JP7829860B2 - Disaster prevention support device and disaster prevention support method - Google Patents
Disaster prevention support device and disaster prevention support methodInfo
- Publication number
- JP7829860B2 JP7829860B2 JP2022075216A JP2022075216A JP7829860B2 JP 7829860 B2 JP7829860 B2 JP 7829860B2 JP 2022075216 A JP2022075216 A JP 2022075216A JP 2022075216 A JP2022075216 A JP 2022075216A JP 7829860 B2 JP7829860 B2 JP 7829860B2
- Authority
- JP
- Japan
- Prior art keywords
- disaster prevention
- information
- facility
- aforementioned
- disaster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、防災支援装置及び防災支援方法に関する。 This invention relates to a disaster prevention support device and a disaster prevention support method.
周知のように、近年水害による被害が多発している。病院等の医療施設には、水害に備えて止水壁及び止水板等からなる防水設備を設置しているところがあるが、人的な要因により防水設備が十分な機能を発揮せず、被害が拡大している現状がある。また、防災関連技術として、下記特許文献1にはタイムラインに記録された防災行動時間に基づいて各項目の対応リードタイムを予測し、この予測結果に基づいてタイムラインの見直しを提案する防災情報管理システムが開示されている。また、下記特許文献2には、タイムラインの防災項目情報と移動系関係者とを連携させることができる防災情報システムが開示されている。 As is well known, flood damage has become frequent in recent years. While some medical facilities such as hospitals have installed waterproofing equipment consisting of watertight walls and watertight plates to prepare for floods, human error has prevented these waterproofing systems from functioning adequately, leading to increased damage. Furthermore, as a disaster prevention technology, Patent Document 1 discloses a disaster prevention information management system that predicts the response lead time for each item based on the disaster prevention action time recorded in a timeline, and proposes revisions to the timeline based on these predictions. Patent Document 2 also discloses a disaster prevention information system that can link disaster prevention item information in the timeline with mobile personnel.
ところで、上述した背景技術があるものの、防災設備やタイムラインが十分に機能しておらず、施設が被災することによって施設の機能が損なわれ、該当地域における施設の役割が果たし得ない状況が発生している。例えば、医療施設では被災によって医療機能が損なわれることにより、所定期間に亘って地域医療に支障をきたすという深刻な状況が発生している。 However, despite the aforementioned background technologies, disaster prevention equipment and timelines are not functioning adequately, resulting in situations where facilities are damaged, their functions are impaired, and they are unable to fulfill their role in the affected area. For example, in the case of medical facilities, damage to medical functions can impair their services, leading to serious disruptions to regional healthcare for a specified period.
本発明は、上述した事情に鑑みてなされたものであり、従来よりも実用性の高い防災計画の作成を支援することが可能な防災支援装置及び防災支援方法の提供を目的とするものである。 This invention was made in view of the circumstances described above, and aims to provide a disaster prevention support device and method that can assist in the creation of more practical disaster prevention plans than conventional methods.
上記目的を達成するために、本発明では、防災支援装置に係る第1の解決手段として、防災対象施設の施設情報を取得する施設情報取得部と、防災情報を取得する防災情報取得部と、前記施設情報及び前記防災情報に基づいて防災タイムラインを防災支援情報として作成する支援情報作成部とを備え、前記支援情報作成部は、前記施設情報に含まれる建物及び設備に関する設置高さ及びフロアー高さと前記防災情報に基づいて予測される浸水高さとを比較することにより、前記防災対象施設の前記設備のリスク評価を行い、前記防災対象施設の組織構造、水害時における各部署の施設職員の業務内容、各業務の担当者、各業務の作業時間及び防災マニュアルを水害時個別業務内容として前記施設情報から取得し、前記リスク評価及び前記水害時個別業務内容に基づいて、水害に関する防災行動を時系列的に示す防災行動関連表を作成し、前記防災行動関連表に基づいて、前記防災タイムラインを作成するものであり、前記防災対象施設は、医療施設である、という手段を採用する。 To achieve the above objective, the present invention provides a first solution relating to a disaster prevention support device, comprising: a facility information acquisition unit that acquires facility information of a disaster prevention target facility; a disaster prevention information acquisition unit that acquires disaster prevention information; and a support information creation unit that creates a disaster prevention timeline as disaster prevention support information based on the facility information and the disaster prevention information. The support information creation unit performs a risk assessment of the equipment of the disaster prevention target facility by comparing the installation height and floor height of the building and equipment included in the facility information with the flood height predicted based on the disaster prevention information. It also acquires the organizational structure of the disaster prevention target facility, the work content of facility staff in each department during a flood, the person in charge of each task, the working time for each task, and the disaster prevention manual from the facility information as individual work content during a flood. Based on the risk assessment and the individual work content during a flood, it creates a disaster prevention action-related table that shows disaster prevention actions related to floods in chronological order, and creates the disaster prevention timeline based on the disaster prevention action-related table. The means adopted is that the disaster prevention target facility is a medical facility .
本発明では、防災支援装置に係る第3の解決手段として、上記第1の解決手段において、前記施設情報は、前記防災対象施設を構成する建物あるいは設備に関する測量情報を含む、という手段を採用する。 In the present invention, as a third solution relating to a disaster prevention support device, the first solution described above employs the means that the facility information includes survey information relating to the buildings or equipment constituting the disaster prevention target facility.
本発明では、防災支援装置に係る第4の解決手段として、上記第1の解決手段において、水害を防災対象とする場合、前記防災情報は、対象地域に存在する河川の水位予測情報を含む、という手段を採用する。 In the present invention, as a fourth solution relating to a disaster prevention support device, in the first solution described above, when floods are the target of disaster prevention, the disaster prevention information is provided to include water level prediction information for rivers located in the target area.
本発明では、防災支援装置に係る第5の解決手段として、上記第1の解決手段において、前記防災タイムラインは、前記防災対象施設における防災行動を誰がどのタイミングで行うかを示す行動計画表である、という手段を採用する。 In the present invention, as a fifth solution relating to a disaster prevention support device, the first solution described above adopts the method that the disaster prevention timeline is an action plan showing who will take disaster prevention actions at the disaster-affected facility and at what timing.
