JP7809001B2 - 発電装置運転システム - Google Patents
発電装置運転システムInfo
- Publication number
- JP7809001B2 JP7809001B2 JP2022060445A JP2022060445A JP7809001B2 JP 7809001 B2 JP7809001 B2 JP 7809001B2 JP 2022060445 A JP2022060445 A JP 2022060445A JP 2022060445 A JP2022060445 A JP 2022060445A JP 7809001 B2 JP7809001 B2 JP 7809001B2
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- response
- time
- command
- generation device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
上記課題を解決するために、本発明の発電装置運転システムは、発電装置と、発電装置と通信可能なサーバとを備え、サーバは、電力の出力指令である応動指令を発する発令者からの応動指令に応じて発電装置が所定の電力を出力可能となるまでに要する応動所要時間に基づいて、発令者からの応動指令を受けサーバが発電装置に発する応動指令よりも前に発電装置に事前準備を指示する応動準備指令を発電装置に送信する情報送信部を備え、情報送信部は、電力の取引が行われる電力取引市場ごとに定められる応動指令の送信時点から電力取引市場で取引された電力の供給開始時点である実需給開始時点までの応動指令時間よりも発電装置の応動所要時間の方が長い場合、応動準備指令を発電装置に送信する。
上記課題を解決するために、本発明の発電装置運転システムは、発電装置と、発電装置と通信可能なサーバとを備え、サーバは、電力の出力指令である応動指令を発する発令者からの応動指令に応じて発電装置が所定の電力を出力可能となるまでに要する応動所要時間に基づいて、発令者からの応動指令を受けサーバが発電装置に発する応動指令よりも前に発電装置に事前準備を指示する応動準備指令を発電装置に送信する情報送信部を備え、情報送信部は、電力の取引が行われる電力取引市場で取引された電力の供給開始時点である実需給開始時点から電力取引市場の種別によって需要家の所定時刻において推定される電力の需要値を示す基準値の提出が義務づけられる時点までの基準値要求時間よりも応動所要時間の方が短い場合、応動準備指令を発電装置に送信する。
上記課題を解決するために、本発明の発電装置運転システムは、発電装置と、発電装置と通信可能なサーバとを備え、サーバは、電力の出力指令である応動指令を発する発令者からの応動指令に応じて発電装置が所定の電力を出力可能となるまでに要する応動所要時間に基づいて、発令者からの応動指令を受けサーバが発電装置に発する応動指令よりも前に発電装置に事前準備を指示する応動準備指令を発電装置に送信する情報送信部を備え、情報送信部は、電力の取引が行われる電力取引市場で約定処理が行われる約定処理時点から電力取引市場で取引された電力の供給開始時点である実需給開始時点に対し所定時間前の所定時点までの間に、応動準備指令を発電装置に送信し、所定時点は、電力取引市場の種別が需要家の所定時刻において推定される電力の需要値を示す基準値の提出が義務づけられる種別であり、かつ、発電装置が基準値の導出を行う場合、実需給開始時点から応動所要時間前の時点、および、実需給開始時点から電力取引市場の種別によって基準値の提出が義務づけられる時点までの基準値要求時間に発電装置の出力調整にかかる調整時間および発電装置とサーバとの通信にかかる通信時間を加算した時間前の時点のうち、いずれか早い方の時点である。
まず、図1を参照して、本実施形態に係る発電装置運転システム1000の全体構成について説明する。図1は、本実施形態に係る発電装置運転システム1000を示す概略図である。
図2は、本実施形態に係るサーバ100の機能を説明するための機能ブロック図である。図2に示すように、本実施形態に係るサーバ100は、サーバ通信部110と、サーバ記憶部130と、サーバ制御部150とを有する。
図3は、本実施形態に係る発電装置200の機能を説明するための機能ブロック図である。図3に示すように、本実施形態に係る発電装置200は、発電通信部210と、発電記憶部230と、発電制御部250とを有する。
110 サーバ通信部
130 サーバ記憶部
150 サーバ制御部
152 情報受信部
154 起動時間導出部
156 処理時間導出部
158 基準値導出部
160 調整時間導出部
162 通信時間導出部
164 応動所要時間導出部
166 応動準備指令決定部
168 情報送信部
200 発電装置
210 発電通信部
230 発電記憶部
250 発電制御部
252 情報受信部
254 運転計画決定部
256 情報送信部
300 需要家
1000 発電装置運転システム
Claims (5)
- 発電装置と、前記発電装置と通信可能なサーバとを備える発電装置運転システムであって、
前記サーバは、電力の出力指令である応動指令を発する発令者からの前記応動指令に応じて前記発電装置が所定の電力を出力可能となるまでに要する応動所要時間に基づいて、前記発令者からの前記応動指令を受け前記サーバが前記発電装置に発する応動指令よりも前に前記発電装置に事前準備を指示する応動準備指令を前記発電装置に送信する情報送信部を備え、
前記応動準備指令は、電力の取引が行われる電力取引市場の種別が需要家の所定時刻において推定される電力の需要値を示す基準値の提出が義務づけられる種別であり、かつ、前記発電装置が前記基準値の導出を行う場合、前記発電装置の起動有無、前記発電装置の運転計画の更新有無、および、前記基準値の導出有無のうち少なくとも1つに関する情報を含む、
発電装置運転システム。 - 発電装置と、前記発電装置と通信可能なサーバとを備える発電装置運転システムであって、
前記サーバは、電力の出力指令である応動指令を発する発令者からの前記応動指令に応じて前記発電装置が所定の電力を出力可能となるまでに要する応動所要時間に基づいて、前記発令者からの前記応動指令を受け前記サーバが前記発電装置に発する応動指令よりも前に前記発電装置に事前準備を指示する応動準備指令を前記発電装置に送信する情報送信部を備え、
前記情報送信部は、
電力の取引が行われる電力取引市場ごとに定められる前記応動指令の送信時点から前記電力取引市場で取引された電力の供給開始時点である実需給開始時点までの応動指令時間よりも前記発電装置の前記応動所要時間の方が長い場合、前記応動準備指令を前記発電装置に送信する、
発電装置運転システム。 - 発電装置と、前記発電装置と通信可能なサーバとを備える発電装置運転システムであって、
前記サーバは、電力の出力指令である応動指令を発する発令者からの前記応動指令に応じて前記発電装置が所定の電力を出力可能となるまでに要する応動所要時間に基づいて、前記発令者からの前記応動指令を受け前記サーバが前記発電装置に発する応動指令よりも前に前記発電装置に事前準備を指示する応動準備指令を前記発電装置に送信する情報送信部を備え、
前記情報送信部は、
電力の取引が行われる電力取引市場で取引された電力の供給開始時点である実需給開始時点から前記電力取引市場の種別によって需要家の所定時刻において推定される電力の需要値を示す基準値の提出が義務づけられる時点までの基準値要求時間よりも前記応動所要時間の方が短い場合、前記応動準備指令を前記発電装置に送信する、
発電装置運転システム。 - 発電装置と、前記発電装置と通信可能なサーバとを備える発電装置運転システムであって、
前記サーバは、電力の出力指令である応動指令を発する発令者からの前記応動指令に応じて前記発電装置が所定の電力を出力可能となるまでに要する応動所要時間に基づいて、前記発令者からの前記応動指令を受け前記サーバが前記発電装置に発する応動指令よりも前に前記発電装置に事前準備を指示する応動準備指令を前記発電装置に送信する情報送信部を備え、
前記情報送信部は、
電力の取引が行われる電力取引市場で約定処理が行われる約定処理時点から前記電力取引市場で取引された電力の供給開始時点である実需給開始時点に対し所定時間前の所定時点までの間に、前記応動準備指令を前記発電装置に送信し、
前記所定時点は、前記電力取引市場の種別が需要家の所定時刻において推定される電力の需要値を示す基準値の提出が義務づけられる種別であり、かつ、前記発電装置が前記基準値の導出を行う場合、前記実需給開始時点から前記応動所要時間前の時点、および、前記実需給開始時点から前記電力取引市場の種別によって前記基準値の提出が義務づけられる時点までの基準値要求時間に前記発電装置の出力調整にかかる調整時間および前記発電装置と前記サーバとの通信にかかる通信時間を加算した時間前の時点のうち、いずれか早い方の時点である、
発電装置運転システム。 - 前記応動準備指令は、前記応動指令の識別子と区別するために設けられた応動準備識別子を含む、
請求項1~4のいずれか1項に記載の発電装置運転システム。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022060445A JP7809001B2 (ja) | 2022-03-31 | 2022-03-31 | 発電装置運転システム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022060445A JP7809001B2 (ja) | 2022-03-31 | 2022-03-31 | 発電装置運転システム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023151045A JP2023151045A (ja) | 2023-10-16 |
| JP7809001B2 true JP7809001B2 (ja) | 2026-01-30 |
Family
ID=88327649
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022060445A Active JP7809001B2 (ja) | 2022-03-31 | 2022-03-31 | 発電装置運転システム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7809001B2 (ja) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102860404B1 (ko) * | 2024-04-26 | 2025-09-18 | (주)띵스파이어 | 탄소배출저감 및 탄소배출권 생성을 위한 vup플랫폼 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009219315A (ja) | 2008-03-12 | 2009-09-24 | Toshiba Corp | 電力系統監視制御システム |
| JP2018125907A (ja) | 2017-01-30 | 2018-08-09 | 株式会社日立製作所 | 分散制御システム、分散制御方法、電力系統の分散制御システムおよび電力資源の制御方法 |
| JP2020092533A (ja) | 2018-12-06 | 2020-06-11 | 株式会社日立製作所 | 電力需給計画装置 |
-
2022
- 2022-03-31 JP JP2022060445A patent/JP7809001B2/ja active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009219315A (ja) | 2008-03-12 | 2009-09-24 | Toshiba Corp | 電力系統監視制御システム |
| JP2018125907A (ja) | 2017-01-30 | 2018-08-09 | 株式会社日立製作所 | 分散制御システム、分散制御方法、電力系統の分散制御システムおよび電力資源の制御方法 |
| JP2020092533A (ja) | 2018-12-06 | 2020-06-11 | 株式会社日立製作所 | 電力需給計画装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023151045A (ja) | 2023-10-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Motalleb et al. | Providing frequency regulation reserve services using demand response scheduling | |
| US10281508B2 (en) | Method and apparatus for automated electricity demand response based on online trading of demand side resources | |
| JP6068590B2 (ja) | サブアグリゲータシステム | |
| Saber et al. | A user-friendly transactive coordination model for residential prosumers considering voltage unbalance in distribution networks | |
| US12580383B2 (en) | Control method, management device, non-transitory computer readable storage medium and power system for distributing surplus power | |
| JP6915233B2 (ja) | 電力管理装置、電力システム、需要家装置、電力管理方法および電力管理プログラム | |
| US20170161849A1 (en) | Industry demand-response control system and industry demand-response control method | |
| JP2003032899A (ja) | 電力制御・管理システム | |
| JP7809001B2 (ja) | 発電装置運転システム | |
| JP5394351B2 (ja) | 電圧抑制処理装置及び電圧抑制処理方法 | |
| CN116050071A (zh) | 基于电力市场和碳市场的电源规划方法及系统 | |
| JP2018152961A (ja) | 電力管理システム | |
| JP6678348B2 (ja) | 分散型発電システム、及び該システムの運転計画の少なくとも一部を該システムの外部に与える方法 | |
| JP7582279B2 (ja) | 電力制御装置、電力制御方法、及び電力制御プログラム | |
| JP2023041314A (ja) | コンピュータ、及び電力調整方法 | |
| AU2019328393B9 (en) | Method for controlling an exchange of energy in an energy system; control centre; energy system; computer program; and storage medium | |
| CN119209469A (zh) | 考虑碳配额和数据负载交互的多数据中心微网调度方法 | |
| JP2025009497A (ja) | 電源制御装置及び電源制御方法 | |
| JP2025084562A (ja) | 電源制御装置及び電源制御方法 | |
| JP7493110B1 (ja) | 電力管理装置、電力管理方法及びプログラム | |
| WO2025183225A1 (ja) | 電源制御装置及び電源制御方法 | |
| JP2025009489A (ja) | 電源制御装置及び電源制御方法 | |
| JP7706313B2 (ja) | 電源管理システム、燃料電池装置及び充放電装置 | |
| JP7550159B2 (ja) | 取引支援システム及び取引支援方法 | |
| JP2025132850A (ja) | 電源制御装置及び電源制御方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240925 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250630 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250708 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250901 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20260106 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20260120 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7809001 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |