JP7843253B2 - Wind power diagnostic and evaluation device, wind power diagnostic and evaluation method, and program - Google Patents
Wind power diagnostic and evaluation device, wind power diagnostic and evaluation method, and programInfo
- Publication number
- JP7843253B2 JP7843253B2 JP2023017020A JP2023017020A JP7843253B2 JP 7843253 B2 JP7843253 B2 JP 7843253B2 JP 2023017020 A JP2023017020 A JP 2023017020A JP 2023017020 A JP2023017020 A JP 2023017020A JP 7843253 B2 JP7843253 B2 JP 7843253B2
- Authority
- JP
- Japan
- Prior art keywords
- wind
- bearing
- load
- condition
- wind power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Wind Motors (AREA)
Description
本発明の実施形態は、風力診断評価装置、風力診断評価方法、およびプログラムに関する。 Embodiments of the present invention relate to a wind power diagnostic and evaluation device, a wind power diagnostic and evaluation method, and a program.
風力発電装置では、風の乱れ等によりブレードに加わる荷重が増大する場合がある。この場合、機械部品の損傷リスクが高まる懸念がある。このため、発電出力を低下させた、通常時よりも低出力の運転状態への切り替えを行う運転制御方法が提案されている。このような出力抑制を伴う運転制御方法では、発電量の損失が生じるものの、機械部品に対する荷重を低減することができる。 In wind power generation systems, wind turbulence and other factors can increase the load on the blades. This raises concerns about an increased risk of damage to mechanical components. Therefore, an operational control method has been proposed that involves switching to a lower-output operating state than normal, thereby reducing power generation. While this type of output-suppressed operation results in a loss of power generation, it can reduce the load on mechanical components.
風力発電装置に設けられた機械部品の一つに、ブレードの回転力を発電機に伝達する回転軸に設置される軸受がある。この軸受は、乱流等の悪風況下で風力発電装置が起動するときに損傷しやすくなる。 One of the mechanical components in a wind turbine is a bearing installed on the rotating shaft that transmits the rotational force of the blades to the generator. This bearing is susceptible to damage when the wind turbine starts up under adverse wind conditions such as turbulence.
しかし、従来の運転制御では、ブレードに加わる荷重ではなく、風速の値に基づいて起動停止を判断する。そのため、上記のような起動時の過負荷による軸受の損傷に対処することが困難である。 However, conventional operating control systems determine start and stop based on wind speed values, not the load applied to the blades. Therefore, it is difficult to address bearing damage caused by overload during startup, as described above.
本発明が解決しようする課題は、風力発電装置の起動時における軸受の損傷リスクを軽減することが可能な風力診断評価装置、風力診断方法、およびプログラムを提案することである。 The problem that this invention aims to solve is to propose a wind power diagnostic and evaluation device, a wind power diagnostic method, and a program that can reduce the risk of bearing damage during the startup of a wind power generation device.
一実施形態に係る風力診断評価装置は、風力で回転するブレードと、ブレードの回転力で発電する発電機と、回転力を発電機に伝達する回転軸と、回転軸に設置される軸受と、を少なくとも備える風力発電装置の風力診断評価装置である。この風力診断評価装置は、風力によってブレードに加わる風荷重を解析する風荷重解析部と、風荷重解析部の解析結果に基づいて、風力発電装置の起動時における軸受の状態量を評価する軸受状態評価部と、軸受状態評価部の評価結果に基づいて、起動時における風力発電装置の発電量を含む出力指令値を設定する出力設定部と、を備える。 One embodiment of the wind power diagnostic and evaluation device is a wind power diagnostic and evaluation device for a wind turbine power generation system comprising at least a blade that rotates with wind power, a generator that generates electricity using the rotational force of the blade, a rotating shaft that transmits the rotational force to the generator, and a bearing installed on the rotating shaft. This wind power diagnostic and evaluation device includes a wind load analysis unit that analyzes the wind load applied to the blade by wind power, a bearing state evaluation unit that evaluates the state quantities of the bearing at startup of the wind turbine power generation system based on the analysis results of the wind load analysis unit, and an output setting unit that sets an output command value including the amount of power generated by the wind turbine power generation system at startup based on the evaluation results of the bearing state evaluation unit.
本実施形態によれば、風力発電装置の起動時における軸受の損傷リスクを軽減することが可能となる。 According to this embodiment, it is possible to reduce the risk of bearing damage during the startup of the wind power generation system.
以下、図面を参照して本発明の実施形態を説明する。下記の実施形態は、本発明を限定するものではない。 The embodiments of the present invention will be described below with reference to the drawings. The embodiments described below are not intended to limit the present invention.
(第1実施形態)
図1は、風力発電装置の概略的な構成を示す模式図である。図1に示す風力発電装置10は、筐体であるナセル1と、ナセル1を下方から支持する支柱であるタワー2と、複数のブレード3と、複数のブレード3を支持するハブ4と、を備える。風力発電装置10は、洋上に設置されてもよいし、陸上に設置されてもよい。
(First Embodiment)
Figure 1 is a schematic diagram showing the general configuration of a wind power generation device. The wind power generation device 10 shown in Figure 1 comprises a nacelle 1 which is a housing, a tower 2 which is a support column that supports the nacelle 1 from below, a plurality of blades 3, and a hub 4 that supports the plurality of blades 3. The wind power generation device 10 may be installed offshore or on land.
ナセル1には、回転軸5、軸受6、変速機構7、および発電機8が収容されている。回転軸5の一端は、軸受6によって、ハブ4に回転可能に固定されている。回転軸5の他端は、変速機構7と連結されている。 The nacelle 1 houses the rotating shaft 5, bearings 6, a transmission mechanism 7, and a generator 8. One end of the rotating shaft 5 is rotatably fixed to the hub 4 by bearings 6. The other end of the rotating shaft 5 is connected to the transmission mechanism 7.
変速機構7は、適宜のカップリング機構などを介して発電機8と連結されている。本実施形態では、3つのブレード3の基端部が、回転方向に120度の間隔をおいてハブ4に固定されている。なお、本実施形態では、変速機構7が設けられていない構成であってもよい。この場合、回転軸5の他端は、発電機8に連結される。 The gear shifting mechanism 7 is connected to the generator 8 via an appropriate coupling mechanism or the like. In this embodiment, the base ends of the three blades 3 are fixed to the hub 4 at 120-degree intervals in the rotational direction. Note that in this embodiment, the gear shifting mechanism 7 may not be provided. In this case, the other end of the rotating shaft 5 is connected to the generator 8.
風力発電装置10の運転中において、ハブ4および回転軸5と共に一体となって回転する複数のブレード3は、風力から得た流体エネルギを回転エネルギに変換する。この回転エネルギは、回転軸5によって変速機構7を介して発電機8へ伝達される。このとき、変速機構7が回転速度を減速又は増速する。発電機8は、伝達された回転エネルギを用いて発電する。 During operation of the wind turbine 10, the multiple blades 3, which rotate together with the hub 4 and the rotating shaft 5, convert fluid energy obtained from wind into rotational energy. This rotational energy is transmitted to the generator 8 via the gearbox 7 by the rotating shaft 5. At this time, the gearbox 7 decelerates or increases the rotational speed. The generator 8 uses the transmitted rotational energy to generate electricity.
風況計測器9は、ナセル1の外周部に設置されている。風況計測器9は、風向を計測可能な風速計や風向を計測可能な風向計として機能する風速センサの一例である。風況計測器9は、風力発電装置10が設置された設置エリアで、例えば風速の平均および風速の変化を示す風況データを計測する。 The wind condition measuring instrument 9 is installed on the outer perimeter of the nacelle 1. The wind condition measuring instrument 9 is an example of a wind speed sensor that functions as an anemometer capable of measuring wind direction or a wind direction indicator capable of measuring wind direction. The wind condition measuring instrument 9 measures wind condition data, such as the average wind speed and changes in wind speed, in the installation area where the wind power generation device 10 is installed.
図2は、軸受6の構造例を示す断面図である。本実施形態では、軸受6は、複数のころ61と、軸受外輪部62と、潤滑油63と、軸受内輪部64と、を有する転がり軸受である。各ころ61は、潤滑油63内で回転する。風力発電装置10の起動時には、ころ61と、軸受外輪部62、軸受内輪部64との間の隙間が小さくなる。そのため、これらの隙間にそれぞれ形成される潤滑油63の油膜の厚さtも小さくなる。そのため、乱流等の状況下で風力発電装置10が、定格発電量の出力指令値に基づいて運転し始めると、軸受6に過大な荷重が加えられる場合がある。この場合、軸受6が損傷しやすくなって、寿命が短くなってしまう。 Figure 2 is a cross-sectional view showing an example of the structure of bearing 6. In this embodiment, bearing 6 is a rolling bearing having a plurality of rollers 61, a bearing outer ring portion 62, lubricating oil 63, and a bearing inner ring portion 64. Each roller 61 rotates in the lubricating oil 63. When the wind power generation device 10 is started, the gap between the rollers 61 and the bearing outer ring portion 62 and bearing inner ring portion 64 becomes smaller. Therefore, the thickness t of the oil film of lubricating oil 63 formed in these gaps also becomes smaller. As a result, when the wind power generation device 10 starts operating based on the output command value of the rated power generation amount under conditions such as turbulence, an excessive load may be applied to bearing 6. In this case, bearing 6 becomes more susceptible to damage, and its lifespan is shortened.
そこで、本実施形態では、風力診断評価装置20が、データ収集装置30に収集されたた種々のデータを用いて風力発電装置10の起動時の出力指令値を設定する。なお、風力診断評価装置20およびデータ収集装置30の設置エリアは、特に限定されない。例えば、風力診断評価装置20は、風力発電装置10の運転制御装置40の周辺に設置されてもよい。 Therefore, in this embodiment, the wind power diagnostic and evaluation device 20 sets the output command value for the wind power generation system 10 at startup using various data collected by the data acquisition device 30. The installation area of the wind power diagnostic and evaluation device 20 and the data acquisition device 30 is not particularly limited. For example, the wind power diagnostic and evaluation device 20 may be installed around the operation control device 40 of the wind power generation system 10.
