JP7833436B2 - Pre-protection control device, anomaly detection and recovery method, protection control system - Google Patents
Pre-protection control device, anomaly detection and recovery method, protection control systemInfo
- Publication number
- JP7833436B2 JP7833436B2 JP2023148799A JP2023148799A JP7833436B2 JP 7833436 B2 JP7833436 B2 JP 7833436B2 JP 2023148799 A JP2023148799 A JP 2023148799A JP 2023148799 A JP2023148799 A JP 2023148799A JP 7833436 B2 JP7833436 B2 JP 7833436B2
- Authority
- JP
- Japan
- Prior art keywords
- protection control
- control device
- abnormality
- detected
- protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Emergency Protection Circuit Devices (AREA)
Description
本発明は、電力系統の保護制御技術に関し、特に、上位装置(Station Computer(以降SC)、Gateway(以降GW))と下位装置(Murging Unit(以降MU))と接続するディジタル保護制御装置と呼ばれる演算装置(Intelligent Electronic Device(以降IED))をシングル系とした際の異常検出手法およびシステム復旧方法・異常復旧時の切り戻し方法に関する。 This invention relates to power system protection and control technology, and more particularly to an anomaly detection method, system recovery method, and rollback method during anomaly recovery when a single system of a digital protection control device (Intelligent Electronic Device (IED)) is used to connect a higher-level device (Station Computer (SC), Gateway (GW)) and a lower-level device (Murging Unit (MU)).
ディジタル装置及び通信技術の技術革新により、より監視対象の設備近傍にMUが設置され、変電所配電盤室に設置するIEDへの情報がプロセスバス伝送でやり取りされている。また、保守員への監視制御を目的にSC及びGWとIEDとはステーションバス伝送でやり取りしている。 Technological advancements in digital devices and communication technologies have enabled the installation of monitoring units (MUs) closer to the monitored equipment, and information is exchanged via process bus transmission to IEDs (Integrated Data Devices) installed in substation switchboard rooms. Furthermore, for monitoring and control purposes by maintenance personnel, communication between SCs (Service Centers) and GWs (Gateways) and IEDs is conducted via station bus transmission.
ディジタル化のメリットとして設備スリム化によるコスト低減があり、これがディジタル化の目的の一つとなっているが、システム信頼度も確保するため、超高圧変電所のシステム系列においては2系列運用を基本としている。IEDは系統事故を監視・除去するための保護リレー装置と変電所状態の監視や機器操作を行う制御装置とに区分されるが、これらをシングル系とした場合は、IED異常時には縮退運転または系統停止が必要となる。 One of the advantages of digitalization is cost reduction through streamlined equipment, and this is one of the objectives of digitalization. However, to ensure system reliability, ultra-high voltage substations generally operate with a two-system configuration. An IED (Integrated Emergency Detector) is divided into a protective relay device for monitoring and eliminating system faults and a control device for monitoring substation conditions and operating equipment. If these were a single system, a degraded operation or system shutdown would be necessary in the event of an IED malfunction.
特開2010-068594号公報(特許文献1)には、IEDをシングル系とし、予備IEDとデータベースIEDを設置することで、保護制御装置異常時に故障した当該装置情報をデータベースIEDがダウンロードし、異常となったIEDの代替装置として復旧する保護制御システムが開示されている。 Japanese Patent Publication No. 2010-068594 (Patent Document 1) discloses a protection control system in which an IED is configured as a single system, and a backup IED and a database IED are installed. In the event of a malfunction in the protection control system, the database IED downloads information about the faulty IED and restores it as a replacement device for the malfunctioning IED.
上記の通り、特許文献1には、IEDをシングル系とし、予備IEDとデータベースIEDを設置する保護制御システムが開示されているが、異常検出手法及び復旧後の応動については明示されていない。ディジタル変電所では多数のMUとIEDが接続されるため、異常検出方法の断定が複雑化されている。また、異常検出時の復旧方法についても予備IEDのみで対象IEDを判断し、復旧できる仕組みと、対象IEDが復旧した際に、予備IEDの応動を整理する必要がある。 As described above, Patent Document 1 discloses a protection and control system that uses a single IED system with a backup IED and a database IED installed. However, the anomaly detection method and the response after recovery are not explicitly stated. In digital substations, numerous MUs and IEDs are connected, making the determination of anomaly detection methods complex. Furthermore, regarding the recovery method in the event of an anomaly, it is necessary to establish a mechanism that allows the backup IED to identify and recover the target IED, and to clarify the response of the backup IED when the target IED is recovered.
上記の課題の少なくとも一つを解決するため、本発明は、電力系統を計測する計器及び前記電力系統を制御する機器の少なくともいずれかと接続された複数のマージングユニットと、少なくとも一つの前記マージングユニットと通信し、前記電力系統の保護又は制御のための演算を行う機能を有する複数の保護制御装置とに接続される予備保護制御装置であって、前記予備保護制御装置は、プロセッサと、メモリと、を有し、前記メモリは、前記複数の保護制御装置の各々の機能を実現するための複数の保護制御プログラムを保持し、前記プロセッサは、前記複数の保護制御装置のいずれかの異常を検知した場合、前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定し、前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されていない場合、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムの実行を開始し、前記異常を検知した保護制御装置から所定のパケットを受信した場合、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定し、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されている場合、その実行を終了することを特徴とする。 To solve at least one of the above problems, the present invention provides a backup protection control device connected to a plurality of merging units connected to at least one of an instrument for measuring a power system and equipment for controlling the power system, and a plurality of protection control devices that communicate with at least one of the merging units and have the function of performing calculations for the protection or control of the power system, wherein the backup protection control device comprises a processor and a memory, the memory holds a plurality of protection control programs for realizing the functions of each of the plurality of protection control devices, and the processor, when it detects an abnormality in any of the plurality of protection control devices, determines whether the protection control program for realizing the function of a protection control device other than the protection control device that detected the abnormality is being executed, and if the protection control program for realizing the function of a protection control device other than the protection control device that detected the abnormality is not being executed , it starts executing the protection control program for realizing the function of the protection control device that detected the abnormality, and when it receives a predetermined packet from the protection control device that detected the abnormality, it determines whether the protection control program for realizing the function of the protection control device that detected the abnormality is being executed, and if the protection control program for realizing the function of the protection control device that detected the abnormality is being executed, it terminates its execution .
本発明の一態様によれば、保護用IED、制御用IEDを二系化することなく、シングル系としてシステム信頼性を確保かつコスト低減が可能となる。これによって、メタルケーブルが不要となったIEDに適した構成を実現できる。 According to one aspect of the present invention, it is possible to ensure system reliability and reduce costs by using a single system without requiring two separate systems for protective and control IEDs. This enables a configuration suitable for IEDs that do not require metal cables.
上記した以外の課題、構成及び効果は、以下の実施形態の説明により明らかにされる。 Other issues, configurations, and effects not mentioned above will be clarified by the following description of the embodiments.
以下、実施例について図面を用いて説明する。 The following examples will be described with reference to the drawings.
図1は、本発明の実施例に係るディジタル変電所システム1の構成の一例を示すブロック図である。 Figure 1 is a block diagram showing an example of the configuration of a digital substation system 1 according to an embodiment of the present invention.
変電所内に設置されている遮断器(以降CB)及び断路器(以降LS)等の機器(CB,LS)10、並びに、計器用変圧器(以降PT)及び計器用変成器(以降CT)等の計器(PT,CT)9と、MU8-1~8-Lとがメタルワイヤで接続される。MU8-1~8-Lは、変電所内の区分毎の機器・計器の状態をディジタル化し、プロセスバス12の伝送へ送り出す。なお、以下の説明では、MU8-1~8-Lの全体又は各々を指して説明する場合に、MU8と記載する場合がある。後述する保護用IED5-1~5-N及び制御用IED6-1~6-Mについても同様である。 The circuit breakers (hereinafter referred to as CBs) and disconnectors (hereinafter referred to as LSs) 10 installed within the substation, as well as the instruments (PTs, CTs) 9 such as instrument transformers (hereinafter referred to as PTs) and instrument transformers (hereinafter referred to as CTs), are connected to MU8-1 to 8-L by metal wires. MU8-1 to 8-L digitize the status of the equipment and instruments in each section of the substation and send the data to the process bus 12. In the following description, MU8 may be used to refer to MU8-1 to 8-L as a whole or to each of them individually. The same applies to the protective IEDs 5-1 to 5-N and control IEDs 6-1 to 6-M described later.
保護用IED5-1~5-Nは、計器9から得たアナログデータを元に変電所内の事故を保護リレー演算によって検出し、事故と判断した場合は、MU側に対し、対象機器の遮断指令をプロセスバス12の伝送へ送り出す。MU8はその指令に従い、メタルワイヤを介して対象CBを遮断し、事故波及を抑制する。 The protective IEDs 5-1 to 5-N detect faults within the substation using protective relay calculations based on analog data obtained from the instrument 9. If a fault is detected, they send a shutdown command for the target equipment to the MU via the process bus 12. The MU 8 then shuts off the target CB via metal wires to suppress the spread of the fault.
制御用IED6-1~6-Mは、計器9から得たアナログデータを計器の一次値に変換し、ステーションバス11の伝送へ送り出す。制御用IEDはその他にも機器状態をステーションバス伝送へ送り出す。制御用IED6は、ゲートウェイ(以降GW)5及び直接運転PC(以降SC)4からの機器制御指令をステーションバス伝送より受け取り、対象機器に接続されたMU8に対し、プロセスバス伝送にて制御指令を送り出す。MU8はその指令に従い、メタルワイヤを介して対象機器を遮断又は投入する。 The control IEDs 6-1 to 6-M convert the analog data obtained from the instrument 9 into the instrument's primary value and send it to the station bus 11 transmission. The control IEDs also send equipment status information to the station bus transmission. Control IED 6 receives equipment control commands from the gateway (GW) 5 and the direct operation PC (SC) 4 via the station bus transmission and sends control commands to the MU 8 connected to the target equipment via process bus transmission. The MU 8 then shuts off or turns on the target equipment via metal wire according to the command.
SC4は、GW不使用時の直接制御用監視制御装置であり、GW不使用時には制御権をGW3からSC4へ移し、ステーションバス伝送から受けた制御用IED6からの変電所内の計測値及び機器状態の監視を可能としている。また、機器点検等による系統停止のための機器操作を可能としている。GW3は、変電所外の制御所システム2からの遠方制御及び遠方監視に使用しており、実装機能はSC4と同等である。 SC4 is a monitoring and control device for direct control when the GW (Gateway Wage) is not in use. When the GW is not in use, control is transferred from GW3 to SC4, enabling monitoring of measured values and equipment status within the substation from the control IED6 received via station bus transmission. It also allows for equipment operation for system shutdown due to equipment inspection, etc. GW3 is used for remote control and remote monitoring from the control center system 2 outside the substation, and its implemented functions are equivalent to those of SC4.
予備IED7は、通常運用時にはこのディジタル変電所システム1の監視制御及び保護リレーに関する挙動は行わず、保護用IED5及び制御用IEDとMU8との間の伝送状態を監視しており、いずれかのIEDが異常となった場合に、それを代替するIEDへ切り替えることができる。また、異常となったIEDの異常要因を解決した場合においては、予備IED7は異常となっていたIEDを代替する機能の役目を終えたため、元の状態へ切戻すことができる。 During normal operation, the backup IED 7 does not perform monitoring, control, or protective relay-related actions for this digital substation system 1. Instead, it monitors the transmission status between the protective IED 5, the control IED, and the MU 8. If any of the IEDs malfunction, it can switch to a replacement IED. Furthermore, once the cause of the malfunction in the malfunctioning IED is resolved, the backup IED 7 has completed its role as a replacement for the malfunctioning IED and can be returned to its original state.
図2は、本発明の実施例に係る予備IED7内部の構成を示すブロック図である。 Figure 2 is a block diagram showing the internal configuration of a spare IED 7 according to an embodiment of the present invention.
予備IED7は、CPU21、ROM23及びRAM24を有し、それらが内部バス22を介して接続されている。予備IED7内部のROM23には、図1に示す保護用IED5の保護用プログラム(メモリ用)26、制御用IED6の制御用プログラム(メモリ用)27、及び、予備IED7の予備IEDプログラム(メモリ用)25の全てのプログラムを圧縮し、保管している。 The backup IED 7 has a CPU 21, ROM 23, and RAM 24, which are connected via an internal bus 22. The ROM 23 inside the backup IED 7 stores compressed versions of all the programs shown in Figure 1: the protection program (for memory) 26 for the protective IED 5, the control program (for memory) 27 for the control IED 6, and the backup IED program (for memory) 25 for the backup IED 7.
図2の例では、保護用プログラム(メモリ用)26として、保護用IED1プログラム~保護用IEDNプログラムが保管される。これらは、それぞれ、予備IED7を保護用IED5-1~保護用IED5-Nの代替IEDとして動作させるためのプログラムを圧縮したものであり、例えば、それぞれ保護用IED5-1~保護用IED5-Nにおいて動作するものと同等のプログラムを圧縮したものである。 In the example shown in Figure 2, the protection programs (for memory) 26 store the protection IED1 program to the protection IEDN program. These are compressed programs that allow the spare IED7 to operate as a replacement IED for protection IED5-1 to protection IED5-N. For example, they are compressed versions of programs equivalent to those that operate in protection IED5-1 to protection IED5-N.
同様に、図2の例では、制御用プログラム(メモリ用)27として、制御用IED1プログラム~制御用IEDMプログラムが保管される。これらは、それぞれ、予備IED7を制御用IED6-1~制御用IED6-Mの代替IEDとして動作させるためのプログラムを圧縮したものであり、例えば、それぞれ制御用IED6-1~制御用IED6-Mにおいて動作するものと同等のプログラムを圧縮したものである。 Similarly, in the example shown in Figure 2, the control program (for memory) 27 stores the control IED1 program to the control IEDM program. These are compressed versions of programs that allow the spare IED7 to operate as a replacement IED for control IED6-1 to control IED6-M. For example, they are compressed versions of programs equivalent to those that operate in control IED6-1 to control IED6-M.
システム正常時は圧縮ファイルを解凍した予備IEDプログラム(運用)28をRAM24に保管し、CPU21にローディングされた状態で運用している。予備IEDプログラム28はシステムに影響を与えない簡易なプログラムとする。 When the system is functioning normally, the backup IED program (operational) 28, obtained by decompressing the compressed file, is stored in RAM 24 and is loaded into the CPU 21 for operation. The backup IED program 28 is a simple program that does not affect the system.
また、RAM24には予備IED7が保護用IED5及び制御用IED6の各々とMU8との間の伝送状態を監視できるよう異常・復旧検知プログラム30を保管し、CPU21にローディングしている。 Furthermore, the RAM 24 stores an anomaly/recovery detection program 30 so that the backup IED 7 can monitor the transmission status between each of the protective IED 5 and control IED 6 and the MU 8, and loads this program into the CPU 21.
例として、保護用IED5-1が異常となった場合、CPU21からRAM24に対し、ROM23に保管されていた保護用IED1プログラム(メモリ用)26を解凍し、RAM24の予備IEDプログラム28の書込みエリアに上書きする指令を与える。保護用IED1プログラム(メモリ用)26を解凍した保護用IED1プログラム(運用)29がRAM24に上書きされたことを確認後、CPU21が保護用IED1プログラム29をローディングし、ローディング後、リフレッシュさせる。 For example, if the protective IED 5-1 malfunctions, the CPU 21 issues a command to the RAM 24 to decompress the protective IED 1 program (for memory) 26 stored in ROM 23 and overwrite the write area of the backup IED program 28 in RAM 24. After confirming that the protective IED 1 program (operation) 29, which was decompressed from the protective IED 1 program (for memory) 26, has overwritten RAM 24, the CPU 21 loads the protective IED 1 program 29 and then refreshes it.
図3は、本発明の実施例に係る予備IED7の動作の一例を示すフローチャートである。 Figure 3 is a flowchart showing an example of the operation of a backup IED 7 according to an embodiment of the present invention.
図3では、具体例として、予備IED7に実装した異常・復旧検知プログラム30による保護用IED1異常時の復旧応動を説明する。予備IED7は常に各保護用IED5及び各制御用IED6と各MU8との伝送状態を認知する(ステップ31)。例えば、各MU8から予備IED7に向けて、各MU8がどの保護用IED5又は制御用IED6と送受信しているかを示す情報をプロセスバス伝送により送信し、それに基づいて予備IED7が各IEDの送受信相手を認知してもよい。 Figure 3 illustrates, as a specific example, the recovery response when the protective IED 1 malfunctions, as demonstrated by the anomaly/recovery detection program 30 implemented in the backup IED 7. The backup IED 7 constantly recognizes the transmission status between each protective IED 5, each control IED 6, and each MU 8 (step 31). For example, each MU 8 may transmit information to the backup IED 7 via process bus transmission indicating which protective IED 5 or control IED 6 it is transmitting and receiving with, and the backup IED 7 may recognize the transmitting and receiving partner of each IED based on this information.
次に、予備IED7は、保護用IED5-1の接続先が2装置より多いか否かを判定する(ステップ32)。保護用IED5-1の接続先が2装置である場合、それらの2装置とも異常であるかを判定する(ステップ34)。この目的は、IEDの送受信相手が2装置の場合は片方の異常情報だけではIED側の異常と断定できないため、2装置共異常情報を受信した場合のみ、保護用IED5-1が異常であることを判定するためである。2装置のAND条件とした理由は、保護用IED5-1に接続したMU側がCPU停止または異常となった場合に予備IED7が保護用IED5-1を異常と誤判定しないためである。 Next, the backup IED 7 determines whether the protective IED 5-1 is connected to more than two devices (step 32). If the protective IED 5-1 is connected to two devices, it determines whether both of those devices are malfunctioning (step 34). The purpose of this is that when the IED is transmitting and receiving from two devices, malfunction information from only one device is insufficient to definitively determine that the IED is malfunctioning. Therefore, the backup IED 5-1 is only determined to be malfunctioning if malfunction information is received from both devices. The reason for using an AND condition of two devices is to prevent the backup IED 7 from mistakenly determining that the protective IED 5-1 is malfunctioning if the MU connected to the protective IED 5-1 experiences a CPU failure or malfunction.
