Tunnel boring machine and method for replacing the pressure sensor of the tunnel boring machine

Info

Publication number
JP7836731B2
JP7836731B2 JP2022125859A JP2022125859A JP7836731B2 JP 7836731 B2 JP7836731 B2 JP 7836731B2 JP 2022125859 A JP2022125859 A JP 2022125859A JP 2022125859 A JP2022125859 A JP 2022125859A JP 7836731 B2 JP7836731 B2 JP 7836731B2
Authority
JP
Japan
Prior art keywords
pressure detector
housing
tunnel
pressure
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022125859A
Other languages
Japanese (ja)
Other versions
JP2024022347A (en
Inventor
慎二 串田
実 米沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2022125859A priority Critical patent/JP7836731B2/en
Publication of JP2024022347A publication Critical patent/JP2024022347A/en
Application granted granted Critical
Publication of JP7836731B2 publication Critical patent/JP7836731B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、トンネル掘削機及びトンネル掘削機の圧力検出器交換方法に関する。 This invention relates to a tunnel boring machine and a method for replacing the pressure sensor of a tunnel boring machine.

特許文献1には、カッタヘッドにより掘削された土砂が流入するチャンバ内の圧力を検出可能な圧力検出器を備えたトンネル掘削機が開示されている。 Patent Document 1 discloses a tunnel boring machine equipped with a pressure detector capable of detecting the pressure inside a chamber into which excavated soil flows by the cutter head.

特開2008-202321号公報Japanese Patent Publication No. 2008-202321

一般的に、特許文献1に記載されるようなトンネル掘削機では、隔壁に設けられた圧力検出器によりチャンバ内の圧力を検出し、検出されたチャンバ内の圧力が推定される切羽の圧力と同等となるように制御することによって、切羽を安定した状態に維持している。つまり、切羽をより安定した状態で維持するには、切羽における圧力を精度よく把握する必要がある。 Generally, in tunnel boring machines like the one described in Patent Document 1, the pressure inside the chamber is detected by a pressure detector installed in the partition wall, and the face is kept stable by controlling the detected pressure inside the chamber to be equivalent to the estimated pressure at the tunnel face. In other words, to maintain a more stable tunnel face, it is necessary to accurately grasp the pressure at the tunnel face.

本発明は、トンネル掘削機において、切羽における圧力を精度よく把握することを目的とする。 The present invention aims to accurately determine the pressure at the tunnel face in a tunnel boring machine.

本発明は、地中を掘削してトンネルを構築するトンネル掘削機であって、トンネルの軸方向に沿って延在する筒状の胴体と、胴体の前方において回転駆動される掘削部と、胴体内に設けられ、トンネルの軸方向において掘削部に対向して配置される隔壁と、胴体と掘削部と隔壁とにより区画され、掘削部により掘削された土砂が滞留するチャンバと、隔壁からチャンバ内に突出して設けられる筐体と、筐体内に収容される圧力検出器と、を備え、筐体には、圧力検出器の圧力検出面を掘削部に対向して露出させる貫通孔が形成され、筐体内には、貫通孔と同軸となるように挿入管が設置され、圧力検出器は、挿入管内に挿入される保持管の端部に取り付けられることにより保持管と一体化された状態で挿入管に固定される。また、本発明は、地中を掘削してトンネルを構築するトンネル掘削機であって、トンネルの軸方向に沿って延在する筒状の胴体と、胴体の前方において回転駆動される掘削部と、胴体内に設けられ、トンネルの軸方向において掘削部に対向して配置される隔壁と、胴体と掘削部と隔壁とにより区画され、掘削部により掘削された土砂が滞留するチャンバと、隔壁からチャンバ内に突出して設けられる筐体と、筐体内に収容される圧力検出器と、を備え、筐体には、圧力検出器の圧力検出面を掘削部に対向して露出させる貫通孔が形成されるトンネル掘削機の圧力検出器を交換する方法であって、掘削された土砂をチャンバ内に取り込むために掘削部に形成された開口部以外の部分が、圧力検出器の圧力検出面に対向する位置において掘削部を停止させる工程と、筐体から圧力検出器を取り外す工程と、取り外された圧力検出器とは別の圧力検出器を筐体に取り付ける工程と、を含む。また、本発明は、地中を掘削してトンネルを構築するトンネル掘削機であって、トンネルの軸方向に沿って延在する筒状の胴体と、胴体の前方において回転駆動される掘削部と、胴体内に設けられ、トンネルの軸方向において掘削部に対向して配置される隔壁と、胴体と掘削部と隔壁とにより区画され、掘削部により掘削された土砂が滞留するチャンバと、隔壁からチャンバ内に突出して設けられる筐体と、筐体内に収容される圧力検出器と、を備え、筐体には、圧力検出器の圧力検出面を掘削部に対向して露出させる貫通孔が形成され、筐体の貫通孔の周囲には、冷媒が流通する凍結管が設けられるトンネル掘削機の圧力検出器を交換する方法であって、掘削された土砂をチャンバ内に取り込むために掘削部に形成された開口部以外の部分が、圧力検出器の圧力検出面に対向する位置において掘削部を停止させる工程と、凍結管に冷媒を流し圧力検出器の圧力検出面の周囲に凍土を形成する工程と、筐体から圧力検出器を取り外す工程と、取り外された圧力検出器とは別の圧力検出器を筐体に取り付ける工程と、を含む。 The present invention relates to a tunnel boring machine for excavating underground to construct a tunnel, comprising: a cylindrical body extending along the axial direction of the tunnel; an excavation section rotated at the front of the body; a partition wall provided inside the body and positioned opposite the excavation section in the axial direction of the tunnel; a chamber partitioned by the body, the excavation section, and the partition wall, where excavated soil and sand accumulate; a housing provided protruding into the chamber from the partition wall; and a pressure detector housed within the housing. The housing has a through-hole formed therein, exposing the pressure detection surface of the pressure detector to face the excavation section . An insertion tube is installed inside the housing coaxially with the through-hole, and the pressure detector is fixed to the insertion tube in an integrated state with the holding tube by being attached to the end of a holding tube inserted into the insertion tube. Furthermore, the present invention relates to a tunnel boring machine for excavating underground to construct a tunnel, comprising: a cylindrical body extending along the axial direction of the tunnel; an excavation section rotated at the front of the body; a partition wall provided inside the body and positioned opposite the excavation section in the axial direction of the tunnel; a chamber partitioned by the body, the excavation section, and the partition wall, where excavated soil is stored; a housing provided protruding into the chamber from the partition wall; and a pressure detector housed within the housing, wherein the housing has a through-hole formed to expose the pressure detection surface of the pressure detector opposite the excavation section, and the method for replacing the pressure detector of a tunnel boring machine includes the steps of: stopping the excavation section at a position where a portion other than the opening formed in the excavation section for taking excavated soil into the chamber faces the pressure detection surface of the pressure detector; removing the pressure detector from the housing; and attaching a pressure detector different from the removed pressure detector to the housing. Furthermore, the present invention relates to a tunnel boring machine for excavating underground to construct a tunnel, comprising: a cylindrical body extending along the axial direction of the tunnel; an excavation section rotated at the front of the body; a partition wall provided inside the body and positioned opposite the excavation section in the axial direction of the tunnel; a chamber partitioned by the body, the excavation section, and the partition wall, where excavated soil is stored; a housing provided protruding into the chamber from the partition wall; and a pressure detector housed within the housing, wherein the housing has a through-hole formed therein that exposes the pressure detection surface of the pressure detector opposite the excavation section, and a freezing pipe through which a refrigerant flows is provided around the through-hole in the housing, comprising a method for replacing the pressure detector of a tunnel boring machine, comprising the steps of: stopping the excavation section at a position where a portion other than the opening formed in the excavation section for taking excavated soil into the chamber faces the pressure detection surface of the pressure detector; flowing a refrigerant through the freezing pipe to form frozen soil around the pressure detection surface of the pressure detector; removing the pressure detector from the housing; and attaching a pressure detector other than the removed pressure detector to the housing.

本発明によれば、トンネル掘削機において、切羽における圧力を精度よく把握することができる。 According to this invention, the pressure at the tunnel face can be accurately determined in a tunnel boring machine.

本発明の実施形態に係るトンネル掘削機の概略構成を示す断面図である。This is a cross-sectional view showing the schematic configuration of a tunnel boring machine according to an embodiment of the present invention. 図1の矢印Aで示される方向から見たトンネル掘削機を拡大して示した拡大図である。This is an enlarged view of the tunnel boring machine as seen from the direction indicated by arrow A in Figure 1. 図1のB部を拡大して示した拡大図である。This is an enlarged view showing section B of Figure 1. 圧力検出器の交換方法を説明するための図である。This is a diagram illustrating how to replace the pressure sensor. 圧力検出器の取り付け構造の変形例を示す図であり、図3に相当する断面を示す図である。This figure shows a modified example of the mounting structure for the pressure detector, and is a cross-sectional view corresponding to Figure 3.

以下、図面を参照して、本発明の実施形態について説明する。 The embodiments of the present invention will be described below with reference to the drawings.

まず、図1を参照して、本発明の実施形態に係るトンネル掘削機について説明する。以下では、トンネル掘削機が、シールド工法において用いられるシールド掘進機100である場合について説明する。シールド掘進機100は、地中(地山)を掘進して掘削坑を形成し、掘削坑の内壁を覆うように後述のセグメントリング112を組み立てることによって、シールドトンネルT(トンネル)を構築するものである。なお、本発明は、シールド掘進機100以外のトンネル掘削機、例えば、推進工法において推進管の先端に設置される掘削機にも適用可能である。 First, with reference to Figure 1, a tunnel boring machine according to an embodiment of the present invention will be described. The following description will focus on the case where the tunnel boring machine is a shield tunneling machine 100 used in the shield tunneling method. The shield tunneling machine 100 excavates through the ground (natural ground) to form a borehole, and then constructs a shield tunnel T (tunnel) by assembling the segment rings 112 (described later) to cover the inner wall of the borehole. Note that the present invention is also applicable to tunnel boring machines other than the shield tunneling machine 100, such as boring machines installed at the tip of a jacking pipe in the tunnel jacking method.

図1は、シールド掘進機100の概略構成を示す断面図であり、図2は、図1の矢印Aで示される方向から見たシールド掘進機100の概略図である。なお、図2では、カッタヘッド20以外の構成の図示を省略している。以下では、シールド掘進機100が進む方向である切羽側を「前方」とし、その反対の方向である坑口側を「後方」として説明する。 Figure 1 is a cross-sectional view showing the schematic configuration of the shield tunneling machine 100, and Figure 2 is a schematic view of the shield tunneling machine 100 as seen from the direction indicated by arrow A in Figure 1. Note that in Figure 2, the components other than the cutter head 20 are omitted from the illustration. In the following explanation, the face side, which is the direction in which the shield tunneling machine 100 moves, will be referred to as "forward," and the opposite direction, the tunnel entrance side, will be referred to as "rear."

図1に示すように、シールド掘進機100は、泥土圧シールド工法に用いられる泥土圧式シールド掘進機であり、筒状の前胴部10と、筒状の後胴部30と、前胴部10と後胴部30とを屈曲可能に連結する中折れ部40と、を備える。 As shown in Figure 1, the shield tunneling machine 100 is a slurry pressure type shield tunneling machine used in the slurry pressure shield tunneling method, and comprises a cylindrical front section 10, a cylindrical rear section 30, and a bendable section 40 that connects the front section 10 and the rear section 30.

前胴部10は、シールドトンネルTの軸方向に沿って延在する円筒状の外殻11(胴体)と、外殻11の前方において回転駆動されるカッタヘッド20(掘削部)と、外殻11内に設けられ、シールドトンネルTの軸方向においてカッタヘッド20に対向して配置される隔壁12と、を有する。なお、外殻11の断面形状は円形に限定されず、楕円状や矩形であってもよい。 The front section 10 comprises a cylindrical outer shell 11 (body) extending along the axial direction of the shield tunnel T, a cutter head 20 (excavation section) that is rotationally driven in front of the outer shell 11, and a partition wall 12 provided within the outer shell 11 and positioned opposite the cutter head 20 in the axial direction of the shield tunnel T. Note that the cross-sectional shape of the outer shell 11 is not limited to a circle; it may be elliptical or rectangular.

カッタヘッド20は、外殻11の外径と略等しい大きさの外径を有する円盤状の構造体であり、図2に示すように、回転軸C1を中心として放射状に延びる複数のスポーク部21と、スポーク部21の先端側が接続される円環状のリング部22と、隣り合うスポーク部21間に形成される開口部23と、スポーク部21の掘削面(切羽)と対向する面に周方向及び径方向に所定の間隔をあけて配置された複数のカッタビット24と、を有する。なお、図2に示される例では、4本のスポーク部21が設けられているが、スポーク部21の数はこれに限定されず、3本以下または5本以上であってもよい。また、カッタビット24を増設するために、隣り合うスポーク部21間にカッタビット24を取り付け可能な面板部を設けてもよい。 The cutter head 20 is a disc-shaped structure having an outer diameter approximately equal to the outer diameter of the outer shell 11. As shown in Figure 2, it has a plurality of spokes 21 extending radially from a rotation axis C1, an annular ring portion 22 to which the tips of the spokes 21 are connected, openings 23 formed between adjacent spokes 21, and a plurality of cutter bits 24 arranged at predetermined intervals in the circumferential and radial directions on the surface of the spokes 21 facing the excavation face. In the example shown in Figure 2, four spokes 21 are provided, but the number of spokes 21 is not limited to this; it may be three or fewer, or five or more. Furthermore, to add more cutter bits 24, a faceplate portion to which cutter bits 24 can be attached may be provided between adjacent spokes 21.

掘削面に向かって突出する複数のカッタビット24によって掘削された土砂は、スポーク部21間の開口部23を通じてカッタヘッド20、隔壁12及び外殻11により区画されるチャンバ15内へと導かれる。また、チャンバ15内に滞留した掘削土砂を撹拌するために、各スポーク部21には、図1に示されるように、チャンバ15内に向かって突出した撹拌棒28がそれぞれ設けられている。 The soil excavated by the multiple cutter bits 24 protruding toward the excavation surface is guided through the openings 23 between the spokes 21 into the chamber 15, which is partitioned by the cutter head 20, the partition wall 12, and the outer shell 11. Furthermore, to agitate the excavated soil accumulated in the chamber 15, each spoke 21 is provided with a stirring rod 28 protruding toward the chamber 15, as shown in Figure 1.

隔壁12には、カッタヘッド20と共に回転する円環状のカッタードラム13が回転自在に支持されているとともに、カッタヘッド20の略中央に接続されるロータリジョイント17が回転自在に支持されている。 The partition wall 12 rotatably supports an annular cutter drum 13 that rotates together with the cutter head 20, and also rotatably supports a rotary joint 17 connected to approximately the center of the cutter head 20.

カッタードラム13は、複数の連結ロッド13aを介してカッタヘッド20のスポーク部21と連結されており、カッタードラム13の後方側に設けられた支持壁16により支持される複数のモータ14によって回転駆動される。このため、モータ14の作動を制御することによって、カッタヘッド20の回転方向や回転速度を制御することが可能である。モータ14は、電動モータであってもよいし、油圧モータであってもよい。なお、カッタヘッド20の回転中心である回転軸C1は、外殻11の中心軸とほぼ一致している。 The cutter drum 13 is connected to the spoke portion 21 of the cutter head 20 via multiple connecting rods 13a, and is rotationally driven by multiple motors 14 supported by a support wall 16 located on the rear side of the cutter drum 13. Therefore, by controlling the operation of the motors 14, it is possible to control the rotation direction and rotation speed of the cutter head 20. The motors 14 may be electric motors or hydraulic motors. The rotation axis C1, which is the rotation center of the cutter head 20, is approximately coincident with the central axis of the outer shell 11.

ロータリジョイント17の内部には、カッタヘッド20側と隔壁12側とを電気的に接続可能な導線や添加剤等の液体を隔壁12側からカッタヘッド20側へと供給するための流路が設けられている。 Inside the rotary joint 17, there are conductive wires that electrically connect the cutter head 20 side and the partition wall 12 side, as well as a flow path for supplying liquids such as additives from the partition wall 12 side to the cutter head 20 side.

また、隔壁12には、カッタヘッド20に設けられた撹拌棒28とともにチャンバ15内に滞留した掘削土砂を撹拌するために、図1に示されるように、チャンバ15内に向かって突出した複数の固定翼18が設けられる。なお、固定翼18は、後述の圧力検出器60を収容するための筐体としても利用される。 Furthermore, the partition wall 12 is equipped with multiple fixed blades 18 that protrude into the chamber 15, as shown in Figure 1, in order to agitate the excavated soil accumulated in the chamber 15, together with the stirring rod 28 provided on the cutter head 20. The fixed blades 18 also serve as housings for the pressure detector 60, which will be described later.

図1に示される実施例において固定翼18と撹拌棒28とは、撹拌棒28が固定翼18よりも径方向外側に位置するようにそれぞれ配置されているが、撹拌棒28は、固定翼18よりも径方向内側に配置さていてもよいし、固定翼18よりも径方向内側と径方向外側との両方に配置されていてもよい。 In the embodiment shown in Figure 1, the fixed blade 18 and the stirring rod 28 are positioned such that the stirring rod 28 is radially outward from the fixed blade 18. However, the stirring rod 28 may also be positioned radially inward from the fixed blade 18, or it may be positioned both radially inward and radially outward from the fixed blade 18.

シールド掘進機100は、チャンバ15内に滞留した掘削土砂をシールド掘進機100の後方へと搬出するためのスクリューコンベヤ50をさらに備える。 The shield tunneling machine 100 is further equipped with a screw conveyor 50 for transporting excavated soil accumulated in the chamber 15 to the rear of the shield tunneling machine 100.

スクリューコンベヤ50は、円筒状のケース51と、ケース51の内部に組み込まれるオーガ52と、を有し、図示しないモータによってオーガ52を回転させることによって、チャンバ15内の掘削土砂を隔壁12の後方へと搬出する。 The screw conveyor 50 comprises a cylindrical case 51 and an auger 52 incorporated inside the case 51. By rotating the auger 52 using a motor (not shown), the excavated soil in the chamber 15 is transported to the rear of the partition wall 12.

後胴部30は、前胴部10の外殻11と同等の断面形状を有する外殻31と、セグメントリング112を組み立てるエレクタ33と、シールド掘進機100を前進させる複数のシールドジャッキ34と、カッタヘッド20により掘削された掘削坑110の内周面とセグメントリング112の外周面との間にグラウト材を注入する裏込め注入装置35と、セグメントリング112の形状を保持する真円保持装置37と、後胴部30内に設けられるこれらの装置を支持する支持部32と、を有する。なお、裏込め注入装置35や真円保持装置37は、任意の構成であり、設けられていなくてもよい。 The rear section 30 comprises an outer shell 31 having the same cross-sectional shape as the outer shell 11 of the front section 10, an erector 33 for assembling the segment ring 112, a plurality of shield jacks 34 for advancing the shield tunneling machine 100, a backfill injection device 35 for injecting grout material between the inner circumferential surface of the excavated hole 110 drilled by the cutter head 20 and the outer circumferential surface of the segment ring 112, a circular shape retaining device 37 for maintaining the shape of the segment ring 112, and a support section 32 provided within the rear section 30 to support these devices. Note that the backfill injection device 35 and the circular shape retaining device 37 are optional and may not be provided.

エレクタ33は、円弧形状のセグメントピース113を把持可能であるとともに、外殻31の内周面に沿って外殻31の中心軸C2方向及び周方向に移動可能に構成される。エレクタ33によって複数のセグメントピース113が外殻31の内周面に沿って組み立てられることにより、円筒状のセグメントリング112が構築される。 The erector 33 is capable of gripping the arc-shaped segment piece 113 and is configured to move along the inner circumferential surface of the outer shell 31 in the direction of the outer shell's central axis C2 and in the circumferential direction. By assembling multiple segment pieces 113 along the inner circumferential surface of the outer shell 31 using the erector 33, a cylindrical segment ring 112 is constructed.

外殻31の内周面には、外殻31とセグメントリング112との間の隙間をシールする環状のテールシール31aが軸方向に所定の間隔をあけて複数設けられる。テールシール31aは、外殻31とセグメントリング112との間の隙間を通じて土砂や水がシールド掘進機100内に侵入することを防止するために設けられる。 Multiple annular tail seals 31a are provided on the inner circumferential surface of the outer shell 31 at predetermined axial intervals to seal the gap between the outer shell 31 and the segment ring 112. The tail seals 31a are provided to prevent soil and water from entering the shield tunneling machine 100 through the gap between the outer shell 31 and the segment ring 112.

シールドジャッキ34は、シリンダ34aとロッド34bとにより構成される油圧ジャッキであり、外殻31の前方端部の内側に周方向に所定の間隔をあけて複数配置される。シールドジャッキ34のシリンダ34aから突出したロッド34bの先端部をセグメントリング112の側面に当接させた状態でシールドジャッキ34を伸長作動させることによってセグメントリング112から得られる反力により、カッタヘッド20は地山に押し付けられる。このように、シールド掘進機100は、シールドジャッキ34が既設のセグメントリング112を押圧することで得られる反力を、前方へ掘進するための推進力としている。 The shield jacks 34 are hydraulic jacks composed of a cylinder 34a and a rod 34b, and multiple jacks are arranged circumferentially at predetermined intervals inside the front end of the outer shell 31. By extending the shield jacks 34 with the tip of the rod 34b protruding from the cylinder 34a in contact with the side surface of the segment ring 112, the cutter head 20 is pressed against the ground by the reaction force obtained from the segment ring 112. In this way, the shield tunneling machine 100 uses the reaction force obtained by the shield jacks 34 pressing against the existing segment ring 112 as the propulsion force for forward excavation.

中折れ部40は、前胴部10の後端部に設けられ内周側に凹球面が形成された前胴接続部41と、後胴部30の前端部に設けられ外周側に前胴接続部41の凹球面に摺接する凸球面が形成された後胴接続部42と、前胴部10と後胴部30との間に設けられる複数の中折れジャッキ43と、を有する。 The folding section 40 includes a front section connecting portion 41 provided at the rear end of the front section 10 and having a concave spherical surface formed on its inner circumference, a rear section connecting portion 42 provided at the front end of the rear section 30 and having a convex spherical surface formed on its outer circumference that slides against the concave spherical surface of the front section connecting portion 41, and a plurality of folding jacks 43 provided between the front section 10 and the rear section 30.

中折れジャッキ43は、シリンダ43aとロッド43bとにより構成される油圧ジャッキであり、ロッド43bは、自在継手を介して後胴部30の前部に固定され、シリンダ43aは、自在継手を介して前胴部10の後部に固定される。 The folding jack 43 is a hydraulic jack composed of a cylinder 43a and a rod 43b. The rod 43b is fixed to the front of the rear body 30 via a universal joint, and the cylinder 43a is fixed to the rear of the front body 10 via a universal joint.

このように前胴部10と後胴部30とに連結された中折れジャッキ43を適宜伸縮させることによって、後胴部30に対する前胴部10の方向、すなわち、後胴部30の中心軸C2方向に対する回転軸C1方向を任意の方向に屈曲させることができる。なお、シールド掘進機100は、中折れ部40を備えていない構成であってもよい。 By appropriately extending and retracting the folding jack 43 connected to the front section 10 and the rear section 30, the direction of the front section 10 relative to the rear section 30, that is, the direction of the rotation axis C1 relative to the central axis C2 of the rear section 30, can be bent in any direction. Note that the shield tunneling machine 100 may also be configured without the folding section 40.

シールド掘進機100の後方には、シールド掘進機100の掘進に追従して移動する図示しない複数の後続台車が配置される。後続台車は、シールド掘進機100の作動を制御する制御装置やシールド掘進機100に電力を供給する電源装置、シールドトンネルTを構築するための部材を運搬するために設けられる。 Behind the shield tunneling machine 100, several follower carriages (not shown) are positioned to move in accordance with the machine's excavation. These follower carriages are used to transport control devices for managing the operation of the shield tunneling machine 100, power supply devices for the shield tunneling machine 100, and materials for constructing the shield tunnel T.

上記構成のシールド掘進機100は、カッタヘッド20を回転し、スクリューコンベヤ50により土砂を搬出し、シールドジャッキ34を伸長させて地山を掘進する。地山には掘削坑110が掘削されるとともに、掘削坑110の内周面に沿ってセグメントリング112が順次組み立てられることによってシールドトンネルTが構築される。掘削坑110の内周面とセグメントリング112の外周面との間に生じる間隙には、裏込め注入装置35によりグラウト材が注入され、セグメントリング112はグラウト材を介して地山に強固に結合された状態となる。 The shield tunneling machine 100 with the above configuration rotates the cutter head 20, transports soil by the screw conveyor 50, and extends the shield jacks 34 to excavate the ground. A borehole 110 is excavated in the ground, and a shield tunnel T is constructed by sequentially assembling segment rings 112 along the inner surface of the borehole 110. Grout material is injected into the gap between the inner surface of the borehole 110 and the outer surface of the segment rings 112 by a backfill injection device 35, and the segment rings 112 become firmly bonded to the ground via the grout material.

このようにシールドトンネルTを構築するシールド掘進機100を掘進させる際、掘削面である切羽において崩落が生じることを抑制するために、チャンバ15内の圧力は、切羽における圧力と同等となるように制御される。つまり、切羽の状態をより安定した状態とするためには、切羽における圧力を精度よく把握する必要がある。 When the shield tunneling machine 100 constructs the shield tunnel T, the pressure inside the chamber 15 is controlled to be equal to the pressure at the tunnel face in order to suppress collapse at the excavation face. In other words, to maintain a more stable condition at the tunnel face, it is necessary to accurately understand the pressure at the tunnel face.

このため、本実施形態では、チャンバ15内の圧力を検出する図示しない土圧計に加えて、切羽における圧力を検出するように配置された圧力検出器60が設けられている。 Therefore, in this embodiment, in addition to an earth pressure gauge (not shown) that detects the pressure inside the chamber 15, a pressure detector 60 is provided, which is arranged to detect the pressure at the tunnel face.

圧力検出器60は、歪みゲージ式や圧電式の圧力センサであって、図3に示すように、圧力検出面60aがカッタヘッド20(掘削部)に対向して露出するように固定翼18(筐体)内に収容されている。図3は、図1のB部を拡大して示した拡大図であり、固定翼18内の構成をわかりやすくするために部分的に断面で示している。 The pressure detector 60 is a strain gauge type or piezoelectric type pressure sensor, and as shown in Figure 3, it is housed within the fixed blade 18 (housing) so that the pressure detection surface 60a is exposed facing the cutter head 20 (excavation section). Figure 3 is an enlarged view of section B in Figure 1, and partially shows a cross-section to make the internal structure of the fixed blade 18 easier to understand.

このように圧力検出器60は、圧力検出面60aが切羽に対向するように配置されていることから、圧力検出面60aには、カッタヘッド20の回転に関わらず、常時、切羽における圧力が作用することになる。 As described above, since the pressure detector 60 is positioned so that its pressure detection surface 60a faces the cutting face, the pressure at the cutting face acts on the pressure detection surface 60a at all times, regardless of the rotation of the cutter head 20.

したがって、圧力検出器60は、切羽における圧力を連続的に検出することが可能である。 Therefore, the pressure detector 60 can continuously detect the pressure at the tunnel face.

図3に示されるように、圧力検出器60が収容される固定翼18は、隔壁12と支持壁16と外殻11とにより区画される作業空間に対して開口するように設けられた筒状の筐体であり、一端が隔壁12に接合される筒部18aと、カッタヘッド20に対向する筒部18aの他端を閉塞する底部18bと、を有する。底部18bには、圧力検出器60の圧力検出面60aをカッタヘッド20に対向して露出させるための貫通孔18cが形成されている。 As shown in Figure 3, the fixed wing 18 housing the pressure detector 60 is a cylindrical housing provided to open into the working space partitioned by the partition wall 12, the support wall 16, and the outer shell 11. It has a cylindrical portion 18a, one end of which is joined to the partition wall 12, and a bottom portion 18b that closes the other end of the cylindrical portion 18a facing the cutter head 20. A through hole 18c is formed in the bottom portion 18b to expose the pressure detection surface 60a of the pressure detector 60, facing the cutter head 20.

このように構成された固定翼18の内部には、一端側が底部18bに固定された遮断弁66と、遮断弁66他端側に連結された筒状の挿入管67と、が設けられる。遮断弁66と挿入管67とは、それぞれの内部に形成された通路が貫通孔18cと同軸となるように固定翼18に対して設置されており、これらは、圧力検出器60を所定の姿勢で固定翼18内に取り付けるための取付部65として機能する。 The fixed wing 18, configured in this way, contains a shut-off valve 66, one end of which is fixed to the bottom 18b, and a cylindrical insertion tube 67 connected to the other end of the shut-off valve 66. The shut-off valve 66 and the insertion tube 67 are positioned relative to the fixed wing 18 such that the passages formed inside them are coaxial with the through-hole 18c. These function as mounting parts 65 for attaching the pressure detector 60 to the fixed wing 18 in a predetermined orientation.

遮断弁66は、開弁状態で貫通孔18cと挿入管67との連通、すなわち、チャンバ15と挿入管67との連通を許容し、閉弁状態で貫通孔18cと挿入管67との連通を遮断する、いわゆるボールバルブである。また、遮断弁66が開弁状態にあるとき、遮断弁66内には、後述の保持管62と、保持管62に保持された圧力検出器60と、が挿通可能な空間が形成される。固定翼18内には、遮断弁66を開閉操作するための油圧式または空気圧式のアクチュエータが設けられる。 The shut-off valve 66 is a so-called ball valve that, when open, allows communication between the through-hole 18c and the insertion pipe 67, i.e., communication between the chamber 15 and the insertion pipe 67, and when closed, blocks communication between the through-hole 18c and the insertion pipe 67. Furthermore, when the shut-off valve 66 is in the open state, a space is formed within the shut-off valve 66 through which the retaining pipe 62 (described later) and the pressure detector 60 held by the retaining pipe 62 can be inserted. A hydraulic or pneumatic actuator for opening and closing the shut-off valve 66 is provided within the fixed vane 18.

なお、遮断弁66は、ボールバルブに限定されず、チャンバ15と挿入管67との連通を遮断可能であるとともに、開弁状態にあるときに保持管62と圧力検出器60とが挿通可能な挿通孔が内部に形成されればどのような形式の弁装置であってもよく、例えば、ピンチバルブやゲートバルブであってもよい。また、遮断弁66の開閉操作は手動で行われてもよい。 Furthermore, the shut-off valve 66 is not limited to a ball valve; any type of valve device is acceptable as long as it can shut off communication between the chamber 15 and the insertion pipe 67, and has an internal through-hole through which the retaining pipe 62 and the pressure detector 60 can be inserted when the valve is open. For example, it could be a pinch valve or a gate valve. Also, the opening and closing operation of the shut-off valve 66 may be performed manually.

挿入管67は、遮断弁66のフランジに図示しない締結部材を介して締結される第1フランジ部67aと、後述の保持管62のフランジ部62bが図示しない締結部材を介して締結される第2フランジ部67bと、が両端に設けられたパイプ材である。 The insertion pipe 67 is a pipe material with a first flange portion 67a fastened to the flange of the shut-off valve 66 via a fastening member (not shown) at both ends, and a second flange portion 67b fastened to the flange portion 62b of the retaining pipe 62 (described later) via a fastening member (not shown) at both ends.

圧力検出器60は、圧力検出器60を保持可能な保持端部62aと、保持端部62aとは反対側の端部に形成されたフランジ部62bと、を有する筒状の保持管62と一体化された状態で、上記構成の取付部65に挿入固定される。 The pressure detector 60 is inserted and fixed into the mounting portion 65 of the above configuration, while being integrated with a cylindrical retaining tube 62 having a retaining end 62a capable of holding the pressure detector 60 and a flange portion 62b formed at the end opposite the retaining end 62a.

具体的には、保持管62の保持端部62aに圧力検出器60の一部分が螺着または嵌合されることによって一体化された圧力検出器60及び保持管62は、取付部65内に挿入された後、保持管62のフランジ部62bと挿入管67の第2フランジ部67bとが図示しない締結部材を介して締結されることにより、固定翼18内の所定の位置に取り付けられた状態となる。なお、圧力検出器60の信号線60bは、保持管62の内部を通じて引き出され、図示しない計測装置に接続される。 Specifically, the pressure detector 60 and the retaining tube 62, which are integrated by screwing or fitting a portion of the pressure detector 60 to the retaining end 62a of the retaining tube 62, are inserted into the mounting portion 65. Afterward, the flange portion 62b of the retaining tube 62 and the second flange portion 67b of the insertion tube 67 are fastened together via a fastening member (not shown), thereby securing them to a predetermined position within the fixed wing 18. The signal line 60b of the pressure detector 60 is routed through the inside of the retaining tube 62 and connected to a measuring device (not shown).

また、挿入管67の内周面には、挿入管67と保持管62との間で圧縮されるシール部材68が設けられており、挿入管67と保持管62との間の隙間を通じて掘削土砂や地下水が作業空間に流入することが防止される。なお、シール部材68は、保持管62の外周面に設けられていてもよい。また、底部18bと遮断弁66との接触面や遮断弁66と挿入管67との接触面、保持管62のフランジ部62bと挿入管67の第2フランジ部67bとの接触面にも図示しないシール部材が適宜設けられる。また、遮断弁66内には、シール部材68と同様に保持管62の外周面に接するシール部材が設けられていてもよい。 Furthermore, a sealing member 68 is provided on the inner circumferential surface of the insertion pipe 67, which is compressed between the insertion pipe 67 and the retaining pipe 62. This prevents excavated soil and groundwater from flowing into the work space through the gap between the insertion pipe 67 and the retaining pipe 62. The sealing member 68 may also be provided on the outer circumferential surface of the retaining pipe 62. Additionally, sealing members (not shown) may be appropriately provided on the contact surfaces between the bottom portion 18b and the shut-off valve 66, the contact surfaces between the shut-off valve 66 and the insertion pipe 67, and the contact surfaces between the flange portion 62b of the retaining pipe 62 and the second flange portion 67b of the insertion pipe 67. Furthermore, a sealing member in contact with the outer circumferential surface of the retaining pipe 62 may be provided inside the shut-off valve 66, similar to the sealing member 68.

固定翼18内には、上記構成の取付部65に加えて、冷媒が流通する凍結管70が貫通孔18cを取り囲むように貼り付けられる。このように貫通孔18cの周囲に配置された凍結管70に液体窒素等の冷媒を流すことによって、後述のように、圧力検出器60の圧力検出面60aの周囲に凍土を形成することが可能となる。 In addition to the mounting portion 65 described above, a freezing pipe 70 through which refrigerant flows is attached to the fixed wing 18 so as to surround the through-hole 18c. By flowing a refrigerant such as liquid nitrogen through the freezing pipe 70 arranged around the through-hole 18c in this way, it becomes possible to form frozen soil around the pressure detection surface 60a of the pressure detector 60, as described later.

なお、冷媒が供給される流路は、凍結管70に限定されず、貫通孔18cの周囲に形成される流路であればよく、例えば、底部18b内に形成された流路であってもよいし、遮断弁66の底部18b側のフランジ内に形成された流路であってもよい。また、凍結管70への冷媒の供給は、後述のように、圧力検出器60を交換する作業が行われる間だけ行われる。 Furthermore, the flow path through which the refrigerant is supplied is not limited to the freezing pipe 70; it may be any flow path formed around the through-hole 18c, for example, a flow path formed within the bottom 18b, or a flow path formed within the flange on the bottom 18b side of the shut-off valve 66. Also, the supply of refrigerant to the freezing pipe 70 is performed only while the pressure detector 60 is being replaced, as described later.

このように、本実施形態の圧力検出器60は、固定翼18(筐体)内という比較的狭い空間内に収容されるが、以下のような手順により、圧力検出器60の故障等に応じて容易に交換することが可能である。 As described above, the pressure detector 60 in this embodiment is housed in a relatively narrow space within the fixed wing 18 (housing), but it can be easily replaced in case of malfunction or other issues by following the procedure described below.

次に、図4を参照し、具体的な圧力検出器60の交換方法について説明する。図4の(a)~(c)は、それぞれ図3に相当する断面を示す図であり、圧力検出器60を交換する方法を時系列に沿って示した図である。 Next, referring to Figure 4, we will explain the specific method for replacing the pressure detector 60. Figures 4(a) to 4(c) are cross-sectional views corresponding to Figure 3, illustrating the method for replacing the pressure detector 60 in chronological order.

圧力検出器60を交換するにあたって、まず、図4の(a)に示すように、カッタヘッド20を所定の位置で停止させる。具体的には、カッタヘッド20の開口部23以外の部分、例えばスポーク部21が圧力検出器60の圧力検出面60aに対向して位置した状態においてカッタヘッド20を停止させる(掘削部停止工程)。なお、隣り合うスポーク部21間に面板部が設けられている場合は、面板部が圧力検出面60aに対向して位置した状態においてカッタヘッド20を停止させてもよい。 When replacing the pressure detector 60, first, as shown in Figure 4(a), the cutter head 20 is stopped at a predetermined position. Specifically, the cutter head 20 is stopped when the portion of the cutter head 20 other than the opening 23, for example, the spoke portion 21, is positioned facing the pressure detection surface 60a of the pressure detector 60 (excavation section stopping step). If a faceplate portion is provided between adjacent spoke portions 21, the cutter head 20 may be stopped when the faceplate portion is positioned facing the pressure detection surface 60a.

続いて、凍結管70に冷媒を流し、圧力検出器60の圧力検出面60aの周囲に凍土を形成する(凍土形成工程)。凍結管70に冷媒を流すと、例えば、図4の(a)に破線で示すように、凍結管70を中心にその周囲が冷却されて凍土が形成される。 Next, refrigerant is flowed through the freezing tube 70, forming frozen soil around the pressure detection surface 60a of the pressure detector 60 (frozen soil formation step). When refrigerant is flowed through the freezing tube 70, for example, as shown by the dashed line in Figure 4(a), the area around the freezing tube 70 is cooled, forming frozen soil.

このように圧力検出面60aの周囲に凍土を形成するにあたって、上述のように、圧力検出面60aにはカッタヘッド20のスポーク部21が対向した状態となっていることから、圧力検出面60aの周辺には、凍土化すべき掘削土砂があまり存在していない状態となっている。したがって、比較的短い時間で圧力検出面60aの周囲に凍土を形成することが可能である。 In forming frozen soil around the pressure-sensing surface 60a in this manner, as described above, the spoke portion 21 of the cutter head 20 is facing the pressure-sensing surface 60a. Therefore, there is not much excavated soil to be frozen around the pressure-sensing surface 60a. Consequently, it is possible to form frozen soil around the pressure-sensing surface 60a in a relatively short time.

なお、圧力検出面60aに対向するカッタヘッド20のスポーク部21に温度センサを貼り付けておくことにより、圧力検出面60aの周囲の凍土の形成状況を確認できるようにしてもよい。 Furthermore, by attaching a temperature sensor to the spoke portion 21 of the cutter head 20 facing the pressure detection surface 60a, it may be possible to check the formation status of frozen soil around the pressure detection surface 60a.

圧力検出器60の圧力検出面60aの周囲に凍土が形成されたことが確認されると、保持管62のフランジ部62bと挿入管67の第2フランジ部67bとを締結していた図示しない締結部材に代えて首下長さが比較的長い抜け止め用ボルト72が取り付けられる。 When it is confirmed that frozen soil has formed around the pressure detection surface 60a of the pressure detector 60, a retaining bolt 72 with a relatively long underhead length is installed in place of the fastening member (not shown) that was fastening the flange portion 62b of the retaining pipe 62 and the second flange portion 67b of the insertion pipe 67.

抜け止め用ボルト72は、保持管62のフランジ部62bに形成された図示しない挿通孔を挿通し、挿入管67の第2フランジ部67bに形成された図示しない雌ねじ孔にネジ部が螺合されることによって取り付けられる。 The retaining bolt 72 is attached by inserting it through a through hole (not shown) formed in the flange portion 62b of the retaining tube 62, and screwing its threaded portion into a female threaded hole (not shown) formed in the second flange portion 67b of the insertion tube 67.

このように保持管62と挿入管67とを締結する際に用いられていた挿通孔や雌ねじ孔を利用して抜け止め用ボルト72を取り付けておくことによって、挿入管67に沿った保持管62の移動は、抜け止め用ボルト72の頭部に保持管62のフランジ部62bが当接することにより制限される。 By attaching the retaining bolt 72 using the through-hole or female thread hole used when fastening the retaining pipe 62 and the insertion pipe 67, the movement of the retaining pipe 62 along the insertion pipe 67 is restricted by the flange portion 62b of the retaining pipe 62 contacting the head of the retaining bolt 72.

このため、例えば、圧力検出面60aの周囲における凍土の形成が不十分であり、チャンバ15内の圧力によって、圧力検出器60及び保持管62が押圧されたとしても、保持管62が挿入管67から抜け出てしまうことは、抜け止め用ボルト72によって阻止される。なお、保持管62が挿入管67から抜け出ることを抑えるために、隔壁12や支持壁16によってベース部が支持されたジャッキ等により保持管62の移動を制限するようにしてもよい。 Therefore, for example, even if the formation of frozen soil around the pressure detection surface 60a is insufficient and the pressure detector 60 and the retaining tube 62 are pressed by the pressure inside the chamber 15, the retaining tube 62 will not come out of the insertion tube 67, as this is prevented by the retaining bolt 72. Furthermore, to prevent the retaining tube 62 from coming out of the insertion tube 67, the movement of the retaining tube 62 may be restricted by a jack or the like, with its base supported by a partition wall 12 or support wall 16.

また、圧力検出器60の圧力検出面60aの周囲に凍土が形成されたことが確認されると、保持管62のフランジ部62bには、図4の(a)に示すように、引き抜き用ボルト74が取り付けられる。 Furthermore, when it is confirmed that frozen soil has formed around the pressure detection surface 60a of the pressure detector 60, the extraction bolt 74 is attached to the flange portion 62b of the retaining pipe 62, as shown in Figure 4(a).

引き抜き用ボルト74は、全ねじボルトであり、保持管62のフランジ部62bに予め形成された図示しない雌ねじ孔にネジ部が螺合され、ネジ部の先端面が挿入管67の第2フランジ部67bに突き当たるように取り付けられる。 The extraction bolt 74 is a fully threaded bolt. Its threaded portion is screwed into a pre-formed female threaded hole (not shown) in the flange portion 62b of the retaining tube 62, and it is installed so that the tip surface of the threaded portion abuts against the second flange portion 67b of the insertion tube 67.

このように保持管62のフランジ部62bに取り付けられた引き抜き用ボルト74を締め込み方向、すなわち、ネジ部が保持管62のフランジ部62bから挿入管67の第2フランジ部67bに向かって徐々に繰り出すように回転させることによって、圧力検出器60は保持管62とともに、取付部65から徐々に引き抜かれる。 By rotating the extraction bolt 74 attached to the flange portion 62b of the retaining tube 62 in the tightening direction, that is, so that the threaded portion gradually extends from the flange portion 62b of the retaining tube 62 toward the second flange portion 67b of the insertion tube 67, the pressure sensor 60 is gradually pulled out from the mounting portion 65 together with the retaining tube 62.

そして、図4の(b)に示されるように、圧力検出器60が遮断弁66の弁部を通過すると、遮断弁66が遮断される(遮断工程)。これにより、貫通孔18cを通じて取付部65内に掘削土砂や地下水が流入することが確実に防止される。 Then, as shown in Figure 4(b), when the pressure detector 60 passes through the valve portion of the shut-off valve 66, the shut-off valve 66 is shut off (shutting-off process). This reliably prevents excavated soil and groundwater from flowing into the mounting portion 65 through the through-hole 18c.

圧力検出器60が遮断弁66の弁部を通過したか否かは、例えば、抜け止め用ボルト72によって保持管62の移動が制限される状態となったか否かによって判断することが可能である。換言すれば、抜け止め用ボルト72の長さは、圧力検出器60が遮断弁66の弁部を通過するまでの長さを考慮して設定される。なお、遮断弁66の開閉操作は、図示しないアクチュエータによって行われる。 Whether or not the pressure sensor 60 has passed the valve section of the shut-off valve 66 can be determined, for example, by whether or not the movement of the retaining tube 62 is restricted by the retaining bolt 72. In other words, the length of the retaining bolt 72 is set considering the length required for the pressure sensor 60 to pass the valve section of the shut-off valve 66. The opening and closing operation of the shut-off valve 66 is performed by an actuator (not shown).

また、遮断弁66が遮断されるまでの間に挿入管67と保持管62との間の隙間を通じて掘削土砂や地下水が流入することを抑制するために、シール部材68は、遮断弁66が遮断されるまでシール機能を発揮可能な位置、すなわち、図4の(b)に示されるように、遮断弁66が遮断される際に、挿入管67と保持管62とによって圧縮された状態となる位置に取り付けられる。 Furthermore, in order to prevent excavated soil and groundwater from flowing in through the gap between the insertion pipe 67 and the retaining pipe 62 before the shut-off valve 66 is shut off, the sealing member 68 is installed in a position where it can perform its sealing function until the shut-off valve 66 is shut off, that is, as shown in Figure 4(b), in a position where it is compressed by the insertion pipe 67 and the retaining pipe 62 when the shut-off valve 66 is shut off.

遮断弁66が遮断され、チャンバ15内の圧力によって圧力検出器60及び保持管62が押圧されるおそれがなくなると、抜け止め用ボルト72及び引き抜き用ボルト74が取り外され、図4の(c)に示すように、圧力検出器60は保持管62とともに、挿入管67から抜き取られる。 When the shut-off valve 66 is shut off and there is no longer any risk of the pressure sensor 60 and retaining tube 62 being pressed by the pressure inside the chamber 15, the retaining bolt 72 and the extraction bolt 74 are removed, and as shown in Figure 4(c), the pressure sensor 60, together with the retaining tube 62, is withdrawn from the insertion tube 67.

これにより固定翼18(筐体)から圧力検出器60を取り外す取外工程が完了する。取外工程が完了すると、引き続いて、別の圧力検出器60を固定翼18へと取り付ける取付工程が行われる。固定翼18への圧力検出器60の取り付けは、圧力検出器60を取り外す手順とほぼ反対の手順で行われる。 This completes the removal process of detaching the pressure detector 60 from the fixed wing 18 (housing). Following the removal process, the installation process of attaching another pressure detector 60 to the fixed wing 18 is performed. The installation of the pressure detector 60 to the fixed wing 18 is performed in almost the reverse order of the removal procedure.

なお、挿入管67へ圧力検出器60及び保持管62を挿入する際、必要に応じて挿入力を補助するジャッキ等が用いられてもよい。また、遮断弁66を開弁し貫通孔18cに向けて圧力検出器60を移動させる際には、挿入管67の第2フランジ部67bに保持管62のフランジ部62bが当接するまで抜け止め用ボルト72を締め込み方向に回転した後、図示しない締結部材によって挿入管67の第2フランジ部67bと保持管62のフランジ部62bとを締結するようにしてもよい。なお、取付工程では、引き抜き用ボルト74は用いられない。 Furthermore, when inserting the pressure sensor 60 and the retaining pipe 62 into the insertion pipe 67, a jack or the like may be used to assist with the insertion force as needed. Also, when opening the shut-off valve 66 and moving the pressure sensor 60 toward the through-hole 18c, the retaining bolt 72 may be rotated in the tightening direction until the flange portion 62b of the retaining pipe 62 contacts the second flange portion 67b of the insertion pipe 67. Then, the second flange portion 67b of the insertion pipe 67 and the flange portion 62b of the retaining pipe 62 may be fastened together using a fastening member (not shown). Note that the extraction bolt 74 is not used in the installation process.

以上のような工程を経て、圧力検出器60の交換は、貫通孔18cを通じて掘削土砂や地下水が流入することが防止された状況において、安全且つ容易に行われる。 Through the above process, the replacement of the pressure detector 60 can be carried out safely and easily, under conditions where the inflow of excavated soil and groundwater through the through-hole 18c is prevented.

上述した実施形態によれば、次の作用効果を奏する。 According to the above-described embodiment, the following effects and advantages are achieved.

本実施形態における圧力検出器60は、固定翼18(筐体)に形成された貫通孔18cから圧力検出面60aがカッタヘッド20(掘削部)に対向して露出するように固定翼18内に収容されている。このように圧力検出器60は、圧力検出面60aが切羽に対向するように配置されていることから、圧力検出面60aには、カッタヘッド20の回転に関わらず、常時、切羽における圧力が作用することになる。したがって、圧力検出器60の検出値に基づいて、切羽における圧力を連続的に精度よく把握することができる。 In this embodiment, the pressure detector 60 is housed within the fixed wing 18 (housing) such that its pressure detection surface 60a is exposed facing the cutter head 20 (excavation section) through a through-hole 18c formed in the fixed wing 18. Because the pressure detector 60 is positioned so that its pressure detection surface 60a faces the working face, the pressure at the working face acts on the pressure detection surface 60a at all times, regardless of the rotation of the cutter head 20. Therefore, the pressure at the working face can be continuously and accurately determined based on the detection value of the pressure detector 60.

また、圧力検出器60は、固定翼18(筐体)内に収容されているため、圧力検出器60の圧力検出面60aに粘性土等が付着することが抑制され、結果として、粘性土等の付着によって圧力検出器60が圧力を誤検出してしまうことを防止することができる。 Furthermore, since the pressure detector 60 is housed within the fixed wing 18 (housing), the adhesion of clay or other materials to the pressure detection surface 60a of the pressure detector 60 is suppressed. As a result, it is possible to prevent the pressure detector 60 from falsely detecting pressure due to the adhesion of clay or other materials.

また、本実施形態における圧力検出器60の交換は、カッタヘッド20の開口部23以外の部分が圧力検出器60の圧力検出面60aに対向して位置した状態においてカッタヘッド20を停止させた後、凍結管70に冷媒を流して圧力検出器60の圧力検出面60aの周囲に凍土が形成された状態において行われる。特に挿入管67からの圧力検出器60の抜き取り及び挿入管67への別の圧力検出器60の挿入は、チャンバ15と挿入管67との連通を遮断可能な遮断弁66が遮断された状態で行われる。 Furthermore, in this embodiment, the replacement of the pressure detector 60 is performed after stopping the cutter head 20 with the portion of the cutter head 20 other than the opening 23 facing the pressure detection surface 60a of the pressure detector 60, and then flowing refrigerant through the freezing pipe 70 to form frozen soil around the pressure detection surface 60a of the pressure detector 60. In particular, the removal of the pressure detector 60 from the insertion pipe 67 and the insertion of another pressure detector 60 into the insertion pipe 67 are performed with the shut-off valve 66, which can block communication between the chamber 15 and the insertion pipe 67, shut off.

このように圧力検出器60の交換は、貫通孔18cを通じてチャンバ15内の掘削土砂や地下水が挿入管67内に流入することが防止された状況において、固定翼18(筐体)から圧力検出器60を取り外し、別の圧力検出器60を固定翼18(筐体)に取り付けることによって、安全且つ容易に行うことができる。 Thus, the replacement of the pressure detector 60 can be performed safely and easily by removing the pressure detector 60 from the fixed vane 18 (housing) and attaching another pressure detector 60 to the fixed vane 18 (housing), while ensuring that excavated soil and groundwater from the chamber 15 do not flow into the insertion pipe 67 through the through-hole 18c.

次に、本実施形態の変形例について説明する。なお、以下のような変形例も本発明の範囲内であり、変形例に示す構成と上述の実施形態で説明した構成を組み合わせたり、以下の異なる変形例で説明する構成同士を組み合わせたりすることも可能である。 Next, we will describe some variations of this embodiment. Note that the following variations are also within the scope of the present invention, and it is possible to combine the configurations shown in the variations with the configurations described in the above-described embodiments, or to combine the configurations described in the following different variations.

上記実施形態では、固定翼18内に圧力検出器60を取り付けるために設けられた取付部65の遮断弁66は、固定翼18の底部18b側に配置されている。これに代えて、図5に示す変形例のように、遮断弁66は、隔壁12側に配置されてもよい。この場合、保持管62のフランジ部62bは、図5に示されるように、遮断弁66のフランジ部66aに図示しない締結部材を介して締結される。このように遮断弁66を隔壁12側に配置することによって、遮断弁66の開閉操作を手動で行うことが可能になるとともに開閉状態の確認を容易に行うことが可能となる。なお、遮断弁66は、隔壁12よりも後方に配置されてもよい。図5は、圧力検出器60の取り付け構造の変形例を示す図であり、図3に相当する断面を示す図である。 In the above embodiment, the shut-off valve 66 of the mounting portion 65, which is provided for mounting the pressure detector 60 within the fixed wing 18, is located on the bottom 18b side of the fixed wing 18. Alternatively, as shown in the modified example in Figure 5, the shut-off valve 66 may be located on the bulkhead 12 side. In this case, the flange portion 62b of the retaining pipe 62 is fastened to the flange portion 66a of the shut-off valve 66 via a fastening member (not shown), as shown in Figure 5. By arranging the shut-off valve 66 on the bulkhead 12 side in this way, it becomes possible to manually open and close the shut-off valve 66 and to easily check its open/closed state. Note that the shut-off valve 66 may also be located behind the bulkhead 12. Figure 5 shows a modified example of the mounting structure for the pressure detector 60, and is a cross-sectional view corresponding to Figure 3.

但し、図5に示す変形例のように、遮断弁66を貫通孔18cから離れた位置に配置すると、圧力検出器60を保持管62とともに取付部65から引き抜く際に、挿入管67内の空間の圧力が負圧となり、凍土を形成した場合であっても、貫通孔18cを通じて掘削土砂が挿入管67内に流入し易くなる。そして、このように挿入管67内に流入した掘削土砂が遮断弁66の摺動部に噛み込まれてしまうと遮断弁66を正常に開閉させることができなくなるおそれがある。 However, as shown in the modified example in Figure 5, if the shut-off valve 66 is positioned away from the through-hole 18c, when the pressure detector 60 is withdrawn from the mounting portion 65 along with the retaining pipe 62, the pressure in the space inside the insertion pipe 67 becomes negative. Even if frozen soil has formed, excavated soil and sand can easily flow into the insertion pipe 67 through the through-hole 18c. Furthermore, if the excavated soil and sand that have flowed into the insertion pipe 67 become jammed in the sliding part of the shut-off valve 66, there is a risk that the shut-off valve 66 will not be able to open or close properly.

このため、挿入管67には、底部18b側から挿入管67内に置換材を注入するための注入孔67cが設けられる。注入孔67cには、図示しない置換材供給装置が接続されており、挿入管67から圧力検出器60が引き抜かれることにともなって、置換材供給装置から置換材が徐々に供給される。これにより挿入管67内は置換材で満たされ、遮断弁66の摺動部に掘削土砂等が噛み込まれることを防止することができる。なお、圧力検出器60が引き抜かれることによって生じる空間を置換材によって満たすために、注入孔67cは、出来るだけ貫通孔18cの近くに設けられることが好ましく、例えば、注入孔67cは、挿入管67ではなく、貫通孔18cにおいて一端が開口するように固定翼18の底部18b内に設けられていてもよい。 Therefore, the insertion tube 67 is provided with an injection hole 67c for injecting replacement material into the insertion tube 67 from the bottom 18b side. A replacement material supply device (not shown) is connected to the injection hole 67c, and as the pressure detector 60 is withdrawn from the insertion tube 67, replacement material is gradually supplied from the replacement material supply device. This fills the insertion tube 67 with replacement material, preventing excavated soil and other debris from becoming trapped in the sliding part of the shut-off valve 66. Furthermore, in order to fill the space created when the pressure detector 60 is withdrawn with replacement material, it is preferable that the injection hole 67c be provided as close as possible to the through hole 18c. For example, the injection hole 67c may be provided not in the insertion tube 67, but within the bottom 18b of the fixed wing 18 such that one end opens at the through hole 18c.

置換材としては、比較的流動性が高いゼリー状の材料(例えば、ベントナイト、粘土、水ガラス)が用いられる。圧力検出器60を引き抜く際に挿入管67内に充填された置換材は、新たな圧力検出器60が保持管62とともに取付部65に挿入される際に、注入孔67cまたは貫通孔18cを通じて排出される。 As the replacement material, a relatively fluid, gel-like material (e.g., bentonite, clay, water glass) is used. When the pressure detector 60 is withdrawn, the replacement material filled into the insertion tube 67 is discharged through the injection hole 67c or through hole 18c when the new pressure detector 60 is inserted into the mounting portion 65 together with the retaining tube 62.

なお、図5に示される変形例では、遮断弁66のフランジ部66a近傍に第1シール部材68aが配置される。この第1シール部材68aは、上記実施形態におけるシール部材68と同様に、遮断弁66が遮断されるまでの間に保持管62の外周側に形成される隙間を通じて掘削土砂や地下水が流入することを抑制するために設けられる。 In the modified example shown in Figure 5, a first sealing member 68a is positioned near the flange portion 66a of the shut-off valve 66. Similar to the sealing member 68 in the above embodiment, this first sealing member 68a is provided to prevent excavated soil and groundwater from flowing in through the gap formed on the outer circumference of the retaining pipe 62 before the shut-off valve 66 is shut off.

また、図5に示される変形例では、注入孔67cよりも貫通孔18c側に第2シール部材68bが配置される。このように貫通孔18cと注入孔67cとの間に第2シール部材68bが設けられることによって、挿入管67と保持管62との間の隙間を通じて掘削土砂や地下水が作業空間や注入孔67cに流入することが防止される。なお、第2シール部材68bに代えて、または、第2シール部材68bに加えて、注入孔67cを通じて掘削土砂や地下水が置換材供給装置へと流入することを阻止するための逆流防止弁が注入孔67c内や注入孔67cと置換材供給装置とを連通する通路上に設けられてもよい。 Furthermore, in the modified configuration shown in Figure 5, the second sealing member 68b is positioned on the through-hole 18c side of the injection hole 67c. By providing the second sealing member 68b between the through-hole 18c and the injection hole 67c in this manner, excavated soil and groundwater are prevented from flowing into the work space and the injection hole 67c through the gap between the insertion pipe 67 and the holding pipe 62. Alternatively, instead of the second sealing member 68b, or in addition to the second sealing member 68b, a backflow prevention valve may be provided inside the injection hole 67c or on the passage connecting the injection hole 67c and the replacement material supply device to prevent excavated soil and groundwater from flowing into the replacement material supply device through the injection hole 67c.

また、上記実施形態では、図5に示される変形例の注入孔67cのように置換材を注入するための孔が設けられていないが、図4の(a)に示される状態から図4の(b)に示される状態へと、遮断弁66内を通じて圧力検出器60を引き抜く際に、遮断弁66内に生じる空間が置換材によって満たされるようにするために、遮断弁66の貫通孔18c側のフランジ部または固定翼18の底部18bに、置換材を注入するための注入孔を設けておいてもよい。 Furthermore, in the above embodiment, although there is no hole for injecting the replacement material, as shown in the modified example in Figure 5 (injection hole 67c), an injection hole for injecting the replacement material may be provided in the flange portion on the through-hole 18c side of the shut-off valve 66 or in the bottom portion 18b of the fixed wing 18, in order to fill the space created inside the shut-off valve 66 with the replacement material when the pressure detector 60 is withdrawn through the shut-off valve 66 from the state shown in Figure 4(a) to the state shown in Figure 4(b).

また、上記実施形態では、図4に示されるように、隔壁12と支持壁16との間の作業空間内において、取付部65に対する圧力検出器60及び保持管62の抜き差しが行われているが、隔壁12からの固定翼18の突出長さが比較的長く、保持管62の長さを、隔壁12と支持壁16との間の間隔の大きさよりも長くする必要がある場合には、圧力検出器60の交換を上述のような手順で行うことが困難となる。 Furthermore, in the above embodiment, as shown in Figure 4, the pressure detector 60 and the retaining tube 62 are inserted into and removed from the mounting portion 65 within the working space between the bulkhead 12 and the support wall 16. However, if the protrusion length of the fixed wing 18 from the bulkhead 12 is relatively long, and the length of the retaining tube 62 needs to be longer than the distance between the bulkhead 12 and the support wall 16, it becomes difficult to replace the pressure detector 60 using the procedure described above.

このため、保持管62を比較的長くする必要がある場合には、保持管62を軸方向において複数のパイプ材に分割可能な構成とし、圧力検出器60を交換する際に、作業空間内で保持管62を組立または分解するようにしてもよい。また、取付部65から引き抜かれた保持管62が挿通可能な大きさの孔を支持壁16に予め形成しておき、圧力検出器60を交換するときだけ、この孔を利用し、取付部65に対して圧力検出器60及び保持管62を抜き差しするようにしてもよい。 Therefore, if the retaining tube 62 needs to be relatively long, it may be configured to be divisible into multiple pipe sections in the axial direction, allowing the retaining tube 62 to be assembled or disassembled within the workspace when replacing the pressure detector 60. Alternatively, a hole large enough for the retaining tube 62 to pass through after being withdrawn from the mounting section 65 may be pre-formed in the support wall 16. This hole may then be used to insert and remove the pressure detector 60 and the retaining tube 62 from the mounting section 65 only when replacing the pressure detector 60.

また、上記実施形態では、圧力検出器60の交換を行う際に、圧力検出器60の圧力検出面60aの周囲に凍土を形成している。圧力検出面60aとスポーク部21との間の隙間が比較的小さく、且つ、チャンバ15内の圧力が比較的低い場合には、貫通孔18cを通じて掘削土砂や地下水が短時間で流入するおそれが低いことから、このような場合には、圧力検出器60の圧力検出面60aの周囲に凍土を形成しなくともよい。 Furthermore, in the above embodiment, when replacing the pressure detector 60, frozen soil is formed around the pressure detection surface 60a of the pressure detector 60. However, if the gap between the pressure detection surface 60a and the spoke portion 21 is relatively small, and the pressure inside the chamber 15 is relatively low, there is little risk of excavated soil or groundwater flowing in through the through-hole 18c in a short time. In such cases, it is not necessary to form frozen soil around the pressure detection surface 60a of the pressure detector 60.

また、上記実施形態では、シールド掘進機100は、いわゆる泥土圧式シールド掘進機である。これに代えて、シールド掘進機100は、チャンバ15内に対して泥水を給排することによりチャンバ15内に滞留した掘削土砂をシールド掘進機100の後方へと搬出する泥水給排装置を備えた、いわゆる泥水圧式シールド掘進機であってもよい。 Furthermore, in the above embodiment, the shield tunneling machine 100 is a so-called earth pressure balance type shield tunneling machine. Alternatively, the shield tunneling machine 100 may be a so-called slurry pressure type shield tunneling machine, equipped with a slurry supply and discharge device that supplies and discharges slurry into the chamber 15 to transport the excavated soil accumulated in the chamber 15 to the rear of the shield tunneling machine 100.

以上、本発明の実施形態について説明したが、上記実施形態は本発明の適用例の一部を示したに過ぎず、本発明の技術的範囲を上記実施形態の具体的構成に限定する趣旨ではない。 Although embodiments of the present invention have been described above, these embodiments represent only a portion of the applications of the present invention, and are not intended to limit the technical scope of the present invention to the specific configurations of the above embodiments.

100・・・シールド掘進機(トンネル掘削機)
11・・・外殻(胴体)
12・・・隔壁
15・・・チャンバ
18・・・固定翼(筐体)
18c・・・貫通孔
20・・・カッタヘッド(掘削部)
60・・・圧力検出器
60a・・・圧力検出面
65・・・取付部
66・・・遮断弁
67・・・挿入管
70・・・凍結管
T・・・シールドトンネル(トンネル)
100... Shield tunneling machine (tunnel boring machine)
11... Outer shell (body)
12...Bulkhead 15...Chamber 18...Fixed wing (housing)
18c...Through hole 20...Cutter head (excavation part)
60... Pressure detector 60a... Pressure detection surface 65... Mounting part 66... Shut-off valve 67... Insertion pipe 70... Freezing pipe T... Shield tunnel (tunnel)

Claims (7)

地中を掘削してトンネルを構築するトンネル掘削機であって、
前記トンネルの軸方向に沿って延在する筒状の胴体と、
前記胴体の前方において回転駆動される掘削部と、
前記胴体内に設けられ、前記トンネルの軸方向において前記掘削部に対向して配置される隔壁と、
前記胴体と前記掘削部と前記隔壁とにより区画され、前記掘削部により掘削された土砂が滞留するチャンバと、
前記隔壁から前記チャンバ内に突出して設けられる筐体と、
前記筐体内に収容される圧力検出器と、を備え、
前記筐体には、前記圧力検出器の圧力検出面を前記掘削部に対向して露出させる貫通孔が形成され、
前記筐体内には、前記貫通孔と同軸となるように挿入管が設置され、
前記圧力検出器は、前記挿入管内に挿入される保持管の端部に取り付けられることにより前記保持管と一体化された状態で前記挿入管に固定される、
トンネル掘削機。
A tunnel boring machine that excavates underground to construct a tunnel,
A cylindrical body extending along the axial direction of the tunnel,
A drilling section that is rotated at the front of the fuselage,
A partition wall is provided within the body and is positioned opposite the excavation section in the axial direction of the tunnel,
The chamber is partitioned by the aforementioned body, the aforementioned excavation section, and the aforementioned bulkhead, and is a chamber in which the soil excavated by the excavation section accumulates.
A housing is provided that protrudes from the partition wall into the chamber,
The enclosure includes a pressure detector housed within the aforementioned housing,
The housing has a through hole formed therein that exposes the pressure detection surface of the pressure detector facing the excavation portion .
An insertion tube is installed inside the housing so as to be coaxial with the through hole.
The pressure detector is fixed to the insertion tube in an integrated state with the retaining tube by being attached to the end of the retaining tube that is inserted into the insertion tube.
Tunnel boring machine.
前記筐体の前記貫通孔の周囲には、冷媒が流通する凍結管が設けられる、
請求項1に記載のトンネル掘削機。
A freezing pipe through which refrigerant flows is provided around the through-hole of the housing.
The tunnel boring machine according to claim 1.
前記貫通孔と前記挿入管との間には、前記貫通孔と前記挿入管との連通を遮断可能な遮断弁が設けられる、A shut-off valve capable of blocking communication between the through-hole and the insertion pipe is provided between the through-hole and the insertion pipe.
請求項1に記載のトンネル掘削機。The tunnel boring machine according to claim 1.
前記掘削部から前記チャンバ内に突出し、径方向において前記筐体に近接して設けられる撹拌棒をさらに備え、
前記筐体は、固定翼であり、
前記チャンバ内に滞留する土砂は、前記筐体と前記撹拌棒とにより撹拌される、
請求項1から3の何れか1つに記載のトンネル掘削機。
The chamber is further provided with a stirring rod that protrudes from the excavation section into the chamber and is positioned radially close to the housing,
The aforementioned housing has fixed wings,
The sediment remaining in the chamber is agitated by the housing and the stirring rod.
A tunnel boring machine according to any one of claims 1 to 3 .
地中を掘削してトンネルを構築するトンネル掘削機であって、前記トンネルの軸方向に沿って延在する筒状の胴体と、前記胴体の前方において回転駆動される掘削部と、前記胴体内に設けられ、前記トンネルの軸方向において前記掘削部に対向して配置される隔壁と、前記胴体と前記掘削部と前記隔壁とにより区画され、前記掘削部により掘削された土砂が滞留するチャンバと、前記隔壁から前記チャンバ内に突出して設けられる筐体と、前記筐体内に収容される圧力検出器と、を備え、前記筐体には、前記圧力検出器の圧力検出面を前記掘削部に対向して露出させる貫通孔が形成されるトンネル掘削機の前記圧力検出器を交換する方法であって、
掘削された土砂を前記チャンバ内に取り込むために前記掘削部に形成された開口部以外の部分が、前記圧力検出器の前記圧力検出面に対向する位置において前記掘削部を停止させる工程と、
前記筐体から前記圧力検出器を取り外す工程と、
取り外された前記圧力検出器とは別の圧力検出器を前記筐体に取り付ける工程と、を含む、
トンネル掘削機の圧力検出器交換方法。
A tunnel boring machine for excavating underground to construct a tunnel, comprising: a cylindrical body extending along the axial direction of the tunnel; an excavation section rotated at the front of the body; a partition wall provided inside the body and positioned opposite the excavation section in the axial direction of the tunnel; a chamber partitioned by the body, the excavation section, and the partition wall, where excavated soil is stored; a housing provided protruding from the partition wall into the chamber; and a pressure detector housed within the housing, wherein the housing has a through-hole formed therein that exposes the pressure detection surface of the pressure detector opposite the excavation section .
A step of stopping the excavation section at a position where a portion of the excavation section other than the opening formed in the excavation section for taking the excavated soil into the chamber faces the pressure detection surface of the pressure detector,
The steps include removing the pressure detector from the housing and
The process includes attaching a pressure detector, different from the one removed, to the housing,
Method for replacing the pressure sensor in a tunnel boring machine.
地中を掘削してトンネルを構築するトンネル掘削機であって、前記トンネルの軸方向に沿って延在する筒状の胴体と、前記胴体の前方において回転駆動される掘削部と、前記胴体内に設けられ、前記トンネルの軸方向において前記掘削部に対向して配置される隔壁と、前記胴体と前記掘削部と前記隔壁とにより区画され、前記掘削部により掘削された土砂が滞留するチャンバと、前記隔壁から前記チャンバ内に突出して設けられる筐体と、前記筐体内に収容される圧力検出器と、を備え、前記筐体には、前記圧力検出器の圧力検出面を前記掘削部に対向して露出させる貫通孔が形成され、前記筐体の前記貫通孔の周囲には、冷媒が流通する凍結管が設けられるトンネル掘削機の前記圧力検出器を交換する方法であって、
掘削された土砂を前記チャンバ内に取り込むために前記掘削部に形成された開口部以外の部分が、前記圧力検出器の前記圧力検出面に対向する位置において前記掘削部を停止させる工程と、
前記凍結管に冷媒を流し前記圧力検出器の前記圧力検出面の周囲に凍土を形成する工程と、
前記筐体から前記圧力検出器を取り外す工程と、
取り外された前記圧力検出器とは別の圧力検出器を前記筐体に取り付ける工程と、を含む、
トンネル掘削機の圧力検出器交換方法。
A method for replacing the pressure detector of a tunnel boring machine, comprising: a tunnel boring machine for excavating underground to construct a tunnel, the machine comprising: a cylindrical body extending along the axial direction of the tunnel; an excavation section rotated at the front of the body; a partition wall provided inside the body and positioned opposite the excavation section in the axial direction of the tunnel; a chamber partitioned by the body, the excavation section, and the partition wall, where excavated soil and sand accumulates; a housing provided protruding from the partition wall into the chamber; and a pressure detector housed within the housing, wherein the housing has a through-hole that exposes the pressure detection surface of the pressure detector opposite the excavation section, and a freezing pipe through which a refrigerant flows is provided around the through-hole of the housing ;
A step of stopping the excavation section at a position where a portion of the excavation section other than the opening formed in the excavation section for taking the excavated soil into the chamber faces the pressure detection surface of the pressure detector,
The steps include flowing a refrigerant through the freezing pipe to form frozen soil around the pressure sensing surface of the pressure detector,
The steps include removing the pressure detector from the housing and
The process includes attaching a pressure detector, different from the one removed, to the housing,
Method for replacing the pressure sensor in a tunnel boring machine.
前記筐体からの前記圧力検出器の取り外しは、前記筐体内に設けられ前記圧力検出器が挿入される挿入管から前記圧力検出器を抜き取ることにより行われ、
前記筐体への前記別の圧力検出器の取り付けは、前記挿入管に前記別の圧力検出器を挿入することにより行われ、
前記挿入管からの前記圧力検出器の抜き取り及び前記挿入管への前記別の圧力検出器の挿入は、前記チャンバと前記挿入管との連通を遮断可能な遮断弁が遮断された状態で行われる、
請求項5または6に記載のトンネル掘削機の圧力検出器交換方法。
The removal of the pressure detector from the housing is performed by removing the pressure detector from the insertion tube into which the pressure detector is inserted, which is provided inside the housing.
The attachment of the other pressure detector to the housing is performed by inserting the other pressure detector into the insertion tube.
The removal of the pressure detector from the insertion tube and the insertion of the other pressure detector into the insertion tube are performed with the shut-off valve, which is capable of blocking communication between the chamber and the insertion tube, closed.
A method for replacing a pressure detector in a tunnel boring machine according to claim 5 or 6 .
JP2022125859A 2022-08-05 2022-08-05 Tunnel boring machine and method for replacing the pressure sensor of the tunnel boring machine Active JP7836731B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022125859A JP7836731B2 (en) 2022-08-05 2022-08-05 Tunnel boring machine and method for replacing the pressure sensor of the tunnel boring machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022125859A JP7836731B2 (en) 2022-08-05 2022-08-05 Tunnel boring machine and method for replacing the pressure sensor of the tunnel boring machine

Publications (2)

Publication Number Publication Date
JP2024022347A JP2024022347A (en) 2024-02-16
JP7836731B2 true JP7836731B2 (en) 2026-03-27

Family

ID=89855105

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022125859A Active JP7836731B2 (en) 2022-08-05 2022-08-05 Tunnel boring machine and method for replacing the pressure sensor of the tunnel boring machine

Country Status (1)

Country Link
JP (1) JP7836731B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009046810A (en) 2007-08-13 2009-03-05 Kajima Corp Shield machine and freezing method in chamber

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60151994U (en) * 1984-03-19 1985-10-09 日立建機株式会社 shield tunneling machine
JPS6294196U (en) * 1985-12-05 1987-06-16
JPH0247288U (en) * 1988-09-22 1990-03-30
JP7337454B2 (en) * 2019-10-21 2023-09-04 株式会社奥村組 shield machine

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009046810A (en) 2007-08-13 2009-03-05 Kajima Corp Shield machine and freezing method in chamber

Also Published As

Publication number Publication date
JP2024022347A (en) 2024-02-16

Similar Documents

Publication Publication Date Title
AU2018412370B2 (en) A long-distance drilling and hydrofracturing integrated device and method in underground mine
CA1285550C (en) Core drilling tool for boreholes in rock
JP4270493B2 (en) Reaming device for ground drilling machine
US20050034896A1 (en) Pipe burying method
US12065932B2 (en) Excavation tool replacement device and tunnel boring machine
JP5672435B2 (en) Double pipe drilling rig
JP7836731B2 (en) Tunnel boring machine and method for replacing the pressure sensor of the tunnel boring machine
CN116888338A (en) Flushing element, rock drilling machine and method
JP5443961B2 (en) Excavator
US8302706B1 (en) Apparatus and method for installing ground anchoring systems
JP5394321B2 (en) Pinch valve device for buried pipe propulsion machine
US11608685B2 (en) Cutting head and method for horizontal directional tunneling
JP7208788B2 (en) natural ground drainage device
JP5420788B1 (en) Shield machine and shield method
US8235147B1 (en) Apparatus and method for installing ground anchoring systems
CN104963651A (en) Novel gushing-prevention device for small-sized orifice
JP3693465B2 (en) Leading cutter for backfilling pipe of shield machine
JP2008150773A (en) Drilling bit and drilling system
JP7273507B2 (en) Shield method
CN211974978U (en) Advanced grouting hole protecting, anti-blocking and dredging device and advanced grouting structure
JP6661978B2 (en) Excavator used for shield method or propulsion method
JPH0288881A (en) Drilling device for continuous hole
JP2023085025A (en) tunnel excavator
KR930008639B1 (en) Method and device for updating existing pipeline
JP2024022355A (en) tunnel boring machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250121

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250829

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250930

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20251117

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260303

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260316

R150 Certificate of patent or registration of utility model

Ref document number: 7836731

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150