本発明では、防災支援方法に係る解決手段として、防災対象施設の施設情報をコンピュータが取得する施設情報取得工程と、防災情報を前記コンピュータが取得する防災情報取得工程と、前記コンピュータで前記施設情報及び前記防災情報に基づいて防災タイムラインを作成する支援情報作成工程とを有し、前記支援情報作成工程は、前記施設情報に含まれる建物及び設備に関する設置高さ及びフロアー高さと前記防災情報に基づいて予測される浸水高さとを比較することにより、前記防災対象施設の前記設備のリスク評価を行い、前記防災対象施設の組織構造、水害時における各部署の施設職員の業務内容、各業務の担当者、各業務の作業時間及び防災マニュアルを水害時個別業務内容として前記施設情報から取得し、前記リスク評価及び前記水害時個別業務内容に基づいて、水害に関する防災行動を時系列的に示す防災行動関連表を作成し、前記防災行動関連表に基づいて、前記防災タイムラインを作成する工程であり、前記防災対象施設は、医療施設である、という手段を採用する。 The present invention provides a solution for a disaster prevention support method comprising: a facility information acquisition step in which a computer acquires facility information of a disaster-target facility; a disaster prevention information acquisition step in which the computer acquires disaster prevention information; and a support information creation step in which the computer creates a disaster prevention timeline based on the facility information and the disaster prevention information. The support information creation step involves comparing the installation height and floor height of buildings and equipment included in the facility information with the flood height predicted based on the disaster prevention information to perform a risk assessment of the equipment of the disaster-target facility; acquiring the organizational structure of the disaster-target facility, the work content of facility staff in each department during a flood, the person in charge of each task, the working hours for each task, and the disaster prevention manual as individual work content during a flood from the facility information; creating a disaster prevention action-related table that shows disaster prevention actions related to floods in chronological order based on the risk assessment and the individual work content during a flood; and creating the disaster prevention timeline based on the disaster prevention action-related table. The disaster-target facility is a medical facility .
本発明によれば、従来よりも実用性の高い防災計画の作成を支援することが可能な防災支援装置及び防災支援方法を提供することが可能である。 According to the present invention, it is possible to provide a disaster prevention support device and a disaster prevention support method that can assist in the creation of more practical disaster prevention plans than those used in the past.
以下、図面を参照して、本発明の一実施形態について説明する。
本実施形態に係る防災支援装置Aは、各種の災害のうち水害を防災対象とする防災計画の作成及び実施を支援するものである。防災対象となる施設(防災対象施設)には様々なものがあるが、本実施形態に係る防災支援装置Aは、一例として地域医療を担う医療施設を防災対象施設とするものである。
One embodiment of the present invention will be described below with reference to the drawings.
The disaster prevention support device A according to this embodiment assists in the creation and implementation of disaster prevention plans that target floods among various types of disasters. While there are various types of facilities that can be targeted for disaster prevention (disaster prevention target facilities), the disaster prevention support device A according to this embodiment targets medical facilities that provide regional medical care as an example.
この防災支援装置Aは、例えば防災支援プログラム(アプリケーションプログラム)が搭載された汎用コンピュータである。防災支援装置Aは、防災計画の作成支援に必要な情報を外部サーバBあるいは施設サーバCから取得することにより、医療施設に特化した防災支援情報の作成及び更新を行う。防災支援情報は、医療施設における防災計画の作成及び実施に必要不可欠な防災タイムライン及び防災行動関連表である。 This disaster prevention support device A is, for example, a general-purpose computer equipped with a disaster prevention support program (application program). Disaster prevention support device A creates and updates disaster prevention support information specific to medical facilities by acquiring information necessary for supporting the creation of disaster prevention plans from external server B or facility server C. This disaster prevention support information includes disaster prevention timelines and disaster action-related tables, which are essential for creating and implementing disaster prevention plans in medical facilities.
詳細については後述するが、防災タイムラインは、防災支援情報の1つであり、防災のために行う各種の防災行動(災害発生前の予防措置)を誰がどのタイミングで行うかを示す行動計画表である。例えば、医療施設には水害に備えて止水壁及び止水板等からなる防水設備を設置しているところがあるが、防水設備は、可動式の止水板を作動または設置させることによって所望の防水機能を発揮する。 As will be explained in more detail later, a disaster prevention timeline is a type of disaster support information, and it is an action plan that shows who will take what actions (preventive measures before a disaster occurs) and when. For example, some medical facilities have waterproofing equipment consisting of watertight walls and watertight plates to prepare for floods, and this waterproofing equipment achieves its desired waterproofing function by activating or installing movable watertight plates.
したがって、防水機能を有効に機能させるためには止水板を適切なタイミングで作動または設置させる必要があるが、止水板の作動は、医療施設の防災担当者による判断に基づいて実施される。防災タイムラインには、防災行動の1つである止水板の作動をどのタイミングで行うかが記載(計画)されている。 Therefore, in order for the waterproofing function to work effectively, the water barriers must be activated or installed at the appropriate time. However, the activation of the water barriers is carried out based on the judgment of the disaster prevention personnel at the medical facility. The disaster prevention timeline includes a plan outlining when the activation of the water barriers, which is one of the disaster prevention actions, will be performed.
防災行動関連表は、防災支援情報の1つであり、水害発生の前段階において医療施設の取るべき防災行動を時系列的に示す行動表である。この防災行動関連表は、水害を想定した医療施設の防災訓練に利用可能なものである。防災行動関連表に従って防災訓練を行うことにより、防災計画をより実効的なものにブラッシュアップさせることができる。 The Disaster Prevention Action Chart is a type of disaster prevention support information, a timeline of disaster prevention actions that medical facilities should take in the pre-flood phase. This chart can be used for disaster prevention drills at medical facilities simulating floods. By conducting disaster prevention drills according to this chart, disaster prevention plans can be refined to be more effective.
外部サーバB及び施設サーバCについて先に説明すると、外部サーバBは、医療施設に関係する防災情報を防災支援装置Aに提供する複数のサーバの集合体である。防災情報は、例えば医療施設が存在する地域(対象地域)のハザードマップや過去の水害情報、過去の水害時における対象地域の降雨量や河川の水位等からなる気象情報、対象地域に存在する河川のある時点以降の水位予測情報(RRI情報)等である。 To begin with, regarding external server B and facility server C, external server B is a collection of multiple servers that provide disaster prevention information related to medical facilities to disaster prevention support device A. This disaster prevention information includes, for example, hazard maps and past flood information for the area where the medical facility is located (target area), weather information such as rainfall and river water levels in the target area during past floods, and water level forecast information (RRI information) for rivers in the target area from a certain point in time onward.
なお、RRI情報は、公知のRRIモデルに基づいて4時間先までの河川水位を予測した水位予測結果であり、国内の複数の河川に関する過去の水位予測結果をも含むものである。RRIモデルは、地域における降雨(Rainfall)、流出(Runoff)及び氾濫(Inundation)に基づいて河川水位を予測する。 The RRI information is a water level forecast result that predicts river water levels up to four hours in advance based on a publicly known RRI model, and includes past water level forecast results for multiple rivers in Japan. The RRI model predicts river water levels based on rainfall, runoff, and inundation in a given region.
施設サーバCは、医療施設が管理するサーバであり、医療施設に関する各種情報(施設情報)を防災支援装置Aに提供する。施設情報は、医療施設を構成する各建物や各種設備の設置場所や設置高さ等の建築情報、医療施設における各種組織に関する組織情報、各種組織の構成員(病院職員)の業務内容、水害に対する医療施設の防災マニュアル、病院職員からのヒアリング情報、過去の水害対応記録、過去の浸水記録等を少なくとも含む。 Facility Server C is a server managed by the medical facility and provides various information (facility information) related to the medical facility to Disaster Prevention Support Device A. Facility information includes at least architectural information such as the location and height of each building and various equipment constituting the medical facility, organizational information regarding various organizations within the medical facility, the job descriptions of members of various organizations (hospital staff), the medical facility's disaster prevention manual for floods, information gathered from interviews with hospital staff, records of past flood responses, and records of past inundation.
ここで、上記建築情報は、医療施設に関する設計図書に加え、医療施設における各建物及び各種設備に関する測量情報、写真や映像、維持保全記録、また各建物及び各種設備に関する在来手法による測量情報、3D点群測量情報を含んでいる。すなわち、建築情報は、医療施設の建設時における情報に加え、防災計画の作成時点(現在)における各建物及び各種設備の状態を示す情報である。 Here, the above architectural information includes not only design documents for the medical facility, but also survey information, photographs and videos, maintenance records, and conventional survey information and 3D point cloud survey information for each building and various equipment within the medical facility. In other words, the architectural information includes information from the time of construction of the medical facility, as well as information showing the condition of each building and various equipment at the time of creation of the disaster prevention plan (present).
防災支援装置Aは、図1に示すように、通信部1、記憶部2、操作部3、演算部4及び表示部5を少なくとも備える汎用コンピュータである。これら通信部1、記憶部2、操作部3、演算部4及び表示部5は、汎用コンピュータを構成するハードウエア要素である。防災支援装置Aは、このようなハードウエア要素とソフトウエア要素(防災支援プログラム)とが協働することによって防災タイムライン及び防災行動関連表の作成及び更新を行う。 As shown in Figure 1, disaster prevention support device A is a general-purpose computer comprising at least a communication unit 1, a storage unit 2, an operation unit 3, a calculation unit 4, and a display unit 5. These communication unit 1, storage unit 2, operation unit 3, calculation unit 4, and display unit 5 are hardware elements constituting the general-purpose computer. Disaster prevention support device A creates and updates disaster prevention timelines and disaster prevention action-related tables through the cooperation of these hardware elements and software elements (disaster prevention support programs).
通信部1は、演算部4と電気的に接続されるとともに外部サーバBと通信自在に接続されている。通信部1は、演算部4から入力される情報取得指示に基づいて外部サーバBと通信を行うことにより防災情報、気象情報及び水位予測情報を取得する。通信部1は、外部サーバBから取得した防災情報、気象情報及び水位予測情報を演算部4に出力する。なお、この通信部1は、本実施形態における施設情報取得部兼防災情報取得部である。 The communication unit 1 is electrically connected to the calculation unit 4 and is also freely connected to the external server B. Based on information acquisition instructions input from the calculation unit 4, the communication unit 1 communicates with the external server B to acquire disaster prevention information, weather information, and water level forecast information. The communication unit 1 outputs the disaster prevention information, weather information, and water level forecast information acquired from the external server B to the calculation unit 4. This communication unit 1 is the facility information acquisition unit and disaster prevention information acquisition unit in this embodiment.
記憶部2は、ROM(Read Only Memory)、RAM(Random Access Memory)及びハードディスク等、複数の記憶装置の集合体であり、演算部4と電気的に接続されている。記憶部2は、上述した防災支援プログラムを予めROMに記憶するととともに、演算部4から入力される書込指示に基づいて防災情報、気象情報及び水位予測情報を例えばハードディスクに記憶する。また、記憶部2は、演算部4から入力される読出指示に基づいて防災情報、気象情報及び水位予測情報を演算部4に提供する。 The memory unit 2 is a collection of multiple storage devices, including ROM (Read Only Memory), RAM (Random Access Memory), and a hard disk, and is electrically connected to the arithmetic unit 4. The memory unit 2 pre-stores the aforementioned disaster prevention support program in the ROM and, based on write instructions received from the arithmetic unit 4, stores disaster prevention information, weather information, and water level prediction information, for example, in the hard disk. Furthermore, the memory unit 2 provides disaster prevention information, weather information, and water level prediction information to the arithmetic unit 4 based on read instructions received from the arithmetic unit 4.
操作部3は、キーボードやマウス等の集合体であり、演算部4と電気的に接続されている。操作部3は、防災タイムライン及び防災行動関連表の作成及び更新に関する操作者の指示(操作指示)を受け付け、当該操作指示を演算部4に出力する。この操作指示は、演算部4で防災支援プログラムに基づいて処理される。なお、上記操作者は、防災タイムライン及び防災行動関連表の作成及び更新に関与する医療施設の防災担当者(施設職員)である。 The operation unit 3 is a collection of components such as a keyboard and mouse, and is electrically connected to the processing unit 4. The operation unit 3 receives instructions (operational commands) from the operator regarding the creation and updating of disaster prevention timelines and disaster prevention action-related tables, and outputs these instructions to the processing unit 4. These operational commands are processed by the processing unit 4 based on the disaster prevention support program. The operator is a disaster prevention officer (facility staff) of a medical facility involved in the creation and updating of disaster prevention timelines and disaster prevention action-related tables.
演算部4は、通信部1、記憶部2、操作部3及び表示部5と電気的に接続されている。演算部4は、防災支援プログラム(アプリケーションプログラム)を記憶部2から読み出して実行することにより、また操作部3から入力される操作指示に基づいて、防災タイムライン及び防災行動関連表の作成及び更新を行う。 The calculation unit 4 is electrically connected to the communication unit 1, the storage unit 2, the operation unit 3, and the display unit 5. The calculation unit 4 creates and updates the disaster prevention timeline and disaster prevention action-related table by reading and executing the disaster prevention support program (application program) from the storage unit 2, and based on operation instructions input from the operation unit 3.
また、この演算部4は、防災支援プログラム及び操作指示に基づいて作成した防災タイムライン及び防災行動関連表を表示部5に出力するとともに記憶部2に記憶させる。また、演算部4は、防災タイムライン及び防災行動関連表を操作指示に基づいて所定の送信先に転送する。このような演算部4は、本実施形態における支援情報作成部である。 Furthermore, the calculation unit 4 outputs the disaster prevention timeline and disaster prevention action-related table, created based on the disaster prevention support program and operation instructions, to the display unit 5 and stores them in the storage unit 2. The calculation unit 4 also transfers the disaster prevention timeline and disaster prevention action-related table to a predetermined destination based on the operation instructions. This calculation unit 4 is the support information creation unit in this embodiment.
表示部5は、例えば液晶表示装置であり、演算部4と電気的に接続されている。表示部5は、演算部4から入力された防災タイムライン及び防災行動関連表を画像として表示する。医療施設の担当者は、表示部5に画面表示される防災タイムライン及び防災行動関連表に基づいて、医療施設における防災計画の作成を行う。 The display unit 5 is, for example, a liquid crystal display device and is electrically connected to the calculation unit 4. The display unit 5 displays the disaster prevention timeline and disaster prevention action-related table, input from the calculation unit 4, as images. Medical facility staff create disaster prevention plans for the facility based on the disaster prevention timeline and disaster prevention action-related table displayed on the display unit 5.
次に、本実施形態に係る防災支援装置Aの動作つまり防災支援装置Aを用いた防災支援方法について、図2~5を参照して詳しく説明する。 Next, the operation of the disaster prevention support device A according to this embodiment, that is, the disaster prevention support method using the disaster prevention support device A, will be explained in detail with reference to Figures 2 to 5.
防災支援装置Aの演算部4は、防災支援プログラムの実行を開始すると、最初に外部サーバBから防災情報を取得する(ステップS1)。すなわち、演算部4は、通信部1に防災情報の取得指示を出力することにより防災情報の送信要求を外部サーバB宛に送信させる。外部サーバBは、上記送信要求に応答することにより対象地域の防災情報を防災支援装置A宛に送信する。通信部1は、外部サーバBから防災情報を受信して演算部4に出力する。なお、ステップS1は、本実施形態における防災情報取得工程である。 The calculation unit 4 of the disaster prevention support device A, upon starting the execution of the disaster prevention support program, first acquires disaster prevention information from the external server B (step S1). That is, the calculation unit 4 outputs a disaster prevention information acquisition instruction to the communication unit 1, causing it to send a request to transmit disaster prevention information to the external server B. The external server B responds to the transmission request and transmits disaster prevention information for the target area to the disaster prevention support device A. The communication unit 1 receives the disaster prevention information from the external server B and outputs it to the calculation unit 4. Step S1 is the disaster prevention information acquisition process in this embodiment.
続いて、演算部4は施設サーバCから施設情報を取得する(ステップS2)。すなわち、演算部4は、通信部1に施設情報の取得指示を出力することにより施設情報の送信要求を施設サーバC宛に送信させる。施設サーバCは、上記送信要求に応答することにより医療施設の施設情報を防災支援装置A宛に送信する。通信部1は、施設サーバCから施設情報を受信して演算部4に出力する。なお、ステップS2は、本実施形態における施設情報取得工程である。 Next, the calculation unit 4 acquires facility information from the facility server C (step S2). That is, the calculation unit 4 outputs a facility information acquisition instruction to the communication unit 1, causing it to send a facility information transmission request to the facility server C. The facility server C responds to the transmission request and transmits the medical facility information to the disaster prevention support device A. The communication unit 1 receives the facility information from the facility server C and outputs it to the calculation unit 4. Note that step S2 is the facility information acquisition process in this embodiment.
通信部1は、このようにして対象地域の防災情報及び医療施設の施設情報を取得すると、医療施設の各種設備に関する浸水評価マトリクスを生成する(ステップS3)。この浸水評価マトリクスは、医療施設の浸水高さと医療施設における各種設備との関係をマトリクス状に表す一覧表である。 When the communications unit 1 obtains disaster prevention information for the target area and facility information for medical facilities in this manner, it generates a flood assessment matrix for various equipment within the medical facilities (step S3). This flood assessment matrix is a table that shows the relationship between the flood level of the medical facilities and the various equipment within those facilities in a matrix format.
例えば、医療施設は固有の電源設備を備えている。この電源設備は、電力事業者から供給される通常電源が遮断されると作動することにより、医療施設の必要箇所に電力を供給して医療機能を維持するためのものである。浸水評価マトリクスには、このような電源設備と浸水高さとの関係が記載されている。 For example, medical facilities have their own power supply systems. These systems activate when the normal power supply from the utility company is interrupted, providing power to necessary parts of the facility to maintain medical functions. The flood assessment matrix includes the relationship between such power supply systems and flood levels.
電源設備の健全性と浸水高さとの関係は、電源設備を構成する各種機器がどのような高さに設置されているかに依存する。医療施設には、電源設備の他に給水設備、汚水排水設備、雨水排水設備、医療ガス設備、電子カルテ、エレベーター、防災センター、薬剤・診療材料及び食事等、様々な設備があるが、これらの各種設備の健全性は、各種設備を構成する各種機器の設置高さや建物のフロアー高さに依存する。 The relationship between the integrity of power supply equipment and the flood level depends on the height at which the various components of the power supply equipment are installed. Medical facilities have various other facilities besides power supply equipment, such as water supply equipment, sewage drainage equipment, rainwater drainage equipment, medical gas equipment, electronic medical records, elevators, disaster prevention centers, pharmaceuticals, medical supplies, and meals. The integrity of these various facilities depends on the installation height of the various components of each facility and the floor height of the building.
そして、演算部4は、施設情報に含まれる建築情報から医療施設における各建物及び各種設備に関する設置高さ及びフロアー高さを抽出し、設置高さ及びフロアー高さと浸水高さとを比較することにより、評価マトリクスに示された医療施設の各種設備のリスク評価(浸水リスク評価)を行う(ステップS4)。 Then, the calculation unit 4 extracts the installation height and floor height for each building and various equipment in the medical facility from the building information included in the facility information, and compares the installation height and floor height with the flood height to perform a risk assessment (flood risk assessment) of the various equipment in the medical facility as shown in the evaluation matrix (step S4).
図3は、演算部4がステップS4の処理の結果として作成するリスク評価表の一例である。演算部4は、ステップS3で作成した浸水評価マトリクスにステップS4の処理によって得られた評価結果を正常(〇)、一部正常(△)または機能不全(×)として追記することによりリスク評価表を作成する。 Figure 3 shows an example of a risk assessment table created by the calculation unit 4 as a result of the processing in step S4. The calculation unit 4 creates the risk assessment table by adding the evaluation results obtained from the processing in step S4 to the flood assessment matrix created in step S3, indicating normal (○), partially normal (△), or malfunction (×).
このようにしてリスク評価表を作成すると、演算部4は、医療施設の組織構造、水害時における各部署の施設職員の業務内容、各業務の担当者、各業務の作業時間及び防災マニュアル等を水害時個別業務内容として施設情報から取得(抽出)する(ステップS5)。そして、演算部4は、このような水害時個別業務内容に基づいて水害に関する防災行動関連表を作成する(ステップS6)。このステップS6は、本実施形態における支援情報作成工程である。 Once the risk assessment table is created in this manner, the calculation unit 4 obtains (extracts) the following information from the facility information as individual flood-related work content: the organizational structure of the medical facility, the work content of facility staff in each department during a flood, the person in charge of each task, the working hours for each task, and disaster prevention manuals (step S5). Then, the calculation unit 4 creates a disaster prevention action-related table based on this individual flood-related work content (step S6). This step S6 is the support information creation process in this embodiment.
図4は、ステップS6で作成される防災行動関連表の一例である。この防災行動関連表は、図示するように、水害発生の前段階において医療施設の各部署や施設職員(災害対策本部、院長、管理職、総務企画課等)の防災行動を時系列的かつ河川の水位とRRI情報とに基づく水害ステージに関連付けて示す行動表である。 Figure 4 shows an example of a disaster prevention action chart created in step S6. As illustrated, this chart shows the disaster prevention actions of various departments and staff members of a medical facility (disaster response headquarters, hospital director, management, general affairs and planning department, etc.) in the pre-flood stage, linked chronologically to flood stages based on river water levels and RRI information.
この防災行動関連表は、例えば総務企画課の担当者が水位及びRRI情報を確認し、事務責任者が対策発動指示を総務企画課の担当者に行うことによって医療施設の水害対策を開始し、水位及びRRI情報の動向を確認しつつ各部署及び院長を含めた各施設職員が必要な行動をとることを示している。 This disaster prevention action chart illustrates how, for example, a staff member in the General Affairs and Planning Division can check water levels and RRI information, and the administrative supervisor can issue an order to the General Affairs and Planning Division staff member to initiate flood control measures at the medical facility. It also shows how each department and facility staff, including the hospital director, can take necessary actions while monitoring trends in water levels and RRI information.
また、防災行動関連表は、水位及びRRI情報に基づいて水害ステージが順次変化することを示している。水害ステージは、水位の上昇及びRRI情報の動向に基づいて時間の経過とともに順次変化するものであり、予め想定したリードタイムで段階的に変かする。 Furthermore, the disaster prevention action table shows that the flood stage changes sequentially based on water level and RRI information. The flood stage changes sequentially over time based on rising water levels and trends in RRI information, and changes gradually according to a predetermined lead time.
例えば図4の例では、例えば水位が2.0mを超過した段階で水害ステージをステージ3からステージ4-1に上昇し、水位が3.0mを超過した段階で水害ステージをステージ4-1からステージ4-12上昇する。すなわち、図4の例では、水位が2.0mから3.0mに変化する13:40から14:50の時間(リードタイム)で水害ステージが変化することを示している。 For example, in the example in Figure 4, the flood stage rises from Stage 3 to Stage 4-1 when the water level exceeds 2.0 m, and then rises from Stage 4-1 to Stage 4-12 when the water level exceeds 3.0 m. In other words, the example in Figure 4 shows that the flood stage changes during the time (lead time) from 13:40 to 14:50, when the water level changes from 2.0 m to 3.0 m.
演算部4は、このような防災行動関連表を作成すると、防災行動関連表に記載された各部署及び各施設職員の防災行動に要する時間(防災行動時間)が水害ステージ毎に想定したリードタイム内に収まるか否かを評価する(ステップS7)。リードタイム内における防災行動は、複数の組織及び複数の施設職員によって個々にかつ連携して行われるが、全ての防災行動をリードタイム内に実施し得ない場合が想定される。 The calculation unit 4, upon creating such a disaster prevention action-related table, evaluates whether the time required for disaster prevention actions by each department and facility staff member listed in the table (disaster prevention action time) falls within the assumed lead time for each flood stage (step S7). While disaster prevention actions within the lead time are carried out individually and in coordination by multiple organizations and facility staff members, it is anticipated that not all disaster prevention actions may be completed within the lead time.
演算部4は、例えば施設職員の操作指示として操作部3から入力される各防災行動の防災行動時間と防災行動関連表のリードタイムとの整合性を判断する。そして、演算部4は、この整合性判断に基づいて防災行動関連表のリードタイムに整合しない防災行動を判定する。 The calculation unit 4 determines the consistency between the disaster prevention action time for each disaster prevention action, which is input from the operation unit 3 as an operation instruction for facility staff, and the lead time in the disaster prevention action-related table. Based on this consistency determination, the calculation unit 4 then determines which disaster prevention actions are inconsistent with the lead time in the disaster prevention action-related table.
そして、演算部4は、ステップS7における評価結果、防災情報のハザードマップや過去の水害時における対象地域の気象情報、また施設情報に含まれる過去の水害対応記録及び過去の浸水記録等に基づいて、防災行動関連表における水害ステージ及び水害ステージを変更する条件(トリガー)を調整する(ステップS8)。すなわち、演算部4は、ステップS8において防災行動関連表のリードタイムを決定する条件(トリガー)を調整する。 Then, the calculation unit 4 adjusts the flood stage and the conditions (triggers) for changing the flood stage in the disaster prevention action-related table (step S8), based on the evaluation results in step S7, the hazard map of the disaster prevention information, weather information for the target area during past floods, and past flood response records and past inundation records included in the facility information. In other words, in step S8, the calculation unit 4 adjusts the conditions (triggers) for determining the lead time in the disaster prevention action-related table.
そして、演算部4は、ステップS8を経ることによって修正された防災行動関連表に基づいて、水害に対する防災タイムラインを作成する(ステップS9)。防災タイムラインは、水害発生の前段階において医療施設における各部署の誰がどの防災行動(実施項目)をどの水害ステージ(どのタイミング)で行うかを示す行動計画表である。なお、ステップS9は、本実施形態における支援情報作成工程である。 Then, the calculation unit 4 creates a disaster prevention timeline for floods based on the disaster prevention action-related table modified through step S8 (step S9). The disaster prevention timeline is an action plan showing who in each department of the medical facility will perform which disaster prevention action (implementation item) at which flood stage (timing) in the pre-flood phase. Step S9 is the support information creation process in this embodiment.
演算部4は、防災タイムラインを作成すると、当該防災タイムラインを出力する(ステップS10)。すなわち、演算部4は、防災タイムラインを記憶部2に記憶させるとともに表示部5に出力して画面表示させる。また、演算部4は、操作部3から入力される操作指示に基づいて、防災タイムラインを通信部1に出力して施設サーバCに保存させたり、通信部1を介して外部のプリンタに送信することにより印刷させる。 The calculation unit 4, upon creating a disaster prevention timeline, outputs the timeline (step S10). That is, the calculation unit 4 stores the disaster prevention timeline in the storage unit 2 and outputs it to the display unit 5 for screen display. Furthermore, based on operation instructions input from the operation unit 3, the calculation unit 4 outputs the disaster prevention timeline to the communication unit 1 for storage on the facility server C, or sends it to an external printer via the communication unit 1 for printing.
図5は、ステップS9で作成される防災タイムラインの一例である。この防災タイムラインは、各々の水害ステージで行うべき防災行動が情報発信拠点となる施設職員毎に示されている。例えば、情報発信拠点となる施設職員の1人である看護師長は、ステージ1の段階で患者搬送状況の確認及び看護部スタッフとの連絡方法の確認が防災行動として割り当てられており、またステージ2の段階で患者搬送順位の確認が防災行動として割り当てられている。 Figure 5 shows an example of a disaster prevention timeline created in Step S9. This timeline outlines the disaster prevention actions to be taken at each stage of flooding, for each facility staff member serving as an information dissemination hub. For example, the head nurse, one of the facility staff members serving as an information dissemination hub, is assigned the tasks of confirming patient transport status and communication methods with nursing staff at Stage 1, and confirming patient transport priority at Stage 2.
演算部4は、ステップS9で防災タイムラインを作成すると、防災タイムラインに基づく防災訓練の結果を訓練情報として取得する。この訓練情報は、防災担当者(施設職員)が操作部3を操作することによって、あるいは施設サーバCから演算部4に入力される。 When the calculation unit 4 creates the disaster prevention timeline in step S9, it acquires the results of the disaster prevention drill based on the timeline as training information. This training information is input to the calculation unit 4 either by a disaster prevention officer (facility staff) operating the operation unit 3, or from the facility server C.
医療施設では、防災支援装置Aを用いて防災タイムラインを作成すると、適当なタイミングで防災タイムラインに従った防災訓練を実施する。そして、この防災訓練の結果は、施設サーバCに施設情報の1つとして保存され、または操作部3を操作することによって操作情報の1つとして演算部4に入力される。 In medical facilities, a disaster prevention timeline is created using disaster prevention support device A, and disaster prevention drills are conducted at appropriate times according to the timeline. The results of these drills are then saved as part of the facility information on the facility server C, or input into the calculation unit 4 as part of the operation information by operating the operation unit 3.
演算部4は、訓練情報の取得指示が操作部3から入力されると、この取得指示に続いて操作部3から入力される訓練情報、または通信部1を介した施設サーバCとの通信によって訓練情報を取得し(ステップS11)、記憶部2に一旦記憶させる。そして、演算部4は、訓練に基づく防災タイムラインの更新が必要か否かを判断する(ステップS12)。 When the calculation unit 4 receives a training information acquisition instruction from the operation unit 3, it acquires the training information from the operation unit 3 following this instruction, or through communication with the facility server C via the communication unit 1 (step S11), and temporarily stores it in the storage unit 2. Then, the calculation unit 4 determines whether or not an update to the disaster prevention timeline based on the training is necessary (step S12).
演算部4は、ステップS11で取得した訓練情報がステップS9で作成した防災タイムラインとを比較することにより、訓練情報に基づく防災タイムラインの更新の必要性を判断する。そして、演算部4は、ステップS12の判断が「Yes」の場合つまり防災タイムラインの修正が必要な場合、ステップS8を再度実行して水害ステージ及びトリガーを訓練情報に沿うように再調整する。 The calculation unit 4 compares the training information acquired in step S11 with the disaster prevention timeline created in step S9 to determine the need to update the disaster prevention timeline based on the training information. If the determination in step S12 is "Yes," meaning that the disaster prevention timeline needs to be modified, the calculation unit 4 executes step S8 again to readjust the flood stages and triggers to align with the training information.
演算部4は、この再調整された水害ステージ及びトリガーに基づいてステップS9を再度実行することにより防災タイムラインを再作成(更新)する。なお、ステップS12の判断が「No」の場合つまり防災タイムラインの修正が必要ない場合には、水害ステージ及びトリガーの再調整及び防災タイムラインを再作成(更新)が実行されることなく、防災行動関連表及び防災タイムラインの作成が終了する。 The calculation unit 4 recreates (updates) the disaster prevention timeline by executing step S9 again based on the readjusted flood stages and triggers. However, if the determination in step S12 is "No," meaning that no modification to the disaster prevention timeline is necessary, the readjustment of flood stages and triggers and the recreation (update) of the disaster prevention timeline are not performed, and the creation of the disaster prevention action-related table and disaster prevention timeline is completed.
本実施形態によれば、医療施設が存在する対象地域の防災情報及び医療施設の施設情報に基づいて防災行動関連表が作成され、また当該防災行動関連表に基づいて医療施設の水害に対する防災タイムラインが作成される。したがって、本実施形態によれば、従来よりも実用性の高い防災計画の作成を支援することが可能な防災支援装置A及び防災支援装置Aを用いた防災支援方法を提供することができる。 According to this embodiment, a disaster prevention action-related table is created based on disaster prevention information for the target area where the medical facility is located and facility information for the medical facility. Furthermore, a disaster prevention timeline for flood damage at the medical facility is created based on this disaster prevention action-related table. Therefore, this embodiment provides a disaster prevention support device A and a disaster prevention support method using the disaster prevention support device A that can support the creation of more practical disaster prevention plans than conventional methods.
また、本実施形態によれば、防災支援情報として防災タイムラインを作成するだけでなく防災行動関連表をも作成する。したがって、本実施形態によれば、医療施設の各施設職員がどの防災行動をどのタイミングで行うべきかを把握できるだけでなく、施設職員同士の連携がどのようになっているのかをも把握できるので、より実用性の高い防災計画の作成を支援することができる。 Furthermore, according to this embodiment, in addition to creating a disaster prevention timeline as disaster prevention support information, a disaster prevention action-related table is also created. Therefore, according to this embodiment, not only can each facility staff member of a medical facility understand which disaster prevention actions to take and when, but they can also understand how facility staff members are coordinating with each other, thus supporting the creation of a more practical disaster prevention plan.
なお、本発明は上記実施形態に限定されるものではなく、例えば以下のような変形例が考えられる。
(1)上記実施形態では、地域医療を担う医療施設を防災対象施設とした場合について説明したが、本発明はこれに限定されない。本発明は、医療施設以外の様々な施設に適用することが可能である。
The present invention is not limited to the embodiments described above, and for example, the following modifications are possible.
(1) In the above embodiment, a case in which a medical facility responsible for regional medical care is designated as a disaster prevention target facility was described, but the present invention is not limited to this. The present invention can be applied to various facilities other than medical facilities.
(2)上記実施形態では、各種の災害のうち水害に対する防災行動関連表及び防災タイムラインの作成について説明してが、本発明はこれに限定されない。本発明は、発生前の防災行動が可能な災害があれば、水害以外の災害にも適用可能である。 (2) In the above embodiment, the creation of a disaster prevention action chart and a disaster prevention timeline for floods among various types of disasters has been described, but the present invention is not limited thereto. The present invention can also be applied to disasters other than floods, as long as there are disasters for which disaster prevention actions can be taken before they occur.
(3)上記実施形態では、外部サーバBから防災情報を取得し、また施設サーバCから施設情報を取得したが、本発明はこれに限定されない。防災情報及び施設情報の取得方法には様々な形態が想定されるので、例えば事前に取得して記憶部2に記憶させておいてもよい。また、防災行動関連表の作成に必要な情報(必要情報)を防災情報と施設情報とに区分けすることなく、一体の情報としてもよい。 (3) In the above embodiment, disaster prevention information was obtained from external server B and facility information was obtained from facility server C, but the present invention is not limited thereto. Various methods for obtaining disaster prevention information and facility information are conceivable; for example, the information may be obtained in advance and stored in storage unit 2. Furthermore, the information necessary for creating the disaster prevention action-related table (essential information) may be treated as a single piece of information, rather than being separated into disaster prevention information and facility information.
(4)上記実施形態では、防災行動関連表の一例を図4に、また防災タイムラインの一例を図5に示したが、防災行動関連表及び防災タイムラインは、図4及び図5に限定されない。 (4) In the above embodiment, an example of a disaster prevention action-related table is shown in Figure 4, and an example of a disaster prevention timeline is shown in Figure 5. However, the disaster prevention action-related table and the disaster prevention timeline are not limited to Figures 4 and 5.
A 防災支援装置
B 外部サーバ
C 施設サーバ
1 通信部(施設情報取得部、防災情報取得部)
2 記憶部
3 操作部
4 演算部(支援情報作成部)
5 表示部
A. Disaster prevention support device B. External server C. Facility server 1. Communication unit (facility information acquisition unit, disaster prevention information acquisition unit)
2. Memory Unit 3. Operation Unit 4. Calculation Unit (Support Information Creation Unit)
5 Display section
Claims (5)
防災情報を取得する防災情報取得部と、
前記施設情報及び前記防災情報に基づいて防災タイムラインを防災支援情報として作成する支援情報作成部とを備え、
前記支援情報作成部は、前記施設情報に含まれる建物及び設備に関する設置高さ及びフロアー高さと前記防災情報に基づいて予測される浸水高さとを比較することにより、前記防災対象施設の前記設備のリスク評価を行い、
前記防災対象施設の組織構造、水害時における各部署の施設職員の業務内容、各業務の担当者、各業務の作業時間及び防災マニュアルを水害時個別業務内容として前記施設情報から取得し、
前記リスク評価及び前記水害時個別業務内容に基づいて、水害に関する防災行動を時系列的に示す防災行動関連表を作成し、前記防災行動関連表に基づいて、前記防災タイムラインを作成するものであり、
前記防災対象施設は、医療施設である防災支援装置。 The facility information acquisition unit acquires facility information for disaster prevention target facilities,
The disaster prevention information acquisition unit acquires disaster prevention information,
The system includes a support information creation unit that creates a disaster prevention timeline as disaster prevention support information based on the aforementioned facility information and disaster prevention information,
The support information creation unit performs a risk assessment of the equipment in the disaster-stricken facility by comparing the installation height and floor height of the building and equipment included in the facility information with the flood height predicted based on the disaster prevention information.
The organizational structure of the aforementioned disaster prevention target facility, the duties of facility staff in each department during a flood, the person in charge of each task, the working hours for each task, and the disaster prevention manual are obtained from the aforementioned facility information as individual duties during a flood.
Based on the aforementioned risk assessment and the details of individual tasks during floods, a disaster prevention action table is created that shows disaster prevention actions related to floods in chronological order, and based on the aforementioned disaster prevention action table, the disaster prevention timeline is created.
The aforementioned disaster prevention target facility is a medical facility that also serves as a disaster prevention support device.
前記防災情報は、対象地域に存在する河川の過去の水害時における水位予測情報を含むことを特徴とする請求項1に記載の防災支援装置。 When floods are included as a disaster prevention target,
The disaster prevention support device according to claim 1 , characterized in that the aforementioned disaster prevention information includes water level prediction information for rivers in the target area during past floods.
防災情報を前記コンピュータが取得する防災情報取得工程と、
前記コンピュータで前記施設情報及び前記防災情報に基づいて防災タイムラインを作成する支援情報作成工程とを有し、
前記支援情報作成工程は、前記施設情報に含まれる建物及び設備に関する設置高さ及びフロアー高さと前記防災情報に基づいて予測される浸水高さとを比較することにより、前記防災対象施設の前記設備のリスク評価を行い、
前記防災対象施設の組織構造、水害時における各部署の施設職員の業務内容、各業務の担当者、各業務の作業時間及び防災マニュアルを水害時個別業務内容として前記施設情報から取得し、
前記リスク評価及び前記水害時個別業務内容に基づいて、水害に関する防災行動を時系列的に示す防災行動関連表を作成し、前記防災行動関連表に基づいて、前記防災タイムラインを作成する工程であり、
前記防災対象施設は、医療施設である防災支援方法。 The facility information acquisition process involves a computer acquiring facility information for disaster prevention target facilities,
A disaster prevention information acquisition process in which the aforementioned computer acquires disaster prevention information,
The computer has a support information creation step that creates a disaster prevention timeline based on the facility information and the disaster prevention information,
The support information creation process involves comparing the installation height and floor height of the building and equipment included in the facility information with the flood height predicted based on the disaster prevention information, thereby performing a risk assessment of the equipment of the disaster-stricken facility.
The organizational structure of the aforementioned disaster prevention target facility, the duties of facility staff in each department during a flood, the person in charge of each task, the working hours for each task, and the disaster prevention manual are obtained from the aforementioned facility information as individual duties during a flood.
This process involves creating a disaster prevention action-related table that shows disaster prevention actions related to floods in chronological order, based on the aforementioned risk assessment and the details of individual tasks during floods, and then creating the disaster prevention timeline based on the aforementioned disaster prevention action-related table.
The aforementioned disaster prevention target facilities are medical facilities, and this is a disaster prevention support method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022075216A JP7829860B2 (en) | 2022-04-28 | 2022-04-28 | Disaster prevention support device and disaster prevention support method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022075216A JP7829860B2 (en) | 2022-04-28 | 2022-04-28 | Disaster prevention support device and disaster prevention support method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023163961A JP2023163961A (en) | 2023-11-10 |
| JP7829860B2 true JP7829860B2 (en) | 2026-03-16 |
Family
ID=88651651
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022075216A Active JP7829860B2 (en) | 2022-04-28 | 2022-04-28 | Disaster prevention support device and disaster prevention support method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7829860B2 (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000048073A (en) | 1998-07-30 | 2000-02-18 | Hitachi Ltd | Disaster Decision Support Device and its System Considering Time Management Rules for Countermeasures |
| JP2009265686A (en) | 2008-04-21 | 2009-11-12 | Nippon Telegr & Teleph Corp <Ntt> | Disaster action support system and scenario preparation program |
| JP2011086237A (en) | 2009-10-19 | 2011-04-28 | Mitsubishi Heavy Ind Ltd | Evaluation index determination device for organizational action plan and training evaluation device for organizational action plan |
| JP2013088958A (en) | 2011-10-17 | 2013-05-13 | Nippon Telegr & Teleph Corp <Ntt> | Apparatus, method and program for supporting formulation of emergency case action plan |
| JP2017004318A (en) | 2015-06-11 | 2017-01-05 | 三菱重工業株式会社 | Planning support system |
| JP2020201704A (en) | 2019-06-10 | 2020-12-17 | 清水建設株式会社 | Disaster prevention support apparatus, disaster prevention support system, disaster prevention support method, and program |
-
2022
- 2022-04-28 JP JP2022075216A patent/JP7829860B2/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000048073A (en) | 1998-07-30 | 2000-02-18 | Hitachi Ltd | Disaster Decision Support Device and its System Considering Time Management Rules for Countermeasures |
| JP2009265686A (en) | 2008-04-21 | 2009-11-12 | Nippon Telegr & Teleph Corp <Ntt> | Disaster action support system and scenario preparation program |
| JP2011086237A (en) | 2009-10-19 | 2011-04-28 | Mitsubishi Heavy Ind Ltd | Evaluation index determination device for organizational action plan and training evaluation device for organizational action plan |
| JP2013088958A (en) | 2011-10-17 | 2013-05-13 | Nippon Telegr & Teleph Corp <Ntt> | Apparatus, method and program for supporting formulation of emergency case action plan |
| JP2017004318A (en) | 2015-06-11 | 2017-01-05 | 三菱重工業株式会社 | Planning support system |
| JP2020201704A (en) | 2019-06-10 | 2020-12-17 | 清水建設株式会社 | Disaster prevention support apparatus, disaster prevention support system, disaster prevention support method, and program |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023163961A (en) | 2023-11-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Anumba et al. | Cyber—physical systems development for construction applications | |
| Smith et al. | On the operational implementation of the European Flood Awareness System (EFAS) | |
| US20250037818A1 (en) | Patient Safety Using Virtual Observation | |
| Aung et al. | Preparing routine health information systems for immediate health responses to disasters | |
| Burtson et al. | Sitter reduction through mobile video monitoring: a nurse-driven sitter protocol and administrative oversight | |
| US20090093997A1 (en) | Performance analysis system and method | |
| Oyebanji et al. | Building local capacity for emergency coordination: establishment of subnational Public Health Emergency Operations Centres in Nigeria | |
| Sasaki et al. | Scoping review of hospital business continuity plans to validate the improvement after the 2011 Great East Japan Earthquake and Tsunami | |
| JP7829860B2 (en) | Disaster prevention support device and disaster prevention support method | |
| Zarrin | Inferring causal networks of health care resilience and safety performance indicators: A two-stage fuzzy cognitive map approach | |
| JP7820228B2 (en) | Disaster prevention support equipment | |
| JP2004164591A (en) | Flood protection support device and program, and flood control support method | |
| DE202025105123U1 (en) | An integrated system for dam failure detection, early warning and evacuation support | |
| McCaughrin et al. | Perfect storm: Organizational management of patient care under natural disaster conditions/Practitioner application | |
| Bailey et al. | Risk assessment and hazard identification | |
| Kubo et al. | Breakthrough on health data collection in disasters—knowledge arises in Asia spread to the world | |
| Cosgriff et al. | Interactive computer modeling, monitoring, and control of Melbourne's water supply system | |
| Bailey et al. | Recovery and resilience in healthcare emergency management | |
| Kissi et al. | Statistical analysis of rural hospital closures in the USA | |
| Zone | Impact of new Madrid seismic zone earthquakes on the Central USA | |
| Berke et al. | Automated decision support systems for hurricane mitigation planning | |
| Berberova-Valcheva | THE IMPACT OF DISASTERS AND ACCIDENTS ON THE FUNCTIONING OF RURAL AREAS IN BULGARIA | |
| Lefevre et al. | Not your typical “historian” Archiving successes and lessons learned during emergency response | |
| Bassani et al. | Health Technology Management Using GETS in Times of Health Crisis | |
| Beer et al. | Building an Agent-Based Community Care Demonstrator on a Worldwide Agent Platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20230222 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20230222 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20230222 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20250228 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20251114 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20251118 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20260116 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20260127 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20260224 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7829860 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |