Existing pile removal method

Info

Publication number
JP7811161B2
JP7811161B2 JP2022128892A JP2022128892A JP7811161B2 JP 7811161 B2 JP7811161 B2 JP 7811161B2 JP 2022128892 A JP2022128892 A JP 2022128892A JP 2022128892 A JP2022128892 A JP 2022128892A JP 7811161 B2 JP7811161 B2 JP 7811161B2
Authority
JP
Japan
Prior art keywords
casing
existing pile
self
existing
hardening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022128892A
Other languages
Japanese (ja)
Other versions
JP2024025441A (en
Inventor
健一 山下
裕季 丸岡
風斗 尾崎
Original Assignee
株式会社長谷工コーポレーション
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社長谷工コーポレーション filed Critical 株式会社長谷工コーポレーション
Priority to JP2022128892A priority Critical patent/JP7811161B2/en
Publication of JP2024025441A publication Critical patent/JP2024025441A/en
Application granted granted Critical
Publication of JP7811161B2 publication Critical patent/JP7811161B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、地盤に埋設された既存杭を引き抜くことで撤去し、引き抜きにより地盤に形成された穴を埋め戻す、既存杭の撤去工法に関するものである。 This invention relates to a method for removing existing piles by pulling them out from the ground and then backfilling the holes formed in the ground.

既存杭の撤去工法として、例えば、本願特許出願人による特許文献1に記載の工法がある。この工法は、地盤から既存杭を縁切りするために用いられる筒状のケーシングの先端付近から地盤内の既存杭を引き抜いた後の残存穴を埋める自硬性安定液(セメントベントナイト液等)を噴射しながら、ケーシングで既存杭を包囲するように掘り下げ、ケーシングの先端が少なくとも既存杭の下端に達したら、ケーシングと既存杭とをそれぞれ引き抜き、噴射した自硬性安定液が滞留している残存穴に、さらに新たな自硬性安定液を注入して残存穴を埋めるものである。既存杭は、ワイヤーを引っ掛けることで引き抜かれる。また、特許文献2には、ケーシング下端部の内部に突出させたチャック爪に既存杭を引っ掛けることで、ケーシングを用いて既存杭を引き抜く工法(チャッキング工法)が記載されている。 One example of a method for removing existing piles is described in Patent Document 1 by the same applicant. This method involves digging around the existing pile while injecting a self-hardening stabilizer (such as a cement-bentonite liquid) from near the tip of a cylindrical casing used to isolate the existing pile from the ground. This liquid fills the hole left behind after the existing pile is extracted. When the tip of the casing reaches at least the bottom of the existing pile, the casing and the existing pile are extracted. Then, new self-hardening stabilizer is injected into the hole, where the injected self-hardening stabilizer has accumulated, to fill the remaining hole. The existing pile is extracted by hooking it with a wire. Patent Document 2 also describes a method (chucking method) in which the existing pile is extracted using a casing by hooking it onto a chuck claw protruding from the inside of the bottom end of the casing.

特許文献1には、残存穴に対して下側に滞留している土砂混じりの自硬性安定液と上側に滞留している新たに注入した自硬性安定液とをオーガースクリューで撹拌することが記載されている。このように撹拌を行うことにより、残存穴内部の土砂と自硬性安定液とを均一に混ざるようにできる。 Patent Document 1 describes using an auger screw to mix the self-hardening stabilizer mixed with soil and sand that has accumulated below the remaining hole with the newly injected self-hardening stabilizer that has accumulated above it. By mixing in this way, the soil and self-hardening stabilizer inside the remaining hole can be mixed evenly.

しかし、撹拌に関して記載された特許文献1に記載の構成では、既存杭を引き抜くに際して用いられるケーシングを、それが設けられていた工事装置(建設用重機等)から取り外し、オーガースクリューを取り付け直す必要があって、工程の増加を招いていた。特に既存杭の長さが長い場合、撤去に用いるケーシングの長さも長くなるので、オーガースクリューへの交換は大変になる。その結果、従来の工法で撹拌を行おうとすると、時間や費用が多くかかっていた。 However, with the configuration described in Patent Document 1, which deals with mixing, the casing used to pull out the existing piles must be removed from the construction equipment (such as heavy construction machinery) on which it was installed and the auger screw must then be reattached, resulting in an increase in the number of steps. In particular, if the existing piles are long, the casing used for removal will also be long, making it difficult to replace with an auger screw. As a result, mixing using conventional methods requires a lot of time and money.

特開2020-23788号公報Japanese Patent Application Laid-Open No. 2020-23788 特許第3052135号公報Patent No. 3052135

そこで本発明は、工程の増加を抑制できる既存杭の撤去工法を提供することを課題とする。 The present invention aims to provide a method for removing existing piles that minimizes the increase in the number of processes.