図3は、第1実施形態に係る風力診断評価装置20およびデータ収集装置30の概略的な構成を示すブロック図である。風力診断評価装置20およびデータ収集装置30は、有線接続されていてもよいし、ネットワークを介して無線接続されていてもよい。 Figure 3 is a block diagram showing a schematic configuration of the wind power diagnostic and evaluation device 20 and data acquisition device 30 according to the first embodiment. The wind power diagnostic and evaluation device 20 and data acquisition device 30 may be connected by a wired connection or by a wireless connection via a network.
まず、データ収集装置30に収集されるデータについて説明する。データ収集装置30は、例えば、SCADA(Supervisory Control And Data Acquisition)データ31、温度計測データ32、気象予測データ33、変位計測データ34、ひずみ計測データ35、および風況計測データ36を収集する。 First, let's explain the data collected by the data acquisition device 30. The data acquisition device 30 collects, for example, SCADA (Supervisory Control And Data Acquisition) data 31, temperature measurement data 32, weather forecast data 33, displacement measurement data 34, strain measurement data 35, and wind condition measurement data 36.
SCADA(Supervisory Control And Data Acquisition)データ31は、風力発電装置10の運転を監視制御するためのデータである。SCADAデータ31には、例えば、発電量、風速、風向、ブレード3のピッチ角およびヨー角などが示されている。SCADAデータ31の風速および風向は、例えば風況計測器9によって計測された風況データである。 SCADA (Supervisory Control And Data Acquisition) data 31 is data used to monitor and control the operation of the wind turbine 10. The SCADA data 31 includes, for example, power generation, wind speed, wind direction, and the pitch and yaw angles of the blades 3. The wind speed and wind direction in the SCADA data 31 are wind condition data measured, for example, by a wind condition measuring instrument 9.
温度計測データ32には、気温や軸受6の温度などが示されている。気温は、例えば風況計測器9によって計測された温度データである。軸受6の温度は、例えば熱電対を用いて計測された温度データである。 The temperature measurement data 32 shows the ambient temperature and the temperature of the bearing 6. The ambient temperature is, for example, temperature data measured by the wind condition measuring instrument 9. The temperature of the bearing 6 is, for example, temperature data measured using a thermocouple.
気象予測データ33には、例えば気象庁から提供されるMSM(Meso Scale Model)やLFM(Local Forecast Model)といった気象解析モデルが含まれている。 The weather forecast data 33 includes weather analysis models such as the MSM (Meso Scale Model) and LFM (Local Forecast Model) provided by the Japan Meteorological Agency.
変位計測データ34には、風力の荷重による軸受6の変位量δが示されている。変位量δは、例えば図2に示すように、上記荷重によって点αから点βまでの径方向および軸方向の相対的な変位量である。変位計測データ34には、変位センサ(不図示)によって計測された3点以上の変位量δが示されている。 The displacement measurement data 34 shows the displacement δ of the bearing 6 due to the wind load. The displacement δ is the relative radial and axial displacement from point α to point β due to the load, as shown, for example, in Figure 2. The displacement measurement data 34 shows the displacement δ at three or more points measured by a displacement sensor (not shown).
ひずみ計測データ35は、ブレード3のひずみ量とタワー2のひずみ量との少なくとも一方を示す。ブレード3のひずみ量は、ひずみセンサ(不図示)を用いて1つ以上のブレード3で少なくとも2点以上計測される。タワー2のひずみ量は、複数のひずみセンサ(不図示)を用いて計測される。ひずみセンサは、少なくとも1箇所以上のフロアの外周部において、周方向に離れた3点以上の計測ポイントに設置される。具体的には、フロアの外周部が1箇所であれば、ブレード3に加わるスラスト荷重を計測することができる。また、地上からの高さが異なるフロアの外周部が2箇所以上であればブレード3に加わるモーメント荷重を計測することができる。 The strain measurement data 35 shows at least one of the strain amounts of the blades 3 and the tower 2. The strain amount of the blades 3 is measured at at least two points on one or more blades 3 using strain sensors (not shown). The strain amount of the tower 2 is measured using multiple strain sensors (not shown). The strain sensors are installed at three or more measurement points spaced circumferentially on the outer perimeter of at least one floor. Specifically, if there is only one outer perimeter of the floor, the thrust load applied to the blades 3 can be measured. Furthermore, if there are two or more outer perimeters of floors at different heights from the ground, the moment load applied to the blades 3 can be measured.
風況計測データ36は、風力発電装置10の周辺に設置された風況実測装置50(図1参照)によって計測された実測データを示す。風況実測装置50は、例えばLiDAR(Light Detection And Ranging)である。LiDARは、レーザー光を大気中に放射して大気からの散乱光を受信、そのドップラー周波数から風速と風向を観測する。 The wind condition measurement data 36 shows the actual measurement data obtained by the wind condition measurement device 50 (see Figure 1) installed around the wind power generation device 10. The wind condition measurement device 50 is, for example, a LiDAR (Light Detection and Ranging) system. A LiDAR system emits laser light into the atmosphere, receives scattered light from the atmosphere, and observes wind speed and direction from its Doppler frequency.
次に、風力診断評価装置20の構成について説明する。風力診断評価装置20は、図3に示すように、通信部21と、操作部22と、表示部23と、記憶部24と、演算部25と、を備える。以下、各部について説明する。 Next, the configuration of the wind power diagnostic and evaluation device 20 will be described. As shown in Figure 3, the wind power diagnostic and evaluation device 20 comprises a communication unit 21, an operation unit 22, a display unit 23, a storage unit 24, and a calculation unit 25. Each unit will be described below.
通信部21は、データ収集装置30と通信するときに通信インターフェースとして機能する。 The communication unit 21 functions as a communication interface when communicating with the data acquisition device 30.
操作部22は、ユーザの操作入力を受け付ける。操作部22は、例えばキーボードやマウス等の入力デバイスを有する。 The operation unit 22 receives user input. The operation unit 22 includes, for example, an input device such as a keyboard or mouse.
表示部23は、演算部25の演出結果等の種々の画像を表示する。表示部23は、例えば液晶ディスプレイ等の表示デバイスを有する。 The display unit 23 displays various images, such as the results of the calculation unit 25's processing. The display unit 23 has a display device, such as a liquid crystal display.
記憶部24は、風況解析データベース241、荷重解析データベース242、過去損傷データベース243、および残存寿命データベース244を格納する。以下、各データベースについて説明する。 The memory unit 24 stores the wind condition analysis database 241, the load analysis database 242, the past damage database 243, and the remaining life database 244. Each database is described below.
風況解析データベース241は、複数の風況条件の各々に対する鉛直方向の風速分布を示す。ここで、図4を参照して風況解析データベース241の風速分布について説明する。 The wind condition analysis database 241 shows the vertical wind speed distribution for each of several wind condition conditions. Here, the wind speed distribution of the wind condition analysis database 241 will be explained with reference to Figure 4.
図4は、風速分布の一例を示す図である。図4では、横軸はタワー2の立地地点の風速を示し、縦軸はその立地地点の標高を示す。図4には、3つの風況条件C1、C2、C3の風速分布が示されている。各風況条件には、風速、風向、乱流強度、および気温などが含まれる。乱流強度は、風速の標準偏差を平均風速で除した値である。なお、図4では、ナセル1のある位置における風速分布を示す。しかし、ナセル1は、タワー2を中心にして回転可能である。そのため、風況解析データベース241の風速分布には、ナセル1の回転位置に応じて図1に示すYZ平面の風速プロファイルが含まれる。ここで図1に示すXYZ座標軸では、ハブ4の高さ位置かつ風車に風が流入する先端位置を原点としている。X軸は、回転軸5に沿った方向である。Z軸は、鉛直方向である。Y軸は、X軸およびZ軸に直交する方向である。なお、本実施形態では、アップウィンド式風車を対象にしているため、原点位置がハブ4の位置になっている。ただし、本実施形態では、ダウンウィンド式風車を対象としてもよい。この場合には、原点は、風が流入するナセル1の先端部(図1の黒丸部分参照)となるため、X軸の方向は、図1に示す向きとは逆向きとなる。 Figure 4 shows an example of a wind speed distribution. In Figure 4, the horizontal axis represents the wind speed at the location of Tower 2, and the vertical axis represents the elevation of that location. Figure 4 shows the wind speed distribution for three wind conditions C1, C2, and C3. Each wind condition includes wind speed, wind direction, turbulence intensity, and temperature. Turbulence intensity is the value obtained by dividing the standard deviation of the wind speed by the average wind speed. Note that Figure 4 shows the wind speed distribution at a certain position of Nacelle 1. However, Nacelle 1 is rotatable around Tower 2. Therefore, the wind speed distribution in the wind condition analysis database 241 includes the wind speed profile in the YZ plane shown in Figure 1, depending on the rotation position of Nacelle 1. Here, in the XYZ coordinate axes shown in Figure 1, the origin is the height position of the hub 4 and the tip position where wind flows into the wind turbine. The X axis is the direction along the rotation axis 5. The Z axis is the vertical direction. The Y axis is the direction perpendicular to the X and Z axes. In this embodiment, since an upwind wind turbine is being considered, the origin is located at the hub 4. However, this embodiment may also be used for a downwind wind turbine. In this case, the origin would be the tip of the nacelle 1 into which the wind flows (see the black circle in Figure 1), and therefore the direction of the X-axis would be opposite to that shown in Figure 1.
図5は、荷重解析データベース242の一例を示す図である。図5に示す荷重解析データベース242は、複数の荷重解析条件の各々に対する風荷重Fを複数の出力指令値ごとに示す。各荷重解析条件は、上記風速分布に対応する。また、風荷重Fは、風力によってブレード3に加わる荷重である。また、複数の出力指令値は、風力発電装置10(発電機8)の発電量が互いに異なっている。各出力指令値に対応する風荷重Fは、風速分布、乱流強度、回転軸5の回転数、およびブレード3のピッチ角などの荷重解析条件に基づいて予め計算されている。本実施形態では、風荷重Fは、同じ風が吹いたときに迎角を変化させたときのブレード3が受けるスラスト荷重である。 Figure 5 shows an example of the load analysis database 242. The load analysis database 242 shown in Figure 5 displays the wind load F for each of the multiple load analysis conditions for each of the multiple output command values. Each load analysis condition corresponds to the wind speed distribution described above. The wind load F is the load applied to the blade 3 by the wind force. The multiple output command values represent different power generation amounts from the wind power generator 10 (generator 8). The wind load F corresponding to each output command value is pre-calculated based on load analysis conditions such as wind speed distribution, turbulence intensity, rotation speed of the rotating shaft 5, and the pitch angle of the blade 3. In this embodiment, the wind load F is the thrust load received by the blade 3 when the angle of attack is changed while the same wind is blowing.
