレベータ本体14内を上昇する。バケットエレベータの最上部9aにおいて各バケット27が駆動ローラ31aを通過する際、その運動方向が上向きから下向きに変化するのに伴って、各バケット27の開口部も上向きから下向きに転回する。このように下向きに転回した各バケット27の開口部の下方には図示しない排出シュートが設けられ、各バケット27が掻き取ったばら荷Mが排出される。排出シュートは、荷揚げ部9の上部の外周に設けられる回転フィーダ37(図1)上にばら荷Mを排出する。 Each bucket 27 of the chain bucket 29 rises within the elevator body 14 with its opening facing upward. As each bucket 27 passes over the drive roller 31a at the top 9a of the bucket elevator, its direction of movement changes from upward to downward, causing the opening of each bucket 27 to rotate from upward to downward. A discharge chute (not shown) is provided below the opening of each bucket 27 that has rotated downward in this way, and the bulk goods M scraped by each bucket 27 are discharged. The discharge chute discharges the bulk goods M onto a rotary feeder 37 (Figure 1) provided on the outer periphery of the upper part of the lifting section 9.
回転フィーダ37は、エレベータ本体14の延伸方向すなわち鉛直方向の回転軸の周りに回転し、排出シュートから排出されたばら荷Mをブーム7のブームコンベア39に移送する。ブームコンベア39はブーム7内でばら荷Mを旋回フレーム5の旋回軸の近傍まで搬送し、そこに設けられる図示しないホッパに供給する。ホッパの吐き出し口の下方の走行部2内にはばら荷Mを受ける機内コンベア43が設けられる。機内コンベア43は、陸地としての埠頭102に設けられる前述のベルトコンベア45にばら荷Mを移送する。 The rotary feeder 37 rotates around a rotation axis in the extension direction of the elevator body 14, i.e., the vertical direction, and transfers the bulk goods M discharged from the discharge chute to the boom conveyor 39 of the boom 7. The boom conveyor 39 transports the bulk goods M within the boom 7 to the vicinity of the rotation axis of the rotating frame 5 and supplies them to a hopper (not shown) installed there. An internal conveyor 43 that receives the bulk goods M is installed within the running section 2 below the hopper's discharge opening. The internal conveyor 43 transfers the bulk goods M to the aforementioned belt conveyor 45 installed on the pier 102, which serves as land.
続いて、以上の構成を備えるCSU1の基本的な荷揚げ動作を説明する。この荷揚げ動作において、荷揚げ部9および/またはCSU1は、船庫201内のばら荷M(積荷)を船庫201外に搬出させる搬出装置として機能する。 Next, the basic lifting operation of the CSU1 having the above configuration will be explained. In this lifting operation, the lifting unit 9 and/or the CSU1 function as a carrying device that carries out the bulk cargo M (cargo) in the warehouse 201 out of the warehouse 201.
CSU1の操作者は主操作室16でCSU1を操作する。初めにレール3上で走行部2を走行させ、荷揚げ対象の船庫201の開口部21に接近した位置まで移動させる。続いて、上面視(図1の上方から見た場合)で走行部2と重なる位置に設けられる鉛直方向の旋回軸を中心に旋回フレーム5を旋回させ、ブーム7の先端部に設けられる荷揚げ部9を荷揚げ対象の船庫201の開口部21の上方に移動させる。ここで、荷揚げ部9が埠頭102や船200に衝突しないように、ブーム7を正方向(図1の時計回り方向)に起伏させ、荷揚げ部9が上昇した状態で走行動作および旋回動作を行うのが好ましい。続いて、ブーム7を負方向(図1の反時計回り方向)に起伏させ、荷揚げ部9の先端に設けられる掻き取り部11を開口部21から船庫201内に挿入する。なお、走行部2の移動、旋回フレーム5の旋回、ブーム7の起伏は同時に行ってもよい。 The operator of the CSU 1 operates the CSU 1 from the main control room 16. First, the running unit 2 travels on the rails 3 until it approaches the opening 21 of the shed 201, the target for unloading. Next, the swivel frame 5 is rotated around a vertical pivot point that overlaps the running unit 2 in a top view (as viewed from above in Figure 1), and the lifting unit 9 at the tip of the boom 7 is moved above the opening 21 of the shed 201, the target for unloading. Here, to prevent the lifting unit 9 from colliding with the wharf 102 or the ship 200, it is preferable to raise and lower the boom 7 in the forward direction (clockwise in Figure 1) and perform the running and swinging operations with the lifting unit 9 raised. Next, the boom 7 is raised and lowered in the reverse direction (counterclockwise in Figure 1), and the scraping unit 11 at the tip of the lifting unit 9 is inserted into the shed 201 through the opening 21. The movement of the travel section 2, the rotation of the swivel frame 5, and the raising and lowering of the boom 7 may be performed simultaneously.
掻き取り部11が船庫201内に挿入された後、ローラチェーン25を矢印Wに沿って周回運動させる。ローラチェーン25に取り付けられた複数のバケット27は、ローラチェーン25と一体的に周回運動をする際に、船庫201内に格納されたばら荷Mを掘削して掻き取る。各バケット27で掻き取られたばら荷Mは、ローラチェーン25の周回運動に伴ってエレベータ本体14内で上方に運搬される。 After the scraping unit 11 is inserted into the ship shed 201, the roller chain 25 is rotated in the direction of arrow W. As the multiple buckets 27 attached to the roller chain 25 rotate together with the roller chain 25, they excavate and scrape up the bulk goods M stored in the ship shed 201. The bulk goods M scraped up by each bucket 27 are transported upward within the elevator body 14 as the roller chain 25 rotates.
掻き取り部11は、船庫201内の各所のばら荷Mを効率的に掻き取るために船庫201内の三次元位置を適宜変更する。例えば、荷揚げ作業の進捗に応じてばら荷Mの表面位置が低くなった場合、ブーム7を負方向に起伏させて掻き取り部11を下降させる。また、船庫201の壁付近のばら荷Mを掻き取るために、走行部2および/または旋回フレーム5を操作して、掻き取り部11の水平面内の位置を変更してもよい。掻き取り部11は三次元位置だけでなく姿勢や形状も変更できる。例えば、掻き取り部11はエレベータ本体14の延伸方向すなわち鉛直方向の回転軸の周りに回転可能であり、その向きを任意に変更可能である。また、図3(B)に一点鎖線で示されるように、掻き取り部11は垂直方向に収縮し水平方向に伸長した傾斜形状または横長形状を取ることができる。これにより、開口部21から壁までの水平距離が大きい船庫201であっても、掻き取り部11を壁に近づけて効率的にばら荷Mを掻き取れる。 The scraping unit 11 changes its three-dimensional position within the shed 201 as needed to efficiently scrape bulk goods M from various locations within the shed 201. For example, if the surface of the bulk goods M becomes lower as the unloading operation progresses, the boom 7 is raised and lowered in the negative direction to lower the scraping unit 11. Furthermore, to scrape bulk goods M near the walls of the shed 201, the running unit 2 and/or the swivel frame 5 may be operated to change the position of the scraping unit 11 in the horizontal plane. The scraping unit 11 can change not only its three-dimensional position but also its posture and shape. For example, the scraping unit 11 can rotate around a rotation axis in the extension direction of the elevator body 14, i.e., the vertical direction, and its orientation can be changed as desired. Furthermore, as shown by the dashed line in Figure 3(B), the scraping unit 11 can assume an inclined or horizontally elongated shape, contracting vertically and extending horizontally. This allows the scraping unit 11 to be moved closer to the wall, even in a shipyard 201 where the horizontal distance from the opening 21 to the wall is large, allowing the bulk cargo M to be scraped off efficiently.
以上のようなCSU1の荷揚げ動作に関する船庫201内での掻き取り部11(荷揚げ部9)の位置、姿勢、形状の変更は、後述する測距センサやカメラを利用してCSU1が自律的に行ってもよいし(すなわち、荷揚げ部9および/またはCSU1が自動運転されてもよいし)、船庫201内にいる作業員と連絡を取りながら主操作室16にいる操作者がマニュアルで行ってもよい。 Changes in the position, posture, and shape of the scraping unit 11 (unloading unit 9) within the shed 201 related to the unloading operation of the CSU 1 as described above may be performed autonomously by the CSU 1 using a ranging sensor or camera (described below) (i.e., the unloading unit 9 and/or CSU 1 may be operated automatically), or may be performed manually by an operator in the main control room 16 while communicating with workers in the shed 201.
船庫201内のばら荷Mを掻き取ったバケット27はエレベータ本体14内を上昇し、その最上部9aで駆動ローラ31aを通過する際に上向きから下向きに転回する。バケット27の転回によって落下したばら荷Mは排出シュートに入り、回転フィーダ37上に排出される。以降、ばら荷Mは、ブームコンベア39および機内コンベア43を経て、陸地としての埠頭102に設けられるベルトコンベア45に移送される。以上のような搬出動作が複数のバケット27によって繰り返し行われることで、船庫201内のばら荷Mが連続的に陸揚げされる。 After scraping out the bulk goods M from the warehouse 201, the bucket 27 rises within the elevator body 14 and rotates from an upward to a downward orientation as it passes over the drive roller 31a at its top 9a. The bulk goods M that fall as the bucket 27 rotates enters the discharge chute and is discharged onto the rotary feeder 37. The bulk goods M are then transported via the boom conveyor 39 and internal conveyor 43 to a belt conveyor 45 installed on the pier 102, which serves as land. By repeatedly performing the above-described discharge operation using multiple buckets 27, the bulk goods M from the warehouse 201 are continuously unloaded.
続いて、荷揚げの安全性と効率性を向上させるためにCSU1に設けられる測距センサについて説明する。 Next, we will explain the distance measurement sensor installed in CSU1 to improve the safety and efficiency of cargo unloading.
図1に示されるように、荷揚げ部9の上部には下方および側方にある測定対象物との距離を測定する複数の測距センサ19が設けられる。図示の荷揚げ時では、開口部21の縁、船庫201の天井/壁/底、ばら荷Mその他の物、船庫201内の人/構造物、後述する集約装置または集荷装置としてのブルドーザ、掻き取り部11、船200、ブーム7/旋回フレーム5/走行部2/主操作室16等のCSU1の他の部分、岸壁101、埠頭102、レール3、ベルトコンベア45等が測距センサ19の測定対象物となる。複数の測距センサ19は、例えば、筒状のエレベータ本体14の上部に、当該エレベータ本体14の外周を囲むように配置されてもよい。あるいは、複数の測距センサ19は、エレベータ本体14の上部を旋回可能に支持するフランジ部91に、エレベータ本体14の外周を囲むように設けてもよい。複数の測距センサ19の下方および側方の測定範囲にブーム7が入らないように、複数の測距センサ19は荷揚げ部9とブーム7の接続部分より下方に設けられるのが好ましい。一方、複数の測距センサ19が荷揚げ部9とブーム7の接続部分より上方に設けられる場合、上面視(図1の上方から見た場合)で各測距センサ19をブーム7と重ならない位置に設ければよい。複数の測距センサ19の上面視での配置例については後述する。なお、測距センサ19の数は任意である。例えば、荷揚げ部9の下方を中心に測距する測距センサ19と、荷揚げ部9の側方を中心に測距する測距センサ19を、それぞれ任意の数設けてもよい。 As shown in FIG. 1, the upper part of the lifting section 9 is provided with multiple distance measuring sensors 19 for measuring the distance to objects located below and to the side. During the illustrated lifting operation, the objects measured by the distance measuring sensors 19 include the edge of the opening 21, the ceiling/walls/bottom of the warehouse 201, bulk cargo M and other objects, people/structures within the warehouse 201, a bulldozer as a consolidation or collection device (described later), the scraping section 11, the ship 200, other parts of the CSU 1 such as the boom 7, rotating frame 5, running section 2, and main control room 16, the quay 101, the wharf 102, the rails 3, the belt conveyor 45, etc. The multiple distance measuring sensors 19 may be positioned, for example, on the upper part of the cylindrical elevator body 14, surrounding the outer periphery of the elevator body 14. Alternatively, the multiple distance measuring sensors 19 may be mounted on a flange 91 that rotatably supports the upper part of the elevator body 14, surrounding the outer periphery of the elevator body 14. It is preferable that the multiple distance measuring sensors 19 be installed below the connection between the lifting unit 9 and the boom 7 so that the boom 7 does not enter the measurement range below or to the sides of the multiple distance measuring sensors 19. On the other hand, if the multiple distance measuring sensors 19 are installed above the connection between the lifting unit 9 and the boom 7, each distance measuring sensor 19 should be installed in a position that does not overlap with the boom 7 when viewed from above (when viewed from above in Figure 1). Examples of the placement of the multiple distance measuring sensors 19 when viewed from above will be described later. The number of distance measuring sensors 19 is arbitrary. For example, any number of distance measuring sensors 19 that measure distances mainly below the lifting unit 9 and any number of distance measuring sensors 19 that measure distances mainly to the sides of the lifting unit 9 may be installed.
荷揚げ部9の下部の掻き取り部11には上方、側方、下方にある測定対象物との距離を測定する複数の測距センサ18が設けられる。図示の荷揚げ時では、開口部21の縁、船庫201の天井/壁/底、ばら荷Mその他の物、船庫201内の人/構造物、後述する集約装置または集荷装置としてのブルドーザ、ブーム7等のCSU1の他の部分等が測距センサ18の測定対象物となる。測距センサ18は、掻き取り部11の前部(図1の左側部分)と後部(図1の右側部分)にそれぞれ設けられる。掻き取り部11のバケット27が掻き取ったばら荷Mの粉塵等による測定精度の悪化を避けるため、複数の測距センサ18はバケット27がばら荷Mを掘削する箇所(掻き取り部11の下部)から離れた位置(掻き取り部11の上部)に設けられるのが好ましい。なお、測距センサ18の数は任意である。例えば、掻き取り部11の側方を中心に測距する測距センサ18と、掻き取り部11の下方を中心に測距する測距センサ18を、それぞれ任意の数設けてもよい。 The scraping section 11 below the lifting section 9 is equipped with multiple distance measuring sensors 18 for measuring the distance to measurement targets above, to the sides, and below. During lifting as shown, the measurement targets of the distance measuring sensors 18 include the edge of the opening 21, the ceiling/walls/bottom of the shed 201, bulk goods M and other objects, people/structures within the shed 201, a bulldozer as a consolidation or collection device (described below), and other parts of the CSU 1, such as the boom 7. The distance measuring sensors 18 are provided at the front (left side of Figure 1) and rear (right side of Figure 1) of the scraping section 11. To avoid degradation of measurement accuracy due to dust from the bulk goods M scraped by the bucket 27 of the scraping section 11, it is preferable to install the multiple distance measuring sensors 18 at a location (above the scraping section 11) away from the location where the bucket 27 excavates the bulk goods M (below the scraping section 11). The number of distance measuring sensors 18 is optional. For example, any number of distance measurement sensors 18 that measure distances centered on the sides of the scraping unit 11 and any number of distance measurement sensors 18 that measure distances centered on the bottom of the scraping unit 11 may be provided.
図4は、測距センサ18、19の外観を示す。測距センサ18、19は測距可能なレーザセンサであり、測定対象物にレーザ光を送る送波部としてのレーザ発光部(図示せず)と、測定対象物で反射したレーザ光を受ける受波部としてのレーザ受光部(図示せず)を備え、測定対象物との距離を測定する測距部を構成する。測距センサ18、19の円柱状の筐体17の側面の全周に亘ってレーザ光が透過可能な透光部171が無端帯状に形成される。 Figure 4 shows the external appearance of distance measuring sensors 18, 19. Distance measuring sensors 18, 19 are laser sensors capable of measuring distances, and comprise a laser emitting unit (not shown) as a wave transmitting unit that transmits laser light to the object to be measured, and a laser receiving unit (not shown) as a wave receiving unit that receives the laser light reflected by the object to be measured, constituting a distance measuring unit that measures the distance to the object to be measured. A light-transmitting portion 171 that allows laser light to pass through is formed in an endless band shape around the entire periphery of the side of the cylindrical housing 17 of distance measuring sensors 18, 19.
筐体17内の透光部171に対向する位置に複数のレーザ発光部が設けられ、透光部171を介して筐体17外に直線状のレーザ光を発射する。各レーザ発光部は筐体17の軸Aの方向(図4の上下方向)に沿って所定間隔を置いて配置されるが、図4では簡易的に一点からレーザ光が発射されるように示す。また、模式的に図示されるように、各レーザ発光部の発射角度には互いに0.1°~3°程度の差異が設けられる。このような構成によって、測距センサ18、19は、筐体17の軸Aに垂直な面を基準面Sとして、基準面Sの上下の所定角度範囲内(図ではθ-~θ+の範囲内)にレーザ光を照射できる。θ-およびθ+は任意に設計可能だが、以下では-θ-=θ+=15°とする。この時、測距センサ18、19は基準面Sを中心とする±15°の範囲内にレーザ光を照射する。また、これらの複数のレーザ発光部は筐体17の軸Aの周りに360°回転可能に一体的に設けられる。このような構成によって、測距センサ18、19は、筐体17の周囲(側方)にある全ての測定対象物にレーザ光を照射できる。なお、CSU1や船200の内部や周囲にいる人を妨害しないように、近赤外線等の非可視波長のレーザ光を用いるのが好ましい。 Multiple laser emitters are provided in positions facing the light-transmitting portion 171 within the housing 17, and emit linear laser light through the light-transmitting portion 171 to the outside of the housing 17. Each laser emitter is spaced apart along the axis A of the housing 17 (the vertical direction in Figure 4), but Figure 4 shows the laser light emitted from a single point for simplicity's sake. As shown in the schematic diagram, the emission angles of each laser emitter differ by approximately 0.1° to 3°. This configuration allows the distance measuring sensors 18 and 19 to emit laser light within a predetermined angular range above and below the reference plane S, which is a plane perpendicular to the axis A of the housing 17. While θ- and θ+ can be set arbitrarily, in the following discussion, we will assume that -θ- = θ+ = 15°. In this case, the distance measuring sensors 18 and 19 emit laser light within a ±15° range centered on the reference plane S. Furthermore, these multiple laser emitters are integrally mounted so as to be rotatable 360 degrees around axis A of housing 17. With this configuration, distance measuring sensors 18 and 19 can irradiate laser light to all measurement targets around (to the sides of) housing 17. Note that it is preferable to use laser light with an invisible wavelength, such as near-infrared light, so as not to disturb people inside or around CSU 1 or ship 200.
測距センサ18、19は、複数のレーザ発光部を一体的に回転させながら、所定の回転角度毎にパルス状のレーザ光を発射させる。各レーザ発光部が発射したパルス状のレーザ光は、測定対象物で反射または散乱して測距センサ18、19に戻り、筐体17内に各レーザ発光部と共に設けられるレーザ受光部で受けられる。測距センサ18、19の演算部(図示せず)は、レーザ発光部がレーザ光のパルスを発射してからレーザ受光部が反射したレーザ光のパルスを受けるまでの時間に基づき、測定対象物との距離を演算する。この技術はLIDAR(Light Detection and RangingまたはLaser Imaging Detection and Ranging)とも呼ばれる。 Range measuring sensors 18, 19 rotate multiple laser emitters together, emitting pulsed laser light at predetermined rotation angles. The pulsed laser light emitted by each laser emitter is reflected or scattered by the object to be measured, returns to distance measuring sensors 18, 19, and is received by a laser receiver located inside housing 17 alongside each laser emitter. A calculation unit (not shown) in distance measuring sensors 18, 19 calculates the distance to the object to be measured based on the time between when the laser emitter emits a pulsed laser light and when the laser receiver receives the reflected pulsed laser light. This technology is also known as LIDAR (Light Detection and Ranging or Laser Imaging Detection and Ranging).
以上では測距センサ18、19の例としてレーザセンサを挙げたが、測距センサ18、19はその他の電磁波を用いるセンサでもよい。例えば、波長が1mm~10mm程度のいわゆるミリ波を用いたミリ波センサを測距センサ18、19として用いてもよい。ミリ波は、周波数が30GHz~300GHz程度と高いため、直進性が高くレーザと同様に扱える。ミリ波センサは図4のレーザセンサと同様に構成でき、レーザ発光部の代わりに測定対象物にミリ波を送るミリ波送信部を、レーザ受光部の代わりに測定対象物で反射したミリ波を受けるミリ波受信部を設ければよい。また、Time of Flight(ToF)方式のイメージセンサのように、レーザ光に限らない光を用いた光学センサを測距センサ18、19として用いてもよい。また、測距センサ18、19は、測定対象物に電磁波を送る送波部を備えないものでもよい。例えば、測定対象物を異なる方向から同時に撮影することで測距可能なステレオカメラ等を測距センサ18、19として用いてもよい。 While laser sensors have been used above as examples of distance measuring sensors 18 and 19, distance measuring sensors 18 and 19 may also use other types of electromagnetic waves. For example, millimeter-wave sensors using so-called millimeter waves with wavelengths of approximately 1 mm to 10 mm may be used as distance measuring sensors 18 and 19. Because millimeter waves have a high frequency of approximately 30 GHz to 300 GHz, they have high directionality and can be treated similarly to lasers. A millimeter-wave sensor can be configured similar to the laser sensor shown in Figure 4, except that instead of a laser emitter, it has a millimeter-wave transmitter that transmits millimeter waves to the object being measured, and instead of a laser receiver, it has a millimeter-wave receiver that receives millimeter waves reflected by the object being measured. Furthermore, optical sensors that use light other than laser light, such as Time of Flight (ToF) image sensors, may also be used as distance measuring sensors 18 and 19. Furthermore, distance measuring sensors 18 and 19 may not have a transmitter that transmits electromagnetic waves to the object being measured. For example, a stereo camera or the like that can measure distance by simultaneously photographing an object to be measured from different directions may be used as distance measurement sensors 18 and 19.
図4の測距センサ18、19は測定目的に応じた任意の姿勢で図1のCSU1に取り付けられる。例えば、掻き取り部11の測距センサ18は、図4の軸Aが鉛直方向で基準面Sが水平面となるように取り付けられる。この時、測距センサ18は掻き取り部11の側方を中心に船庫201内を測距できる。また、測距センサ18は、図4の軸Aが水平方向で基準面Sが鉛直面となるように取り付けられてもよい。この時、測距センサ18は掻き取り部11の上方の開口部21や掻き取り部11の下方のばら荷Mを測距できる。なお、測距センサ18の軸Aの向きは鉛直方向または水平方向に限らず任意の向きでよい。 The distance measuring sensors 18 and 19 in Figure 4 can be attached to the CSU 1 in Figure 1 in any orientation depending on the purpose of measurement. For example, the distance measuring sensor 18 of the scraping unit 11 is attached so that axis A in Figure 4 is vertical and reference plane S is a horizontal plane. In this case, the distance measuring sensor 18 can measure distances within the warehouse 201, centered on the side of the scraping unit 11. The distance measuring sensor 18 may also be attached so that axis A in Figure 4 is horizontal and reference plane S is a vertical plane. In this case, the distance measuring sensor 18 can measure distances to the opening 21 above the scraping unit 11 and the bulk cargo M below the scraping unit 11. Note that the orientation of axis A of the distance measuring sensor 18 is not limited to vertical or horizontal and can be any orientation.
荷揚げ部9の上部の測距センサ19は、図4の軸Aが水平方向で基準面Sが鉛直面となるように取り付けられる。この時、測距センサ19は下方にある船庫201の開口部21の縁や船庫201内のばら荷M等を測距できる。なお、この測距センサ19は上方にもレーザ光を発射できるが、上方には測定対象物が存在しないため、測距センサ19の上側を遮光性のカバーで覆う等によって上方の測距が無効化される。また、測距センサ19は、図4の軸Aが鉛直方向で基準面Sが水平面と平行になるように取り付けられてもよい。この時、測距センサ19は側方にある船庫201外の測定対象物を効率的に測距できる。測距センサ19の軸Aの向きは水平方向または鉛直方向に限らず任意の向きでよいが、以下では水平方向の場合を詳細に説明する。 The distance measurement sensor 19 at the top of the loading section 9 is mounted so that axis A in Figure 4 is horizontal and reference plane S is vertical. In this case, the distance measurement sensor 19 can measure the distance to the edge of the opening 21 of the warehouse 201 below, the bulk cargo M inside the warehouse 201, etc. Note that this distance measurement sensor 19 can also emit laser light upward, but since there are no objects to be measured above, upward distance measurement can be disabled by covering the top of the distance measurement sensor 19 with a light-blocking cover, for example. The distance measurement sensor 19 may also be mounted so that axis A in Figure 4 is vertical and reference plane S is parallel to the horizontal plane. In this case, the distance measurement sensor 19 can efficiently measure the distance to objects to be measured outside the warehouse 201 to the side. The direction of axis A of the distance measurement sensor 19 can be any direction, not just horizontal or vertical, but the horizontal direction will be described in detail below.
以上のような測距センサ18、19を荷揚げ部9に設けることで、開口部21の縁、船庫201の天井/壁/底、ばら荷Mその他の物、船庫201内の人/構造物、後述する集約装置または集荷装置としてのブルドーザ、掻き取り部11等の各種の測定対象物の位置を正確に把握できる。したがって、荷揚げ中の荷揚げ部9が他の物と衝突するのを防止でき、ばら荷Mを効率的に荷揚げできる。 By installing distance measuring sensors 18, 19 as described above in the lifting unit 9, it is possible to accurately determine the positions of various measurement targets, such as the edge of the opening 21, the ceiling/walls/bottom of the shed 201, bulk goods M and other objects, people/structures inside the shed 201, a bulldozer as a consolidation or collection device (described below), and the scraping unit 11. This prevents the lifting unit 9 from colliding with other objects during lifting, allowing bulk goods M to be lifted efficiently.
図5は、測距センサ19の配置例を上面視で示す。測距センサ19として三つの測距センサ191、192、193が、フランジ部91またはエレベータ本体14の外周を囲むように配置される。測距センサ191は、図4の軸Aが図5の左右方向で、図4の基準面Sに対応する基準面S1が図5の上下方向になるように配置される。測距センサ191は基準面S1を中心とする±15°の範囲内にレーザ光を照射して測距する。測距センサ192、193は、図4の軸Aが図5の上下方向で、図4の基準面Sに対応する基準面S2、S3が図5の左右方向になるように配置される。測距センサ192、193は基準面S2、S3を中心とする±15°の範囲内にレーザ光を照射して測距する。測距センサ192、193の基準面S2、S3は互いに平行な異なる平面であり、測距センサ191の基準面S1と直交する。 Figure 5 shows an example of the arrangement of distance measurement sensors 19 from a top view. Three distance measurement sensors 191, 192, and 193 are arranged as distance measurement sensors 19, surrounding the outer periphery of the flange portion 91 or the elevator body 14. Distance measurement sensor 191 is arranged so that axis A in Figure 4 is in the left-right direction in Figure 5, and reference plane S1 corresponding to reference plane S in Figure 4 is in the up-down direction in Figure 5. Distance measurement sensor 191 measures distance by emitting laser light within a range of ±15° centered on reference plane S1. Distance measurement sensors 192 and 193 are arranged so that axis A in Figure 4 is in the up-down direction in Figure 5, and reference planes S2 and S3 corresponding to reference plane S in Figure 4 are in the left-right direction in Figure 5. Distance measurement sensors 192 and 193 measure distance by emitting laser light within a range of ±15° centered on reference planes S2 and S3. The reference planes S2 and S3 of the distance measurement sensors 192 and 193 are different planes parallel to each other and perpendicular to the reference plane S1 of the distance measurement sensor 191.
CSU1は図5に示される姿勢を荷揚げ時の基本姿勢として船庫201からばら荷Mを搬出する。この基本姿勢において、走行部2は船庫201の正面位置からずれた位置にあり、旋回フレーム5およびブーム7は走行部2の軌道を構成するレール3に対して鋭角をなす旋回位置にある。この時、荷揚げ部9は船200の船庫201の上方にあり、その下部の掻き取り部11が開口部21から船庫201内に挿入される。 The CSU 1 unloads bulk cargo M from the shed 201 with the posture shown in Figure 5 as the basic posture for unloading. In this basic posture, the traveling section 2 is positioned away from the front of the shed 201, and the rotating frame 5 and boom 7 are in a rotation position that forms an acute angle with the rail 3 that forms the track of the traveling section 2. At this time, the unloading section 9 is located above the shed 201 of the ship 200, and the scraping section 11 at its bottom is inserted into the shed 201 through the opening 21.
船庫201の開口部21は、船200の進行方向(図5の左右方向)に長尺の矩形状であることが多い。この場合、開口部21の短辺(図5の上下方向の辺)に平行にレーザ光を照射する測距センサ191によって、開口部21の上辺の縁E11および下辺の縁E12を検出できる。なお、縁E11、E12の中心に示す点は測距センサ191の基準面S1上のレーザ光が開口部21の縁に当たる位置を表し、それを囲む矩形は基準面S1を中心とする±15°の範囲内に照射されたレーザ光が開口部21の縁に当たる範囲を模式的に表す。以下、測距センサ192、193についても同様の表記を用いる。 The opening 21 of the shipyard 201 is often rectangular and elongated in the direction of travel of the ship 200 (left-right in Figure 5). In this case, the upper edge E11 and lower edge E12 of the opening 21 can be detected by a distance measurement sensor 191 that emits laser light parallel to the short sides of the opening 21 (the sides in the vertical direction in Figure 5). Note that the points shown at the centers of edges E11 and E12 represent the positions where the laser light on the reference plane S1 of the distance measurement sensor 191 hits the edge of the opening 21, and the rectangle surrounding it schematically represents the range in which the laser light emitted within a ±15° range centered on the reference plane S1 hits the edge of the opening 21. The same notation will be used for distance measurement sensors 192 and 193 below.
同様に、開口部21の長辺(図5の左右方向の辺)に平行にレーザ光を照射する測距センサ192、193によれば、開口部21の左辺の縁E21、E31および右辺の縁E22、E32を検出できる。二つの測距センサ192、193を用いることで、短尺方向に比べて測距難易度が高い長尺方向でも高精度に測距できる。このように図5の測距センサ191、192、193の配置は、長方形などの一方向に長尺な形状の開口部21の縁の検出に好適である。 Similarly, distance measurement sensors 192 and 193, which emit laser light parallel to the long sides of opening 21 (the left-right sides in Figure 5), can detect edges E21 and E31 on the left side and edges E22 and E32 on the right side of opening 21. By using two distance measurement sensors 192 and 193, distance measurement can be performed with high accuracy even in the long direction, which is more difficult to measure than in the short direction. In this way, the arrangement of distance measurement sensors 191, 192, and 193 in Figure 5 is suitable for detecting the edges of opening 21 that is long in one direction, such as a rectangle.
なお、CSU1が図5に示される基本姿勢にない場合でも、荷揚げ部9が上面視で開口部21内にあれば、三つの測距センサ191、192、193によって、E11、E12、E21、E22、E31、E32に相当する開口部21の縁上の六つの測距点群を取得でき、開口部21の位置を正確に把握できる。 Even if the CSU1 is not in the basic position shown in Figure 5, if the loading/unloading unit 9 is within the opening 21 when viewed from above, the three distance measurement sensors 191, 192, and 193 can acquire six distance measurement point groups on the edge of the opening 21 corresponding to E11, E12, E21, E22, E31, and E32, and the position of the opening 21 can be accurately determined.
また、CSU1の荷揚げ時の基本姿勢は図5に示すものに限らず、例えば、走行部2が船庫201の正面にあり、旋回フレーム5およびブーム7がレール3に対して直角をなす姿勢を基本姿勢としてもよい。この場合、ブーム7の延伸方向が開口部21の短辺方向に一致するため、測距センサ191の基準面S1はブーム7の延伸方向と平行になり、測距センサ192、193の基準面S2、S3はブーム7の延伸方向と垂直になる。ここで、測距センサ191、192、193を筒状のエレベータ本体14の軸の周りに一体的に回転可能とすれば、CSU1の荷揚げ時の基本姿勢の変更に応じて、上記の長尺形状の開口部21に好適な測距センサ191、192、193の配置を容易に実現できる。 Furthermore, the basic position of the CSU 1 during lifting is not limited to that shown in Figure 5. For example, the basic position may be one in which the running unit 2 is located in front of the shipyard 201 and the swivel frame 5 and boom 7 are perpendicular to the rail 3. In this case, the extension direction of the boom 7 coincides with the short side direction of the opening 21, so the reference plane S1 of the distance measuring sensor 191 is parallel to the extension direction of the boom 7, and the reference planes S2 and S3 of the distance measuring sensors 192 and 193 are perpendicular to the extension direction of the boom 7. Here, if the distance measuring sensors 191, 192, and 193 are rotatable integrally around the axis of the cylindrical elevator body 14, it is possible to easily arrange the distance measuring sensors 191, 192, and 193 appropriately for the elongated opening 21 described above, depending on whether the basic position of the CSU 1 during lifting is changed.
上記の測距センサ19の数および配置は一例に過ぎず、任意の数および配置を採用できる。測距センサ19の数は、上面視で荷揚げ部9を囲む開口部21の形状を効率的に測定するために、少なくとも2個とするのが好ましい。より好ましくは3個以上とする。複数の測距センサ19は、フランジ部91またはエレベータ本体14の外周に沿って等間隔で配置してもよい。この場合の各測距センサ19の設置姿勢は任意であるが、例えば、各測距センサ19の基準面Sがフランジ部91またはエレベータ本体14の外周と接するように設置する。このように対称的な配置とすれば、CSU1の荷揚げ時の姿勢によらず安定的に開口部21の形状を測定できる。 The above number and arrangement of distance measuring sensors 19 are merely examples, and any number and arrangement can be adopted. It is preferable to have at least two distance measuring sensors 19 in order to efficiently measure the shape of the opening 21 surrounding the lifting section 9 when viewed from above. More preferably, three or more distance measuring sensors 19 are used. Multiple distance measuring sensors 19 may be arranged at equal intervals along the outer periphery of the flange section 91 or elevator body 14. In this case, the installation orientation of each distance measuring sensor 19 is arbitrary, but for example, each distance measuring sensor 19 is installed so that its reference surface S is in contact with the outer periphery of the flange section 91 or elevator body 14. Such a symmetrical arrangement allows the shape of the opening 21 to be measured stably regardless of the orientation of the CSU 1 during lifting.
以上のような測距センサ18、19で測定された船庫201内外の測定対象物との距離に応じて、CSU1の各可動部、すなわち、移動可能な走行部2、旋回可能な旋回フレーム5、起伏可能なブーム7、回転および変形可能な掻き取り部11等を制御することで、荷揚げ中の荷揚げ部9が船庫201内外の他の物と衝突するのを防止でき、ばら荷Mを効率的に荷揚げできる。なお、測距センサ18、19に加えてまたは代えて、測定対象物を撮影する画像センサやカメラによって船庫201内外の物を検知してもよい。 By controlling each movable part of the CSU 1, namely the movable traveling part 2, the swivelable swivel frame 5, the raiseable boom 7, and the rotatable and deformable scraping part 11, etc., according to the distance to the measurement object inside or outside the shed 201 measured by the distance measuring sensors 18, 19 as described above, it is possible to prevent the lifting part 9 from colliding with other objects inside or outside the shed 201 during unloading, and to efficiently unload the bulk goods M. Note that in addition to or instead of the distance measuring sensors 18, 19, objects inside or outside the shed 201 may be detected by an image sensor or camera that photographs the measurement object.
図6に模式的に示されるように、荷揚げ部9による荷揚げ動作の終盤には、ブルドーザ400が利用されて船庫201の底等に残存するばら荷Mを荷揚げ部9が荷揚げできるように集める。以下では、ブルドーザ400が荷揚げ部9(搬出装置)のためにばら荷Mを集めることを「(ばら荷Mを)集約する」または「集荷する」と表現する。船庫201内でばら荷M(積荷)を集約または集荷するブルドーザ400は、集約装置または集荷装置の一態様である。 As shown schematically in Figure 6, towards the end of the lifting operation by the lifting unit 9, a bulldozer 400 is used to collect the bulk goods M remaining at the bottom of the warehouse 201, etc., so that the lifting unit 9 can lift them. Hereinafter, the bulldozer 400's collection of the bulk goods M for the lifting unit 9 (discharge device) will be expressed as "aggregating (the bulk goods M)" or "collecting." The bulldozer 400 that aggregates or collects the bulk goods M (cargo) within the warehouse 201 is one aspect of an aggregation device or collection device.
このような船庫201のいわゆる「底さらい」のためのブルドーザ400は、搭乗するオペレータによってマニュアル操縦されることが一般的である。しかし、オペレータの人的リソースが必要とされるだけでなく、船庫201内を移動可能な大型構造物としての荷揚げ部9とブルドーザ400が衝突する可能性もある危険な作業であった。また、荷揚げ部9のばら荷Mの搬出効率に直結するブルドーザ400の集約効率または集荷効率が、オペレータの経験や技能によって大きく変わってしまうという問題もあった。以下で詳細に説明するように、本実施形態によれば、ブルドーザ400が荷揚げ部9と衝突せず、かつ、荷揚げ部9の搬出効率を高められるブルドーザ400の船庫201内の推奨軌道が自動的に生成されるため、ブルドーザ400の積荷集約作業時の安全性と積荷集約効率(すなわち荷揚げ部9の搬出効率)を高められる。更に、ブルドーザ400は自動的に生成された推奨軌道に従って自動運転されてもよく、オペレータを危険にさらすことなく安全かつ効率的に積荷集約作業を行える。 Such bulldozers 400 used for so-called "dredging" the bottom of the shipyard 201 are typically manually operated by an operator on board. However, this not only requires the operator's human resources, but also presents a risk of collision between the bulldozer 400 and the landing unit 9, a large structure that can move within the shipyard 201. Another problem is that the bulldozer's 400's aggregation or collection efficiency, which is directly linked to the efficiency of the landing unit 9's bulk cargo removal, varies significantly depending on the operator's experience and skill. As described in detail below, this embodiment automatically generates a recommended trajectory for the bulldozer 400 within the shipyard 201 that prevents the bulldozer 400 from colliding with the landing unit 9 and improves the loading efficiency of the landing unit 9. This improves the safety and loading efficiency (i.e., the loading efficiency of the landing unit 9) of the bulldozer 400 during its cargo removal work. Furthermore, the bulldozer 400 may be automatically driven according to an automatically generated recommended trajectory, allowing load aggregation operations to be performed safely and efficiently without endangering the operator.
図6は、CSU1(特に荷揚げ部9)およびブルドーザ400の制御システム300の機能ブロック図である。制御システム300は、集約装置位置検知部301と、積荷形状検知部302と、搬出装置位置検知部303と、軌道生成部304と、承認受付部305と、搬出装置制御部306と、軌道候補生成部307と、積荷形状予測部308と、積荷形状評価部309を備える。これらの機能ブロックは、コンピュータの中央演算処理装置、メモリ、入力装置、出力装置、コンピュータに接続される周辺機器等のハードウェア資源と、それらを用いて実行されるソフトウェアの協働により実現される。コンピュータの種類や設置場所は問わず、上記の各機能ブロックは、単一のコンピュータのハードウェア資源で実現してもよいし、複数のコンピュータに分散したハードウェア資源を組み合わせて実現してもよい。特に本実施形態では、制御システム300の機能ブロックの一部または全部は、CSU1のコンピュータで実現してもよいし、ブルドーザ400のコンピュータで実現してもよいし、CSU1およびブルドーザ400外に設置されてCSU1およびブルドーザ400と通信可能なコンピュータで実現してもよい。 Figure 6 is a functional block diagram of the control system 300 for the CSU 1 (particularly the unloading unit 9) and bulldozer 400. The control system 300 includes an aggregation device position detection unit 301, a cargo shape detection unit 302, a carry-out device position detection unit 303, a trajectory generation unit 304, an approval reception unit 305, a carry-out device control unit 306, a trajectory candidate generation unit 307, a cargo shape prediction unit 308, and a cargo shape evaluation unit 309. These functional blocks are realized through the cooperation of hardware resources such as the computer's central processing unit, memory, input devices, output devices, and peripheral devices connected to the computer, as well as software executed using these resources. Regardless of the type of computer or its installation location, each of the above functional blocks may be realized by the hardware resources of a single computer or by combining hardware resources distributed across multiple computers. In particular, in this embodiment, some or all of the functional blocks of the control system 300 may be implemented by a computer in the CSU 1, by a computer in the bulldozer 400, or by a computer installed outside the CSU 1 and bulldozer 400 and capable of communicating with the CSU 1 and bulldozer 400.
集約装置位置検知部301、積荷形状検知部302、搬出装置位置検知部303は、搬出装置としてのCSU1(荷揚げ部9を含む)および/または集約装置としてのブルドーザ400に設けられた一または複数のセンサである。各センサは、測定対象物との距離を測定するためにCSU1および/またはブルドーザ400に設けられた測距センサ(CSU1の測距センサとしては前述の測距センサ18、19を利用できる)でもよいし、測定対象物を撮影するためにCSU1および/またはブルドーザ400に設けられた画像センサでもよいし、測定対象物を検知可能な他の任意のセンサでもよい。以下で説明するように、図示の例における主な測定対象物は、ブルドーザ400(集約装置)、ばら荷M(積荷)、荷揚げ部9または掻き取り部11(搬出装置)である。 The aggregation device position detection unit 301, the cargo shape detection unit 302, and the discharge device position detection unit 303 are one or more sensors provided on the CSU 1 (including the unloading unit 9) as the discharge device and/or the bulldozer 400 as the aggregation device. Each sensor may be a distance measurement sensor provided on the CSU 1 and/or the bulldozer 400 to measure the distance to the measurement object (the aforementioned distance measurement sensors 18 and 19 can be used as the distance measurement sensor for the CSU 1), an image sensor provided on the CSU 1 and/or the bulldozer 400 to photograph the measurement object, or any other sensor capable of detecting the measurement object. As described below, the main measurement objects in the illustrated example are the bulldozer 400 (aggregation device), the bulk load M (cargo), and the unloading unit 9 or scraping unit 11 (discharge device).
集約装置位置検知部301は、集約装置としてのブルドーザ400の船庫201内の位置を検知する。集約装置位置検知部301としては、荷揚げ部9に設けられる前述の測距センサ18、19や画像センサ等を利用できる。また、ブルドーザ400自体に設けられるGPS(Global Positioning System)等の衛星測位システムによる測位センサや、ブルドーザ400自体に設けられる測距センサや画像センサ等であって船庫201の壁等を検知することで自身の船庫201内の位置を検知するセンサを集約装置位置検知部301として利用してもよい。 The aggregation device position detection unit 301 detects the position of the bulldozer 400, which serves as an aggregation device, within the shipyard 201. The aforementioned distance sensors 18, 19 or image sensors provided in the unloading unit 9 can be used as the aggregation device position detection unit 301. Alternatively, a positioning sensor using a satellite positioning system such as a GPS (Global Positioning System) provided on the bulldozer 400 itself, or a distance sensor or image sensor provided on the bulldozer 400 itself that detects its own position within the shipyard 201 by detecting the walls of the shipyard 201, etc., can also be used as the aggregation device position detection unit 301.
積荷形状検知部302は、船庫201内の積荷形状(ばら荷Mの形状)を検知する。積荷形状検知部302としては、荷揚げ部9に設けられる前述の測距センサ18、19や画像センサ等を利用できる。また、ブルドーザ400自体に設けられる測距センサや画像センサ等を積荷形状検知部302として利用してもよい。 The cargo shape detection unit 302 detects the shape of the cargo (shape of the bulk cargo M) in the warehouse 201. The aforementioned distance measuring sensors 18, 19 and image sensors provided in the unloading unit 9 can be used as the cargo shape detection unit 302. Furthermore, distance measuring sensors and image sensors provided in the bulldozer 400 itself may also be used as the cargo shape detection unit 302.
搬出装置位置検知部303は、搬出装置としての荷揚げ部9の船庫201内の位置、具体的には荷揚げ部9においてばら荷Mを掻き取る掻き取り部11の先端や後端等の位置を検知する。搬出装置位置検知部303としては、荷揚げ部9自体に設けられる前述の測距センサ18、19や画像センサ等を利用できる。また、ブルドーザ400に設けられる測距センサや画像センサ等を搬出装置位置検知部303として利用してもよい。なお、荷揚げ部9を制御する搬出装置制御部306が、荷揚げ部9の船庫201内の位置を認識できている場合は、搬出装置位置検知部303を設けなくてもよい。 The discharge device position detection unit 303 detects the position of the unloading unit 9 as a discharge device within the warehouse 201, specifically the position of the leading and trailing ends of the scraping unit 11 that scrapes off the bulk goods M in the unloading unit 9. The aforementioned distance sensors 18, 19 and image sensors provided on the unloading unit 9 itself can be used as the discharge device position detection unit 303. Furthermore, a distance sensor or image sensor provided on the bulldozer 400 may also be used as the discharge device position detection unit 303. Note that if the discharge device control unit 306 that controls the unloading unit 9 is able to recognize the position of the unloading unit 9 within the warehouse 201, the discharge device position detection unit 303 does not need to be provided.
軌道生成部304は、集約装置位置検知部301によって検知されたブルドーザ400の位置、積荷形状検知部302によって検知された積荷形状、搬出装置位置検知部303によって検知された荷揚げ部9の位置に応じて、ブルドーザ400の船庫201内の軌道を生成する。具体的には、軌道生成部304は、ブルドーザ400が荷揚げ部9の掻き取り部11と衝突せず、かつ、ブルドーザ400が掻き取り部11のために効率的にばら荷Mを集約できるブルドーザ400の船庫201内の推奨軌道を、ブルドーザ400および掻き取り部11の位置およびばら荷Mの位置や形状に基づいて自動的に生成する。このため、ブルドーザ400の積荷集約作業時の安全性と積荷集約効率(すなわち荷揚げ部9の搬出効率)を高められる。なお、ブルドーザ400と掻き取り部11の衝突を確実に回避するため、軌道生成部304はブルドーザ400の推奨軌道を生成する際に、搬出装置制御部306から荷揚げ部9の軌道情報や運転情報を取得して考慮するのが好ましい。 The trajectory generation unit 304 generates a trajectory for the bulldozer 400 within the shed 201 based on the position of the bulldozer 400 detected by the consolidation device position detection unit 301, the shape of the load detected by the load shape detection unit 302, and the position of the unloading unit 9 detected by the carry-out device position detection unit 303. Specifically, the trajectory generation unit 304 automatically generates a recommended trajectory for the bulldozer 400 within the shed 201 based on the positions of the bulldozer 400 and the scraping unit 11 and the position and shape of the bulk load M, so that the bulldozer 400 does not collide with the scraping unit 11 of the unloading unit 9 and can efficiently collect the bulk load M for the scraping unit 11. This improves the safety and load consolidation efficiency (i.e., the carry-out efficiency of the unloading unit 9) of the bulldozer 400 during load consolidation operations. In order to reliably avoid collisions between the bulldozer 400 and the scraping unit 11, it is preferable that the trajectory generating unit 304 obtain and take into consideration trajectory information and operation information of the unloading unit 9 from the carrying-out device control unit 306 when generating a recommended trajectory for the bulldozer 400.
ブルドーザ400は、軌道生成部304が生成した軌道に従って自動運転されてもよい。あるいは、有人のブルドーザ400に搭乗しているオペレータに対して、軌道生成部304が生成した推奨軌道を、ブルドーザ400の操縦室における表示画面やオペレータが使用する携帯端末の表示画面に表示し、オペレータが当該推奨軌道に従ってブルドーザ400をマニュアル操縦してもよい。 The bulldozer 400 may be operated automatically according to the trajectory generated by the trajectory generating unit 304. Alternatively, the recommended trajectory generated by the trajectory generating unit 304 may be displayed to the operator of the manned bulldozer 400 on a display screen in the bulldozer's 400 control room or on a display screen of a mobile device used by the operator, and the operator may manually operate the bulldozer 400 according to the recommended trajectory.
なお、制御システム300は、軌道生成部304が生成した軌道に対する承認を受け付ける承認受付部305を備えてもよい。例えば、ブルドーザ400のオペレータ、CSU1の主操作室16内等の操作者、制御システム300の管理者等が、軌道生成部304が生成した軌道に対する承認権限を有し、承認受付部305に対して承認または却下を入力できる。承認受付部305が設けられる場合、ブルドーザ400が承認受付部305によって受け付けられた承認に係る軌道に従って自動運転されてもよいし、承認受付部305によって受け付けられた承認に係る軌道の提示を受けたオペレータがブルドーザ400をマニュアル操縦してもよい。 The control system 300 may also include an approval receiving unit 305 that receives approval for the trajectory generated by the trajectory generation unit 304. For example, the operator of the bulldozer 400, an operator in the main control room 16 of the CSU 1, or an administrator of the control system 300 has the authority to approve the trajectory generated by the trajectory generation unit 304 and can input approval or rejection to the approval receiving unit 305. When the approval receiving unit 305 is provided, the bulldozer 400 may be automatically driven according to the trajectory approved by the approval receiving unit 305, or the operator who receives the trajectory approved by the approval receiving unit 305 may manually operate the bulldozer 400.
搬出装置制御部306は、船庫201内のばら荷Mを搬出装置としての荷揚げ部9によって船庫201外に搬出させる。搬出装置制御部306は、軌道生成部304が生成したブルドーザ400の軌道(承認受付部305が設けられる場合は、承認受付部305において承認されたブルドーザ400の軌道)と干渉しないように荷揚げ部9を船庫201内において移動させる。この時、搬出装置制御部306は、荷揚げ部9の掻き取り部11がブルドーザ400と衝突せず、かつ、掻き取り部11によるばら荷Mの搬出効率が高い掻き取り部11の船庫201内の推奨軌道を、軌道生成部304が生成したブルドーザ400の軌道や、集約装置位置検知部301、積荷形状検知部302、搬出装置位置検知部303によって検知されたブルドーザ400および掻き取り部11の位置およびばら荷Mの位置や形状に基づいて自動的に生成してもよい。掻き取り部11は、当該推奨軌道に従って自動運転されてもよいし、当該推奨軌道や軌道生成部304が生成したブルドーザ400の軌道の提示を受けた主操作室16内等の操作者によってマニュアル操作されてもよい。 The carrying-out device control unit 306 causes the unloading unit 9, which serves as a carrying-out device, to carry out the bulk cargo M from the shipyard 201 to the outside of the shipyard 201. The carrying-out device control unit 306 moves the unloading unit 9 within the shipyard 201 so as not to interfere with the trajectory of the bulldozer 400 generated by the trajectory generation unit 304 (or, if an approval reception unit 305 is provided, the trajectory of the bulldozer 400 approved by the approval reception unit 305). At this time, the carry-out device control unit 306 may automatically generate a recommended trajectory for the scraping unit 11 within the warehouse 201, which will prevent the scraping unit 11 of the unloading unit 9 from colliding with the bulldozer 400 and will ensure high efficiency in carrying out the bulk material M by the scraping unit 11, based on the trajectory of the bulldozer 400 generated by the trajectory generation unit 304, the positions of the bulldozer 400 and scraping unit 11 detected by the aggregation device position detection unit 301, the cargo shape detection unit 302, and the carry-out device position detection unit 303, and the position and shape of the bulk material M. The scraping unit 11 may be automatically operated according to the recommended trajectory, or may be manually operated by an operator in the main operation room 16 or the like who is presented with the recommended trajectory or the trajectory of the bulldozer 400 generated by the trajectory generation unit 304.
軌道候補生成部307、積荷形状予測部308、積荷形状評価部309は、より精緻なブルドーザ400(および荷揚げ部9)の軌道生成を可能にする。 The trajectory candidate generation unit 307, cargo shape prediction unit 308, and cargo shape evaluation unit 309 enable more precise trajectory generation for the bulldozer 400 (and the lifting unit 9).
軌道候補生成部307は、集約装置位置検知部301によって検知されたブルドーザ400の位置、積荷形状検知部302によって検知された積荷形状、搬出装置位置検知部303によって検知された荷揚げ部9の位置、搬出装置制御部306から提供される荷揚げ部9の軌道情報や運転情報に応じて、ブルドーザ400の船庫201内の複数の軌道候補を生成する。 The trajectory candidate generation unit 307 generates multiple trajectory candidates for the bulldozer 400 within the warehouse 201 based on the position of the bulldozer 400 detected by the aggregation device position detection unit 301, the cargo shape detected by the cargo shape detection unit 302, the position of the unloading unit 9 detected by the unloading device position detection unit 303, and the trajectory information and operation information of the unloading unit 9 provided by the unloading device control unit 306.
積荷形状予測部308は、軌道候補生成部307が生成した各軌道候補に従ってブルドーザ400が運転された後の積荷形状を予測する。なお、積荷形状はブルドーザ400の運転中にばら荷Mを搬出する荷揚げ部9によっても変化するため、積荷形状予測部308は搬出装置制御部306から提供される荷揚げ部9の軌道情報や運転情報も考慮して積荷形状を予測するのが好ましい。 The cargo shape prediction unit 308 predicts the cargo shape after the bulldozer 400 is operated according to each trajectory candidate generated by the trajectory candidate generation unit 307. Note that since the cargo shape also changes depending on the unloading unit 9 that unloads the bulk goods M while the bulldozer 400 is operating, it is preferable that the cargo shape prediction unit 308 predicts the cargo shape taking into account the trajectory information and operation information of the unloading unit 9 provided by the unloading device control unit 306.
積荷形状評価部309は、積荷形状予測部308によって予測された各積荷形状について、荷揚げ部9による搬出のしやすさ等を評価する。なお、積荷形状評価部309は、積荷形状検知部302によって検知された現在の積荷形状について、荷揚げ部9による搬出のしやすさ等を評価してもよい。積荷形状評価部309による評価の具体例については後述する。 The cargo shape evaluation unit 309 evaluates the ease of removal by the unloading unit 9 for each cargo shape predicted by the cargo shape prediction unit 308. Note that the cargo shape evaluation unit 309 may also evaluate the ease of removal by the unloading unit 9 for the current cargo shape detected by the cargo shape detection unit 302. Specific examples of evaluations by the cargo shape evaluation unit 309 will be described later.
軌道生成部304は、積荷形状評価部309による評価に応じて、ブルドーザ400の船庫201内の軌道を生成してもよい。例えば、軌道生成部304は、軌道候補生成部307によって生成された複数の軌道候補のうち、積荷形状評価部309による評価が最も高い軌道を生成してもよい。 The trajectory generation unit 304 may generate a trajectory for the bulldozer 400 within the warehouse 201 based on the evaluation by the cargo shape evaluation unit 309. For example, the trajectory generation unit 304 may generate the trajectory that has received the highest evaluation by the cargo shape evaluation unit 309 from among multiple trajectory candidates generated by the trajectory candidate generation unit 307.
続いて、制御システム300による制御の具体例を図7のフローチャートに沿って説明する。フローチャートにおける「S」はステップまたは処理を意味する。図7の例では、搬出装置としてのCSU1全体または荷揚げ部9と、集約装置としてのブルドーザ400がいずれも自動運転される。前述のように、荷揚げ部9の軌道は搬出装置制御部306によって生成され、ブルドーザ400の軌道は軌道生成部304によって生成される。 Next, a specific example of control by the control system 300 will be explained using the flowchart in Figure 7. In the flowchart, "S" denotes a step or process. In the example in Figure 7, the entire CSU 1 or the unloading unit 9 as the unloading device, and the bulldozer 400 as the aggregation device, are both operated automatically. As mentioned above, the trajectory of the unloading unit 9 is generated by the unloading device control unit 306, and the trajectory of the bulldozer 400 is generated by the trajectory generation unit 304.
S1では、CSU1の荷揚げ部9または掻き取り部11と船庫201の相対位置が検出される。具体的には、荷揚げ部9に設けられた前述の測距センサ18、19や画像センサ等によって検知される船庫201の開口部21等の位置と、搬出装置制御部306が認識して制御する荷揚げ部9または掻き取り部11の位置の相対位置が検出される。なお、荷揚げ部9または掻き取り部11の位置は、搬出装置位置検知部303によって検出されてもよい。以下では、船庫201に固定された任意の基準点を原点とする三次元座標系(船庫座標系ともいう)において説明する。S1で検出された船庫座標系における時刻kの掻き取り部11の位置/姿勢をxc kと表す。なお、添え字「c」はCSU1を意味する。xc kは、掻き取り部11の一または複数の代表点(例えば先端や後端)の位置(例えば三次元座標)と姿勢(例えば三次元座標軸周りの回転角度)を表すベクトルである。 In S1, the relative position of the unloading unit 9 or scraping unit 11 of the CSU 1 and the warehouse 201 is detected. Specifically, the relative position between the position of the opening 21 of the warehouse 201 detected by the distance sensors 18, 19 and image sensors provided in the unloading unit 9 and the position of the unloading unit 9 or scraping unit 11 recognized and controlled by the carry-out device control unit 306 is detected. Note that the position of the unloading unit 9 or scraping unit 11 may be detected by the carry-out device position detection unit 303. The following description is given in a three-dimensional coordinate system (also referred to as the warehouse coordinate system) with an arbitrary reference point fixed to the warehouse 201 as the origin. The position/posture of the scraping unit 11 at time k in the warehouse coordinate system detected in S1 is represented as x c k . Note that the subscript "c" refers to CSU 1. x c k is a vector representing the position (for example, three-dimensional coordinates) and orientation (for example, a rotation angle around a three-dimensional coordinate axis) of one or more representative points (for example, the leading or trailing end) of the scraping part 11 .
S2では、ブルドーザ400の船庫座標系における時刻kの位置/姿勢xb kが集約装置位置検知部301によって検出される。なお、添え字「b」はブルドーザ400を意味する。xb kは、集約装置位置検知部301について前述したように、荷揚げ部9に設けられた前述の測距センサ18、19や画像センサ等、ブルドーザ400自体に設けられた測距センサ、画像センサ、測位センサ等によって測定される。ここで、荷揚げ部9に設けられた前述の測距センサ18、19や画像センサ等によってブルドーザ400を検知する場合、測距センサ18、19からのレーザ光を反射するリフレクタや画像センサが検知しやすいマーカをブルドーザ400に設けることで、ブルドーザ400の検知精度を高められる。xb kは、ブルドーザ400の一または複数の代表点(例えば、ブルドーザ400中心や排土板の先端)の位置(例えば三次元座標)と姿勢(例えば三次元座標軸周りの回転角度)を表すベクトルである。なお、ブルドーザ400が移動する船庫201の底が実質的に平面である場合、ブルドーザ400の各代表点は、当該平面内の二次元座標系における位置を表す二つのパラメータと、当該平面の法線周りの回転角度(姿勢)を表す一つのパラメータの、合計三つのパラメータで表すことができる。 In S2, the position/posture x b k of the bulldozer 400 at time k in the shed coordinate system is detected by the aggregation device position detection unit 301. The subscript "b" denotes the bulldozer 400. As described above for the aggregation device position detection unit 301, x b k is measured by the aforementioned distance measuring sensors 18, 19 and image sensors provided at the unloading unit 9, or distance measuring sensors, image sensors, positioning sensors, etc. provided at the bulldozer 400 itself. When the bulldozer 400 is detected by the aforementioned distance measuring sensors 18, 19 and image sensors, etc. provided at the unloading unit 9, the detection accuracy of the bulldozer 400 can be improved by providing the bulldozer 400 with reflectors that reflect laser light from the distance measuring sensors 18, 19 or markers that are easily detected by the image sensors. x b k is a vector representing the position (e.g., three-dimensional coordinates) and attitude (e.g., a rotation angle around a three-dimensional coordinate axis) of one or more representative points (e.g., the center of the bulldozer 400 or the tip of the blade) of the bulldozer 400. If the bottom of the shed 201 in which the bulldozer 400 moves is substantially flat, each representative point of the bulldozer 400 can be represented by a total of three parameters: two parameters representing a position in a two-dimensional coordinate system within that plane, and one parameter representing a rotation angle (attitude) around the normal to that plane.
S3では、積荷形状検知部302によって船庫201内の積荷形状(ばら荷Mの形状)が検出される。図8は、積荷形状検知部302による積荷形状の検出の具体例を示す。船庫201の底が近似された平面上にX軸およびY軸による二次元座標系が設定されており、X軸およびY軸に沿って船庫201の底が格子状に区画されている。図8の例では、X軸に沿った30個の区間およびY軸に沿った15個の区間によって船庫201の底が合計450個の区画に分けられている。積荷形状検知部302は、各区画におけるばら荷Mの高さを検知する。i番目(図8の例では、i=1~450)の区画における時刻kのばら荷Mの高さをhi kと表す。積荷形状検知部302は、h1 k~h450 kの総体または集合としての時刻kの積荷形状hkを検出する。なお、ブルドーザ400や荷揚げ部9を含む船庫201内の物や人によって、積荷形状検知部302が一部の区画のばら荷Mの高さを測定できない場合は、Semantic Scene Completion等の補間技術によって当該区間のばら荷Mの高さを推定してもよい。 In S3, the cargo shape detection unit 302 detects the cargo shape (shape of the bulk cargo M) in the cargo hold 201. FIG. 8 shows a specific example of cargo shape detection by the cargo shape detection unit 302. A two-dimensional coordinate system with X and Y axes is set on a plane that approximates the bottom of the cargo hold 201, and the bottom of the cargo hold 201 is divided into a grid pattern along the X and Y axes. In the example of FIG. 8, the bottom of the cargo hold 201 is divided into a total of 450 sections, consisting of 30 sections along the X axis and 15 sections along the Y axis. The cargo shape detection unit 302 detects the height of the bulk cargo M in each section. The height of the bulk cargo M in the ith section (i = 1 to 450 in the example of FIG. 8) at time k is represented as h i k . The cargo shape detection unit 302 detects the cargo shape h k at time k as the aggregate or set of h 1 k to h 450 k . In addition, if the cargo shape detection unit 302 is unable to measure the height of the bulk cargo M in some sections due to objects or people inside the warehouse 201, including the bulldozer 400 and the unloading unit 9, the height of the bulk cargo M in that section may be estimated using an interpolation technique such as Semantic Scene Completion.
S4では、積荷(ばら荷M)が十分に少ないか否かが判定される。具体的には、S3で検出された各区間のばら荷Mの高さhi kの総和(Σihi k=h1 k+h2 k+…+h450 k)が所定の搬出完了閾値以下であるかが判定される。S4でYesと判定された場合、荷揚げ部9とブルドーザ400の自動運転が停止され、ブルドーザ400の支援の下での掻き取り部11によるばら荷Mの搬出が完了する。S4でNoと判定された場合は次のS5に進む。 In S4, it is determined whether the load (bulk goods M) is sufficiently small. Specifically, it is determined whether the sum of the heights h i k of the bulk goods M in each section detected in S3 (Σ i h i k = h 1 k + h 2 k + ... + h 450 k ) is equal to or less than a predetermined carry-out completion threshold. If the determination in S4 is Yes, the automatic operation of the unloading unit 9 and bulldozer 400 is stopped, and the carry-out of the bulk goods M by the scraping unit 11 with the assistance of the bulldozer 400 is completed. If the determination in S4 is No, the process proceeds to the next S5.
S5では、軌道候補生成部307、積荷形状予測部308、積荷形状評価部309、軌道生成部304、搬出装置制御部306によって、ブルドーザ400の将来時刻k+1~Hの軌道(位置/姿勢)xb k+1:Hと荷揚げ部9の将来時刻k+1~Hの軌道(位置/姿勢)xc k+1:Hが生成される。S5の詳細については後述する。S6では、S5で軌道生成部304によって生成されたブルドーザ400の軌道xb k+1:Hに従ってブルドーザ400が自動運転(軌道追従制御)され、S5で搬出装置制御部306によって生成された荷揚げ部9の軌道xc k+1:Hに従って荷揚げ部9が自動運転(軌道追従制御)される。S6の後はS1に戻り、S4でYesと判定される(ばら荷Mの搬出が完了する)までS1~S6の一連の処理が間欠的または連続的に繰り返される。 In S5, the trajectory candidate generation unit 307, the cargo shape prediction unit 308, the cargo shape evaluation unit 309, the trajectory generation unit 304, and the unloading apparatus control unit 306 generate a trajectory (position/posture) x b k+1:H of the bulldozer 400 from future time k+1 to H and a trajectory (position/posture) x c k+1:H of the unloading unit 9 from future time k+1 to H. Details of S5 will be described later. In S6, the bulldozer 400 is automatically driven (trajectory tracking control) in accordance with the trajectory x b k+1:H of the bulldozer 400 generated by the trajectory generation unit 304 in S5, and the unloading unit 9 is automatically driven (trajectory tracking control) in accordance with the trajectory x c k+1:H of the unloading unit 9 generated by the unloading apparatus control unit 306 in S5. After S6, the process returns to S1, and the series of steps S1 to S6 are repeated intermittently or continuously until a Yes is determined in S4 (unloading of the bulk goods M is completed).
続いて、S5の詳細を説明する。S5では、ブルドーザ400の将来時刻k+1~Hの軌道xb k+1:Hと荷揚げ部9の将来時刻k+1~Hの軌道xc k+1:Hが生成されるが、ここでは掻き取り部11の掻き取り速度等の荷揚げ部9またはCSU1の時刻kの制御状態yc kとブルドーザ400の排土板の上下位置等のブルドーザ400の時刻kの制御状態yb kも併せて考慮する。なお、軌道および制御状態の予測または生成の範囲を定める将来時刻Hを以下では予測ホライズンHともいう。荷揚げ部9の時刻kの軌道xc kおよび制御状態yc kの組合せを荷揚げ部9の時刻kの状態zc k=(xc k,yc k)と置き、ブルドーザ400の時刻kの軌道xb kおよび制御状態yb kの組合せをブルドーザ400の時刻kの状態zb k=(xb k,yb k)と置く。 Next, details of S5 will be explained. In S5, a trajectory x b k+1:H of the bulldozer 400 from future time k+1 to H and a trajectory x c k+1 :H of the unloading unit 9 from future time k+1 to H are generated, but here, the control state y c k of the unloading unit 9 or CSU 1 at time k, such as the scraping speed of the scraping unit 11, and the control state y b k of the bulldozer 400 at time k , such as the up and down position of the blade of the bulldozer 400, are also taken into consideration. Note that the future time H that determines the range of prediction or generation of the trajectory and control state will be referred to as the prediction horizon H below. The combination of the trajectory xck and control state yck of the unloading unit 9 at time k is defined as the state zck = ( xck , yck ) of the unloading unit 9 at time k , and the combination of the trajectory xbk and control state ybk of the bulldozer 400 at time k is defined as the state zbk = ( xbk , ybk ) of the bulldozer 400 at time k .
これらに基づいて、現在時刻k=0の荷揚げ部9の状態zc 0、現在時刻k=0のブルドーザ400の状態zb 0、現在時刻k=0の積荷形状h0の組(zc 0,zb 0,h0)から、将来時刻1~Hの荷揚げ部9およびブルドーザ400の状態(zc 1:H,zb 1:H)を生成する関数gを考える。すなわち(zc 1:H,zb 1:H)=g(zc 0,zb 0,h0)である。なお、荷揚げ部9およびブルドーザ400の速度や加速度も考慮するため、関数gには現在時刻0より少し前の時刻-Lから現在時刻0までの荷揚げ部9およびブルドーザ400の状態(zc -L:0,zb -L:0)を入力するのが好ましい。Lは例えば1である。この場合、関数gは(zc 1:H,zb 1:H)=g(zc -L:0,zb -L:0,h0)と表される。S5の軌道生成処理の目的は、荷揚げ部9の掻き取り部11がブルドーザ400と衝突せず、かつ、掻き取り部11によるばら荷Mの搬出効率を最大化できる、荷揚げ部9およびブルドーザ400の将来時刻1~Hの軌道(zc 1:H,zb 1:H)を与える最適な関数gを見つけることである。 Based on these, consider a function g that generates the states ( zc1 :H, zb1:H) of the unloading unit 9 and bulldozer 400 at future times 1 to H from a set ( zc0 , zb0 , h0 ) of the state zc0 of the unloading unit 9 at the current time k = 0 , the state zb0 of the bulldozer 400 at the current time k=0, and the load shape h0 at the current time k=0. That is, (zc1 : H , zb1 : H ) = g( zc0 , zb0 , h0 ). Note that, in order to take into consideration the speed and acceleration of the unloading unit 9 and bulldozer 400, it is preferable to input into function g the states ( zc -L:0 , zb -L:0 ) of the unloading unit 9 and bulldozer 400 from time -L, which is slightly before the current time 0, to the current time 0. L is, for example, 1. In this case, the function g is expressed as ( zc1 :H , zb1 :H ) = g( zc -L:0 , zb -L:0 , h0 ). The purpose of the trajectory generation process in S5 is to find an optimal function g that gives trajectories ( zc1 :H, zb1:H) of the landing unit 9 and bulldozer 400 at future times 1 to H, so that the scraping unit 11 of the landing unit 9 does not collide with the bulldozer 400 and the efficiency of the scraping unit 11 in carrying out the bulk material M can be maximized.
(zc 1:H,zb 1:H)=g(zc -L:0,zb -L:0,h0)において、右辺の関数gへの入力となるzc -L:0,zb -L:0,h0は、それぞれ搬出装置位置検知部303(および/または搬出装置制御部306)、集約装置位置検知部301、積荷形状検知部302によって検知される。これらのパラメータ(zc -L:0,zb -L:0,h0)を取得した軌道候補生成部307は、ブルドーザ400の複数の軌道候補zb 1:Hを生成する。また、同じパラメータ(zc -L:0,zb -L:0,h0)を取得した搬出装置制御部306は、荷揚げ部9の複数の軌道候補zc 1:Hを生成する。このように、荷揚げ部9およびブルドーザ400の複数の軌道候補(zc 1:H,zb 1:H)が、搬出装置制御部306および軌道候補生成部307によって生成される。 In ( zc1 :H , zb1 :H ) = g( zc -L:0 , zb- L :0 , h0 ), zc -L:0 , zb -L:0 , h0 , which are inputs to the function g on the right-hand side, are detected by the unloading device position detection unit 303 (and/or the unloading device control unit 306), the consolidation device position detection unit 301, and the cargo shape detection unit 302, respectively. The trajectory candidate generation unit 307, which has acquired these parameters ( zc -L:0 , zb -L:0 , h0 ), generates multiple trajectory candidates zb1 :H for the bulldozer 400. Furthermore, the unloading device control unit 306, which has acquired the same parameters ( zc -L:0 , zb -L:0 , h0 ), generates multiple trajectory candidates zc1 :H for the unloading unit 9. In this way, a plurality of trajectory candidates (z c 1:H , z b 1:H ) for the unloading unit 9 and the bulldozer 400 are generated by the unloading device control unit 306 and the trajectory candidate generation unit 307 .
積荷形状予測部308は、生成された各軌道候補(zc 1:H,zb 1:H)に従って荷揚げ部9およびブルドーザ400が運転された後の将来時刻1~Hの積荷形状h1~hHを予測する。ここで、時刻kの積荷形状hkは、前の時刻k-1の積荷形状hk-1と時刻kの荷揚げ部9およびブルドーザ400の状態(zc k,zb k)に基づいて、hk=f(hk-1,zc k,zb k)と表される。ここで、関数fはニューラルネットワーク等を通じた機械学習によって予め用意される。機械学習するためのデータは、オペレータによるマニュアル操縦時に収集した実環境のデータでもよいし、シミュレーションによって収集したデータでもよい。積荷形状予測部308は、各軌道候補(zc 1:H,zb 1:H)と積荷形状検知部302で検知された現在時刻の積荷形状h0を関数fに順次入力し、h1=f(h0,zc 1,zb 1)、h2=f(h1,zc 2,zb 2)、…、hH=f(hH-1,zc H,zb H)によって、各将来時刻1~Hの各積荷形状h1~hHを軌道候補(zc 1:H,zb 1:H)毎に予測する。 The cargo shape prediction unit 308 predicts cargo shapes h1 to hH at future times 1 to H after the unloading unit 9 and bulldozer 400 have been operated according to the generated trajectory candidates ( zc1 :H , zb1 :H ) . Here, the cargo shape hk at time k is expressed as hk = f( hk -1 , zck , zbk ) based on the cargo shape hk-1 at the previous time k- 1 and the state of the unloading unit 9 and bulldozer 400 at time k (zck , zbk ) . Here, the function f is prepared in advance by machine learning using a neural network or the like. The data used for machine learning may be data of the actual environment collected during manual operation by an operator, or may be data collected by simulation. The cargo shape prediction unit 308 sequentially inputs each trajectory candidate ( zc1 :H , zb1 :H ) and the cargo shape h0 at the current time detected by the cargo shape detection unit 302 into a function f, and predicts each cargo shape h1 to hH at each future time 1 to H for each trajectory candidate ( zc1 : H , zb1 : H ) using h1 = f( h0 , zc1 , zb1 ), h2 = f( h1 , zc2 , zb2 ), ..., hH = f( hH - 1 , zcH , zbH ) .
以上のように、複数の軌道候補(zc 1:H,zb 1:H)について、現在時刻0における荷揚げ部9、ブルドーザ400、ばら荷Mの初期状態(zc -L:0,zb -L:0,h0)から、将来時刻1~Hにおける荷揚げ部9、ブルドーザ400、ばら荷Mの状態(h1:H,zc 1:H,zb 1:H)への遷移(h1:H,zc 1:H,zb 1:H|zc -L:0,zb -L:0,h0)が与えられる。積荷形状評価部309は、これらの遷移におけるばら荷Mの搬出のしやすさ等を評価する評価関数J(h1:H,zc 1:H,zb 1:H|zc -L:0,zb -L:0,h0)と、これらの遷移において荷揚げ部9およびブルドーザ400が現実的な速度や加速度で衝突を避けながら運動するための制約条件b(h1:H,zc 1:H,zb 1:H|zc -L:0,zb -L:0,h0)を用いて、各軌道候補(zc 1:H,zb 1:H)を評価する。評価関数Jおよび制約条件bについては後述する。 As described above, for multiple trajectory candidates ( zc1 :H , zb1 :H ), a transition (h1:H, zc1:H, zb1:H | zc -L:0 , zb -L:0 , h0 ) is given from the initial state ( zc-L :0, zb -L : 0, h0) of the unloading unit 9, bulldozer 400, and bulk load M at current time 0 to the state ( h1: H, zc1 : H , zb1 :H ) of the unloading unit 9 , bulldozer 400 , and bulk load M at future times 1 to H. The cargo shape evaluation unit 309 evaluates each trajectory candidate (zc1:H, zb1:H) using an evaluation function J (h1:H , zc1 :H , zb1 :H | zc -L:0 , zb -L:0 , h0 ) that evaluates the ease of carrying out the bulk goods M during these transitions, and constraints b ( h1:H , zc1 :H , zb1 :H | zc - L :0 , zb -L:0 , h0 ) that allow the unloading unit 9 and bulldozer 400 to move at realistic speeds and accelerations while avoiding collisions during these transitions . The evaluation function J and constraints b will be described later.
積荷形状評価部309が行う評価関数Jおよび制約条件bによる複数の軌道候補(zc
1:H,zb
1:H)の評価は、以下の数式で表される制約付き非線形最適化問題として扱える。評価においては、主双対内点法、SQP(Sequential Quadratic Programming)、ランダムシューティング等を利用してもよい。この結果、最も高い評価が得られた軌道候補(zc
1:H,zb
1:H)が軌道生成部304によって採用されて、荷揚げ部9およびブルドーザ400の自動運転に使用される。
評価関数Jは、複数の異なる評価観点に対応して設計された複数の関数rl(h1:H,zc 1:H,zb 1:H|zc -L:0,zb -L:0,h0)を、重みαlで適宜重み付けをして加算したものとして構成できる。すなわち、J=Σlαlrl(h1:H,zc 1:H,zb 1:H|zc -L:0,zb -L:0,h0)である。以下で関数rlの具体例を挙げる。 The evaluation function J can be constructed by adding together a plurality of functions r l (h 1:H , z c 1:H , z b 1:H | z c -L:0 , z b -L:0 , h 0 ) designed to correspond to a plurality of different evaluation viewpoints, appropriately weighted with weights α l . That is, J = Σ l α l r l (h 1:H , z c 1:H , z b 1:H |z c -L:0 , z b -L:0 , h 0 ). Specific examples of the function r l are given below.
第1の関数r1は、積荷(ばら荷M)の総量に関する。具体的には、r1(h1:H,zc 1:H,zb 1:H|zc -L:0,zb -L:0,h0)=Σihi Hと定義する。このr1は予測ホライズンHにおけるばら荷Mの総量を表すため、評価が高くなるほど(r1の値が小さくなるほど)掻き取り部11によるばら荷Mの搬出効率が高いといえる。また、掻き取り部11によるばら荷Mの搬出速度(単位時間当たりのばら荷Mの搬出量)の将来時刻1~Hに亘る変動が過大にならないように制限する(搬出速度の変動が小さいほど評価が高くなる)評価関数を設けてもよい。 The first function r1 relates to the total amount of cargo (bulk goods M). Specifically, it is defined as r1 ( h1:H , zc1 :H , zb1 :H | zc -L:0 , zb -L:0 , h0 ) = Σih1H . Since r1 represents the total amount of bulk goods M in the prediction horizon H, it can be said that the higher the evaluation (the smaller the value of r1 ) , the higher the efficiency of the removal of bulk goods M by the scraping unit 11. In addition, an evaluation function may be provided that limits the fluctuations in the removal speed of bulk goods M by the scraping unit 11 (the amount of bulk goods M removed per unit time) over future times 1 to H so that they do not become excessive (the smaller the fluctuations in the removal speed, the higher the evaluation).
第2の関数r2は、積荷(ばら荷M)の集約状態に関する。例えば、船庫201の中央にばら荷Mが集約されていれば、掻き取り部11によって効率的に掻き取れる。そこで、船庫201の中央の区画(図8)に比較的大きな重みwiを設定して、r2=(h1:H,zc 1:H,zb 1:H|zc -L:0,zb -L:0,h0)=Σiwihi Hと定義する。このr2の評価が高くなるほど(r2の値が大きくなるほど)、船庫201の中央へのばら荷Mの集約度が高くなる。 The second function r2 relates to the concentration state of the cargo (bulk cargo M). For example, if the bulk cargo M is concentrated in the center of the warehouse 201, it can be efficiently scraped off by the scraping unit 11. Therefore, a relatively large weight w i is set for the central section of the warehouse 201 (FIG. 8), and r2 is defined as r2 = (h1 :H , zc1 :H , zb1 :H | zc -L :0 , zb- L :0 , h0 ) = Σi w i h i H. The higher the evaluation of r2 (the larger the value of r2 ), the higher the concentration of bulk cargo M in the center of the warehouse 201.
第3の関数r3は、荷揚げ部9の加減速に関する。荷揚げ部9の加減速は少ない方が好ましく、荷揚げ部9の加速度の絶対値をr3で評価する。具体的には、各時刻-L~Hの荷揚げ部9の軌道xc -L:Hを時間で二回微分して得られる各時刻-L+1~H-1の荷揚げ部9の加速度ac -L+1:H-1のうち、現在時刻0以降の荷揚げ部9の加速度ac 0:H-1の絶対値(ac 0:H-1)T(ac 0:H-1)をr3と定義する。このr3の評価が高くなるほど(r3の値が小さくなるほど)、荷揚げ部9の加減速が少なくなる。また、荷揚げ部9の軌道の曲率が過大にならないように制限する(曲率が小さいほど評価が高くなる)評価関数を設けてもよい。同様に、荷揚げ部9の移動速度の将来時刻1~Hに亘る変動が過大にならないように制限する(移動速度の変動が小さいほど評価が高くなる)評価関数を設けてもよい。 The third function r3 relates to the acceleration/deceleration of the unloading unit 9. Smaller acceleration/deceleration of the unloading unit 9 is preferable, and the absolute value of the acceleration of the unloading unit 9 is evaluated by r3 . Specifically, the absolute value (a c 0:H-1 ) T (a c 0: H -1 ) of the acceleration a c 0:H-1 of the unloading unit 9 from the current time 0 onward is defined as r3, out of the acceleration a c -L+1:H -1 of the unloading unit 9 at each time -L +1 to H-1 obtained by twice differentiating the trajectory x c -L:H of the unloading unit 9 at each time -L to H. The higher the evaluation of r3 (the smaller the value of r3 ), the smaller the acceleration/deceleration of the unloading unit 9. An evaluation function may also be provided that limits the curvature of the trajectory of the unloading unit 9 so that it does not become excessive (the smaller the curvature, the higher the evaluation). Similarly, an evaluation function may be provided that limits the fluctuation in the moving speed of the unloading unit 9 over future times 1 to H so that it does not become excessive (the smaller the fluctuation in the moving speed, the higher the evaluation).
第4の関数r4は、ブルドーザ400の加減速に関する。ブルドーザ400の加減速は少ない方が好ましく、ブルドーザ400の加速度の絶対値をr4で評価する。具体的には、各時刻-L~Hのブルドーザ400の軌道xb -L:Hを時間で二回微分して得られる各時刻-L+1~H-1のブルドーザ400の加速度ab -L+1:H-1のうち、現在時刻0以降のブルドーザ400の加速度ab 0:H-1の絶対値(ab 0:H-1)T(ab 0:H-1)をr4と定義する。このr4の評価が高くなるほど(r4の値が小さくなるほど)、ブルドーザ400の加減速が少なくなる。また、ブルドーザ400の軌道の曲率が過大にならないように制限する(曲率が小さいほど評価が高くなる)評価関数を設けてもよい。同様に、ブルドーザ400の移動速度の将来時刻1~Hに亘る変動が過大にならないように制限する(移動速度の変動が小さいほど評価が高くなる)評価関数を設けてもよい。 The fourth function r4 relates to the acceleration and deceleration of the bulldozer 400. Smaller acceleration and deceleration of the bulldozer 400 is preferable, and the absolute value of the acceleration of the bulldozer 400 is evaluated by r4 . Specifically, the absolute value (a b 0 :H-1 ) T (a b 0:H-1 ) of the acceleration a b 0:H-1 of the bulldozer 400 from the current time 0 onward is defined as r4, among the accelerations a b -L+1: H-1 of the bulldozer 400 at times -L +1 to H- 1 obtained by differentiating the trajectory x b -L :H of the bulldozer 400 twice with respect to time at times -L to H. The higher the evaluation of r4 (the smaller the value of r4 ), the smaller the acceleration and deceleration of the bulldozer 400. An evaluation function may also be provided that limits the curvature of the trajectory of the bulldozer 400 so that it does not become excessive (the smaller the curvature, the higher the evaluation). Similarly, an evaluation function may be provided that limits fluctuations in the movement speed of the bulldozer 400 over future times 1 to H so that they do not become excessive (the smaller the fluctuations in the movement speed, the higher the evaluation).
続いて、制約条件b(h1:H,zc 1:H,zb 1:H|zc -L:0,zb -L:0,h0)の具体例を挙げる。 Next, a specific example of constraint b (h 1:H , z c 1:H , z b 1:H |z c −L:0 , z b −L:0 , h 0 ) will be given.
第1の制約条件は、荷揚げ部9の運動に関する。荷揚げ部9の軌道または状態zc 1:Hは、荷揚げ部9で物理的に実現不可能な運動パラメータ(速度、加速度、角速度、角加速度、曲率等)を伴うものであってはならない。そこで、これらの各運動パラメータについての上限や下限を制約条件として設定する。例えば、荷揚げ部9の速度の絶対値(速さ)を上限Vc以下に制限する場合、各時刻-L~Hの荷揚げ部9の軌道xc -L:Hを時間で微分して得られる各時刻-L+1~H-1の荷揚げ部9の速度vc -L+1:H-1のうち、時刻1以降の荷揚げ部9の速度vc 1:H-1の絶対値を上限Vc以下に制限する。具体的には、0≦Vc-|vc 1:H-1|の不等式で表される制約条件を設定する。なお、荷揚げ部9がブルドーザ400や船庫201の壁等の構造物から所定距離以内の近傍にいる場合、衝突を避けるために上限Vcを低くしてもよい。同様に、荷揚げ部9の他の運動パラメータについても上限や下限を設定できる。 The first constraint relates to the motion of the unloading unit 9. The trajectory or state z c 1:H of the unloading unit 9 must not involve motion parameters (velocity, acceleration, angular velocity, angular acceleration, curvature, etc.) that are physically impossible for the unloading unit 9 to achieve. Therefore, upper and lower limits for each of these motion parameters are set as constraints. For example, when limiting the absolute value of the velocity (speed) of the unloading unit 9 to an upper limit V c , the absolute value of the velocity v c 1:H -1 of the unloading unit 9 from time 1 onward is limited to an upper limit V c , out of the velocity v c -L+1:H-1 of the unloading unit 9 at times −L+1 to H-1 obtained by time-differentiating the trajectory x c -L :H of the unloading unit 9 at times −L to H. Specifically, a constraint expressed by the inequality 0≦V c - |v c 1:H-1 | is set. It should be noted that the upper limit Vc may be lowered to avoid collision when the unloading unit 9 is within a predetermined distance from structures such as the bulldozer 400 or the wall of the shipyard 201. Similarly, upper and lower limits may be set for the other motion parameters of the unloading unit 9.
第2の制約条件は、ブルドーザ400の運動に関する。ブルドーザ400の軌道または状態zb 1:Hは、ブルドーザ400で物理的に実現不可能な運動パラメータ(速度、加速度、角速度、角加速度、曲率等)を伴うものであってはならない。そこで、これらの各運動パラメータについての上限や下限を制約条件として設定する。例えば、ブルドーザ400の速度の絶対値(速さ)を上限Vb以下に制限する場合、各時刻-L~Hのブルドーザ400の軌道xb -L:Hを時間で微分して得られる各時刻-L+1~H-1のブルドーザ400の速度vb -L+1:H-1のうち、時刻1以降のブルドーザ400の速度vb 1:H-1の絶対値を上限Vb以下に制限する。具体的には、0≦Vb-|vb 1:H-1|の不等式で表される制約条件を設定する。なお、ブルドーザ400が荷揚げ部9や船庫201の壁等の構造物から所定距離以内の近傍にいる場合、衝突を避けるために上限Vbを低くしてもよい。同様に、ブルドーザ400の他の運動パラメータについても上限や下限を設定できる。 The second constraint relates to the movement of the bulldozer 400. The trajectory or state z b 1:H of the bulldozer 400 must not involve movement parameters (speed, acceleration, angular velocity, angular acceleration, curvature, etc.) that are physically impossible for the bulldozer 400 to achieve. Therefore, upper and lower limits for each of these movement parameters are set as constraints. For example, when limiting the absolute value (speed) of the speed of the bulldozer 400 to an upper limit V b or less, the absolute value of the speed v b 1 :H -1 of the bulldozer 400 from time 1 onwards is limited to an upper limit V b or less among the speeds v b -L+1:H-1 of the bulldozer 400 at times −L+1 to H- 1 obtained by time differentiating the trajectory x b -L:H of the bulldozer 400 at times −L to H. Specifically, a constraint expressed by the inequality 0≦V b -|v b 1:H-1 | is set. It should be noted that the upper limit Vb may be lowered to avoid collision when the bulldozer 400 is within a predetermined distance from structures such as the unloading section 9 and the wall of the shipyard 201. Similarly, upper and lower limits can be set for the other motion parameters of the bulldozer 400.
第3の制約条件は、ブルドーザ400と荷揚げ部9の接触回避に関する。例えば、0≦|xc 1:H-1-xb 1:H-1|-Xcbの不等式で表される制約条件を設定することで、ブルドーザ400と荷揚げ部9が最小近接距離Xcbより近接しないことを担保できる。同様に、ブルドーザ400および荷揚げ部9が、それぞれ船庫201の壁等の構造物に所定の最小近接距離より近接しないことを担保する制約条件を設定できる。 The third constraint relates to avoidance of contact between the bulldozer 400 and the unloading unit 9. For example, by setting a constraint expressed by the inequality 0≦|x c 1:H-1 -x b 1:H-1 |-X cb , it is possible to ensure that the bulldozer 400 and the unloading unit 9 do not come closer than the minimum approach distance X cb . Similarly, it is possible to set a constraint that ensures that the bulldozer 400 and the unloading unit 9 do not come closer than a predetermined minimum approach distance to structures such as the walls of the shipyard 201.
第4の制約条件は、ブルドーザ400の安定性に関する。例えば、ブルドーザ400が傾斜のあるばら荷Mに乗り上げることで不安定になる事態を防止するための制約条件が設定される。具体的には、ブルドーザ400の位置xb 1:H-1におけるばら荷Mの傾斜を、積荷形状検知部302が検知した積荷形状h1:H-1から算出し、それが所定の傾斜上限以下に制限される制約条件が設定される。 The fourth constraint condition relates to the stability of the bulldozer 400. For example, a constraint condition is set to prevent the bulldozer 400 from becoming unstable due to running over an inclined bulk load M. Specifically, the inclination of the bulk load M at the position x b 1:H-1 of the bulldozer 400 is calculated from the load shape h 1:H-1 detected by the load shape detection unit 302, and a constraint condition is set to limit the inclination to a predetermined upper limit.