本発明は、既存杭が埋められている地盤に、内径が既存杭の外径よりも大きい筒状のケーシングを、既存杭の周囲に自硬性安定液を供給しながら差し込んでいき、前記既存杭を前記ケーシングで包囲する縁切り工程と、前記ケーシングの下端部に設けられている可動爪を移動させ、前記可動爪を前記既存杭の下端部よりも下方に位置させるか、または、前記下端部に一致させた上で、前記ケーシングを上方に移動させることで前記既存杭を地盤から引き抜く引き抜き工程と、前記既存杭が引き抜かれた後の残存穴に、前記既存杭を取り除いた前記ケーシングを再度配置させ、追加の自硬性安定液を供給して、前記ケーシングを複数回上下動させることで、前記残存穴内部の土砂と前記自硬性安定液とを撹拌する撹拌工程と、を有する既存杭の撤去工法である。 This invention is a method for removing existing piles, which includes the following steps: a cutting process in which a cylindrical casing with an inner diameter larger than the outer diameter of the existing pile is inserted into the ground in which the existing pile is buried while supplying self-hardening liquid around the existing pile, thereby surrounding the existing pile with the casing; an extraction process in which movable claws attached to the lower end of the casing are moved to position the movable claws below the lower end of the existing pile or to align them with the lower end, and then the casing is moved upward to extract the existing pile from the ground; and a stirring process in which the casing, from which the existing pile has been removed, is re-placed in the hole remaining after the existing pile has been extracted, additional self-hardening liquid is supplied, and the casing is moved up and down multiple times to stir the soil and self-hardening liquid inside the remaining hole.

この構成によれば、縁切り工程及び引き抜き工程で用いたケーシングをそのまま利用して、撹拌工程にて、残存穴内部の土砂と自硬性安定液とを撹拌することができる。このため、従来用いられていたオーガースクリューのように、工事装置において撹拌のために治具を付け替える必要がない。 With this configuration, the casing used in the edge-cutting and extraction processes can be used as is to mix the soil and self-hardening stabilizer inside the remaining hole during the mixing process. This eliminates the need to change jigs on the construction equipment for mixing, as was the case with conventional auger screws.

また、前記ケーシングが、筒状の本体部と、前記本体部から径方向に突出しており前記撹拌工程における前記ケーシングの上下動に伴い前記土砂と前記自硬性安定液との撹拌をなす撹拌翼とを備えるものとできる。 The casing may also include a cylindrical main body and stirring blades that protrude radially from the main body and stir the soil and the self-hardening stabilizer liquid as the casing moves up and down during the stirring process.

この構成によれば、ケーシングが撹拌翼を備えることにより、撹拌工程での土砂と自硬性安定液の撹拌を効率的にできる。 With this configuration, the casing is equipped with agitating blades, allowing for efficient mixing of the soil and self-hardening stabilizer during the mixing process.

また、前記引き抜き工程で移動させられた状態と同じ状態とされた前記可動爪を、前記撹拌翼として用いるものとできる。 Furthermore, the movable claw, which is in the same state as when it was moved in the pulling-out process, can be used as the stirring blade.

この構成によれば、ケーシングに設けられている可動爪を撹拌翼として用いることで、撹拌のための特別な構成を設ける必要がない。 With this configuration, the movable claws on the casing are used as stirring blades, eliminating the need for special stirring components.

本発明は、工事装置において撹拌のために治具を付け替える必要がない。このため、工程の増加を抑制できる。 The present invention eliminates the need to change jigs for mixing in construction equipment, thereby minimizing the increase in the number of processes.

本発明の一実施形態に係る工法において、ケーシングを地盤に差し込む前(縁切り工程実施前)の状態を示す概略図である。This is a schematic diagram showing the state before the casing is inserted into the ground (before the edge separation process is performed) in a construction method according to one embodiment of the present invention. 前記工法における縁切り工程にて、ケーシングを地盤に差し込んで既存杭の周囲に配置させた状態を示す概略図である。This is a schematic diagram showing the state in which the casing is inserted into the ground and placed around the existing pile during the edge separation process in the construction method. (a)は、前記工法における引き抜き工程に先立ち、ケーシング下端部に設けられた可動爪を内部に突出させた閉じ状態とし、可動爪が既存杭の下端部に引っ掛かった状態を示す概略図であり、(b)は(a)の丸囲み部を拡大した概略図である。(a) is a schematic diagram showing the state in which, prior to the extraction process in the construction method, the movable claws provided at the lower end of the casing are protruding inward and closed, and the movable claws are hooked onto the lower end of the existing pile, and (b) is a schematic diagram showing an enlargement of the circled area in (a). 前記工法における引き抜き工程にて、ケーシングを地盤から引き出して、既存杭を引き抜いている途中の状態を示す概略図である。FIG. 10 is a schematic diagram showing the state in the middle of the extraction process in the construction method, in which the casing is pulled out of the ground and the existing pile is pulled out. 前記工法における引き抜き工程にて、ケーシングを地盤から引き出して、既存杭の引き抜きを完了した状態を示す概略図である。This is a schematic diagram showing the state in which the casing has been pulled out of the ground and the existing pile has been completely pulled out in the pulling-out process of the construction method. 前記工法における撹拌工程にて、既存杭を取り外したケーシングを残存穴に差し込み、残存穴内部の土砂と自硬性安定液とを撹拌している状態を示す概略図である。FIG. 1 is a schematic diagram showing a state in which a casing from which an existing pile has been removed is inserted into a remaining hole and the soil and self-hardening stabilizer inside the remaining hole are stirred during the stirring step of the construction method.