図6は、過去損傷データベース243の一例を示す図である。図6に示す過去損傷データベース243は、複数の出力指令値ごとに、軸受6に形成される油膜厚さのしきい値を示す。過去損傷データベース243に示されるしきい値は、軸受6が過去に損傷したときの油膜厚さに基づいて予め出力指令値ごとに予め設定されている。例えば、風力発電装置10の起動時に出力指令値aが設定されている場合、起動時における軸受6の油膜厚さtがしきい値tth1を下回っていると、軸受6が損傷する可能性が高くなる。 Figure 6 shows an example of a past damage database 243. The past damage database 243 shown in Figure 6 indicates threshold values for the oil film thickness formed on the bearing 6 for each of several output command values. The threshold values shown in the past damage database 243 are pre-set for each output command value based on the oil film thickness when the bearing 6 was damaged in the past. For example, if an output command value a is set when the wind power generation device 10 is started, if the oil film thickness t of the bearing 6 at the time of startup is below the threshold value t th1 , the likelihood of the bearing 6 being damaged increases.
図7は、残存寿命データベース244を説明するための図である。残存寿命データベース244には、風力発電装置10の運転時間の経過に伴って軸受6の寿命がどの程度消費されるかを表すデータが登録されている。図7に示す残存寿命データベース244では、風力発電装置10の総運転時間と、軸受6の残存寿命率とが関連付けられている。残存寿命率は、風力発電装置10の総運転時間が0であるときの寿命1.0に対して、ある出力指令値で運転時間が経過したときの消費寿命を差し引いた残存寿命の割合を示す。残存寿命データベース244は、実線で示される実績データであってもよいし、点線で示される平均データであってもよい。平均データは、複数の実績データを平均処理した平均寿命消費率である。 Figure 7 is a diagram illustrating the remaining life database 244. The remaining life database 244 contains data indicating how much of the bearing 6's life is consumed as the operating time of the wind turbine 10 elapses. In the remaining life database 244 shown in Figure 7, the total operating time of the wind turbine 10 is associated with the remaining life rate of the bearing 6. The remaining life rate represents the ratio of the remaining life to the life of 1.0 when the total operating time of the wind turbine 10 is 0, minus the life consumed when operating at a certain output command value. The remaining life database 244 may be actual data shown as a solid line, or average data shown as a dotted line. The average data is the average life consumption rate obtained by averaging multiple actual data sets.
上述した各データベースは、演算部25の演算処理に用いられる。演算部25は、データ取得部251と、風況解析部252と、風荷重解析部253と、軸受状態評価部254と、軸受寿命計算部255と、出力設定部256と、を有する。なお、各部の機能が、例えばコンピュータプログラムに基づいて演算処理を実行するCPU(Central Processing Unit)によって実現される場合、このコンピュータプログラムは、記憶部24に記憶される。 The databases described above are used for the calculation processing of the calculation unit 25. The calculation unit 25 includes a data acquisition unit 251, a wind condition analysis unit 252, a wind load analysis unit 253, a bearing condition evaluation unit 254, a bearing life calculation unit 255, and an output setting unit 256. If the functions of each unit are implemented by a CPU (Central Processing Unit) that executes calculation processing based on a computer program, for example, this computer program is stored in the storage unit 24.
ここで、風力診断評価装置20による風力診断評価方法として、演算部25の演算処理について説明する。 Here, we will explain the calculation process of the calculation unit 25 as a wind power diagnostic and evaluation method using the wind power diagnostic and evaluation device 20.
図8は、第1実施形態に係る演算部25の演算処理の手順を示すフローチャートである。このフローチャートでは、まず、データ取得部251が、通信部21を介してデータ収集装置30からデータを取得する(ステップS11)。本実施形態では、データ取得部251は、例えばSCADAデータ31および温度計測データ32を取得する。なお、ステップS11では、データ取得部251は、風況計測データ36も取得してよい。 Figure 8 is a flowchart showing the calculation process of the calculation unit 25 according to the first embodiment. In this flowchart, first, the data acquisition unit 251 acquires data from the data collection device 30 via the communication unit 21 (step S11). In this embodiment, the data acquisition unit 251 acquires, for example, SCADA data 31 and temperature measurement data 32. Note that in step S11, the data acquisition unit 251 may also acquire wind condition measurement data 36.
次に、風況解析部252が、データ取得部251によって取得されたデータと、風況解析データベース241とを用いて風況解析を行う(ステップS12)。ステップS12では、まず、風況解析部252は、SCADAデータ31に示された風速や風向等に基づいて風況条件を特定する。続いて、風況解析部252は、特定した風況条件に対応する風速分布を風況解析データベース241から選出する。続いて、風況解析部252は、選出した風速分布に基づいて、軸受6等が収容されたナセル1の地上からの高さH(図4)を含むブレード3全体に作用する風速分布を求める。 Next, the wind condition analysis unit 252 performs a wind condition analysis using the data acquired by the data acquisition unit 251 and the wind condition analysis database 241 (step S12). In step S12, first, the wind condition analysis unit 252 identifies wind conditions based on the wind speed, wind direction, etc., shown in the SCADA data 31. Subsequently, the wind condition analysis unit 252 selects a wind speed distribution corresponding to the identified wind conditions from the wind condition analysis database 241. Then, based on the selected wind speed distribution, the wind condition analysis unit 252 determines the wind speed distribution acting on the entire blade 3, including the height H (Figure 4) of the nacelle 1 where the bearings 6 etc. are housed from the ground.
なお、ステップS11でデータ取得部251が風況計測データ36も取得している場合には、ステップS1において、風況解析部252は、風況計測データ36から高さHを含むブレード3全体に作用する風速分布を求める。この場合、風況解析部252は、高さHを含むブレード3全体に作用する風速分布について、例えば、風況解析データベース241から求めた値と、風況計測データ36から求めた値とに同じまたは異なる重み付け係数をそれぞれ乗算して加算した値を風況解析結果として出力する。 Furthermore, if the data acquisition unit 251 also acquires wind condition measurement data 36 in step S11, in step S1, the wind condition analysis unit 252 determines the wind speed distribution acting on the entire blade 3, including height H, from the wind condition measurement data 36. In this case, the wind condition analysis unit 252 outputs a wind condition analysis result obtained by multiplying, for example, the value obtained from the wind condition analysis database 241 and the value obtained from the wind condition measurement data 36 by the same or different weighting coefficients and adding them together.
また、ステップS12では、風況解析部252は、高さH(図4)における風速の所定時間内の平均を示す平均風速、または乱流強度を求めてもよい。 Furthermore, in step S12, the wind condition analysis unit 252 may determine the average wind speed, which represents the average wind speed at height H (Figure 4) over a predetermined time period, or the turbulence intensity.
風況解析部252の風況解析が終了すると、次に、風荷重解析部253が、風況解析部252の風況解析結果と、荷重解析データベース242とを用いて、風荷重を解析する(ステップS13)。ステップS13では、まず風荷重解析部253は、風況解析部252の風況解析結果、具体的には高さHを含むブレード3全体に作用する風速分布における風速に基づいて荷重解析条件を特定する。続いて、風荷重解析部253は、特定した荷重解析条件に対応する風荷重を、荷重解析データベース242から出力指令値ごとに選定する。このように、ステップS13では、風荷重解析部253が、荷重解析データベース242を用いて風況解析部252の風況解析結果を風荷重に変換する。 Once the wind condition analysis by the wind condition analysis unit 252 is complete, the wind load analysis unit 253 then analyzes the wind load using the wind condition analysis results from the wind condition analysis unit 252 and the load analysis database 242 (step S13). In step S13, the wind load analysis unit 253 first identifies the load analysis conditions based on the wind condition analysis results from the wind condition analysis unit 252, specifically the wind speed in the wind speed distribution acting on the entire blade 3, including height H. Next, the wind load analysis unit 253 selects the wind load corresponding to the identified load analysis conditions from the load analysis database 242 for each output command value. Thus, in step S13, the wind load analysis unit 253 converts the wind condition analysis results from the wind condition analysis unit 252 into wind loads using the load analysis database 242.
なお、ステップS12で風況解析部252が平均風速を求める場合には、荷重解析データベース242には、風荷重の平均値が予め登録されている。そのため、ステップS13では、風荷重解析部253は、高さHにおける平均風速に基づいて荷重解析条件を特定し、特定した荷重解析条件に対応する風荷重の平均値を荷重解析データベース242から出力指令値ごとに選定する。なお、この平均風速は、例えば、予め設定された評価時間幅内に複数回計測された風速の平均値であってもよいし、風速分布に示された鉛直方向における(各標高の)複数個の風速の平均値であってもよい。 Furthermore, when the wind condition analysis unit 252 calculates the average wind speed in step S12, the load analysis database 242 already has the average wind load registered. Therefore, in step S13, the wind load analysis unit 253 identifies the load analysis conditions based on the average wind speed at height H, and selects the average wind load corresponding to the identified load analysis conditions from the load analysis database 242 for each output command value. This average wind speed may, for example, be the average of wind speeds measured multiple times within a pre-set evaluation time range, or it may be the average of multiple wind speeds in the vertical direction (at each elevation) shown in the wind speed distribution.
また、ステップS12で風況解析部252が乱流強度を求める場合には、荷重解析データベース242には、風荷重の最大値が予め登録されている。そのため、ステップS13では、風荷重解析部253は、高さHにおける乱流強度に基づいて荷重解析条件を特定し、特定した荷重解析条件に対応する風荷重の最大値を荷重解析データベース242から出力指令値ごとに選定する。 Furthermore, when the wind condition analysis unit 252 determines the turbulence intensity in step S12, the maximum wind load is pre-registered in the load analysis database 242. Therefore, in step S13, the wind load analysis unit 253 identifies the load analysis conditions based on the turbulence intensity at height H, and selects the maximum wind load corresponding to the identified load analysis conditions from the load analysis database 242 for each output command value.
風荷重解析部253の荷重解析が終了すると、次に、軸受状態評価部254が、風荷重解析部253の解析結果と、過去損傷データベース243とを用いて、風力に対する軸受6の状態量を評価する(ステップS14)。ステップS14では、まず軸受状態評価部254は、軸受要素モデルを用いて、風荷重によって軸受6に加わる軸受荷重を計算する。軸受要素モデルは、例えば、出力指令値ごとに求められた風荷重を軸受6のころ61に加わる面圧に換算するための計算モデルである。この計算モデルは、ころ61の数、形式、およびころ61と軸受外輪部62、軸受内輪部64との隙間等に応じて予め決められている。本実施形態では、ころ61に加わる面圧の積分値が、軸受荷重に相当する。なお、ステップS13で風荷重解析部253が風荷重の平均値または最大値を選定する場合には、軸受状態評価部254によって軸受荷重の平均値または最大値が計算される。 Once the load analysis by the wind load analysis unit 253 is complete, the bearing condition evaluation unit 254 then evaluates the state quantities of the bearing 6 in relation to wind force using the analysis results from the wind load analysis unit 253 and the past damage database 243 (step S14). In step S14, the bearing condition evaluation unit 254 first calculates the bearing load applied to the bearing 6 by the wind load using a bearing element model. The bearing element model is, for example, a calculation model for converting the wind load obtained for each output command value into the surface pressure applied to the rollers 61 of the bearing 6. This calculation model is predetermined according to the number and type of rollers 61, and the gap between the rollers 61 and the bearing outer ring portion 62 and bearing inner ring portion 64. In this embodiment, the integral value of the surface pressure applied to the rollers 61 corresponds to the bearing load. Note that if the wind load analysis unit 253 selects an average or maximum value of the wind load in step S13, the bearing condition evaluation unit 254 calculates the average or maximum value of the bearing load.
続いて、軸受状態評価部254は、軸受荷重および軸受6の温度に基づいて、出力指令値ごとに潤滑油63の油膜厚さtを計算する。このとき、軸受状態評価部254は、データ取得部251によって取得されたSCADAデータ31または温度計測データ32から軸受6の温度を特定する。また、軸受状態評価部254は、軸受荷重および軸受6の温度をパラメータとする所定式を用いて、油膜厚さtを算出する。この所定式は、例えば、松山博樹著、「転がり軸受の高効率化とトライボロジー」、JTEKT ENGINEERING JOURNAL No.1009、2011年を参照して導出することができる。 Next, the bearing condition evaluation unit 254 calculates the oil film thickness t of the lubricating oil 63 for each output command value based on the bearing load and the temperature of the bearing 6. At this time, the bearing condition evaluation unit 254 identifies the temperature of the bearing 6 from the SCADA data 31 or temperature measurement data 32 acquired by the data acquisition unit 251. Furthermore, the bearing condition evaluation unit 254 calculates the oil film thickness t using a predetermined formula with the bearing load and the temperature of the bearing 6 as parameters. This predetermined formula can be derived, for example, by referring to "High Efficiency Improvement and Tribology of Rolling Bearings" by Hiroki Matsuyama, JTEKT ENGINEERING JOURNAL No. 1009, 2011.
続いて、軸受状態評価部254は、出力指令値ごとに、算出した油膜厚さtと、過去損傷データベース243のしきい値tthとを比較する。油膜厚さtがしきい値tth以下となる出力指令値が存在する場合、軸受状態評価部254は、その出力指令値では、風力発電装置10の起動時に軸受6が損傷する可能性が高いと評価する。この場合、例えば軸受状態評価部254は、その出力指令値を表示部23に表示させる。 Next, the bearing condition evaluation unit 254 compares the calculated oil film thickness t with the threshold tth of the past damage database 243 for each output command value. If there is an output command value for which the oil film thickness t is less than or equal to the threshold tth, the bearing condition evaluation unit 254 evaluates that there is a high probability that the bearing 6 will be damaged when the wind power generation device 10 is started up for that output command value. In this case, for example, the bearing condition evaluation unit 254 displays that output command value on the display unit 23.
一方、油膜厚さtがしきい値tthよりも大きい出力指令値が存在する場合、軸受寿命計算部255が、残存寿命データベース244を用いて、その出力指令値で風力発電装置10を起動した時の軸受6の残存寿命を計算する(ステップS15)。ここで、図9を参照してステップS15について説明する。 On the other hand, if there is an output command value where the oil film thickness t is greater than the threshold tth , the bearing life calculation unit 255 uses the remaining life database 244 to calculate the remaining life of the bearing 6 when the wind power generation device 10 is started with that output command value (step S15). Step S15 will now be explained with reference to Figure 9.
図9は、例えば、油膜厚さtがしきい値tthよりも大きい3つの出力指令値a,b,c(a<b<c)が存在する場合、軸受寿命計算部255は、まず、残存寿命データベース244を用いて、総運転時間が時間T1となるときを風力発電装置10の起動時と特定し、時間T1における軸受6の残存寿命率を特定する。続いて、軸受寿命計算部255は、出力指令値a,b,cごとに、時間T1以降の軸受6の残存寿命率の変化量、換言すると軸受6の寿命消費量を算出する。このとき、軸受寿命計算部255は、例えば、図9に示すように、総運転時間と残存寿命率との関係を1次関数の直線で表す平均データを用いて、寿命消費量を算出することができる。 Figure 9 shows that, for example, if there are three output command values a, b, and c (a < b < c) where the oil film thickness t is greater than the threshold t th , the bearing life calculation unit 255 first uses the remaining life database 244 to identify the time when the total operating time reaches time T1 as the startup time of the wind power generation device 10, and identifies the remaining life rate of the bearing 6 at time T1. Subsequently, the bearing life calculation unit 255 calculates the change in the remaining life rate of the bearing 6 after time T1, in other words, the life consumption of the bearing 6, for each output command value a, b, and c. At this time, the bearing life calculation unit 255 can calculate the life consumption using average data that represents the relationship between the total operating time and the remaining life rate as a linear function, as shown in Figure 9.
上記のように軸受寿命計算部255が風力発電装置10の起動時からの軸受6の残存寿命を計算すると、出力設定部256が、軸受寿命計算部255の計算結果を用いて、風力発電装置10の起動時における出力指令値を設定する(ステップS16)。ステップS16では、出力設定部256は、軸受寿命計算部255によって残存寿命が計算された出力指令値a~出力指令値cの中で、風力発電装置10の総運転時間が設計寿命時間T2に達した時点で残存寿命率が0となっていない条件を満たし、発電量が最も高い出力指令値bを、風力発電装置10の起動時における出力指令値として設定する。ただし、出力設定部256は、寿命だけでなく、例えば、売電により得られる利益も考慮して出力指令値を設定してもよい。 As described above, once the bearing life calculation unit 255 calculates the remaining life of the bearing 6 from the time of startup of the wind power generation system 10, the output setting unit 256 uses the calculation result of the bearing life calculation unit 255 to set the output command value at the time of startup of the wind power generation system 10 (step S16). In step S16, the output setting unit 256 sets the output command value b, which satisfies the condition that the remaining life rate is not 0 when the total operating time of the wind power generation system 10 reaches the design life time T2, among the output command values a to c for which the remaining life has been calculated by the bearing life calculation unit 255, and which has the highest power generation amount, as the output command value at the time of startup of the wind power generation system 10. However, the output setting unit 256 may also consider, for example, the profit obtained from selling electricity, in addition to the lifespan when setting the output command value.
図10は、風力発電装置10の総運転時間と売電利益との関係の一例を出力指令値ごとに示した図である。図10では、横軸は風力発電装置10の総運転時間を示す。縦軸は売電利益を示す。売電利益は、売電量に売電単価を乗算した売電収益から設備維持費差し引いた金額である。この設備維持費には、軸受6の交換で生じるコストが含まれている。 Figure 10 shows an example of the relationship between the total operating time of the wind power generation system 10 and the electricity sales profit for each output command value. In Figure 10, the horizontal axis represents the total operating time of the wind power generation system 10. The vertical axis represents the electricity sales profit. The electricity sales profit is the amount obtained by subtracting the equipment maintenance costs from the electricity sales revenue, which is calculated by multiplying the amount of electricity sold by the electricity sales price. These equipment maintenance costs include the costs incurred for replacing the bearings 6.
出力設定部256は、例えば、出力指令値a~出力指令値cのそれぞれについて、過去の実績額またはこの実績額を平均化した平均額に基づいて、風力発電装置10の起動時(時間T1)から設計寿命時間T2までの売電利益を予想する。図9に示すように、風力発電装置10の起動時に出力指令値cが設定されていると、設計寿命時間T2よりも前の時間T3で残存寿命率が0となる。この場合、軸受6の交換が必要になる。そのため、図10に示すように、出力指令値cが設定されている場合には、時間T3で売電利益が減少する。 The output setting unit 256 predicts the electricity sales profit from the start-up of the wind turbine 10 (time T1) to the design lifespan T2, based on past performance figures or an average of these past performance figures, for each of the output command values a to c. As shown in Figure 9, if output command value c is set at the start-up of the wind turbine 10, the remaining lifespan becomes 0 at time T3, before the design lifespan T2. In this case, the bearing 6 will need to be replaced. Therefore, as shown in Figure 10, if output command value c is set, the electricity sales profit decreases at time T3.
出力設定部256は、例えば、設計寿命時間T2の時点で売電利益が最も多くなる出力指令値を、風力発電装置10の起動時における出力指令値として設定する。図10の例では、設計寿命時間T2の時点で出力指令値bの売電利益が最も多い。この場合、出力設定部256は、出力指令値bを風力発電装置10の起動時における出力指令値として設定する。 The output setting unit 256 sets the output command value that maximizes electricity sales profit at the design life time T2 as the output command value at startup of the wind power generation device 10. In the example in Figure 10, the electricity sales profit is highest with output command value b at the design life time T2. In this case, the output setting unit 256 sets output command value b as the output command value at startup of the wind power generation device 10.
なお、出力設定部256による出力指令値の選定方法は、設計寿命時間T2における売電利益に限定されない。例えば、夏季には、風力が弱くなるため、売電益も少なくなる。そこで、出力設定部256は、軸受6の交換時期(時間T3)が夏季になると推定される場合には、出力指令値cを選定して売電利益の最大化を図ってもよい。また、出力設定部256が出力指令値を設定する際には、軸受6の予備品の状況といったパラメータを加えてもよい。例えば、予備品が十分に確保されている場合には、直ちに軸受6の交換作業を開始できるため、交換作業を短縮できる。これにより、交換コストが軽減されるため、売電利益の減少を必要最小限に抑えることができる。 Furthermore, the method for selecting the output command value by the output setting unit 256 is not limited to the electricity sales profit at the design life time T2. For example, in summer, wind power is weaker, resulting in lower electricity sales profits. Therefore, if the output setting unit 256 estimates that the bearing 6 replacement time (time T3) will be in summer, it may select an output command value c to maximize electricity sales profits. Also, when the output setting unit 256 sets the output command value, parameters such as the availability of spare parts for the bearing 6 may be added. For example, if sufficient spare parts are available, the bearing 6 replacement work can be started immediately, thus shortening the replacement work time. This reduces replacement costs, minimizing the decrease in electricity sales profits.
最後に、出力設定部256は、設定した出力指令値を、運転制御装置40に出力する。運転制御装置40は、出力設定部256によって設定された出力指令値に基づいて風力発電装置10の運転を制御する。 Finally, the output setting unit 256 outputs the set output command value to the operation control device 40. The operation control device 40 controls the operation of the wind power generation system 10 based on the output command value set by the output setting unit 256.
以上説明した本実施形態によれば、風力診断評価装置20が、ブレード3の風荷重に基づいて軸受6の残存寿命を予測し、予測した残存寿命に基づいて風力発電装置10の起動時における出力指令値を設定する。このように、風力診断評価装置20は、風況がブレード3を介して軸受6に影響を及ぼす残存寿命を診断した上で、出力指令値を設定する。そのため、風力発電装置10の起動時における軸受6の損傷リスクを軽減することができる。 According to the embodiment described above, the wind power diagnostic and evaluation device 20 predicts the remaining life of the bearing 6 based on the wind load on the blade 3, and sets the output command value at startup of the wind power generation device 10 based on the predicted remaining life. In this way, the wind power diagnostic and evaluation device 20 diagnoses the remaining life of the bearing 6, which is affected by wind conditions via the blade 3, and then sets the output command value. Therefore, the risk of damage to the bearing 6 at startup of the wind power generation device 10 can be reduced.
なお、本実施形態では、風力診断評価装置20は、風力発電装置10の起動後も、上述したステップS11~ステップS16の処理を実行してもよい。この場合、ステップS11では、データ取得部251は、気象予測データ33も取得する。続いて、ステップS12では、風況解析部252は、気象予測データ33を用いて今後の風速分布を推定する。 In this embodiment, the wind power diagnostic and evaluation device 20 may also perform the processes described in steps S11 to S16 even after the wind power generation device 10 has been started. In this case, in step S11, the data acquisition unit 251 also acquires weather forecast data 33. Subsequently, in step S12, the wind condition analysis unit 252 estimates the future wind speed distribution using the weather forecast data 33.
続いて、ステップS13では、風荷重解析部253が、ステップS12で推定された風速分布を用いて今後の風荷重を予測する。続いて、ステップS14では、軸受状態評価部254が、ステップS13で予測された風荷重を用いて軸受6の状態量(油膜厚さt)を計算する。続いて、ステップS15では、軸受寿命計算部255がステップS14で計算された軸受6の状態量を用いて、軸受6の残存寿命を計算する。最後に、ステップS16では、出力設定部256が、ステップS15で計算された軸受6の残存寿命に基づいて、風力発電装置10の起動時における出力指令値を設定する。この場合、風力発電装置10の運転中の風荷重の予測精度が向上するので、軸受6の残存寿命の計算精度も向上する。よって、風力発電装置10の運転中も軸受6の損傷リスクを軽減することが可能となる。 Next, in step S13, the wind load analysis unit 253 predicts the future wind load using the wind speed distribution estimated in step S12. Then, in step S14, the bearing condition evaluation unit 254 calculates the state variable (oil film thickness t) of the bearing 6 using the wind load predicted in step S13. Next, in step S15, the bearing life calculation unit 255 calculates the remaining life of the bearing 6 using the state variable of the bearing 6 calculated in step S14. Finally, in step S16, the output setting unit 256 sets the output command value for the wind power generation system 10 at startup based on the remaining life of the bearing 6 calculated in step S15. In this case, the accuracy of predicting the wind load during operation of the wind power generation system 10 is improved, and therefore the accuracy of calculating the remaining life of the bearing 6 is also improved. Thus, it becomes possible to reduce the risk of damage to the bearing 6 even during operation of the wind power generation system 10.
また、本実施形態では、風力診断評価装置20が、風力発電装置10の起動後も出力指令値を設定する場合、軸受状態評価部254が、軸受6に設置された振動センサ(不図示)によって計測された振動値を軸受6の状態量として評価してもよい。この振動値が大きいと、軸受6の損傷リスクが高くなり、寿命が短く成り得る。そのため、出力設定部256は、軸受6の振動値が小さくなるように出力指令値を設定する。 Furthermore, in this embodiment, if the wind power diagnostic and evaluation device 20 sets the output command value even after the wind power generation device 10 has started up, the bearing condition evaluation unit 254 may evaluate the vibration value measured by a vibration sensor (not shown) installed on the bearing 6 as a condition variable of the bearing 6. If this vibration value is large, the risk of damage to the bearing 6 increases, and its lifespan may be shortened. Therefore, the output setting unit 256 sets the output command value so that the vibration value of the bearing 6 is reduced.
(変形例1)
以下、第1実施形態の変形例1について説明する。ここでは、第1実施形態と異なる点を中心に説明する。
(Variation 1)
The following describes Modification 1 of the First Embodiment. Here, we will focus on the differences from the First Embodiment.
本実施形態では、ステップS11において、データ取得部251は、ひずみ計測データ35も取得する。本変形例に係るひずみ計測データ35は、タワー2のひずみ量を計測したデータを示す。このひずみ計測データ35は、ステップS13で風荷重解析部253が風荷重を解析する際に用いられる。ここで、図11(a)~図11(d)を参照して、本変形例に係る風荷重解析ステップを説明する。 In this embodiment, in step S11, the data acquisition unit 251 also acquires strain measurement data 35. The strain measurement data 35 in this modified example shows the amount of strain measured in the tower 2. This strain measurement data 35 is used in step S13 when the wind load analysis unit 253 analyzes the wind load. Now, referring to Figures 11(a) to 11(d), the wind load analysis step in this modified example will be explained.
図11(a)は、風力発電装置10の正面図である。図11(a)に示すように、本変形例では、タワー2において、地上から高さH1となるフロアのひずみ量と、地上から高さH2(>H1)となるフロアのひずみ量とが、ひずみセンサ(不図示)によって計測される。なお、ひずみ量を計測するフロアは、少なくとも1箇所であればよく、2箇所より多くてもよい。 Figure 11(a) is a front view of the wind power generation device 10. As shown in Figure 11(a), in this modified example, the strain of the floor at a height H1 from the ground and the strain of the floor at a height H2 (>H1) from the ground are measured by strain sensors (not shown) in the tower 2. Note that at least one floor is required for strain measurement, and more than two floors may be used.
図11(b)は、地上から高さH1におけるタワー2の上面図である。また、図11(c)は、地上から高さH2におけるタワー2の上面図である。図11(b)および図11(c)において、ひずみ量は、タワー2の外周部と中心との成す中心角が、0°、90°、180°、270°となるポイントで計測される。タワー2の正面が、中心角0°に相当する。なお、本変形例では、タワー2の各フロアにおいて、4ポイントのひずみ量を計測しているが、ひずみ量の計測ポイントは、少なくとも3ポイント以上であればよい。 Figure 11(b) is a top view of Tower 2 at a height H1 from the ground. Figure 11(c) is a top view of Tower 2 at a height H2 from the ground. In Figures 11(b) and 11(c), the strain is measured at points where the central angle between the outer perimeter and the center of Tower 2 is 0°, 90°, 180°, and 270°. The front of Tower 2 corresponds to a central angle of 0°. In this modified example, strain is measured at four points on each floor of Tower 2, but at least three or more strain measurement points are sufficient.
風荷重解析部253は、各計測ポイントで計測されたひずみ量の計測値から荷重方向と風荷重の大きさをフロアごとに計算する。例えば、4つの計測ポイントの中で、0°、90°の計測値が、180°、270°の計測値よりも大きい場合、風荷重解析部253は、0°から90°の範囲を荷重方向の範囲として特定する。また、0°の計測値と90°の計測値との差に応じて、荷重方向および風荷重をフロアごとに計算する。 The wind load analysis unit 253 calculates the load direction and wind load magnitude for each floor from the strain measurements taken at each measurement point. For example, if the measured values at 0° and 90° are greater than those at 180° and 270° among the four measurement points, the wind load analysis unit 253 identifies the range from 0° to 90° as the load direction range. Furthermore, it calculates the load direction and wind load for each floor based on the difference between the measured values at 0° and 90°.
図11(d)は、各フロアの風荷重の方向と大きさを示す模式図である。図11(d)は、高さH1の風荷重FH1と、高さH2の風荷重FH2とをベクトルで示している。風荷重解析部253は、これら2つの風荷重をベクトル演算して、地上から高さHの風荷重FHを求める。 Figure 11(d) is a schematic diagram showing the direction and magnitude of wind loads on each floor. Figure 11(d) shows the wind load F H1 at height H1 and the wind load F H2 at height H2 as vectors. The wind load analysis unit 253 performs vector calculations on these two wind loads to determine the wind load F H at height H from the ground.
続いて、風荷重解析部253は、第1実施形態で説明した荷重解析データベース242から選定した風荷重Fと、タワー2のひずみ量に基づいて計算した風荷重FHとに同じまたは異なる重み付け係数をそれぞれ乗算して加算した値を風荷重解析結果として出力する。その後、第1実施形態と同様に、ステップS14~ステップS16の処理が実行される。 Next, the wind load analysis unit 253 outputs a value as the wind load analysis result obtained by multiplying the wind load F selected from the load analysis database 242 described in the first embodiment and the wind load FH calculated based on the amount of strain of the tower 2 by the same or different weighting coefficients and adding them together. After that, the processing of steps S14 to S16 is executed in the same manner as in the first embodiment.
以上説明した本変形例によれば、風荷重解析部253は、風況解析結果だけでなくタワー2のひずみ量も用いて風荷重を解析する。そのため、風荷重を高精度に計算することができる。これにより、軸受6の残存寿命の予測精度も向上する。よって、風力発電装置10の起動時における出力指令値をより適切に設定することが可能となる。 According to the modified configuration described above, the wind load analysis unit 253 analyzes the wind load using not only the wind condition analysis results but also the strain amount of the tower 2. Therefore, the wind load can be calculated with high accuracy. This also improves the accuracy of predicting the remaining life of the bearing 6. Consequently, it becomes possible to set the output command value at the start-up of the wind power generation device 10 more appropriately.
(変形例2)
以下、第1実施形態の変形例2について説明する。ここでも、第1実施形態と異なる点を中心に説明する。
(Variation 2)
The following describes a second modification of the first embodiment. Here again, the focus will be on the differences from the first embodiment.
本実施形態では、ステップS11において、データ取得部251は、ひずみ計測データ35も取得する。本変形例に係るひずみ計測データ35は、ブレード3のひずみ量を計測したデータである。取得されたひずみ計測データ35は、ステップS13で風荷重解析部253が風荷重を解析する際に用いられる。ここで、図12(a)~図12(c)を参照して、本変形例に係る風荷重解析ステップを説明する。 In this embodiment, in step S11, the data acquisition unit 251 also acquires strain measurement data 35. The strain measurement data 35 in this modified example is data measuring the amount of strain of the blade 3. The acquired strain measurement data 35 is used in step S13 when the wind load analysis unit 253 analyzes the wind load. Now, referring to Figures 12(a) to 12(c), the wind load analysis step in this modified example will be explained.
図12(a)は、風力発電装置10の正面図である。図12(a)に示すように、本変形例では、各ブレード3の根元部分からの距離がそれぞれ異なる4つの計測ポイントi、j、k、mのひずみ量が、ひずみセンサ(不図示)によって計測される。なお、ひずみ量の計測ポイントは、4つに限定されず、少なくとも2つであればよい。 Figure 12(a) is a front view of the wind turbine 10. As shown in Figure 12(a), in this modified example, the strain amounts at four measurement points i, j, k, and m, each at a different distance from the base of each blade 3, are measured by a strain sensor (not shown). Note that the number of strain measurement points is not limited to four; at least two are sufficient.
図12(b)は、ひずみ計測データ35の一例を示す図である。図12(b)は、計測ポイントmで計測されたひずみの経時的な変化を示す。風荷重解析部253は、各計測ポイントのひずみ量を一定時間で平均する。続いて、風荷重解析部253は、ひずみ量の平均値と、ブレード3の材料定数と、ブレード3のアジマス角とを用いた関数式によって、各計測ポイントの風荷重を計算する。 Figure 12(b) shows an example of strain measurement data 35. Figure 12(b) shows the change in strain measured at measurement point m over time. The wind load analysis unit 253 averages the strain at each measurement point over a certain period of time. Subsequently, the wind load analysis unit 253 calculates the wind load at each measurement point using a functional equation based on the average strain value, the material constants of the blade 3, and the azimuth angle of the blade 3.
図12(c)は、風荷重とアジマス角との関係を示す図である。図12(c)では、横軸はブレード3のアジマス角を示し、縦軸は風荷重を示す。風荷重解析部253は、図12(c)に示す4つの計測ポイントi、j、k、mの風荷重を積分することによって、ブレード3の根元部分に加わる荷重とモーメントを計算する。ブレード3の根元にはナセル1が設けられ、軸受6はナセル1に収容されている。そのため、ブレード3の根元部分の荷重は、軸受6に加わる荷重に近い値となる。 Figure 12(c) shows the relationship between wind load and azimuth angle. In Figure 12(c), the horizontal axis represents the azimuth angle of the blade 3, and the vertical axis represents the wind load. The wind load analysis unit 253 calculates the load and moment applied to the base of the blade 3 by integrating the wind loads at the four measurement points i, j, k, and m shown in Figure 12(c). A nacelle 1 is provided at the base of the blade 3, and the bearing 6 is housed in the nacelle 1. Therefore, the load at the base of the blade 3 is close to the load applied to the bearing 6.
続いて、風荷重解析部253は、第1実施形態で説明した荷重解析データベース242から選定した風荷重Fと、ブレード3のひずみ量に基づいて計算した風荷重とに同じまたは異なる重み付け係数をそれぞれ乗算して加算した値を風荷重解析結果として出力する。その後、第1実施形態と同様に、ステップS14~ステップS16の処理が実行される。 Next, the wind load analysis unit 253 outputs a value as the wind load analysis result, obtained by multiplying the wind load F selected from the load analysis database 242 described in the first embodiment and the wind load calculated based on the strain amount of the blade 3 by the same or different weighting coefficients and adding them together. After that, the processing of steps S14 to S16 is executed, similar to the first embodiment.
以上説明した本変形例によれば、風荷重解析部253は、風況解析結果だけでなくブレード3のひずみ量も用いて風荷重を解析する。そのため、本変形例においても風荷重を高精度に計算することができる。これにより、軸受6の残存寿命の予測精度も向上する。よって、風力発電装置10の起動時における出力指令値をより適切に設定することが可能となる。 According to the modified configuration described above, the wind load analysis unit 253 analyzes the wind load using not only the wind condition analysis results but also the strain amount of the blade 3. Therefore, even in this modified configuration, the wind load can be calculated with high accuracy. This also improves the accuracy of predicting the remaining life of the bearing 6. Consequently, it becomes possible to set the output command value at the start-up of the wind power generation device 10 more appropriately.
なお、本変形例では、風荷重解析部253は、風荷重を解析する際、変形例1で説明したタワー2のひずみ量を用いてもよい。この場合、風荷重解析部253は、第1実施形態で説明した荷重解析データベース242から選定した風荷重Fと、第1変形例で説明したタワー2のひずみ量に基づく風荷重FHと、本変形例で説明したブレード3のひずみ量に基づく風荷重と、に同じまたは異なる重み付け係数をそれぞれ乗算して加算した値を風荷重解析結果として出力する。これにより、風荷重が、風況解析結果、ブレード3のひずみ量、およびタワー2のひずみ量に基づいて計算されるため、風荷重の精度がさらに高くなる。したがって、軸受6の残存寿命の予測精度もさらに向上するため、風力発電装置10の起動時における軸受6の損傷リスクをより一層軽減することが可能となる。 In this modified example, the wind load analysis unit 253 may use the amount of strain of the tower 2 described in Modification 1 when analyzing the wind load. In this case, the wind load analysis unit 253 outputs a value as the wind load analysis result obtained by multiplying the wind load F selected from the load analysis database 242 described in the first embodiment, the wind load FH based on the amount of strain of the tower 2 described in the first modified example, and the wind load based on the amount of strain of the blade 3 described in this modified example by the same or different weighting coefficients and adding them together. As a result, the wind load is calculated based on the wind condition analysis result, the amount of strain of the blade 3, and the amount of strain of the tower 2, so the accuracy of the wind load is further improved. Therefore, the accuracy of predicting the remaining life of the bearing 6 is also further improved, making it possible to further reduce the risk of damage to the bearing 6 when the wind power generation device 10 is started up.
(変形例3)
以下、第1実施形態の変形例3について説明する。ここでも、第1実施形態と異なる点を中心に説明する。
(Variation 3)
The following describes a third modification of the first embodiment. Here again, the focus will be on the differences from the first embodiment.
本実施形態では、ステップS11において、データ取得部251は、変位計測データ34も取得する。変位計測データ34は、第1実施形態で説明したように、軸受6の径方向における変位量δを計測したデータである(図2参照)。取得された変位計測データ34は、ステップS14で軸受状態評価部254が軸受荷重を解析する際に用いられる。本変形例に係る軸受荷重解析ステップを説明する。 In this embodiment, in step S11, the data acquisition unit 251 also acquires displacement measurement data 34. As described in the first embodiment, the displacement measurement data 34 is data measuring the radial displacement δ of the bearing 6 (see Figure 2). The acquired displacement measurement data 34 is used in step S14 when the bearing condition evaluation unit 254 analyzes the bearing load. The bearing load analysis step according to this modified example will now be described.
軸受状態評価部254は、少なくとも3点以上の計測ポイントで計測された変位量δに基づいて、回転軸5が押し込まれた量や回転軸5の傾きを算出する。続いて、軸受状態評価部254は、回転軸5の押し込みや回転軸5の傾きによって生じる軸受荷重やモーメントを、軸受6の変位量との関係式に基づいて計算する。 The bearing condition evaluation unit 254 calculates the amount the rotating shaft 5 is pushed in and the tilt of the rotating shaft 5 based on the displacement δ measured at at least three measurement points. Subsequently, the bearing condition evaluation unit 254 calculates the bearing load and moment generated by the pushing in and tilt of the rotating shaft 5, based on the relationship formula with the displacement of the bearing 6.
続いて、軸受状態評価部254は、第1実施形態で説明した軸受要素モデルから算出した軸受荷重と、軸受6の変位量に基づく軸受荷重とに同じまたは異なる重み付け係数をそれぞれ乗算して加算した値を軸受荷重解析結果とする。その後は、第1実施形態と同様の処理が実行される。 Next, the bearing condition evaluation unit 254 obtains the bearing load analysis result by multiplying the bearing load calculated from the bearing element model described in the first embodiment and the bearing load based on the displacement of the bearing 6 by the same or different weighting coefficients and adding them together. After that, the same processing as in the first embodiment is performed.
以上説明した本変形例によれば、軸受荷重が、風況解析および風荷重解析だけでなく、軸受6の変位量にも基づいて計算されている。そのため、軸受荷重の計算精度が高くなる。したがって、軸受6の残存寿命の予測精度も向上するため、風力発電装置10の起動時における軸受6の損傷リスクをさらに軽減することが可能となる。 According to the modified version described above, the bearing load is calculated not only based on wind condition analysis and wind load analysis, but also on the displacement of the bearing 6. Therefore, the accuracy of the bearing load calculation is improved. Consequently, the accuracy of predicting the remaining life of the bearing 6 is also improved, making it possible to further reduce the risk of damage to the bearing 6 during the startup of the wind power generation device 10.
(第2実施形態)
図13は、第2実施形態に係る風力診断評価装置20aおよびデータ収集装置30の概略的な構成を示すブロック図である。図13では、上述した第1実施形態と同じ構成要素には同じ符号を付し、詳細な説明を省略する。
(Second Embodiment)
Figure 13 is a block diagram showing the schematic configuration of the wind power diagnostic and evaluation device 20a and data acquisition device 30 according to the second embodiment. In Figure 13, the same reference numerals are used for the same components as in the first embodiment described above, and detailed explanations are omitted.
本実施形態に係る風力診断評価装置20aは、第1実施形態に係る風力診断評価装置20の構成要素に加えて、制御部26をさらに備える。制御部26は、演算部25で設定された出力指令値に基づいて風力診断評価装置20の運転を制御する。すなわち、本実施形態に係る風力診断評価装置20aには、第1実施形態で説明した運転制御装置40の機能が制御部26に内蔵されている。ここで、図14を参照して、風力発電装置10の起動時における制御部26の制御動作について説明する。 The wind power diagnostic and evaluation device 20a according to this embodiment further includes a control unit 26 in addition to the components of the wind power diagnostic and evaluation device 20 according to the first embodiment. The control unit 26 controls the operation of the wind power diagnostic and evaluation device 20 based on the output command value set by the calculation unit 25. In other words, the functions of the operation control device 40 described in the first embodiment are built into the control unit 26 of the wind power diagnostic and evaluation device 20a according to this embodiment. Now, referring to Figure 14, the control operation of the control unit 26 during the startup of the wind power generation device 10 will be described.
図14は、第2実施形態に係る制御部26の制御動作の手順を示すフローチャートである。このフローチャートでは、まず、制御部26は、演算部25から上述した第1実施形態または変形例1~変形例3のいずれかの方法で設定された出力指令値を示すデータや、風速データを取得する(ステップS21)。この風速データは、データ収集装置30のSCADAデータ31であってもよいし、風況計測データ36であってもよい。 Figure 14 is a flowchart showing the control operation procedure of the control unit 26 according to the second embodiment. In this flowchart, first, the control unit 26 acquires data indicating the output command value set by one of the methods described in the first embodiment or modifications 1 to 3, as well as wind speed data, from the calculation unit 25 (step S21). This wind speed data may be SCADA data 31 from the data acquisition device 30, or wind condition measurement data 36.
次に、制御部26は、風速データに示された風速の計測値が、カットイン風速よりも大きくて、かつカットアウト風速よりも小さい風速条件を満たすか否かを判定する(ステップS22)。カットイン風速は、風力発電装置10が発電可能な風速の最小値である。一方、カットアウト風速は、風力発電装置10が発電可能な風速の最大値である。 Next, the control unit 26 determines whether the measured wind speed shown in the wind speed data satisfies the wind speed condition that is greater than the cut-in wind speed and less than the cut-out wind speed (step S22). The cut-in wind speed is the minimum wind speed at which the wind power generator 10 can generate electricity. On the other hand, the cut-out wind speed is the maximum wind speed at which the wind power generator 10 can generate electricity.
計測値が、上記風速条件を満たすと、制御部26は、演算部25で設定された出力指令値で風力発電装置10を起動させる(ステップS23)。風力発電装置10では、出力指令値に含まれる発電量に到達するように、ブレード3のピッチ角や発電機8のトルク値が設定される。 When the measured value meets the above wind speed conditions, the control unit 26 starts the wind turbine 10 with the output command value set by the calculation unit 25 (step S23). The wind turbine 10 sets the pitch angle of the blades 3 and the torque value of the generator 8 so that the amount of power generated reaches the output command value.
なお、本実施形態では、演算部25が、風力発電装置10の起動後も出力指令値の設定動作を継続する場合には、制御部26も、演算部25で設定された出力指令値に基づく風力発電装置10の運転制御を継続する。 In this embodiment, if the calculation unit 25 continues setting the output command value even after the wind power generation device 10 has started up, the control unit 26 also continues to control the operation of the wind power generation device 10 based on the output command value set by the calculation unit 25.
以上説明した本実施形態においても、第1実施形態と同様に、風力発電装置10の起動時における出力指令値が、風況がブレード3を介して軸受6に影響を及ぼす残存寿命を診断した上で設定される。そのため、風力発電装置10の起動時における軸受6の損傷リスクを軽減することができる。 In this embodiment, as described above, the output command value at startup of the wind turbine 10 is set after diagnosing the remaining lifespan of the bearing 6, which is affected by wind conditions via the blades 3. Therefore, the risk of damage to the bearing 6 at startup of the wind turbine 10 can be reduced.
また、本実施形態では、風力診断評価装置20aが、風力発電装置10の運転制御機能も有しているため、第1実施形態で説明した運転制御装置40が不要になる。これにより、最適化された出力指令値による風力発電装置10の運転制御を、1台の装置によって実現することが可能となる。 Furthermore, in this embodiment, since the wind power diagnostic and evaluation device 20a also has an operation control function for the wind power generation device 10, the operation control device 40 described in the first embodiment becomes unnecessary. This makes it possible to achieve operation control of the wind power generation device 10 using optimized output command values with a single device.
以上、実施形態を幾つか説明したが、これらの実施形態は、例としてのみ提示したものであり、発明の範囲を限定することを意図したものではない。本明細書で説明した新規なシステムは、その他の様々な形態で実施することができる。また、本明細書で説明したシステムの形態に対し、発明の要旨を逸脱しない範囲内で、種々の省略、置換、変更を行うことができる。添付の特許請求の範囲およびこれに均等な範囲は、発明の範囲や要旨に含まれるこのような形態や変形例を含むように意図されている。 While several embodiments have been described above, these embodiments are presented only as examples and are not intended to limit the scope of the invention. The novel system described herein can be implemented in various other forms. Furthermore, various omissions, substitutions, and modifications can be made to the system embodiments described herein without departing from the spirit of the invention. The appended claims and equivalents are intended to include such forms and modifications included in the scope and spirit of the invention.
1:ナセル
2:タワー
3:ブレード
4:ハブ
5:回転軸
6:軸受
7:変速機構
8:発電機
9:風況計測器
10:風力発電装置
20、20a:風力診断評価装置
21:通信部
22:操作部
23:表示部
24:記憶部
25:演算部
26:制御部
30:データ収集装置
31:SCADAデータ
32:温度計測データ
33:気象予測データ
34:変位計測データ
35:ひずみ計測データ
36:風況計測データ
40:運転制御装置
50:風況実測装置
241:風況解析データベース
242:荷重解析データベース
243:過去損傷データベース
244:残存寿命データベース
251:データ取得部
252:風況解析部
253:風荷重解析部
254:軸受状態評価部
255:軸受寿命計算部
256:出力設定部
1: Nacelle 2: Tower 3: Blade 4: Hub 5: Rotating shaft 6: Bearing 7: Transmission mechanism 8: Generator 9: Wind condition measuring instrument 10: Wind power generation device 20, 20a: Wind force diagnostic evaluation device 21: Communication unit 22: Operation unit 23: Display unit 24: Storage unit 25: Calculation unit 26: Control unit 30: Data acquisition device 31: SCADA data 32: Temperature measurement data 33: Weather forecast data 34: Displacement measurement data 35: Strain measurement data 36: Wind condition measurement data 40: Operation control device 50: Wind condition measurement device 241: Wind condition analysis database 242: Load analysis database 243: Past damage database 244: Remaining life database 251: Data acquisition unit 252: Wind condition analysis unit 253: Wind load analysis unit 254: Bearing condition evaluation unit 255: Bearing life calculation unit 256: Output setting unit
Claims (15)
前記風力によって前記ブレードに加わる風荷重を解析する風荷重解析部と、
前記風荷重解析部の解析結果に基づいて、前記風力発電装置の起動時における前記転がり軸受の状態量を評価する軸受状態評価部と、
前記軸受状態評価部の評価結果に基づいて、前記起動時における前記風力発電装置の発電量を含む出力指令値を設定する出力設定部と、
を備える、風力診断評価装置。 A wind power diagnostic and evaluation device for diagnosing and evaluating a wind power generation device comprising at least a blade that rotates with wind power, a generator that generates electricity using the rotational force of the blade, a rotating shaft that transmits the rotational force to the generator, and a rolling bearing installed on the rotating shaft,
A wind load analysis unit analyzes the wind load applied to the blade by the wind force,
Based on the analysis results of the wind load analysis unit, a bearing state evaluation unit evaluates the state quantities of the rolling bearings at the time of startup of the wind power generation device,
Based on the evaluation results of the bearing condition evaluation unit, an output setting unit sets an output command value including the amount of power generated by the wind power generation device at startup,
A wind power diagnostic and evaluation device equipped with the following features.
前記軸受状態評価部は、前記起動後の前記風荷重の解析結果に基づいて、前記起動後における前記状態量を予測し、
前記出力設定部は、前記起動後における前記状態量に基づいて前記出力指令値を設定する、請求項1に記載の風力診断評価装置。 The wind load analysis unit continues to analyze the wind load even after the wind power generation device has been started.
The bearing condition evaluation unit predicts the state quantity after startup based on the analysis results of the wind load after startup,
The wind force diagnostic and evaluation apparatus according to claim 1, wherein the output setting unit sets the output command value based on the state quantity after startup.
前記風荷重解析部は、前記風況解析部の解析結果に基づいて前記風荷重を計算する、請求項1または2に記載の風力診断評価装置。 The system further includes a wind condition analysis unit for analyzing wind conditions related to the aforementioned wind power,
The wind load analysis unit calculates the wind load based on the analysis results of the wind condition analysis unit, as described in claim 1 or 2.
前記風荷重解析部は、前記平均風速に基づいて前記風荷重の平均値を計算し、
前記軸受状態評価部は、前記平均値に基づいて前記状態量を評価する、請求項3に記載の風力診断評価装置。 The wind condition analysis unit calculates the average wind speed as a result of the analysis,
The wind load analysis unit calculates the average value of the wind load based on the average wind speed,
The wind force diagnostic and evaluation device according to claim 3, wherein the bearing condition evaluation unit evaluates the condition quantity based on the average value.
前記風荷重解析部は、前記乱流強度に基づいて前記風荷重の最大値を計算し、
前記軸受状態評価部は、前記最大値に基づいて前記状態量を予測する、請求項3に記載の風力診断評価装置。 The wind condition analysis unit calculates the turbulence intensity as a result of the wind condition analysis,
The wind load analysis unit calculates the maximum value of the wind load based on the turbulence intensity,
The wind force diagnostic and evaluation apparatus according to claim 3, wherein the bearing condition evaluation unit predicts the condition quantity based on the maximum value.
前記風況解析部は、前記風況解析データベースを用いて前記風速分布を選出し、
前記風荷重解析部は、前記荷重解析データベースを用いて、複数の出力指令値ごとに、前記風況解析部によって特定された風速分布に対応する風荷重を選出する、請求項3に記載の風力診断評価装置。 The system further includes a storage unit that stores a wind condition analysis database showing the vertical wind speed distribution for each of multiple wind condition conditions, and a load analysis database showing the wind load for each of multiple load analysis conditions corresponding to the wind speed distribution for each of the output command values.
The wind condition analysis unit selects the wind speed distribution using the wind condition analysis database,
The wind load analysis unit uses the load analysis database to select a wind load corresponding to the wind speed distribution identified by the wind condition analysis unit for each of the multiple output command values, as described in claim 3, for the wind load analysis device according to claim 3.
前記風荷重解析部は、少なくとも1つ以上のフロアで計測された前記タワーのひずみ量を用いて前記ブレードに加わる風荷重を計算する、請求項6に記載の風力診断評価装置。 The wind power generation device further comprises a nacelle housing the generator, the rotating shaft, and the rolling bearings , and a tower supporting the nacelle.
The wind load analysis unit calculates the wind load applied to the blades using the amount of strain of the tower measured on at least one floor, as described in claim 6.
前記軸受状態評価部は、前記油膜の厚さと前記しきい値との比較結果に基づいて前記状態量を評価する、前記請求項10に記載の風力診断評価装置。 The memory unit further stores a past damage database that indicates thresholds set based on the oil film thickness when the rolling bearing was damaged in the past.
The wind force diagnostic and evaluation apparatus according to claim 10, wherein the bearing condition evaluation unit evaluates the condition quantity based on the result of comparing the thickness of the oil film with the threshold value.
前記出力設定部は、前記軸受寿命計算部の計算結果に基づいて前記出力指令値を設定する、請求項6に記載の風力診断評価装置。 The system further includes a bearing life calculation unit that calculates the remaining life of the rolling bearings at startup of the wind power generation device based on the evaluation results of the bearing condition evaluation unit.
The wind force diagnostic and evaluation apparatus according to claim 6, wherein the output setting unit sets the output command value based on the calculation result of the bearing life calculation unit.
前記風力によって前記ブレードに加わる風荷重を解析し、
前記風荷重の解析結果に基づいて、前記風力発電装置の起動時における前記転がり軸受の状態量を評価し、
前記転がり軸受の状態量を評価した結果に基づいて、前記起動時における前記風力発電装置の発電量を含む出力指令値を設定する、風力診断評価方法。 A wind power diagnostic and evaluation method for diagnosing and evaluating a wind power generation device comprising at least a blade that rotates with wind power, a generator that generates electricity using the rotational force of the blade, a rotating shaft that transmits the rotational force to the generator, and a rolling bearing installed on the rotating shaft,
The wind load applied to the blade by the wind force is analyzed,
Based on the analysis results of the wind load, the state quantities of the rolling bearings at the time of startup of the wind power generation device are evaluated.
A wind power diagnostic evaluation method that sets an output command value, including the amount of power generated by the wind power generation device at startup, based on the results of evaluating the state quantities of the rolling bearings .
前記風力によって前記ブレードに加わる風荷重を解析する処理と、
前記風荷重の解析結果に基づいて、前記風力発電装置の起動時における前記転がり軸受の状態量を評価する処理と、
前記転がり軸受の状態量を評価した結果に基づいて、前記起動時における前記風力発電装置の発電量を含む出力指令値を設定する処理と、
をコンピュータに実行させるためのプログラム。 A program for diagnosing and evaluating a wind power generation device comprising at least a blade that rotates with wind power, a generator that generates electricity using the rotational force of the blade, a rotating shaft that transmits the rotational force to the generator, and a rolling bearing installed on the rotating shaft,
A process for analyzing the wind load applied to the blade by the wind force,
Based on the analysis results of the wind load, a process is performed to evaluate the state quantities of the rolling bearings at the time of startup of the wind power generation device,
Based on the results of evaluating the state quantities of the rolling bearings , a process is performed to set an output command value including the amount of power generated by the wind power generation device at startup.
A program that causes a computer to execute something.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023017020A JP7843253B2 (en) | 2023-02-07 | 2023-02-07 | Wind power diagnostic and evaluation device, wind power diagnostic and evaluation method, and program |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023017020A JP7843253B2 (en) | 2023-02-07 | 2023-02-07 | Wind power diagnostic and evaluation device, wind power diagnostic and evaluation method, and program |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2024112138A JP2024112138A (en) | 2024-08-20 |
| JP7843253B2 true JP7843253B2 (en) | 2026-04-09 |
Family
ID=92423848
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2023017020A Active JP7843253B2 (en) | 2023-02-07 | 2023-02-07 | Wind power diagnostic and evaluation device, wind power diagnostic and evaluation method, and program |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7843253B2 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012532279A (en) | 2009-07-10 | 2012-12-13 | シーメンス アクチエンゲゼルシヤフト | Wind turbine main bearing |
| JP2017193996A (en) | 2016-04-20 | 2017-10-26 | 株式会社日立製作所 | Wind power generation system |
| JP2018185171A (en) | 2017-04-24 | 2018-11-22 | 株式会社東芝 | Fatigue life analysis apparatus for windmill power generator, wind power generation system, and fatigue life analysis method for windmill power generator |
-
2023
- 2023-02-07 JP JP2023017020A patent/JP7843253B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012532279A (en) | 2009-07-10 | 2012-12-13 | シーメンス アクチエンゲゼルシヤフト | Wind turbine main bearing |
| JP2017193996A (en) | 2016-04-20 | 2017-10-26 | 株式会社日立製作所 | Wind power generation system |
| JP2018185171A (en) | 2017-04-24 | 2018-11-22 | 株式会社東芝 | Fatigue life analysis apparatus for windmill power generator, wind power generation system, and fatigue life analysis method for windmill power generator |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2024112138A (en) | 2024-08-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3465359B1 (en) | System and method for controlling a dynamic system, in particular a wind turbine | |
| JP6906354B2 (en) | Wind turbine generator fatigue damage calculation device, wind power generation system, and wind turbine generator fatigue damage calculation method | |
| JP6650030B2 (en) | Rolling bearing fatigue state prediction device and rolling bearing fatigue state prediction method | |
| DK1988284T3 (en) | Method of operating a wind turbine and wind turbine | |
| CN108291527B (en) | A method of monitoring and evaluating changes in wind turbine power performance | |
| CN108291529A (en) | A method of monitoring and assessment wind turbine power performance change | |
| US11946448B2 (en) | System for contactless displacement measurement of a blade root of a wind turbine | |
| EP3511567B1 (en) | State monitoring device, system and method for wind power generating device | |
| JP6783110B2 (en) | Predictive diagnostic device and power generation device control system with it | |
| US10539119B2 (en) | System and method for augmenting control of a wind turbine assembly | |
| JP2019027324A (en) | Abnormality detection system and abnormality detection method of wind power generator | |
| KR20240023651A (en) | Method and device for evaluating the life of pitch bearings of wind turbines | |
| CN115492727A (en) | Method and system for monitoring icing status of wind turbine blades | |
| CN119903655A (en) | Structural fatigue assessment method, system, equipment and storage medium for tower of wind turbine generator set | |
| Torsvik et al. | Experimental field study of floater motion effects on a main bearing in a full-scale spar floating wind turbine | |
| JP7843253B2 (en) | Wind power diagnostic and evaluation device, wind power diagnostic and evaluation method, and program | |
| JP7009237B2 (en) | Wind power generation equipment and wind power generation system | |
| JP7684107B2 (en) | Remaining life assessment method and device for wind power generation equipment | |
| De Oliveira-Filho et al. | Condition monitoring of wind turbine main bearing using SCADA data and informed by the principle of energy conservation | |
| TWI657335B (en) | Power generation monitoring device and power generation monitoring system | |
| WO2018110268A1 (en) | Operation assistance system and operation assistance method | |
| JP7519892B2 (en) | LOAD ADJUSTMENT METHOD, LOAD ADJUSTMENT DEVICE, AND PROGRAM | |
| Moynihan et al. | Fatigue life analysis of main shaft bearings in wind turbines using strain measurements collected on blades | |
| Braam et al. | CONMOW: condition monitoring for offshore wind farms | |
| JP7842048B2 (en) | Operation control method and operation control device for wind power generation equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20250305 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20251106 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20251111 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20260105 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20260303 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20260330 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7843253 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |