Information processing device, information processing method, and information processing program

Info

Publication number
JP7812249B2
JP7812249B2 JP2022031106A JP2022031106A JP7812249B2 JP 7812249 B2 JP7812249 B2 JP 7812249B2 JP 2022031106 A JP2022031106 A JP 2022031106A JP 2022031106 A JP2022031106 A JP 2022031106A JP 7812249 B2 JP7812249 B2 JP 7812249B2
Authority
JP
Japan
Prior art keywords
power generation
amount
predicted
information processing
generation amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022031106A
Other languages
Japanese (ja)
Other versions
JP2023127356A (en
Inventor
剛史 塩田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Chemicals Inc
Original Assignee
Mitsui Chemicals Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Chemicals Inc filed Critical Mitsui Chemicals Inc
Priority to JP2022031106A priority Critical patent/JP7812249B2/en
Publication of JP2023127356A publication Critical patent/JP2023127356A/en
Application granted granted Critical
Publication of JP7812249B2 publication Critical patent/JP7812249B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Photovoltaic Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、情報処理装置、情報処理方法、及び情報処理プログラムに関する。 The present invention relates to an information processing device, an information processing method, and an information processing program.

特許文献1には、太陽光発電システムの発電量を地域別および天候別に予測する方法であって、大気透過率と直達日射強度と散乱日射強度とから求める全天日射強度と、該全天日射強度と気象台による地域別日最低気温とから求める太陽電池動作温度と、該太陽電池動作温度から求める太陽電池の動作温度発電量と、該動作温度発電量から求める直流発電量と、該直流発電量から求める交流発電量とを用い、発電量を任意の時間間隔毎に予測することを特徴とする太陽光発電システムの発電量予測方法が開示されている。 Patent Document 1 discloses a method for predicting the amount of power generated by a solar power generation system by region and weather, which uses the global solar radiation intensity calculated from atmospheric transmittance, direct solar radiation intensity, and diffuse solar radiation intensity, the solar cell operating temperature calculated from the global solar radiation intensity and the regional daily minimum temperature measured by a weather station, the solar cell operating temperature power generation amount calculated from the solar cell operating temperature, the DC power generation amount calculated from the operating temperature power generation amount, and the AC power generation amount calculated from the DC power generation amount to predict the amount of power generation at any time interval.

特許文献2には、太陽光発電システム予測装置において太陽光発電システムの発電量を予測する方法であって、日射量予測式導出手段が、太陽光発電システムの設置地域において過去に観測された天気現象と、該地域において過去に計測された日射量とを基に日射量予測式を導出するステップと、日射量予測計算手段が、該地域に対する予測対象日または予測対象時間帯についての天気予報と、予測対象日の予測実施時刻前に該地域において計測された日射量とを前記日射量予測式に入力することにより、該地域における日射量を予測するステップと、発電量予測計算手段が、予測された日射量と、前記地域に対する予測対象日または予測対象時間帯についての気温予報とを、日射量と気温の情報から発電量を計算することが可能な太陽光発電システムモデルに入力することにより、前記太陽光発電システムの発電量を予測するステップとを有する太陽光発電システムの発電量予測方法が開示されている。 Patent Document 2 discloses a method for predicting the power generation amount of a solar power generation system using a solar power generation system prediction device, the method comprising: a solar radiation prediction formula deriving means for deriving a solar radiation prediction formula based on weather phenomena previously observed in the area where the solar power generation system is installed and solar radiation previously measured in the area; a solar radiation prediction calculation means for predicting the solar radiation amount in the area by inputting a weather forecast for the area on a target prediction day or time period and solar radiation measured in the area before the prediction time on the target prediction day into the solar radiation prediction formula; and a power generation prediction calculation means for predicting the power generation amount of the solar power generation system by inputting the predicted solar radiation and a temperature forecast for the area on a target prediction day or time period into a solar power generation system model capable of calculating the power generation amount from solar radiation and temperature information.

特開平10-108486号公報Japanese Patent Application Publication No. 10-108486 特開2006-33908号公報Japanese Patent Application Laid-Open No. 2006-33908

ここで、太陽光発電機器の故障を予測できれば、故障が発生する前に太陽光パネルを交換する等の作業を行うことによって故障を未然に防ぐことが可能となるが、従来では太陽光発電機器の故障を精度良く予測するのは困難であった。 If it were possible to predict failures in solar power generation equipment, it would be possible to prevent failures by replacing solar panels or taking other measures before a failure occurs. However, it has traditionally been difficult to accurately predict failures in solar power generation equipment.

そこで、本発明は、太陽光発電機器の故障を精度良く予測することができる情報処理装置、情報処理方法、及び情報処理プログラムを提供することを目的とする。 Therefore, the present invention aims to provide an information processing device, information processing method, and information processing program that can accurately predict failures in solar power generation equipment.

第1の態様の情報処理装置は、太陽光を受けて電気を発電する太陽光発電機器の過去の発電量に関する発電量データと、前記太陽光発電機器が設置されている地域の気象予報に関する気象予報データと、を含む参照データを取得する参照データ取得部と、前記参照データ取得部が取得した参照データに基づいて、前記太陽光発電機器の発電量を予測する発電量予測部と、前記発電量予測部が過去に予測した発電量に対応する前記太陽光発電機器の実績発電量を取得する実績発電量取得部と、前記発電量予測部が過去に予測した発電量と、前記実績発電量取得部が取得した実績発電量と、の差に基づいて、前記太陽光発電機器の故障を予測する故障予測部と、を備える。 The information processing device of the first aspect includes a reference data acquisition unit that acquires reference data including power generation data relating to the past power generation amount of a solar power generation device that receives sunlight and generates electricity, and weather forecast data relating to weather forecasts for the area where the solar power generation device is installed; a power generation prediction unit that predicts the power generation amount of the solar power generation device based on the reference data acquired by the reference data acquisition unit; an actual power generation amount acquisition unit that acquires the actual power generation amount of the solar power generation device corresponding to the power generation amount predicted in the past by the power generation amount prediction unit; and a failure prediction unit that predicts a failure of the solar power generation device based on the difference between the power generation amount predicted in the past by the power generation amount prediction unit and the actual power generation amount acquired by the actual power generation amount acquisition unit.

第2の態様の情報処理装置は、第1の態様の情報処理装置であって、前記参照データ取得部は、前記太陽光発電機器の電力損失に関する電力損失データを更に取得する。 The information processing device of the second aspect is the information processing device of the first aspect, wherein the reference data acquisition unit further acquires power loss data related to power loss of the photovoltaic power generation device.

第3の態様の情報処理装置は、第1の態様又は第2の態様の情報処理装置であって、前記発電量予測部が予測した発電量の修正が必要か否かを検証する検証部と、前記検証部により前記発電量の修正が必要と判定された場合に前記予測した発電量を修正する修正部と、を備える。 The information processing device of the third aspect is the information processing device of the first or second aspect, and includes a verification unit that verifies whether the amount of power generation predicted by the power generation amount prediction unit needs to be corrected, and a correction unit that corrects the predicted amount of power generation when the verification unit determines that the amount of power generation needs to be corrected.

第4の態様の情報処理装置は、第3の態様の情報処理装置であって、前記修正部は、直前の発電量に基づいて前記予測した発電量を修正する。 A fourth aspect of the information processing device is the third aspect of the information processing device, in which the correction unit corrects the predicted amount of power generation based on the immediately preceding amount of power generation.

第5の態様の情報処理方法は、コンピュータが、太陽光を受けて電気を発電する太陽光発電機器の過去の発電量に関する発電量データと、前記太陽光発電機器が設置されている地域の気象予報に関する気象予報データと、を含む参照データを取得し、取得した参照データに基づいて、前記太陽光発電機器の発電量を予測し、過去に予測した発電量に対応する前記太陽光発電機器の実績発電量を取得し、過去に予測した発電量と、取得した実績発電量と、の差に基づいて、前記太陽光発電機器の故障を予測する処理を実行する。 In a fifth aspect of the information processing method, a computer acquires reference data including power generation data relating to the past power generation amount of a photovoltaic power generation device that receives sunlight and generates electricity, and weather forecast data relating to weather forecasts for the area where the photovoltaic power generation device is installed, predicts the power generation amount of the photovoltaic power generation device based on the acquired reference data, acquires the actual power generation amount of the photovoltaic power generation device corresponding to the previously predicted power generation amount, and executes a process of predicting a failure of the photovoltaic power generation device based on the difference between the previously predicted power generation amount and the acquired actual power generation amount.

第6の態様の情報処理プログラムは、コンピュータが、太陽光を受けて電気を発電する太陽光発電機器の過去の発電量に関する発電量データと、前記太陽光発電機器が設置されている地域の気象予報に関する気象予報データと、を含む参照データを取得し、取得した参照データに基づいて、前記太陽光発電機器の発電量を予測し、過去に予測した発電量に対応する前記太陽光発電機器の実績発電量を取得し、過去に予測した発電量と、取得した実績発電量と、の差に基づいて、前記太陽光発電機器の故障を予測する処理を実行させる。 The information processing program of the sixth aspect causes a computer to acquire reference data including power generation data relating to the past power generation amount of a photovoltaic power generation device that receives sunlight and generates electricity, and weather forecast data relating to weather forecasts for the area where the photovoltaic power generation device is installed, predict the power generation amount of the photovoltaic power generation device based on the acquired reference data, acquire the actual power generation amount of the photovoltaic power generation device corresponding to the previously predicted power generation amount, and execute a process of predicting a failure of the photovoltaic power generation device based on the difference between the previously predicted power generation amount and the acquired actual power generation amount.

本発明によれば、太陽光発電機器の故障を精度良く予測することができる。 This invention makes it possible to accurately predict failures in solar power generation equipment.

本実施形態に係る情報処理システムの概略構成を示す図である。1 is a diagram showing a schematic configuration of an information processing system according to an embodiment of the present invention; 本実施形態に係る情報処理装置及び発電所端末のハードウェア構成を示すブロック図である。2 is a block diagram showing the hardware configuration of an information processing device and a power plant terminal according to the present embodiment. FIG. 本実施形態に係る情報処理装置の記憶部の構成を示すブロック図である。FIG. 2 is a block diagram showing the configuration of a storage unit of the information processing device according to the present embodiment. 本実施形態に係る情報処理装置の機能構成の例を示すブロック図である。1 is a block diagram illustrating an example of a functional configuration of an information processing device according to an embodiment of the present invention. 本実施形態に係る情報処理装置により行われる故障予測処理の流れを示すフローチャートである。10 is a flowchart showing the flow of a failure prediction process performed by the information processing device according to the present embodiment.

以下、本実施形態に係る情報処理システム10について説明する。 The information processing system 10 according to this embodiment will be described below.

本実施形態に係る情報処理システム10は、太陽光発電機器の故障を予測するためのシステムである。 The information processing system 10 according to this embodiment is a system for predicting failures in photovoltaic power generation equipment.

本実施形態では、太陽光発電機器は、低圧連系の発電設備であるがこれに限定されない。つまり、太陽光発電機器は、発電所の設備容量が50kW未満である低圧連系の発電設備であってもよいし、発電所の設備容量が50kW以上である高圧連系の発電設備であってもよい。 In this embodiment, the solar power generation equipment is a low-voltage grid-connected power generation facility, but is not limited to this. In other words, the solar power generation equipment may be a low-voltage grid-connected power generation facility with a power plant capacity of less than 50 kW, or a high-voltage grid-connected power generation facility with a power plant capacity of 50 kW or more.

図1は、情報処理システム10の概略構成を示す図である。 Figure 1 shows the general configuration of the information processing system 10.

図1に示すように、情報処理システム10は、情報処理装置20及び複数の発電所端末30を含む。各発電所端末30には、太陽光発電機器40が接続されている。複数の発電所端末30及び太陽光発電機器40は、互いに異なる地域に設置される。 As shown in FIG. 1, the information processing system 10 includes an information processing device 20 and multiple power plant terminals 30. Each power plant terminal 30 is connected to a solar power generation device 40. The multiple power plant terminals 30 and solar power generation devices 40 are installed in different regions.

情報処理装置20及び複数の発電所端末30は、ネットワークNを介して接続され、互いに通信可能となっている。 The information processing device 20 and multiple power plant terminals 30 are connected via a network N and can communicate with each other.

情報処理装置20は、所定の事業者が保有するサーバコンピュータである。情報処理装置20は、太陽光を受けて電気を発電する太陽光発電機器40の過去の発電量に関する発電量データと、太陽光発電機器40が設置されている地域の気象予報に関する気象予報データと、を含む参照データに基づいて、太陽光発電機器40の発電量を予測し、過去に予測した発電量と、予測した発電量に対応する太陽光発電機器40の実績発電量と、の差に基づいて、太陽光発電機器40の故障を予測する。 The information processing device 20 is a server computer owned by a specified business operator. The information processing device 20 predicts the amount of power generated by the solar power generation device 40 based on reference data including power generation data relating to the past amount of power generated by the solar power generation device 40, which generates electricity from sunlight, and weather forecast data relating to weather forecasts for the area where the solar power generation device 40 is installed, and predicts a failure of the solar power generation device 40 based on the difference between the amount of power generated in the past and the actual amount of power generated by the solar power generation device 40 corresponding to the predicted amount of power generation.

発電所端末30は、太陽光発電機器40が設置された発電所が保有する端末である。発電所端末30は、太陽光発電機器40の発電量データ及び電力損失データ等を情報処理装置20に送信する。 The power plant terminal 30 is a terminal owned by the power plant where the solar power generation equipment 40 is installed. The power plant terminal 30 transmits power generation amount data and power loss data of the solar power generation equipment 40 to the information processing device 20.

次に、情報処理装置20及び発電所端末30のハードウェア構成を説明する。図2は、情報処理装置20及び発電所端末30のハードウェア構成を示すブロック図である。なお、情報処理装置20及び発電所端末30は、基本的には一般的なコンピュータ構成であるため、情報処理装置20を代表して説明する。 Next, the hardware configuration of the information processing device 20 and the power plant terminal 30 will be explained. Figure 2 is a block diagram showing the hardware configuration of the information processing device 20 and the power plant terminal 30. Note that since the information processing device 20 and the power plant terminal 30 basically have a general computer configuration, the information processing device 20 will be explained as a representative.

図2に示すように、情報処理装置20は、CPU21(Central Processing Unit)、ROM22(Read Only Memory)、RAM23(Random Access Memory)、記憶部24、入力部25、表示部26、及び通信部27を備えている。各構成は、バス28を介して相互に通信可能に接続されている。 As shown in FIG. 2, the information processing device 20 includes a CPU 21 (Central Processing Unit), a ROM 22 (Read Only Memory), a RAM 23 (Random Access Memory), a storage unit 24, an input unit 25, a display unit 26, and a communication unit 27. Each component is connected to each other via a bus 28 so that they can communicate with each other.

CPU21は、中央演算処理ユニットであり、各種プログラムを実行したり、各部を制御したりする。すなわち、CPU21は、ROM22又は記憶部24からプログラムを読み出し、RAM23を作業領域としてプログラムを実行する。CPU21は、ROM22又は記憶部24に記録されているプログラムにしたがって、上記各構成の制御及び各種の演算処理を行う。 The CPU 21 is a central processing unit that executes various programs and controls each component. That is, the CPU 21 reads programs from the ROM 22 or the storage unit 24 and executes the programs using the RAM 23 as a work area. The CPU 21 controls the above components and performs various calculations in accordance with the programs stored in the ROM 22 or the storage unit 24.

ROM22は、各種プログラム及び各種データを格納する。RAM23は、作業領域として一時的にプログラム又はデータを記憶する。 ROM 22 stores various programs and data. RAM 23 serves as a working area for temporarily storing programs or data.

記憶部24は、HDD(Hard Disk Drive)、SSD(Solid State Drive)又はフラッシュメモリ等の記憶装置により構成され、各種プログラム、及び各種データを格納する。 The memory unit 24 is composed of a storage device such as a hard disk drive (HDD), solid state drive (SSD), or flash memory, and stores various programs and data.

入力部25は、マウス等のポインティングデバイス、キーボード、マイク、及びカメラ等を含み、各種の入力を行うために使用される。 The input unit 25 includes a pointing device such as a mouse, a keyboard, a microphone, a camera, etc., and is used to perform various inputs.

表示部26は、例えば、液晶ディスプレイであり、種々の情報を表示する。表示部26は、タッチパネル方式を採用して、入力部25として機能してもよい。 The display unit 26 is, for example, a liquid crystal display, and displays various information. The display unit 26 may also function as the input unit 25 by adopting a touch panel system.

通信部27は、他の機器と通信するためのインターフェースである。当該通信には、例えば、イーサネット(登録商標)若しくはFDDI等の有線通信の規格、又は、4G、5G、若しくはWi-Fi(登録商標)等の無線通信の規格が用いられる。 The communication unit 27 is an interface for communicating with other devices. For this communication, for example, a wired communication standard such as Ethernet (registered trademark) or FDDI, or a wireless communication standard such as 4G, 5G, or Wi-Fi (registered trademark) is used.

図3は、情報処理装置20の記憶部24の構成を示すブロック図である。 Figure 3 is a block diagram showing the configuration of the memory unit 24 of the information processing device 20.

図3に示すように、記憶部24には、情報処理装置20のCPU21を後述する図4に示す機能構成として機能させるための情報処理プログラム24Aが格納されている。当該情報処理プログラム24Aを実行する際に、情報処理装置20は、図2に示すハードウェア資源を用いて、当該情報処理プログラム24Aに基づく処理を実行する。 As shown in FIG. 3, the storage unit 24 stores an information processing program 24A for causing the CPU 21 of the information processing device 20 to function as the functional configuration shown in FIG. 4, which will be described later. When executing the information processing program 24A, the information processing device 20 uses the hardware resources shown in FIG. 2 to perform processing based on the information processing program 24A.

次に、情報処理装置20の機能構成について説明する。 Next, we will explain the functional configuration of the information processing device 20.

図4は、情報処理装置20の機能構成の例を示すブロック図である。 Figure 4 is a block diagram showing an example of the functional configuration of the information processing device 20.

図4に示すように、情報処理装置20のCPU21は、機能構成として、参照データ取得部21A、発電量予測部21B、実績発電量取得部21C、故障予測部21D、検証部21E、及び修正部21Fを有する。各機能構成は、CPU21が記憶部24に記憶された情報処理プログラム24Aを読み出し、実行することにより実現される。 As shown in FIG. 4, the CPU 21 of the information processing device 20 has, as its functional components, a reference data acquisition unit 21A, a power generation amount prediction unit 21B, a performance power generation amount acquisition unit 21C, a failure prediction unit 21D, a verification unit 21E, and a correction unit 21F. Each functional component is realized by the CPU 21 reading and executing the information processing program 24A stored in the memory unit 24.

参照データ取得部21Aは、太陽光を受けて電気を発電する太陽光発電機器40の過去の発電量に関する発電量データと、太陽光発電機器40が設置されている地域の気象予報に関する気象予報データと、を含む参照データを取得する。参照データ取得部21Aが取得した参照データは、記憶部24に記憶される。 The reference data acquisition unit 21A acquires reference data including power generation amount data relating to the past power generation amount of the solar power generation device 40, which receives sunlight and generates electricity, and weather forecast data relating to the weather forecast for the area where the solar power generation device 40 is installed. The reference data acquired by the reference data acquisition unit 21A is stored in the memory unit 24.

また、本実施形態では、参照データ取得部21Aは、太陽光発電機器40の電力損失に関する電力損失データを更に取得する。 In addition, in this embodiment, the reference data acquisition unit 21A further acquires power loss data related to the power loss of the solar power generation device 40.

過去の発電量データは、例えば故障を予測したい発電所の発電所端末30から取得する。発電所端末30は、情報処理装置20から要求された場合、太陽光発電機器40の過去の発電量データ、例えば過去10年~30年分程度の発電量データを情報処理装置20へ送信する。 Past power generation data is acquired, for example, from the power plant terminal 30 of the power plant where a failure is to be predicted. When requested by the information processing device 20, the power plant terminal 30 transmits past power generation data of the photovoltaic power generation equipment 40, for example, power generation data from the past 10 to 30 years, to the information processing device 20.

気象予報データは、太陽光発電機器40が設置されている地域の気象予報に関する情報であり、天気予報、気象注意報、及び気象警報等が含まれる。気象予報データは、例えば図示しない外部装置から取得する。外部装置は、太陽光発電機器40が設置されている地域に対応する気象予報データを情報処理装置20へ送信する。 The weather forecast data is information about the weather forecast for the area where the solar power generation equipment 40 is installed, and includes weather forecasts, weather advisories, and weather warnings. The weather forecast data is obtained, for example, from an external device (not shown). The external device transmits weather forecast data corresponding to the area where the solar power generation equipment 40 is installed to the information processing device 20.

電力損失データは、例えば故障を予測したい発電所の発電所端末30から取得する。電力損失データは、太陽光発電機器40の発電についてどの程度の電力損失が生じるかを示すデータである。電力損失は、季節や地域毎の気象条件等によって変化する。また、太陽光発電機器40に固有の条件、例えば太陽光パネルとパワーコンディショナーとを接続するケーブルの損失等によっても変化する。このため、電力損失データには、月別の電力損失データ、年別の電力損失データ、及び太陽光発電機器40の設置環境に関する固有の電力損失がある。 The power loss data is acquired, for example, from the power plant terminal 30 of the power plant where a failure is to be predicted. The power loss data is data indicating the degree of power loss that will occur in the power generation of the photovoltaic power generation equipment 40. The power loss varies depending on the season, weather conditions in each region, and the like. The power loss also varies depending on conditions specific to the photovoltaic power generation equipment 40, such as loss in the cable connecting the solar panel and the power conditioner. For this reason, the power loss data includes monthly power loss data, yearly power loss data, and power loss specific to the installation environment of the photovoltaic power generation equipment 40.

発電所端末30は、情報処理装置20から要求された場合、太陽光発電機器40の電力損失データを情報処理装置20へ送信する。 When requested by the information processing device 20, the power plant terminal 30 transmits power loss data of the solar power generation equipment 40 to the information processing device 20.

発電量予測部21Bは、参照データ取得部21Aが取得した参照データに基づいて、太陽光発電機器40の発電量を予測する。すなわち、発電量予測部21Bは、参照データ取得部21Aが取得した過去の発電量データと、気象予報データと、電力損失データと、に基づいて、所定の予測時期における太陽光発電機器40の発電量を予測する。予測時期は、例えば翌日以降の日単位、月単位としてもよいし、30分後、1時間後等の時間単位としてもよい。 The power generation amount prediction unit 21B predicts the amount of power generated by the photovoltaic power generation device 40 based on the reference data acquired by the reference data acquisition unit 21A. That is, the power generation amount prediction unit 21B predicts the amount of power generated by the photovoltaic power generation device 40 at a specified prediction time based on past power generation amount data, weather forecast data, and power loss data acquired by the reference data acquisition unit 21A. The prediction time may be, for example, on a daily or monthly basis from the next day onwards, or may be on a time basis such as 30 minutes or 1 hour in the future.

具体的には、例えば過去の発電量データと、気象予報データと、電力損失データと、予測時期と、を入力すると、予測時期における予測発電量を出力する学習モデルを機械学習により学習した学習済みモデルを用いて発電量を予測する。学習モデルは、例えば公知の教師有り学習を用いて学習することができる。 Specifically, for example, when past power generation data, weather forecast data, power loss data, and the predicted time are input, a trained model that is trained through machine learning to output the predicted power generation amount at the predicted time is used to predict the power generation amount. The learning model can be trained using, for example, well-known supervised learning.

実績発電量取得部21Cは、発電量予測部21Bが過去に予測した発電量に対応する太陽光発電機器40の実績発電量を取得する。具体的には、実績発電量取得部21Cは、参照データ取得部21Aが取得した過去の発電量データのうち、発電量予測部21Bが過去に予測した発電量の予測時期と一致する時期の過去の発電量を実績発電量として取得する。 The actual power generation amount acquisition unit 21C acquires the actual power generation amount of the photovoltaic power generation device 40 corresponding to the power generation amount previously predicted by the power generation amount prediction unit 21B. Specifically, the actual power generation amount acquisition unit 21C acquires, from the past power generation amount data acquired by the reference data acquisition unit 21A, the past power generation amount for a period that coincides with the prediction period of the power generation amount previously predicted by the power generation amount prediction unit 21B as the actual power generation amount.

故障予測部21Dは、発電量予測部21Bが過去に予測した発電量と、実績発電量取得部21Cが取得した実績発電量と、の差に基づいて、太陽光発電機器40の故障を予測する。すなわち、発電量予測部21Bが過去に予測した発電量と、実績発電量取得部21Cが取得した実績発電量と、の差が、予め定めた閾値以上の場合は太陽光発電機器40が故障する可能性があると予測する。一方、発電量予測部21Bが過去に予測した発電量と、実績発電量取得部21Cが取得した実績発電量と、の差が、予め定めた閾値未満の場合は、太陽光発電機器40が故障する可能性がないと予測する。閾値は、例えば実際の太陽光発電機器40の故障実績等から予め設定される。 The failure prediction unit 21D predicts a failure of the photovoltaic power generation device 40 based on the difference between the amount of power generation previously predicted by the power generation amount prediction unit 21B and the amount of actual power generation acquired by the actual power generation amount acquisition unit 21C. That is, if the difference between the amount of power generation previously predicted by the power generation amount prediction unit 21B and the amount of actual power generation acquired by the actual power generation amount acquisition unit 21C is equal to or greater than a predetermined threshold, it predicts that there is a possibility that the photovoltaic power generation device 40 will fail. On the other hand, if the difference between the amount of power generation previously predicted by the power generation amount prediction unit 21B and the amount of actual power generation acquired by the actual power generation amount acquisition unit 21C is less than the predetermined threshold, it predicts that there is no possibility that the photovoltaic power generation device 40 will fail. The threshold is set in advance, for example, based on the actual failure history of the photovoltaic power generation device 40.

検証部21Eは、発電量予測部21Bが予測した発電量の修正が必要か否かを検証する。例えば検証部21Eは、発電量予測部21Bが予測した発電量が予め定めた修正条件を満たす場合は、予測した発電量の修正が必要と判断する。一方、発電量予測部21Bが予測した発電量が予め定めた修正条件を満たさない場合は、予測した発電量の修正が不要と判断する。例えば、天気が晴れの期間が続いている場合は、発電量の変化は小さいと考えられるため、予測した発電量の修正は不要としてもよい。逆に天気が曇りと晴れが交互に繰り返されているような場合は発電量の変化が大きいと考えられるため、予測した発電量の修正は必要としてもよい。従って、例えば天気が晴れの期間が予め定めた期間連続していない場合は予測した発電量の修正が必要とし、天気が晴れの期間が予め定めた期間連続している場合は予測した発電量の修正が不要とする修正条件を設定してよい。 The verification unit 21E verifies whether the amount of power generation predicted by the power generation amount prediction unit 21B needs to be revised. For example, if the amount of power generation predicted by the power generation amount prediction unit 21B satisfies a predetermined revision condition, the verification unit 21E determines that the predicted amount of power generation needs to be revised. On the other hand, if the amount of power generation predicted by the power generation amount prediction unit 21B does not satisfy the predetermined revision condition, the verification unit 21E determines that the predicted amount of power generation does not need to be revised. For example, if there is a continuous period of sunny weather, the change in the amount of power generation is likely to be small, so revision of the predicted amount of power generation may be unnecessary. Conversely, if the weather is alternating between cloudy and sunny weather, the change in the amount of power generation is likely to be large, so revision of the predicted amount of power generation may be necessary. Therefore, for example, a revision condition may be set such that the predicted amount of power generation needs to be revised if there is not a predetermined consecutive period of sunny weather, and the predicted amount of power generation does not need to be revised if there is a predetermined consecutive period of sunny weather.

修正部21Fは、直前の発電量に基づいて予測した発電量を修正する。具体的には、故障を予測したい太陽光発電機器40の直前の発電量、例えば最新の発電量を発電所端末30から取得する。そして、直前の発電量及び予測した発電量を入力すると、修正した予測発電量を出力する学習モデルを機械学習により学習した学習済みモデルを用いて発電量を修正する。学習モデルは、例えば公知の教師有り学習を用いて学習することができる。 The correction unit 21F corrects the predicted power generation amount based on the most recent power generation amount. Specifically, the correction unit 21F obtains the most recent power generation amount, for example the most recent power generation amount, of the photovoltaic power generation device 40 for which a failure is to be predicted from the power plant terminal 30. Then, when the most recent power generation amount and the predicted power generation amount are input, the correction unit 21F corrects the power generation amount using a trained model trained by machine learning to output a corrected predicted power generation amount. The learning model can be trained, for example, using known supervised learning.

図5は、情報処理装置20により行われる情報処理としての故障予測処理の流れを示すフローチャートである。CPU21が記憶部24から情報処理プログラム24Aを読み出して、RAM23に展開して実行することにより、故障予測処理が行われる。 Figure 5 is a flowchart showing the flow of failure prediction processing as information processing performed by the information processing device 20. The CPU 21 reads the information processing program 24A from the storage unit 24, expands it into the RAM 23, and executes it to perform failure prediction processing.

図5に示すステップS100では、CPU21は、太陽光発電機器40の過去の発電量に関する発電量データを取得する。すなわち、故障を予測したい太陽光発電機器40が設置されている発電所の発電所端末30に過去の発電量に関する発電量データを送信するよう要求し、発電所端末30から過去の発電量に関する発電量データを取得する。 In step S100 shown in FIG. 5, the CPU 21 acquires power generation data relating to the past power generation amount of the photovoltaic power generation device 40. That is, the CPU 21 requests the power plant terminal 30 of the power plant where the photovoltaic power generation device 40 for which a failure is to be predicted is installed to transmit power generation data relating to the past power generation amount, and acquires the power generation data relating to the past power generation amount from the power plant terminal 30.

ステップS101では、CPU21は、太陽光発電機器40が設置されている地域の気象予報に関する気象予報データを取得する。すなわち、故障を予測したい発電所が設置されている地域の気象予報データを送信するよう外部装置に要求し、外部装置から気象予報データを取得する。 In step S101, the CPU 21 acquires weather forecast data relating to the weather forecast for the region where the photovoltaic power generation equipment 40 is installed. That is, the CPU 21 requests the external device to transmit weather forecast data for the region where the power plant where a failure is to be predicted is installed, and acquires the weather forecast data from the external device.

ステップS102では、CPU21は、電力損失データを取得する。すなわち、故障を予測したい太陽光発電機器40が設置されている発電所の発電所端末30に電力損失データを送信するよう要求し、発電所端末30から電力損失データを取得する。電力損失データは、故障を予測したい発電所の発電所端末30から取得する。 In step S102, the CPU 21 acquires power loss data. That is, it requests the power plant terminal 30 of the power plant where the solar power generation device 40 for which a failure is to be predicted is installed to send the power loss data, and acquires the power loss data from the power plant terminal 30. The power loss data is acquired from the power plant terminal 30 of the power plant for which a failure is to be predicted.

ステップS103では、CPU21は、ステップS100で取得した過去の発電量データと、ステップS101で取得した気象予報データと、ステップS102で取得した電力損失データと、に基づいて、所定の予測時期における太陽光発電機器40の発電量を予測する。すなわち、過去の発電量データと、気象予報データと、電力損失データと、予測時期と、を学習済みモデルに入力し、予測時期における予測発電量を取得する。 In step S103, the CPU 21 predicts the amount of power generated by the photovoltaic power generation device 40 at a specified prediction time based on the past power generation data acquired in step S100, the weather forecast data acquired in step S101, and the power loss data acquired in step S102. That is, the past power generation data, weather forecast data, power loss data, and prediction time are input into the trained model, and the predicted power generation amount at the prediction time is obtained.

ステップS104では、CPU21は、ステップS103で予測した発電量の修正が必要か否かを検証する。すなわち、予測した発電量が予め定めた修正条件を満たすか否かを判定する。そして、ステップS103で予測した発電量が修正条件を満たす場合は修正が必要と判断し、ステップS105へ移行する。一方、ステップS103で予測した発電量が修正条件を満たさず修正が不要と判断した場合はステップS106へ移行する。 In step S104, the CPU 21 verifies whether the amount of power generation predicted in step S103 needs to be corrected. That is, it determines whether the predicted amount of power generation satisfies predetermined correction conditions. If the amount of power generation predicted in step S103 satisfies the correction conditions, it determines that correction is necessary, and proceeds to step S105. On the other hand, if the amount of power generation predicted in step S103 does not satisfy the correction conditions and it is determined that correction is not necessary, it proceeds to step S106.

ステップS105では、ステップS103で予測した発電量を修正する。すなわち、例えば直前の発電量を発電所端末30から取得し、取得した直前の発電量及びステップS103で予測した発電量を学習済みモデルに入力し、予測した発電量を修正した発電量を取得する。 In step S105, the amount of power generation predicted in step S103 is corrected. That is, for example, the most recent amount of power generation is obtained from the power plant terminal 30, and the obtained most recent amount of power generation and the amount of power generation predicted in step S103 are input into the trained model, and the corrected amount of power generation is obtained.

ステップS106では、CPU21は、過去にステップS103で予測した発電量に対応する太陽光発電機器40の実績発電量を取得する。すなわち、ステップS100で取得した過去の発電量データのうち、過去に予測した発電量の予測時期と一致する時期の過去の発電量を実績発電量として取得する。 In step S106, the CPU 21 acquires the actual power generation amount of the photovoltaic power generation device 40 corresponding to the power generation amount previously predicted in step S103. That is, from the past power generation amount data acquired in step S100, the past power generation amount for the period that coincides with the prediction period of the previously predicted power generation amount is acquired as the actual power generation amount.

ステップS107では、CPU21は、過去にステップS103で予測した発電量と、ステップS105で取得した実績発電量と、の差に基づいて、太陽光発電機器40の故障を予測する。すなわち、過去にステップS103で予測した発電量と、ステップS105で取得した実績発電量と、の差が、予め定めた閾値以上の場合は太陽光発電機器40が故障する可能性があると予測する。一方、過去にステップS103で予測した発電量と、ステップS105で取得した実績発電量と、の差が、予め定めた閾値未満の場合は、太陽光発電機器40が故障する可能性がないと予測する。このように、予測した発電量と実績発電量との乖離が大きい場合は、太陽光発電機器40に不具合が発生し、予測に見合う発電量が得られず、故障する可能性があると判断する。 In step S107, the CPU 21 predicts a failure of the photovoltaic power generation device 40 based on the difference between the amount of power generation previously predicted in step S103 and the actual amount of power generation acquired in step S105. That is, if the difference between the amount of power generation previously predicted in step S103 and the actual amount of power generation acquired in step S105 is equal to or greater than a predetermined threshold, it predicts that there is a possibility of a failure of the photovoltaic power generation device 40. On the other hand, if the difference between the amount of power generation previously predicted in step S103 and the actual amount of power generation acquired in step S105 is less than the predetermined threshold, it predicts that there is no possibility of a failure of the photovoltaic power generation device 40. In this way, if there is a large discrepancy between the predicted amount of power generation and the actual amount of power generation, it is determined that a malfunction has occurred in the photovoltaic power generation device 40, the amount of power generation commensurate with the prediction will not be obtained, and there is a possibility of a failure.

ステップS108では、CPU21は、ステップS107で太陽光発電機器40が故障する可能性有りと予測したか否かを判定する。そして、ステップS107で太陽光発電機器40が故障する可能性有りと予測した場合はステップS109へ移行する。一方、ステップS107で太陽光発電機器40が故障する可能性無しと予測した場合は、本ルーチンを終了する。 In step S108, the CPU 21 determines whether or not it predicted in step S107 that there is a possibility of failure of the photovoltaic power generation device 40. If it predicted in step S107 that there is a possibility of failure of the photovoltaic power generation device 40, it proceeds to step S109. On the other hand, if it predicted in step S107 that there is no possibility of failure of the photovoltaic power generation device 40, it terminates this routine.

ステップS109では、太陽光発電機器40が故障する可能性があることを発電所端末30に通知する。これにより、太陽光発電機器40の太陽光パネル等の交換を促すことができる。 In step S109, the power plant terminal 30 is notified that the solar power generation equipment 40 may malfunction. This can prompt the user to replace the solar panels of the solar power generation equipment 40, etc.

以上説明したように、情報処理装置20では、所定の事業者が保有するサーバコンピュータである。情報処理装置20は、太陽光を受けて電気を発電する太陽光発電機器40の過去の発電量に関する発電量データと、太陽光発電機器40が設置されている地域の気象予報に関する気象予報データと、電力損失データと、を含む参照データに基づいて、太陽光発電機器40の発電量を予測し、過去に予測した発電量と、予測した発電量に対応する太陽光発電機器40の実績発電量と、の差に基づいて、太陽光発電機器40の故障を予測する。 As described above, the information processing device 20 is a server computer owned by a specified business operator. The information processing device 20 predicts the amount of power generated by the solar power generation device 40 based on reference data including power generation amount data relating to the past amount of power generated by the solar power generation device 40, which generates electricity from sunlight, weather forecast data relating to weather forecasts for the area where the solar power generation device 40 is installed, and power loss data, and predicts a failure of the solar power generation device 40 based on the difference between the amount of power generated in the past and the actual amount of power generated by the solar power generation device 40 corresponding to the predicted amount of power generation.

なお、本実施形態では、電力損失データも用いて発電量を予測する場合について説明したが、電力損失データを用いずに発電量を予測してもよい。すなわち、図5のステップS102の処理を省略してもよい。 In this embodiment, the case where power loss data is also used to predict power generation amount has been described, but power generation amount may also be predicted without using power loss data. In other words, the processing of step S102 in Figure 5 may be omitted.

また、本実施形態では、予測した発電量の修正が必要か否かを検証し、修正が必要となった場合に予測した発電量を修正する場合について説明したが、予測した発電量をそのまま用いても良い。すなわち、図5のステップS104、S105の処理を省略してもよい。 Furthermore, in this embodiment, we have described a case where it is verified whether the predicted power generation amount needs to be corrected, and if a correction is necessary, the predicted power generation amount is corrected. However, the predicted power generation amount may also be used as is. In other words, the processing of steps S104 and S105 in Figure 5 may be omitted.

なお、上記実施形態でCPU21がソフトウェア(プログラム)を読み込んで実行した情報処理を、CPU以外の各種のプロセッサが実行してもよい。この場合のプロセッサとしては、FPGA(Field-Programmable Gate Array)等の製造後に回路構成を変更可能なPLD(Programmable Logic Device)、及びASIC(Application Specific Integrated Circuit)等の特定の処理を実行させるために専用に設計された回路構成を有するプロセッサである専用電気回路等が例示される。また、情報処理を、これらの各種のプロセッサのうちの1つで実行してもよいし、同種又は異種の2つ以上のプロセッサの組み合わせ(例えば、複数のFPGA、及びCPUとFPGAとの組み合わせ等)で実行してもよい。また、これらの各種のプロセッサのハードウェア的な構造は、より具体的には、半導体素子等の回路素子を組み合わせた電気回路である。 In the above embodiment, the information processing performed by the CPU 21 by loading software (programs) may be performed by various processors other than a CPU. Examples of processors in this case include PLDs (Programmable Logic Devices) such as FPGAs (Field-Programmable Gate Arrays), whose circuit configuration can be changed after manufacture, and dedicated electrical circuits, such as ASICs (Application Specific Integrated Circuits), which are processors with circuit configurations designed specifically to perform specific processes. Information processing may be performed by one of these various processors, or by a combination of two or more processors of the same or different types (e.g., multiple FPGAs, or a combination of a CPU and an FPGA). The hardware structure of these various processors is, more specifically, an electrical circuit that combines circuit elements such as semiconductor devices.

また、上記実施形態では、情報処理プログラム24Aが記憶部24に予め記憶(インストール)されている態様を説明したが、これに限定されない。情報処理プログラム24Aは、CD-ROM(Compact Disk Read Only Memory)、DVD-ROM(Digital Versatile Disk Read Only Memory)、及びUSB(Universal Serial Bus)メモリ等の記録媒体に記録された形態で提供されてもよい。また、情報処理プログラム24Aは、ネットワークNを介して外部装置からダウンロードされる形態としてもよい。 In the above embodiment, the information processing program 24A is pre-stored (installed) in the storage unit 24, but this is not limiting. The information processing program 24A may be provided in a form recorded on a recording medium such as a CD-ROM (Compact Disk Read Only Memory), a DVD-ROM (Digital Versatile Disk Read Only Memory), or a USB (Universal Serial Bus) memory. The information processing program 24A may also be downloaded from an external device via the network N.

10 情報処理システム
20 情報処理装置
21A 参照データ取得部
21B 発電量予測部
21C 実績発電量取得部
21D 故障予測部
21E 検証部
21F 修正部
24 記憶部
24A 情報処理プログラム
30 発電所端末
40 太陽光発電機器
REFERENCE SIGNS LIST 10 Information processing system 20 Information processing device 21A Reference data acquisition unit 21B Power generation amount prediction unit 21C Actual power generation amount acquisition unit 21D Failure prediction unit 21E Verification unit 21F Correction unit 24 Storage unit 24A Information processing program 30 Power plant terminal 40 Photovoltaic power generation equipment

Claims (5)

太陽光を受けて電気を発電する太陽光発電機器の過去の発電量に関する発電量データと、前記太陽光発電機器が設置されている地域の気象予報に関する気象予報データと、前記太陽光発電機器の発電についてどの程度の電力損失が生じるかを示すデータである電力損失データと、を含む参照データを取得する参照データ取得部と、
前記参照データ取得部が取得した参照データに基づいて、前記太陽光発電機器の将来の所定の予測時期における発電量を予測する発電量予測部と、
前記発電量予測部が過去に予測した前記発電量に対応する前記太陽光発電機器の実績発電量を取得する実績発電量取得部と、
前記発電量予測部が過去に予測した前記発電量と、前記実績発電量取得部が取得した実績発電量と、の差に基づいて、前記太陽光発電機器の故障を予測する故障予測部と、
天気が晴れの期間が予め定めた期間連続していない場合は、前記発電量予測部が予測した発電量の修正が必要と判定し、天気が晴れの期間が予め定めた期間連続している場合は、前記発電量予測部が予測した前記将来の所定の予測時期における発電量の修正が不要と判定する検証部と、
前記検証部により前記将来の所定の予測時期における発電量の修正が必要と判定された場合に、前記発電量予測部が過去に予測した前記発電量を修正する修正部と、
を備えた情報処理装置。
a reference data acquisition unit that acquires reference data including power generation amount data relating to past power generation amounts of a solar power generation device that generates electricity by receiving sunlight, weather forecast data relating to weather forecasts for the area where the solar power generation device is installed, and power loss data that is data indicating the amount of power loss that occurs in the power generation of the solar power generation device;
a power generation amount prediction unit that predicts the amount of power generated by the photovoltaic power generation device at a predetermined future prediction time based on the reference data acquired by the reference data acquisition unit;
an actual power generation amount acquisition unit that acquires an actual power generation amount of the photovoltaic power generation device corresponding to the power generation amount predicted in the past by the power generation amount prediction unit;
a failure prediction unit that predicts a failure of the photovoltaic power generation device based on a difference between the power generation amount predicted in the past by the power generation amount prediction unit and the actual power generation amount acquired by the actual power generation amount acquisition unit;
a verification unit that determines that the amount of power generation predicted by the power generation amount prediction unit needs to be corrected when a period of clear weather has not continued for a predetermined period, and that the amount of power generation predicted by the power generation amount prediction unit at the predetermined future prediction time does not need to be corrected when a period of clear weather has continued for a predetermined period;
a correction unit that corrects the power generation amount predicted in the past by the power generation amount prediction unit when the verification unit determines that the power generation amount at the predetermined future prediction time needs to be corrected;
An information processing device comprising:
前記電力損失データは、月別の電力損失データ、年別の電力損失データ、及び設置環境に関する固有の電力損失データを含む
請求項1記載の情報処理装置。
The information processing apparatus according to claim 1 , wherein the power loss data includes monthly power loss data, annual power loss data, and power loss data specific to the installation environment.
前記修正部は、前記実績発電量取得部が取得した最新の実績発電量に基づいて、前記発電量予測部が過去に予測した前記発電量を修正する
請求項1又は請求項2記載の情報処理装置。
The information processing device according to claim 1 , wherein the correction unit corrects the amount of power generation predicted in the past by the power generation amount prediction unit based on the latest actual amount of power generation acquired by the actual amount of power generation acquisition unit .
コンピュータが、
太陽光を受けて電気を発電する太陽光発電機器の過去の発電量に関する発電量データと、前記太陽光発電機器が設置されている地域の気象予報に関する気象予報データと、前記太陽光発電機器の発電についてどの程度の電力損失が生じるかを示すデータである電力損失データと、を含む参照データを取得し、
取得した参照データに基づいて、前記太陽光発電機器の将来の所定の予測時期における発電量を予測し、
過去に予測した前記発電量に対応する前記太陽光発電機器の実績発電量を取得し、
過去に予測した前記発電量と、取得した実績発電量と、の差に基づいて、前記太陽光発電機器の故障を予測し、
天気が晴れの期間が予め定めた期間連続していない場合は、予測した発電量の修正が必要と判定し、天気が晴れの期間が予め定めた期間連続している場合は、予測した前記将来の所定の予測時期における発電量の修正が不要と判定し、
前記将来の所定の予測時期における発電量の修正が必要と判定された場合に、前記過去に予測した前記発電量を修正する
処理を実行する情報処理方法。
The computer
acquire reference data including power generation amount data relating to the past power generation amount of a solar power generation device that generates electricity by receiving sunlight, weather forecast data relating to the weather forecast for the area where the solar power generation device is installed, and power loss data which is data indicating the amount of power loss that occurs in the power generation of the solar power generation device;
predicting the amount of power generated by the photovoltaic power generation device at a predetermined future prediction time based on the acquired reference data;
Acquire the actual power generation amount of the photovoltaic power generation device corresponding to the power generation amount predicted in the past;
predicting a failure of the photovoltaic power generation device based on a difference between the predicted power generation amount in the past and the acquired actual power generation amount ;
If the period of sunny weather is not consecutive for a predetermined period, it is determined that the predicted amount of power generation needs to be corrected, and if the period of sunny weather is consecutive for a predetermined period, it is determined that the predicted amount of power generation at the predetermined future prediction time does not need to be corrected;
When it is determined that the amount of power generation at the predetermined future prediction time needs to be corrected, the amount of power generation predicted in the past is corrected.
An information processing method that performs processing.
コンピュータに、
太陽光を受けて電気を発電する太陽光発電機器の過去の発電量に関する発電量データと、前記太陽光発電機器が設置されている地域の気象予報に関する気象予報データと、前記太陽光発電機器の発電についてどの程度の電力損失が生じるかを示すデータである電力損失データと、を含む参照データを取得し、
取得した参照データに基づいて、前記太陽光発電機器の将来の所定の予測時期における発電量を予測し、
過去に予測した前記発電量に対応する前記太陽光発電機器の実績発電量を取得し、
過去に予測した前記発電量と、取得した実績発電量と、の差に基づいて、前記太陽光発電機器の故障を予測し、
天気が晴れの期間が予め定めた期間連続していない場合は、予測した発電量の修正が必要と判定し、天気が晴れの期間が予め定めた期間連続している場合は、予測した前記将来の所定の予測時期における発電量の修正が不要と判定し、
前記将来の所定の予測時期における発電量の修正が必要と判定された場合に、前記過去に予測した前記発電量を修正する
処理を実行させる情報処理プログラム。
On the computer,
acquire reference data including power generation amount data relating to the past power generation amount of a solar power generation device that generates electricity by receiving sunlight, weather forecast data relating to the weather forecast for the area where the solar power generation device is installed, and power loss data which is data indicating the amount of power loss that occurs in the power generation of the solar power generation device;
predicting the amount of power generated by the photovoltaic power generation device at a predetermined future prediction time based on the acquired reference data;
Acquire the actual power generation amount of the photovoltaic power generation device corresponding to the power generation amount predicted in the past;
predicting a failure of the photovoltaic power generation device based on a difference between the predicted power generation amount in the past and the acquired actual power generation amount ;
If the period of sunny weather is not consecutive for a predetermined period, it is determined that the predicted amount of power generation needs to be corrected, and if the period of sunny weather is consecutive for a predetermined period, it is determined that the predicted amount of power generation at the predetermined future prediction time does not need to be corrected;
When it is determined that the amount of power generation at the predetermined future prediction time needs to be corrected, the amount of power generation predicted in the past is corrected.
An information processing program that executes processing.
JP2022031106A 2022-03-01 2022-03-01 Information processing device, information processing method, and information processing program Active JP7812249B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022031106A JP7812249B2 (en) 2022-03-01 2022-03-01 Information processing device, information processing method, and information processing program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022031106A JP7812249B2 (en) 2022-03-01 2022-03-01 Information processing device, information processing method, and information processing program

Publications (2)

Publication Number Publication Date
JP2023127356A JP2023127356A (en) 2023-09-13
JP7812249B2 true JP7812249B2 (en) 2026-02-09

Family

ID=87971619

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022031106A Active JP7812249B2 (en) 2022-03-01 2022-03-01 Information processing device, information processing method, and information processing program

Country Status (1)

Country Link
JP (1) JP7812249B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117993741B (en) * 2024-04-03 2024-06-28 长江三峡集团实业发展(北京)有限公司 Photovoltaic power generation abnormality diagnosis method, device, computer equipment and storage medium
JP7739651B1 (en) * 2025-06-05 2025-09-16 株式会社JERA Cross Information processing device, information processing system, and information processing method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010249608A (en) 2009-04-14 2010-11-04 Chugoku Electric Power Co Inc:The Photovoltaic power generation status prediction device and system
JP2013084736A (en) 2011-10-07 2013-05-09 Chugoku Electric Power Co Inc:The Photovoltaic power generation output estimating device and photovoltaic power generation output estimating method
JP2014236541A (en) 2013-05-31 2014-12-15 株式会社Nttドコモ Control device, program
JP2017049866A (en) 2015-09-03 2017-03-09 田淵電機株式会社 Solar panel power generation simulator, solar panel power generation simulation method, and solar panel power generation simulation program
WO2017109970A1 (en) 2015-12-25 2017-06-29 三菱電機株式会社 Power generation amount calculation device, power generation amount calculation system, power generation amount calculation method, and program
JP2018007311A (en) 2016-06-27 2018-01-11 藤崎電機株式会社 Photovoltaic power generation maintenance apparatus, photovoltaic power generation maintenance system, photovoltaic power generation maintenance method and computer program
JP2021022244A (en) 2019-07-29 2021-02-18 大和ハウス工業株式会社 Photovoltaic power generation amount prediction system
KR102338511B1 (en) 2021-04-08 2021-12-13 주식회사 인코어드 테크놀로지스 A system for monitering abnormality of solar power generation
JP2022023410A (en) 2020-07-27 2022-02-08 中国電力株式会社 Prediction system and prediction value calculating method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010249608A (en) 2009-04-14 2010-11-04 Chugoku Electric Power Co Inc:The Photovoltaic power generation status prediction device and system
JP2013084736A (en) 2011-10-07 2013-05-09 Chugoku Electric Power Co Inc:The Photovoltaic power generation output estimating device and photovoltaic power generation output estimating method
JP2014236541A (en) 2013-05-31 2014-12-15 株式会社Nttドコモ Control device, program
JP2017049866A (en) 2015-09-03 2017-03-09 田淵電機株式会社 Solar panel power generation simulator, solar panel power generation simulation method, and solar panel power generation simulation program
WO2017109970A1 (en) 2015-12-25 2017-06-29 三菱電機株式会社 Power generation amount calculation device, power generation amount calculation system, power generation amount calculation method, and program
JP2018007311A (en) 2016-06-27 2018-01-11 藤崎電機株式会社 Photovoltaic power generation maintenance apparatus, photovoltaic power generation maintenance system, photovoltaic power generation maintenance method and computer program
JP2021022244A (en) 2019-07-29 2021-02-18 大和ハウス工業株式会社 Photovoltaic power generation amount prediction system
JP2022023410A (en) 2020-07-27 2022-02-08 中国電力株式会社 Prediction system and prediction value calculating method
KR102338511B1 (en) 2021-04-08 2021-12-13 주식회사 인코어드 테크놀로지스 A system for monitering abnormality of solar power generation

Also Published As

Publication number Publication date
JP2023127356A (en) 2023-09-13

Similar Documents

Publication Publication Date Title
JP5940922B2 (en) Renewable energy prediction device
JP7812249B2 (en) Information processing device, information processing method, and information processing program
JP5746098B2 (en) Deterioration diagnosis device for power generation system using natural energy
US12531413B2 (en) Power generation amount management system and power generation amount management method
JP2012043421A (en) Maintenance optimization method and system
CN112886922B (en) Calculation method, device and storage medium for loss electric quantity of photovoltaic power station
Alavi et al. Assessing the impact of PV panel climate-based degradation rates on inverter reliability in grid-connected solar energy systems
JP2016220493A (en) Power generation situation discrimination method for photovoltaic power generation system, and device therefor
JP2017220980A (en) Prediction device, prediction method, and prediction program
US20200204110A1 (en) Device and method for simulating power consumption by power load
Idbouhouch et al. Assessing PV inverter efficiency degradation under semi-arid conditions: A case study in Morocco
CN112801374A (en) Model training method, power load prediction method, device and equipment
EP3168948A1 (en) Information processing device, information processing method, and storage medium
JP2021131627A (en) DR activation prediction system
JP2013021781A (en) Power supply system
CN117650516A (en) A high-proportion new energy grid operation risk assessment method considering high temperature weather
US20150066449A1 (en) Solar farm and method for forecasting solar farm performance
JP2020115722A (en) Precision prediction method for power generation amount by expected value calculation, precision prediction system for power generation amount by expected value calculation, and precision prediction program for power generation amount by expected value calculation
US20180313720A1 (en) Planning device, planning method, and program
WO2021167530A1 (en) Method and apparatus for determining snowfall date of photovoltaic station, and device and storage medium thereof
JP6104116B2 (en) Energy reduction prediction method and apparatus
CN115983121B (en) Coastal NWP data grid refinement method and device based on double mapping
JP2016136004A (en) Power generation amount prediction device, power generation amount prediction method, and program
CN117833453A (en) Panoramic monitoring method for low voltage distributed photovoltaics
JP7492890B2 (en) Electronic device, electronic device control method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241108

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250625

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250701

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250828

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250930

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20251121

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260106

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260128

R150 Certificate of patent or registration of utility model

Ref document number: 7812249

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150