また、保護用IED5-1の接続先が2装置より多い場合は、予備IED7は、多数決処理を行い、異常判定数が正常判定数以上となる場合にIED側の異常であると判定する(ステップ33)。ここの多数決処理では異常判定数と正常判定数が同数の場合は異常判定数を優先し、異常であると判定する。 Furthermore, if the protective IED 5-1 is connected to more than two devices, the backup IED 7 performs a majority vote and determines that the IED is faulty if the number of fault detections is equal to or greater than the number of normal detections (step 33). In this majority vote, if the number of fault detections and normal detections are equal, the number of fault detections takes precedence, and the IED is determined to be faulty.
なお、予備IED7は、例えばプロセスバス12を介して送受信されるパケットを監視し、MU8からのパケットに応答しないIEDがある場合にそのIEDとの伝送の異常を検知してもよい。例えばステップ31においてMU8-1の送受信相手が保護用IED5-1であると認知されている場合において、MU8-1から保護用IED5-1宛てのパケットが送信されているにもかかわらず、保護用IED5-1からMU8-1宛てのパケットが送信されていない場合、予備IED7は、MU8-1と保護用IED5-1との間の伝送の異常を検知してもよい。あるいは、そのような場合にMU8-1が保護用IED5-1との間の伝送の異常を予備IED7に通知し、それに基づいて予備IED7がMU8-1と保護用IED5-1との間の伝送の異常を検知してもよい。 Furthermore, the backup IED 7 may monitor packets transmitted and received via, for example, the process bus 12, and detect transmission anomalies with an IED if an IED does not respond to packets from MU8. For example, if in step 31 it is recognized that the transmission partner of MU8-1 is the protective IED 5-1, and packets are transmitted from MU8-1 to protective IED 5-1, but packets are not transmitted from protective IED 5-1 to MU8-1, the backup IED 7 may detect a transmission anomaly between MU8-1 and protective IED 5-1. Alternatively, in such a case, MU8-1 may notify the backup IED 7 of the transmission anomaly with protective IED 5-1, and based on this, the backup IED 7 may detect a transmission anomaly between MU8-1 and protective IED 5-1.
図3に示す例の条件では保護用IED5-1はMU8-1及びMU8-2の2装置と送受信している。この場合、予備IED7は、この2装置の両方から異常情報受信時に保護用IED1を異常と判定し、予備IED7の現状プログラムが予備IEDプログラム28であるかを確認する(ステップ35)。この目的とは、既に他プログラムがローディングされていた場合はプログラム書換処理を実施できないためであり、この場合は処理終了としている(ステップ37)。 In the example shown in Figure 3, the protective IED 5-1 transmits and receives data from two devices, MU8-1 and MU8-2. In this case, the backup IED 7, upon receiving abnormal information from both devices, determines that the protective IED 1 is abnormal and verifies that the backup IED 7's current program is the backup IED program 28 (step 35). The purpose of this is that if another program is already loaded, the program rewriting process cannot be performed; in this case, the process is terminated (step 37).
ディジタル変電所システム1に含まれる予備IED7が1台のみである場合は、代替可能となるIEDも1台とするが、拡充機能として、予備IED7を複数台設けて運用する場合においては、予備IED7側に優先順位を設定することで、優先順位が若い予備IED7から順に、異常と判定されたIEDを代替可能とする。 If the digital substation system 1 includes only one backup IED7, then only one IED will be available for replacement. However, as an enhanced feature, when multiple backup IED7s are installed and operated, a priority order can be set for the backup IED7s. This allows for the replacement of faulty IEDs in order from the backup IED7 with the lowest priority.
ステップ37において、既にローディングされている現状プログラムが予備IEDプログラム28であることを確認できた場合に、予備IED7は、ROM23に記録している保護用IED1プログラム26を解凍し、解凍した保護用IED1プログラム29をRAM24へ書換し、書換完了後にCPU21へローディングし、ローディング完了後はCPUリフレッシュを実施する(ステップ36)。 In step 37, if it is confirmed that the currently loaded program is the backup IED program 28, the backup IED 7 decompresses the protective IED 1 program 26 recorded in ROM 23, rewrites the decompressed protective IED 1 program 29 to RAM 24, loads it to CPU 21 after the rewriting is complete, and performs a CPU refresh after the loading is complete (step 36).
リフレッシュ後、CPU21が正常RUNした場合に、予備IED7は、プロセスバス伝送側でMU8と接続、ステーションバス伝送側でSC4、GW3と接続することで、予備IED7が保護用IED5-1を代替する動作を行い、ディジタル変電所システム1が復旧する。 After the refresh, if the CPU 21 runs normally, the backup IED 7 connects to the MU 8 on the process bus transmission side and to the SC 4 and GW 3 on the station bus transmission side. This allows the backup IED 7 to replace the protective IED 5-1, and the digital substation system 1 is restored.
異常となった保護用IED5-1においては、時間経過後、運用保守員が変電所に出向き、異常要因であった基板の交換等によってIEDを復旧させることになる。復旧操作時は保護用IED5-1の電源を一旦切断し、その後再投入することにより、保護用IED5-1のCPU(図示省略)が起動し、起動完了後に保護用IED5-1から各MU8及び予備IED7に対し、イニシャルパケット(すなわち、CPU正常演算処理開始時の最初のパケット)をプログラムバス伝送に送り出す。そのイニシャルパケットを、予備IED7がプロセスバス伝送経由で受信する(ステップ38)。 In the case of a malfunctioning protective IED 5-1, after a period of time, maintenance personnel will visit the substation and restore the IED by replacing the circuit board that was the cause of the malfunction. During the restoration operation, the power to the protective IED 5-1 is temporarily cut off and then restored. This starts the CPU (not shown) of the protective IED 5-1. After startup is complete, the protective IED 5-1 sends an initial packet (i.e., the first packet at the start of normal CPU processing) via program bus transmission to each MU8 and the backup IED 7. The backup IED 7 receives this initial packet via process bus transmission (step 38).
予備IED7は、イニシャルパケットを受信すると、予備IED7の現状プログラムが保護用IED1プログラム29であるかを確認する(ステップ39)。 Upon receiving the initial packet, the backup IED7 verifies that its current program is the protective IED1 program 29 (step 39).
現状プログラムが保護用IED1プログラム29である場合は、予備IED7は、MU8との伝送を切断し、ROM23に記録している予備IEDプログラム25を解凍し、解凍した予備IEDプログラム28をRAM24へ書換する。予備IEDプログラム28への書換完了後にCPUへローディングし、ローディング完了後はCPUリフレッシュを実施する(ステップ40)。これによって、保護用IED1プログラム29の実行が終了し、その結果、予備IED7が保護用IED5-1を代替する動作が終了する。 If the current program is the protective IED1 program 29, the backup IED7 disconnects from the MU8, decompresses the backup IED program 25 stored in the ROM 23, and rewrites the decompressed backup IED program 28 to the RAM 24. After the rewriting to the backup IED program 28 is complete, it is loaded to the CPU, and after loading is complete, a CPU refresh is performed (step 40). This terminates the execution of the protective IED1 program 29, and as a result, the backup IED7's operation of substituting for the protective IED5-1 ends.
リフレッシュ後、予備IED7のCPU21が正常RUNした場合に、予備IED7は、従来通りにディジタル変電所システム1の監視制御や保護リレーに関する挙動は行わず、保護用IED5及び制御用IED6とMU8との間の伝送状態を監視する。 After refreshing, if the CPU 21 of the backup IED 7 performs a normal run, the backup IED 7 will not perform the monitoring and control or protective relay behavior of the digital substation system 1 as before, but will instead monitor the transmission status between the protective IED 5, the control IED 6, and the MU 8.
また、予備IED7がMU8との伝送切断後に復旧した保護用IED5-1がプロセスバス伝送側でMU8と接続、ステーションバス伝送側でSC4、GW3と接続することでシステムとして復旧する。 Furthermore, after the backup IED7 loses transmission with MU8, the protective IED5-1, which has been restored, connects to MU8 on the process bus transmission side and to SC4 and GW3 on the station bus transmission side, thereby restoring the system.
また、本発明の実施形態のシステムは次のように構成されてもよい。 Furthermore, the system of the embodiment of the present invention may be configured as follows:
(1)予備保護制御装置(例えば予備IED7)であって、複数のマージングユニット(例えばMU8)及び複数の保護制御装置(例えば保護用IED5及び制御用IED6)と接続され、前記各マージングユニットは、電力系統を計測する計器(例えば計器9)及び前記電力系統を制御する機器(例えば機器10)の少なくともいずれかと接続され、前記各保護制御装置は、少なくとも一つの前記マージングユニットと通信し、前記電力系統の保護又は制御のための演算を行う機能を有し、前記予備保護制御装置は、プロセッサ(例えばCPU21)と、メモリ(例えばROM23及びRAM24)と、を有し、前記メモリは、前記複数の保護制御装置の各々の機能を実現するための複数の保護制御プログラム(例えば保護用IEDプログラム26及び制御用IEDプログラム27)を保持し、前記プロセッサは、前記複数の保護制御装置のいずれかの異常を検知した場合、前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定し(例えばステップ35)、前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されていない場合、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムの実行を開始する(例えばステップ36)。 (1) A backup protection control device (e.g., backup IED 7) is connected to a plurality of merging units (e.g., MU 8) and a plurality of protection control devices (e.g., protection IED 5 and control IED 6), each of which merging units is connected to at least one of an instrument for measuring the power system (e.g., instrument 9) and equipment for controlling the power system (e.g., equipment 10), each of which protection control devices communicates with at least one of the merging units and has the function of performing calculations for the protection or control of the power system, and the backup protection control device has a processor (e.g., CPU 21) and memory (e.g., ROM 23 and RAM 24), and the memory is connected to the plurality of protection control The device maintains multiple protection control programs (e.g., a protection IED program 26 and a control IED program 27) for implementing each of its functions. When the processor detects an abnormality in any of the multiple protection control devices, it determines whether the protection control program for implementing the functions of the protection control devices other than the one that detected the abnormality is being executed (e.g., step 35). If the protection control program for implementing the functions of the protection control devices other than the one that detected the abnormality is not being executed, the processor starts executing the protection control program for implementing the functions of the protection control device that detected the abnormality (e.g., step 36).
これによって、保護用IED、制御用IEDを二系化することなく、複数の保護用IED及び複数の制御用IEDに対して一つ又は少数の予備IEDを用意することで、シングル系としてシステム信頼性を確保し、かつコストを低減することができる。 This allows for system reliability to be ensured and costs reduced by providing one or a few spare IEDs for multiple protective IEDs and multiple control IEDs, without requiring two separate systems for protective and control IEDs.
(2)上記(1)に記載の予備保護制御装置であって、前記プロセッサは、前記異常を検知した保護制御装置から所定のパケット(例えばイニシャルパケット)を受信した場合、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定し(例えばステップ39)、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されている場合、その実行を終了する(例えばステップ40)。 (2) In the auxiliary protection control device described in (1) above, when the processor receives a predetermined packet (e.g., an initial packet) from the protection control device that detected the anomaly, it determines whether the protection control program for realizing the function of the protection control device that detected the anomaly is being executed (e.g., step 39), and if the protection control program for realizing the function of the protection control device that detected the anomaly is being executed, it terminates its execution (e.g., step 40).
これによって、異常が発生した保護用IED又は制御用IEDが復旧したときに切り戻すことができる。 This allows for a rollback when a malfunctioning protective or control IED is restored.
(3)上記(2)に記載の予備保護制御装置であって、前記プロセッサは、前記複数の保護制御装置の各々と前記複数のマージングユニットとの間の伝送状態を検知し、前記伝送状態に基づいて前記複数の保護制御装置の各々の異常を検知する(例えばステップ33、34)。 (3) The auxiliary protection control device described in (2) above, wherein the processor detects the transmission status between each of the plurality of protection control devices and the plurality of merging units, and detects an abnormality in each of the plurality of protection control devices based on the transmission status (for example, steps 33 and 34).
これによって、保護制御装置の異常を適切に検知することができる。 This allows for the proper detection of abnormalities in the protective control system.
(4)上記(3)に記載の予備保護制御装置であって、前記プロセッサは、前記複数の保護制御装置の各々との送受信相手である前記マージングユニットを特定し(例えばステップ31)、前記複数の保護制御装置のうち、送受信相手として二つの前記マージングユニットが特定された保護制御装置について、前記特定された二つのマージングユニットのいずれとの伝送においても異常が検知された場合、当該保護制御装置の異常を検知し(例えばステップ32、34)、前記複数の保護制御装置のうち、送受信相手として三つ以上の前記マージングユニットが特定された保護制御装置について、前記特定された三つ以上のマージングユニットの半数以上との伝送において異常が検知された場合、当該保護制御装置の異常を検知する(例えばステップ32、33)。 (4) The auxiliary protection control device described in (3) above, wherein the processor identifies the merging units that are the transmitting and receiving partners for each of the plurality of protection control devices (for example, step 31), and for a protection control device in which two of the plurality of protection control devices have been identified as transmitting and receiving partners, if an abnormality is detected in the transmission with either of the two identified merging units, the processor detects an abnormality in the protection control device (for example, steps 32, 34), and for a protection control device in which three or more of the plurality of protection control devices have been identified as transmitting and receiving partners, if an abnormality is detected in the transmission with more than half of the three or more identified merging units, the processor detects an abnormality in the protection control device (for example, steps 32, 33).
これによって、保護制御装置の異常を適切に検知することができる。 This allows for the proper detection of abnormalities in the protective control system.
(5)上記(3)に記載の予備保護制御装置であって、前記予備保護制御装置は、バス(例えばプロセスバス12)を介して前記複数のマージングユニット及び前記複数の保護制御装置と接続され、前記プロセッサは、前記バスを介して送受信されるパケットを監視し、前記マージングユニットから送信されたパケットに対して前記保護制御装置が応答しない場合、当該マージングユニットと当該保護制御装置との間の伝送の異常を検知する。 (5) The auxiliary protection control device described in (3) above, wherein the auxiliary protection control device is connected to the plurality of merging units and the plurality of protection control devices via a bus (e.g., process bus 12), and the processor monitors packets transmitted and received via the bus, and detects an abnormality in transmission between the merging unit and the protection control device if the protection control device does not respond to a packet transmitted from the merging unit.
これによって、保護制御装置の異常を適切に検知することができる。 This allows for the proper detection of abnormalities in the protective control system.
なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明のより良い理解のために詳細に説明したものであり、必ずしも説明の全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、また、ある実施例の構成に他の実施例の構成を加えることが可能である。また、各実施例の構成の一部について、他の構成の追加・削除・置換をすることが可能である。 Furthermore, the present invention is not limited to the embodiments described above, and various modifications are included. For example, the embodiments described above are explained in detail for a better understanding of the present invention, and are not necessarily limited to those having all of the described configurations. Also, it is possible to replace parts of the configuration of one embodiment with those of another embodiment, and to add configurations from other embodiments to the configuration of one embodiment. In addition, it is possible to add, delete, or replace parts of the configuration of each embodiment with those of other embodiments.
また、上記の各構成、機能、処理部、処理手段等は、それらの一部又は全部を、例えば集積回路で設計する等によってハードウェアで実現してもよい。また、上記の各構成、機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによってソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル等の情報は、不揮発性半導体メモリ、ハードディスクドライブ、SSD(Solid State Drive)等の記憶デバイス、または、ICカード、SDカード、DVD等の計算機読み取り可能な非一時的データ記憶媒体に格納することができる。 Furthermore, each of the above-described configurations, functions, processing units, and processing means may be implemented in hardware, either partially or entirely, by designing them as integrated circuits, for example. Alternatively, each of the above-described configurations and functions may be implemented in software by a processor interpreting and executing programs that implement each function. Information such as programs, tables, and files that implement each function can be stored in storage devices such as non-volatile semiconductor memory, hard disk drives, SSDs (Solid State Drives), or computer-readable non-temporary data storage media such as IC cards, SD cards, and DVDs.
また、制御線及び情報線は説明上必要と考えられるものを示しており、製品上必ずしも全ての制御線及び情報線を示しているとは限らない。実際にはほとんど全ての構成が相互に接続されていると考えてもよい。 Furthermore, the control and information lines shown are those deemed necessary for explanation purposes and do not necessarily represent all control and information lines in the actual product. In practice, it can be assumed that almost all components are interconnected.
1…ディジタル変電所システム
2…遠方制御システム
3…ゲートウェイ(GW)
4…直接運転PC(SC)
5-1~N…保護用IED
6-1~M…制御用IED
7…予備用IED
8-1~L…MU
9…計器(PT、CT)
10…機器(CB、LS)
11…ステーションバス
12…プロセスバス
21…CPU
22…内部バス
23…ROM
24…RAM
25…予備IEDプログラム(メモリ用)
26…保護用プログラム(メモリ用)
27…制御用プログラム(メモリ用)
28…予備IEDプログラム(運用)
29…保護用IED1プログラム(運用)
30…異常・復旧検知プログラム
1. Digital substation system 2. Remote control system 3. Gateway (GW)
4. Direct Operation PC (SC)
5-1~N…Protection IED
6-1 to M... Control IED
7. Spare IED
8-1~L...MU
9... Instrument (PT, CT)
10...Equipment (CB, LS)
11... Station bus 12... Process bus 21... CPU
22...Internal bus 23...ROM
24...RAM
25... Backup IED program (for memory)
26...Protection program (for memory)
27... Control program (for memory)
28. Backup IED Program (Operation)
29...Protective IED1 program (operation)
30... Anomaly/Recovery Detection Program
Claims (9)
前記予備保護制御装置は、プロセッサと、メモリと、を有し、
前記メモリは、前記複数の保護制御装置の各々の機能を実現するための複数の保護制御プログラムを保持し、
前記プロセッサは、
前記複数の保護制御装置のいずれかの異常を検知した場合、前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定し、
前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されていない場合、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムの実行を開始し、
前記異常を検知した保護制御装置から所定のパケットを受信した場合、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定し、
前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されている場合、その実行を終了することを特徴とする予備保護制御装置。 A backup protection control device connected to a plurality of merging units connected to at least one of an instrument for measuring a power system and equipment for controlling the power system, and a plurality of protection control devices having the function of communicating with at least one of the merging units and performing calculations for the protection or control of the power system ,
The aforementioned pre-protection control device has a processor and memory,
The memory holds multiple protection control programs for realizing the functions of each of the multiple protection control devices,
The aforementioned processor,
If an abnormality is detected in any of the above-mentioned multiple protection control devices, it is determined whether the protection control program for implementing the functions of the protection control devices other than the protection control device that detected the abnormality is being executed.
If the protection control program for realizing the functions of a protection control device other than the protection control device that detected the abnormality is not being executed, the execution of the protection control program for realizing the functions of the protection control device that detected the abnormality will be started .
When a predetermined packet is received from the protection control device that detected the anomaly, it is determined whether the protection control program for realizing the function of the protection control device that detected the anomaly is being executed.
A backup protection control device characterized in that, if the protection control program for realizing the function of the protection control device that detected the aforementioned abnormality is being executed, the execution of the program is terminated .
前記プロセッサは、前記複数の保護制御装置の各々と前記複数のマージングユニットとの間の伝送状態を検知し、前記伝送状態に基づいて前記複数の保護制御装置の各々の異常を検知することを特徴とする予備保護制御装置。The processor is characterized by detecting the transmission state between each of the plurality of protection control devices and the plurality of merging units, and detecting an abnormality in each of the plurality of protection control devices based on the transmission state.
前記プロセッサは、The aforementioned processor,
前記複数の保護制御装置の各々との送受信相手である前記マージングユニットを特定し、Identify the merging unit that is the transmitting and receiving partner for each of the plurality of protection control devices,
前記複数の保護制御装置のうち、送受信相手として二つの前記マージングユニットが特定された保護制御装置について、前記特定された二つのマージングユニットのいずれとの伝送においても異常が検知された場合、当該保護制御装置の異常を検知し、In the case of a protection control device among the plurality of protection control devices in which two merging units have been identified as the transmitting and receiving partners, if an abnormality is detected in the transmission with either of the two identified merging units, the protection control device will be detected as having an abnormality.
前記複数の保護制御装置のうち、送受信相手として三つ以上の前記マージングユニットが特定された保護制御装置について、前記特定された三つ以上のマージングユニットの半数以上との伝送において異常が検知された場合、当該保護制御装置の異常を検知することを特徴とする予備保護制御装置。A backup protection control device is characterized in that, among the plurality of protection control devices, if a protection control device for which three or more merging units have been identified as the transmitting and receiving partners detects an abnormality in transmission with more than half of the three or more identified merging units, the backup protection control device detects an abnormality in the said protection control device.
前記予備保護制御装置は、バスを介して前記複数のマージングユニット及び前記複数の保護制御装置と接続され、The aforementioned auxiliary protection control device is connected to the plurality of merging units and the plurality of protection control devices via a bus.
前記プロセッサは、前記バスを介して送受信されるパケットを監視し、前記マージングユニットから送信されたパケットに対して前記保護制御装置が応答しない場合、当該マージングユニットと当該保護制御装置との間の伝送の異常を検知することを特徴とする予備保護制御装置。The backup protection control device is characterized in that the processor monitors packets transmitted and received via the bus, and detects an abnormality in transmission between the merging unit and the protection control device if the protection control device does not respond to packets transmitted from the merging unit.
前記予備保護制御装置は、プロセッサと、メモリと、を有し、The aforementioned pre-protection control device has a processor and memory,
前記メモリは、前記複数の保護制御装置の各々の機能を実現するための複数の保護制御プログラムを保持し、The memory holds multiple protection control programs for realizing the functions of each of the multiple protection control devices,
前記異常検知及び復旧方法は、The aforementioned anomaly detection and recovery method is:
前記プロセッサが、前記複数の保護制御装置のいずれかの異常を検知した場合、前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定する第1手順と、If the processor detects an abnormality in any of the plurality of protection control devices, the first step is to determine whether the protection control program for implementing the functions of the protection control devices other than the protection control device that detected the abnormality is being executed.
前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されていない場合、前記プロセッサが、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムの実行を開始する第2手順と、If the protection control program for realizing the functions of a protection control device other than the protection control device that detected the abnormality is not being executed, the processor starts executing the protection control program for realizing the functions of the protection control device that detected the abnormality, in a second step.
前記プロセッサが、前記異常を検知した保護制御装置から所定のパケットを受信した場合、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定する第3手順と、A third step in which, when the processor receives a predetermined packet from the protection control device that detected the anomaly, it determines whether the protection control program for realizing the function of the protection control device that detected the anomaly is being executed.
前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されている場合、その実行を終了する第4手順と、を含むことを特徴とする異常検知及び復旧方法。An anomaly detection and recovery method, characterized by comprising: a fourth step of terminating the execution of the protection control program if it is running to implement the function of the protection control device that has detected the anomaly.
前記第1手順において、前記プロセッサは、前記複数の保護制御装置の各々と前記複数のマージングユニットとの間の伝送状態を検知し、前記伝送状態に基づいて前記複数の保護制御装置の各々の異常を検知することを特徴とする異常検知及び復旧方法。An anomaly detection and recovery method characterized in that, in the first step, the processor detects the transmission state between each of the plurality of protection control devices and the plurality of merging units, and detects an anomaly in each of the plurality of protection control devices based on the transmission state.
前記第1手順において、前記プロセッサは、In the first step, the processor,
前記複数の保護制御装置の各々との送受信相手である前記マージングユニットを特定し、Identify the merging unit that is the transmitting and receiving partner for each of the plurality of protection control devices,
前記複数の保護制御装置のうち、送受信相手として二つの前記マージングユニットが特定された保護制御装置について、前記特定された二つのマージングユニットのいずれとの伝送においても異常が検知された場合、当該保護制御装置の異常を検知し、In the case of a protection control device among the plurality of protection control devices in which two merging units have been identified as the transmitting and receiving partners, if an abnormality is detected in the transmission with either of the two identified merging units, the protection control device will be detected as having an abnormality.
前記複数の保護制御装置のうち、送受信相手として三つ以上の前記マージングユニットが特定された保護制御装置について、前記特定された三つ以上のマージングユニットの半数以上との伝送において異常が検知された場合、当該保護制御装置の異常を検知することを特徴とする異常検知及び復旧方法。An abnormality detection and recovery method characterized in that, among the plurality of protection control devices, if an abnormality is detected in transmission with more than half of the three or more specified merging units, an abnormality of the protection control device is detected.
前記予備保護制御装置は、バスを介して前記複数のマージングユニット及び前記複数の保護制御装置と接続され、The aforementioned auxiliary protection control device is connected to the plurality of merging units and the plurality of protection control devices via a bus.
前記第1手順において、前記プロセッサは、前記バスを介して送受信されるパケットを監視し、前記マージングユニットから送信されたパケットに対して前記保護制御装置が応答しない場合、当該マージングユニットと当該保護制御装置との間の伝送の異常を検知することを特徴とする異常検知及び復旧方法。An anomaly detection and recovery method characterized in that, in the first step, the processor monitors packets transmitted and received via the bus, and if the protection control device does not respond to a packet transmitted from the merging unit, it detects an anomaly in the transmission between the merging unit and the protection control device.
電力系統を計測する計器及び前記電力系統を制御する機器の少なくともいずれかと接続された複数のマージングユニットと、少なくとも一つの前記マージングユニットと通信し、前記電力系統の保護又は制御のための演算を行う機能を有する複数の保護制御装置と、前記複数のマージングユニット及び前記複数の保護制御装置に接続された1以上の予備保護制御装置と、を有し、The system comprises: a plurality of merging units connected to at least one of an instrument for measuring the power system and equipment for controlling the power system; a plurality of protection control devices having the function of communicating with at least one of the merging units and performing calculations for the protection or control of the power system; and one or more auxiliary protection control devices connected to the plurality of merging units and the plurality of protection control devices.
前記予備保護制御装置の数は、前記保護制御装置の数より少なく、The number of the aforementioned auxiliary protection control devices is less than the number of the aforementioned protection control devices.
前記予備保護制御装置は、プロセッサと、メモリと、を有し、The aforementioned pre-protection control device has a processor and memory,
前記メモリは、前記複数の保護制御装置の各々の機能を実現するための複数の保護制御プログラムを保持し、The memory holds multiple protection control programs for realizing the functions of each of the multiple protection control devices,
前記プロセッサは、The aforementioned processor,
前記複数の保護制御装置のいずれかの異常を検知した場合、前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定し、If an abnormality is detected in any of the above-mentioned multiple protection control devices, it is determined whether the protection control program for implementing the functions of the protection control devices other than the protection control device that detected the abnormality is being executed.
前記異常を検知した保護制御装置以外の前記保護制御装置の機能を実現するための前記保護制御プログラムが実行されていない場合、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムの実行を開始し、If the protection control program for realizing the functions of a protection control device other than the protection control device that detected the abnormality is not being executed, the execution of the protection control program for realizing the functions of the protection control device that detected the abnormality will be started.
前記異常を検知した保護制御装置から所定のパケットを受信した場合、前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されているかを判定し、When a predetermined packet is received from the protection control device that detected the anomaly, it is determined whether the protection control program for realizing the function of the protection control device that detected the anomaly is being executed.
前記異常を検知した保護制御装置の機能を実現するための前記保護制御プログラムが実行されている場合、その実行を終了することを特徴とする保護制御システム。A protection control system characterized in that, when the protection control program for realizing the function of the protection control device that detected the aforementioned abnormality is being executed, the execution of the protection control program is terminated.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023148799A JP7833436B2 (en) | 2023-09-13 | 2023-09-13 | Pre-protection control device, anomaly detection and recovery method, protection control system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023148799A JP7833436B2 (en) | 2023-09-13 | 2023-09-13 | Pre-protection control device, anomaly detection and recovery method, protection control system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2025041471A JP2025041471A (en) | 2025-03-26 |
| JP7833436B2 true JP7833436B2 (en) | 2026-03-19 |
Family
ID=95104898
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2023148799A Active JP7833436B2 (en) | 2023-09-13 | 2023-09-13 | Pre-protection control device, anomaly detection and recovery method, protection control system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7833436B2 (en) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006085246A (en) | 2004-09-14 | 2006-03-30 | Toshiba Corp | Multiprocessor signal processor |
| JP2010068594A (en) | 2008-09-09 | 2010-03-25 | Mitsubishi Electric Corp | Protection and control system |
-
2023
- 2023-09-13 JP JP2023148799A patent/JP7833436B2/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006085246A (en) | 2004-09-14 | 2006-03-30 | Toshiba Corp | Multiprocessor signal processor |
| JP2010068594A (en) | 2008-09-09 | 2010-03-25 | Mitsubishi Electric Corp | Protection and control system |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2025041471A (en) | 2025-03-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8306670B2 (en) | Protection and control system | |
| US6892115B2 (en) | Method and apparatus for optimized centralized critical control architecture for switchgear and power equipment | |
| JP2001075880A (en) | Device for electronically monitoring supply currents of module connected with bus | |
| CN112714173B (en) | Platform door controller cloud platform system and control method | |
| CN113557533B (en) | Methods for detecting faults in intelligent electronic devices | |
| US7245044B2 (en) | Electrical system, and control module and smart power supply for electrical system | |
| JP7833436B2 (en) | Pre-protection control device, anomaly detection and recovery method, protection control system | |
| EP2779342B1 (en) | Protection control system, protection control devices, and merging unit | |
| JP2015220948A (en) | Digital protection relay system | |
| CN117761461A (en) | A method and device for locating ground faults in EMU power systems | |
| KR101631631B1 (en) | Method for failure check and recovery of Protective relay | |
| KR100675741B1 (en) | Protection relay control system and method using mobile software | |
| WO2023042344A1 (en) | Protection and control system | |
| JP7772755B2 (en) | Protective relay system and power system protection method | |
| EP4531239A1 (en) | Distributed main-tie-tie-main transfer control scheme | |
| JPH0522850A (en) | Shiya disconnection malfunction prevention device | |
| KR102673587B1 (en) | System and Method for preliminary integrated control monitoring to relieve vulnerability of digital substation | |
| KR100568960B1 (en) | Protection relay system and method using mobile software | |
| WO2026053460A1 (en) | Protection control device, protection control system, and protection control method | |
| JP2011151972A (en) | Protective relay | |
| JP4128907B2 (en) | Supervisory control system | |
| JP2009088880A (en) | Communication disconnection circuit at the time of failure of wide area network communication equipment | |
| JP2026049928A (en) | Protection control system | |
| KR101108324B1 (en) | Electric current monitoring method of digital output module and its device | |
| JPS6022401A (en) | Reset system of microcomputer for electric railcar controller |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20241216 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250910 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20251014 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20251212 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20260303 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20260309 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7833436 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |