JP7822006B2 - Method for constructing slab-like members - Google Patents
[go: Go Back, main page]

JP7822006B2 - Method for constructing slab-like members - Google Patents

Method for constructing slab-like members

Info

Publication number
JP7822006B2
JP7822006B2 JP2022078692A JP2022078692A JP7822006B2 JP 7822006 B2 JP7822006 B2 JP 7822006B2 JP 2022078692 A JP2022078692 A JP 2022078692A JP 2022078692 A JP2022078692 A JP 2022078692A JP 7822006 B2 JP7822006 B2 JP 7822006B2
Authority
JP
Japan
Prior art keywords
slab
hanging
precast
precast slab
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022078692A
Other languages
Japanese (ja)
Other versions
JP2023167478A (en
Inventor
真 池田
和行 湯浅
真樹 松野
直樹 曽我部
拓也 岩本
春奈 皆川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2022078692A priority Critical patent/JP7822006B2/en
Publication of JP2023167478A publication Critical patent/JP2023167478A/en
Application granted granted Critical
Publication of JP7822006B2 publication Critical patent/JP7822006B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、ハーフプレキャストコンクリート製のスラブ状部材を構築する構築方法に関する。 The present invention relates to a construction method for constructing slab-like members made of half-precast concrete.

鉄筋コンクリート構造等の鉄筋を有するコンクリート複合構造物においては、現場での省力化・省人化を目的として、プレキャスト部材と現場打ちコンクリート部材とを組み合わせたハーフプレキャストコンクリート製のスラブ状部材が用いられる。例えば、2つのコンクリート部材(プレキャストコンクリート部材及び現場打ちコンクリート部材)を組み合わせて構造物の頂版、梁部材、柱部材といった各種構造物を構成する部材が製作される。 In composite concrete structures containing reinforcing bars, such as reinforced concrete structures, slab-like members made of half-precast concrete, which combine precast members and cast-in-place concrete members, are used to reduce labor and manpower on site. For example, two concrete members (a precast concrete member and a cast-in-place concrete member) are combined to produce members that make up various structures, such as the top slab, beam members, and column members of a structure.

例えば、特許文献1には、プレキャストコンクリート版やそれを備えた建造物の床版構造が開示されている。特許文献1に開示された発明によれば、トラス構造補強体を構成する上端部材として縦リブを有する鉄骨を採用することで、コスト低減、工期短縮、現場作業性の向上等が図られるとされている。 For example, Patent Document 1 discloses precast concrete slabs and the floor slab structure of a building equipped with them. According to the invention disclosed in Patent Document 1, by using a steel frame with vertical ribs as the upper end member that makes up the truss structure reinforcement, it is possible to reduce costs, shorten construction time, and improve on-site workability.

特開2000-1938号公報Japanese Patent Application Laid-Open No. 2000-1938

しかしながら、上記特許文献1に記載の技術では、上端部材として縦リブを有する鉄骨を用いているが、この上端部材を強固なものとする必要があるため、部材の大型化や大重量化が懸念される。そのため、作業性やコスト等の面で更なる改良の余地がある。現場打ち部分の鉄筋工は現場作業であり、特に過密配筋の場合には作業性が悪いため、作業性の向上や、鉄筋のユニット化などによる鉄筋工の工期短縮が求められる。本発明者らは、ハーフプレキャストコンクリート製のスラブ状部材の構築方法について、更なる作業性の向上や、工期短縮を図ることが可能な技術について鋭意検討を行った。 However, the technology described in Patent Document 1 uses a steel frame with vertical ribs as the top member, and because this top member needs to be strong, there are concerns that the member will become larger and heavier. Therefore, there is room for further improvement in terms of workability and cost. Reinforcing bar work for cast-in-place sections is done on-site, and workability is poor, especially when the reinforcing bars are densely arranged. Therefore, there is a need to improve workability and shorten the construction period for reinforcing bar work by, for example, unitizing the reinforcing bars. The inventors have conducted extensive research into technologies that can further improve workability and shorten construction periods for methods of constructing slab-like members made of half-precast concrete.

上記事情に鑑み、本発明の目的は、ハーフプレキャストコンクリート製のスラブ状部材の構築において、作業性の向上や工期の短縮を図ることが可能なスラブ状部材の構築方法を提供することにある。 In light of the above circumstances, the object of the present invention is to provide a method for constructing slab-like members made of half-precast concrete that can improve workability and shorten construction time.

前記の目的を達成するため、本発明によれば、プレキャストスラブと現場打ちコンクリートからなり、上下方向に延伸し、肩部と、当該肩部から上方に延伸する頂部とを備えた一対の支持部材架け渡して設置されるハーフプレキャストコンクリート製のスラブ状部材の構築方法であって、前記一対の支持部材の肩部上に前記プレキャストスラブの幅方向端部を載置する工程と、前記一対の支持部材の頂部上にその端部を載置して前記プレキャストスラブの上方に支保工を架け渡す工程と、前記プレキャストスラブの上方に架け渡した支保工から下方に向かって伸びる吊り下げ材を介して前記プレキャストスラブを吊り下げる工程と、前記プレキャストスラブの上方に鉄筋構造を構築する工程と、前記吊り下げ材の少なくとも一部と前記鉄筋構造を埋設するように前記プレキャストスラブ及び前記肩部の上部にその上面位置が前記頂部の上端に一致するまで、現場打ちコンクリートを打設し養生する工程と、前記支保工から前記吊り下げ材を分離し、前記支保工を撤去する工程と、を含み、前記スラブ状部材において前記現場打ちコンクリートに埋設された前記吊り下げ材はせん断補強筋として機能することを特徴とする、スラブ状部材の構築方法が提供される。
In order to achieve the above object, according to the present invention, there is provided a method for constructing a half -precast concrete slab-like member that is made of a precast slab and cast-in-place concrete, and that is installed by bridging a pair of support members that extend in the vertical direction and have shoulders and a top extending upward from the shoulders, the method comprising the steps of placing the widthwise ends of the precast slab on the shoulders of the pair of support members, placing the ends on the tops of the pair of support members and bridging supports above the precast slab, and attaching hanging members that extend downward from the supports bridging above the precast slab. a step of suspending the precast slab through a cast-in-place concrete support; a step of constructing a reinforcing bar structure above the precast slab; a step of pouring and curing cast-in-place concrete onto the top of the precast slab and the shoulder portion so that the top surface of the cast-in-place concrete is aligned with the upper end of the crest so as to embed at least a portion of the hanging material and the reinforcing bar structure; and a step of separating the hanging material from the shoring and removing the shoring, wherein the hanging material embedded in the cast-in-place concrete in the slab-like member functions as shear reinforcement.

前記プレキャストスラブは当該プレキャストスラブに埋設された補強材によって補強され、前記プレキャストスラブを吊り下げる工程においては、前記吊り下げ材の下端を前記補強材又は前記プレキャストスラブに連結させても良い。 The precast slab may be reinforced by a reinforcing material embedded in the precast slab, and in the process of suspending the precast slab, the lower end of the suspending material may be connected to the reinforcing material or the precast slab.

前記吊り下げ材の上端部には雄ネジ加工が施され、前記プレキャストスラブを吊り下げる工程においては、前記支保工と前記吊り下げ材の連結部において前記雄ネジに螺合するナットを締緩することにより前記吊り下げ材を上下させ、前記プレキャストスラブの姿勢を調整しても良い。
A male thread is machined on the upper end of the hanging material, and in the process of hanging the precast slab, the hanging material can be raised and lowered by tightening or loosening a nut that threads onto the male thread at the connection between the support and the hanging material, thereby adjusting the posture of the precast slab.

前記吊り下げ材は、前記支保工に連結される上部吊り下げ材と、前記プレキャストスラブと連結される下部吊り下げ材と、が継手によって連結された構造を有し、
前記支保工を撤去する工程においては、前記継手を外すことにより前記下部吊り下げ材を前記支保工から分離させても良い。
The hanging member has a structure in which an upper hanging member connected to the support and a lower hanging member connected to the precast slab are connected by joints,
In the step of removing the support, the lower hanging member may be separated from the support by removing the joint.

前記下部吊り下げ材の上端及び下端に定着具を有しても良い。 The lower hanging member may have fixings at its upper and lower ends.

前記支持部材はカルバートの壁であり、前記スラブ状部材は前記カルバートの頂版であっても良い。 The support member may be a culvert wall, and the slab-like member may be the top plate of the culvert.

前記支持部材は柱であり、前記スラブ状部材は梁であっても良い。 The support member may be a column and the slab-like member may be a beam.

前記鉄筋構造は、前記プレキャストスラブの幅方向に平行に設置される主鉄筋と、前記主鉄筋と交差する方向に設置される配力筋と、を含み、前記吊り下げ材は、前記主鉄筋と前記配力筋の一方又は両方に係留されても良い。 The reinforcing steel structure includes main reinforcing steel bars installed parallel to the width of the precast slab and distribution steel bars installed in a direction intersecting the main reinforcing steel bars, and the hanging member may be anchored to one or both of the main reinforcing steel bars and the distribution steel bars.

前記プレキャストスラブは前記カルバート長さ方向に互いに隣接して複数設置され、前記プレキャストスラブには、前記カルバートの長さ方向に延伸する配力筋が、当該配力筋の端部が当該プレキャストスラブから突出するように埋設され、複数の前記プレキャストスラブにおいて、隣り合う前記プレキャストスラブ同士は前記配力筋同士を継手により連結し、前記現場打ちコンクリートを打設し養生する工程では、隣接する複数のプレキャストスラブ間も含めてコンクリート打設が行われても良い。
The precast slabs are installed adjacent to each other along the length of the culvert , and distribution bars extending along the length of the culvert are embedded in the precast slabs so that their ends protrude from the precast slab. Adjacent precast slabs are connected to each other by joints between the distribution bars, and in the process of pouring and curing the cast-in-place concrete, concrete may be poured between adjacent precast slabs as well.

本発明によれば、ハーフプレキャストコンクリート製のスラブ状部材の構築において、作業性の向上や工期の短縮を図ることが可能となる。 This invention makes it possible to improve workability and shorten construction time when constructing slab-like members made of half-precast concrete.

なお、上記の効果は必ずしも限定的なものではなく、上記の効果とともに、又は、上記の効果に代えて、本明細書に示されたいずれかの効果、又は、本明細書から把握され得る他の効果が奏されてもよい。 The above effects are not necessarily limiting, and any of the effects described in this specification, or other effects that can be understood from this specification, may be achieved in addition to or instead of the above effects.

頂版構造の概略平面図である。FIG. 2 is a schematic plan view of the top plate structure. 頂版構造の概略側面断面図である。FIG. 2 is a schematic side cross-sectional view of the top plate structure. 吊り下げ材の構成の一例を示す概略説明図である。FIG. 2 is a schematic explanatory diagram showing an example of the configuration of a hanging material. 頂版構造を構築する場合の工程図である。FIG. 10 is a process diagram for constructing a top plate structure. 頂版構造を構築する場合の工程図である。FIG. 10 is a process diagram for constructing a top plate structure. 頂版構造を構築する場合の工程図である。FIG. 10 is a process diagram for constructing a top plate structure. 頂版構造を構築する場合の工程図である。FIG. 10 is a process diagram for constructing a top plate structure. 頂版構造を構築する場合の工程図である。FIG. 10 is a process diagram for constructing a top plate structure. 頂版構造を構築する場合の工程図である。FIG. 10 is a process diagram for constructing a top plate structure. 頂版構造を構築する場合の工程図である。FIG. 10 is a process diagram for constructing a top plate structure. プレキャストスラブの構成の一例を示す概略説明図である。FIG. 1 is a schematic explanatory diagram showing an example of the configuration of a precast slab. プレキャストスラブと吊り下げ材との連結に関する概略説明図である。FIG. 1 is a schematic explanatory diagram of the connection between a precast slab and a hanging member. 支保工として溝形鋼を用いた場合の概略断面図である。This is a schematic cross-sectional view of a case where channel steel is used as support. 梁を構築する場合の工程図である。This is a process diagram for constructing a beam. 梁を構築する場合の工程図である。This is a process diagram for constructing a beam. 梁を構築する場合の工程図である。This is a process diagram for constructing a beam. 梁を構築する場合の工程図である。This is a process diagram for constructing a beam. 梁を構築する場合の工程図である。This is a process diagram for constructing a beam. 梁を構築する場合の工程図である。This is a process diagram for constructing a beam. 梁を構築する場合の工程図である。This is a process diagram for constructing a beam. 支保工と頂部との間に架台を介して支保工の設置を行う場合の概略図である。This is a schematic diagram of the installation of support via a platform between the support and the top. 吊り下げ材の他の構成例を示す概略説明図である。FIG. 10 is a schematic explanatory diagram showing another example of the configuration of the hanging material.

以下、本発明の実施の形態について図面を参照して説明する。本明細書および図面において、実質的に同一の機能構成を有する構成要素については、同一の符号を付することにより重複説明を省略する場合がある。なお、本実施形態では、本発明に係るスラブ状部材の構築方法によりカルバートの頂版を構築する場合を例示して説明する。また、本明細書の実施の形態においては、説明のために鉄筋構造や配筋構成について、一部図示を省略する場合や、あるいは、部材内部の鉄筋等を図示する場合がある。 Embodiments of the present invention will be described below with reference to the drawings. In this specification and drawings, components having substantially the same functional configuration will be assigned the same reference numerals, and redundant description will be omitted. Note that this embodiment will be described by exemplifying the construction of a culvert top plate using the method for constructing a slab-like member according to the present invention. Furthermore, in the embodiments of this specification, for the purpose of explanation, some of the reinforcing bar structure and reinforcing bar arrangement may be omitted from illustration, or reinforcing bars inside the member may be illustrated.

以下の説明では、カルバートにおいてその内部空間が延びる方向をカルバートの「長さ方向」とし、内部空間を横切るように長さ方向に直交する方向をカルバートの「幅方向」とし、これら長さ方向及び幅方向に直交する方向を「高さ方向」とする。図面においては、長さ方向を「Y軸」、幅方向を「X軸」、高さ方向を「Z軸」として図示する場合がある。また、後述するプレキャストスラブ20の幅方向とは、上述のカルバートの幅方向と同じ方向を指す。 In the following description, the direction in which the internal space of a culvert extends is referred to as the "length direction" of the culvert, the direction perpendicular to the length direction so as to cut across the internal space is referred to as the "width direction" of the culvert, and the direction perpendicular to these length and width directions is referred to as the "height direction." In the drawings, the length direction may be illustrated as the "Y axis," the width direction as the "X axis," and the height direction as the "Z axis." Furthermore, the width direction of the precast slab 20 described below refers to the same direction as the width direction of the culvert described above.

<頂版構造の構成>
図1、図2は本発明の実施の形態に係るスラブ状部材の構築方法によって構築される頂版構造1の概略説明図であり、図1は概略平面図、図2は概略側面断面図を示している。なお、この頂版構造1は、例えばカルバートの側壁を支持部材とし、複数の支持部材に跨って搭載されるスラブ状部材の一例である。ここで、図2には、説明のため、頂版構造1に加え、支持部材(後述する支持部材10)や、最終的には撤去される場合もある、吊り下げ材を含む支保工(後述する支保工30)等についても図示している。
<Top plate structure configuration>
1 and 2 are schematic explanatory diagrams of a top plate structure 1 constructed by a method for constructing a slab-like member according to an embodiment of the present invention, with Fig. 1 showing a schematic plan view and Fig. 2 showing a schematic side cross-sectional view. This top plate structure 1 is an example of a slab-like member that is mounted across multiple support members, such as the side walls of a culvert. For the sake of explanation, Fig. 2 also shows, in addition to the top plate structure 1, support members (support members 10, described below) and shoring (shoring 30, described below) including hanging members that may eventually be removed.

図1、2に示すように、頂版構造1は例えばカルバートの側壁、中壁等である一対の支持部材10(10a、10b)に跨って搭載される。支持部材10は、上面において後述するプレキャストスラブ20を搭載するための肩部12と、肩部12から更に上方に向かって延伸する頂部14と、を含む。頂版構造1は、一対の支持部材10に跨るように、その幅方向(図中X方向)端部が向かい合う肩部12、12に搭載される複数のプレキャストスラブ20を含む。本実施の形態に係る構成では、複数のプレキャストスラブ20がカルバートの長さ方向(図中Y方向)に隣接するように搭載されている。 As shown in Figures 1 and 2, the top plate structure 1 is mounted across a pair of support members 10 (10a, 10b), such as the side walls or middle walls of a culvert. The support member 10 includes a shoulder 12 on its upper surface for mounting a precast slab 20 (described below), and a top portion 14 extending upward from the shoulder 12. The top plate structure 1 includes multiple precast slabs 20 mounted on the shoulders 12, 12 with their widthwise (X-direction in the figure) ends facing each other, straddling the pair of support members 10. In the configuration of this embodiment, the multiple precast slabs 20 are mounted adjacent to each other along the length of the culvert (Y-direction in the figure).

プレキャストスラブ20は、工場などで予め製作された部材(いわゆるプレキャスト部材)であっても良く、補強材27を含むように構成することで補強されても良い。補強材27は特に限定されないが、例えばH形鋼、PC鋼材といった鋼材や鉄筋であっても良い。 The precast slab 20 may be a component (a so-called precast component) prefabricated in a factory or the like, or may be reinforced by including reinforcing material 27. The reinforcing material 27 is not particularly limited, but may be, for example, steel such as H-section steel or PC steel, or reinforcing bars.

プレキャストスラブ20の上方において、支持部材10の向かい合う頂部14、14に掛け渡されるように支保工30が設置される。支保工30は例えばH形鋼であっても良い。支保工30には下方に向かって伸びる複数の吊り下げ材33が連結されている。吊り下げ材33としては、異形鉄筋、セパレーター、PC鋼材、総ネジボルトといった種々の鋼材が用いられても良い。 Above the precast slab 20, shoring 30 is installed so as to span the opposing tops 14, 14 of the support members 10. The shoring 30 may be, for example, H-shaped steel. A number of hanging members 33 extending downward are connected to the shoring 30. Various steel materials may be used as the hanging members 33, such as deformed steel bars, separators, PC steel, and fully threaded bolts.

支保工30と吊り下げ材33の連結手段は任意であり、例えば、支保工30に孔開け加工を施し、吊り下げ材33の上端に雄ネジ加工を施し、支保工30と吊り下げ材33の連結部において雄ネジ加工とナットを締結させることで連結させても良い。 The means of connecting the shoring 30 and the hanging material 33 is optional. For example, the shoring 30 may be drilled, a male thread may be drilled into the upper end of the hanging material 33, and the connection between the shoring 30 and the hanging material 33 may be achieved by threading the male thread and tightening a nut.

図3は吊り下げ材33の構成の一例を示す概略説明図であり、図2中の破線部を拡大して図示したものである。一例として、図3のように、吊り下げ材33は、支保工30に連結される上部吊り下げ材33aと、プレキャストスラブ20と連結される下部吊り下げ材33bと、から構成されても良い。下部吊り下げ材33bの上端には定着具34が備えられても良い。下部吊り下げ材33bの下端にも同様の定着具(図3では図示せず)が備えられても良い。図3のように、上部吊り下げ材33aと下部吊り下げ材33bは、ナット35aやPコン35bを含む継手35により連結された構成でも良い。 Figure 3 is a schematic diagram showing an example of the configuration of the hanging member 33, and is an enlarged view of the dashed line portion in Figure 2. As an example, as shown in Figure 3, the hanging member 33 may be composed of an upper hanging member 33a connected to the shoring 30 and a lower hanging member 33b connected to the precast slab 20. A fixing device 34 may be provided at the upper end of the lower hanging member 33b. A similar fixing device (not shown in Figure 3) may also be provided at the lower end of the lower hanging member 33b. As shown in Figure 3, the upper hanging member 33a and the lower hanging member 33b may be connected by a joint 35 including a nut 35a and a P cone 35b.

また、支保工30によるプレキャストスラブ20吊り下げ時には、吊り下げ材33の下端と、プレキャストスラブ20あるいは補強材27と、が連結される。その連結手段は任意であり、例えば補強材27に孔開け加工を施し、加工された孔を介して図示しないナットと雄ネジ加工とを螺合させることで連結しても良い。 When the precast slab 20 is suspended by the support 30, the lower end of the suspension member 33 is connected to the precast slab 20 or the reinforcing member 27. The means of connection is optional; for example, the reinforcing member 27 may be drilled and a nut (not shown) may be threaded through the drilled hole to engage with a male thread.

プレキャストスラブ20の上方には鉄筋構造40が構築される。この鉄筋構造40は、プレキャストスラブ20の幅方向に平行に設置される複数の主鉄筋44と、主鉄筋44と交差する方向(例えば直交する方向)に設置される複数の配力筋42と、を含む。ここで、吊り下げ材33の少なくとも一部は、主鉄筋44と配力筋42の一方又は両方に係留されても良い。なお、この鉄筋構造40はオフサイトで予め製作したものでも良い。「オフサイト」とは、据え付け場所とは異なる場所であることを示し、据え付け場所そのものを除外する概念である。即ち、「オフサイトにて製作する」との記載は、例えば、工場や据え付け場所の近傍で製作する場合を含んでいる。 A reinforcing steel structure 40 is constructed above the precast slab 20. This reinforcing steel structure 40 includes multiple main reinforcing steel bars 44 installed parallel to the width of the precast slab 20, and multiple distribution reinforcement bars 42 installed in a direction intersecting (e.g., perpendicular to) the main reinforcing steel bars 44. At least a portion of the hanging member 33 may be anchored to one or both of the main reinforcing steel bars 44 and the distribution reinforcement bars 42. Note that this reinforcing steel structure 40 may be fabricated off-site in advance. "Off-site" refers to a location different from the installation site, and is a concept that excludes the installation site itself. In other words, the phrase "fabricated off-site" includes cases where the structure is fabricated in a factory or near the installation site, for example.

プレキャストスラブ20の上方においては、吊り下げ材33の少なくとも一部及び鉄筋構造40を埋設するようにコンクリート打設された現場打ちコンクリート部50が構成される。図2のように、現場打ちコンクリート部50の構成時には、吊り下げ材33の少なくとも一部及び鉄筋構造40を内部に埋設させ、肩部12の上部に対してもコンクリート打設が行われる。例えばその上面位置が高さ方向で頂部14の上端と一致するようにコンクリート打設が行われても良い。 Above the precast slab 20, a cast-in-place concrete section 50 is constructed, in which concrete is poured to embed at least a portion of the hanging member 33 and the reinforcing steel structure 40. As shown in Figure 2, when constructing the cast-in-place concrete section 50, at least a portion of the hanging member 33 and the reinforcing steel structure 40 are buried inside, and concrete is also poured on the top of the shoulder section 12. For example, concrete may be poured so that the top surface is aligned with the top end of the peak 14 in the height direction.

以上、図1~3を参照して説明したように頂版構造1は構成される。なお、頂版構造1においては、その構築過程において図2に示した支保工30が用いられ、プレキャストスラブ20が吊り下げられる。但し、最終的な頂版構造1の構築後には、この支保工30は撤去される。支保工30の撤去は、例えば上部吊り下げ材33aと下部吊り下げ材33bの継手35を介した連結を解除することで実施されても良い。 The top slab structure 1 is constructed as described above with reference to Figures 1 to 3. During the construction process of the top slab structure 1, the shoring 30 shown in Figure 2 is used to suspend the precast slab 20. However, once the top slab structure 1 is finally constructed, the shoring 30 is removed. The shoring 30 may be removed, for example, by releasing the connection between the upper hanging member 33a and the lower hanging member 33b via the joint 35.

<頂版構造の構築方法>
次に、上記説明した頂版構造1の構築方法について説明する。図4~図10は本発明の実施の形態に係るスラブ状部材の構築方法を適用して頂版構造1を構築する場合の工程図であり、図4から図10までの順に工程が実施される。なお、図4~図10の各図面には、説明のため(a)に概略平面図、(b)に概略側面断面図、(c)にA-A断面図を示し、更に、図5~図10には(d)にB-B断面図を示している。
<How to construct the top plate structure>
Next, we will explain the method for constructing the top plate structure 1 described above. Figures 4 to 10 are process diagrams for constructing the top plate structure 1 using the method for constructing a slab-like member according to an embodiment of the present invention, and the processes are carried out in the order shown in Figures 4 to 10. For the purpose of explanation, each of Figures 4 to 10 shows a schematic plan view in (a), a schematic side cross-sectional view in (b), and an A-A cross-sectional view in (c), and Figures 5 to 10 also show a B-B cross-sectional view in (d).

先ず、図4に示すように、例えばカルバートの側壁である一対の支持部材10(10a、10b)が構築される。支持部材10は肩部12及び頂部14を含むように構築され、その内部には鉄筋15が埋設されていても良い。なお、支持部材10は工場などで予め製作された部材(いわゆるプレキャスト部材)でも良く、現場打ちにより構築されても良い。 First, as shown in Figure 4, a pair of support members 10 (10a, 10b), which serve as the side walls of a culvert, are constructed. The support members 10 are constructed to include shoulders 12 and a top 14, and reinforcing bars 15 may be embedded within them. Note that the support members 10 may be prefabricated in a factory or other facility (precast members), or may be constructed by casting on site.

そして、図5に示すように、一対の支持部材10(10a、10b)のそれぞれの肩部12に、プレキャストスラブ20の幅方向端部を搭載することで、プレキャストスラブ20が対向する支持部材10に掛け渡される。例えば、図5(a)のように、複数のプレキャストスラブ20がカルバート長さ方向に設置されても良く、その際に、補強材27は隣り合う頂部14の間に形成された隙間に配置されるようにプレキャストスラブ20の設置が行われても良い。 As shown in Figure 5, the widthwise ends of the precast slab 20 are mounted on the shoulders 12 of each of a pair of support members 10 (10a, 10b), so that the precast slab 20 spans the opposing support members 10. For example, as shown in Figure 5(a), multiple precast slabs 20 may be installed along the length of the culvert, and in this case, the precast slabs 20 may be installed so that the reinforcement members 27 are positioned in the gaps formed between adjacent tops 14.

また、図5(c)、(d)に示すように、プレキャストスラブ20には、プレキャストスラブ20幅方向に延伸する配力筋28が、その端部が当該プレキャストスラブ20から突出するように埋設されていても良い。そして、複数のプレキャストスラブ20が設置される場合には、隣り合うプレキャストスラブ20同士が配力筋28同士を例えば継手構造によって連結させることで一体的に構成されても良い。継手構造の具体的構成は任意であり、例えばループ継手、機械式継手、ハーフフラップ継手等であっても良い。 Furthermore, as shown in Figures 5(c) and (d), the precast slab 20 may have distribution bars 28 embedded in it, extending in the width direction of the precast slab 20, with their ends protruding from the precast slab 20. When multiple precast slabs 20 are installed, adjacent precast slabs 20 may be integrally constructed by connecting the distribution bars 28 with, for example, a joint structure. The specific configuration of the joint structure is arbitrary, and may be, for example, a loop joint, a mechanical joint, a half-flap joint, etc.

そして、図6に示すように、プレキャストスラブ20の上方において、一対の支持部材10(10a、10b)の頂部14同士に掛け渡されるように、支保工30が設置される。その際、支保工30と頂部14との間に、支保工30の高さ調整を行うためのスペーサー31を設置しても良い。 Then, as shown in Figure 6, a support 30 is installed above the precast slab 20 so that it spans the tops 14 of a pair of support members 10 (10a, 10b). At this time, a spacer 31 may be installed between the support 30 and the tops 14 to adjust the height of the support 30.

そして、図7に示すように、支保工30から下方に向かって伸びる複数の吊り下げ材33が設置される。吊り下げ材33は、例えばその上端が支保工30に連結され、その下端がプレキャストスラブ20の本体又は補強材27に連結され、これによりプレキャストスラブ20が強固に吊り下げられる。なお、図7では、吊り下げ材33と補強材27が連結した構成を図示している。 As shown in Figure 7, multiple hanging members 33 are then installed, extending downward from the support 30. For example, the upper ends of the hanging members 33 are connected to the support 30, and the lower ends are connected to the main body of the precast slab 20 or the reinforcing members 27, thereby firmly suspending the precast slab 20. Note that Figure 7 illustrates a configuration in which the hanging members 33 and the reinforcing members 27 are connected.

支保工30と吊り下げ材33との連結手段は任意である。例えば、吊り下げ材33の上端部に雄ネジ加工を施し、支保工30に孔開け加工を行い、加工された孔を介して図示しないナットと雄ネジ加工とを螺合させることで連結しても良い。また、例えば、図3を参照して説明した構成において、上部吊り下げ材33aを支保工30に同様の方法で連結させても良い。 The means for connecting the shoring 30 and the hanging member 33 is arbitrary. For example, the upper end of the hanging member 33 may be externally threaded, a hole may be drilled in the shoring 30, and a nut (not shown) may be threaded through the drilled hole to engage with the external thread. Also, for example, in the configuration described with reference to Figure 3, the upper hanging member 33a may be connected to the shoring 30 in a similar manner.

また、吊り下げ材33とプレキャストスラブ20との連結手段は任意である。例えば、図3を参照して説明した下部吊り下げ材33bを予めプレキャストスラブ20に埋設しても良い。このように構成された上部吊り下げ材33aと下部吊り下げ材33bを継手35でもって連結させ、プレキャストスラブ20の吊り下げを行っても良い。 The means for connecting the hanging member 33 to the precast slab 20 is optional. For example, the lower hanging member 33b described with reference to Figure 3 may be embedded in the precast slab 20 in advance. The upper hanging member 33a and lower hanging member 33b configured in this manner may be connected with a joint 35 to hang the precast slab 20.

吊り下げ材33を介した支保工30によるプレキャストスラブ20の吊り下げ時には、支保工30と吊り下げ材33との連結箇所において吊り下げ材33を上下させることで、吊り下げられたプレキャストスラブ20の姿勢を調整しても良い。吊り下げ材33の上下動は、例えば支保工30と吊り下げ材33との連結手段として用いたナットを締緩することにより行っても良い。 When the precast slab 20 is suspended by the shoring 30 via the hanging member 33, the posture of the suspended precast slab 20 may be adjusted by raising or lowering the hanging member 33 at the connection point between the shoring 30 and the hanging member 33. The up and down movement of the hanging member 33 may be achieved, for example, by tightening or loosening the nut used as the connection means between the shoring 30 and the hanging member 33.

そして、図8に示すように、プレキャストスラブ20の上方において鉄筋構造40が構築される。この時、吊り下げ材33の少なくとも一部を、鉄筋構造40を構成する配力筋42と主鉄筋44の一方又は両方に係留しても良い。鉄筋構造40は現場において構築しても良く、あるいはオフサイトで予め製作したものを設置しても良い。 Then, as shown in Figure 8, a reinforcing steel structure 40 is constructed above the precast slab 20. At this time, at least a portion of the hanging member 33 may be anchored to one or both of the reinforcing bars 42 and main reinforcing bars 44 that make up the reinforcing steel structure 40. The reinforcing steel structure 40 may be constructed on-site, or may be prefabricated off-site and installed.

そして、図9に示すように、吊り下げ材33の少なくとも一部及び鉄筋構造40を埋設するようにコンクリートの打設及び養生が行われ、現場打ちコンクリート部50が構成される(図中の破線部参照)。図示のように、現場打ちコンクリート部50の天端高さと、支持部材10の頂部14の上端の高さ一致するようにコンクリートの打設及び養生が行われても良い。 Then, as shown in Figure 9, concrete is poured and cured to bury at least a portion of the hanging material 33 and the reinforcing steel structure 40, forming a cast-in-place concrete section 50 (see the dashed line in the figure). As shown, concrete may be poured and cured so that the height of the top of the cast-in-place concrete section 50 matches the height of the upper end of the top 14 of the support member 10.

そして、図10に示すように、支保工30と吊り下げ材33の少なくとも一部を分離させ、支保工30の撤去(図中の破線参照)が行われる。支保工30の撤去は、例えば図3に示す上部吊り下げ材33aと下部吊り下げ材33bを継手35で連結させた構成において、継手35の連結を解除し、ナット35aやPコン35bを撤去して行われても良い。 Then, as shown in Figure 10, at least a portion of the shoring 30 and the hanging member 33 are separated, and the shoring 30 is removed (see the dashed line in the figure). For example, in a configuration in which the upper hanging member 33a and the lower hanging member 33b are connected by a joint 35 as shown in Figure 3, the shoring 30 may be removed by disconnecting the joint 35 and removing the nut 35a and P cone 35b.

以上、図4~図10を参照して説明した構築方法により、プレキャストスラブ20と現場打ちコンクリート部50からなるスラブ状部材としての頂版構造1が構築される。 By using the construction method described above with reference to Figures 4 to 10, a top slab structure 1 is constructed as a slab-like member consisting of a precast slab 20 and a cast-in-place concrete section 50.

<プレキャストスラブの構成>
プレキャストスラブ20は工場などで予め製作された部材であっても良く、その構成は任意である。即ち、吊り下げ材33の下端(下部吊り下げ材33bの下端)を連結させて吊り下げることが可能であればその構成は限定されるものではない。以下では、プレキャストスラブ20の構成の一例について図11を参照して説明する。図11はプレキャストスラブ20の構成の一例を示す概略説明図であり、(a)、(b)ともにその幅方向断面図である。
<Precast slab configuration>
The precast slab 20 may be a component prefabricated in a factory or the like, and its configuration is arbitrary. In other words, as long as it is possible to connect and hang the lower ends of the hanging members 33 (the lower ends of the lower hanging members 33b), the configuration is not limited. An example of the configuration of the precast slab 20 will be described below with reference to Figure 11. Figure 11 is a schematic explanatory diagram showing an example of the configuration of the precast slab 20, and both (a) and (b) are width-direction cross-sectional views.

図11(a)に示すように、プレキャストスラブ20の構成の一例として、吊り下げ材33の下端を内部に埋設しても良く、その埋設箇所にプレキャストスラブ20の上方に突出する突起部22を有しても良い。突起部22を設けることで、吊り下げ材33をプレキャストスラブ20に埋設させる際の定着効率や引抜耐力を向上させることができる。また、図示のように、プレキャストスラブ20の内部において、上記配力筋28と直交する方向(長手方向)に延伸する1又は複数の主鉄筋24を埋設しても良い。これによりプレキャストスラブ20自体の強度を向上させることができる。 As shown in Figure 11(a), one example of the configuration of the precast slab 20 is that the lower end of the hanging material 33 may be buried inside, and the buried location may have a protrusion 22 that protrudes above the precast slab 20. By providing the protrusion 22, it is possible to improve the anchoring efficiency and pull-out resistance when the hanging material 33 is buried in the precast slab 20. Also, as shown in the figure, one or more main reinforcing bars 24 may be buried inside the precast slab 20, extending in a direction perpendicular to the above-mentioned distribution bars 28 (longitudinal direction). This can improve the strength of the precast slab 20 itself.

また、図11(b)に示すように、プレキャストスラブ20の構成の一例として、その下面に鋼板25を設置しても良い。加えて、プレキャストスラブ20に埋設させた吊り下げ材33を鋼板25に接合しても良い。これにより、吊り下げ材33の定着効率向上に加え、プレキャストスラブ20へのひび割れ発生を抑制あるいは許容することができる。 As shown in Figure 11(b), one example of the configuration of the precast slab 20 is to install a steel plate 25 on its underside. In addition, a hanging member 33 embedded in the precast slab 20 may be joined to the steel plate 25. This not only improves the anchoring efficiency of the hanging member 33, but also makes it possible to suppress or tolerate the occurrence of cracks in the precast slab 20.

なお、プレキャストスラブ20の製作においては、例えばFRC(Fiber Reinforced Concrete:繊維補強コンクリート)を用いても良い。これによりプレキャストスラブ20自体の強度や靭性を高めることができる。例えば、プレキャストスラブ20が補強材27及び上記のFRCによって補強され、コンクリート打設前の施工時荷重に対して十分な曲げ剛性を有している場合には、以下のような施工手順を採ることもできる。即ち、プレキャストスラブ20を設置した後、鉄筋構造40を構築し、その後、支保工30を設置して吊り下げ材33とプレキャストスラブ20の本体又は補強材27とを連結させ、コンクリート打設により現場打ちコンクリート部50を構成させても良い。 Fiber reinforced concrete (FRC), for example, may be used in the production of the precast slab 20. This increases the strength and toughness of the precast slab 20 itself. For example, if the precast slab 20 is reinforced with reinforcing materials 27 and the above-mentioned FRC and has sufficient bending rigidity to withstand the construction load before concrete is poured, the following construction procedure may be adopted. That is, after installing the precast slab 20, the reinforcing steel structure 40 may be constructed, and then shoring 30 may be installed to connect the hanging materials 33 to the main body of the precast slab 20 or the reinforcing materials 27, and the cast-in-place concrete section 50 may be formed by pouring concrete.

図4~図10を参照して上述したような、支保工30が設置された状態で鉄筋構造40を構築する場合には、上方が一部閉鎖された状態で作業が行われる。そのため、構造条件によっては作業効率の低下が懸念される。一方、鉄筋構造40を構築した後に支保工30の設置を行う手順によれば、上方が開放された状態で鉄筋構造40を構築できるため、資材の搬入や鉄筋組立といった作業効率の向上が図られる。 When constructing a reinforced concrete structure 40 with shoring 30 already installed, as described above with reference to Figures 4 to 10, work is carried out with the upper section partially closed off. This raises concerns about reduced work efficiency depending on the structural conditions. On the other hand, by installing the shoring 30 after constructing the reinforced concrete structure 40, the reinforced concrete structure 40 can be constructed with the upper section open, improving work efficiency for transporting materials and assembling rebar.

<プレキャストスラブと吊り下げ材との連結>
上述した頂版構造1の構築方法においては、図7を参照して説明した吊り下げ材33を介した支保工30によるプレキャストスラブ20の吊り下げが重要な工程である。吊り下げ時の連結手段やその構成は、吊り下げ材33とプレキャストスラブ20とを確実に連結できるものであれば特に限定されるものではない。ここでは、プレキャストスラブ20と吊り下げ材33との連結手段やその構成の一例について説明する。
<Connection between precast slab and hanging material>
In the method for constructing the top slab structure 1 described above, the important step is to hang the precast slab 20 from the support 30 via the hanging members 33 described with reference to Figure 7. The connecting means and its configuration during hanging are not particularly limited as long as they can reliably connect the hanging members 33 and the precast slab 20. Here, an example of the connecting means and its configuration between the precast slab 20 and the hanging members 33 will be described.

図12は、プレキャストスラブ20と吊り下げ材33との連結に関する概略説明図であり、連結の構成を模式的に図示したものである。図12に示すように、プレキャストスラブ20に吊り下げ材33の下端(下部吊り下げ材33bの下端)を連結させる際には種々の構成が考え得る。 Figure 12 is a schematic diagram illustrating the connection between the precast slab 20 and the hanging member 33, and shows a schematic diagram of the connection configuration. As shown in Figure 12, various configurations are possible when connecting the lower end of the hanging member 33 (the lower end of the lower hanging member 33b) to the precast slab 20.

例えば、吊り下げ材33の下端(下部吊り下げ材33bの下端)に定着具32を有する構成とし、図12(a)のように定着具32を含めて吊り下げ材33の下端を直接プレキャストスラブ20に埋設させても良い。これにより、吊り下げ材33のプレキャストスラブ20に対する定着効率や引抜耐力を向上させることができる。 For example, the lower end of the hanging member 33 (the lower end of the lower hanging member 33b) may be configured to have a fixing device 32, and the lower end of the hanging member 33, including the fixing device 32, may be embedded directly into the precast slab 20, as shown in Figure 12(a). This can improve the anchoring efficiency and pull-out strength of the hanging member 33 to the precast slab 20.

また、例えば、図12(b)のようにプレキャストスラブ20にインサート36を埋設し、ネジ加工した吊り下げ材33の下端をインサート36に接続して連結しても良い。 Alternatively, for example, as shown in Figure 12(b), an insert 36 may be embedded in the precast slab 20, and the lower end of a threaded hanging member 33 may be connected to the insert 36 for connection.

また、例えば、図12(c)のようにプレキャストスラブ20に切欠き37を形成し、下端に定着具32を有する吊り下げ材33を切欠き37に挿入しグラウト38の充填を行うことで連結しても良い。 Alternatively, for example, as shown in Figure 12(c), a notch 37 may be formed in the precast slab 20, and a hanging member 33 having a fixing device 32 at its lower end may be inserted into the notch 37 and then filled with grout 38 to connect the slabs.

また、例えば、図12(d)のようにプレキャストスラブ20に鋼管39を設置し、下端に定着具32を有する吊り下げ材33を鋼管39に挿入しグラウト38の充填を行うことで連結しても良い。 Alternatively, for example, as shown in Figure 12(d), a steel pipe 39 may be installed on the precast slab 20, and a hanging member 33 having a fixing device 32 at its lower end may be inserted into the steel pipe 39 and then filled with grout 38 to connect the two.

<支保工の構成>
上述したように、支保工30としては例えばH形鋼が例示され、吊り下げ材33との連結は支保工30に孔開け加工を施し、吊り下げ材33の上端に雄ネジ加工を施し、支保工30と吊り下げ材33の連結部において雄ネジ加工とナットを締結させることで行われる。但し、これに限定されるものではなく、支保工30の構成や吊り下げ材33の上端との連結構成については種々のものが考え得る。
<Configuration of support>
As described above, H-shaped steel is exemplified as the shoring 30, and the connection to the hanging material 33 is made by drilling holes in the shoring 30, machining male threads at the upper ends of the hanging material 33, and then machining male threads and fastening nuts at the connection points between the shoring 30 and the hanging material 33. However, this is not limitative, and various configurations of the shoring 30 and the connection configuration with the upper ends of the hanging material 33 are possible.

図13は支保工30として溝形鋼を用いた場合の概略断面図である。図13に示すように、支保工30を2本の溝形鋼30a、30bからなる構成とし、2本の溝形鋼30a、30b間に吊り下げ材33を設置し、定着板60及びナット61で吊り下げ材33を接合しても良い。これにより、孔開け加工量の低減が図られる。 Figure 13 is a schematic cross-sectional view of a case where a channel steel is used as the support 30. As shown in Figure 13, the support 30 may be composed of two channel steels 30a and 30b, with a hanging member 33 installed between the two channel steels 30a and 30b, and the hanging member 33 joined with an anchor plate 60 and a nut 61. This reduces the amount of hole drilling required.

また、支保工30の設置において、支保工30と頂部14との間に例えばH形鋼等である架台70を介しても良い。図21は支保工30と頂部14との間に架台70を介して支保工30の設置を行う場合の概略図である。例えば、架台70を隣り合う頂部14に跨るように設置し、隣り合う頂部14の支間中央位置において架台70上に支保工30を設置することで、隣り合う頂部14の設置間隔を大きく設計することができる。 When installing the shoring 30, a platform 70, such as an H-shaped steel beam, may be placed between the shoring 30 and the crest 14. Figure 21 is a schematic diagram of installing the shoring 30 via a platform 70 between the shoring 30 and the crest 14. For example, by installing the platform 70 so that it straddles adjacent crests 14 and installing the shoring 30 on the platform 70 at the center of the span between the adjacent crests 14, it is possible to design a larger installation distance between adjacent crests 14.

<作用効果>
以上説明したスラブ状部材としての頂版構造1の構築方法によれば、支保工30を用いてプレキャストスラブ20を吊り下げる工程において、吊り下げ材33を用い、その吊り下げ材33の少なくとも一部を現場打ちコンクリート部50に埋設させている。これにより、頂版構造1において、吊り下げ材33の少なくとも一部がせん断補強筋として機能する。即ち、プレキャストスラブ20と現場打ちコンクリート部50からなるスラブ状部材としての頂版構造1において十分なせん断耐力が担保される。
<Action and effect>
According to the method for constructing the top slab structure 1 as a slab-like member explained above, in the process of suspending the precast slab 20 using the shoring 30, the suspension members 33 are used, and at least a portion of the suspension members 33 is embedded in the cast-in-place concrete portion 50. As a result, at least a portion of the suspension members 33 functions as shear reinforcement in the top slab structure 1. In other words, sufficient shear strength is ensured in the top slab structure 1 as a slab-like member consisting of the precast slab 20 and the cast-in-place concrete portion 50.

また、頂版構造1において、吊り下げ材33をせん断補強筋として機能させることにより、別途せん断補強筋を配筋する必要がないため、鉄筋工における作業性の向上や工期短縮が図られる。加えて、鉄筋構造40をオフサイトで予め製作したものとしてユニット化させることで鉄筋の施工作業性が向上する。 Furthermore, by having the hanging members 33 function as shear reinforcement in the top slab structure 1, there is no need to arrange separate shear reinforcement, which improves workability in reinforcing bar work and shortens construction time. Additionally, by fabricating the reinforcing bar structure 40 off-site and unitizing it, the workability of reinforcing bar installation is improved.

また、支保工30を用い、吊り下げ材33を介してプレキャストスラブ20を吊り下げる際に、プレキャストスラブ20と吊り下げ材33との連結や、支保工30と吊り下げ材33との連結において、図11~図13を参照して説明したような種々の連結構成を用いることで、定着効率や引抜耐力の向上が図られる。 Furthermore, when using shoring 30 to suspend the precast slab 20 via the hanging members 33, various connection configurations such as those described with reference to Figures 11 to 13 can be used to connect the precast slab 20 to the hanging members 33 and to connect the shoring 30 to the hanging members 33, thereby improving anchorage efficiency and pull-out resistance.

以上、本発明の実施の形態の一例を説明したが、本発明は図示の形態に限定されない。当業者であれば、特許請求の範囲に記載された思想の範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。 The above describes one example of an embodiment of the present invention, but the present invention is not limited to the illustrated form. It is clear that a person skilled in the art can conceive of various modifications and alterations within the scope of the ideas set forth in the claims, and it is understood that these also naturally fall within the technical scope of the present invention.

例えば、上記実施の形態では、上部吊り下げ材33aと下部吊り下げ材33bとの連結手段の一例として継手35を用いた構成について説明したが、連結手段はこれに限られない。即ち、連結手段として、貫通式定着体及び機械式継手により連結を行い、ナット及び発泡スチロールによる箱抜きを用いても良い。また、連結時のがたつきを解消するために、ターンバックルを用いても良い。 For example, in the above embodiment, a configuration using a joint 35 was described as an example of a means for connecting the upper hanging member 33a and the lower hanging member 33b, but the connecting means is not limited to this. That is, the connecting means may be a through-type fixing body and a mechanical joint, and nuts and polystyrene foam box punches may also be used. Furthermore, turnbuckles may also be used to eliminate rattle during connection.

上記実施の形態では、吊り下げ材33の構成として上部吊り下げ材33aと下部吊り下げ材33bが継手35で連結された構成について図3に図示したが、吊り下げ材33の構成はこれに限られるものではない。図22は吊り下げ材33の他の構成例を示す概略説明図であり、(a)は俯瞰図、(b)は側面図である。なお、図22において上記実施の形態と同じ機能構成を有する構成要素については、同一の符号を付して図示し、説明は省略する場合がある。 In the above embodiment, Figure 3 illustrates a configuration of the hanging member 33 in which the upper hanging member 33a and the lower hanging member 33b are connected by a joint 35, but the configuration of the hanging member 33 is not limited to this. Figure 22 is a schematic explanatory diagram showing another configuration example of the hanging member 33, where (a) is an overhead view and (b) is a side view. Note that in Figure 22, components having the same functional configuration as those in the above embodiment are illustrated with the same reference numerals, and their description may be omitted.

図22に示すように、吊り下げ材33は、例えば、非金属で形成されるフック状上部吊り下げ材33cと、竹節鉄筋又はねじ節鉄筋で形成されるフック状下部吊り下げ材33dから構成されても良い。これらフック状上部吊り下げ材33cとフック状下部吊り下げ材33dは高さ方向において互いに突き合わせた状態で係止し接続することが可能に構成される。図示のように、フック状上部吊り下げ材33cとフック状下部吊り下げ材33dは鉄筋構造40の配力筋42を介して接続されても良い。 As shown in Figure 22, the hanging member 33 may be composed of, for example, a hook-shaped upper hanging member 33c made of non-metallic material and a hook-shaped lower hanging member 33d made of bamboo-node rebar or threaded rebar. These hook-shaped upper hanging member 33c and hook-shaped lower hanging member 33d are configured so that they can be locked and connected when butted against each other in the height direction. As shown, the hook-shaped upper hanging member 33c and hook-shaped lower hanging member 33d may be connected via the distribution bars 42 of the steel structure 40.

頂版構造1を構築するに際し、フック状上部吊り下げ材33cは残置しても良く、あるいは現場打ちコンクリート部50の上面位置において切断しても良い。フック状上部吊り下げ材33cは非金属で形成されるため、防錆処理等は不要である。吊り下げ材33をこのような構成にすることで、フック状下部吊り下げ材33dの撤去や、箱抜きを用いた際の箱埋め処理等が必要なくなり、省力化が図られる。 When constructing the top slab structure 1, the hook-shaped upper hanging member 33c can be left in place or cut off at the top surface of the cast-in-place concrete section 50. Because the hook-shaped upper hanging member 33c is made of a non-metallic material, rust prevention treatment is not required. By configuring the hanging member 33 in this way, it is no longer necessary to remove the hook-shaped lower hanging member 33d or to fill the box when using a box cutter, thereby saving labor.

<本発明の他実施形態>
上記実施の形態においては、本発明に係るスラブ状部材の構築方法により構築される頂版構造1を例示して図示説明したが、本発明の適用範囲はこれに限られるものではない。具体的には、スラブ状部材として梁を構築する場合にも適用できる。以下、本発明の他実施形態として、本発明に係るスラブ状部材の構築方法を用いて梁を構築する方法について図面を参照して説明する。なお、以下の他実施形態に係る説明において、上記実施の形態と同じ機能構成を有する構成要素については、同一の符号を付して図示し、説明は省略する場合がある。
<Another embodiment of the present invention>
In the above embodiment, a top plate structure 1 constructed by the method for constructing a slab-like member according to the present invention has been illustrated and described as an example, but the scope of application of the present invention is not limited to this. Specifically, the present invention can also be applied to the construction of a beam as a slab-like member. Below, as another embodiment of the present invention, a method for constructing a beam using the method for constructing a slab-like member according to the present invention will be described with reference to the drawings. Note that in the following description of another embodiment, components having the same functional configuration as those in the above embodiment will be illustrated with the same reference numerals, and their description may be omitted.

図14~図20は本発明に係るスラブ状部材の構築方法を適用して梁100を構築する場合の工程図であり、図14から図20までの順に工程が実施される。なお、図14~図20の各図面には、説明のため(a)に概略平面図、(b)に概略側面断面図、(c)にA-A断面図を示し、更に、図5~図10には(d)にB-B断面図を示している。 Figures 14 to 20 are process diagrams for constructing a beam 100 using the slab-like member construction method of the present invention, with the processes being carried out in the order shown in Figures 14 to 20. For explanatory purposes, each of Figures 14 to 20 includes a schematic plan view (a), a schematic side cross-sectional view (b), and an A-A cross-sectional view (c). Furthermore, Figures 5 to 10 also include a B-B cross-sectional view (d).

先ず、図14に示すように、柱部材としての支持部材110(110a、110b、110c、110d)が構築される。支持部材110の配置は梁100の構造に応じて任意に設計される。本形態では平面視において略四角形状である梁100が構築される場合を図示し、その際には支持部材110は四方4箇所に配置される。支持部材110は肩部112と、その上部に設けられる頂部114を含むように構築される。肩部112の周縁部には、上方に向けて突出する鉄筋115が埋設されても良い。なお、支持部材110は工場などで予め製作された部材(いわゆるプレキャスト部材)でも良く、現場打ちにより構築されても良い。 First, as shown in Figure 14, support members 110 (110a, 110b, 110c, 110d) are constructed as column members. The placement of the support members 110 is designed as desired depending on the structure of the beam 100. This embodiment illustrates the construction of a beam 100 that is approximately rectangular in plan view, with support members 110 positioned at four locations on all four sides. The support members 110 are constructed to include shoulder portions 112 and a peak portion 114 located above the shoulder portions 112. Reinforcing bars 115 that protrude upward may be embedded around the periphery of the shoulder portions 112. The support members 110 may be prefabricated in a factory or the like (so-called precast members), or may be constructed by casting on site.

そして、図15に示すように、支持部材110(110a、110b、110c、110d)のそれぞれ向かい合う肩部112に、プレキャストスラブ20の幅方向端部を搭載することで、プレキャストスラブ20が対向する支持部材110に掛け渡される。例えば、図15(a)のように、4本のプレキャストスラブ20が略四角形状に掛け渡されても良い。ここで、隣り合うプレキャストスラブ20に含まれる補強材27同士は、交差部128において溶接等の手段により接続しても良い。 As shown in Figure 15, the widthwise ends of the precast slab 20 are mounted on the opposing shoulders 112 of the support members 110 (110a, 110b, 110c, 110d), so that the precast slab 20 is suspended across the opposing support members 110. For example, as shown in Figure 15(a), four precast slabs 20 may be suspended in a roughly rectangular shape. Here, the reinforcing members 27 included in adjacent precast slabs 20 may be connected at the intersections 128 by means of welding or other means.

そして、図16に示すように、プレキャストスラブ20の上方において、支持部材110(110a、110b、110c、110d)の頂部14同士に掛け渡されるように、支保工30が設置される。その際、支保工30と頂部114との間に、支保工30の高さ調整を行うためのスペーサー31を設置しても良い。 Then, as shown in Figure 16, shoring 30 is installed above the precast slab 20 so that it spans the tops 14 of the support members 110 (110a, 110b, 110c, 110d). At this time, spacers 31 may be installed between the shoring 30 and the tops 114 to adjust the height of the shoring 30.

そして、図17に示すように、支保工30から下方に向かって伸びる複数の吊り下げ材33が設置される。吊り下げ材33は、例えばその上端が支保工30に連結され、その下端がプレキャストスラブ20の本体又は補強材27に連結され、これによりプレキャストスラブ20が強固に吊り下げられる。なお、図17では、吊り下げ材33と補強材27が連結した構成を図示している。支保工30と吊り下げ材33との連結手段や、吊り下げ材33とプレキャストスラブ20との連結手段は任意であり、上記実施の形態で説明した構成にて連結が行われても良い。 As shown in Figure 17, multiple hanging members 33 are then installed, extending downward from the shoring 30. The upper ends of the hanging members 33 are connected to the shoring 30, and the lower ends are connected to the main body of the precast slab 20 or the reinforcing members 27, thereby firmly suspending the precast slab 20. Note that Figure 17 illustrates a configuration in which the hanging members 33 and the reinforcing members 27 are connected. The means of connecting the shoring 30 and the hanging members 33, and the means of connecting the hanging members 33 and the precast slab 20, are optional, and the connections may be made using the configuration described in the above embodiment.

そして、図18に示すように、プレキャストスラブ20の上方において鉄筋構造40が構築される。この時、上記実施の形態と同様に、吊り下げ材33の少なくとも一部を、鉄筋構造40に係留しても良い。鉄筋構造40は現場において構築しても良く、あるいはオフサイトで予め製作したものを設置しても良い。 Then, as shown in Figure 18, a reinforcing steel structure 40 is constructed above the precast slab 20. At this time, as in the above embodiment, at least a portion of the hanging member 33 may be moored to the reinforcing steel structure 40. The reinforcing steel structure 40 may be constructed on-site, or may be prefabricated off-site and installed.

そして、図19に示すように、吊り下げ材33の少なくとも一部及び鉄筋構造40を埋設するようにコンクリートの打設及び養生が行われ、現場打ちコンクリート部50が構成される(図中の破線部参照)。図示のように、現場打ちコンクリート部50の天端高さと、頂部114の上端の高さ一致するようにコンクリートの打設及び養生が行われても良い。 Then, as shown in Figure 19, concrete is poured and cured to bury at least a portion of the hanging material 33 and the reinforcing steel structure 40, forming a cast-in-place concrete section 50 (see the dashed line in the figure). As shown, concrete may be poured and cured so that the height of the top of the cast-in-place concrete section 50 matches the height of the upper end of the peak 114.

そして、図20に示すように、支保工30と吊り下げ材33の少なくとも一部を分離させ、支保工30の撤去(図中の破線参照)が行われる。支保工30の撤去は、上記実施の形態で説明したように、例えば、継手35の連結を解除し、ナット35aやPコン35bを撤去して行われても良い。 Then, as shown in Figure 20, at least a portion of the support 30 and the hanging material 33 are separated, and the support 30 is removed (see the dashed line in the figure). As explained in the above embodiment, the support 30 may be removed, for example, by disconnecting the joint 35 and removing the nut 35a and P cone 35b.

以上、図14~図20を参照して説明した構築方法により、プレキャストスラブ20と現場打ちコンクリート部50からなるスラブ状部材としての梁100が構築される。このように、本発明に係るスラブ状部材の構築方法を梁・柱構造に適用させることで、梁100を構築する際にも、上記実施の形態と同様に作業性の向上や工期の短縮を図ることができる。 As described above, the construction method described with reference to Figures 14 to 20 constructs a beam 100 as a slab-like member consisting of a precast slab 20 and a cast-in-place concrete section 50. In this way, by applying the construction method for a slab-like member according to the present invention to a beam-column structure, it is possible to improve workability and shorten construction time when constructing a beam 100, just as in the above embodiment.

また、本明細書に記載された効果は、あくまで説明的または例示的なものであって限定的ではない。つまり、本開示に係る技術は、上記の効果とともに、又は、上記の効果に代えて、本明細書の記載から当業者には明らかな他の効果を奏しうる。 Furthermore, the effects described in this specification are merely descriptive or exemplary and are not limiting. In other words, the technology disclosed herein may achieve other effects in addition to or in place of the above-mentioned effects that would be apparent to those skilled in the art from the description herein.

なお、以下のような構成も本発明の技術的範囲に属する。
(1)プレキャストスラブと現場打ちコンクリートからなり、一対の支持部材に跨って搭載されるハーフプレキャストコンクリート製のスラブ状部材の構築方法であって、前記一対の支持部材に前記プレキャストスラブの幅方向端部を搭載する工程と、前記プレキャストスラブの上方に掛け渡した支保工により当該支保工から下方に向かって伸びる吊り下げ材を介して前記プレキャストスラブを吊り下げる工程と、前記プレキャストスラブの上方に鉄筋構造を構築する工程と、前記吊り下げ材の少なくとも一部と前記鉄筋構造を埋設するように前記プレキャストスラブの上部に現場打ちコンクリートを打設し養生する工程と、前記支保工から前記吊り下げ材を分離し、前記支保工を撤去する工程と、を含み、前記スラブ状部材において前記現場打ちコンクリートに埋設された前記吊り下げ材はせん断補強筋として機能することを特徴とする、スラブ状部材の構築方法。
(2)前記プレキャストスラブは当該プレキャストスラブに埋設された補強材によって補強され、前記プレキャストスラブを吊り下げる工程においては、前記吊り下げ材の下端を前記補強材又は前記プレキャストスラブに連結させることを特徴とする、(1)に記載のスラブ状部材の構築方法。
(3)前記吊り下げ材の上端部には雄ネジ加工が施され、前記プレキャストスラブを吊り下げる工程においては、前記支保工と前記吊り下げ材の連結部において前記雄ネジに螺合するナットを締緩することにより前記吊り下げ材を上下させ、前記プレキャストスラブの姿勢を調整することを特徴とする、(1)又は(2)に記載のスラブ状部材の構築方法。
(4)前記吊り下げ材は、前記支保工に連結される上部吊り下げ材と、前記プレキャストスラブと連結される下部吊り下げ材と、が継手によって連結された構造を有し、前記支保工を撤去する工程においては、前記継手を外すことにより前記下部吊り下げ材を前記支保工から分離させることを特徴とする、(1)~(3)のいずれか一項に記載のスラブ状部材の構築方法。
(5)前記下部吊り下げ材の上端及び下端に定着具を有することを特徴とする、(4)に記載のスラブ状部材の構築方法。
(6)前記支持部材は、肩部と、当該肩部から上方に延伸する頂部と、を備え、前記プレキャストスラブの幅方向端部は前記肩部上に搭載され、前記支保工は前記一対の支持部材の前記頂部上に掛け渡すように搭載されることを特徴とする、(1)~(5)のいずれか一項に記載のスラブ状部材の構築方法。
(7)前記支持部材はカルバートの壁であり、前記スラブ状部材は前記カルバートの頂版であることを特徴とする、(1)~(6)のいずれか一項に記載のスラブ状部材の構築方法。
(8)前記支持部材は柱であり、前記スラブ状部材は梁であることを特徴とする、(1)~(6)のいずれか一項に記載のスラブ状部材の構築方法。
(9)前記鉄筋構造は、前記プレキャストスラブの幅方向に平行に設置される主鉄筋と、前記主鉄筋と交差する方向に設置される配力筋と、を含み、前記吊り下げ材は、前記主鉄筋と前記配力筋の一方又は両方に係留されることを特徴とする、(1)~(8)のいずれか一項に記載のスラブ状部材の構築方法。
(10)前記プレキャストスラブは互いに隣接して複数搭載され、前記プレキャストスラブには、当該プレキャストスラブの幅方向に延伸する配力筋が、当該配力筋の端部が当該プレキャストスラブから突出するように埋設され、複数の前記プレキャストスラブにおいて、隣り合う前記プレキャストスラブ同士は前記配力筋同士を継手により連結し、前記現場打ちコンクリートを打設し養生する工程では、隣接する複数のプレキャストスラブ間も含めてコンクリート打設が行われることを特徴とする、(1)~(7)のいずれか一項に記載のスラブ状部材の構築方法。
(11)前記支持部材はカルバートの壁であり、前記スラブ状部材は前記カルバートの頂版であり、複数の前記プレキャストスラブは、前記カルバートの長さ方向において複数設置されることを特徴とする、(10)に記載のスラブ状部材の構築方法。
The following configurations also fall within the technical scope of the present invention.
(1) A method for constructing a slab-like member made of half precast concrete, which is made of a precast slab and cast-in-place concrete and is mounted across a pair of support members, comprising the steps of: mounting the widthwise ends of the precast slab on the pair of support members; suspending the precast slab from supports suspended above the precast slab via hanging members extending downward from the supports; constructing a steel structure above the precast slab; pouring and curing cast-in-place concrete above the precast slab so as to embed at least a portion of the hanging members and the steel structure; and separating the hanging members from the supports and removing the supports, wherein the hanging members embedded in the cast-in-place concrete in the slab-like member function as shear reinforcement.
(2) A method for constructing a slab-like member as described in (1), characterized in that the precast slab is reinforced by a reinforcing material embedded in the precast slab, and in the process of suspending the precast slab, the lower end of the suspending material is connected to the reinforcing material or the precast slab.
(3) A method for constructing a slab-like member described in (1) or (2), characterized in that the upper end of the hanging material is provided with a male thread, and in the process of hanging the precast slab, the hanging material is raised and lowered by tightening or loosening a nut that threads onto the male thread at the connection between the support and the hanging material, thereby adjusting the posture of the precast slab.
(4) A method for constructing a slab-like member described in any one of (1) to (3), characterized in that the hanging material has a structure in which an upper hanging material connected to the shoring and a lower hanging material connected to the precast slab are connected by joints, and in the process of removing the shoring, the lower hanging material is separated from the shoring by removing the joints.
(5) A method for constructing a slab-like member according to (4), characterized in that the lower hanging member has fixing devices at its upper and lower ends.
(6) A method for constructing a slab-like member described in any one of (1) to (5), characterized in that the support member has a shoulder portion and a top portion extending upward from the shoulder portion, the widthwise end portion of the precast slab is mounted on the shoulder portion, and the support is mounted so as to span the top portions of the pair of support members.
(7) A method for constructing a slab-like member described in any one of (1) to (6), characterized in that the support member is a wall of a culvert and the slab-like member is a top plate of the culvert.
(8) A method for constructing a slab-like member described in any one of (1) to (6), characterized in that the support member is a column and the slab-like member is a beam.
(9) A method for constructing a slab-like member described in any one of (1) to (8), characterized in that the reinforcement structure includes main reinforcement bars installed parallel to the width direction of the precast slab and distribution reinforcement bars installed in a direction intersecting the main reinforcement bars, and the hanging member is moored to one or both of the main reinforcement bars and the distribution reinforcement bars.
(10) A method for constructing a slab-like member described in any one of (1) to (7), characterized in that a plurality of the precast slabs are mounted adjacent to each other, distribution bars extending in the width direction of the precast slabs are embedded in the precast slabs so that the ends of the distribution bars protrude from the precast slabs, the distribution bars of adjacent precast slabs in the plurality of precast slabs are connected to each other with joints, and in the process of pouring and curing the cast-in-place concrete, concrete is poured including between adjacent precast slabs.
(11) A method for constructing a slab-like member described in (10), characterized in that the support member is a culvert wall, the slab-like member is the top plate of the culvert, and multiple precast slabs are installed in the longitudinal direction of the culvert.

本発明は、ハーフプレキャストコンクリート製のスラブ状部材を構築する構築方法に適用できる。 The present invention can be applied to a construction method for constructing slab-like members made of half-precast concrete.

1…頂版構造
10…支持部材
12…肩部
14…頂部
15…鉄筋
20…プレキャストスラブ
27…補強材
28…(プレキャストスラブの)配力筋
30…支保工
33…吊り下げ材
34…定着具
35…継手
40…鉄筋構造
42…配力筋
44…主鉄筋
50…現場打ちコンクリート部
100…梁
DESCRIPTION OF SYMBOLS 1...Top slab structure 10...Support member 12...Shoulder 14...Top 15...Reinforcing bar 20...Precast slab 27...Reinforcing material 28...(Precast slab) distribution bar 30...Support 33...Hanging material 34...Anchor 35...Joint 40...Reinforcing bar structure 42...Distribution bar 44...Main reinforcing bar 50...Caused-in-place concrete section 100...Beam

Claims (9)

プレキャストスラブと現場打ちコンクリートからなり、上下方向に延伸し、肩部と、当該肩部から上方に延伸する頂部とを備えた一対の支持部材架け渡して設置されるハーフプレキャストコンクリート製のスラブ状部材の構築方法であって、
前記一対の支持部材の肩部上に前記プレキャストスラブの幅方向端部を載置する工程と、
前記一対の支持部材の頂部上にその端部を載置して前記プレキャストスラブの上方に支保工を架け渡す工程と、
前記プレキャストスラブの上方に架け渡した支保工から下方に向かって伸びる吊り下げ材を介して前記プレキャストスラブを吊り下げる工程と、
前記プレキャストスラブの上方に鉄筋構造を構築する工程と、
前記吊り下げ材の少なくとも一部と前記鉄筋構造を埋設するように前記プレキャストスラブ及び前記肩部の上部にその上面位置が前記頂部の上端に一致するまで、現場打ちコンクリートを打設し養生する工程と、
前記支保工から前記吊り下げ材を分離し、前記支保工を撤去する工程と、を含み、
前記スラブ状部材において前記現場打ちコンクリートに埋設された前記吊り下げ材はせん断補強筋として機能することを特徴とする、スラブ状部材の構築方法。
A method for constructing a half-precast concrete slab-like member that is made of precast slab and cast-in-place concrete, and that is installed across a pair of support members that extend in the vertical direction and have shoulders and a top that extends upward from the shoulders, comprising:
placing widthwise ends of the precast slab on shoulder portions of the pair of support members;
a step of placing a support structure above the precast slab by placing its end on the top of the pair of support members;
A step of suspending the precast slab via a suspension member extending downward from a support structure suspended above the precast slab;
constructing a reinforcing steel structure above the precast slab;
Pouring and curing cast-in-place concrete onto the precast slab and the upper portion of the shoulder portion so as to embed at least a portion of the hanging material and the reinforcing bar structure until the upper surface position of the cast-in-place concrete coincides with the upper end of the top portion ;
Separating the hanging material from the support and removing the support,
A method for constructing a slab-like member, characterized in that the hanging members embedded in the cast-in-place concrete in the slab-like member function as shear reinforcement.
前記プレキャストスラブは当該プレキャストスラブに埋設された補強材によって補強され、
前記プレキャストスラブを吊り下げる工程においては、前記吊り下げ材の下端を前記補強材又は前記プレキャストスラブに連結させることを特徴とする、請求項1に記載のスラブ状部材の構築方法。
The precast slab is reinforced by a reinforcing material embedded in the precast slab,
2. The method for constructing a slab-like member according to claim 1, wherein in the step of suspending the precast slab, the lower end of the suspension member is connected to the reinforcement member or the precast slab.
前記吊り下げ材の上端部には雄ネジ加工が施され、前記プレキャストスラブを吊り下げる工程においては、前記支保工と前記吊り下げ材の連結部において前記雄ネジに螺合するナットを締緩することにより前記吊り下げ材を上下させ、前記プレキャストスラブの姿勢を調整することを特徴とする、請求項1又は2に記載のスラブ状部材の構築方法。 A method for constructing a slab- like member as described in claim 1 or 2, characterized in that a male thread is machined on the upper end of the hanging material, and in the process of hanging the precast slab, the hanging material is raised and lowered by tightening or loosening a nut that engages with the male thread at the connection between the support and the hanging material, thereby adjusting the posture of the precast slab. 前記吊り下げ材は、前記支保工に連結される上部吊り下げ材と、前記プレキャストスラブと連結される下部吊り下げ材と、が継手によって連結された構造を有し、
前記支保工を撤去する工程においては、前記継手を外すことにより前記下部吊り下げ材を前記支保工から分離させることを特徴とする、請求項1又は2に記載のスラブ状部材の構築方法。
The hanging member has a structure in which an upper hanging member connected to the support and a lower hanging member connected to the precast slab are connected by joints,
3. A method for constructing a slab-like member according to claim 1 or 2, characterized in that in the step of removing the support, the lower hanging member is separated from the support by removing the joint.
前記下部吊り下げ材の上端及び下端に定着具を有することを特徴とする、請求項4に記載のスラブ状部材の構築方法。 A method for constructing a slab-like member as described in claim 4, characterized in that the lower hanging member has fixings at its upper and lower ends. 前記支持部材はカルバートの壁であり、前記スラブ状部材は前記カルバートの頂版であることを特徴とする、請求項1又は2に記載のスラブ状部材の構築方法。3. A method for constructing a slab-like member according to claim 1 or 2, characterized in that the support member is a wall of a culvert and the slab-like member is a top plate of the culvert. 前記支持部材は柱であり、前記スラブ状部材は梁であることを特徴とする、請求項1又は2に記載のスラブ状部材の構築方法。3. A method for constructing a slab-like member according to claim 1 or 2, characterized in that the support members are columns and the slab-like members are beams. 前記鉄筋構造は、前記プレキャストスラブの幅方向に平行に設置される主鉄筋と、前記主鉄筋と交差する方向に設置される配力筋と、を含み、The reinforcing bar structure includes main reinforcing bars installed parallel to the width direction of the precast slab and distribution bars installed in a direction intersecting the main reinforcing bars,
前記吊り下げ材は、前記主鉄筋と前記配力筋の一方又は両方に係留されることを特徴とする、請求項1又は2に記載のスラブ状部材の構築方法。3. The method for constructing a slab-like member according to claim 1 or 2, wherein the hanging member is anchored to one or both of the main reinforcing bars and the distribution bars.
前記プレキャストスラブは前記カルバート長さ方向に互いに隣接して複数設置され、The precast slabs are installed adjacent to each other in the longitudinal direction of the culvert,
前記プレキャストスラブには、前記カルバートの長さ方向に延伸する配力筋が、当該配力筋の端部が当該プレキャストスラブから突出するように埋設され、In the precast slab, a distribution bar extending in the longitudinal direction of the culvert is embedded so that the end of the distribution bar protrudes from the precast slab,
複数の前記プレキャストスラブにおいて、隣り合う前記プレキャストスラブ同士は前記配力筋同士を継手により連結し、前記現場打ちコンクリートを打設し養生する工程では、隣接する複数のプレキャストスラブ間も含めてコンクリート打設が行われることを特徴とする、請求項6に記載のスラブ状部材の構築方法。7. The method for constructing a slab-like member according to claim 6, wherein the precast slabs adjacent to each other are connected by joints at the distribution bars, and the process of pouring and curing the cast-in-place concrete includes pouring concrete between adjacent precast slabs.
JP2022078692A 2022-05-12 2022-05-12 Method for constructing slab-like members Active JP7822006B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022078692A JP7822006B2 (en) 2022-05-12 2022-05-12 Method for constructing slab-like members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022078692A JP7822006B2 (en) 2022-05-12 2022-05-12 Method for constructing slab-like members

Publications (2)

Publication Number Publication Date
JP2023167478A JP2023167478A (en) 2023-11-24
JP7822006B2 true JP7822006B2 (en) 2026-03-02

Family

ID=88838008

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022078692A Active JP7822006B2 (en) 2022-05-12 2022-05-12 Method for constructing slab-like members

Country Status (1)

Country Link
JP (1) JP7822006B2 (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000001938A (en) 1998-06-15 2000-01-07 Kozo Plan:Kk Precast concrete board and floorboard structure of building
JP2001049779A (en) 1999-08-12 2001-02-20 Toshiba Eng Co Ltd Closing method of construction for floor opening for prefabricated equipment
JP2001132149A (en) 1999-11-09 2001-05-15 Nippon Kaiser Kk Precast concrete floor plate for viaduct, viaduct, and method of constructing the same
JP2003193544A (en) 2001-12-26 2003-07-09 Haneda Concrete Industrial Co Ltd Concrete assembly structure
JP2007285119A (en) 2007-07-26 2007-11-01 Tokyu Construction Co Ltd Reinforcing methods and structures for concrete structures.
US20150167289A1 (en) 2013-12-13 2015-06-18 Urbantech Consulting Engineering, PC Open web composite shear connector construction
JP2017166229A (en) 2016-03-16 2017-09-21 ジオスター株式会社 Box culvert
JP2018141284A (en) 2017-02-27 2018-09-13 清水建設株式会社 Joint structure for shear reinforcement steel member of steel concrete composite structure and joint method for shear reinforcement member of steel concrete composition structure
JP2019073929A (en) 2017-10-18 2019-05-16 五洋建設株式会社 Concrete structure and construction method for the same
JP2020079496A (en) 2018-11-12 2020-05-28 鹿島建設株式会社 Method for constructing top slab for underground structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09279609A (en) * 1996-04-11 1997-10-28 Tokyu Koken Kk Building method of precast reinforced concrete-made underground structure
JP4089761B2 (en) * 1998-03-05 2008-05-28 東急建設株式会社 Construction method of ramen railway viaduct
JP2008285119A (en) * 2007-05-21 2008-11-27 Kojima Press Co Ltd Vehicle storage device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000001938A (en) 1998-06-15 2000-01-07 Kozo Plan:Kk Precast concrete board and floorboard structure of building
JP2001049779A (en) 1999-08-12 2001-02-20 Toshiba Eng Co Ltd Closing method of construction for floor opening for prefabricated equipment
JP2001132149A (en) 1999-11-09 2001-05-15 Nippon Kaiser Kk Precast concrete floor plate for viaduct, viaduct, and method of constructing the same
JP2003193544A (en) 2001-12-26 2003-07-09 Haneda Concrete Industrial Co Ltd Concrete assembly structure
JP2007285119A (en) 2007-07-26 2007-11-01 Tokyu Construction Co Ltd Reinforcing methods and structures for concrete structures.
US20150167289A1 (en) 2013-12-13 2015-06-18 Urbantech Consulting Engineering, PC Open web composite shear connector construction
JP2017166229A (en) 2016-03-16 2017-09-21 ジオスター株式会社 Box culvert
JP2018141284A (en) 2017-02-27 2018-09-13 清水建設株式会社 Joint structure for shear reinforcement steel member of steel concrete composite structure and joint method for shear reinforcement member of steel concrete composition structure
JP2019073929A (en) 2017-10-18 2019-05-16 五洋建設株式会社 Concrete structure and construction method for the same
JP2020079496A (en) 2018-11-12 2020-05-28 鹿島建設株式会社 Method for constructing top slab for underground structure

Also Published As

Publication number Publication date
JP2023167478A (en) 2023-11-24

Similar Documents

Publication Publication Date Title
CN106836479B (en) Assembled prestressed concrete frame structure
KR101168763B1 (en) Composite bridge construction method
KR101027393B1 (en) Two-way and one-way masonry seismic reinforcement method
CN111648468B (en) Ultrahigh space utilization rate fabricated building system and efficient construction method thereof
JP3844743B2 (en) Box girder bridge structure and its construction method
KR101112195B1 (en) Steel-concrete composite crossbeam having wire mesh and construction method using the same
CN111364681B (en) Staggered tensioning anchoring structure for prestressed tendons of end column-beam joints and construction method
KR101263370B1 (en) Precast end-block with girder connection member and bridge construction method using ths same
JP2005256341A (en) Corrugated steel-plate web u component bridge
KR100939970B1 (en) A method of constructing a complex girder and its structure
KR20100018877A (en) Structure for jointing framework of vertical construction supporting precast concrete girder panel and method thereof
KR100949828B1 (en) Steel beam and hybrid beam of steel concrete for slim floor
KR100565384B1 (en) Continuous structure of precast PS beam using beam connecting member and steel beam and bridge construction method
KR100522298B1 (en) Improved prestressed steel reinforced concrete beam and bridge construction method using the same beam
CN110392758B (en) Inverted T-section hybrid prestressed concrete beam and panel construction method using the same
JP7822006B2 (en) Method for constructing slab-like members
CN114809076A (en) Structure and construction method of roof upturning beam and node thereof of subway station
CN114319977A (en) Steel pipe concrete row column type connection prefabricated shear wall structure and construction method
KR100565359B1 (en) Bridge Continuous Chemical Method
JP2006183286A (en) Connection structure of corrugated steel web for corrugated steel web u-shaped component bridge
KR200406615Y1 (en) Tee type precast concrete panel
KR100653283B1 (en) Connection method of reinforced concrete structures
KR20080004753U (en) Continuous Structure of Steel Composite Steel Bridge
KR100725879B1 (en) Bridge Load Capacity Enhancement System using Reinforcement Girder
CN116837959B (en) Inter-column connection structure and column connection nodes

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250226

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20251021

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20251028

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20251219

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260206

R150 Certificate of patent or registration of utility model

Ref document number: 7822006

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150