本発明につき、一実施形態に係る既存杭Pの撤去工法を取り上げて、図面とともに以下説明を行う。以下の説明における方向は、工法実施時の方向である。 The present invention will be explained below with reference to drawings, focusing on one embodiment of a method for removing existing piles P. The directions in the following explanation refer to the directions when the method is being carried out.

本実施形態の工法は、主に、縁切り工程、引き抜き工程、撹拌工程を有し、記載した順番で実施される。本実施形態の工法は公知の工事装置を用いて実施できる。工事装置は、例えば杭打機やクレーン等の建設用重機である。工事装置には、筒状(具体的には円筒状)のケーシング1が取り付けられる。 The construction method of this embodiment mainly comprises the edge-cutting process, the extraction process, and the mixing process, which are carried out in the order listed. The construction method of this embodiment can be carried out using known construction equipment. The construction equipment is, for example, a pile driver, a crane, or other heavy construction machinery. A tubular (specifically, cylindrical) casing 1 is attached to the construction equipment.

ケーシング1は工事装置において、図示しない駆動源(エンジン、モータ、油圧ポンプ等)の駆動力を受けて上下動、及び、軸方向まわりの回転運動が可能とされている。ケーシング1としては、内径が撤去対象である既存杭Pの外径よりも大きいものが用いられる。ケーシング1の下端には、ケーシング1を回転させることで地盤Gを掘削できる掘削刃2が形成されている。各図は概略図のため、掘削刃2がケーシング1(本体部11)の下端面にのみ形成されているように図示されているが、これに限らず、掘削刃2がケーシング1(本体部11)から周方向に張り出して形成されていてもよい。また、ケーシング1の下端部には自硬性安定液Lをケーシング1の外部に出す液供給部3が設けられている。液供給部3には、自硬性安定液Lを供給する配管(図示しない)が接続されており、この配管は地上側の設備(自硬性安定液Lを供給するプラントを構成するタンク、ポンプ等)に接続されている。自硬性安定液Lとは、土砂Sと混ぜ合わされた状態で、混合物Mを硬化させるための液体であって、例えばベントナイト(粘土)とセメントミルク(硬化剤であるセメントと水の混合液)との混合体を用いることができる。自硬性安定液Lの組成はこれに限定されず、種々の硬化性を有する液体を用いることができる。また、自硬性安定液Lの性質を調整するための添加剤を加えることもできる。 The casing 1 of the construction equipment is capable of vertical movement and axial rotation under the driving force of a driving source (engine, motor, hydraulic pump, etc., not shown). The casing 1 has an inner diameter larger than the outer diameter of the existing pile P to be removed. The lower end of the casing 1 is formed with a drilling blade 2 that can excavate the ground G by rotating the casing 1. Because each figure is a schematic view, the drilling blade 2 is shown formed only on the lower end surface of the casing 1 (main body 11). However, this is not limited to this, and the drilling blade 2 may be formed extending circumferentially from the casing 1 (main body 11). The lower end of the casing 1 is provided with a liquid supply unit 3 that dispenses self-hardening stabilizer L to the outside of the casing 1. The liquid supply unit 3 is connected to a pipe (not shown) that supplies the self-hardening stabilizer L, which is connected to aboveground equipment (tanks, pumps, etc. that constitute the plant that supplies the self-hardening stabilizer L). Self-hardening stabilizer L is a liquid that is mixed with soil and sand S to harden the mixture M, and can be, for example, a mixture of bentonite (clay) and cement milk (a mixture of cement, which is a hardener, and water). The composition of the self-hardening stabilizer L is not limited to this, and liquids with various hardening properties can be used. Additives can also be added to adjust the properties of the self-hardening stabilizer L.

また、ケーシング1の下端部には可動爪4が設けられている。可動爪4は、円筒状であるケーシング1の本体部において、ケーシング1が有する内部空間に対して出没するように開閉可能に設けられている。本実施形態では径方向に対向して2個の可動爪4が設けられているが、数量は特に問わない。なお、複数の可動爪4を設ける場合、ケーシング1の本体部11において軸方向で一定の位置であって、周方向で等間隔に設けることが望ましい。本実施形態の可動爪4は、ケーシング1の本体部11に対して周方向に沿う回動軸を中心に回動し、ケーシング1の本体部11の内周面に対して径方向に出没するように構成されている。なお、可動爪4の出没方向はこれに限定されず、径方向及び周方向に対して傾斜した方向で出没するよう構成されていてもよい。可動爪4は、径内方向に突出させた状態(閉じ状態)で、既存杭Pの下端部よりも下方に位置させることができ、閉じ状態の可動爪4に既存杭Pを引っ掛けて(キャッチして)、ケーシング1と共に上方に引き上げることができる。つまり、工事装置によりケーシング1を引き上げることにより、既存杭Pが地盤Gから引き抜かれる。 Mountable claws 4 are provided at the lower end of the casing 1. The movable claws 4 are provided in the cylindrical main body of the casing 1 so as to be openable and closable, extending and retracting from the internal space of the casing 1. In this embodiment, two movable claws 4 are provided radially opposite each other, but the number is not particularly limited. If multiple movable claws 4 are provided, they are preferably provided at fixed axial positions on the main body 11 of the casing 1 and at equal circumferential intervals. In this embodiment, the movable claws 4 rotate about a rotation axis that runs circumferentially relative to the main body 11 of the casing 1, and are configured to extend and retract radially relative to the inner circumferential surface of the main body 11 of the casing 1. The direction in which the movable claws 4 extend and retract is not limited to this, and they may be configured to extend and retract in a direction inclined relative to the radial and circumferential directions. When the movable claws 4 protrude radially inward (closed state), they can be positioned below the lower end of the existing pile P. The existing pile P can be hooked (caught) by the movable claws 4 in the closed state and pulled upward together with the casing 1. In other words, the existing pile P is pulled out of the ground G by pulling up the casing 1 with the construction equipment.

次に、本実施形態の工法における各工程について説明する。事前準備として、図1に示すように、既存杭Pの上端が地盤Gから露出するように、油圧ショベル等を用いて、既存杭Pの周囲の地盤Gを掘り下げておく。 Next, each step in the construction method of this embodiment will be explained. As a preliminary step, as shown in Figure 1, the ground G around the existing pile P is excavated using a hydraulic excavator or similar tool so that the top end of the existing pile P is exposed above the ground G.

縁切り工程では、図1及び図2に示すように、既存杭Pが埋められている地盤Gに、ケーシング1を差し込んでいく。差し込みは、ケーシング1の下端が既存杭Pの下端よりも下方に達するまで行われる。これにより、既存杭Pの側方全周をケーシング1で包囲する。ケーシング1の差し込みは、液供給部3から自硬性安定液Lを噴出させることで、既存杭Pの周囲に自硬性安定液Lを供給しながら行われる。 In the edge separation process, as shown in Figures 1 and 2, the casing 1 is inserted into the ground G in which the existing pile P is buried. The insertion continues until the bottom end of the casing 1 reaches a position lower than the bottom end of the existing pile P. This causes the casing 1 to surround the entire lateral periphery of the existing pile P. The casing 1 is inserted while the self-hardening stabilizer L is sprayed from the liquid supply unit 3 to supply the self-hardening stabilizer L around the existing pile P.

引き抜き工程では、ケーシング1の可動爪4を移動させ、ケーシング1が有する内部空間に突出した閉じ状態とし、図3(a)(b)に示すように、可動爪4を既存杭Pの下端部よりも下方に位置させた上で、図4及び図5に示すように、工事装置を駆動させてケーシング1を上方に移動させることで、既存杭Pを地盤Gから引き抜く。本実施形態では、可動爪4は可動範囲で最も閉じた状態とされる。なお、図3(a)(b)に示したのは、既存杭Pの下端が平坦な形状の場合であって、既存杭Pの下端が尖っている場合(図示しない)、尖った部分の一部が可動爪4よりも下方に位置することがある。つまりこの場合は、可動爪4を既存杭Pの下端部に一致させた状態となる。引き抜き工程の完了後、地盤Gには、ケーシング1が掘削した残存穴Hが形成されている。そして、残存穴Hの下部には自硬性安定液L(土砂Sも混じっている)が溜まった状態となっている。ケーシング1を地盤Gから引き抜いた後、可動爪4をケーシング1が有する内部空間から退避させた開き状態とする。こうすることで、ケーシング1から既存杭Pを取り外す(抜く)ことができる。ケーシング1及び既存杭Pに付着していた土砂Sは、可能な範囲で集められて残存穴Hに戻される。想定した条件で土砂Sと自硬性安定液Lとの混合物Mを硬化させるためである。 During the extraction process, the movable claws 4 of the casing 1 are moved to a closed position protruding into the internal space of the casing 1. As shown in Figures 3(a) and 3(b), the movable claws 4 are positioned below the lower end of the existing pile P. Then, as shown in Figures 4 and 5, the construction equipment is driven to move the casing 1 upward, thereby extracting the existing pile P from the ground G. In this embodiment, the movable claws 4 are in the most closed position within their movable range. Note that Figures 3(a) and 3(b) show a case where the lower end of the existing pile P is flat. If the lower end of the existing pile P is pointed (not shown), part of the pointed portion may be located below the movable claws 4. In this case, the movable claws 4 are aligned with the lower end of the existing pile P. After the extraction process is completed, a remaining hole H excavated by the casing 1 is formed in the ground G. Self-hardening stabilizer L (mixed with soil and sand S) accumulates at the bottom of the remaining hole H. After the casing 1 is pulled out of the ground G, the movable claws 4 are retracted from the internal space of the casing 1 to open it. This allows the existing pile P to be removed (pulled out) from the casing 1. As much soil S as possible adhering to the casing 1 and the existing pile P is collected and returned to the remaining hole H. This is to harden the mixture M of soil S and self-hardening stabilizer L under the intended conditions.

撹拌工程では、図6に示すように、既存杭Pが引き抜かれた後の残存穴Hに、既存杭Pを取り除いたケーシング1を再度配置させ、追加の自硬性安定液Lを供給して、ケーシング1を複数回上下動させることで、残存穴Hの内部(空間)に位置しており、流動性を有した状態の土砂Sと自硬性安定液L(縁切り工程及び撹拌工程で供給された分の合計)とを撹拌する。ケーシング1を残存穴Hに配置させるに先立ち、可動爪4を開き状態から閉じ状態に戻しておく。この閉じ状態は、引き抜き工程における閉じ状態と同じ開度とされる。つまり、可動爪4を可動範囲で最も閉じた状態とする。 In the mixing process, as shown in Figure 6, the casing 1, from which the existing pile P has been removed, is re-placed in the hole H remaining after the existing pile P has been extracted. Additional self-hardening stabilizer L is supplied, and the casing 1 is moved up and down multiple times to mix the fluid soil S located inside (space) of the remaining hole H with the self-hardening stabilizer L (total of the amount supplied in the edge-cutting and mixing processes). Prior to placing the casing 1 in the remaining hole H, the movable claws 4 are returned from the open state to the closed state. This closed state is the same opening as the closed state in the extraction process. In other words, the movable claws 4 are set to the closedest position within their movable range.

撹拌工程では、例えば、ケーシング1を上下方向に3往復させる。そして、最初の1往復の途中で追加の自硬性安定液Lを供給する。上下動の範囲は、有効な撹拌力を土砂Sと自硬性安定液Lとに与えるために適宜設定できるが、確実な撹拌をなすためには、例えば、ケーシング1の下端が残存穴Hの上端から下端までの範囲を往復するように設定する。撹拌工程にかける時間は特に限定されないが、例えば3分以上行うことができる。上下動により、可動爪4の上下面が土砂Sと自硬性安定液Lとの混合物Mを掻くことになるので、有効に撹拌がなされる。また、上下動と共にケーシング1を回転させる。ケーシング1を回転させることで、可動爪4の側面も土砂Sと自硬性安定液Lとの混合物Mを掻くことになるので、更に有効に撹拌がなされる。また、ケーシング1を回転させることで、掘削刃2も撹拌に寄与させられる。既存杭Pが引き抜かれて残存穴Hに空間が生じるため、自硬性安定液Lは少なくとも既存杭Pの体積よりも多い体積量を追加供給する。この撹拌工程は引き抜き工程の直後に行ってもよいし、ある程度時間を置いて(ただし、引き抜き工程を行った当日内が望ましい)行ってもよい。もし、撹拌工程において自硬性安定液Lが残存穴Hからあふれ、残存穴Hの内部に存在する量が予定量よりも不足する場合には、適宜自硬性安定液Lを補充的に供給する。 During the mixing process, for example, the casing 1 is moved up and down three times. Additional self-hardening stabilizer L is supplied during the first round trip. The range of vertical movement can be set appropriately to provide effective mixing force to the soil S and self-hardening stabilizer L. To ensure reliable mixing, for example, it is set so that the lower end of the casing 1 moves back and forth between the top and bottom of the remaining hole H. The time required for the mixing process is not particularly limited, but it can be performed for, for example, three minutes or more. The vertical movement causes the upper and lower surfaces of the movable claws 4 to scrape the mixture M of soil S and self-hardening stabilizer L, thereby achieving effective mixing. The casing 1 is also rotated in conjunction with the vertical movement. By rotating the casing 1, the sides of the movable claws 4 also scrape the mixture M of soil S and self-hardening stabilizer L, further enhancing mixing. Rotating the casing 1 also allows the excavation blades 2 to contribute to mixing. When the existing pile P is pulled out, a space is created in the remaining hole H, so an additional volume of self-hardening stabilizer L is supplied that is at least greater than the volume of the existing pile P. This stirring process can be carried out immediately after the pulling out process, or after a certain amount of time has passed (preferably within the same day as the pulling out process). If the self-hardening stabilizer L overflows from the remaining hole H during the stirring process and the amount inside the remaining hole H is less than the planned amount, self-hardening stabilizer L is supplied as needed to make up for it.

ここで、従来の「チャッキング工法」(例えば特許文献2に記載)では、既存杭の周囲を本実施形態と同様のケーシングで清水を噴射しながら掘削し、既存杭と地盤の縁切りを行う。その後、ケーシングの下端部で既存杭をキャッチして一緒に既存杭を引き上げる(同時に自硬性安定液を注入する)工法であったが、以下の問題があった。すなわち、この工法では、既存杭を引き上げる際、ケーシングと既存杭の間の清水と土の混じった泥水が、既存杭を撤去した時に残存穴に落下して自硬性安定液と混合し切らず、埋め戻し状態が不均一になっていた。このため、杭穴を新たに掘削する際に、過去に埋め戻しを行った部分に当たると、その部分の強度が小さいことから、杭穴が崩壊して埋まってしまう可能性があった。 Here, in the conventional "chucking method" (described, for example, in Patent Document 2), excavation is performed around the existing pile while spraying fresh water using a casing similar to that of this embodiment, thereby separating the existing pile from the ground. The existing pile is then caught by the lower end of the casing and pulled up together with the existing pile (while simultaneously injecting self-hardening stabilizer). However, this method had the following problem. Specifically, when pulling up the existing pile, this method involves the muddy water mixed with fresh water and soil between the casing and the existing pile falling into the remaining hole when the existing pile is removed, and not completely mixing with the self-hardening stabilizer, resulting in an uneven backfill. As a result, when a new pile hole is excavated and an area that has previously been backfilled is hit, the strength of that area is weak, so there is a risk that the pile hole will collapse and become filled up.

これに対して本実施形態の工法では、ケーシング1に設けられた液供給部3より、清水ではなく自硬性安定液Lを供給しつつケーシング1で縁切りを行う。そして、既存杭Pを引き抜いた後、可動爪4を閉じて自硬性安定液Lを供給しながら撹拌を行う。清水ではなく自硬性安定液Lを用いて縁切りを行うことで、単なる泥水ではなく、土を含む改良土(セメントベントナイト改良土)となる。更に、既存杭Pの引き抜き後に、自硬性安定液Lを残存穴Hに供給しながら十分に撹拌することで、土砂Sと自硬性安定液Lとの混合物Mが硬化した硬化物の、残存穴Hの内部における強度の均一性を確保できる。 In contrast, in the construction method of this embodiment, the casing 1 is used to cut the edge while supplying self-hardening stabilizer L instead of fresh water from the liquid supply unit 3 installed in the casing 1. Then, after the existing pile P is extracted, the movable claws 4 are closed and stirring is performed while supplying self-hardening stabilizer L. By using self-hardening stabilizer L instead of fresh water to cut the edge, improved soil containing soil (cement-bentonite improved soil) is produced rather than simple muddy water. Furthermore, after the existing pile P is extracted, supplying self-hardening stabilizer L into the remaining hole H while stirring thoroughly ensures that the hardened mixture M of soil and sand S and self-hardening stabilizer L has uniform strength within the remaining hole H.

以上、本実施形態によれば、縁切り工程及び引き抜き工程で用いたケーシング1をそのまま利用して、撹拌工程にて、残存穴Hの内部の土砂Sと自硬性安定液Lとを撹拌することができる。このため、従来用いられていたオーガースクリューのように、工事装置において撹拌のために治具を付け替える必要がない。このため、工程の増加を抑制できる。従って、時間や費用を節約できる。 As described above, according to this embodiment, the casing 1 used in the edge-cutting and extraction processes can be used as is to mix the soil S and self-hardening stabilizer L inside the remaining hole H in the mixing process. Therefore, unlike the auger screw used in the past, there is no need to change jigs on the construction equipment for mixing. This prevents the number of processes from increasing, thereby saving time and money.

以上、本発明につき一実施形態を取り上げて説明してきたが、本発明は、前記実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲で種々の変更が可能である。 The present invention has been described above using one embodiment, but the present invention is not limited to this embodiment and various modifications are possible without departing from the spirit of the present invention.

例えば、ケーシング1が、筒状の本体部11と、本体部11から径方向(内径方向または外径方向)に突出しており撹拌工程におけるケーシング1の上下動に伴い土砂Sと自硬性安定液Lとの撹拌をなす撹拌翼とを備えるよう構成されていてもよい。ケーシング1が撹拌翼を備えることにより、撹拌工程での土砂Sと自硬性安定液Lの撹拌を効率的にできる。撹拌翼は、ケーシング1の本体部11に対して着脱可能な、別体の板状体(羽根のような薄肉のもの)やブロック状体(厚肉のもの)であってもよいし、ケーシング1の本体部11に出没可能に取り付けられていてもよい。前記実施形態における可動爪4は、既存杭Pをキャッチする機能を有すると共に、前記撹拌翼を兼ねたものであると言える。このため、本実施形態では前記「チャッキング工法」に用いられるケーシング1の構成をそのまま、撹拌機能を発揮するものとして利用でき、撹拌のための特別な(別途の)構成が不要でありコスト面で有利である。また、着脱式の撹拌翼では、ケーシング1から脱落するリスクがあるが、可動爪4を撹拌翼として用いれば、ケーシング1の本体部11から脱落する可能性を小さくできる。 For example, the casing 1 may be configured to include a cylindrical main body 11 and agitating blades that protrude radially (inner or outer) from the main body 11 and agitate the soil S and self-hardening stabilizer L as the casing 1 moves up and down during the agitation process. By including the agitating blades in the casing 1, the soil S and self-hardening stabilizer L can be agitated efficiently during the agitation process. The agitating blades may be separate, detachable plates (thin blades) or blocks (thick blades) that can be attached to the main body 11 of the casing 1, or they may be attached so that they can be extended or retracted from the main body 11 of the casing 1. The movable claws 4 in the above embodiment can be said to both catch the existing pile P and also function as the agitating blades. Therefore, in this embodiment, the casing 1 configuration used in the "chucking method" can be used as is to perform the agitation function, eliminating the need for a special (separate) agitation component, which is advantageous in terms of cost. Furthermore, while detachable agitator blades have the risk of falling off the casing 1, using movable claws 4 as agitator blades reduces the possibility of them falling off the main body 11 of the casing 1.

また、撹拌工程において、前記実施形態では、ケーシング1を回転させつつ上下移動させていたが、回転せずに上下移動だけをさせることもできる。また、可動爪4は、前記実施形態では最大の閉じ状態とされていたが、例えば撹拌強度の調整のため、中間的な閉じ状態で撹拌を行ってもよい。また、前記実施形態では、最初の1往復の途中で追加の自硬性安定液Lを供給していたが、2往復目、更に、3往復目以降にわたって自硬性安定液Lを供給してもよい。また、前記実施形態では、自硬性安定液Lを連続的に供給していたが、間欠的に供給することもできる。また、ケーシング1の液供給部3を用いずに、残存穴Hに直接追加の自硬性安定液Lを供給してもよい。また、例えば液供給部3から空気を噴出できるように構成しておき、撹拌工程において空気噴出を並行して行うことで、より強い撹拌を行うようにしてもよい。 In the above embodiment, the casing 1 was rotated and moved up and down during the stirring process, but it can also be moved up and down without rotating. In the above embodiment, the movable claws 4 were closed to the maximum extent, but stirring can be performed in an intermediate closed state, for example, to adjust the stirring intensity. In the above embodiment, additional self-hardening stabilizer L was supplied during the first reciprocation, but self-hardening stabilizer L may be supplied during the second reciprocation, or even the third reciprocation and beyond. In the above embodiment, the self-hardening stabilizer L was supplied continuously, but it can also be supplied intermittently. Additional self-hardening stabilizer L may also be supplied directly to the remaining hole H without using the liquid supply unit 3 of the casing 1. For example, the liquid supply unit 3 may be configured to eject air, and by ejecting air in parallel during the stirring process, stronger stirring may be achieved.

1 ケーシング
2 掘削刃
3 液供給部
4 可動爪
11 ケーシングの本体部
P 既存杭
G 地盤
H 残存穴
L 自硬性安定液
S 土砂
M 混合物
1 Casing 2 Excavation blade 3 Liquid supply part 4 Movable claw 11 Casing main body P Existing pile G Ground H Remaining hole L Self-hardening stabilized liquid S Soil and sand M Mixture

Claims (3)

既存杭が埋められている地盤に、内径が既存杭の外径よりも大きい筒状のケーシングを、既存杭の周囲に自硬性安定液を供給しながら差し込んでいき、前記既存杭を前記ケーシングで包囲する縁切り工程と、
前記ケーシングの下端部に設けられている可動爪を移動させ、前記可動爪を前記既存杭の下端部よりも下方に位置させるか、または、前記下端部に一致させた上で、前記ケーシングを上方に移動させることで前記既存杭を地盤から引き抜く引き抜き工程と、
前記既存杭が引き抜かれた後の残存穴に、前記既存杭を取り除いた前記ケーシングを再度配置させ、追加の自硬性安定液を供給して、前記ケーシングを複数回上下動させることで、前記残存穴内部の土砂と前記自硬性安定液とを撹拌する撹拌工程と、
を有する既存杭の撤去工法。
a cutting-edge process in which a cylindrical casing having an inner diameter larger than the outer diameter of the existing pile is inserted into the ground in which the existing pile is buried while supplying a self-hardening stabilizing liquid around the existing pile, and the existing pile is surrounded by the casing;
a pulling-out process in which a movable claw provided at the lower end of the casing is moved to position the movable claw below the lower end of the existing pile or to align the movable claw with the lower end, and then the casing is moved upward to pull out the existing pile from the ground;
a stirring step of relocating the casing from which the existing piles have been removed into the hole remaining after the existing piles have been pulled out, supplying additional self-hardening liquid, and moving the casing up and down multiple times to stir the soil and the self-hardening liquid inside the remaining hole;
A method for removing existing piles.
前記ケーシングが、筒状の本体部と、前記本体部から径方向に突出しており前記撹拌工程における前記ケーシングの上下動に伴い前記土砂と前記自硬性安定液との撹拌をなす撹拌翼とを備える、請求項1に記載の既存杭の撤去工法。 The existing pile removal method described in claim 1, wherein the casing comprises a cylindrical main body and mixing blades that protrude radially from the main body and mix the soil and the self-hardening stabilizing liquid as the casing moves up and down during the mixing process. 前記引き抜き工程で移動させられた状態と同じ状態とされた前記可動爪を、前記撹拌翼として用いる、請求項2に記載の既存杭の撤去工法。 The existing pile removal method described in claim 2, wherein the movable claw, which has been moved in the same state as when it was moved in the extraction process, is used as the mixing blade.
JP2022128892A 2022-08-12 2022-08-12 Existing pile removal method Active JP7811161B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022128892A JP7811161B2 (en) 2022-08-12 2022-08-12 Existing pile removal method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022128892A JP7811161B2 (en) 2022-08-12 2022-08-12 Existing pile removal method

Publications (2)

Publication Number Publication Date
JP2024025441A JP2024025441A (en) 2024-02-26
JP7811161B2 true JP7811161B2 (en) 2026-02-04

Family

ID=90010886

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022128892A Active JP7811161B2 (en) 2022-08-12 2022-08-12 Existing pile removal method

Country Status (1)

Country Link
JP (1) JP7811161B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001051716A1 (en) 2000-01-13 2001-07-19 Dae Yang Geotechnic Pte. Ltd. Apparatus for extracting a pile
JP2009256999A (en) 2008-04-18 2009-11-05 Nippon Concrete Ind Co Ltd Pile extracting construction method for existing hollow pile
JP2021169749A (en) 2020-04-17 2021-10-28 株式会社フジタ How to improve the ground of the pile pull-out hole
JP2021188378A (en) 2020-05-30 2021-12-13 株式会社マルシン Pile extraction backfilling method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001051716A1 (en) 2000-01-13 2001-07-19 Dae Yang Geotechnic Pte. Ltd. Apparatus for extracting a pile
JP2009256999A (en) 2008-04-18 2009-11-05 Nippon Concrete Ind Co Ltd Pile extracting construction method for existing hollow pile
JP2021169749A (en) 2020-04-17 2021-10-28 株式会社フジタ How to improve the ground of the pile pull-out hole
JP2021188378A (en) 2020-05-30 2021-12-13 株式会社マルシン Pile extraction backfilling method

Also Published As

Publication number Publication date
JP2024025441A (en) 2024-02-26

Similar Documents

Publication Publication Date Title
JP7152899B2 (en) Extraction method for existing piles
JP2021169733A (en) Agitation device
JP7811161B2 (en) Existing pile removal method
JP2021169749A (en) How to improve the ground of the pile pull-out hole
JP5252511B2 (en) Equipment for crushing and discharging existing concrete piles
JP3158053U (en) Ground improvement body construction equipment
JP6162356B1 (en) Method for excavating pile bottom sediment and stirring in hole and rotary table device used therefor
JP7231271B1 (en) Ground improvement method and ground improvement device
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
JP2005054437A (en) Construction method for foundation pile
JP2006322190A (en) Pile head processing method of cast-in-place concrete pile and concrete processing agent mixing device
JP2014047482A (en) Ground improvement device, surplus soil discharge inhibitor of ground improvement device, and ground improvement method
KR100521888B1 (en) Method for constructing soil cement a stake
JP2886365B2 (en) Construction method of pile
JP4550792B2 (en) Construction method of underground wall
JP2576046B2 (en) Method of forming cured soil
JP5769122B1 (en) Foundation pile construction method
JP2026000228A (en) Method of removing and backfilling existing piles
KR102772711B1 (en) Deep cement mixing method (dcm) with pre cutting depth step based on the porosity of the target soil
JP2840024B2 (en) Vertical hole forming method
JP2836808B2 (en) Drill stirrer for soil cement pile method
JP4805014B2 (en) Ground improvement method
JP2698768B2 (en) Method of forming underground continuous wall
JP2024083026A (en) Ground improvement method, drilling rod device and ground improvement device used in ground improvement method
JP2025095368A (en) How to remove the piles

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250612

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20260116

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260123

R150 Certificate of patent or registration of utility model

Ref document number: 7811161

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150