JP7843444B2 - Power adjustment plan creation device and power adjustment plan creation method - Google Patents
[go: Go Back, main page]

JP7843444B2 - Power adjustment plan creation device and power adjustment plan creation method - Google Patents

Power adjustment plan creation device and power adjustment plan creation method

Info

Publication number
JP7843444B2
JP7843444B2 JP2021186990A JP2021186990A JP7843444B2 JP 7843444 B2 JP7843444 B2 JP 7843444B2 JP 2021186990 A JP2021186990 A JP 2021186990A JP 2021186990 A JP2021186990 A JP 2021186990A JP 7843444 B2 JP7843444 B2 JP 7843444B2
Authority
JP
Japan
Prior art keywords
market
unit
loss
adjustment
price
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021186990A
Other languages
Japanese (ja)
Other versions
JP2023074177A (en
Inventor
貴雅 上野
健一 渡辺
将慶 茶山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2021186990A priority Critical patent/JP7843444B2/en
Publication of JP2023074177A publication Critical patent/JP2023074177A/en
Application granted granted Critical
Publication of JP7843444B2 publication Critical patent/JP7843444B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、電力調整計画作成装置および電力調整計画作成方法に関する。 This invention relates to a power adjustment plan creation device and a power adjustment plan creation method.

電力の小売全面自由化に伴い、電気の小売業に参入する民間企業(いわゆる小売電気事業者)が続々と現れている。このような小売電気事業者には、販売計画と実績値との差分であるインバランスが発生するとインバランス料金と呼ばれる料金の支払いが課されることがある。そこで、特許文献1には、需給計画の実行前にインバランス価格を予測する装置が開示されている。 With the full liberalization of electricity retail, numerous private companies (so-called retail electricity providers) are entering the retail electricity market. These retail electricity providers may be charged an imbalance fee if an imbalance occurs, which is the difference between sales plans and actual sales. Therefore, Patent Document 1 discloses a device for predicting imbalance prices before the execution of supply and demand plans.

特開2017-117356号公報Japanese Patent Publication No. 2017-117356

ところで、小売電気事業者は、例えば、需要家に電力供給を行う対象日の前日等に、当該対象日の電力調整計画を作成する。小売電気事業者の収益改善の観点から、小売電気事業者における経済性が高い電力調整計画が作成されることが望まれることがある。 Incidentally, retail electricity providers create a power adjustment plan for a specific day, for example, the day before the day they are scheduled to supply electricity to customers. From the perspective of improving the profitability of retail electricity providers, it is desirable that they create power adjustment plans that are highly economical.

そこで、本発明は、経済性が高い電力調整計画を作成可能な電力調整計画作成装置および電力調整計画作成方法を提供する。 Therefore, the present invention provides a power adjustment plan creation device and a power adjustment plan creation method capable of creating highly economical power adjustment plans.

本発明の一態様に係る電力調整計画作成装置は、電力の小売を行う事業者が需要家に電力供給を行うときの電力の調整計画を作成する電力調整計画作成装置であって、前日市場および当日市場を含む電力取引市場と調整が必要な電力量を示す調整電力量を取得する調整電力量取得部と、前記調整電力量を前記前日市場で取引するときの損益を示す前日市場調整推定損益をデマンド時限単位で取得する前日市場調整損益取得部と、前記調整電力量を前記当日市場で取引するときの損益を示す当日市場調整推定損益を前記デマンド時限単位で取得する当日市場調整損益取得部と、前記前日市場調整推定損益および前記当日市場調整推定損益を前記デマンド時限単位のそれぞれで比較し、比較結果に基づいて前記調整計画を作成する調整計画作成部と、前記調整計画を出力する出力部と、を備える。 A power adjustment plan creation device according to one aspect of the present invention is a power adjustment plan creation device for a power retailer to create a power adjustment plan when supplying power to consumers, and comprises: an adjustment power amount acquisition unit that acquires an adjustment power amount indicating the amount of power that needs to be adjusted with the power trading market, including the previous day market and the current day market; a previous day market adjustment profit and loss acquisition unit that acquires the previous day market adjustment estimated profit and loss indicating the profit and loss when the adjustment power amount is traded in the previous day market in a demand time unit; a current day market adjustment profit and loss acquisition unit that acquires the current day market adjustment estimated profit and loss indicating the profit and loss when the adjustment power amount is traded in the current day market in a demand time unit; an adjustment plan creation unit that compares the previous day market adjustment estimated profit and loss and the current day market adjustment estimated profit and loss for each of the demand time units and creates the adjustment plan based on the comparison result; and an output unit that outputs the adjustment plan.

本発明の一態様に係る電力調整計画作成方法は、電力の小売を行う事業者が需要家に電力供給を行うときの電力の調整計画を作成する電力調整計画作成方法であって、前日市場および当日市場を含む電力取引市場と調整が必要な電力量を示す調整電力量を取得する第1取得ステップと、前記調整電力量を前日市場で取引するときの損益を示す前日市場調整推定損益をデマンド時限単位で取得する第2取得ステップと、前記調整電力量を当日市場で取引するときの損益を示す当日市場調整推定損益を前記デマンド時限単位で取得する第3取得ステップと、前記前日市場調整推定損益および前記当日市場調整推定損益を前記デマンド時限単位のそれぞれで比較し、比較結果に基づいて前記調整計画を作成する作成ステップと、前記調整計画を出力する出力ステップと、を含む。 A method for creating a power adjustment plan according to one aspect of the present invention is a method for creating a power adjustment plan when a power retailer supplies power to a consumer, and includes: a first acquisition step of acquiring an adjustment amount indicating the amount of power that needs to be adjusted with the power trading market, including the previous day market and the current day market; a second acquisition step of acquiring an estimated profit and loss for adjustments in the previous day market, indicating the profit and loss when the adjustment amount is traded in the previous day market, in demand time units; a third acquisition step of acquiring an estimated profit and loss for adjustments in the current day market, indicating the profit and loss when the adjustment amount is traded in the current day market, in demand time units; a creation step of comparing the estimated profit and loss for adjustments in the previous day market and the estimated profit and loss for adjustments in the current day market in each of the demand time units, and creating the adjustment plan based on the comparison result; and an output step of outputting the adjustment plan.

本発明の一態様によれば、経済性が高い電力調整計画を作成可能な電力調整計画作成装置等を実現することができる。 According to one aspect of the present invention, a power adjustment plan creation device and the like capable of creating highly economical power adjustment plans can be realized.

図1は、実施の形態1に係る電力調整計画提示システムの構成を示す機能ブロック図である。Figure 1 is a functional block diagram showing the configuration of the power adjustment plan presentation system according to Embodiment 1. 図2は、実施の形態1に係る電力調整計画作成装置の動作を示すフローチャートである。Figure 2 is a flowchart showing the operation of the power adjustment plan creation device according to Embodiment 1. 図3は、実施の形態1に係る提示部の表示例を示す図である。Figure 3 shows an example of the display of the presentation unit according to Embodiment 1. 図4は、実施の形態2に係る電力調整計画提示システムの構成を示す機能ブロック図である。Figure 4 is a functional block diagram showing the configuration of the power adjustment plan presentation system according to Embodiment 2. 図5は、実施の形態2に係る電力調整計画作成装置の動作を示すフローチャートである。Figure 5 is a flowchart showing the operation of the power adjustment plan creation device according to Embodiment 2. 図6は、実施の形態3に係る電力調整計画提示システムの構成を示す機能ブロック図である。Figure 6 is a functional block diagram showing the configuration of the power adjustment plan presentation system according to Embodiment 3. 図7は、実施の形態3に係る電力調整計画作成装置の動作を示すフローチャートである。Figure 7 is a flowchart showing the operation of the power adjustment plan creation device according to Embodiment 3. 図8は、実施の形態4に係る電力調整計画提示システムの構成を示す機能ブロック図である。Figure 8 is a functional block diagram showing the configuration of the power adjustment plan presentation system according to Embodiment 4. 図9は、実施の形態4に係る電力調整計画作成装置の動作を示すフローチャートである。Figure 9 is a flowchart showing the operation of the power adjustment plan creation device according to Embodiment 4.

(本発明に至った経緯)
日本において2016年に電力小売の全面自由化が始まり、家庭、商店等のあらゆる需要家(消費者)が、電気の購入先、料金プランを自由に選択できるようになった。その結果、これまでは主に各エリアの電力会社(旧一般電気事業者)が電気を供給していたが、電力自由化を受けて新たに電気の小売業に参入する事業者、いわゆる「小売電気事業者(旧特定規模電気事業者)」が続々と現れている。小売電気事業者は、電力の小売供給を行う事業者の一例である。なお、電力の小売を行う事業者は、小売電気事業者に限定されない。
(Background leading to the present invention)
In 2016, the full liberalization of electricity retail began in Japan, allowing all consumers, including households and shops, to freely choose their electricity supplier and pricing plan. As a result, while electricity was previously supplied mainly by local power companies (formerly general electricity utilities), the liberalization of the electricity market has led to a surge in new businesses entering the retail electricity market, known as "retail electricity suppliers" (formerly specified-scale electricity utilities). A retail electricity supplier is one example of a business that supplies electricity to the retail market. It should be noted that businesses that sell electricity are not limited to retail electricity suppliers.

電力小売の全面自由化に伴い、2016年より計画値同時同量制度が導入された。これにより、小売電気事業者には、電力の販売計画と販売実績とを常に(例えば、30分単位で)一致させることが義務付けられている。小売電気事業者における電力の需要量の計画値を含む販売計画と、電力の需要量の実績値を含む販売実績との差分であるインバランスが発生すると、小売電気事業者にはインバランス料金と呼ばれる料金の支払いが課されることがある。そのため、販売計画と販売実績との差を小さくすることは、小売電気事業者の収益にとって重要である。インバランス量を抑えることで小売電気事業者の電力の調達および調整のコストを削減することができるため、当該小売電気事業者の収益改善につながる。また、インバランス量を抑えることで電力系統における需給バランスの維持にもつながる。 With the full liberalization of electricity retail, the simultaneous supply and demand matching system was introduced in 2016. This obligates retail electricity providers to always match their planned sales figures with their actual sales figures (for example, every 30 minutes). If an imbalance occurs—the difference between a retail electricity provider's sales plan (which includes planned demand) and their actual sales figures (which include actual demand)—the provider may be charged an imbalance fee. Therefore, minimizing the difference between planned and actual sales is crucial for a retail electricity provider's profitability. Reducing imbalances lowers the costs of electricity procurement and adjustment for retail electricity providers, leading to improved profitability. Furthermore, reducing imbalances contributes to maintaining the supply-demand balance in the power grid.

なお、30分は、所定の期間の一例である。所定の期間は、デマンド時限(需要時限)単位の期間であり、例えば、30分であるがこれに限定されない。また、販売計画の作成方法は、特に限定されず、既存のいかなる方法が用いられてもよい。販売は供給とも称され、販売計画は需要計画または販売電力量計画とも称される。 Note that 30 minutes is just one example of a specified period. The specified period is the period of a demand time unit (demand time unit), and is not limited to 30 minutes, for example. Furthermore, the method of creating the sales plan is not particularly limited, and any existing method may be used. Sales are also referred to as supply, and the sales plan is also referred to as a demand plan or sales volume plan.

このような小売電気事業者のおおまかな業務フローについて説明する。まずは、需要家に電力を販売する前日の業務フローについて説明する。 This section will explain the general workflow of a retail electricity provider. First, we will describe the workflow for the day before selling electricity to customers.

小売電気事業者は、必要に応じて、一般送配電事業者(旧一般電気事業者の送配電部門)から翌日のFIT(Feed-in Tariff)発電計画値の情報を取得する。発電計画値は、例えば、30分単位の計画値であってもよい。また、小売電気事業者は、必要に応じて、契約している需要家の需要量(電力需要量)の予測値に基づいて、翌日の販売計画を策定する。販売計画は、例えば、翌日(当日)の30分単位の48コマの需要量を含む。 Retail electricity providers obtain information on the next day's FIT (Feed-in Tariff) power generation plan values from general transmission and distribution companies (the transmission and distribution divisions of former general electricity companies) as needed. These power generation plan values may be, for example, planned values in 30-minute intervals. Furthermore, retail electricity providers formulate the next day's sales plan based on the predicted demand (electricity demand) of their contracted customers, as needed. The sales plan may include, for example, demand data for 48 30-minute intervals for the following day (or current day).

小売電気事業者は、販売計画と例えば発電事業者から直接調達する電力量とに基づいて、翌日の電力の不足分があるか否かを判定し、不足している場合には、JEPX(一般社団法人 日本卸電力取引所)における卸電力取引市場(いわゆるスポット市場)から入札により電力の不足分を調達する。発電事業者は、自ら発電設備(発電用の電気工作物)を維持・運用し、小売電気事業等の用に供するための電気を発電する事業者である。なお、小売電気事業者が発電設備を保有している場合、すなわち、例えば、発電事業と小売電気事業とを兼業している場合、小売電気事業者は、販売計画と当該発電設備による発電量(発電予測量)とに基づいて、翌日の電力の不足分があるか否かを判定するようにしてもよい。また、スポット市場は前日市場の一例であり、時間前市場は当日市場の一例である。 Retail electricity providers determine whether there will be a power shortage for the following day based on their sales plan and, for example, the amount of electricity they procure directly from power generators. If there is a shortage, they procure the necessary electricity through bidding from the wholesale electricity trading market (the so-called spot market) at JEPX (Japan Electric Power Exchange). Power generators are businesses that maintain and operate their own power generation facilities (electrical installations for power generation) and generate electricity for use in retail electricity businesses, etc. If a retail electricity provider owns power generation facilities, i.e., if they operate both a power generation business and a retail electricity business, they may determine whether there will be a power shortage for the following day based on their sales plan and the amount of electricity generated by those facilities (forecasted generation amount). Furthermore, the spot market is an example of a day-ahead market, and the hour-ahead market is an example of a day-ahead market.

そして、小売電気事業者は、卸電力取引市場からの調達分を含めて、最終的な翌日の販売計画を策定し、策定した販売計画を電力広域的運営推進機関(OCCTO)に提出する。最終的な翌日の販売計画を当初の販売計画とも記載する。電力広域的運営推進機関は、長期方針・広域系統整備計画の策定、系統アクセス業務の審査等を行う機関である。 Retail electricity providers then formulate a final sales plan for the following day, including procurement from the wholesale electricity market, and submit this plan to the Organization for Cross-regional Coordination of Transmission Operators (OCCTO). This final sales plan for the following day is also referred to as the initial sales plan. OCCTO is responsible for formulating long-term policies and wide-area grid development plans, and reviewing grid access operations.

電力の取引価格には、発電事業者と小売電気事業者との間の取引価格と、スポット市場から調達するときの取引価格とがある。発電事業者と小売電気事業者との間の取引価格は、発電事業者と小売電気事業者との間の相対契約において取り決められている。 Electricity transaction prices include the transaction price between power generators and retail electricity providers, and the transaction price when procuring from the spot market. The transaction price between power generators and retail electricity providers is determined through bilateral contracts between them.

また、スポット市場から調達するときの取引価格は、例えば、スポット市場での約定価格であり、前日の午前10時過ぎに決定される。例えば、約定価格、すなわち卸電力取引市場の市場価格にはシステムプライス(全国大の売り入札曲線と買い入札曲線の交点の価格)とエリアごとのエリアプライス(連系線容量の制約により、エリアごとに約定価格を算出する場合の価格)とがあるが、取引価格はどちらのプライスであってもよい。当該取引価格は、卸電力取引市場を介した1以上の小売電気事業者と1以上の発電事業者との取引に基づく電力の価格であるとも言える。なお、電力が不足するケースについて説明したが、小売電気事業者は、販売計画と例えば発電事業者から直接調達する電力量とに基づいて、翌日の電力の余剰分がある場合には、スポット市場に売り手として入札し取引してもよい。 Furthermore, the transaction price when procuring from the spot market is, for example, the contract price in the spot market, which is determined shortly after 10:00 AM the previous day. For example, the contract price, i.e., the market price in the wholesale electricity trading market, includes both a system price (the price at the intersection of the nationwide sell bid curve and buy bid curve) and an area price (the price when the contract price is calculated for each area due to interconnection line capacity constraints). The transaction price can be either price. This transaction price can also be said to be the price of electricity based on transactions between one or more retail electricity businesses and one or more power generators via the wholesale electricity trading market. While we have explained the case of electricity shortage, retail electricity businesses may bid and trade as sellers in the spot market if there is a surplus of electricity for the following day, based on their sales plan and, for example, the amount of electricity procured directly from power generators.

なお、発電事業者と小売電気事業者との間の取引価格、および、スポット市場から調達するときの取引価格の少なくとも一方は、販売電力量計画に基づく電力の取引価格の一例である。 Furthermore, at least one of the transaction prices between power generators and retail electricity providers, and the transaction price when procuring from the spot market, is an example of the transaction price of electricity based on the electricity sales volume plan.

なお、上記では、JEPXにおけるスポット市場から電力を調達する例について説明したが、JEPXにおけるスポット市場であることに限定されず、卸電力取引市場であればよい。 The above example described procuring electricity from the spot market on JEPX, but it is not limited to the JEPX spot market; any wholesale electricity trading market will suffice.

次に、需要家に電力を供給する当日の業務フローについて説明する。 Next, we will explain the daily workflow for supplying electricity to customers.

