Beam joint structure and building

Info

Publication number
JP7811155B2
JP7811155B2 JP2022118500A JP2022118500A JP7811155B2 JP 7811155 B2 JP7811155 B2 JP 7811155B2 JP 2022118500 A JP2022118500 A JP 2022118500A JP 2022118500 A JP2022118500 A JP 2022118500A JP 7811155 B2 JP7811155 B2 JP 7811155B2
Authority
JP
Japan
Prior art keywords
web
joint structure
joined
lower flange
transfer member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022118500A
Other languages
Japanese (ja)
Other versions
JP2024016409A (en
Inventor
博和 安田
賢史 山岡
唯 佐藤
勇輝 大場
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Civil Engineering and Construction Corp
Original Assignee
JFE Civil Engineering and Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Civil Engineering and Construction Corp filed Critical JFE Civil Engineering and Construction Corp
Priority to JP2022118500A priority Critical patent/JP7811155B2/en
Publication of JP2024016409A publication Critical patent/JP2024016409A/en
Priority to JP2026009391A priority patent/JP2026063349A/en
Application granted granted Critical
Publication of JP7811155B2 publication Critical patent/JP7811155B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、建築物を構成する梁接合構造及び梁接合構造を備えた建築物に関する。 The present invention relates to a beam joint structure that constitutes a building and a building equipped with a beam joint structure.

従来、建築物の床構造は、梁を格子状に配置し、その上に鉄筋コンクリートの床スラブが構築されることにより形成される。例えば特許文献1に開示された梁接合構造は、H形鋼からなる第一梁と、H形鋼からなる第二梁と、がガセットプレートを介して接合された構成である。第二梁は、第一梁のウェブを挟んで両側に端面を対向させて配置されている。第一梁を挟んで配置された隣り合う第二梁は、第一梁のウェブを貫通して配置された板状の圧縮力伝達部材で接続されている。圧縮力伝達部材は、両端部が固定部とされ、2つの第二梁のそれぞれの下フランジにボルトを用いて固定されている。これにより、第二梁に生じる曲げモーメントを隣り合う第二梁に伝達させている。 Conventionally, the floor structure of a building is formed by arranging beams in a grid pattern and constructing a reinforced concrete floor slab on top of them. For example, the beam connection structure disclosed in Patent Document 1 is configured so that a first beam made of H-shaped steel and a second beam made of H-shaped steel are joined via gusset plates. The second beams are arranged on both sides of the web of the first beam, with their end faces facing each other. Adjacent second beams arranged on either side of the first beam are connected by a plate-shaped compression force transmission member that penetrates the web of the first beam. The compression force transmission member has fixed ends at both ends and is fixed to the bottom flanges of each of the two second beams using bolts. This allows the bending moment generated in the second beam to be transmitted to the adjacent second beam.

特開2022-25804号公報Japanese Patent Application Laid-Open No. 2022-25804

特許文献1に開示された梁接合構造は、第一梁のせいの寸法が第二梁のせいの寸法よりも大きい構造において、第二梁に生じる曲げモーメントを隣り合う第二梁に伝達させる構成である。つまり、特許文献1には、第一梁のせいの寸法が第二梁のせいの寸法と等しい、又は第一梁のせいの寸法が第二梁のせいの寸法よりも小さい構造において、第二梁の端部に生じる曲げモーメントを隣り合う第二梁に伝達させる構成は開示されていない。このような構成は、他の文献においても開示されておらず、未だ見聞きしない。 The beam joint structure disclosed in Patent Document 1 is configured to transmit the bending moment generated in a second beam to an adjacent second beam in a structure in which the depth dimension of a first beam is greater than that of a second beam. In other words, Patent Document 1 does not disclose a configuration in which the bending moment generated at the end of a second beam is transmitted to an adjacent second beam in a structure in which the depth dimension of a first beam is equal to or smaller than that of a second beam. Such a configuration has not been disclosed in any other documents, and has yet to be seen or heard of.

本発明は上記課題を解決するものであって、第一梁のせいの寸法と第二梁のせいの寸法が等しい、又は第一梁のせいの寸法が第二梁のせいの寸法よりも小さい構造において、第二梁に生じる曲げモーメントを隣り合う第二梁に伝達させる構造とした梁接合構造及び建築物を提供することを目的とする。 The present invention aims to solve the above-mentioned problems by providing a beam joint structure and building in which the depth dimension of the first beam is equal to the depth dimension of the second beam, or the depth dimension of the first beam is smaller than the depth dimension of the second beam, and in which the bending moment generated in the second beam is transferred to the adjacent second beam.

本発明に係る梁接合構造は、第一梁と、前記第一梁と交差し、前記第一梁を挟んで両側に端面を対向させて配置され、前記第一梁に端部が接合される第二梁と、を備え、前記第一梁は、第一ウェブと、前記第一ウェブの上端部に設けられた第一上フランジと、前記第一ウェブの下端部に設けられた第一下フランジと、を有し、前記第二梁は、第二ウェブと、前記第二ウェブの上端部に設けられた第二上フランジと、前記第二ウェブの下端部に設けられた第二下フランジと、を有しており、前記第一梁を挟んで配置された隣り合う前記第二梁は、前記第一下フランジの下方に配置された応力伝達部材によって第二下フランジ同士が接合されており、前記第一梁のせいの寸法は、前記第二梁のせいの寸法よりも小さい構成とされているものである。 The beam joining structure of the present invention comprises a first beam and a second beam that intersects with the first beam and is arranged on both sides of the first beam with their end faces facing each other, and whose end is joined to the first beam, wherein the first beam has a first web, a first upper flange provided at the upper end of the first web, and a first lower flange provided at the lower end of the first web, and the second beam has a second web, a second upper flange provided at the upper end of the second web, and a second lower flange provided at the lower end of the second web, and the second lower flanges of adjacent second beams arranged on either side of the first beam are joined to each other by stress transfer members arranged below the first lower flanges, and the width dimension of the first beam is smaller than the width dimension of the second beam .

本発明に係る建築物は、上記梁接合構造を備えている。 The building of the present invention is equipped with the above-mentioned beam joint structure.

本発明に係る梁接合構造及び建築物は、第一下フランジよりも下方に配置された応力伝達部材によって、第一梁を挟んで配置された隣り合う第二梁の第二フランジ部同士が接合されているので、第一梁のせいの寸法が第二梁のせいの寸法と等しい、又は第一梁のせいの寸法が第二梁のせいの寸法よりも小さい構成において、第二梁に生じる曲げモーメントを隣り合う第二梁に伝達させることができる。 In the beam joint structure and building of the present invention, the second flange portions of adjacent second beams arranged on either side of a first beam are joined by a stress transfer member located below the first lower flange. Therefore, in a configuration in which the depth dimension of the first beam is equal to or smaller than the depth dimension of the second beam, the bending moment generated in the second beam can be transferred to the adjacent second beam.

実施の形態1に係る梁接合構造を示した斜視図である。1 is a perspective view showing a beam joining structure according to a first embodiment; 実施の形態1に係る梁接合構造であって、第一梁の長手方向から見た縦断面図である。FIG. 2 is a longitudinal cross-sectional view of a beam joint structure according to the first embodiment, viewed from the longitudinal direction of a first beam. 実施の形態1に係る梁接合構造であって、第二梁の長手方向から見た縦断面図である。FIG. 2 is a longitudinal cross-sectional view of the beam joining structure according to the first embodiment, seen from the longitudinal direction of the second beam. 実施の形態1に係る梁接合構造の応力伝達部材を示した平面図である。1 is a plan view showing a stress transfer member of a beam joint structure according to embodiment 1. FIG. 実施の形態1に係る梁接合構造の変形例であって、第一梁の長手方向から見た縦断面図である。FIG. 10 is a longitudinal cross-sectional view of a modified example of the beam joint structure according to the first embodiment, seen from the longitudinal direction of the first beam. 図5に示した梁接合構造に適用される応力伝達部材を示した平面図である。6 is a plan view showing a stress transfer member applied to the beam joint structure shown in FIG. 5. 実施の形態1に係る梁接合構造を適用した建築物の一例を概略的に示した平面図である。1 is a plan view showing an example of a building to which a beam joint structure according to embodiment 1 is applied; 実施の形態2に係る梁接合構造であって、第一梁の長手方向から見た縦断面図である。FIG. 10 is a longitudinal cross-sectional view of a beam joint structure according to a second embodiment of the present invention, viewed from the longitudinal direction of a first beam. 実施の形態2に係る梁接合構造の変形例であって、第一梁の長手方向から見た縦断面図である。FIG. 10 is a longitudinal cross-sectional view of a modified example of the beam joint structure according to the second embodiment, seen from the longitudinal direction of the first beam.

以下、本発明の実施の形態を図面に基づいて説明する。なお、以下に説明する実施の形態によって本発明が限定されるものではない。各図は模式的に示すものであって、各部材の相対的な大きさや板厚等は図示する寸法に限定されるものではない。また、以下の図面では各構成部材の大きさの関係が実際のものとは異なる場合がある。 Embodiments of the present invention will be described below with reference to the drawings. However, the present invention is not limited to the embodiments described below. Each figure is a schematic illustration, and the relative size and thickness of each component are not limited to the dimensions shown. Furthermore, the size relationships between the components in the following drawings may differ from the actual ones.

実施の形態1.
図1は、実施の形態1に係る梁接合構造100を示した斜視図である。図2は、実施の形態1に係る梁接合構造100であって、第一梁1の長手方向から見た縦断面図である。図3は、実施の形態1に係る梁接合構造100であって、第二梁2の長手方向から見た縦断面図である。図4は、実施の形態1に係る梁接合構造100の応力伝達部材5を示した平面図である。図5は、実施の形態1に係る梁接合構造100の変形例であって、第一梁1の長手方向から見た縦断面図である。図6は、図5に示した梁接合構造100に適用される応力伝達部材5を示した平面図である。
Embodiment 1.
FIG. 1 is a perspective view showing a beam joint structure 100 according to the first embodiment. FIG. 2 is a longitudinal cross-sectional view of the beam joint structure 100 according to the first embodiment, seen from the longitudinal direction of the first beam 1. FIG. 3 is a longitudinal cross-sectional view of the beam joint structure 100 according to the first embodiment, seen from the longitudinal direction of the second beam 2. FIG. 4 is a plan view showing a stress transfer member 5 of the beam joint structure 100 according to the first embodiment. FIG. 5 is a modified example of the beam joint structure 100 according to the first embodiment, seen from the longitudinal direction of the first beam 1. FIG. 6 is a plan view showing a stress transfer member 5 applied to the beam joint structure 100 shown in FIG. 5.

本実施の形態1に係る梁接合構造100では、図1~図3に示すように、第一梁1と、第二梁2と、の接合構造である。第二梁2は、第一梁1と交差し、第一梁1を挟んで両側に長手方向の端面を対向させて配置され、第一梁1に端部が接合されている。第一梁1は、一例として大梁である。第二梁2は、一例として小梁である。なお、第一梁1と第二梁2は、共に小梁でもよい。 As shown in Figures 1 to 3, the beam joint structure 100 according to the first embodiment is a joint structure of a first beam 1 and a second beam 2. The second beam 2 intersects with the first beam 1 and is arranged on both sides of the first beam 1 with its longitudinal end faces facing each other, and its end is joined to the first beam 1. As an example, the first beam 1 is a main beam. As an example, the second beam 2 is a sub-beam. Note that both the first beam 1 and the second beam 2 may be sub-beams.

第一梁1は、例えばH形鋼であり、第一ウェブ10と、第一ウェブ10の上端部に設けられた第一上フランジ11と、第一ウェブ10の下端部に設けられた第一下フランジ12と、を有している。第二梁2も、例えばH形鋼であり、第二ウェブ20と、第二ウェブ20の上端部に設けられた第二上フランジ21と、第二ウェブ20の下端部に設けられた第二下フランジ22と、を有している。第一梁1のせいの寸法と第二梁2のせいの寸法は、等しい構成とされている。なお、せいの寸法が等しいとは、厳密に等しいことに限定されず、公差がある場合も含むものとする。 The first beam 1 is, for example, an H-shaped steel and has a first web 10, a first upper flange 11 provided at the upper end of the first web 10, and a first lower flange 12 provided at the lower end of the first web 10. The second beam 2 is also, for example, an H-shaped steel and has a second web 20, a second upper flange 21 provided at the upper end of the second web 20, and a second lower flange 22 provided at the lower end of the second web 20. The depth dimensions of the first beam 1 and the second beam 2 are configured to be equal. Note that equal depth dimensions do not necessarily mean strictly equal, but also include cases where there is a tolerance.

図1~図3に示すように、第二梁2は、第一梁1に溶接接合されたガセットプレート3に第二ウェブ20がボルト接合されることで、ガセットプレート3を介して第一梁1に接合されている。ガセットプレート3は、第一梁1の第一ウェブ10の両面にそれぞれ配置されている。ガセットプレート3は、第一梁1の第一ウェブ10、第一上フランジ11の下面、及び第一下フランジ12の上面に周縁が溶接され、先端面30が第二梁2の長手方向の端部に向かって突き出している。ガセットプレート3の先端面30には、複数のボルト孔30aが形成されている。一方、第二梁2の長手方向の端部には、第二ウェブ20に複数のボルト孔(図示省略)が形成されている。第二梁2は、長手方向の端部において、第二ウェブ20にガセットプレート3の先端面30が重ねられ、互いのボルト孔に共通に通したボルト40をナット41で締結してボルト接合することにより、ガセットプレート3に接合される。 As shown in Figures 1 to 3, the second beam 2 is joined to the first beam 1 via the gusset plate 3 by bolting the second web 20 to the gusset plate 3, which is welded to the first beam 1. The gusset plates 3 are arranged on both sides of the first web 10 of the first beam 1. The periphery of the gusset plate 3 is welded to the first web 10, the lower surface of the first upper flange 11, and the upper surface of the first lower flange 12 of the first beam 1, and the tip surface 30 protrudes toward the longitudinal end of the second beam 2. Multiple bolt holes 30a are formed in the tip surface 30 of the gusset plate 3. Meanwhile, multiple bolt holes (not shown) are formed in the second web 20 at the longitudinal end of the second beam 2. The second beam 2 is joined to the gusset plate 3 by overlapping the tip surface 30 of the gusset plate 3 on the second web 20 at the longitudinal end, and by fastening the bolts 40 passed through the bolt holes in common to each other and tightening them with nuts 41.

なお、ガセットプレート3と第二ウェブ20とのボルト接合は、第一ウェブ10の上下方向に沿って接合した複数のボルト40からなるボルト群の中心が、第一ウェブ10の中心よりも第一上フランジ11側に位置するように、第一上フランジ11側に偏った構成とされている。また、ボルト40は、通常においては普通ボルトが用いられるが、高力ボルトを用いることもできる。また、ガセットプレート3と第二ウェブ20とのボルト接合は、図示した構成に限定されない。例えば、ガセットプレート3の先端面30を第一下フランジ12の近傍まで形成し、第一上フランジ11の近傍から第一下フランジ12の近傍まで均一にボルト接合してもよい。 The bolted connection between the gusset plate 3 and the second web 20 is configured so that the center of a group of bolts consisting of multiple bolts 40 joined along the vertical direction of the first web 10 is biased toward the first upper flange 11, so that it is located closer to the first upper flange 11 than the center of the first web 10. Although standard bolts are typically used for the bolts 40, high-strength bolts can also be used. The bolted connection between the gusset plate 3 and the second web 20 is not limited to the configuration shown in the figure. For example, the tip surface 30 of the gusset plate 3 may be formed up to the vicinity of the first lower flange 12, and the bolts may be uniformly connected from the vicinity of the first upper flange 11 to the vicinity of the first lower flange 12.

図1及び図2に示すように、第一梁1と第二梁2とが接合された状態において、第一上フランジ11の上面と第二上フランジ21の上面は、略面一となる。また、図2に示すように、第一梁1と第二梁2とが接合された状態において、第一下フランジ12の下面と第二下フランジ22の下面は、略面一となる。 As shown in Figures 1 and 2, when the first beam 1 and the second beam 2 are joined, the upper surface of the first upper flange 11 and the upper surface of the second upper flange 21 are approximately flush. Also, as shown in Figure 2, when the first beam 1 and the second beam 2 are joined, the lower surface of the first lower flange 12 and the lower surface of the second lower flange 22 are approximately flush.

そして、本実施の形態1に係る梁接合構造100では、図2及び図3に示すように、第一梁1を挟んで配置された隣り合う第二梁2、2が、第一下フランジ12よりも下方に配置された応力伝達部材5によって第二下フランジ22、22同士が接合されている。 In the beam joint structure 100 according to this first embodiment, as shown in Figures 2 and 3, adjacent second beams 2, 2 are arranged on either side of the first beam 1, and the second lower flanges 22, 22 are joined together by a stress transfer member 5 arranged below the first lower flange 12.

応力伝達部材5は、図4に示すように、例えば長方形状の鋼板で構成されている。応力伝達部材5は、第二下フランジ22に接合される各領域50に複数のボルト孔5aが形成されている。例えば図4に示すボルト孔5aは、第二下フランジ22に当接する各領域50に、応力伝達部材5の長手方向に沿って2列で形成されている。一方、第二梁2の第二下フランジ22には、応力伝達部材5のボルト孔5aに対応する位置に複数のボルト孔(図示省略)が形成されている。応力伝達部材5は、上面を第二梁2の第二下フランジ22の下面に当接させ、互いのボルト孔に共通に通したボルト60をナット61で締結してボルト接合することにより、第二下フランジ22に接合される。このとき、応力伝達部材5の上面は、第一梁1の第一下フランジ12の下面にも当接している。なお、ボルト60は、通常においては普通ボルトが用いられるが、高力ボルトを用いることもできる。また、ボルト孔5aの位置及び個数は、図示した構成に限定されず、第一梁1及び第二梁2の大きさ及び形状に応じて種々の態様で実施するものとする。また、応力伝達部材5を第二梁2の第二下フランジ22に接合する手段は、図示したボルト接合に限定されない。例えば応力伝達部材5を第二梁2の第二下フランジ22に溶接して接合することもできる。 As shown in FIG. 4, the stress transfer member 5 is made of, for example, a rectangular steel plate. The stress transfer member 5 has multiple bolt holes 5a formed in each region 50 that is joined to the second lower flange 22. For example, the bolt holes 5a shown in FIG. 4 are formed in two rows along the longitudinal direction of the stress transfer member 5 in each region 50 that abuts the second lower flange 22. Meanwhile, the second lower flange 22 of the second beam 2 has multiple bolt holes (not shown) formed at positions corresponding to the bolt holes 5a of the stress transfer member 5. The stress transfer member 5 is joined to the second lower flange 22 by abutting its upper surface against the lower surface of the second lower flange 22 of the second beam 2 and fastening bolts 60 that are commonly threaded through the bolt holes with nuts 61. At this time, the upper surface of the stress transfer member 5 also abuts against the lower surface of the first lower flange 12 of the first beam 1. While standard bolts are typically used as the bolts 60, high-strength bolts can also be used. Furthermore, the position and number of bolt holes 5a are not limited to the configuration shown in the figure, and can be implemented in various ways depending on the size and shape of the first beam 1 and second beam 2. Furthermore, the means for joining the stress transfer member 5 to the second lower flange 22 of the second beam 2 is not limited to the bolt joining shown in the figure. For example, the stress transfer member 5 can also be joined by welding to the second lower flange 22 of the second beam 2.

なお、応力伝達部材5は、図5に示すように、第一梁1の第一下フランジ12にボルト接合して、施工用の仮止めを行った後に、第二梁2の第二下フランジ22にボルト接合してもよい。第一梁1の第一下フランジ12に施工用の仮止めする理由は、施工性の向上と応力伝達部材5の座屈を抑制するためである。この場合、図6に示すように、応力伝達部材5は、第一下フランジ12に当接する領域51に複数のボルト孔5bが形成されている。一方、第一梁1の第一下フランジ12には、応力伝達部材5のボルト孔5bに対応する位置に複数のボルト孔(図示省略)が形成されている。応力伝達部材5は、上面を第一梁1の第一下フランジ12の下面に当接させ、互いのボルト孔に共通に通したボルト70をナット71で締結してボルト接合することにより仮止めされる。当該ボルト70をナット71は、応力伝達部材5を第二下フランジ22に接合した後に、取り付けたままでよいし、取り外してもよい。なお、ボルト孔5bの位置及び個数は、図示した構成に限定されず、第一梁1及び第二梁2の大きさ及び形状に応じて種々の態様で実施するものとする。 As shown in FIG. 5, the stress transfer member 5 may be bolted to the first lower flange 12 of the first beam 1, temporarily fastened for construction, and then bolted to the second lower flange 22 of the second beam 2. The reason for temporarily fastening the stress transfer member 5 to the first lower flange 12 of the first beam 1 for construction is to improve construction ease and prevent buckling of the stress transfer member 5. In this case, as shown in FIG. 6, the stress transfer member 5 has multiple bolt holes 5b formed in the region 51 abutting the first lower flange 12. Meanwhile, the first lower flange 12 of the first beam 1 has multiple bolt holes (not shown) formed in positions corresponding to the bolt holes 5b of the stress transfer member 5. The stress transfer member 5 is temporarily fastened by abutting its upper surface against the lower surface of the first lower flange 12 of the first beam 1 and fastening bolts 70 commonly passing through the bolt holes with nuts 71. The bolts 70 and nuts 71 may remain attached or may be removed after the stress transfer member 5 is joined to the second lower flange 22. The position and number of bolt holes 5b are not limited to the configuration shown in the figure, and can be implemented in various ways depending on the size and shape of the first beam 1 and second beam 2.

また、応力伝達部材5は、図示した長方形状の鋼板に限定されず、例えば山形鋼、溝形鋼又はT形鋼等でもよい。要するに、応力伝達部材5は、第一梁1を挟んで配置された隣り合う第二梁2同士が、応力を伝達できればよい。 Furthermore, the stress transmission member 5 is not limited to the rectangular steel plate shown in the figure, but may be, for example, an angle steel, a channel steel, or a T-shaped steel. In short, the stress transmission member 5 only needs to be able to transmit stress between adjacent second beams 2 arranged on either side of the first beam 1.

そして、図2に示すように、本実施の形態1に係る梁接合構造100では、第一梁1の第一上フランジ11の上面と、第二梁2の第二上フランジ21の上面に、スタッドボルト80が立設される。また、第一梁1と第二梁2とで形成された升目にデッキプレート等の床版(図示は省略)が設けられ、第一梁1、第二梁2及び床版の上方に鉄筋81が配置される。そして、第一梁1、第二梁2及び床版の上面にコンクリート82が打設され、コンクリート床スラブ8が形成される。コンクリート床スラブ8は、スタッドボルト80により第一梁1と第二梁2と接続され、鉄筋81により補強されている。コンクリート床スラブ8が荷重を受けると、鉄筋81及びスタッドボルト80を介して第一梁1と第二梁2に荷重が伝達されて曲げモーメントが生じる。 As shown in FIG. 2 , in the beam connection structure 100 according to the first embodiment, stud bolts 80 are erected on the upper surface of the first upper flange 11 of the first beam 1 and the upper surface of the second upper flange 21 of the second beam 2. A deck plate or other floor slab (not shown) is installed in the square formed by the first beam 1 and the second beam 2, and reinforcing bars 81 are placed above the first beam 1, the second beam 2, and the floor slab. Concrete 82 is then poured onto the upper surfaces of the first beam 1, the second beam 2, and the floor slab to form a concrete floor slab 8. The concrete floor slab 8 is connected to the first beam 1 and the second beam 2 by stud bolts 80 and reinforced with reinforcing bars 81. When the concrete floor slab 8 is subjected to a load, the load is transmitted to the first beam 1 and the second beam 2 via the reinforcing bars 81 and the stud bolts 80, generating a bending moment.

なお、第一梁1と第二梁2とを接合した後、床版の上面に打設したコンクリート82が固まるまでは、ガセットプレート3と第二ウェブ20とのボルト接合と、応力伝達部材5と第二下フランジ22とのボルト接合と、で固定荷重による曲げモーメントを保持する必要がある。そこで、本実施の形態1に係る梁接合構造100では、上記したように、ガセットプレート3と第二ウェブ20とのボルト接合において、第一ウェブ10の上下方向に沿って接合した複数のボルト40からなるボルト群の中心が、第一ウェブ10の中心よりも第一上フランジ11側に位置するように、第一上フランジ11側に偏った構成としている。つまり、ガセットプレート3のボルト群の中心と応力伝達部材5との距離を大きくとることで固定荷重に対する反力を大きくし、支持できるモーメントを大きくしている。なお、ボルト40の個数及び位置は、固定荷重に応じて決定される。 After the first beam 1 and second beam 2 are joined, the bending moment due to the fixed load must be supported by the bolted joint between the gusset plate 3 and the second web 20 and the bolted joint between the stress transfer member 5 and the second lower flange 22 until the concrete 82 poured on the upper surface of the deck hardens. Therefore, in the beam joint structure 100 according to the first embodiment, as described above, the bolted joint between the gusset plate 3 and the second web 20 is configured so that the center of the bolt group consisting of multiple bolts 40 joined along the vertical direction of the first web 10 is biased toward the first upper flange 11, so that it is located closer to the first upper flange 11 than the center of the first web 10. In other words, increasing the distance between the center of the bolt group of the gusset plate 3 and the stress transfer member 5 increases the reaction force against the fixed load and increases the moment that can be supported. The number and position of the bolts 40 are determined according to the fixed load.

ところで、第一梁1と第二梁2とがガセットプレート3のみによって接合された場合、第二梁2の端部は、ピンにより固定されたものとみなし、自由端であるものとして強度設計が行われる。例えば、コンクリート床スラブ8が荷重を受けた時に、第二梁2の中央部に、大きな曲げモーメントが生じる。そのため、第二梁2は、この曲げモーメントに対応するように断面形状が大きくする設計が行われる。しかしながら、第二梁2の断面形状を大きくすることで、材料費が嵩むおそれがあった。 However, when the first beam 1 and second beam 2 are joined only by a gusset plate 3, the end of the second beam 2 is considered to be fixed by a pin, and strength design is performed as if it were a free end. For example, when the concrete floor slab 8 is subjected to a load, a large bending moment occurs in the center of the second beam 2. For this reason, the second beam 2 is designed to have a larger cross-sectional shape to accommodate this bending moment. However, increasing the cross-sectional shape of the second beam 2 could result in increased material costs.

なお、従来では、上記したように、第一梁1のせいの寸法が第二梁のせいの寸法よりも大きい構造において、第二梁2の端部に生じる曲げモーメントを隣り合う第二梁2に伝達させる構成は開示されている。しかしながら、第一梁1のせいの寸法が第二梁2のせいの寸法と等しい、又は第一梁1のせいの寸法が第二梁2のせいの寸法よりも小さい構造において、第二梁2の端部に生じる曲げモーメントを隣り合う第二梁2に伝達させる構成は未だ見聞きしない。 As mentioned above, conventionally, in a structure in which the depth dimension of the first beam 1 is greater than the depth dimension of the second beam 2, a configuration has been disclosed in which the bending moment occurring at the end of the second beam 2 is transmitted to the adjacent second beam 2. However, in a structure in which the depth dimension of the first beam 1 is equal to the depth dimension of the second beam 2 or is smaller than the depth dimension of the second beam 2, a configuration in which the bending moment occurring at the end of the second beam 2 is transmitted to the adjacent second beam 2 has not yet been seen or heard of.

本実施の形態1に係る梁接合構造100では、上記したように、第一梁1のせいの寸法と第二梁2のせいの寸法は、等しい構成とされている。第一梁1を挟んで配置された隣り合う第二梁2は、第一下フランジ12の下方に配置された応力伝達部材5によって第二下フランジ22同士が接合されている。これにより、第二梁2に生じる曲げモーメントを隣り合う第二梁2に伝達させることができるので、第二梁2の中央部の曲げモーメントと撓みを低減させることができる。よって、第二梁2の断面形状を小さくすることができるので、材料費の削減に寄与することができる。また、第二梁2の両端部の回転角が小さくなるので、コンクリート床スラブ8のひび割れを低減することができる。 In the beam joint structure 100 according to the first embodiment, as described above, the depth dimensions of the first beam 1 and the second beam 2 are configured to be equal. Adjacent second beams 2, arranged on either side of the first beam 1, are joined at their second lower flanges 22 by stress transfer members 5 located below the first lower flanges 12. This allows the bending moment generated in the second beam 2 to be transmitted to the adjacent second beam 2, thereby reducing the bending moment and deflection in the center of the second beam 2. This allows the cross-sectional shape of the second beam 2 to be smaller, contributing to reduced material costs. Furthermore, the rotation angle at both ends of the second beam 2 is reduced, reducing cracking in the concrete floor slab 8.

なお、図7は、実施の形態1に係る梁接合構造100を適用した建築物200の一例を概略的に示した平面図である。建築物200は、複数の柱201を有しており、2つの柱201の間に大梁202が配置されている。大梁202は、両端部が柱201に接合されている。大梁202は、柱201を節点として格子を形成するように配置されている。格子目を形成する4辺は、それぞれ大梁202により形成されている。なお、格子目は、図7に示した正方形に限定されず、例えば、柱201及び大梁202の配置を適宜変更することにより、長方形、三角形、及び菱形等とすることができる。 Note that Figure 7 is a plan view that schematically illustrates an example of a building 200 to which the beam joint structure 100 according to embodiment 1 is applied. The building 200 has multiple columns 201, and a girder 202 is arranged between two columns 201. Both ends of the girder 202 are joined to the columns 201. The girder 202 is arranged to form a lattice with the columns 201 as nodes. Each of the four sides that form the lattice is formed by a girder 202. Note that the lattice is not limited to the square shown in Figure 7, and can be, for example, rectangular, triangular, diamond-shaped, etc., by appropriately changing the arrangement of the columns 201 and girders 202.

四角形の格子目を形成している4本の大梁202の内側の領域には、背骨梁203及び小梁204が配置されている。背骨梁203は、格子目の中央に配置され、4つの大梁202のうち、一方の対向する2つの大梁202に両端部が接合されている。 The spine beam 203 and sub-beams 204 are arranged in the inner area of the four main beams 202 that form a rectangular grid. The spine beam 203 is located in the center of the grid, and both ends are joined to two opposing main beams 202 of one of the four main beams 202.

小梁204は、格子目を形成する4つの大梁202のうち、一方の対向する2つの大梁202間に配置されている。小梁204の両端部は、一端が背骨梁203に接合され、他端が背骨梁203と対向する大梁202に接合されている。小梁204は、一例として、大梁202と背骨梁203との間に、3本並列させて配置されている。 The sub-beams 204 are arranged between two opposing girders 202 of the four girders 202 that form the grid. One end of the sub-beam 204 is joined to the spine beam 203, and the other end is joined to the girder 202 facing the spine beam 203. As an example, three sub-beams 204 are arranged in parallel between the girder 202 and the spine beam 203.

実施の形態1に係る梁接合構造100は、背骨梁203と小梁204とが接合されている接合部分100A、大梁202と小梁204とが接合されている接合部分100B、大梁202と背骨梁203とが接合されている接合部分100Cに適用することができる。接合部分100Aにおいて、第一梁1は、背骨梁203であり、第二梁2は、小梁204である。接合部分100Bにおいて、第一梁1は、大梁202であり、第二梁2は、小梁204である。接合部分100Cにおいて、第一梁1は、大梁202であり、第二梁2は、背骨梁203である。 The beam joint structure 100 according to embodiment 1 can be applied to joint portion 100A where the spine beam 203 and the sub-beam 204 are joined, joint portion 100B where the main beam 202 and the sub-beam 204 are joined, and joint portion 100C where the main beam 202 and the spine beam 203 are joined. In joint portion 100A, the first beam 1 is the spine beam 203, and the second beam 2 is the sub-beam 204. In joint portion 100B, the first beam 1 is the main beam 202, and the second beam 2 is the sub-beam 204. In joint portion 100C, the first beam 1 is the main beam 202, and the second beam 2 is the spine beam 203.

実施の形態2.
次に、図8及び図9を参照して、本実施の形態2に係る梁接合構造101を説明する。図8は、実施の形態2に係る梁接合構造101であって、第一梁1の長手方向から見た縦断面図である。図9は、実施の形態2に係る梁接合構造101の変形例であって、第一梁1の長手方向から見た縦断面図である。なお、実施の形態1で説明した梁接合構造100と同一の構成要素については、同一の符号を付して、その説明を適宜省略する。
Embodiment 2.
Next, a beam joint structure 101 according to the second embodiment will be described with reference to Fig. 8 and Fig. 9. Fig. 8 is a longitudinal cross-sectional view of the beam joint structure 101 according to the second embodiment, seen from the longitudinal direction of the first beam 1. Fig. 9 is a modified example of the beam joint structure 101 according to the second embodiment, seen from the longitudinal direction of the first beam 1. Note that the same components as those in the beam joint structure 100 described in the first embodiment will be given the same reference numerals, and their description will be omitted as appropriate.

本実施の形態2に係る梁接合構造101は、第一梁1のせいの寸法が、第二梁2のせいの寸法よりも小さい構成である。第一梁1と交差し、第一梁1を挟んで配置された隣り合う第二梁2は、第一下フランジ12の下方に配置された応力伝達部材5によって第二下フランジ22同士が接合されている。第一梁1の第一下フランジ12の下面と、応力伝達部材5の上面との間には、隙間Sが形成されている。 The beam joint structure 101 according to the second embodiment is configured such that the width dimension of the first beam 1 is smaller than the width dimension of the second beam 2. The second beams 2, which intersect with the first beam 1 and are arranged on either side of the first beam 1, have their second lower flanges 22 joined together by stress transfer members 5 arranged below the first lower flanges 12. A gap S is formed between the lower surface of the first lower flange 12 of the first beam 1 and the upper surface of the stress transfer member 5.

なお、応力伝達部材5は、上記実施の形態1で説明したように、第一梁1の第一下フランジ12にボルト接合して、施工用の仮止めを行った後に、第二梁2の第二下フランジ22にボルト接合してもよい。 As described in the first embodiment above, the stress transfer member 5 may be bolted to the first lower flange 12 of the first beam 1, temporarily fastened for construction, and then bolted to the second lower flange 22 of the second beam 2.

また、図9に示すように、第二梁2に、第一下フランジ12の下面と応力伝達部材5の上面との間の隙間Sに向かって突き出す凸部23を設けてもよい。凸部23は、隙間Sを埋めるように、第二ウェブ20の下方部分と、第二下フランジ22とを長手方向に沿って延伸させた構成である。凸部23は、第二梁2の両端に設けられている。これにより、第一梁1及び第二梁2の座屈を抑制することができる。なお、凸部23は、前記構成に限定されず、例えば第二梁2の長手方向の端面に別部材の鋼材等を取り付けて形成してもよい。また、凸部23は、隙間Sを完全に埋める構成である必要はない。 Also, as shown in FIG. 9, the second beam 2 may be provided with a convex portion 23 that protrudes toward the gap S between the lower surface of the first lower flange 12 and the upper surface of the stress transfer member 5. The convex portion 23 is configured by extending the lower portion of the second web 20 and the second lower flange 22 along the longitudinal direction so as to fill the gap S. The convex portion 23 is provided on both ends of the second beam 2. This makes it possible to suppress buckling of the first beam 1 and the second beam 2. Note that the convex portion 23 is not limited to the above configuration and may be formed, for example, by attaching a separate steel member to the longitudinal end face of the second beam 2. Furthermore, the convex portion 23 does not need to be configured to completely fill the gap S.

本実施の形態2に係る梁接合構造101においても、応力伝達部材5によって、第二梁2に生じる曲げモーメントを隣り合う第二梁2に伝達させることができるので、第二梁2の中央部の曲げモーメントと撓みを低減させることができる。よって、第二梁2の断面形状を小さくすることができるので、材料費の削減に寄与することができる。また、第二梁2の両端部の回転角が小さくなるので、コンクリート床スラブ8のひび割れを低減することができる。 In the beam joint structure 101 according to the second embodiment, the stress transfer member 5 also allows the bending moment generated in the second beam 2 to be transferred to the adjacent second beam 2, thereby reducing the bending moment and deflection in the center of the second beam 2. This allows the cross-sectional shape of the second beam 2 to be smaller, which contributes to reducing material costs. Furthermore, the rotation angle at both ends of the second beam 2 is reduced, which reduces cracking in the concrete floor slab 8.

以上、実施の形態に基づいて梁接合構造100及び101を説明したが、梁接合構造100及び101は上述した実施の形態の構成に限定されるものではない。上記した梁接合構造100及び101の構成は、一例であって、構成要素の一部を省略してもよいし、他の構成要素を含んでもよい。要するに、梁接合構造100及び101は、その技術的思想を逸脱しない範囲において、当業者が通常に行う設計変更及び応用のバリエーションの範囲を含むものである。 The beam joint structures 100 and 101 have been described above based on the embodiments, but the beam joint structures 100 and 101 are not limited to the configurations of the above-described embodiments. The configurations of the beam joint structures 100 and 101 described above are merely examples, and some of the components may be omitted, or other components may be included. In short, the beam joint structures 100 and 101 include a range of design modifications and application variations that would normally be made by a person skilled in the art, as long as they do not deviate from the technical concept.

以下、本開示の諸態様を付記としてまとめて記載する。 The various aspects of this disclosure are summarized below as appendices.

(付記1)
第一梁と、
前記第一梁と交差し、前記第一梁を挟んで両側に端面を対向させて配置され、前記第一梁に端部が接合される第二梁と、を備え、
前記第一梁は、第一ウェブと、前記第一ウェブの上端部に設けられた第一上フランジと、前記第一ウェブの下端部に設けられた第一下フランジと、を有し、
前記第二梁は、第二ウェブと、前記第二ウェブの上端部に設けられた第二上フランジと、前記第二ウェブの下端部に設けられた第二下フランジと、を有しており、
前記第一梁を挟んで配置された隣り合う前記第二梁は、前記第一下フランジの下方に配置された応力伝達部材によって第二下フランジ同士が接合されている、梁接合構造。
(Appendix 1)
The first beam and
a second beam that intersects with the first beam, is disposed on both sides of the first beam with end faces facing each other, and has an end joined to the first beam;
The first beam has a first web, a first upper flange provided at an upper end of the first web, and a first lower flange provided at a lower end of the first web,
the second beam has a second web, a second upper flange provided at an upper end of the second web, and a second lower flange provided at a lower end of the second web,
A beam joining structure in which the adjacent second beams arranged on either side of the first beam have their second lower flanges joined together by stress transfer members arranged below the first lower flanges.

(付記2)
前記第一梁のせいの寸法と前記第二梁のせいの寸法は、等しい構成とされている、付記1に記載の梁接合構造。
(Appendix 2)
The beam joint structure described in Appendix 1, wherein the depth dimensions of the first beam and the depth dimensions of the second beam are configured to be equal.

(付記3)
前記第一梁のせいの寸法は、前記第二梁のせいの寸法よりも小さい構成とされている、付記1に記載の梁接合構造。
(Appendix 3)
The beam joint structure described in Appendix 1, wherein the width dimension of the first beam is smaller than the width dimension of the second beam.

(付記4)
前記第二梁には、前記第一下フランジの下面と前記応力伝達部材の上面との間の隙間に向かって突き出す凸部が設けられている、付記3に記載の梁接合構造。
(Appendix 4)
A beam joint structure as described in Appendix 3, wherein the second beam has a protrusion that protrudes toward the gap between the lower surface of the first lower flange and the upper surface of the stress transfer member.

(付記5)
前記応力伝達部材は、前記第一下フランジにボルト接合されている、付記1~3のいずれか一つに記載の梁接合構造。
(Appendix 5)
The beam joint structure according to any one of claims 1 to 3, wherein the stress transfer member is bolted to the first lower flange.

(付記6)
前記第二梁は、前記第一梁に接合されたガセットプレートに前記第二ウェブがボルト接合されることで、前記ガセットプレートを介して前記第一梁に接合されており、
前記ガセットプレートと前記第二ウェブとのボルト接合は、前記第一ウェブの上下方向に沿って接合した複数のボルトからなるボルト群の中心が、前記第一ウェブの中心よりも前記第一上フランジ側に位置するように、前記第一上フランジ側に偏った構成とされている、付記1~5のいずれか一つに記載の梁接合構造。
(Appendix 6)
The second beam is joined to the first beam via the gusset plate by bolting the second web to the gusset plate joined to the first beam,
A beam connection structure described in any one of Appendices 1 to 5, wherein the bolt connection between the gusset plate and the second web is configured so that the center of a group of bolts consisting of multiple bolts joined along the vertical direction of the first web is biased toward the first upper flange so that it is located closer to the first upper flange than the center of the first web.

(付記7)
付記1~6のいずれか一つに記載の梁接合構造を備えた、建築物。
(Appendix 7)
A building comprising a beam joint structure according to any one of appendices 1 to 6.

1 第一梁、2 第二梁、3 ガセットプレート、5 応力伝達部材、5a、5b ボルト孔、8 コンクリート床スラブ、10 第一ウェブ、11 第一上フランジ、12 第一下フランジ、20 第二ウェブ、21 第二上フランジ、22 第二下フランジ、23 凸部、30 先端面、30a ボルト孔、40 ボルト、41 ナット、50 領域、60 ボルト、61 ナット、70 ボルト、71 ナット、80 スタッドボルト、81 鉄筋、82 コンクリート、100、101 梁接合構造、100A、100B、100C 接合部分、200 建築物、201 柱、202 大梁、203 背骨梁、204 小梁、S 隙間。 1 First beam, 2 Second beam, 3 Gusset plate, 5 Stress transfer member, 5a, 5b Bolt hole, 8 Concrete floor slab, 10 First web, 11 First upper flange, 12 First lower flange, 20 Second web, 21 Second upper flange, 22 Second lower flange, 23 Convex portion, 30 Tip surface, 30a Bolt hole, 40 Bolt, 41 Nut, 50 Area, 60 Bolt, 61 Nut, 70 Bolt, 71 Nut, 80 Stud bolt, 81 Reinforcement bar, 82 Concrete, 100, 101 Beam connection structure, 100A, 100B, 100C Connection portion, 200 Building, 201 Column, 202 Main beam, 203 Backbone beam, 204 Sub-beam, S Gap.

Claims (5)

第一梁と、
前記第一梁と交差し、前記第一梁を挟んで両側に端面を対向させて配置され、前記第一梁に端部が接合される第二梁と、を備え、
前記第一梁は、第一ウェブと、前記第一ウェブの上端部に設けられた第一上フランジと、前記第一ウェブの下端部に設けられた第一下フランジと、を有し、
前記第二梁は、第二ウェブと、前記第二ウェブの上端部に設けられた第二上フランジと、前記第二ウェブの下端部に設けられた第二下フランジと、を有しており、
前記第一梁を挟んで配置された隣り合う前記第二梁は、前記第一下フランジの下方に配置された応力伝達部材によって第二下フランジ同士が接合されており、
前記第一梁のせいの寸法は、前記第二梁のせいの寸法よりも小さい構成とされている、梁接合構造。
The first beam and
a second beam that intersects with the first beam, is disposed on both sides of the first beam with end faces facing each other, and has an end joined to the first beam;
The first beam has a first web, a first upper flange provided at an upper end of the first web, and a first lower flange provided at a lower end of the first web,
the second beam has a second web, a second upper flange provided at an upper end of the second web, and a second lower flange provided at a lower end of the second web,
The second beams adjacent to each other and disposed on either side of the first beam have second lower flanges joined to each other by stress transmission members disposed below the first lower flanges,
A beam joint structure , wherein the width of the first beam is smaller than the width of the second beam .
前記第二梁には、前記第一下フランジの下面と前記応力伝達部材の上面との間の隙間に向かって突き出す凸部が設けられている、請求項に記載の梁接合構造。 The beam joint structure according to claim 1 , wherein the second beam is provided with a protrusion that protrudes toward the gap between the lower surface of the first lower flange and the upper surface of the stress transfer member. 前記応力伝達部材は、前記第一下フランジにボルト接合されている、請求項1又は2に記載の梁接合構造。 The beam joint structure according to claim 1 or 2 , wherein the stress transfer member is bolted to the first lower flange. 前記第二梁は、前記第一梁に接合されたガセットプレートに前記第二ウェブがボルト接合されることで、前記ガセットプレートを介して前記第一梁に接合されており、
前記ガセットプレートと前記第二ウェブとのボルト接合は、前記第一ウェブの上下方向に沿って接合した複数のボルトからなるボルト群の中心が、前記第一ウェブの中心よりも前記第一上フランジ側に位置するように、前記第一上フランジ側に偏った構成とされている、請求項1又は2に記載の梁接合構造。
The second beam is joined to the first beam via the gusset plate by bolting the second web to the gusset plate joined to the first beam,
A beam connection structure as described in claim 1 or 2, wherein the bolt connection between the gusset plate and the second web is configured so that the center of a group of bolts consisting of multiple bolts joined along the vertical direction of the first web is biased toward the first upper flange so that it is located closer to the first upper flange than the center of the first web.
請求項1又は2に記載の梁接合構造を備えた、建築物。 A building comprising the beam joint structure according to claim 1 or 2 .
JP2022118500A 2022-07-26 2022-07-26 Beam joint structure and building Active JP7811155B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2022118500A JP7811155B2 (en) 2022-07-26 2022-07-26 Beam joint structure and building
JP2026009391A JP2026063349A (en) 2022-07-26 2026-01-23 Beam connection structure and building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022118500A JP7811155B2 (en) 2022-07-26 2022-07-26 Beam joint structure and building

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2026009391A Division JP2026063349A (en) 2022-07-26 2026-01-23 Beam connection structure and building

Publications (2)

Publication Number Publication Date
JP2024016409A JP2024016409A (en) 2024-02-07
JP7811155B2 true JP7811155B2 (en) 2026-02-04

Family

ID=89806575

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2022118500A Active JP7811155B2 (en) 2022-07-26 2022-07-26 Beam joint structure and building
JP2026009391A Pending JP2026063349A (en) 2022-07-26 2026-01-23 Beam connection structure and building

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2026009391A Pending JP2026063349A (en) 2022-07-26 2026-01-23 Beam connection structure and building

Country Status (1)

Country Link
JP (2) JP7811155B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0220322Y2 (en) * 1985-04-12 1990-06-04
JPH0739698B2 (en) * 1985-07-30 1995-05-01 株式会社構建設計研究所 Steel lattice girder joint structure
EP3480376B1 (en) * 2017-11-03 2021-01-06 Akhnaton Stephen Imhotep Saint Rose Flooring system

Also Published As

Publication number Publication date
JP2024016409A (en) 2024-02-07
JP2026063349A (en) 2026-04-10

Similar Documents

Publication Publication Date Title
US7418804B2 (en) Floor structure
JP5053016B2 (en) Girder structure using corrugated steel web
JP2000319816A (en) Rigid structure of upper and lower composite members
US20220220734A1 (en) Panelized serrated beam assembly
KR20200137334A (en) Advanced Interlocking Girder adapt to Load Factor Resistance Design Method
JP7453084B2 (en) beam joint structure, building
JP7811155B2 (en) Beam joint structure and building
KR20130081605A (en) Corrugated steel plate web-psc composite beam structure which combined corrugated steel plate and concrete plate with l shape steel
JP7470660B2 (en) Joint structure of the small beam end
KR101274990B1 (en) Auxiliary cross beam and plate girder bridge having the same
JP7237668B2 (en) Receiving material for deck and mounting method of the receiving material for deck
JP2813107B2 (en) Bridge
KR102633906B1 (en) Temporary bridge and construction method using the same
JP3996043B2 (en) Joint structure of bridge corrugated steel web composite girder
JP2024048567A (en) Joint structure between main beam and sub-beam
KR100555248B1 (en) Steel I beam with increased cross-sectional rigidity and bridge construction method using the same
JP3950748B2 (en) Bridge girder
JP7390993B2 (en) Beam joint structures and buildings
KR101984211B1 (en) Wide composite structure for reinforcing the connecting part of girders and column
JP2024140792A (en) Structures
JP2005273289A (en) Two-way composite floor slab
KR101807119B1 (en) Pre-Engineered Building system and Reinforcement structure of end plate connection using tendon
KR102919867B1 (en) Joint structure of steel column and W-type composite beam
JP7502710B2 (en) Joint structure and method for constructing the joint structure
JP2025170635A (en) Reinforcement structure of lattice structural materials

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250131

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250930

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20251007

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20251107

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260106

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260123

R150 Certificate of patent or registration of utility model

Ref document number: 7811155

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150