以上、本発明を実施形態に基づいて説明した。実施形態は例示であり、それらの各構成要素や各処理プロセスの組合せに様々な変形例が可能なこと、またそうした変形例も本発明の範囲にあることは当業者に理解されるところである。 The present invention has been described above based on an embodiment. The embodiment is merely an example, and those skilled in the art will understand that various modifications are possible in the combination of each component and each treatment process, and that such modifications are also within the scope of the present invention.
本発明は、実施形態で説明したバケットエレベータ式の連続アンローダに限らず、スパイラル型の連続アンローダや、エアー搬送機構を備える連続アンローダにも適用できる。 The present invention is not limited to the bucket elevator type continuous unloader described in the embodiment, but can also be applied to spiral type continuous unloaders and continuous unloaders equipped with an air conveying mechanism.
なお、実施形態で説明した各装置の機能構成はハードウェア資源またはソフトウェア資源により、あるいはハードウェア資源とソフトウェア資源の協働により実現できる。ハードウェア資源としてプロセッサ、ROM、RAM、その他のLSIを利用できる。ソフトウェア資源としてオペレーティングシステム、アプリケーション等のプログラムを利用できる。 The functional configuration of each device described in the embodiments can be realized using hardware resources, software resources, or a combination of hardware and software resources. Processors, ROM, RAM, and other LSIs can be used as hardware resources. Operating systems, applications, and other programs can be used as software resources.
1 荷揚げ装置(CSU)、9 荷揚げ部、11 掻き取り部、18 測距センサ、19 測距センサ、201 船庫、300 制御システム、301 集約装置位置検知部、302 積荷形状検知部、303 搬出装置位置検知部、304 軌道生成部、305 承認受付部、306 搬出装置制御部、307 軌道候補生成部、308 積荷形状予測部、309 積荷形状評価部、400 ブルドーザ。 1. Cargo lifting unit (CSU), 9. Cargo lifting unit, 11. Scraping unit, 18. Distance measurement sensor, 19. Distance measurement sensor, 201. Warehouse, 300. Control system, 301. Aggregation device position detection unit, 302. Cargo shape detection unit, 303. Cargo device position detection unit, 304. Trajectory generation unit, 305. Approval reception unit, 306. Cargo device control unit, 307. Trajectory candidate generation unit, 308. Cargo shape prediction unit, 309. Cargo shape evaluation unit, 400. Bulldozer.
Claims (12)
船庫内の積荷を搬出装置によって船庫外に搬出させる搬出装置制御部と、
船庫内の積荷形状を検知する積荷形状検知部と、
前記集約装置位置検知部によって検知された前記集約装置の位置および前記積荷形状検知部によって検知された積荷形状に応じて、前記集約装置の船庫内の軌道を生成する軌道生成部と、
を備え、
前記積荷形状検知部によって検知された積荷形状について、前記搬出装置による搬出のしやすさを評価する積荷形状評価部を更に備え、
前記軌道生成部は、前記集約装置の位置に加えて、前記積荷形状評価部による評価に応じて、前記集約装置の船庫内の軌道を生成する荷下ろし装置。 a consolidation device position detection unit that detects the position of a consolidation device that consolidates cargo in a shipyard;
a carrying-out device control unit that causes the carrying-out device to carry out the cargo in the shed to the outside of the shed;
a cargo shape detection unit that detects the shape of cargo in the warehouse;
a trajectory generating unit that generates a trajectory of the aggregation device in the warehouse in accordance with the position of the aggregation device detected by the aggregation device position detecting unit and the cargo shape detected by the cargo shape detecting unit;
Equipped with
a cargo shape evaluation unit that evaluates the ease of carrying out the cargo shape detected by the cargo shape detection unit using the carrying-out device;
The trajectory generation unit is an unloading device that generates a trajectory within the warehouse of the aggregation device based on the evaluation by the cargo shape evaluation unit in addition to the position of the aggregation device .
前記軌道生成部は、前記集約装置の位置および前記積荷形状に加えて、前記搬出装置位置検知部によって検知された前記搬出装置の位置に応じて、前記集約装置の船庫内の軌道を生成する、
請求項1に記載の荷下ろし装置。 Further provided is a carry-out device position detection unit that detects the position of the carry-out device in the shipyard,
the trajectory generation unit generates a trajectory in the warehouse of the aggregation device according to the position of the carrying-out device detected by the carrying-out device position detection unit in addition to the position of the aggregation device and the cargo shape.
2. The unloading device of claim 1.
前記集約装置は、前記承認受付部によって受け付けられた承認に係る軌道に従って自動運転される、
請求項3に記載の荷下ろし装置。 further comprising an approval receiving unit that receives approval for the trajectory generated by the trajectory generating unit,
The aggregation device is automatically driven according to a trajectory related to the approval received by the approval receiving unit.
4. An unloading device according to claim 3.
当該各軌道候補に従って前記集約装置が運転された後の積荷形状を予測する積荷形状予測部と、
前記積荷形状予測部によって予測された各積荷形状について、前記搬出装置による搬出のしやすさを評価する積荷形状評価部と、
を更に備え、
前記軌道生成部は、前記複数の軌道候補のうち前記積荷形状評価部による評価が最も高い軌道を生成する、
請求項1から5のいずれかに記載の荷下ろし装置。 a trajectory candidate generation unit that generates a plurality of trajectory candidates within the warehouse of the aggregation device according to the position of the aggregation device detected by the aggregation device position detection unit and the cargo shape detected by the cargo shape detection unit;
a cargo shape prediction unit that predicts a cargo shape after the aggregation device is operated according to each of the trajectory candidates;
a cargo shape evaluation unit that evaluates the ease of carrying out by the carrying-out device for each cargo shape predicted by the cargo shape prediction unit;
Further provided with
the trajectory generation unit generates a trajectory that is most highly evaluated by the cargo shape evaluation unit from among the plurality of trajectory candidates.
An unloading device according to any one of claims 1 to 5 .
船庫内の積荷を搬出装置によって船庫外に搬出させる搬出装置制御ステップと、
船庫内の積荷形状を検知する積荷形状検知ステップと、
前記集約装置位置検知ステップによって検知された前記集約装置の位置および前記積荷形状検知ステップによって検知された積荷形状に応じて、前記集約装置の船庫内の軌道を生成する軌道生成ステップと、
を備え、
前記積荷形状検知ステップによって検知された積荷形状について、前記搬出装置による搬出のしやすさを評価する積荷形状評価ステップを更に備え、
前記軌道生成ステップは、前記集約装置の位置に加えて、前記積荷形状評価ステップによる評価に応じて、前記集約装置の船庫内の軌道を生成する荷下ろし装置の制御方法。 a consolidation device position detection step of detecting a position of a consolidation device that consolidates cargo in a shipyard;
a carrying-out device control step of carrying out the cargo in the warehouse to the outside of the warehouse by the carrying-out device;
a cargo shape detection step of detecting a cargo shape in a cargo hold;
a trajectory generating step of generating a trajectory of the aggregating device in the warehouse according to the position of the aggregating device detected by the aggregating device position detecting step and the cargo shape detected by the cargo shape detecting step;
Equipped with
a cargo shape evaluation step of evaluating ease of carrying out the cargo shape detected by the cargo shape detection step by the carrying-out device;
The trajectory generation step is a control method for an unloading device that generates a trajectory within the warehouse of the aggregation device based on the evaluation by the cargo shape evaluation step in addition to the position of the aggregation device .
船庫内の積荷を搬出装置によって船庫外に搬出させる搬出装置制御ステップと、
船庫内の積荷形状を検知する積荷形状検知ステップと、
前記集約装置位置検知ステップによって検知された前記集約装置の位置および前記積荷形状検知ステップによって検知された積荷形状に応じて、前記集約装置の船庫内の軌道を生成する軌道生成ステップと、
をコンピュータに実行させ、
前記積荷形状検知ステップによって検知された積荷形状について、前記搬出装置による搬出のしやすさを評価する積荷形状評価ステップを前記コンピュータに更に実行させ、
前記軌道生成ステップは、前記集約装置の位置に加えて、前記積荷形状評価ステップによる評価に応じて、前記集約装置の船庫内の軌道を生成する荷下ろし装置の制御プログラム。 a consolidation device position detection step of detecting a position of a consolidation device that consolidates cargo in a shipyard;
a carrying-out device control step of carrying out the cargo in the warehouse to the outside of the warehouse by the carrying-out device;
a cargo shape detection step of detecting a cargo shape in a cargo hold;
a trajectory generating step of generating a trajectory of the aggregating device in the warehouse according to the position of the aggregating device detected by the aggregating device position detecting step and the cargo shape detected by the cargo shape detecting step;
on the computer ,
a cargo shape evaluation step of evaluating ease of unloading by the unloading device for the cargo shape detected by the cargo shape detection step;
The trajectory generation step is a control program for an unloading device that generates a trajectory within the warehouse of the aggregation device based on the evaluation by the cargo shape evaluation step in addition to the position of the aggregation device .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022036366A JP7804492B2 (en) | 2022-03-09 | 2022-03-09 | Unloading device, control method for unloading device, and control program for unloading device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022036366A JP7804492B2 (en) | 2022-03-09 | 2022-03-09 | Unloading device, control method for unloading device, and control program for unloading device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023131541A JP2023131541A (en) | 2023-09-22 |
| JP7804492B2 true JP7804492B2 (en) | 2026-01-22 |
Family
ID=88065832
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022036366A Active JP7804492B2 (en) | 2022-03-09 | 2022-03-09 | Unloading device, control method for unloading device, and control program for unloading device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7804492B2 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018177495A (en) | 2017-04-18 | 2018-11-15 | Ihi運搬機械株式会社 | Automatic operation monitoring device of harbor cargo handling machine |
| JP2019196630A (en) | 2018-05-09 | 2019-11-14 | 大成建設株式会社 | Unmanned construction system and bulldozer |
| JP2021088430A (en) | 2019-12-03 | 2021-06-10 | Ihi運搬機械株式会社 | Device for automatically transferring heavy machine for marine vessel in cargo handling equipment |
-
2022
- 2022-03-09 JP JP2022036366A patent/JP7804492B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018177495A (en) | 2017-04-18 | 2018-11-15 | Ihi運搬機械株式会社 | Automatic operation monitoring device of harbor cargo handling machine |
| JP2019196630A (en) | 2018-05-09 | 2019-11-14 | 大成建設株式会社 | Unmanned construction system and bulldozer |
| JP2021088430A (en) | 2019-12-03 | 2021-06-10 | Ihi運搬機械株式会社 | Device for automatically transferring heavy machine for marine vessel in cargo handling equipment |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023131541A (en) | 2023-09-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111433143B (en) | Unloading device | |
| CN111757962A (en) | work machinery | |
| TWI724369B (en) | Unloading apparatus | |
| CN111344238B (en) | Uninstaller | |
| JP7804492B2 (en) | Unloading device, control method for unloading device, and control program for unloading device | |
| JP7761503B2 (en) | Cargo compartment detection device, cargo compartment detection method, cargo compartment detection program, and unloading device | |
| CN111328318B (en) | Unloading device | |
| JP3965229B2 (en) | Unloader device and operation method thereof | |
| JP7765993B2 (en) | Unloading device, control method for unloading device, and control program for unloading device | |
| JP7633067B2 (en) | Structure detection device, structure detection method, structure detection program, and unloading device | |
| JP7818425B2 (en) | Cargo compartment detection device, cargo compartment detection method, and cargo compartment detection program | |
| TWI845180B (en) | Unloading device, control method of unloading device, control program of unloading device, control system | |
| JP2573175Y2 (en) | Unloader and ship relative position detector | |
| JP2026050260A (en) | Range-finding point group adjustment device, range-finding point group adjustment method, storage medium | |
| JP7612624B2 (en) | Unloading device, calibration method for unloading device, and calibration program for unloading device | |
| JP2025008084A (en) | Space Estimation Apparatus, Space Estimation Method, Space Estimation Program, Unloading Apparatus | |
| JP2025127262A (en) | Lifting machine, lifting method, and storage medium | |
| JP2022155994A (en) | Cargo unloading device, calibration method of the same, and calibration program of the same | |
| JP2024104184A (en) | Dust prevention equipment for cargo handling, cargo handling equipment | |
| JP2025127263A (en) | Calibration device, calibration method, and storage medium | |
| JP7655759B2 (en) | Unloading device, method for detecting abnormality in unloading device, and program for detecting abnormality in unloading device | |
| JP7626417B2 (en) | Lifting device | |
| JP2025138299A (en) | Roller chain inspection device, roller chain inspection method, roller chain | |
| CN113330186A (en) | Open-pit mining installation and method for operating an open-pit mining installation | |
| JP7633068B2 (en) | Unloading device, calibration method for unloading device, and calibration program for unloading device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A625 | Written request for application examination (by other person) |
Free format text: JAPANESE INTERMEDIATE CODE: A625 Effective date: 20250115 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20251031 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20251111 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20251224 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20260106 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20260109 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7804492 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |