Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7820907B2 - Earth retaining wall construction method and soil cement diaphragm wall - Google Patents
[go: Go Back, main page]

JP7820907B2 - Earth retaining wall construction method and soil cement diaphragm wall - Google Patents

Earth retaining wall construction method and soil cement diaphragm wall

Info

Publication number
JP7820907B2
JP7820907B2 JP2020204845A JP2020204845A JP7820907B2 JP 7820907 B2 JP7820907 B2 JP 7820907B2 JP 2020204845 A JP2020204845 A JP 2020204845A JP 2020204845 A JP2020204845 A JP 2020204845A JP 7820907 B2 JP7820907 B2 JP 7820907B2
Authority
JP
Japan
Prior art keywords
core material
wall
soil cement
pliers
earth retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020204845A
Other languages
Japanese (ja)
Other versions
JP2022092192A (en
Inventor
拓也 茂木
友和 青木
大裕 上田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2020204845A priority Critical patent/JP7820907B2/en
Publication of JP2022092192A publication Critical patent/JP2022092192A/en
Application granted granted Critical
Publication of JP7820907B2 publication Critical patent/JP7820907B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、山留壁構築方法およびソイルセメント連続壁に関する。 The present invention relates to a method for constructing an earth retaining wall and a soil cement continuous wall.

建物の基礎や地下部分を構築する際に、建物の周辺地盤に山留壁を構築する場合がある。このような山留壁としては、原位置土とセメント系固化材とを混錬してソイルセメントを生成するソイルセメント連続壁(SMW工法)が広く採用されている(例えば、特許文献1参照)。
ソイルセメント連続壁では、芯材が略全高にわたって配設されているのが一般的である。一方、構造物の施工に支障になる場合や、構造物の施工後の外構工事や配管工事等に支障になる場合には、山留壁の不要な部分を撤去する場合がある。
ソイルセメント連続壁を撤去する場合には、芯材に付着したソイルセメントを除去した後、芯材を切断する必要があり、その作業に手間がかかる。また、撤去したソイルセメントの破片や芯材は産業廃棄物として処理するため、費用が嵩むとともに環境負荷低減化の妨げとなる。
そのため、特許文献2には、残置する芯材の上部に芯材の外径よりも大きな内径を有した鋼筒を被せた状態で山留壁を構築し、山留壁の内側に構造物を施工した後、鋼筒を引き抜くことで、山留壁の上部分を撤去する施工方法が開示されている。
また、特許文献3には、芯材をヤットコとともに掘削孔内に建て込んで山留壁を形成し、この山留壁の内側を掘削した後、ヤットコを回収する施工方法が開示されている。
特許文献2および特許文献3の施工方法では、芯材とともに鋼筒またはヤットコを掘削孔内に建て込んで山留壁を形成するため、芯材と同数の鋼筒またはヤットコが必要になり、コスト削減の妨げとなる。
When constructing the foundation or underground portion of a building, an earth retaining wall may be constructed on the ground surrounding the building. For such earth retaining walls, a soil cement continuous wall (SMW method) in which in-situ soil is mixed with a cement-based solidification material to produce soil cement is widely used (see, for example, Patent Document 1).
In soil cement diaphragm walls, core material is generally installed over almost the entire height. However, unnecessary portions of the retaining wall may be removed if they interfere with the construction of the structure or with exterior construction or piping work after the structure is constructed.
When removing a soil-cement diaphragm wall, the soil cement adhering to the core material must be removed and then the core material must be cut, which is a time-consuming process. Furthermore, the removed soil-cement fragments and core material must be disposed of as industrial waste, which increases costs and hinders efforts to reduce environmental impact.
Therefore, Patent Document 2 discloses a construction method in which a retaining wall is constructed with a steel cylinder having an inner diameter larger than the outer diameter of the core material placed on top of the core material to be left in place, and after constructing a structure inside the retaining wall, the steel cylinder is pulled out, thereby removing the upper part of the retaining wall.
Furthermore, Patent Document 3 discloses a construction method in which a core material is placed in a borehole together with pliers to form a retaining wall, and the pliers are then removed after excavating the inside of the retaining wall.
In the construction methods of Patent Documents 2 and 3, steel cylinders or pliers are erected into the excavated hole along with the core material to form a retaining wall, which requires the same number of steel cylinders or pliers as the core material, which hinders cost reduction.

特開平9-151450号公報Japanese Patent Application Publication No. 9-151450 特開2013-227737号公報JP 2013-227737 A 実開平8-416号公報Japanese Utility Model Application Publication No. 8-416

本発明は、簡易かつ安価に、必要な位置のみに芯材が建て込まれたソイルセメント連続壁を形成することを可能とした山留壁構築方法およびソイルセメント連続壁を提案することを課題とする。 The objective of the present invention is to propose a method for constructing an earth retaining wall and a soil cement diaphragm wall that allows for the simple and inexpensive creation of a soil cement diaphragm wall in which core materials are erected only in necessary locations.

前記課題を解決するための本発明の山留壁構築方法は、既存地下壁の内側の地盤を地表面から削孔して掘削孔を形成する削孔工程と、前記掘削孔内に芯材を建て込む芯材建込工程とを備えており、前記削孔工程では前記掘削孔内において原位置土とセメントスラリーとを混錬してソイルセメントを生成し、前記芯材建込工程では前記芯材の上端部を保持するヤットコを利用して前記芯材を前記既存地下壁の下部から前記既存地下壁の下端よりも深い位置に挿入する挿入作業と、地上に設置された架台で前記芯材を吊持する受け替え作業と、前記芯材を吊持した状態で前記ヤットコのみを引き抜く引抜作業とを行い、前記既存地下壁の内側に沿って前記地表面から当該既存地下壁の下端よりも深く、かつ、前記新設建物の底面よりも深い位置に山留壁を形成する前記ソイルセメント連続壁の前記芯材は、該ソイルセメント連続壁の中間部に配置されていて、該ソイルセメント連続壁の下端部および上端部には前記芯材が配設されていない。
かかる山留壁構築方法では、ヤットコを利用することで、芯材を所定の位置に配置する。また、ヤットコを引き抜くことで、上部に芯材が存在しないソイルセメント連続壁を構築できる。そのため、芯材を撤去するために要する手間や費用を削減できる。また、地上に設置された架台で芯材を吊持した状態でヤットコを引き抜くため、セメントスラリーが硬化する前にヤットコを抜き出すことができる。つまり、ヤットコを他の芯材の建込み作業に速やかに転用できるため、費用の低減化を図ることができる。
前記架台に保持された吊材により前記芯材を吊持した状態で養生した後、前記ソイルセメントに所定の強度が発現したら、前記吊材を撤去する養生工程をさらに備えていてもよい。このようにすると、所定の深さ位置に芯材が配設されたソイルセメント連続壁を構築できる。また、吊材を撤去するので、吊材がその後の施工の妨げになることもない。
また、油圧ユニットに接続されたジョイントピンを介して前記芯材と前記ヤットコを連結すれば、前記引抜作業において、前記油圧ユニットを操作することにより、前記ジョイントピンによる連結を解除してから前記ヤットコを引き抜くことできる。このようにすると、簡易な機構でありながらも、ソイルセメント内において芯材とヤットコとの接続を解除することができる。
The method for constructing an earth retaining wall according to the present invention for solving the above-mentioned problems includes a drilling step of drilling a hole from the ground surface inside an existing basement wall to form a borehole, and a core material installation step of installing a core material into the borehole. In the drilling step, in-situ soil and cement slurry are mixed in the borehole to produce soil cement. In the core material installation step, the core material is inserted from the bottom of the existing basement wall to a position deeper than the bottom of the existing basement wall using pliers that hold the upper end of the core material. The core material is then suspended from a platform installed above ground . Finally, the pliers are removed while the core material is suspended. This results in an earth retaining wall formed along the inside of the existing basement wall at a position deeper from the ground surface than the bottom of the existing basement wall and deeper than the bottom of the new building. The core material of the soil cement continuous wall is located in the middle of the soil cement continuous wall, and the core material is not located at the bottom or top of the soil cement continuous wall.
In this earth retaining wall construction method, pliers are used to place the core material in a predetermined position. Furthermore, by removing the pliers, a soil cement continuous wall can be constructed without a core material on top. This reduces the effort and cost required to remove the core material. Furthermore, because the pliers are removed while the core material is suspended on a platform installed above ground, the pliers can be removed before the cement slurry hardens. In other words, the pliers can be quickly diverted to the construction of other core materials, thereby reducing costs.
The method may further include a curing step of curing the core material while suspended by the hangers held by the frame, and then removing the hangers once the soil cement has developed a predetermined strength. In this way, a soil cement continuous wall can be constructed with the core material disposed at a predetermined depth. Furthermore, because the hangers are removed, they do not interfere with subsequent construction.
Furthermore, if the core material and the pliers are connected via a joint pin connected to a hydraulic unit, the hydraulic unit can be operated during the extraction work to release the connection by the joint pin before the pliers can be extracted. In this way, the core material and the pliers can be released from the soil cement in a simple mechanism.

また、本発明のソイルセメント連続壁は、土留壁や既存構造物の外壁などの既存地下壁の内側の地盤に、前記既存地下壁に沿って構築されたものであり、前記ソイルセメント連続壁の芯材の上端は、前記既存地下壁の下部の深さ位置に位置している。また、前記芯材の下端は、前記既存地下壁の下端よりも深く、かつ新設建物の底面よりも深い位置に配設されていて、前記ソイルセメント連続壁は、前記既存地下壁の内側に沿って地表面から当該既存地下壁の下端よりも深く、かつ、前記新設建物の底面よりも深い位置に形成されている。前記ソイルセメント連続壁の前記芯材は、該ソイルセメント連続壁の中間部に配置されていて、該ソイルセメント連続壁の下端部および上端部には前記芯材が配設されていない。
かかるソイルセメント連続壁によれば、既存地下壁の下部以深にソイルセメント連続壁の芯材が配置されるので、既存地下壁の内側に構造物を構築する場合や、構造物への配管接続作業を行う場合に、ソイルセメント連続壁の芯材が作業の妨げになり難い。また、ソイルセメント連続壁は、既存地下壁よりも深く形成されているため、新設する構造物を既存地下壁よりも深い地下まで構築できる。
The soil cement diaphragm wall of the present invention is constructed along an existing basement wall, such as an earth retaining wall or the exterior wall of an existing structure, on the ground inside the existing basement wall, and the upper end of the core material of the soil cement diaphragm wall is located at a depth below the lower part of the existing basement wall. The lower end of the core material is disposed deeper than the lower end of the existing basement wall and deeper than the bottom surface of the new building, and the soil cement diaphragm wall is formed along the inside of the existing basement wall, from the ground surface to a position deeper than the lower end of the existing basement wall and deeper than the bottom surface of the new building . The core material of the soil cement diaphragm wall is disposed in the middle of the soil cement diaphragm wall, and no core material is disposed at the lower or upper end of the soil cement diaphragm wall.
With such a soil cement diaphragm wall, the core material of the soil cement diaphragm wall is placed deeper than the bottom of the existing basement wall, so when constructing a structure inside the existing basement wall or when connecting pipes to the structure, the core material of the soil cement diaphragm wall is unlikely to interfere with work. Also, because the soil cement diaphragm wall is formed deeper than the existing basement wall, a new structure can be constructed deeper underground than the existing basement wall.

本発明の山留壁構築方法およびソイルセメント連続壁によれば、簡易かつ安価に、必要な位置のみに芯材が建て込まれたソイルセメント連続壁を形成することが可能となる。 The earth retaining wall construction method and soil cement diaphragm wall of the present invention make it possible to easily and inexpensively form a soil cement diaphragm wall in which core materials are erected only in necessary locations.

本実施形態に係る山留壁の断面図である。FIG. 2 is a cross-sectional view of an earth retaining wall according to the present embodiment. 本実施形態に係る山留壁構築方法のフローチャートである。1 is a flowchart of a method for constructing an earth retaining wall according to the present embodiment. 山留壁構築方法の施工状況を示す断面図であって、(a)は削孔工程、(b)は芯材建込工程の挿入作業、(c)は芯材建込工程の引抜作業である。1A and 1B are cross-sectional views showing the construction status of the earth retaining wall construction method, in which (a) is the drilling process, (b) is the insertion work in the core material installation process, and (c) is the extraction work in the core material installation process. ヤットコを示す図であって、(a)は正面図、(b)は下端から望む平面図である。1A and 1B are diagrams showing pliers, in which (a) is a front view and (b) is a plan view seen from the bottom. 芯材とヤットコの接合部を示す図であって、(a)は正面図、(b)は側面図、(c)は断面図である。1A to 1C are diagrams showing the joint between the core material and the pliers, where (a) is a front view, (b) is a side view, and (c) is a cross-sectional view. 受代え作業の施工状況を示す正面図であって、(a)は受け替え前、(b)は受け替え後である。10A and 10B are front views showing the construction status of the replacement work, in which FIG. 10A shows the state before the replacement and FIG. 本施工サイクルの掘削孔と次施工サイクルの掘削孔を示す平面図である。A plan view showing the excavation holes of this construction cycle and the excavation holes of the next construction cycle.

本実施形態では、既存建物を撤去した跡地に、既存建物の地下壁(既存地下壁1)の一部を利用して、既存建物(既存地下壁1)よりも深い地下部分を有する新設建物Sを構築する場合について説明する。新設建物Sは、既存地下壁1の内側に沿って山留壁2を構築した後、山留壁2の内側部分を掘削した領域に形成する。山留壁2は、既存地下壁1に沿って構築されたソイルセメント連続壁である。図1に山留壁2を示す。図1に示すように、山留壁2は、地表面から既存地下壁1の下端よりも深い位置まで形成されており、既存地下壁1の下部から既存地下壁1の下端11よりも深く、かつ、新設建物Sの底面Sbよりも深い位置に到達する範囲のみにH形鋼からなる芯材3が配設されている。また、本実施形態の山留壁2は、下端部(例えば下端から3m程度の範囲)にも芯材3が配設されていない区間を有している。 This embodiment describes the construction of a new building S, which has a deeper underground section than the existing building (existing basement wall 1), on the site where the existing building has been demolished, by utilizing a portion of the basement wall (existing basement wall 1) of the existing building. The new building S is constructed by constructing an earth retaining wall 2 along the inside of the existing basement wall 1, and then forming the inner portion of the earth retaining wall 2 in the excavated area. The earth retaining wall 2 is a soil cement continuous wall constructed along the existing basement wall 1. Figure 1 shows the earth retaining wall 2. As shown in Figure 1, the earth retaining wall 2 is formed from the ground surface to a position deeper than the bottom end of the existing basement wall 1, and a core material 3 made of H-shaped steel is disposed only in the range from the bottom of the existing basement wall 1 to a position deeper than the bottom end 11 of the existing basement wall 1 and deeper than the bottom surface Sb of the new building S. Furthermore, the earth retaining wall 2 of this embodiment also has a section at the bottom (for example, within approximately 3 m from the bottom end) where the core material 3 is not disposed.

次に、本実施形態の山留壁構築方法を示す。図2に本実施形態の山留壁構築方法のフローチャートを示す。本実施形態の山留壁構築方法は、図2に示すように、削孔工程S1と、芯材建込工程S2と、養生工程S3とを備えている。
削孔工程S1では、地盤を削孔して掘削孔4を形成する。図3(a)に削孔工程S1の施工状況を示す。図3(a)に示すように、掘削孔4は、既存地下壁1の内面に沿って、孔底41が既存地下壁1の下端よりも深い位置に到達するように削孔する。本実施形態では、3本の攪拌軸51(図面では1本のみ表示)が並設された多軸混錬オーガー機5を利用して削孔を行う。削孔工程S1では、掘削孔4の掘削に伴い、攪拌軸51から排出されたセメントスラリーを掘削孔4内において原位置土と混錬してソイルセメント6を生成する。なお、セメントスラリーの注入(掘削孔4の削孔)に伴って掘削孔4から排出される残土は搬出する。
Next, the earth retaining wall construction method of this embodiment will be described. A flowchart of the earth retaining wall construction method of this embodiment is shown in Figure 2. As shown in Figure 2, the earth retaining wall construction method of this embodiment includes a hole drilling step S1, a core material installation step S2, and a curing step S3.
In the drilling step S1, the ground is drilled to form a borehole 4. FIG. 3( a) shows the construction status of the drilling step S1. As shown in FIG. 3( a), the borehole 4 is drilled along the inner surface of the existing basement wall 1 so that the hole bottom 41 reaches a position deeper than the lower end of the existing basement wall 1. In this embodiment, the drilling is performed using a multi-shaft auger 5 equipped with three agitation shafts 51 (only one is shown in the drawing) arranged side by side. In the drilling step S1, as the borehole 4 is excavated, cement slurry discharged from the agitation shafts 51 is mixed with the in-situ soil in the borehole 4 to produce soil cement 6. Note that the residual soil discharged from the borehole 4 following the injection of the cement slurry (drilling of the borehole 4) is transported away.

芯材建込工程S2では、掘削孔4内に芯材3を建て込む。図2に示すように、芯材建込工程S2では、挿入作業S21、受け替え作業S22および引抜作業S23を行うことで、芯材3を所定の位置(深さ位置)に建て込む。図3(b)に芯材建込工程S2の概要を示す。
挿入作業S21では、図3(b)に示すように、芯材3の上端部を保持するヤットコ7を利用して芯材3を所定の深さ位置に挿入する。まず、芯材3を掘削孔4内に挿入する。芯材3の頭部のみが掘削孔4から突出する位置まで芯材3を挿入したら、芯材3の頭部にヤットコ7を連結する(図5参照)。その後、ヤットコ7を介して、芯材3を所定の深さまで下降させる。
ヤットコ7は、芯材3を保持した状態で掘削孔4内に挿入されて、芯材3を掘削孔内の所定の深さ位置に誘導する。
In the core material erection process S2, the core material 3 is erected in the excavation hole 4. As shown in Figure 2, in the core material erection process S2, the core material 3 is erected at a predetermined position (depth position) by performing an insertion operation S21, a replacement operation S22, and a withdrawal operation S23. Figure 3(b) shows an overview of the core material erection process S2.
In the insertion operation S21, as shown in Figure 3(b), the core material 3 is inserted to a predetermined depth using pliers 7 that hold the upper end of the core material 3. First, the core material 3 is inserted into the drilling hole 4. Once the core material 3 has been inserted to a position where only the head of the core material 3 protrudes from the drilling hole 4, the pliers 7 are connected to the head of the core material 3 (see Figure 5). Then, the core material 3 is lowered to the predetermined depth using the pliers 7.
The pliers 7 are inserted into the drill hole 4 while holding the core material 3, and guide the core material 3 to a predetermined depth position within the drill hole.

図4にヤットコ7を示す。図4に示すように、ヤットコ7は、H形鋼からなる本体部71と、本体部71のウェブ下端部から下方に突設されて芯材3のウェブに添接される一対の鋼材(例えば溝形鋼)からなる挟持部72,72と、本体部71の両フランジ下端部から下方に突設されて芯材3のフランジ外面に添接されるガイド材73とを備えている。本実施形態の本体部71は、芯材3を構成するH形鋼と同じ断面のH形鋼により構成する。また、本実施形態の挟持部72は、本体部71にボルト接合されている。また、本実施形態のガイド材73は、本体部71のフランジに溶接されている。挟持部72には、本体部71からの突出部分に、芯材3との接合に使用するジョイントピンを挿通するためのピン挿通孔74が形成されている。挟持部72,72のうち、本体部71の下端から突出した部分は、芯材3のウェブを挿入可能な隙間をあけて対向している。また、本体部71の下端から突出した部分における挟持部72とガイド材73との間には、芯材3のフランジを挿入可能な隙間が形成されている。 Figure 4 shows the pliers 7. As shown in Figure 4, the pliers 7 include a main body 71 made of an H-shaped steel; clamping sections 72, 72 made of a pair of steel members (e.g., channel steel) that protrude downward from the lower end of the web of the main body 71 and are attached to the web of the core material 3; and guide members 73 that protrude downward from the lower ends of both flanges of the main body 71 and are attached to the outer surfaces of the flanges of the core material 3. In this embodiment, the main body 71 is made of an H-shaped steel with the same cross section as the H-shaped steel that constitutes the core material 3. In addition, the clamping section 72 in this embodiment is bolted to the main body 71. In addition, the guide members 73 in this embodiment are welded to the flanges of the main body 71. A pin insertion hole 74 is formed in the protruding portion of the clamping section 72 from the main body 71, through which a joint pin used to join the core material 3 is inserted. The portions of the clamping sections 72, 72 that protrude from the lower end of the main body 71 face each other with a gap that allows the web of the core material 3 to be inserted. Additionally, a gap is formed between the clamping portion 72 at the portion protruding from the lower end of the main body portion 71 and the guide member 73, allowing the flange of the core member 3 to be inserted.

図5に芯材3とヤットコ7との接合部を示す。本実施形態では、芯材3として、H形鋼を使用する。図5(a)~(c)に示すように、芯材3は、ウェブをヤットコ7の挟持部72同士の間に挿入し、かつ、フランジを挟持部72とガイド材73との間に挿入した状態で、ヤットコ7に連結されている。すなわち、芯材3は、挟持部72同士の間およびガイド材73同士の間に挿入されることで、ヤットコ7との軸心が一致または略一致するように誘導される。芯材3のウェブには、挟持部72のピン挿通孔74に対応する位置にピン挿通孔31が形成されている。芯材3とヤットコ7は、ピン挿通孔31、74を挿通したジョイントピン75を介して連結されている。ジョイントピン75は、ジョイントピン75のピン挿通孔74への挿入または抜き出しを制御する油圧ユニット76に接続されている。 Figure 5 shows the joint between the core material 3 and the pliers 7. In this embodiment, an H-beam is used as the core material 3. As shown in Figures 5(a) to 5(c), the core material 3 is connected to the pliers 7 with its web inserted between the clamping portions 72 of the pliers 7 and its flange inserted between the clamping portions 72 and the guide members 73. In other words, by inserting the core material 3 between the clamping portions 72 and between the guide members 73, it is guided so that its axis is aligned or nearly aligned with that of the pliers 7. A pin insertion hole 31 is formed in the web of the core material 3 at a position corresponding to the pin insertion hole 74 of the clamping portion 72. The core material 3 and the pliers 7 are connected via a joint pin 75 that passes through the pin insertion holes 31 and 74. The joint pin 75 is connected to a hydraulic unit 76 that controls the insertion and removal of the joint pin 75 into the pin insertion hole 74.

図5(a)に示すように、芯材3には、予め吊材8が接続されている。吊材8は、先端にネジ加工が施された鉄筋またはネジ鉄筋からなり、芯材3の上部に固定された長ナット32に螺合することにより芯材3に接続されている。吊材8は、芯材3を所定の位置に配設した際に、上端部が掘削孔4から突出する長さを有している。芯材3を掘削孔4に挿入する際には、吊材8はヤットコ7のフランジとウェブとの角部に沿って延設されている。図5(b)に示すように、ヤットコ7の本体部71は、フランジの一部を切り欠くことにより形成された凹部77を備えている。凹部77は、吊材8を回転させて長ナット32に螺合する際に、工具や作業員の腕などがフランジに接触することを防止するための切欠き部分である。本実施形態では、ヤットコ7を側面視したときに、凹部77を通じて吊り材8を視認可能である。 As shown in Figure 5(a), a suspension member 8 is pre-connected to the core member 3. The suspension member 8 is made of rebar or threaded rebar with a threaded tip, and is connected to the core member 3 by threading it into a long nut 32 fixed to the top of the core member 3. The suspension member 8 is long enough that its upper end protrudes from the drilling hole 4 when the core member 3 is placed in its designated position. When inserting the core member 3 into the drilling hole 4, the suspension member 8 extends along the corner between the flange and web of the pliers 7. As shown in Figure 5(b), the body 71 of the pliers 7 has a recess 77 formed by cutting out a portion of the flange. The recess 77 is a cutout portion that prevents tools or the worker's arm from coming into contact with the flange when the suspension member 8 is rotated and threaded onto the long nut 32. In this embodiment, the suspension member 8 is visible through the recess 77 when the pliers 7 are viewed from the side.

受け替え作業S22では、地上に設置された架台9で芯材3を吊持する。図6に受け替え作業S22の施工状況を示す。図6(a)に示すように、掘削孔4の上方の地上部には、予め架台9が形成されている。架台9は、鋼材(例えば、H形鋼)を組み合わせることにより形成されている。受け替え作業S22では、図6(b)に示すように、架台9に設けた受材91に吊材8を係止することにより芯材3の荷重をヤットコ7から架台9に受け替える。
芯材3を架台9に係止させたら、次工区(隣接する掘削孔4)の削孔(削孔工程S1)を開始する。なお、当該工区がその日の最終工区の場合には、次工区の削孔は行なわない。図7に本工区の掘削孔4と次工区(次サイクル)の掘削孔4を示す。図7に示すように、隣り合う工区の掘削孔4同士は、部分的に重なり合っている。なお、図7では、受材91を省略している。
In the transfer operation S22, the core material 3 is suspended by a platform 9 installed on the ground. Figure 6 shows the construction status of the transfer operation S22. As shown in Figure 6(a), the platform 9 is formed in advance on the ground above the borehole 4. The platform 9 is formed by combining steel materials (e.g., H-shaped steel). In the transfer operation S22, as shown in Figure 6(b), the load of the core material 3 is transferred from the pliers 7 to the platform 9 by engaging the suspension material 8 with a support material 91 provided on the platform 9.
Once the core material 3 is secured to the platform 9, drilling (drilling process S1) of the next section (adjacent borehole 4) begins. If the section in question is the final section of the day, drilling of the next section is not carried out. Figure 7 shows the borehole 4 of this section and the borehole 4 of the next section (next cycle). As shown in Figure 7, the boreholes 4 of adjacent sections partially overlap. Note that the receiving material 91 is omitted from Figure 7.

引抜作業S23では、図3(c)に示すように、芯材3を吊持した状態(芯材3を受材91に係止させた状態)でヤットコ7のみを引き抜く。ヤットコ7の引き抜きは、隣接する掘削孔4の削孔が完了した後に行う(図7参照)。なお、当該工区がその日の最終工区の場合には、吊材8を架台9に係止させた段階でヤットコ7を掘削孔4から引き抜く。
引抜作業S23では、油圧ユニット76を操作することにより、ジョイントピン75による連結を解除してから(芯材3とヤットコ7の接続を解除してから)、揚重機Mを利用してヤットコ7を引き上げる。
In the pulling-out operation S23, as shown in Figure 3(c), only the pliers 7 are pulled out while the core material 3 is suspended (with the core material 3 engaged with the receiving material 91). The pliers 7 are pulled out after the adjacent borehole 4 has been drilled (see Figure 7). If the construction section in question is the final construction section of the day, the pliers 7 are pulled out of the borehole 4 once the hanging material 8 has been engaged with the platform 9.
In the pulling-out operation S23, the hydraulic unit 76 is operated to release the connection by the joint pin 75 (after releasing the connection between the core material 3 and the pliers 7), and then the lifting machine M is used to lift the pliers 7.

養生工程S3では、ソイルセメント6を養生する。
養生工程S3では、図6(b)に示すように、受材91に吊材8に係止することで、芯材3を吊持した状態でソイルセメント6を養生する。養生によりソイルセメント6に所定の強度が発現したら、吊材8を撤去する(吊材8を回転させて長ナット32から外し、掘削孔4から引き抜く)。
In the curing step S3, the soil cement 6 is cured.
In the curing step S3, as shown in Fig. 6(b), the soil cement 6 is cured while the core material 3 is suspended by engaging the hanger 8 with the receiving material 91. When the soil cement 6 has attained a predetermined strength through curing, the hanger 8 is removed (the hanger 8 is rotated to remove it from the long nut 32 and pulled out of the borehole 4).

所定の範囲に山留壁2を構築したら、既存地下壁1および山留壁2の内側部分を掘削して、新設建物Sの施工を行う(図1参照)。このとき、芯材3よりも浅い部分においては、既存地下壁1に設けられたブラケット12に梁Saを取り付ける。また、芯材3が配設された深さ位置における新設建物Sの地下部分では、山留壁2に設けられた(芯材3に固定された)ブラケット21に梁Saを接続する。 After constructing the earth retaining wall 2 within the specified area, the existing basement wall 1 and the interior portion of the earth retaining wall 2 are excavated, and the new building S is constructed (see Figure 1). At this time, in the portion shallower than the core material 3, the beam Sa is attached to the bracket 12 attached to the existing basement wall 1. Furthermore, in the underground portion of the new building S at the depth where the core material 3 is installed, the beam Sa is connected to the bracket 21 attached to the earth retaining wall 2 (fixed to the core material 3).

本実施形態の山留壁構築方法によれば、山留壁2(ソイルセメント連続壁)の芯材3が既存地下壁1の下部以深に配置されるので、既存地下壁1の内側に新設建物Sを構築する場合や、新設建物Sへの配管接続作業を行う場合に、山留壁2の芯材3が作業の妨げになり難い。また、山留壁2は、既存地下壁1よりも深く形成されているため、新設建物を既存地下壁1よりも深い地下まで構築できる。
また、ヤットコ7を利用して芯材3を所定の位置(深さおよび平面位置)に配置でき、ヤットコ7を引き抜くことで、上部に芯材3が存在しないソイルセメント連続壁(山留壁2)を構築できる。そのため、山留壁2を部分的に撤去するために要する手間や費用を削減できる。
According to the earth retaining wall construction method of this embodiment, the core material 3 of the earth retaining wall 2 (soil cement continuous wall) is placed deeper than the bottom of the existing basement wall 1, so the core material 3 of the earth retaining wall 2 is less likely to interfere with work when constructing a new building S inside the existing basement wall 1 or when connecting pipes to the new building S. Furthermore, because the earth retaining wall 2 is formed deeper than the existing basement wall 1, the new building can be constructed deeper underground than the existing basement wall 1.
Furthermore, the core material 3 can be placed in a predetermined position (depth and horizontal position) using the pliers 7, and by pulling out the pliers 7, a soil cement continuous wall (earth retaining wall 2) can be constructed with no core material 3 at the top. This reduces the effort and cost required to partially remove the earth retaining wall 2.

また、ヤットコ7は、油圧ユニット76に接続されたジョイントピン75を介して芯材3と連結されているため、芯材3とヤットコ7との連結を容易に解除できる。そのため、簡易な機構でありながらも、ソイルセメント6内において芯材3とヤットコ7との接続を解除することができ、したがって、ヤットコ7の引抜作業も容易である。
ヤットコ7には凹部77が形成されているため、芯材3に吊材8を設置する際に、ヤットコ7のフランジが邪魔になることがなく、作業性に優れている。
ヤットコ7と芯材3の連結部においては、芯材3のウェブがヤットコ7の挟持部72,72の間に挿入され、芯材3のフランジがヤットコ7の挟持部72とガイド材73に挿入されるため、ガタツキを極力抑えた状態で芯材3とヤットコ7とが連結される。したがって、掘削孔4に芯材3を挿入する際に、芯材3を精度よく配設することができる。
Furthermore, since the pliers 7 are connected to the core material 3 via a joint pin 75 connected to the hydraulic unit 76, the connection between the core material 3 and the pliers 7 can be easily released. Therefore, even though it is a simple mechanism, the connection between the core material 3 and the pliers 7 can be released within the soil cement 6, and therefore the pliers 7 can be easily removed.
Since a recess 77 is formed in the pliers 7, the flange of the pliers 7 does not get in the way when installing the hanging material 8 on the core material 3, making it easy to work with.
At the connection between the pliers 7 and the core material 3, the web of the core material 3 is inserted between the clamping portions 72, 72 of the pliers 7, and the flange of the core material 3 is inserted into the clamping portion 72 of the pliers 7 and the guide material 73, so that the core material 3 and the pliers 7 are connected with as little rattle as possible. Therefore, when the core material 3 is inserted into the drilling hole 4, the core material 3 can be positioned with precision.

また、地上に設置された架台9で吊材8を介して芯材3を吊持した状態でヤットコ7を引き抜くため、セメントスラリーが硬化する前にヤットコ7を抜き出すことができる。つまり、ヤットコ7を他の芯材3の建込み作業に速やかに転用できるため、費用の低減化を図ることができる。また、吊材8として鉄筋を使用して、芯材3を支持しているため、ヤットコ7を引き抜く際や引き抜いた後の振動等によって芯材3の位置がずれることを防止できる。
また、吊材8は、ソイルセメント6の養生後に撤去するため、新設建物施工時に山留壁2の不要な部分を撤去する際に吊材8が妨げになることがない。
Furthermore, because the pliers 7 are pulled out while the core material 3 is suspended from the stand 9 installed on the ground via the hanging members 8, the pliers 7 can be pulled out before the cement slurry hardens. In other words, the pliers 7 can be quickly diverted to the erection work of other core materials 3, thereby reducing costs. Furthermore, because the core material 3 is supported by rebar as the hanging members 8, it is possible to prevent the core material 3 from shifting position due to vibrations when or after the pliers 7 are pulled out.
Furthermore, since the hanging material 8 is removed after the soil cement 6 has cured, the hanging material 8 does not get in the way when removing unnecessary parts of the retaining wall 2 during construction of a new building.

以上、本発明に係る実施形態について説明したが、本発明は前述の実施形態に限らず、前記の各構成要素については本発明の趣旨を逸脱しない範囲で適宜変更が可能である。
前記実施形態では、芯材3とヤットコ7との連結をジョイントピン75により行う場合について説明したが、芯材3とヤットコ7との連結方法は限定されるものではなく、例えば、ジョイントピン75以外の治具を用いてもよいし、把持手段などを用いてもよい。
また、前記実施形態では、ジョイントピン75を油圧ユニット76により制御する場合について説明したが、ジョイントピン75の制御手段は限定されるものではなく、例えば、空気圧ユニット、磁力、電気的制御手段等を用いてもよい。
前記実施形態では、山留壁2の芯材3を既存地下壁の下部よりも深い位置に配設するものとしたが、芯材3を配設する深さ位置は限定されるものではなく、例えば、既存地下壁1の中間部よりも深い位置であってもよい。
前記実施形態では、既存地下壁1を利用して新設建物Sを施工する場合について説明したが、既存地下壁1は必ずしも新設建物Sの一部に使用する必要はない。
Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and each of the above-described components can be appropriately modified within the scope of the invention.
In the above embodiment, the core material 3 and the pliers 7 are connected using a joint pin 75, but the method of connecting the core material 3 and the pliers 7 is not limited, and for example, a jig other than the joint pin 75 may be used, or a gripping means may be used.
In addition, in the above embodiment, the case where the joint pin 75 is controlled by the hydraulic unit 76 has been described, but the control means for the joint pin 75 is not limited thereto, and for example, a pneumatic unit, magnetic force, electrical control means, etc. may also be used.
In the above embodiment, the core material 3 of the retaining wall 2 is arranged at a position deeper than the lower part of the existing underground wall, but the depth position at which the core material 3 is arranged is not limited, and it may be, for example, at a position deeper than the middle part of the existing underground wall 1.
In the above embodiment, the case where the new building S is constructed using the existing basement wall 1 has been described, but the existing basement wall 1 does not necessarily have to be used as part of the new building S.

1 既存地下壁
2 山留壁(ソイルセメント連続壁)
3 芯材
31 ピン挿通孔
32 長ナット
4 掘削孔
5 多軸混錬オーガー機
51 攪拌軸
6 ソイルセメント
7 ヤットコ
71 本体部
72 挟持部
73 ガイド材
74 ピン挿通孔
75 ジョイントピン
76 油圧ユニット
77 凹部
8 吊材
9 架台
1. Existing basement wall 2. Retaining wall (soil cement continuous wall)
3 Core material 31 Pin insertion hole 32 Long nut 4 Drilling hole 5 Multi-shaft mixing auger machine 51 Stirring shaft 6 Soil cement 7 Pliers 71 Main body 72 Clamping part 73 Guide material 74 Pin insertion hole 75 Joint pin 76 Hydraulic unit 77 Recess 8 Hanging material 9 Stand

Claims (4)

既存地下壁の内側の地盤を地表面から削孔して掘削孔を形成する削孔工程と、
前記掘削孔内に芯材を建て込む芯材建込工程と、を備える山留壁構築方法であって、
前記削孔工程では、前記掘削孔内において原位置土とセメントスラリーとを混錬してソイルセメントを生成し、
前記芯材建込工程では、前記芯材の上端部を保持するヤットコを利用して前記芯材を前記既存地下壁の下部から前記既存地下壁の下端よりも深く、かつ、新設建物の底面よりも深い位置に挿入する挿入作業と、地上に設置された架台で前記芯材を吊持する受け替え作業と、前記芯材を吊持した状態で前記ヤットコを引き抜く引抜作業と、を行い、
前記既存地下壁の内側に沿って前記地表面から当該既存地下壁の下端よりも深く、かつ、前記新設建物の底面よりも深い位置に山留壁が形成され、
前記山留壁の前記芯材は、該山留壁の中間部に配置され、該山留壁の下端部および上端部には前記芯材が配設されていないことを特徴とする、山留壁構築方法。
a drilling step of drilling a hole from the ground surface into the ground inside the existing underground wall to form a borehole;
A core material erection process for erecting a core material into the excavation hole,
In the drilling step, in-situ soil and cement slurry are mixed in the drilled hole to produce soil cement,
The core material installation process involves inserting the core material from the bottom of the existing basement wall to a position deeper than the bottom end of the existing basement wall and deeper than the bottom surface of the new building using pliers that hold the upper end of the core material; replacing the core material by suspending it on a platform installed on the ground; and pulling out the pliers while the core material is suspended .
A retaining wall is formed along the inside of the existing basement wall from the ground surface to a position deeper than the lower end of the existing basement wall and deeper than the bottom surface of the new building,
A method for constructing an earth retaining wall, characterized in that the core material of the earth retaining wall is arranged in the middle part of the earth retaining wall, and the core material is not arranged at the lower end and upper end of the earth retaining wall.
前記ソイルセメントを養生する養生工程をさらに備えており、
前記養生工程では、前記架台に保持された吊材により前記芯材を吊持した状態で養生した後、前記ソイルセメントに所定の強度が発現したら、前記吊材を撤去することを特徴とする、請求項1に記載の山留壁構築方法。
The method further includes a curing step of curing the soil cement,
2. The earth retaining wall construction method according to claim 1, wherein in the curing step, the core material is cured in a suspended state by hanging materials held by the frame, and then the hanging materials are removed when the soil cement has developed a predetermined strength.
前記芯材と前記ヤットコは、油圧ユニットに接続されたジョイントピンを介して連結されており、
前記引抜作業では、前記油圧ユニットを操作することにより、前記ジョイントピンによる連結を解除してから、前記ヤットコを引き抜くことを特徴とする、請求項1または請求項2に記載の山留壁構築方法。
The core material and the pliers are connected via a joint pin connected to a hydraulic unit,
3. The method for constructing an earth retaining wall according to claim 1 or claim 2, characterized in that, in the pulling-out operation, the hydraulic unit is operated to release the connection by the joint pin, and then the pliers are pulled out.
既存地下壁の内側の地盤に、前記既存地下壁に沿って構築されたソイルセメント連続壁であって、
前記ソイルセメント連続壁の芯材の上端は、前記既存地下壁の下部の深さ位置に位置し、
前記芯材の下端は、前記既存地下壁の下端よりも深く、かつ新設建物の底面よりも深い位置に配設されていて、
前記ソイルセメント連続壁は、前記既存地下壁の内側に沿って地表面から当該既存地下壁の下端よりも深く、かつ、前記新設建物の底面よりも深い位置に形成され、
前記ソイルセメント連続壁の前記芯材は、該ソイルセメント連続壁の中間部に配置され、該ソイルセメント連続壁の下端部および上端部には前記芯材が配設されていないことを特徴とするソイルセメント連続壁。
A soil cement continuous wall constructed along the existing underground wall on the ground inside the existing underground wall,
The upper end of the core material of the soil cement continuous wall is located at a depth position below the lower part of the existing underground wall,
The lower end of the core material is disposed at a position deeper than the lower end of the existing basement wall and deeper than the bottom surface of the new building ,
The soil cement continuous wall is formed along the inside of the existing basement wall from the ground surface to a position deeper than the lower end of the existing basement wall and deeper than the bottom surface of the new building,
A soil cement continuous wall characterized in that the core material of the soil cement continuous wall is arranged in the middle part of the soil cement continuous wall, and the core material is not arranged at the lower end and upper end of the soil cement continuous wall.
JP2020204845A 2020-12-10 2020-12-10 Earth retaining wall construction method and soil cement diaphragm wall Active JP7820907B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020204845A JP7820907B2 (en) 2020-12-10 2020-12-10 Earth retaining wall construction method and soil cement diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020204845A JP7820907B2 (en) 2020-12-10 2020-12-10 Earth retaining wall construction method and soil cement diaphragm wall

Publications (2)

Publication Number Publication Date
JP2022092192A JP2022092192A (en) 2022-06-22
JP7820907B2 true JP7820907B2 (en) 2026-02-26

Family

ID=82068112

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020204845A Active JP7820907B2 (en) 2020-12-10 2020-12-10 Earth retaining wall construction method and soil cement diaphragm wall

Country Status (1)

Country Link
JP (1) JP7820907B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002138462A (en) 2000-11-01 2002-05-14 Seiko Kogyo Kk Stress material building equipment and construction method of stress material
JP2003293363A (en) 2002-03-29 2003-10-15 Ohbayashi Corp Method for constructing earth retaining wall
JP2005133310A (en) 2003-10-28 2005-05-26 Marutoku Kigyo:Kk How to build core material in underground continuous wall method
JP2005282063A (en) 2004-03-29 2005-10-13 Tenox Corp Composite site construction pile, its construction method, and composite field construction pile construction device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10121466A (en) * 1996-10-23 1998-05-12 Maeda Corp Stress material chuting device
JP4947459B2 (en) * 2006-05-19 2012-06-06 清水建設株式会社 Pile core construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002138462A (en) 2000-11-01 2002-05-14 Seiko Kogyo Kk Stress material building equipment and construction method of stress material
JP2003293363A (en) 2002-03-29 2003-10-15 Ohbayashi Corp Method for constructing earth retaining wall
JP2005133310A (en) 2003-10-28 2005-05-26 Marutoku Kigyo:Kk How to build core material in underground continuous wall method
JP2005282063A (en) 2004-03-29 2005-10-13 Tenox Corp Composite site construction pile, its construction method, and composite field construction pile construction device

Also Published As

Publication number Publication date
JP2022092192A (en) 2022-06-22

Similar Documents

Publication Publication Date Title
CN113389205B (en) A recyclable anchored prestressed hanging pile support structure and construction method
JP5235748B2 (en) Wall metal fittings and underground continuous wall construction method
JP2018024982A (en) Reinforcement method and reinforcement structure of existing pile foundation
JP5268732B2 (en) Wall member for underground continuous wall, underground continuous wall construction method, and underground continuous wall
CN114278227A (en) Construction method of lower pile casing of cast-in-place pile
KR102190480B1 (en) Implant pile pressing apparatus in architecture foundation system and a universal implant piling method
CN115354709B (en) Construction method of troughing underground pipelines and continuous wall construction method of buried pipelines
JP7820907B2 (en) Earth retaining wall construction method and soil cement diaphragm wall
KR101345457B1 (en) Driving piles pressure device and using the device driving pile method
CN114215051A (en) A casing device and rotary drilling rig for construction of cast-in-place piles
CN112962603A (en) Dismantling construction process for reinforced concrete cast-in-place pile
JP6220659B2 (en) Position adjustment method of reaction force receiving member and top of column
JP2018003433A (en) Construction method of double pipe pile and double pipe pile
JP2007308951A (en) Method of constructing outer peripheral column by inverted construction method
JP6940081B2 (en) Lock structure, how to build the lock structure, and how to remove the lock structure
JP2011220009A (en) Erection method of permanent sub-substructural column
JP2016037706A (en) Pile head reinforcement method for foundation pile
JP2002138462A (en) Stress material building equipment and construction method of stress material
JP7704016B2 (en) How to install the core material
JPH09111763A (en) Device for pulling-out casing
KR102073630B1 (en) Sacrificial Steel Pipe Cutting Method Using Sacrificial Steel Pipe for Field Drilled Shaft and Construction Method for Stiffness Increase on the Pile
JP2013253378A (en) Auxiliary tool for forming pile head space, hollow precast pile having the same, pile head treatment method using the hollow precast pile, and method for forming pile head space
CN222648747U (en) Portable device for cyclic utilization of bored concrete pile reinforcement cage locating rack
KR101279009B1 (en) Bored pile method
JP2635934B2 (en) Shaft construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231101

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231114

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231225

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240312

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240404

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20240709

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240822

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20240829

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20241018

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260213

R150 Certificate of patent or registration of utility model

Ref document number: 7820907

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150