小売電気事業者は、前日に策定した販売計画通りの電力の販売ができているか監視(いわゆる同時同量達成の監視)を行う。小売電気事業者は、当日に電力が不足する場合、JEPXにおける卸電力取引市場(いわゆる時間前市場)への入札により当日に発生した電力の不足分を調達し、必要に応じて販売計画の再計画を行って電力広域的運営推進機関に提出する。再計画は、例えば、前日に策定した販売計画と当日の販売とが大きく乖離する場合等に行われる。なお、余剰分がある場合には、スポット市場と同様、時間前市場に売り手として入札し取引してもよい。また、時間前市場は当日市場の一例であり、時間前市場における電力の取引価格は、卸電力取引市場の市場価格の一例である。 Retail electricity providers monitor whether they are selling electricity according to the sales plan formulated the previous day (so-called monitoring of simultaneous supply and demand). If there is a power shortage on the day, retail electricity providers procure the necessary amount by bidding on the wholesale electricity trading market (so-called pre-sale market) at JEPX, and revise their sales plan as needed before submitting it to the Organization for Cross-regional Coordination of Transmission Operators. Revisions are made, for example, when there is a significant discrepancy between the sales plan formulated the previous day and the actual sales on the day. If there is a surplus, the provider may bid and trade as a seller in the pre-sale market, similar to the spot market. Furthermore, the pre-sale market is an example of the same-day market, and the electricity trading price in the pre-sale market is an example of the market price in the wholesale electricity trading market.

小売電気事業者は、上記でも説明したように前日に当初の販売計画を作成する必要がある。小売電気事業者は、販売計画と例えば発電事業者から直接調達する電力量とに基づいて、翌日の電力が不足している場合には、スポット市場または翌日の時間前市場から不足分の電力調達をするように当初の販売計画を作成する。スポット市場取引単価と時間前市場取引単価とが大きく異なる場合、最適な当初の販売計画からのズレが生じるので、小売電気事業者の収益性が低下する恐れがある。また、市場価格がインバランス価格以上に高騰した場合にも、最適な当初の販売計画からのズレが生じるので、小売電気事業者の収益性が低下する恐れがある。そのため、小売電気事業者にける収益改善の観点から、当初の販売計画を作成する上で、スポット市場取引単価および時間前市場取引単価を考慮し、翌日の電力不足分を調達するための経済性の高い電力調達計画が作成されることが望まれる。なお、上記では電力が不足するケースについて説明したが、計画値に対して電力の余剰が発生する場合も余剰分を引き渡してインバランスの発生を抑制することになる。小売電気事業者は、余剰分を卸電力取引市場に売却することを含む事前計画を作成する。 As explained above, retail electricity providers are required to create their initial sales plan the day before. Based on this sales plan and, for example, the amount of electricity they procure directly from power generators, they create their initial sales plan to procure the necessary amount of electricity from the spot market or the next day's pre-sale market if there is a shortage of electricity for the following day. If the spot market transaction price and the pre-sale market transaction price differ significantly, a deviation from the optimal initial sales plan will occur, which may reduce the profitability of the retail electricity provider. Similarly, if market prices rise above the imbalance price, a deviation from the optimal initial sales plan will occur, which may also reduce the profitability of the retail electricity provider. Therefore, from the perspective of improving the profitability of retail electricity providers, it is desirable that when creating the initial sales plan, the spot market transaction price and the pre-sale market transaction price be considered, and that an economically efficient electricity procurement plan be created to procure the necessary amount of electricity for the following day's shortage. Although the above has described the case of a power shortage, if there is a surplus of electricity compared to the planned value, the surplus will also be transferred to suppress the occurrence of an imbalance. Retail electricity providers create a pre-sale plan that includes selling the surplus to the wholesale electricity trading market.

そこで、本願発明者らは、経済性が高い電力調整計画を作成可能な電力調整計画作成装置および電力調整計画作成方法について鋭意検討を行い、以下で説明する電力調整計画作成装置および電力調整計画作成方法を創案した。なお、以下では、電力調整計画を単に調整計画と記載する。 Therefore, the inventors of this application have diligently studied a power adjustment plan creation device and method capable of creating highly economical power adjustment plans, and have devised the power adjustment plan creation device and method described below. In the following, a power adjustment plan will be simply referred to as an adjustment plan.

以下、実施の形態について、図面を参照しながら具体的に説明する。 The embodiments will be described in detail below with reference to the drawings.

なお、以下で説明する実施の形態は、いずれも包括的または具体的な例を示すものである。以下の実施の形態で示される数値、構成要素、構成要素の配置位置および接続形態、ステップ、ステップの順序等は、一例であり、本発明を限定する主旨ではない。また、以下の実施の形態における構成要素のうち、独立請求項に記載されていない構成要素については、任意の構成要素として説明される。 The embodiments described below are either comprehensive or specific examples. The numerical values, components, their arrangement and connection configurations, steps, and step order shown in the following embodiments are examples only and are not intended to limit the present invention. Furthermore, components in the following embodiments that are not described in an independent claim are described as optional components.

また、各図は、模式図であり、必ずしも厳密に図示されたものではない。したがって、例えば、各図において縮尺などは必ずしも一致しない。また、各図において、実質的に同一の構成については同一の符号を付しており、重複する説明は省略または簡略化する。 Furthermore, each figure is a schematic diagram and not necessarily a strictly accurate representation. Therefore, for example, the scale may not necessarily match across all figures. Also, in each figure, substantially identical components are denoted by the same reference numerals, and redundant explanations are omitted or simplified.

また、本明細書において、同じ、一致等の要素間の関係性を示す用語、並びに、数値、および、数値範囲は、厳格な意味のみを表す表現ではなく、実質的に同等な範囲、例えば数%程度(例えば、10%程度)の差異をも含むことを意味する表現である。 Furthermore, in this specification, terms indicating relationships between elements such as "same" or "identical," as well as numerical values and numerical ranges, do not represent only strict meanings, but also include substantially equivalent ranges, such as differences of a few percent (e.g., about 10%).

(実施の形態1)
以下、本実施の形態に係る電力調整計画作成装置について、図1~図3を参照しながら説明する。
(Embodiment 1)
The power adjustment plan creation device according to this embodiment will be described below with reference to Figures 1 to 3.

[1-1.電力調整損計画提示システムの構成]
まず、本実施の形態に係る電力調整計画作成装置を備える電力調整計画提示システムの構成について、図1を参照しながら説明する。図1は、本実施の形態に係る電力調整計画提示システム1の構成を示す機能ブロック図である。
[1-1. Configuration of the Power Adjustment Loss Plan Presentation System]
First, the configuration of the power adjustment plan presentation system equipped with the power adjustment plan creation device according to this embodiment will be described with reference to Figure 1. Figure 1 is a functional block diagram showing the configuration of the power adjustment plan presentation system 1 according to this embodiment.

図1に示すように、電力調整計画提示システム1は、電力調整計画作成装置100と、提示部300とを備える。電力調整計画作成装置100と、提示部300との通信は、無線通信であってもよいし、有線通信であってもよい。 As shown in Figure 1, the power adjustment plan presentation system 1 comprises a power adjustment plan creation device 100 and a presentation unit 300. Communication between the power adjustment plan creation device 100 and the presentation unit 300 may be wireless or wired.

電力調整計画作成装置100は、小売電気事業者が需要家に電力供給を行うときの調整計画を作成する。電力調整計画作成装置100は、販売計画と発電事業者から調達する電力量とに基づいて翌日の電力が不足している場合に、不足分の電力を調達するための調整計画を作成する。小売電気事業者は、需要家に電力供給を行う事業者である。なお、小売電気事業者が発電設備(例えば、発電所)を保有している場合、電力調整計画作成装置100は、販売計画と当該発電設備による発電量(発電予測量)とに基づいて、調整計画を作成してもよい。小売電気事業者と発電事業者とは、同一の事業者であってもよい。 The power adjustment plan creation device 100 creates an adjustment plan for when a retail electricity provider supplies electricity to consumers. Based on the sales plan and the amount of electricity procured from power generators, the power adjustment plan creation device 100 creates an adjustment plan to procure the necessary electricity if there is a shortage of electricity for the following day. A retail electricity provider is a business that supplies electricity to consumers. If a retail electricity provider owns power generation facilities (e.g., a power plant), the power adjustment plan creation device 100 may create an adjustment plan based on the sales plan and the amount of electricity generated by those facilities (predicted generation amount). The retail electricity provider and the power generator may be the same business.

なお、需要家は、小売電気事業者と電力に関する契約を行い、小売電気事業者から電力を購入する消費者である。需要家の施設は、例えば、住居であるがこれに限定されず、工場、マンション、ビル、病院、学校等の、少なくとも負荷が配置される建物であってもよい。なお、以下では、需要家に電力を供給する対象となる日(例えば、翌日)を当日とし、当該当日の前の日を前日と記載する場合がある。 A customer is a consumer who enters into a contract with a retail electricity provider and purchases electricity from them. A customer's facility may be, for example, a residence, but is not limited to this; it may also be a factory, apartment building, office building, hospital, school, or any other building where a load is located. In the following, the day on which electricity is supplied to the customer (for example, the next day) may be referred to as "the current day," and the day before that day may be referred to as "the previous day."

電力調整計画作成装置100は、販売電力量取得部110aと、気象情報取得部110bと、市場取引価格取得部110cと、調整電力量予測部120と、スポット市場単価予測部130と、時間前市場単価予測部140と、スポット市場調整損益推定部150と、時間前市場調整損益推定部160と、調整計画作成部170と、出力部180と、各種テーブルを記憶する記憶部(図示しない)とを備える。電力調整計画作成装置100は、プロセッサ、メモリ等を含むコンピュータまたはスマートフォンにより実現される。具体的には、電力調整計画作成装置100は、プロセッサがメモリに記憶されたプログラムに従って動作することにより、販売電力量取得部110a、気象情報取得部110b、市場取引価格取得部110c、調整電力量予測部120、スポット市場単価予測部130、時間前市場単価予測部140、スポット市場調整損益推定部150、時間前市場調整損益推定部160、調整計画作成部170および出力部180として機能する。電力調整計画作成装置100は、例えば、小売電気事業者が有するサーバ装置等により実現されてもよい。 The power adjustment plan creation device 100 comprises a sales electricity acquisition unit 110a, a weather information acquisition unit 110b, a market transaction price acquisition unit 110c, an adjustment electricity forecast unit 120, a spot market unit price forecast unit 130, a time-ahead market unit price forecast unit 140, a spot market adjustment profit/loss estimation unit 150, a time-ahead market adjustment profit/loss estimation unit 160, an adjustment plan creation unit 170, an output unit 180, and a storage unit (not shown) for storing various tables. The power adjustment plan creation device 100 is implemented by a computer including a processor, memory, etc., or by a smartphone. Specifically, the power adjustment plan creation device 100 functions as a sales electricity acquisition unit 110a, a weather information acquisition unit 110b, a market transaction price acquisition unit 110c, an adjustment electricity forecast unit 120, a spot market unit price forecast unit 130, a time-ahead market unit price forecast unit 140, a spot market adjustment profit/loss estimation unit 150, a time-ahead market adjustment profit/loss estimation unit 160, an adjustment plan creation unit 170, and an output unit 180, through the operation of a processor according to a program stored in memory. The power adjustment plan creation device 100 may be implemented, for example, by a server device owned by a retail electricity provider.

販売電力量取得部110aは、1以上の需要家への過去の第1期間の電力量の販売実績を示す販売電力量(販売電力量実績値)を取得する。販売電力量取得部110aは、例えば、一般送配電事業者または需要家に設置された計量器から直接、販売電力量を取得してもよいし、販売電力量を管理するサーバ装置から販売電力量を取得してもよいし、自装置の記憶部に販売電力量が記憶されている場合、記憶部から読み出すことで販売電力量を取得してもよい。なお、販売電力量は、小売電気事業者が契約している需要家に第1期間に販売(供給)した総電力量の実績値である。また、販売電力量は、例えば、デマンド時限単位ごとに取得される。 The electricity sales volume acquisition unit 110a acquires electricity sales volume (actual electricity sales volume value) that shows the actual amount of electricity sold to one or more customers during the past first period. The electricity sales volume acquisition unit 110a may, for example, acquire electricity sales volume directly from meters installed by general transmission and distribution companies or customers, acquire electricity sales volume from a server device that manages electricity sales volume, or acquire electricity sales volume by reading it from the storage unit of the unit itself if the electricity sales volume is stored there. Note that the electricity sales volume is the actual value of the total amount of electricity sold (supplied) by the retail electricity business operator to customers with whom it has a contract during the first period. Furthermore, electricity sales volume is acquired, for example, for each demand time unit.

気象情報取得部110bは、第1期間および将来の電力供給対象となる第2期間の気象情報を取得する。気象情報は、第1期間における3時間ごとの気象実績と、第2期間における3時間ごとの気象予報とを含んでいてもよい。つまり、気象情報は、3時間ごとの情報であってもよい。なお、気象情報は3時間ごとの情報であることに限定されない。 The weather information acquisition unit 110b acquires weather information for the first period and the second period, which will be subject to future power supply. The weather information may include hourly weather data for the first period and hourly weather forecasts for the second period. In other words, the weather information may be in three-hour intervals. However, the weather information is not limited to three-hour intervals.

なお、気象情報取得部110bは、例えば、気象情報配信会社等から気象情報を取得してもよい。気象情報取得部110bは、例えば、気象情報を管理するサーバ装置(例えば、気象庁または気象情報を提供する民間企業等が管理するサーバ装置)から第1期間および第2期間の気象情報を取得してもよい。また、第1期間は特に限定されず、例えば、第2期間から数日、数週間、数ヶ月または数年前の期間であってもよい。 Furthermore, the weather information acquisition unit 110b may acquire weather information from, for example, a weather information distribution company. The weather information acquisition unit 110b may also acquire weather information for the first and second periods from, for example, a server device that manages weather information (for example, a server device managed by the Japan Meteorological Agency or a private company that provides weather information). The first period is not particularly limited and may be, for example, a period of several days, weeks, months, or several years prior to the second period.

気象情報には、温湿度、天気(晴れ、曇り、雨、雪等)、日射量等が含まれるが、これに限定されない。また、ここでの第2期間の気象情報は、スポット市場に入札する前に取得される(予報される)情報を含む。つまり、ここでの気象情報は、前日において、販売計画を電力広域的運営推進機関に提出する前に取得される情報である。ここでの第2期間の気象情報は、電力広域的運営推進機関に提出するための販売計画を策定するときに用いられる気象情報である。 Weather information includes, but is not limited to, temperature, humidity, weather (sunny, cloudy, rainy, snowy, etc.), and solar radiation. Furthermore, the weather information for the second period here includes information obtained (forecasted) before bidding on the spot market. In other words, the weather information here is information obtained on the previous day, before submitting the sales plan to the Organization for Cross-regional Coordination of Transmission Operators (OCCTO). The weather information for the second period here is the weather information used when formulating the sales plan to be submitted to OCCTO.

また、気象情報取得部110bは、気象情報に替えて、または、気象情報に加えてイベント情報を取得してもよい。イベント情報は、当日に行われるイベントの内容(祭り、コンサート等)と、当該イベントが行われる時間帯とを含む。また、イベント情報は、祝祭日等のカレンダー情報を含んでいてもよい。例えば、需要家が工場またはオフィスビルである場合、カレンダー情報には、稼働日、営業日および休業日を示す情報が含まれる。ここで、取得する気象情報またはイベント情報は、少なくとも小売電気事業者が契約している需要家が存在するエリアに紐づく気象情報またはイベント情報となる。 Furthermore, the weather information acquisition unit 110b may acquire event information in addition to or instead of weather information. The event information includes the content of the event (festival, concert, etc.) and the time period during which the event will take place. The event information may also include calendar information such as public holidays. For example, if the customer is a factory or office building, the calendar information would include information indicating working days, business days, and holidays. Here, the acquired weather information or event information is at least linked to the area where the customer contracted by the retail electricity provider is located.

市場取引価格取得部110cは、第1期間の卸電力取引市場価格の実績を示す取引実績価格を取得する。取引実績価格は、卸電力取引市場の市場取引における価格であり、小売電気事業者が卸電力取引市場で電力を取引したときの価格(例えば、単価)を含む。取引実績価格は、例えば、需要家に電力を供給するために第1期間にスポット市場で電力を取引したときの実績(スポット市場取引実績価格)と、第1期間に需要家に電力を供給するために時間前市場で電力を取引したときの実績(時間前市場取引実績価格)とを含む。スポット市場取引実績価格と時間前市場取引実績価格とは、同一期間の実績であってもよいし、互いに異なる期間の実績であってもよい。市場取引価格取得部110cは、卸電力取引市場を管理するサーバ装置等から取引実績価格を取得する。スポット市場取引実績価格は第1価格の一例であり、時間前市場取引実績価格は第2価格の一例である。また、スポット市場取引実績価格は、例えば、スポット市場から電力を調達したときの実績と、スポット市場に電力を売却したときの実績との少なくとも一方を含み、時間前市場取引実績価格は、例えば、時間前市場から電力を調達したときの実績と、時間前市場に電力を売却したときの実績との少なくとも一方を含む。 The market transaction price acquisition unit 110c acquires actual transaction prices that show the actual wholesale electricity market prices for the first period. The actual transaction price is the price in market transactions in the wholesale electricity market, and includes the price (e.g., unit price) at which retail electricity businesses trade electricity in the wholesale electricity market. The actual transaction price includes, for example, the actual price at which electricity was traded in the spot market during the first period to supply electricity to consumers (spot market transaction price) and the actual price at which electricity was traded in the advance market during the first period to supply electricity to consumers (advance market transaction price). The spot market transaction price and the advance market transaction price may be from the same period or from different periods. The market transaction price acquisition unit 110c acquires actual transaction prices from a server device or the like that manages the wholesale electricity market. The spot market transaction price is an example of a first price, and the advance market transaction price is an example of a second price. Furthermore, the spot market transaction price includes, for example, at least one of the actual transactions when electricity was procured from the spot market and the actual transactions when electricity was sold to the spot market, and the ahead market transaction price includes, for example, at least one of the actual transactions when electricity was procured from the ahead market and the actual transactions when electricity was sold to the ahead market.

販売電力量取得部110a、気象情報取得部110bおよび市場取引価格取得部110cは、例えば、通信回路(通信モジュール)を含んで構成される。なお、販売電力量取得部110a、気象情報取得部110bおよび市場取引価格取得部110cの少なくとも1つは、キーボード、ボタン、タッチパネル等を含んで構成され、小売電気事業者の管理者等からの入力により各種情報を取得してもよい。また、販売電力量取得部110a、気象情報取得部110bおよび市場取引価格取得部110cは、1つの装置として実現されてもよいし、互いに異なる装置として実現されてもよい。 The electricity sales volume acquisition unit 110a, the weather information acquisition unit 110b, and the market transaction price acquisition unit 110c are configured to include, for example, a communication circuit (communication module). At least one of the electricity sales volume acquisition unit 110a, the weather information acquisition unit 110b, and the market transaction price acquisition unit 110c may be configured to include a keyboard, buttons, a touch panel, etc., and may acquire various information through input from the retail electricity business operator's administrator, etc. Furthermore, the electricity sales volume acquisition unit 110a, the weather information acquisition unit 110b, and the market transaction price acquisition unit 110c may be implemented as a single device or as separate devices.

調整電力量予測部120は、卸電力取引市場と取引が必要な電力量を示す調整電力量を取得する。本実施の形態では、調整電力量予測部120は、販売電力量、気象情報、需要家マスターテーブルおよび計画値に基づいて、第2期間における卸電力取引市場で取引が必要な電力量を示す調整電力量を予測することで調整電力量を取得する。まず、調整電力量予測部120は、販売電力量、気象情報および需要家マスターテーブルに基づいて、第2期間の電力需要量を予測する。調整電力量予測部120は、例えば、第2期間の気象予報と同じ気象実績のときの1以上の販売電力量に基づいて、基本電力需要量を算出する。基本電力需要量は、1以上の販売電力量の平均値、中央値、最頻値、最大値または最小値のいずれかであってもよい。そして、調整電力量予測部120は、基本電力需要量に需要家マスターテーブルに応じた演算を行うことで第2期間の電力需要量を算出する。需要家マスターテーブルに応じた演算とは、例えば、当日需要家が休業日等であり電力消費量が減る見込みである場合、基本電力需要量から所定の電力量を減らすまたは係数を小さくして電力需要量を算出し、当日がイベント日等であり電力消費量が増える見込みである場合、基本電力需要量から所定の電力量を増やすまたは係数を大きくして電力需要量を算出してもよい。 The Adjusted Power Quantity Forecasting Unit 120 acquires the adjusted power quantity, which indicates the amount of electricity that needs to be traded in the wholesale power trading market. In this embodiment, the Adjusted Power Quantity Forecasting Unit 120 acquires the adjusted power quantity by predicting the adjusted power quantity, which indicates the amount of electricity that needs to be traded in the wholesale power trading market during the second period, based on the amount of electricity sold, weather information, the customer master table, and planned values. First, the Adjusted Power Quantity Forecasting Unit 120 predicts the electricity demand for the second period based on the amount of electricity sold, weather information, and the customer master table. For example, the Adjusted Power Quantity Forecasting Unit 120 calculates the basic electricity demand based on one or more sales amounts when the weather conditions are the same as the weather forecast for the second period. The basic electricity demand may be the average, median, mode, maximum, or minimum value of one or more sales amounts. Then, the Adjusted Power Quantity Forecasting Unit 120 calculates the electricity demand for the second period by performing calculations on the basic electricity demand according to the customer master table. Calculations based on the customer master table may, for example, involve calculating the electricity demand by reducing a predetermined amount of electricity from the basic electricity demand or by decreasing the coefficient if the customer is closed on a holiday or similar day and electricity consumption is expected to decrease. Conversely, if the day is an event day or similar day and electricity consumption is expected to increase, the electricity demand may be calculated by increasing a predetermined amount of electricity from the basic electricity demand or by increasing the coefficient.

なお、電力需要量の算出方法は、これに限定されず、既存のいなかる算出方法が用いられてもよい。例えば、調整電力量予測部120は、少なくとも販売電力量に基づいて電力需要量を予測すればよく、気象情報および需要家マスターテーブルの少なくとも一方を用いなくてもよい。この場合、調整電力量予測部120は、第1期間の販売電力量の平均値、中央値、最頻値、最大値または最小値を第2期間の電力需要量として予測してもよい。第1期間は第2期間と属性が同じ期間を含んでいてもよく、第1期間と第2期間とは、例えば、季節、曜日、気象情報が同じ期間であってもよい。 The method for calculating electricity demand is not limited to this, and any existing calculation method may be used. For example, the adjustment electricity forecasting unit 120 only needs to forecast electricity demand based on the amount of electricity sold, and does not need to use at least one of the weather information and the customer master table. In this case, the adjustment electricity forecasting unit 120 may forecast the electricity demand for the second period as the average, median, mode, maximum, or minimum value of the amount of electricity sold during the first period. The first period may include periods with the same attributes as the second period, and the first and second periods may, for example, be periods with the same season, day of the week, or weather information.

そして、調整電力量予測部120は、第2期間の電力需要量と第2期間の計画値とに基づいて第2期間における調整電力量を予測する。調整電力量予測部120は、例えば、電力需要量と計画値との差分を調整電力量として算出してもよい。調整電力量予測部120は、例えば、電力需要量から計画値を減算した値がプラスである場合、当該値を不足分の電力量として算出してもよい。また、調整電力量予測部120は、電力需要量から計画値を減算した値がマイナスである場合、当該値の絶対値を余剰分の電力量として算出してもよい。このように、調整電力量予測部120は、電力の不足が予測される場合、卸電力取引市場から調達する電力量(調整電力量の一例)を予測し、電力の余剰が予測される場合、卸電力取引市場に売却する電力量(調整電力量の一例)を予測してもよい。 The power adjustment forecasting unit 120 then predicts the amount of power adjustment for the second period based on the power demand for the second period and the planned value for the second period. The power adjustment forecasting unit 120 may, for example, calculate the difference between the power demand and the planned value as the amount of power adjustment. For example, if the value obtained by subtracting the planned value from the power demand is positive, the power adjustment forecasting unit 120 may calculate this value as the amount of power shortage. Furthermore, if the value obtained by subtracting the planned value from the power demand is negative, the power adjustment forecasting unit 120 may calculate the absolute value of this value as the amount of power surplus. In this way, when a power shortage is predicted, the power adjustment forecasting unit 120 may predict the amount of power to be procured from the wholesale power trading market (an example of power adjustment), and when a power surplus is predicted, it may predict the amount of power to be sold to the wholesale power trading market (an example of power adjustment).

調整電力量予測部120は、前日のスポット市場の入札開始前に調整電力量を予測する。調整電力量予測部120は、デマンド時限単位のそれぞれで調整電力量を予測する。このように、調整電力量予測部120は、第2期間の電力需要量を予測することで当該電力需要量を取得する調整電力量取得部として機能する。 The power adjustment forecasting unit 120 forecasts the amount of power adjustment before the start of bidding in the spot market the previous day. The power adjustment forecasting unit 120 forecasts the amount of power adjustment for each demand time unit. In this way, the power adjustment forecasting unit 120 functions as a power adjustment acquisition unit that acquires the power demand for the second period by forecasting that power demand.

また、調整電力量予測部120は、予測誤差を含む電力量を調整電力量として予測してもよい。調整電力量予測部120は、例えば、販売電力量のばらつき、気象情報のばらつき、または、需要家の情報に基づいて、調整電力量の誤差を算出してもよい。このように、調整電力量予測部120は、調整電力量の上限値および下限値を含む調整電力量の範囲を予測してもよい。 Furthermore, the power adjustment prediction unit 120 may predict a power amount including prediction errors as the adjusted power amount. The power adjustment prediction unit 120 may calculate the error in the adjusted power amount based, for example, on variations in the amount of electricity sold, variations in weather information, or customer information. In this way, the power adjustment prediction unit 120 may predict a range of adjusted power amount including upper and lower limits.

スポット市場単価予測部130は、取引実績価格(スポット市場取引実績価格)に基づいて、当日(第2期間)にスポット市場で約定するスポット市場取引予測単価をデマンド時限単位で予測する。スポット市場単価予測部130は、例えば、スポット市場における取引予測単価を予測する。スポット市場単価予測部130は、例えば、第1期間の取引実績価格の平均値、中央値、最頻値、最大値または最小値を第2期間の取引予測単価として予測してもよい。 The spot market price forecasting unit 130 forecasts the spot market transaction forecast price for the day (second period) in the spot market, based on actual transaction prices (actual spot market transaction prices), in units of demand time. For example, the spot market price forecasting unit 130 forecasts the transaction forecast price in the spot market. The spot market price forecasting unit 130 may also forecast the transaction forecast price for the second period as, for example, the average, median, mode, maximum, or minimum of the actual transaction prices for the first period.

スポット市場単価予測部130は、取引実績価格および気象情報に基づいて、当日(第2期間)にスポット市場で約定するスポット市場取引予測単価をデマンド時限単位で予測してもよい。スポット市場単価予測部130は、第1期間および第2期間の気象情報と、当該第1期間のスポット市場取引実績価格とに基づいて、第2期間のスポット市場取引予測単価を算出する。また、スポット市場単価予測部130は、推定誤差を含む価格をスポット市場取引実績価格として算出してもよい。スポット市場単価予測部130は、例えば、スポット市場取引実績価格のばらつきに基づいて、スポット市場取引予測単価の推定誤差を算出してもよい。このように、スポット市場単価予測部130は、スポット市場取引実績価格の上限値および下限値を含むスポット市場取引実績価格の範囲を予測してもよい。 The spot market price forecasting unit 130 may forecast the spot market transaction price to be executed in the spot market on the day (second period) in demand time units, based on actual transaction prices and weather information. The spot market price forecasting unit 130 calculates the spot market transaction price for the second period based on weather information for the first and second periods and the actual spot market transaction price for the first period. Furthermore, the spot market price forecasting unit 130 may calculate the spot market transaction price including estimation error as the actual spot market transaction price. The spot market price forecasting unit 130 may, for example, calculate the estimation error of the spot market transaction price forecast based on the variability of the actual spot market transaction price. In this way, the spot market price forecasting unit 130 may forecast a range of actual spot market transaction prices, including upper and lower limits of the actual spot market transaction price.

なお、スポット市場単価予測部130は、全国大で同一のスポット市場取引実績価格を算出してもよいし、エリアごとに同一のスポット市場取引実績価格を算出してもよい。スポット市場単価予測部130は、前日市場単価予測部の一例であり、スポット市場取引予測単価は、前日市場取引予測単価の一例である。 The spot market price forecasting unit 130 may calculate the same spot market transaction price nationwide, or it may calculate the same spot market transaction price for each area. The spot market price forecasting unit 130 is an example of the previous day's market price forecasting unit, and the spot market transaction forecast price is an example of the previous day's market transaction forecast price.

時間前市場単価予測部140は、取引実績価格(時間前市場取引実績価格)に基づいて、当日(第2期間)に時間前市場で約定する時間前市場取引予測単価をデマンド時限単位で予測する。時間前市場単価予測部140は、例えば、時間前市場における取引予測単価を予測する。時間前市場単価予測部140は、例えば、第1期間の取引実績価格の平均値、中央値、最頻値、最大値または最小値を第2期間の取引予測単価として予測してもよい。 The pre-hour market price forecasting unit 140 forecasts the pre-hour market transaction forecast price for the day (second period) in the pre-hour market, based on actual transaction prices (pre-hour market transaction prices), in units of demand time. For example, the pre-hour market price forecasting unit 140 forecasts the transaction forecast price in the pre-hour market. For example, the pre-hour market price forecasting unit 140 may forecast the average, median, mode, maximum, or minimum of the actual transaction prices for the first period as the transaction forecast price for the second period.

時間前市場単価予測部140は、取引実績価格(時間前市場取引実績価格)および気象情報に基づいて、当日(第2期間)に時間前市場で約定する時間前市場取引予測単価をデマンド時限単位で予測する。時間前市場単価予測部140は、第1期間および第2期間の気象情報と、当該第1期間の時間前市場取引実績価格とに基づいて、第2期間の時間前市場取引予測単価を算出する。また、時間前市場単価予測部140は、推定誤差を含む価格を時間前市場取引予測単価として算出してもよい。時間前市場単価予測部140は、例えば、時間前市場取引実績価格のばらつきに基づいて、時間前市場取引予測単価の推定誤差を算出してもよい。このように、時間前市場単価予測部140は、時間前市場取引予測単価の上限値および下限値を含む時間前市場取引予測単価の範囲を予測してもよい。 The pre-hourly market price forecasting unit 140 forecasts the pre-hourly market transaction forecast price for the day (second period) in demand time units, based on actual transaction prices (pre-hourly market transaction prices) and weather information. The pre-hourly market price forecasting unit 140 calculates the pre-hourly market transaction forecast price for the second period based on weather information for the first and second periods and the actual pre-hourly market transaction prices for the first period. The pre-hourly market price forecasting unit 140 may also calculate the pre-hourly market transaction forecast price including estimation error. For example, the pre-hourly market price forecasting unit 140 may calculate the estimation error of the pre-hourly market transaction forecast price based on the variability of actual pre-hourly market transaction prices. Thus, the pre-hourly market price forecasting unit 140 may forecast a range of the pre-hourly market transaction forecast price, including upper and lower limits.

なお、時間前市場単価予測部140は、全国大で同一の時間前市場取引実績価格を算出してもよいし、エリアごとに同一の時間前市場取引実績価格を算出してもよい。時間前市場単価予測部140は、当日市場単価予測部の一例であり、時間前市場取引実績価格は、当日市場取引予測単価の一例である。 The pre-hourly market price forecasting unit 140 may calculate the same pre-hourly market transaction price nationwide, or it may calculate the same pre-hourly market transaction price for each area. The pre-hourly market price forecasting unit 140 is an example of the day-of-day market price forecasting unit, and the pre-hourly market transaction price is an example of the day-of-day market transaction forecasting unit price.

スポット市場調整損益推定部150は、調整電力量をスポット市場で取引するときの損益を示すスポット市場調整推定損益をデマンド時限単位で取得する。スポット市場調整損益推定部150は、調整電力量が電力の不足が発生することを含む場合、調整電力量をスポット市場から調達するときの損益を示すスポット市場調達推定損益をデマンド時限単位で取得する。スポット市場調整損益推定部150は、例えば、調整電力量の全てをスポット市場から調達するときのスポット市場調達推定損益を取得する。本実施の形態では、スポット市場調整損益推定部150は、調整電力量、売電単価および取引予測単価(スポット市場取引予測価格)に基づいて、前日における市場調達分の損益を示すスポット市場調達推定損益を推定する。市場調達分とは、調整電力量であってもよい。このように、スポット市場調整損益推定部150は、スポット市場調達推定損益を推定することで当該スポット市場調達推定損益を取得するスポット市場調整損益取得部として機能する。 The Spot Market Adjustment Profit/Loss Estimation Unit 150 acquires the Spot Market Adjustment Estimated Profit/Loss, which indicates the profit or loss when trading the adjusted electricity amount in the spot market, on a demand time-limited basis. If the adjusted electricity amount includes a power shortage, the Spot Market Adjustment Profit/Loss Estimation Unit 150 also acquires the Spot Market Procurement Estimated Profit/Loss, which indicates the profit or loss when procuring the adjusted electricity amount from the spot market, on a demand time-limited basis. For example, the Spot Market Adjustment Profit/Loss Estimation Unit 150 acquires the Spot Market Procurement Estimated Profit/Loss when all of the adjusted electricity amount is procured from the spot market. In this embodiment, the Spot Market Adjustment Profit/Loss Estimation Unit 150 estimates the Spot Market Procurement Estimated Profit/Loss, which indicates the profit or loss of the market procurement portion on the previous day, based on the adjusted electricity amount, the electricity sales price, and the predicted transaction price (spot market predicted transaction price). The market procurement portion may be the adjusted electricity amount. Thus, the Spot Market Adjustment Profit/Loss Estimation Unit 150 functions as a Spot Market Adjustment Profit/Loss Acquisition Unit, acquiring the Spot Market Procurement Estimated Profit/Loss by estimating it.

スポット市場調整損益推定部150は、例えば、以下の(式1)に基づいて市場調達分の損益を算出することで、スポット市場調達推定損益を推定する。スポット市場調整損益推定部150は、(式1)を用いてデマンド時限単位ごとにスポット市場調達推定損益を算出する。スポット市場調整損益推定部150は、例えば、調整電力量が電力の不足が発生することを含む場合、当該電力の不足が発生する時間帯(例えば、後述する図3に示す時間帯「0:00-0:30」)の損益を以下の(式1)を用いて算出する。 The spot market adjustment profit/loss estimation unit 150 estimates the spot market procurement estimated profit/loss by calculating the profit/loss of market procurement based, for example, on (Equation 1) below. The spot market adjustment profit/loss estimation unit 150 calculates the spot market procurement estimated profit/loss for each demand time unit using (Equation 1). For example, if the adjustment amount includes a power shortage, the spot market adjustment profit/loss estimation unit 150 calculates the profit/loss for the time period during which the power shortage occurs (for example, the time period "0:00-0:30" shown in Figure 3, described later) using (Equation 1) below.

スポット市場調達推定損益=調整電力量×(売電単価-スポット市場取引予測価格) ・・・(式1) Estimated profit/loss from spot market procurement = Adjusted electricity amount × (Selling price - Forecasted spot market transaction price) ... (Equation 1)

スポット市場調整損益推定部150は、調整電力量に対する小売電気事業者の損益を算出するとも言える。当該損益は、利益または損失である。例えば、スポット市場取引予測価格が売電単価を上回る場合、損失が発生し得る。 The spot market adjustment profit/loss estimation unit 150 can also be said to calculate the profit or loss of the retail electricity provider with respect to the adjusted electricity amount. This profit or loss can be either a profit or a loss. For example, if the spot market transaction forecast price exceeds the electricity selling price, a loss may occur.

また、スポット市場調整損益推定部150は、調整電力量が電力の余剰が発生することを含む場合、調整電力量をスポット市場に売却するときの損益を示すスポット市場売却推定損益をデマンド時限単位で取得する。スポット市場調整損益推定部150は、例えば、調整電力量の全てをスポット市場に売却するときのスポット市場売却推定損益を取得する。本実施の形態では、スポット市場調整損益推定部150は、調整電力量および取引予測単価(スポット市場取引予測価格)に基づいて、第2期間における余剰分に関する損益を示すスポット市場売却推定損益(スポット市場売却推定利益)を推定する。スポット市場調整損益推定部150は、例えば、以下の(式2)に基づいて、余剰分をスポット市場で売却したときの利益を算出することで、スポット市場売却推定損益を推定する。スポット市場調整損益推定部150は、例えば、調整電力量が電力の余剰が発生することを含む場合、当該電力の余剰が発生する時間帯(例えば、図3に示す時間帯「0:30-1:00」)の損益を以下の(式2)を用いて算出する。 Furthermore, the spot market adjustment profit/loss estimation unit 150 obtains, in demand time units, the spot market sale estimated profit/loss, which indicates the profit or loss when selling the adjusted electricity amount to the spot market, if the adjusted electricity amount includes a surplus of electricity. For example, the spot market adjustment profit/loss estimation unit 150 obtains the spot market sale estimated profit/loss when all of the adjusted electricity amount is sold to the spot market. In this embodiment, the spot market adjustment profit/loss estimation unit 150 estimates the spot market sale estimated profit/loss (spot market sale estimated profit), which indicates the profit or loss related to the surplus in the second period, based on the adjusted electricity amount and the predicted transaction unit price (spot market transaction predicted price). For example, the spot market adjustment profit/loss estimation unit 150 estimates the spot market sale estimated profit/loss by calculating the profit when the surplus is sold to the spot market based on the following (Equation 2). The spot market adjustment profit/loss estimation unit 150 calculates the profit/loss for the time period during which the power surplus occurs (for example, the time period "0:30-1:00" shown in Figure 3) using the following formula (Equation 2), for example, when the adjustment amount includes a power surplus.

スポット市場売却推定損益=調整電力量×スポット市場取引予測単価・・・(式2) Estimated profit/loss from spot market sales = Adjusted electricity amount × Forecasted spot market transaction price ... (Equation 2)

なお、スポット市場において余剰分の買い手がつかないことも考えられるので、スポット市場調整損益推定部150は、スポット市場売却推定損益を一律に0としてもよい。 Furthermore, since it is possible that no buyers will be found for the surplus in the spot market, the spot market adjustment profit/loss estimation unit 150 may uniformly set the estimated profit/loss from spot market sales to 0.

スポット市場調整損益推定部150は、例えば、調整電力量に基づいて、所定の期間ごとに(式1)および(式2)のいずれの算出式を用いて当該所定の期間の損益を算出するかを判定し、判定された算出式を用いて当該所定の期間の損益を推定する。 The spot market adjustment profit/loss estimation unit 150, for example, determines, based on the amount of adjusted electricity, which of the calculation formulas (Formula 1) and (Formula 2) to use to calculate the profit/loss for each predetermined period, and then estimates the profit/loss for that predetermined period using the determined calculation formula.

スポット市場調整損益推定部150は、前日市場調整損益推定部の一例であり、スポット市場調達推定損益およびスポット市場売却推定損益は、スポット市場調整推定損益の一例である。スポット市場調整推定損益は、例えば、所定の期間ごとに推定される。なお、スポット市場調整損益推定部150は、スポット市場調達推定損益およびスポット市場売却推定損益の少なくとも一方を推定すればよい。スポット市場調整推定損益には、スポット市場調達推定損益およびスポット市場売却推定損益の少なくとも一方が含まれていればよい。また、スポット市場調整推定損益は、前日市場調整推定損益の一例である。 The spot market adjusted profit/loss estimation unit 150 is an example of the previous day's market adjusted profit/loss estimation unit, and the spot market procurement estimated profit/loss and spot market sales estimated profit/loss are examples of spot market adjusted estimated profit/loss. The spot market adjusted estimated profit/loss is estimated, for example, at predetermined intervals. The spot market adjusted profit/loss estimation unit 150 only needs to estimate at least one of the spot market procurement estimated profit/loss and the spot market sales estimated profit/loss. The spot market adjusted estimated profit/loss only needs to include at least one of the spot market procurement estimated profit/loss and the spot market sales estimated profit/loss. Furthermore, the spot market adjusted estimated profit/loss is an example of the previous day's market adjusted estimated profit/loss.

なお、スポット市場調整損益推定部150は、例えば、調整電力量およびスポット市場取引予測価格の少なくとも1つが推定誤差を含む場合、誤差を含むスポット市場調整推定損益を推定してもよい。スポット市場調整損益推定部150は、スポット市場調整推定損益の上限値および下限値を含むスポット市場調整推定損益の範囲を推定してもよい。 Furthermore, the spot market adjusted profit/loss estimation unit 150 may, for example, estimate the spot market adjusted profit/loss including the error if at least one of the adjusted electricity amount and the spot market transaction forecast price includes an estimation error. The spot market adjusted profit/loss estimation unit 150 may also estimate a range of the spot market adjusted profit/loss, including an upper and lower limit for the spot market adjusted profit/loss.

時間前市場調整損益推定部160は、調整電力量を時間前市場で取引するときの損益を示す時間前市場調整推定損益をデマンド時限単位で取得する。時間前市場調整損益推定部160は、調整電力量が電力の不足が発生することを含む場合、調整電力量を時間前市場から調達するときの損益を示す時間前市場調達推定損益をデマンド時限単位で取得する。時間前市場調整損益推定部160は、例えば、調整電力量の全てを時間前市場から調達するときの時間前市場調達推定損益を取得する。本実施の形態では、時間前市場調整損益推定部160は、調整電力量、売電単価および取引予測単価(時間前市場取引予測価格)に基づいて、当日(第2期間)における市場調達分の損益を示す時間前市場調達推定損益を推定する。市場調達分とは、調整電力量であってもよい。このように、時間前市場調整損益推定部160は、時間前市場調達推定損益を推定することで当該時間前市場調達推定損益を取得する時間前市場調整損益取得部として機能する。 The advance market adjustment profit/loss estimation unit 160 obtains advance market adjustment estimated profit/loss in demand time units, showing the profit or loss when trading the adjustment amount in the advance market. If the adjustment amount includes a power shortage, the advance market adjustment profit/loss estimation unit 160 obtains advance market procurement estimated profit/loss in demand time units, showing the profit or loss when procuring the adjustment amount from the advance market. For example, the advance market adjustment profit/loss estimation unit 160 obtains advance market procurement estimated profit/loss when all of the adjustment amount is procured from the advance market. In this embodiment, the advance market adjustment profit/loss estimation unit 160 estimates advance market procurement estimated profit/loss, showing the profit or loss of market procurement on the day (second period), based on the adjustment amount, the electricity selling price, and the predicted transaction price (advance market transaction predicted price). Market procurement may refer to the adjustment amount. Thus, the pre-hourly market adjustment profit/loss estimation unit 160 functions as a pre-hourly market adjustment profit/loss acquisition unit that acquires the pre-hourly market procurement estimated profit/loss by estimating the pre-hourly market procurement estimated profit/loss.

時間前市場調整損益推定部160は、例えば、以下の(式3)に基づいて市場調達分の損益を算出することで、時間前市場調達推定損益を推定する。時間前市場調整損益推定部160は、(式3)を用いてデマンド時限単位ごとに時間前市場調達推定損益を算出する。時間前市場調整損益推定部160は、例えば、調整電力量が電力の不足が発生することを含む場合、当該電力の不足が発生する時間帯(例えば、図3に示す時間帯「1:00-1:30」)の損益を以下の(式3)を用いて算出する。 The pre-hourly market adjustment profit/loss estimation unit 160 estimates the pre-hourly market procurement estimated profit/loss by calculating the profit/loss of market procurement based, for example, on (Equation 3) below. The pre-hourly market adjustment profit/loss estimation unit 160 calculates the pre-hourly market procurement estimated profit/loss for each demand time unit using (Equation 3). For example, if the adjusted power amount includes a power shortage, the pre-hourly market adjustment profit/loss estimation unit 160 calculates the profit/loss for the time period in which the power shortage occurs (for example, the time period "1:00-1:30" shown in Figure 3) using (Equation 3) below.

時間前市場調達推定損益=調整電力量×(売電単価-時間前市場取引予測価格) ・・・(式3) Estimated profit/loss from advance market procurement = Adjusted electricity amount × (Selling price - Forecasted advance market transaction price) ... (Equation 3)

時間前市場調整損益推定部160は、調整電力量に対する小売電気事業者の損益を算出するとも言える。当該損益は、利益または損失である。例えば、時間前市場取引予測価格が売電単価を上回る場合、損失が発生し得る。 The pre-hourly market adjustment profit/loss estimation unit 160 can also be said to calculate the profit or loss of the retail electricity provider with respect to the adjusted electricity amount. This profit or loss can be either a profit or a loss. For example, if the pre-hourly market transaction forecast price exceeds the electricity selling price, a loss may occur.

また、時間前市場調整損益推定部160は、調整電力量が電力の余剰が発生することを含む場合、調整電力量を時間前市場に売却するときの損益を示す時間前市場売却推定損益をデマンド時限単位で取得する。時間前市場調整損益推定部160は、例えば、調整電力量の全てを時間前市場に売却するときの時間前市場売却推定損益を取得する。本実施の形態では、時間前市場調整損益推定部160は、調整電力量および取引予測単価(時間前市場取引予測価格)に基づいて、第2期間における余剰分に関する損益を示す時間前市場売却推定損益(時間前市場売却推定利益)を推定する。時間前市場調整損益推定部160は、例えば、以下の(式4)に基づいて、余剰分を時間前市場で売却したときの利益を算出することで、時間前市場売却推定損益を推定する。時間前市場調整損益推定部160は、例えば、調整電力量が電力の余剰が発生することを含む場合、当該電力の余剰が発生する時間帯の損益を以下の(式4)を用いて算出する。 Furthermore, if the amount of adjusted electricity includes a surplus of electricity, the advance market adjustment profit/loss estimation unit 160 obtains an estimated advance market sale profit/loss in demand time units, which shows the profit or loss when the adjusted electricity is sold to the advance market. For example, the advance market adjustment profit/loss estimation unit 160 obtains an estimated advance market sale profit/loss when all of the adjusted electricity is sold to the advance market. In this embodiment, the advance market adjustment profit/loss estimation unit 160 estimates an estimated advance market sale profit/loss (estimated advance market sale profit) that shows the profit or loss related to the surplus in the second period, based on the amount of adjusted electricity and the predicted transaction unit price (predicted transaction price in the advance market). For example, the advance market adjustment profit/loss estimation unit 160 estimates the estimated advance market sale profit/loss by calculating the profit when the surplus is sold to the advance market based on the following (Equation 4). The pre-market adjustment profit/loss estimation unit 160 calculates, for example, the profit/loss for the time period during which a power surplus occurs, using the following (Equation 4), if the adjustment amount includes a power surplus.

時間前市場売却推定損益=調整電力量×時間前市場取引予測単価 ・・・(式4) Estimated profit/loss from sale in the market ahead of time = Adjusted electricity amount × Forecasted unit price for transactions in the market ahead of time ... (Equation 4)

なお、時間前市場において余剰分の買い手がつかないことも考えられるので、時間前市場調整損益推定部160は、時間前市場売却推定損益を一律に0としてもよい。 Furthermore, since it is possible that no buyers will be found for the surplus in the pre-hours market, the pre-hours market adjustment profit/loss estimation unit 160 may uniformly set the estimated profit/loss for pre-hours market sales to 0.

時間前市場調整損益推定部160は、例えば、調整電力量に基づいて、所定の期間ごとに(式3)および(式4)のいずれの算出式を用いて当該所定の期間の損益を算出するかを判定し、判定された算出式を用いて当該所定の期間の損益を推定する。 The pre-market adjustment profit/loss estimation unit 160, for example, determines, based on the amount of adjusted electricity, which of the calculation formulas (Equation 3) and (Equation 4) to use to calculate the profit/loss for each predetermined period, and then estimates the profit/loss for that predetermined period using the determined calculation formula.

時間前市場調整損益推定部160は、当日市場調整損益推定部の一例であり、時間前市場調達推定損益および時間前市場売却推定損益は、時間前市場調整推定損益の一例である。時間前市場調整推定損益は、例えば、所定の期間ごとに推定される。なお、時間前市場調整損益推定部160は、時間前市場調達推定損益および時間前市場売却推定損益の少なくとも一方を推定すればよい。時間前市場調整推定損益には、時間前市場調達推定損益および時間前市場売却推定損益の少なくとも一方が含まれていればよい。また、時間前市場調整推定損益は、当日市場調整推定損益の一例である。 The pre-hourly market adjustment profit/loss estimation unit 160 is an example of the same-day market adjustment profit/loss estimation unit, and the pre-hourly market procurement estimated profit/loss and pre-hourly market sales estimated profit/loss are examples of pre-hourly market adjustment estimated profit/loss. The pre-hourly market adjustment estimated profit/loss is estimated, for example, at predetermined intervals. The pre-hourly market adjustment profit/loss estimation unit 160 only needs to estimate at least one of the pre-hourly market procurement estimated profit/loss and the pre-hourly market sales estimated profit/loss. The pre-hourly market adjustment estimated profit/loss only needs to include at least one of the pre-hourly market procurement estimated profit/loss and the pre-hourly market sales estimated profit/loss. Furthermore, the pre-hourly market adjustment estimated profit/loss is an example of the same-day market adjustment estimated profit/loss.

なお、時間前市場調整損益推定部160は、例えば、調整電力量および時間前市場取引予測価格の少なくとも1つが推定誤差を含む場合、誤差を含む時間前市場調整推定損益を推定してもよい。時間前市場調整損益推定部160は、時間前市場調整推定損益の上限値および下限値を含む時間前市場調整推定損益の範囲を推定してもよい。 Furthermore, the pre-hourly market adjusted profit/loss estimation unit 160 may, for example, estimate pre-hourly market adjusted profit/loss including estimation errors if at least one of the adjusted power quantity and the pre-hourly market transaction forecast price includes estimation errors. The pre-hourly market adjusted profit/loss estimation unit 160 may also estimate a range of pre-hourly market adjusted profit/loss, including upper and lower limits.

調整計画作成部170は、スポット市場調整推定損益および時間前市場調整推定損益をデマンド時限単位のそれぞれで比較し、比較結果に基づいて調整計画を作成する。調整計画作成部170は、例えば、スポット市場調整推定損益および時間前市場調整推定損益のデマンド時限単位での比較結果に基づいて、小売電気事業者の収益が最大となる行動を含む調整計画を作成する。調整計画作成部170は、例えば、デマンド時限単位で、スポット市場および時間前市場での推定損益を比較し、収益を最大化する行動を行うように調整計画を作成してもよい。調整計画作成部170は、比較結果に基づいて調整計画を決定するとも言える。 The adjustment plan creation unit 170 compares the estimated profit/loss adjusted for the spot market and the estimated profit/loss adjusted for the pre-hour market at each demand time unit, and creates an adjustment plan based on the comparison results. For example, the adjustment plan creation unit 170 creates an adjustment plan that includes actions to maximize the retail electricity provider's revenue, based on the comparison results of the estimated profit/loss adjusted for the spot market and the estimated profit/loss adjusted for the pre-hour market at each demand time unit. The adjustment plan creation unit 170 may also, for example, compare the estimated profit/loss in the spot market and the pre-hour market at each demand time unit and create an adjustment plan that takes actions to maximize revenue. It can also be said that the adjustment plan creation unit 170 determines the adjustment plan based on the comparison results.

また、調整計画作成部170は、スポット市場調整推定損益および時間前市場調整推定損益が推定誤差を含む範囲である場合、スポット市場調整推定損益の範囲および時間前市場調整推定損益の範囲が少なくとも一部において重なるとき、推定誤差の小さい損益に応じた行動を含む調整計画を作成してもよい。なお、ここでの行動とは、調整電力量をスポット市場で取引するか、時間前市場で取引するかのいずれかを含む。 Furthermore, the adjustment plan creation unit 170 may, when the estimated profit/loss for spot market adjustments and the estimated profit/loss for time-ahead market adjustments are within a range that includes estimation errors, create an adjustment plan that includes actions corresponding to the profit/loss with the smaller estimation error, at least partially overlapping ranges of the estimated profit/loss for spot market adjustments and the estimated profit/loss for time-ahead market adjustments. Here, "actions" include either trading the adjusted electricity quantity in the spot market or trading it in the time-ahead market.

調整計画作成部170は、上記のように、デマンド時限単位のそれぞれにおいて、スポット市場調整推定損益および時間前市場調整推定損益の大小を比較し、利益が大きいほうの市場で調整電力量を取引するように調整計画を作成する。また、調整計画作成部170は、デマンド時限単位のそれぞれにおける比較結果に基づいて、デマンド時限単位のそれぞれの行動を含む調整計画を作成してもよい。 The adjustment plan creation unit 170, as described above, compares the magnitude of the estimated profit/loss for spot market adjustments and the estimated profit/loss for pre-hour market adjustments for each demand time unit, and creates an adjustment plan to trade the adjustment amount in the market with the larger profit. Alternatively, the adjustment plan creation unit 170 may create an adjustment plan that includes the actions for each demand time unit based on the comparison results for each demand time unit.

出力部180は、調整計画作成部170が作成した調整計画を含む情報を提示部300に出力する。出力部180は、例えば、通信回路(通信モジュール)を含んで構成される。調整計画を含む情報は、例えば、デマンド時限単位のそれぞれにおける、調整先および調整量(調整電力量)を含むが、さらにスポット市場調整推定損益および時間前市場調整推定損益を含んでいてもよい。 The output unit 180 outputs information including the adjustment plan created by the adjustment plan creation unit 170 to the presentation unit 300. The output unit 180 is configured, for example, to include a communication circuit (communication module). The information including the adjustment plan includes, for example, the adjustment target and adjustment amount (adjusted power amount) for each demand time unit, but may also include the estimated profit/loss for spot market adjustments and the estimated profit/loss for time-ahead market adjustments.

記憶部は、需要家マスターテーブル191、供給能力テーブル192および売電単価テーブル193を記憶する記憶装置である。需要家マスターテーブル191、供給能力テーブル192および売電単価テーブル193は、1つの記憶装置に記憶されていてもよいし、互いに異なる記憶装置に記憶されていてもよい。記憶部は、HDD(Hard Disk Drive)または不揮発性の半導体メモリ等により実現されるが、これに限定されない。 The memory unit is a storage device that stores the customer master table 191, the supply capacity table 192, and the electricity sales price table 193. The customer master table 191, the supply capacity table 192, and the electricity sales price table 193 may be stored in a single storage device, or they may be stored in different storage devices. The memory unit is implemented using, but is not limited to, an HDD (Hard Disk Drive) or non-volatile semiconductor memory.

需要家マスターテーブル191には、需要家の施設の地点情報、カレンダー情報等の需要家に固有の情報が登録されている。地点情報は、例えば、需要家の施設の緯度および経度を含み、カレンダー情報は、第1期間および第2期間の少なくとも一方における、需要家の施設の営業日、イベント等の情報を含む。需要家マスターテーブル191は、需要家情報の一例である。 The customer master table 191 contains customer-specific information, such as location information for the customer's facilities and calendar information. Location information includes, for example, the latitude and longitude of the customer's facilities, and calendar information includes information such as business days and events at the customer's facilities during at least one of the first and second periods. The customer master table 191 is an example of customer information.

なお、稼働日、営業日および休業日等のカレンダー情報は、需要家情報に含まれていてもよいし、気象情報取得部110bを介して外部から取得されてもよい。また、需要家マスターテーブル191は、気象情報取得部110bを介して外部から取得されたカレンダー情報に基づいて更新されてもよい。 Furthermore, calendar information such as working days, business days, and holidays may be included in the customer information, or it may be acquired externally via the weather information acquisition unit 110b. Also, the customer master table 191 may be updated based on the calendar information acquired externally via the weather information acquisition unit 110b.

供給能力テーブル192には、第2期間に小売電気事業者から需要家への供給可能な電力量の計画値(供給計画量とも記載する)が登録されている。供給能力テーブル192は、例えば、前日以前に登録される。供給能力テーブル192には、例えば、第2期間における所定の期間ごと(例えば、デマンド時限単位ごと)の計画値が含まれる。供給計画量は、小売電気事業者が発電事業者から相対契約で購入する電力量、または、小売電気事業者が発電設備(例えば、発電所)を所有する場合は当該小売電気事業者内の発電設備から引き込む予定の電力量を意味してもよい。 The supply capacity table 192 registers the planned amount of electricity that retail electricity providers can supply to consumers during the second period (also referred to as the planned supply amount). The supply capacity table 192 is registered, for example, on or before the previous day. The supply capacity table 192 includes, for example, planned values for each predetermined period (e.g., each demand time unit) within the second period. The planned supply amount may also mean the amount of electricity that the retail electricity provider purchases from power generators under bilateral contracts, or, if the retail electricity provider owns power generation facilities (e.g., a power plant), the amount of electricity that the retail electricity provider plans to draw from its own power generation facilities.

売電単価テーブル193には、小売電気事業者から需要家への売電時の売電単価が登録されている。売電単価は、例えば、小売電気事業者と需要家との間の契約等により予め設定されている。 The electricity sales price table 193 contains the electricity sales price at which retail electricity providers sell electricity to consumers. The electricity sales price is predetermined, for example, by a contract between the retail electricity provider and the consumer.

提示部300は、電力調整計画作成装置100からの小売電気事業者の調整計画を含む情報を小売電気事業者の管理者等に提示する。提示部300は、例えば、液晶ディスプレイ装置等の表示装置であり画像により当該情報を提示するが、音声等により当該情報を提示してもよい。提示部300は、据え置き型の装置により実現されてもよいし、小売電気事業者の管理者等が所持する携帯端末が備える表示部等により実現されてもよい。提示部300は、例えば、電力調整計画作成装置100から遠隔地に設けられるが、これに限定されない。 The display unit 300 presents information, including the adjustment plan of the retail electricity provider, from the power adjustment plan creation device 100 to the manager of the retail electricity provider. The display unit 300 is, for example, a display device such as a liquid crystal display, and presents the information as an image, but it may also present the information as audio or other means. The display unit 300 may be implemented as a stationary device, or as a display unit on a portable terminal held by the manager of the retail electricity provider. The display unit 300 is, for example, located remotely from the power adjustment plan creation device 100, but is not limited to this.

[1-2.電力調整計画作成装置の動作]
続いて、上記のように構成される電力調整計画作成装置100の動作(電力調整計画作成方法)について、図2を参照しながら説明する。図2は、本実施の形態に係る電力調整計画作成装置100の動作を示すフローチャートである。図2に示す動作は、例えば、翌日分(第2期間分)の調整電力量の調整のためにスポット市場に入札する前に実行される。なお、図2では、スポット市場調整推定損益のうちスポット市場調達推定損益のみを推定し、時間前市場調整推定損益のうち時間前市場調達推定損益のみを推定する場合の動作例を示している。
[1-2. Operation of the Power Adjustment Planning Device]
Next, the operation (power adjustment plan creation method) of the power adjustment plan creation device 100 configured as described above will be explained with reference to Figure 2. Figure 2 is a flowchart showing the operation of the power adjustment plan creation device 100 according to this embodiment. The operation shown in Figure 2 is performed, for example, before bidding on the spot market to adjust the amount of power to be adjusted for the next day (second period). Note that Figure 2 shows an example of operation in which only the spot market procurement estimated profit and loss is estimated from the spot market adjustment estimated profit and loss, and only the time-before market procurement estimated profit and loss is estimated from the time-before market adjustment estimated profit and loss.

図2に示すように、電力調整計画作成装置100は、販売電力量、気象情報および取引実績価格を取得する(S101)。具体的には、販売電力量取得部110aは第1期間の販売電力量を取得し、気象情報取得部110bは第1期間および第2期間の気象情報を取得し、市場取引価格取得部110cは第1期間のスポット市場取引実績価格および時間前市場取引実績価格を取得する。販売電力量取得部110a、気象情報取得部110bおよび市場取引価格取得部110cが各種情報を取得するタイミングおよび順序は特に限定されない。また、販売電力量が取得される第1期間と、取引実績価格が取得される第1期間とは、同一の期間であってもよいし、互いに異なる期間であってもよい。 As shown in Figure 2, the power adjustment plan creation device 100 acquires sales electricity volume, weather information, and transaction history prices (S101). Specifically, the sales electricity volume acquisition unit 110a acquires the sales electricity volume for the first period, the weather information acquisition unit 110b acquires weather information for the first and second periods, and the market transaction price acquisition unit 110c acquires the spot market transaction history price and the time-ahead market transaction history price for the first period. The timing and order in which the sales electricity volume acquisition unit 110a, the weather information acquisition unit 110b, and the market transaction price acquisition unit 110c acquire various types of information are not particularly limited. Furthermore, the first period in which sales electricity volume is acquired and the first period in which transaction history prices are acquired may be the same period or may be different periods.

販売電力量取得部110aは、販売電力量を調整電力量予測部120に出力する。気象情報取得部110bは、気象情報を少なくともスポット市場単価予測部130および時間前市場単価予測部140に出力し、本実施の形態では、さらに調整電力量予測部120にも出力する。市場取引価格取得部110cは、スポット市場取引実績価格をスポット市場単価予測部130に出力し、時間前市場取引実績価格を時間前市場単価予測部140に出力する。 The electricity sales volume acquisition unit 110a outputs the electricity sales volume to the adjusted electricity volume forecasting unit 120. The weather information acquisition unit 110b outputs weather information to at least the spot market price forecasting unit 130 and the hourly market price forecasting unit 140, and in this embodiment, also outputs it to the adjusted electricity volume forecasting unit 120. The market transaction price acquisition unit 110c outputs the actual spot market transaction price to the spot market price forecasting unit 130 and the actual hourly market transaction price to the hourly market price forecasting unit 140.

次に、調整電力量予測部120は、少なくとも販売電力量に基づいて、第2期間の電力需要量を予測し、予測した電力需要量と計画値(供給計画量)とに基づいて、第2期間における電力の調整電力量を予測する(S102)。なお、以降では、ステップS102において電力が不足することを含む調整電力量が予測された場合の処理を主に説明する。 Next, the power adjustment forecasting unit 120 forecasts the power demand for the second period based on at least the amount of power sold, and then forecasts the amount of power adjustment for the second period based on the forecasted power demand and the planned value (supply plan amount) (S102). The following section will mainly describe the process when the forecast for power adjustment includes a power shortage.

調整電力量予測部120は、予測した調整電力量をスポット市場調整損益推定部150および時間前市場調整損益推定部160に出力する。また、調整電力量予測部120は、予測した調整電力量を出力部180に出力してもよい。ステップS102は、第1取得ステップの一例である。 The power adjustment amount prediction unit 120 outputs the predicted power adjustment amount to the spot market adjustment profit/loss estimation unit 150 and the time-ahead market adjustment profit/loss estimation unit 160. The power adjustment amount prediction unit 120 may also output the predicted power adjustment amount to the output unit 180. Step S102 is an example of the first acquisition step.

次に、スポット市場単価予測部130は、スポット市場取引実績価格および気象情報に基づいて、前日にスポット市場で約定するスポット市場取引予測単価をデマンド時限単位で予測する(S103)。スポット市場単価予測部130は、予測したスポット市場取引予測単価をスポット市場調整損益推定部150に出力する。また、スポット市場単価予測部130は、予測したスポット市場取引予測単価を出力部180に出力してもよい。 Next, the spot market price forecasting unit 130 forecasts the spot market transaction price for the day's trades in the spot market, based on actual spot market transaction prices and weather information, in demand time units (S103). The spot market price forecasting unit 130 outputs the forecasted spot market transaction price to the spot market adjusted profit/loss estimation unit 150. Alternatively, the spot market price forecasting unit 130 may output the forecasted spot market transaction price to the output unit 180.

次に、スポット市場調整損益推定部150は、調整電力量、売電単価およびスポット市場取引予測価格に基づいて、スポット市場調達推定損益を推定する(S104)。スポット市場調整損益推定部150は、例えば、(式1)を用いてスポット市場調達推定損益をデマンド時限単位で推定する。スポット市場調整損益推定部150は、推定したスポット市場調達推定損益を調整計画作成部170に出力する。また、スポット市場調整損益推定部150は、推定したスポット市場調達推定損益を出力部180に出力してもよい。ステップS104は、第2取得ステップの一例である。 Next, the spot market adjustment profit/loss estimation unit 150 estimates the spot market procurement estimated profit/loss based on the adjusted electricity amount, the electricity sales price, and the spot market transaction forecast price (S104). The spot market adjustment profit/loss estimation unit 150 estimates the spot market procurement estimated profit/loss in demand time units, for example, using (Equation 1). The spot market adjustment profit/loss estimation unit 150 outputs the estimated spot market procurement estimated profit/loss to the adjustment plan creation unit 170. Alternatively, the spot market adjustment profit/loss estimation unit 150 may output the estimated spot market procurement estimated profit/loss to the output unit 180. Step S104 is an example of the second acquisition step.

なお、スポット市場売却推定損益が推定される場合、スポット市場調整損益推定部150は、ステップS104において、調整電力量および取引予測単価に基づいて、余剰分をスポット市場に売却した場合のスポット市場売却推定損益を推定する。スポット市場調整損益推定部150は、例えば、上記の(式2)に基づいて、スポット市場売却推定損益をデマンド時限単位で推定する。この場合、スポット市場調整損益推定部150は、デマンド時限単位ごとにスポット市場調達推定損益およびスポット市場売却推定損益のいずれかを含むスポット市場調整推定損益を調整計画作成部170に出力する。 Furthermore, if an estimated profit or loss from spot market sales is estimated, the spot market adjustment profit/loss estimation unit 150 estimates the spot market sales profit or loss if the surplus is sold to the spot market, based on the adjusted electricity amount and the predicted transaction unit price, in step S104. The spot market adjustment profit/loss estimation unit 150 estimates the spot market sales profit or loss in demand time units, for example, based on (Equation 2) above. In this case, the spot market adjustment profit/loss estimation unit 150 outputs the spot market adjustment estimated profit or loss, including either the spot market procurement estimated profit or loss or the spot market sales estimated profit or loss, to the adjustment plan creation unit 170 for each demand time unit.

次に、時間前市場単価予測部140は、時間前市場取引実績価格および気象情報に基づいて、当日(第2期間)に時間前市場で約定する時間前市場取引予測単価をデマンド時限単位で予測する(S105)。時間前市場単価予測部140は、予測した時間前市場取引予測単価を時間前市場調整損益推定部160に出力する。また、時間前市場単価予測部140は、予測した時間前市場取引予測単価を出力部180に出力してもよい。 Next, the pre-hourly market price forecasting unit 140 forecasts the pre-hourly market transaction price for the day (second period) to be executed in the pre-hourly market, based on the actual transaction price in the pre-hourly market and weather information, in units of demand time (S105). The pre-hourly market price forecasting unit 140 outputs the forecasted pre-hourly market transaction price to the pre-hourly market adjusted profit and loss estimation unit 160. Alternatively, the pre-hourly market price forecasting unit 140 may output the forecasted pre-hourly market transaction price to the output unit 180.

次に、時間前市場調整損益推定部160は、調整電力量、売電単価および時間前市場取引予測価格に基づいて、時間前市場調達推定損益を推定する(S106)。時間前市場調整損益推定部160は、例えば、(式3)を用いて時間前市場調達推定損益をデマンド時限単位で推定する。時間前市場調整損益推定部160は、推定した時間前市場調達推定損益を調整計画作成部170に出力する。また、時間前市場調整損益推定部160は、推定した時間前市場調達推定損益を出力部180に出力してもよい。ステップS106は、第3取得ステップの一例である。 Next, the pre-hourly market adjustment profit/loss estimation unit 160 estimates the pre-hourly market procurement estimated profit/loss based on the adjusted electricity amount, the electricity sales price, and the pre-hourly market transaction forecast price (S106). The pre-hourly market adjustment profit/loss estimation unit 160 estimates the pre-hourly market procurement estimated profit/loss in demand time units, for example, using (Equation 3). The pre-hourly market adjustment profit/loss estimation unit 160 outputs the estimated pre-hourly market procurement estimated profit/loss to the adjustment plan creation unit 170. Alternatively, the pre-hourly market adjustment profit/loss estimation unit 160 may output the estimated pre-hourly market procurement estimated profit/loss to the output unit 180. Step S106 is an example of the third acquisition step.

なお、時間前市場売却推定損益が推定される場合、時間前市場調整損益推定部160は、ステップS106において、調整電力量および取引予測単価に基づいて、余剰分を時間前市場に売却した場合の時間前市場売却推定損益を推定する。時間前市場調整損益推定部160は、例えば、上記の(式4)に基づいて、時間前市場売却推定損益をデマンド時限単位で推定する。この場合、時間前市場調整損益推定部160は、デマンド時限単位ごとに時間前市場調達推定損益および時間前市場売却推定損益のいずれかを含む時間前市場調整推定損益を調整計画作成部170に出力する。 Furthermore, if the estimated profit or loss from pre-hourly market sales is estimated, the pre-hourly market adjustment profit/loss estimation unit 160 estimates the pre-hourly market sales profit or loss based on the adjusted electricity amount and the predicted transaction unit price in step S106, assuming that the surplus is sold to the pre-hourly market. The pre-hourly market adjustment profit/loss estimation unit 160 estimates the pre-hourly market sales profit or loss for each demand time unit, for example, based on (Equation 4) above. In this case, the pre-hourly market adjustment profit/loss estimation unit 160 outputs the pre-hourly market adjustment estimated profit or loss, including either the pre-hourly market procurement estimated profit or loss or the pre-hourly market sales estimated profit or loss, to the adjustment plan creation unit 170 for each demand time unit.

次に、調整計画作成部170は、スポット市場調整推定損益および時間前市場調整推定損益をデマンド時限単位のそれぞれで比較し、比較結果に基づいて調整計画を作成する(S107)。調整計画作成部170は、比較結果に基づいてデマンド時限単位のそれぞれで調整電力量をスポット市場で取引するか、時間前市場で取引するかを判定した結果を含む調整計画を作成する。調整計画作成部170は、作成した調整計画を出力部180に出力する。ステップS107は、作成ステップの一例である。 Next, the adjustment plan creation unit 170 compares the estimated profit/loss for spot market adjustments and the estimated profit/loss for time-ahead market adjustments for each demand time unit, and creates an adjustment plan based on the comparison results (S107). Based on the comparison results, the adjustment plan creation unit 170 creates an adjustment plan that includes the result of determining whether to trade the adjustment amount in the spot market or the time-ahead market for each demand time unit. The adjustment plan creation unit 170 outputs the created adjustment plan to the output unit 180. Step S107 is an example of the creation step.

次に、出力部180は、小売電気事業者の調整計画を含む情報を提示部300に出力する(S108)。出力部180は、翌日分(第2期間分)の調整電力量の調整のためにスポット市場に入札する前に、当該情報を提示部300に出力する。ステップS108は、出力ステップの一例である。 Next, the output unit 180 outputs information including the retail electricity provider's adjustment plan to the display unit 300 (S108). The output unit 180 outputs this information to the display unit 300 before bidding on the spot market for the adjustment of the next day's (second period's) adjustment amount. Step S108 is an example of an output step.

これにより、電力調整計画作成装置100は、提示部300を介して小売電気事業者の調整計画を含む情報を小売電気事業者の管理者等に提示することができる。 This allows the power adjustment plan creation device 100 to present information, including the retail electricity provider's adjustment plan, to the retail electricity provider's administrator, etc., via the presentation unit 300.

また、出力部180は、ステップS108において、調整電力量、スポット市場取引予測単価、時間前市場取引予測単価、スポット市場調整推定損益および時間前市場調整推定損益の少なくとも1つを提示部300に出力してもよい。 Furthermore, in step S108, the output unit 180 may output at least one of the following to the display unit 300: adjusted power amount, spot market transaction forecast unit price, pre-hour market transaction forecast unit price, spot market adjusted estimated profit/loss, and pre-hour market adjusted estimated profit/loss.

これにより、電力調整計画作成装置100は、提示部300を介して、調整計画の作成に用いられた情報を小売電気事業者の管理者等に提示することができる。 This allows the power adjustment plan creation device 100 to present the information used to create the adjustment plan to the manager of the retail electricity provider, etc., via the presentation unit 300.

ここで、提示部300に表示される画像の一例について図3を参照しながら説明する。図3は、本実施の形態に係る提示部300の表示例を示す図である。なお、A1、A2、B1、B2等の単価を示しており、同じアルファベットにおいて、数値が小さい方が単価が小さいことを示す。 Here, an example of an image displayed on the display unit 300 will be explained with reference to Figure 3. Figure 3 is a diagram showing an example of the display on the display unit 300 according to this embodiment. Note that it shows unit prices such as A1, A2, B1, B2, etc., and within the same alphabet, a smaller number indicates a lower unit price.

図3に示すように、調整計画は、年月日、時間帯、調整先、調整電力量、スポット市場取引予測単価および時間前市場取引予測単価を含む。調整計画は、調整電力量、スポット市場取引予測単価および時間前市場取引予測単価に替えて、または、調整電力量、スポット市場取引予測単価および時間前市場取引予測単価とともに、スポット市場調整推定損益および時間前市場調整推定損益の少なくとも1つを含んでいてもよい。 As shown in Figure 3, the adjustment plan includes the date, time period, adjustment target, adjusted electricity amount, spot market transaction forecast unit price, and advance market transaction forecast unit price. The adjustment plan may include, in place of, or together with the adjusted electricity amount, spot market transaction forecast unit price, and advance market transaction forecast unit price, at least one of the spot market adjusted estimated profit/loss and advance market adjusted estimated profit/loss.

年月日は、電力を供給する対象となる日であり、例えば翌日である。 The date (year, month, and day) is the day on which electricity will be supplied, for example, the following day.

時間帯は、デマンド時限単位の時間帯であり、本実施の形態では、30分ごとの時間帯である。 The time slots are based on demand time units, and in this embodiment, they are time slots every 30 minutes.

調整先は、調整電力量をスポット市場および時間前市場のいずれかで取引することをデマンド時限単位ごとに示す情報である。例えば、「スポット市場」または「時間前市場」が表示される。なお、調整しなくてもよい時間帯は、例えば、「-」で示される。 The adjustment destination indicates whether the adjusted electricity amount will be traded in the spot market or the advance market for each demand time unit. For example, "Spot Market" or "Advance Market" will be displayed. Time periods when adjustment is not required are indicated, for example, with a "-".

調整電力量は、調整する電力量(不足する電力量または余剰となる電力量)をデマンド時限単位ごとに示す情報である。0kWhは、不足するまたは余剰となる電力量がない、つまり予測された電力需要量と計画値とが一致することを示す。 Adjusted power quantity is information indicating the amount of power to be adjusted (insufficient or surplus power) for each demand time unit. 0 kWh indicates that there is no shortage or surplus power, meaning the predicted power demand matches the planned value.

スポット市場取引単価は、スポット市場取引単価をデマンド時限単位ごとに示す情報である。時間前市場取引単価は、時間前市場取引単価をデマンド時限単位ごとに示す情報である。 The spot market trading price is information showing the spot market trading price for each demand time unit. The hour-ahead market trading price is information showing the hour-ahead market trading price for each demand time unit.

時間帯0:00-0:30の調整電力量は、2000kWh不足である。この場合、2000kWhの電力を卸電力取引市場から調達することが想定される。時間帯0:00-0:30では、スポット市場取引予測単価のA1(<A2)円/kWhは、時間前市場取引予測単価のA2円/kWhより低いので、調整電力量2000kWhの調達先がスポット市場となっている。 The adjustment power requirement for the time period 0:00-0:30 is 2000 kWh short. In this case, it is assumed that 2000 kWh of electricity will be procured from the wholesale electricity trading market. For the time period 0:00-0:30, the predicted spot market trading price A1 (<A2) yen/kWh is lower than the predicted pre-hour market trading price A2 yen/kWh, therefore the source of the 2000 kWh adjustment power is the spot market.

また、時間帯0:30-1:00の調整電力量は、2300kWhの余剰である。この場合、2300kWhの電力を卸電力取引市場に売却することが想定される。時間帯0:30-1:00では、スポット市場取引予測単価のB2(>B1)円/kWhは、時間前市場取引予測単価のB1円/kWhより高いので、調整電力量2300kWhの売却先がスポット市場となっている。 Furthermore, the surplus of adjusted electricity during the time period 0:30-1:00 is 2300 kWh. In this case, it is assumed that 2300 kWh of electricity will be sold to the wholesale electricity trading market. During the time period 0:30-1:00, the predicted spot market trading price of B2 (>B1) yen/kWh is higher than the predicted pre-hour market trading price of B1 yen/kWh, therefore, the spot market is the destination for the 2300 kWh of adjusted electricity.

また、時間帯1:00-1:30の調整電力量は、1500kWhの不足である。この場合、1500kWhの電力を卸電力取引市場から調達することが想定される。時間帯1:00-1:30では、スポット市場取引予測単価のC2(>C1)円/kWhは、時間前市場取引予測単価のC1円/kWhより高いので、調整電力量1500kWhの調達先が時間前市場となっている。 Furthermore, the adjustment power requirement for the time period 1:00-1:30 is a deficit of 1500 kWh. In this case, it is assumed that 1500 kWh of electricity will be procured from the wholesale electricity trading market. For the time period 1:00-1:30, the spot market trading forecast price C2 (>C1) yen/kWh is higher than the hourly market trading forecast price C1 yen/kWh, therefore, the source of the 1500 kWh adjustment power requirement is the hourly market.

なお、調整計画は、少なくとも年月日、時間帯および調整先が含まれていればよい。また、調整電力量、スポット市場取引予測単価および時間前市場取引予測単価の少なくとも1つは、上限値および下限値を含む範囲であってもよい。 Furthermore, the adjustment plan only needs to include at least the date, time period, and target of the adjustment. Additionally, at least one of the adjusted electricity amount, the spot market transaction forecast unit price, and the hour-ahead market transaction forecast unit price may include an upper and lower limit range.

[1-3.効果等]
以上のように、本実施の形態に係る電力調整計画作成装置100は、小売電気事業者(電力の小売を行う事業者の一例)が需要家に電力供給を行うときの電力の調整計画を作成する電力調整計画作成装置である。電力調整計画作成装置100は、スポット市場(前日市場の一例)および時間前市場(当日市場の一例)を含む卸電力取引市場と調整が必要な電力量を示す調整電力量を取得する調整電力量予測部120(調整電力量取得部の一例)と、調整電力量をスポット市場で取引するときの損益を示すスポット市場調整推定損益をデマンド時限単位で取得するスポット市場調整損益推定部150(前日市場調整損益取得部の一例)と、調整電力量を時間前市場で取引するときの損益を示す時間前市場調整推定損益をデマンド時限単位で取得する時間前市場調整損益推定部160(当日市場調整損益取得部の一例)と、スポット市場調整推定損益および時間前市場調整推定損益をデマンド時限単位のそれぞれで比較し、比較結果に基づいて調整計画を作成する調整計画作成部170と、調整計画を出力する出力部180とを備える。
[1-3. Effects, etc.]
As described above, the power adjustment plan creation device 100 according to this embodiment is a power adjustment plan creation device that creates a power adjustment plan when a retail electricity business operator (an example of a business operator that sells electricity) supplies electricity to consumers. The power adjustment plan creation device 100 includes an adjustment power amount forecasting unit 120 (an example of an adjustment power amount acquisition unit) that acquires an adjustment power amount indicating the amount of power that needs to be adjusted from the wholesale power trading market, including the spot market (an example of the previous day market) and the hourly ahead market (an example of the current day market); a spot market adjustment profit and loss estimation unit 150 (an example of a previous day market adjustment profit and loss acquisition unit) that acquires a spot market adjustment estimated profit and loss indicating the profit and loss when the adjustment power amount is traded in the spot market in demand time units; an hourly ahead market adjustment profit and loss estimation unit 160 (an example of a current day market adjustment profit and loss acquisition unit) that acquires an hourly ahead market adjustment estimated profit and loss indicating the profit and loss when the adjustment power amount is traded in the hourly ahead market in demand time units; an adjustment plan creation unit 170 that compares the spot market adjustment estimated profit and loss and the hourly ahead market adjustment estimated profit and loss in each demand time unit and creates an adjustment plan based on the comparison results; and an output unit 180 that outputs the adjustment plan.

これにより、電力調整計画作成装置100は、スポット市場調整推定損益および時間前市場調整推定損益を比較するので、例えば、損益が高い方に応じた行動(調整先)を含む調整計画を作成可能である。よって、電力調整計画作成装置100は、経済性が高い電力調整計画を作成可能である。このような調整計画は、小売電気事業者において販売計画を作成する上で有益である。 As a result, the power adjustment plan creation device 100 compares the estimated profit/loss for spot market adjustments with the estimated profit/loss for time-ahead market adjustments, making it possible to create an adjustment plan that includes actions (adjustment targets) corresponding to the higher profit/loss. Therefore, the power adjustment plan creation device 100 can create a highly economical power adjustment plan. Such an adjustment plan is beneficial for retail electricity providers in creating sales plans.

また、電力調整計画作成装置100は、需要家への過去の第1期間における販売電力の実績を示す販売電力量を取得する販売電力量取得部110aと、第1期間の電力取引市場価格の実績を示す取引実績価格を取得する市場取引価格取得部110cと、需要家への供給可能な電力量の計画値および需要家への電力の売電単価を記憶する記憶部と、取引実績価格に含まれるスポット市場取引実績価格(第1価格の一例)に基づいて、スポット市場で約定するスポット市場取引予測単価をデマンド時限単位で予測するスポット市場単価予測部130と、取引実績価格に含まれる時間前市場取引実績価格(第2価格の一例)に基づいて、将来の電力供給の対象となる第2期間の時間前市場で約定する時間前市場取引予測単価をデマンド時限単位で予測する時間前市場単価予測部140とをさらに備える。そして、調整電力量予測部120は、販売電力量および計画値に基づいて、第2期間における調整電力量を予測し、スポット市場調整損益推定部150は、売電単価、スポット市場取引予測単価および調整電力量に基づいて、スポット市場調整推定損益をデマンド時限単位で推定し、時間前市場調整損益推定部160は、売電単価、時間前市場取引予測単価および調整電力量に基づいて、時間前市場調整推定損益をデマンド時限単位で推定する。 Furthermore, the power adjustment plan creation device 100 includes a power sales volume acquisition unit 110a that acquires the power sales volume showing the actual power sales to consumers in the past first period, a market transaction price acquisition unit 110c that acquires the actual transaction price showing the actual power trading market price for the first period, a storage unit that stores the planned value of the amount of power that can be supplied to consumers and the unit price for selling power to consumers, a spot market unit price forecasting unit 130 that forecasts the spot market transaction forecasting unit price to be concluded in the spot market in demand time units based on the spot market transaction forecasting unit price (an example of a first price) included in the transaction forecasting unit price, and a time-ahead market unit price forecasting unit 140 that forecasts the time-ahead market transaction forecasting unit price to be concluded in the time-ahead market for the second period that will be the target of future power supply in demand time units, based on the time-ahead market transaction forecasting unit price (an example of a second price) included in the transaction forecasting unit price. The power adjustment forecasting unit 120 then forecasts the power adjustment amount for the second period based on the power sales amount and planned values. The spot market adjustment profit/loss estimation unit 150 estimates the spot market adjustment profit/loss in demand time units based on the power sales price, the spot market transaction forecast price, and the power adjustment amount. The time-ahead market adjustment profit/loss estimation unit 160 estimates the time-ahead market adjustment profit/loss in demand time units based on the power sales price, the time-ahead market transaction forecast price, and the power adjustment amount.

これにより、電力調整計画作成装置100は、過去の実績を用いるので、スポット市場取引予測単価および時間前市場取引予測単価を精度よく予測することができる。つまり、電力調整計画作成装置100は、スポット市場調整推定損益および時間前市場調整推定損益を精度よく推定することができるので、例えば、スポット市場調整推定損益および時間前市場調整推定損益の差が小さい場合でも大小関係を正確に判定することができる。よって、電力調整計画作成装置100は、スポット市場調整推定損益および時間前市場調整推定損益の差の大小によらず、経済性が高い電力調整計画を作成可能である。また、電力調整計画作成装置100は、スポット市場調整推定損益および時間前市場取引予測単価を推定することにより取得することができる。つまり、電力調整計画作成装置100は、スポット市場調整推定損益および時間前市場取引予測単価の取得から経済性が高い調整計画の作成までを自動で行うことができる。よって、電力調整計画作成装置100の利便性が向上する。 As a result, the power adjustment plan creation device 100 can accurately predict the spot market transaction forecast unit price and the time-ahead market transaction forecast unit price by using past performance data. In other words, the power adjustment plan creation device 100 can accurately estimate the spot market adjustment estimated profit/loss and the time-ahead market adjustment estimated profit/loss. Therefore, even when the difference between the spot market adjustment estimated profit/loss and the time-ahead market adjustment estimated profit/loss is small, it can accurately determine the relative magnitudes. Thus, the power adjustment plan creation device 100 can create a highly economical power adjustment plan regardless of the magnitude of the difference between the spot market adjustment estimated profit/loss and the time-ahead market adjustment estimated profit/loss. Furthermore, the power adjustment plan creation device 100 can obtain the spot market adjustment estimated profit/loss and the time-ahead market transaction forecast unit price by estimation. In other words, the power adjustment plan creation device 100 can automatically perform everything from obtaining the spot market adjustment estimated profit/loss and the time-ahead market transaction forecast unit price to creating a highly economical adjustment plan. Therefore, the convenience of the power adjustment plan creation device 100 is improved.

また、電力調整計画作成装置100は、第1期間および第2期間の気象情報を取得する気象情報取得部110bをさらに備え、記憶部は、さらに、需要家の施設の地点情報および営業日情報の少なくとも一方を含む需要家情報を記憶し、調整電力量予測部120は、さらに、気象情報および需要家情報に基づいて、調整電力量を予測する。 Furthermore, the power adjustment plan creation device 100 further includes a weather information acquisition unit 110b that acquires weather information for the first and second periods, a storage unit that further stores customer information including at least one of the customer's facility location information and business day information, and the power adjustment amount prediction unit 120 further predicts the power adjustment amount based on the weather information and customer information.

これにより、さらに、気象情報および需要家情報の少なくとも一方を用いて調整電力量が算出されるので、調整電力量の予測精度が向上することが期待される。 This further improves the accuracy of power adjustment predictions, as the amount of power adjustment is calculated using at least one of weather information and consumer information.

また、スポット市場単価予測部130は、さらに気象情報に基づいて、スポット市場取引予測単価を予測し、時間前市場単価予測部140は、さらに気象情報に基づいて、時間前市場取引予測単価を予測する。 Furthermore, the spot market price forecasting unit 130 further forecasts the spot market transaction price based on weather information, and the time-before market price forecasting unit 140 further forecasts the time-before market transaction price based on weather information.

これにより、さらに、気象情報を用いてスポット市場取引予測単価および時間前市場取引予測単価が算出されるので、スポット市場取引予測単価および時間前市場取引予測単価の予測精度が向上することが期待される。 This will further improve the accuracy of spot market and hourly-ahead market price forecasts, as weather information will be used to calculate both.

また、調整計画作成部170は、比較結果に基づいて小売電気事業者の損益が最大となる行動を含む調整計画を作成する。 Furthermore, the adjustment plan creation unit 170 creates an adjustment plan that includes actions that maximize the profit and loss of the retail electricity provider, based on the comparison results.

これにより、調整計画作成部170は、小売電気事業者の損益が最大となるように調整計画を作成することができるので、経済性がさらに高い調整計画を作成可能である。 This allows the adjustment plan creation unit 170 to create an adjustment plan that maximizes the profit and loss of the retail electricity provider, thus enabling the creation of an even more economically efficient adjustment plan.

また、以上のように、本実施の形態に係る電力調整計画作成方法は、小売電気事業者が需要家に電力供給を行うときの電力の調整計画を作成する電力調整計画作成方法である。電力調整計画作成方法は、スポット市場および時間前市場を含む卸電力取引市場と調整が必要な電力量を示す調整電力量を取得する第1取得ステップ(S102)と、調整電力量をスポット市場で取引するときの損益を示すスポット市場調整推定損益をデマンド時限単位で取得する第2取得ステップ(S104)と、調整電力量を時間前市場で取引するときの損益を示す時間前市場調整推定損益をデマンド時限単位で取得する第3取得ステップ(S106)と、スポット市場調整推定損益および時間前市場調整推定損益をデマンド時限単位のそれぞれで比較し、比較結果に基づいて調整計画を作成する作成ステップ(S107)と、調整計画を出力する出力ステップ(S108)とを含む。 Furthermore, as described above, the power adjustment plan creation method according to this embodiment is a power adjustment plan creation method for retail electricity businesses to create a power adjustment plan when supplying electricity to consumers. The power adjustment plan creation method includes: a first acquisition step (S102) of acquiring an adjustment amount indicating the amount of electricity that needs to be adjusted with the wholesale electricity trading market, including the spot market and the advance market; a second acquisition step (S104) of acquiring an estimated spot market adjustment profit/loss indicating the profit/loss when trading the adjustment amount in the spot market, in demand time units; a third acquisition step (S106) of acquiring an estimated advance market adjustment profit/loss indicating the profit/loss when trading the adjustment amount in the advance market, in demand time units; a creation step (S107) of comparing the estimated spot market adjustment profit/loss and the estimated advance market adjustment profit/loss in each demand time unit and creating an adjustment plan based on the comparison results; and an output step (S108) of outputting the adjustment plan.

これにより、上記の電力調整計画作成装置100と同様の効果を奏する。 This achieves the same effect as the power adjustment plan creation device 100 described above.

(実施の形態2)
以下では、本実施の形態に係る電力調整計画作成装置について、図4および図5を参照しながら説明する。なお、以下では、実施の形態1との相違点を中心に説明し、実施の形態1と同一または類似の内容については説明を省略または簡略化する。
(Embodiment 2)
In the following, the power adjustment plan creation device according to this embodiment will be described with reference to Figures 4 and 5. Note that the following description will focus on the differences from Embodiment 1, and the same or similar content as in Embodiment 1 will be omitted or simplified.

[2-1.電力調整計画提示システムの構成]
まず、本実施の形態に係る電力調整計画作成装置を備える電力調整計画提示システムの構成について、図4を参照しながら説明する。図4は、本実施の形態に係る電力調整計画提示システム1aの構成を示す機能ブロック図である。本実施の形態に係る電力調整計画提示システム1aの電力調整計画作成装置100aは、提示部300が提示した調整計画に対する入力を受け付ける受付部210を備える点において、実施の形態1に係る電力調整計画提示システム1の電力調整計画作成装置100と相違する。また、調整電力量取得部、スポット市場調整損益取得部および時間前市場調整損益取得部の少なくとも1つはデマンド時限単位で入力を受け付けるユーザインタフェース部として実現され、本実施の形態では、調整電力量取得部、スポット市場調整損益取得部および時間前市場調整損益取得部のそれぞれがユーザインタフェース部として実現される。
[2-1. Configuration of the Power Adjustment Plan Presentation System]
First, the configuration of the power adjustment plan presentation system equipped with the power adjustment plan creation device according to this embodiment will be described with reference to Figure 4. Figure 4 is a functional block diagram showing the configuration of the power adjustment plan presentation system 1a according to this embodiment. The power adjustment plan creation device 100a of the power adjustment plan presentation system 1a according to this embodiment differs from the power adjustment plan creation device 100 of the power adjustment plan presentation system 1 according to Embodiment 1 in that it includes a reception unit 210 that receives input for the adjustment plan presented by the presentation unit 300. Furthermore, at least one of the adjusted power amount acquisition unit, the spot market adjustment profit/loss acquisition unit, and the time-ahead market adjustment profit/loss acquisition unit is implemented as a user interface unit that receives input in demand time units, and in this embodiment, each of the adjusted power amount acquisition unit, the spot market adjustment profit/loss acquisition unit, and the time-ahead market adjustment profit/loss acquisition unit is implemented as a user interface unit.

図4に示すように、電力調整計画作成装置100aは、電力調整計画作成装置100に加えて受付部210を備える。受付部210は、出力部180が調整計画を提示部300に出力した後、調整電力量、スポット市場調整推定損益を取得するためのスポット市場取引予測単価および時間前市場調整推定損益を取得するための時間前市場取引予測単価の少なくとも1つの入力を取得する。受付部210は、調整計画に対する入力を受け受けるとも言える。受付部210は、キーボード、ボタン、タッチパネル等を含んで構成されてもよいし、音声による入力を受け付ける集音装置等を含んで構成されてもよい。 As shown in Figure 4, the power adjustment plan creation device 100a includes a reception unit 210 in addition to the power adjustment plan creation device 100. After the output unit 180 outputs the adjustment plan to the presentation unit 300, the reception unit 210 receives at least one input: the amount of power to be adjusted, the spot market transaction forecast unit price for obtaining the estimated profit/loss of the spot market adjustment, and the time-ahead market transaction forecast unit price for obtaining the estimated profit/loss of the time-ahead market adjustment. The reception unit 210 can also be said to receive input for the adjustment plan. The reception unit 210 may include a keyboard, buttons, a touch panel, etc., or it may include a sound collection device for receiving voice input, etc.

なお、電力調整計画作成装置100aがインバランス予測単価を予測する構成(例えば、後述する図8に示すインバランス単価予測部410を備える構成)である場合、受付部210は、出力部180が調整計画を提示部300に出力した後、インバランス予測単価の入力を取得してもよい。 Furthermore, if the power adjustment plan creation device 100a is configured to predict imbalance unit prices (for example, a configuration including an imbalance unit price prediction unit 410 as shown in Figure 8, which will be described later), the reception unit 210 may acquire the input of the imbalance unit price after the output unit 180 outputs the adjustment plan to the presentation unit 300.

調整計画作成部170は、当該少なくとも1つの入力に基づいて調整計画を更新する。 The adjustment plan creation unit 170 updates the adjustment plan based on at least one of the inputs.

[2-2.電力調整計画作成装置の動作]
続いて、上記のように構成される電力調整計画作成装置100aの動作(電力調整計画作成方法)について、図5を参照しながら説明する。図5は、本実施の形態に係る電力調整計画作成装置100aの動作を示すフローチャートである。図5に示すフローチャートは、図2に示すフローチャートの後に実行される。
[2-2. Operation of the Power Adjustment Planning Device]
Next, the operation (power adjustment plan creation method) of the power adjustment plan creation device 100a configured as described above will be explained with reference to Figure 5. Figure 5 is a flowchart showing the operation of the power adjustment plan creation device 100a according to this embodiment. The flowchart shown in Figure 5 is executed after the flowchart shown in Figure 2.

図5に示すように、受付部210は、調整電力量、スポット市場取引予測単価および時間前市場取引予測単価の少なくとも1つの入力を受け付ける(S201)。受付部210は、例えば管理者等の入力により当該少なくとも1つを取得するが、例えば、通信により当該少なくとも1つを取得してもよい。受付部210は、調整電力量の入力を受け付けた場合、入力された調整電力量を調整電力量予測部120に出力し、調整電力量予測部120は、入力された調整電力量をスポット市場調整損益推定部150および時間前市場調整損益推定部160に出力する。受付部210は、スポット市場取引予測単価の入力を受け付けた場合、入力されたスポット市場取引予測単価をスポット市場単価予測部130に出力し、スポット市場単価予測部130は、入力されたスポット市場取引予測単価をスポット市場調整損益推定部150に出力する。受付部210は、時間前市場取引予測単価の入力を受け付けた場合、入力された時間前市場取引予測単価を時間前市場単価予測部140に出力し、時間前市場単価予測部140は、入力された時間前市場取引予測単価を時間前市場調整損益推定部160に出力する。 As shown in Figure 5, the reception unit 210 receives at least one input of adjusted power quantity, spot market transaction forecast unit price, and time-ahead market transaction forecast unit price (S201). The reception unit 210 obtains this at least one input, for example, from an administrator, but may also obtain this at least one input, for example, by communication. When the reception unit 210 receives input of adjusted power quantity, it outputs the input adjusted power quantity to the adjusted power quantity forecast unit 120, and the adjusted power quantity forecast unit 120 outputs the input adjusted power quantity to the spot market adjusted profit and loss estimation unit 150 and the time-ahead market adjusted profit and loss estimation unit 160. When the reception unit 210 receives input of spot market transaction forecast unit price, it outputs the input spot market transaction forecast unit price to the spot market unit price forecast unit 130, and the spot market unit price forecast unit 130 outputs the input spot market transaction forecast unit price to the spot market adjusted profit and loss estimation unit 150. When the reception unit 210 receives input for the predicted market trading price ahead of time, it outputs the input predicted market trading price ahead of time to the market price forecasting unit 140. The market price forecasting unit 140 then outputs the input predicted market trading price ahead of time to the adjusted profit/loss estimation unit 160.

なお、調整電力量予測部120、スポット市場単価予測部130および時間前市場単価予測部140の少なくとも1つは、受付部210により入力された入力値を用いて次回の予測を行ってもよい。 Furthermore, at least one of the adjusted power quantity forecasting unit 120, the spot market price forecasting unit 130, and the hourly market price forecasting unit 140 may use the input values received by the reception unit 210 to perform the next forecast.

なお、受付部210は、入力された調整電力量、スポット市場取引予測単価および時間前市場取引予測単価の少なくとも1つを、スポット市場調整損益推定部150または時間前市場調整損益推定部160に出力してもよい。 Furthermore, the reception unit 210 may output at least one of the input adjusted power amount, spot market transaction forecast unit price, and hourly market transaction forecast unit price to the spot market adjusted profit/loss estimation unit 150 or the hourly market adjusted profit/loss estimation unit 160.

次に、電力調整計画作成装置100aは、スポット市場調整推定損益および時間前市場調整推定損益の少なくとも一方を更新する(S202)。スポット市場調整損益推定部150は、受付部210に入力された調整電力量およびスポット市場取引予測単価の少なくとも1つに基づいて、スポット市場調整推定損益を更新する。また、時間前市場調整損益推定部160は、受付部210に入力された調整電力量および時間前市場取引予測単価の少なくとも1つに基づいて、時間前市場調整推定損益を更新する。更新された推定損益は、調整計画作成部170に出力される。 Next, the power adjustment plan creation device 100a updates at least one of the spot market adjustment estimated profit/loss and the pre-hour market adjustment estimated profit/loss (S202). The spot market adjustment profit/loss estimation unit 150 updates the spot market adjustment estimated profit/loss based on at least one of the adjustment amount and the spot market transaction forecast unit price input to the reception unit 210. The pre-hour market adjustment profit/loss estimation unit 160 also updates the pre-hour market adjustment estimated profit/loss based on at least one of the adjustment amount and the pre-hour market transaction forecast unit price input to the reception unit 210. The updated estimated profit/loss is output to the adjustment plan creation unit 170.

次に、調整計画作成部170は、更新された推定損益に基づいて、調整計画を更新する(S203)。調整計画作成部170は、スポット市場調整推定損益および時間前市場調整推定損益の両方が更新された場合、更新されたスポット市場調整推定損益および更新された時間前市場調整推定損益をデマンド時限単位のそれぞれで比較し、比較結果に基づいて調整計画を更新する。調整計画作成部170は、更新された調整計画を出力部180に出力する。 Next, the adjustment plan creation unit 170 updates the adjustment plan based on the updated estimated profit and loss (S203). If both the spot market adjusted estimated profit and loss and the time-ahead market adjusted estimated profit and loss are updated, the adjustment plan creation unit 170 compares the updated spot market adjusted estimated profit and loss and the updated time-ahead market adjusted estimated profit and loss for each demand time unit and updates the adjustment plan based on the comparison result. The adjustment plan creation unit 170 outputs the updated adjustment plan to the output unit 180.

次に、出力部180は、更新された調整計画を提示部300に出力する(S204)。 Next, the output unit 180 outputs the updated adjustment plan to the presentation unit 300 (S204).

これにより、電力調整計画作成装置100aは、提示部300を介して小売電気事業者の更新された調整計画を含む情報を小売電気事業者の管理者等に提示することができる。提示部300は、例えば、更新前後の調整計画を並べて表示させてもよい。 This allows the power adjustment plan creation device 100a to present information, including the updated adjustment plan of the retail electricity provider, to the retail electricity provider's administrator or other relevant party via the presentation unit 300. The presentation unit 300 may, for example, display the adjustment plans before and after the update side-by-side.

[2-3.効果等]
以上のように、本実施の形態に係る電力調整計画作成装置100は、出力部180が調整計画を出力した後に、調整電力量、スポット市場取引予測単価、時間前市場取引予測単価およびインバランス予測単価の少なくとも1つの入力を受け付ける受付部210をさらに備える。そして、調整計画作成部170は、受付部210が受け付けた調整電力量、スポット市場取引予測単価および時間前市場取引予測単価の当該少なくとも1つに基づいて、調整計画を更新する。
[2-3. Effects, etc.]
As described above, the power adjustment plan creation device 100 according to this embodiment further includes a receiving unit 210 that receives at least one input of adjustment amount, spot market transaction forecast unit price, time-ahead market transaction forecast unit price, and imbalance forecast unit price after the output unit 180 outputs the adjustment plan. The adjustment plan creation unit 170 then updates the adjustment plan based on the at least one of the adjustment amount, spot market transaction forecast unit price, and time-ahead market transaction forecast unit price received by the receiving unit 210.

これにより、電力調整計画作成装置100は、調整電力量、スポット市場取引予測単価、時間前市場取引予測単価およびインバランス予測単価の少なくとも1つの予測値が不自然である場合等に、小売電気事業者の管理者等の入力により、調整計画を修正することができる。また、電力調整計画作成装置100は、損益以外の要素(例えば、調整先、調整量に何らかの制約がある等)がある場合、当該要素を反映した調整計画に修正することができる。 This allows the power adjustment plan creation device 100 to modify the adjustment plan based on input from a retail electricity provider's administrator or other relevant party when at least one of the predicted values—the adjustment amount, the spot market transaction forecast unit price, the time-ahead market transaction forecast unit price, and the imbalance forecast unit price—is unnatural. Furthermore, if there are factors other than profit and loss (for example, constraints on the adjustment destination or adjustment amount), the power adjustment plan creation device 100 can modify the adjustment plan to reflect those factors.

(実施の形態3)
以下では、本実施の形態に係る電力調整計画作成装置について、図6および図7を参照しながら説明する。なお、以下では、実施の形態1との相違点を中心に説明し、実施の形態1と同一または類似の内容については説明を省略または簡略化する。
(Embodiment 3)
In the following, the power adjustment plan creation device according to this embodiment will be described with reference to Figures 6 and 7. Note that the following description will focus on the differences from Embodiment 1, and the same or similar content as in Embodiment 1 will be omitted or simplified.

[3-1.電力調整計画提示システムの構成]
まず、本実施の形態に係る電力調整計画作成装置を備える電力調整計画提示システムの構成について、図6を参照しながら説明する。図6は、本実施の形態に係る電力調整計画提示システム1bの構成を示す機能ブロック図である。本実施の形態に係る電力調整計画提示システム1bの電力調整計画作成装置100bは、市場入札部310を備える点において、実施の形態1に係る電力調整計画提示システム1の電力調整計画作成装置100と相違する。また、調整計画作成部170は、作成した調整計画を市場入札部310にも出力する。
[3-1. Configuration of the Power Adjustment Plan Presentation System]
First, the configuration of the power adjustment plan presentation system equipped with the power adjustment plan creation device according to this embodiment will be described with reference to Figure 6. Figure 6 is a functional block diagram showing the configuration of the power adjustment plan presentation system 1b according to this embodiment. The power adjustment plan creation device 100b of the power adjustment plan presentation system 1b according to this embodiment differs from the power adjustment plan creation device 100 of the power adjustment plan presentation system 1 according to Embodiment 1 in that it includes a market bidding unit 310. In addition, the adjustment plan creation unit 170 also outputs the created adjustment plan to the market bidding unit 310.

図6に示すように、電力調整計画作成装置100bは、電力調整計画作成装置100に加えて市場入札部310を備える。市場入札部310は、調整計画に基づいて、デマンド時間単位で卸電力取引市場に対して調整電力量を入札する処理を実行する。市場入札部310は、スポット市場で調整電力量を取引する場合、前日の所定時間にスポット市場に入札し、時間前市場で調整電力量を取引する場合、当日(第2期間)に時間前市場に入札する。 As shown in Figure 6, the power adjustment plan creation device 100b includes a market bidding unit 310 in addition to the power adjustment plan creation device 100. The market bidding unit 310 executes the process of bidding on the adjustment amount to the wholesale power trading market in demand hour units, based on the adjustment plan. When trading the adjustment amount in the spot market, the market bidding unit 310 bids in the spot market at a predetermined time the previous day. When trading the adjustment amount in the advance market, it bids in the advance market on the current day (second period).

また、電力調整計画作成装置100bは、市場入札部310による卸電力取引市場への入札に関する入札情報を取得する入札情報取得部をさらに備えていてもよい。入札情報取得部は、例えば、実施の形態2に示す受付部210により実現されてもよい。つまり、受付部210は、入札情報を取得する入札情報取得部として機能してもよい。入札情報取得部は、管理者等から受け付けた入力情報を市場入札部310に出力する。入札情報は、入札を実行することを許可することを示す情報であってもよいし、デマンド時限単位ごとの市場調整分の電力量または調整先の入力(調整計画を一部変更する入力)であってもよい。また、入札情報取得部は、API(Application Programming Interface)を提供し、スマートフォン等の端末からAPI経由で入力を受け付けてもよい。 Furthermore, the power adjustment plan creation device 100b may further include a bidding information acquisition unit that acquires bidding information related to bids to the wholesale power trading market by the market bidding unit 310. The bidding information acquisition unit may be implemented, for example, by the reception unit 210 shown in Embodiment 2. That is, the reception unit 210 may function as a bidding information acquisition unit that acquires bidding information. The bidding information acquisition unit outputs input information received from the administrator, etc., to the market bidding unit 310. The bidding information may be information indicating permission to execute a bid, or it may be input of the amount of electricity for market adjustment for each demand time unit or the adjustment destination (input to partially change the adjustment plan). The bidding information acquisition unit may also provide an API (Application Programming Interface) and accept input via the API from a terminal such as a smartphone.

[3-2.電力調整計画作成装置の動作]
続いて、上記のように構成される電力調整計画作成装置100bの動作(電力調整計画作成方法)について、図7を参照しながら説明する。図7は、本実施の形態に係る電力調整計画作成装置100bの動作を示すフローチャートである。図7に示すフローチャートは、図2に示すフローチャートに加えて、ステップS301を含む。なお、図7では、図2と同様、スポット市場調整推定損益のうちスポット市場調達推定損益のみを推定し、時間前市場調整推定損益のうち時間前市場調達推定損益のみを推定する場合の動作例を示している。
[3-2. Operation of the Power Adjustment Planning Device]
Next, the operation of the power adjustment plan creation device 100b configured as described above (power adjustment plan creation method) will be explained with reference to Figure 7. Figure 7 is a flowchart showing the operation of the power adjustment plan creation device 100b according to this embodiment. The flowchart shown in Figure 7 includes step S301 in addition to the flowchart shown in Figure 2. Note that, as in Figure 2, Figure 7 shows an example of operation when only the spot market procurement estimated profit and loss is estimated from the spot market adjustment estimated profit and loss, and only the time-before market procurement estimated profit and loss is estimated from the time-before market adjustment estimated profit and loss.

図7に示すように、市場入札部310は、出力部180が調整計画を出力した後、入札処理を実行する(S301)。入札方法は特に限定されないが、JEPXのウェブサイトに入力する、または、WebAPI等の電文通信を行うことにより(電力取引市場のAPIを用いて)、入札を実行する。また、市場入札部310は、電力調整計画作成装置100bが表示部を備えている場合、表示部に電力取引市場のウェブサイトを表示させてもよい。これにより、計画値に対して調整が必要な電力量(例えば、不足している電力量または余剰となる電力量)を調整するための処理を、自動化することができる。 As shown in Figure 7, the market bidding unit 310 executes the bidding process (S301) after the output unit 180 outputs the adjustment plan. The bidding method is not particularly limited, but bidding is executed by inputting into the JEPX website or by performing telegraphic communication such as Web API (using the API of the electricity trading market). Furthermore, if the power adjustment plan creation device 100b is equipped with a display unit, the market bidding unit 310 may display the electricity trading market website on the display unit. This allows for the automation of the process of adjusting the amount of electricity that needs to be adjusted from the planned value (for example, the amount of electricity that is insufficient or surplus).

なお、市場入札部310は、調達電力量が電力の不足を含む場合、当該電力を調達するための入札処理を実行し、調達電力量が電力の余剰を含む場合、当該電力を売却するための入札処理を実行する。 Furthermore, the market bidding unit 310 executes a bidding process to procure electricity if the amount of electricity to be procured includes a shortage of electricity, and executes a bidding process to sell electricity if the amount of electricity to be procured includes a surplus of electricity.

[3-3.効果等]
以上のように、本実施の形態に係る電力調整計画作成装置100bは、電力取引市場に対して調整電力量を入札する市場入札部310と、市場入札部310による卸電力取引市場への入札に関する入札情報を取得する入札情報取得部(例えば、実施の形態2の受付部210)とをさらに備える。
[3-3. Effects, etc.]
As described above, the power adjustment plan creation device 100b according to this embodiment further comprises a market bidding unit 310 that bids on the amount of power to be adjusted to the power trading market, and a bidding information acquisition unit (for example, the reception unit 210 in Embodiment 2) that acquires bidding information related to the bidding to the wholesale power trading market by the market bidding unit 310.

これにより、電力調整計画作成装置100bは、入札情報に応じてスポット市場または時間前市場で調整電力量に応じた電力を取引するための入札を自動で行うことができる。 This allows the power adjustment plan creation device 100b to automatically bid on electricity corresponding to the adjustment amount in the spot market or the advance market, based on the bidding information.

(実施の形態4)
以下では、本実施の形態に係る電力調整計画作成装置について、図8および図9を参照しながら説明する。なお、以下では、実施の形態1との相違点を中心に説明し、実施の形態1と同一または類似の内容については説明を省略または簡略化する。
(Embodiment 4)
In the following, the power adjustment plan creation device according to this embodiment will be described with reference to Figures 8 and 9. Note that the following description will focus on the differences from Embodiment 1, and the same or similar content as in Embodiment 1 will be omitted or simplified.

[4-1.電力調整計画提示システムの構成]
まず、本実施の形態に係る電力調整計画作成装置を備える電力調整計画提示システムの構成について、図8を参照しながら説明する。図8は、本実施の形態に係る電力調整計画提示システム1cの構成を示す機能ブロック図である。本実施の形態に係る電力調整計画提示システム1cの電力調整計画作成装置100cは、インバランス推定損失を推定するための各構成要素を備える点において、実施の形態1に係る電力調整計画提示システム1の電力調整計画作成装置100と相違する。また、気象情報取得部110bは、取得した気象情報をインバランス単価予測部410にも出力する。
[4-1. Configuration of the Power Adjustment Plan Presentation System]
First, the configuration of the power adjustment plan presentation system equipped with the power adjustment plan creation device according to this embodiment will be described with reference to Figure 8. Figure 8 is a functional block diagram showing the configuration of the power adjustment plan presentation system 1c according to this embodiment. The power adjustment plan creation device 100c of the power adjustment plan presentation system 1c according to this embodiment differs from the power adjustment plan creation device 100 of the power adjustment plan presentation system 1 according to Embodiment 1 in that it is equipped with various components for estimating imbalance estimated losses. In addition, the weather information acquisition unit 110b also outputs the acquired weather information to the imbalance unit price prediction unit 410.

図8に示すように、電力調整計画作成装置100cは、電力調整計画作成装置100に加えて、供給予備率取得部110dと、インバランス価格取得部110eと、インバランス単価予測部410と、インバランス損失推定部420とを備える。 As shown in Figure 8, the power adjustment plan creation device 100c includes, in addition to the power adjustment plan creation device 100, a supply reserve rate acquisition unit 110d, an imbalance price acquisition unit 110e, an imbalance unit price forecasting unit 410, and an imbalance loss estimation unit 420.

供給予備率取得部110dは、第2期間におけるデマンド時限単位ごとの電力供給予備率を含む供給予備率情報を取得する。供給予備率取得部110dは、さらに、第1期間におけるデマンド時限単位ごとの電力供給予備率を含む供給予備率情報を取得してもよい。供給予備率取得部110dは、例えば、電力供給予備率を管理するサーバ装置または一般送配電事業者等から電力供給予備率を、前日のスポット市場に入札する前に取得する。 The supply reserve rate acquisition unit 110d acquires supply reserve rate information, including the power supply reserve rate for each demand time unit during the second period. The supply reserve rate acquisition unit 110d may further acquire supply reserve rate information, including the power supply reserve rate for each demand time unit during the first period. For example, the supply reserve rate acquisition unit 110d acquires the power supply reserve rate from a server device managing the power supply reserve rate or a general transmission and distribution company, etc., before bidding on the spot market the previous day.

インバランス価格取得部110eは、第1期間のインバランス実績価格を取得する。インバランス価格取得部110eは、例えば、インバランス実績価格を管理するサーバ装置からインバランス実績価格を、前日のスポット市場に入札する前に取得する。インバランス実績価格は、デマンド時限単位ごとの価格(単価)であってもよい。インバランス実績価格は、インバランス単価の実績を示す。 The imbalance price acquisition unit 110e acquires the actual imbalance price for the first period. For example, the imbalance price acquisition unit 110e acquires the actual imbalance price from a server device that manages the actual imbalance price before bidding on the spot market the previous day. The actual imbalance price may be the price (unit price) for each demand time unit. The actual imbalance price represents the actual imbalance unit price.

供給予備率取得部110dおよびインバランス価格取得部110eは、例えば、通信回路(通信モジュール)を含んで構成される。なお、供給予備率取得部110dおよびインバランス価格取得部110eの少なくとも1つは、キーボード、ボタン、タッチパネル等を含んで構成され、小売電気事業者の管理者等からの入力により各種情報を取得してもよい。また、供給予備率取得部110dおよびインバランス価格取得部110eは、1つの装置として実現されてもよいし、互いに異なる装置として実現されてもよい。供給予備率取得部110dおよびインバランス価格取得部110eは、情報取得部の一例である。 The supply reserve rate acquisition unit 110d and the imbalance price acquisition unit 110e are configured, for example, to include a communication circuit (communication module). At least one of the supply reserve rate acquisition unit 110d and the imbalance price acquisition unit 110e may include a keyboard, buttons, a touch panel, etc., and acquire various information through input from a retail electricity provider's administrator, etc. Furthermore, the supply reserve rate acquisition unit 110d and the imbalance price acquisition unit 110e may be implemented as a single device or as separate devices. The supply reserve rate acquisition unit 110d and the imbalance price acquisition unit 110e are examples of information acquisition units.

なお、インバランス価格取得部110eは、デマンド時限単位でインバランス予測単価に対する入力を受け付けるボタン等のユーザインタフェース部として実現されてもよい。 Furthermore, the imbalance price acquisition unit 110e may be implemented as a user interface unit, such as a button, that accepts input for the imbalance forecast unit price in demand time units.

インバランス単価予測部410は、少なくとも供給予備率情報に基づいて、第2期間のインバランス単価であるインバランス予測単価をデマンド時限単位で予測する。インバランス単価予測部410は、第2期間の供給予備率情報と、供給予備率情報およびインバランス価格が対応付けられたテーブルとに基づいて、第2期間のインバランス予測単価を予測してもよい。また、インバランス単価予測部410は、例えば、供給予備率情報に基づいて、電力の余剰時のインバランス価格予測値、および、電力の不足時のインバランス価格予測値を予測してもよい。 The imbalance price forecasting unit 410 forecasts the imbalance price for the second period, which is the imbalance price, in demand time units, based at least on the supply reserve ratio information. The imbalance price forecasting unit 410 may also forecast the imbalance price for the second period based on the supply reserve ratio information for the second period and a table that associates the supply reserve ratio information with the imbalance price. Furthermore, the imbalance price forecasting unit 410 may, for example, forecast the imbalance price forecast value during a power surplus and the imbalance price forecast value during a power shortage, based on the supply reserve ratio information.

インバランス単価予測部410は、供給予備率情報と、インバランス実績単価および気象情報の少なくとも一方とに基づいて、インバランス予測単価をデマンド時限単位で予測してもよい。インバランス単価予測部410は、第2期間の供給予備率情報と、第1期間および第2期間の気象情報と、当該第1期間のインバランス実績価格とに基づいて、第2期間(当日)のインバランス価格予測値を算出してもよい。インバランス単価予測部410は、第1期間のうち第2期間の気象情報と同一または類似する気象情報であった期間の1以上のインバランス実績価格を抽出し、抽出した1以上のインバランス実績価格と、供給予備率情報に基づくインバランス価格とに基づいてインバランス価格予測値を算出してもよい。第1期間のインバランス実績価格の平均値、中央値、最頻値、最大値または最小値と、供給予備率情報に基づくインバランス価格とに基づいて第2期間のインバランス価格予測値を算出してもよい。また、インバランス単価予測部410は、例えば、気象情報およびインバランス実績価格に基づいて、インバランス価格の誤差範囲を算出してもよい。 The imbalance unit price forecasting unit 410 may forecast the imbalance forecast unit price in demand time units based on supply reserve ratio information and at least one of the actual imbalance unit price and weather information. The imbalance unit price forecasting unit 410 may calculate the imbalance price forecast value for the second period (today) based on the supply reserve ratio information for the second period, weather information for the first and second periods, and the actual imbalance price for the first period. The imbalance unit price forecasting unit 410 may extract one or more actual imbalance prices from the first period for periods in which the weather information was the same as or similar to that of the second period, and calculate the imbalance price forecast value based on the extracted one or more actual imbalance prices and the imbalance price based on the supply reserve ratio information. The imbalance price forecast value for the second period may be calculated based on the mean, median, mode, maximum or minimum of the actual imbalance prices for the first period and the imbalance price based on the supply reserve ratio information. Furthermore, the imbalance price forecasting unit 410 may calculate the error range of the imbalance price based, for example, on weather information and actual imbalance prices.

また、インバランス単価予測部410は、電力供給予備率に基づいてインバランス価格予測値を算出してもよい。インバランス単価予測部410は、例えば、エリアごと、当日のデマンド時限単位ごと(例えば、30分ごと)の電力供給予備率の予測値に基づいて当該デマンド時限単位ごとのインバランス価格予測値を算出してもよい。インバランス単価予測部410は、インバランス単価取得部の一例である。 Furthermore, the imbalance price forecasting unit 410 may calculate the imbalance price forecast value based on the power supply reserve ratio. For example, the imbalance price forecasting unit 410 may calculate the imbalance price forecast value for each demand time unit (e.g., every 30 minutes) based on the predicted power supply reserve ratio for each area and each demand time unit for the day. The imbalance price forecasting unit 410 is an example of an imbalance price acquisition unit.

なお、電力の不足を発生させた場合のインバランス価格と電力の余剰を発生させた場合のインバランス価格とは、異なることが想定される。そのため、インバランス単価予測部410は、電力の不足を発生させた場合のインバランス価格の予測値である第1インバランス価格予測値と、電力の余剰を発生させた場合のインバランス価格の予測値である第2インバランス価格予測値とを予測してもよい。インバランス単価予測部410は、電力の不足を発生させた場合のインバランス価格の実績である第1インバランス実績単価に基づいて、第1インバランス価格予測値を予測し、電力の余剰を発生させた場合のインバランス価格の実績である第2インバランス実績単価に基づいて、第2インバランス価格予測値を予測してもよい。また、インバランス単価予測部410は、第2期間の供給予備率情報と、当該供給予備率情報および第1インバランス価格が対応付けられたテーブルとに基づいて、第2期間の第1インバランス予測単価を予測し、当該供給予備率情報と、当該供給予備率情報および第2インバランス価格が対応付けられたテーブルとに基づいて、第2期間の第2インバランス予測単価を予測してもよい。 It is assumed that the imbalance price when a power shortage occurs will be different from the imbalance price when a power surplus occurs. Therefore, the imbalance price forecasting unit 410 may forecast a first imbalance price forecast value, which is the predicted value of the imbalance price when a power shortage occurs, and a second imbalance price forecast value, which is the predicted value of the imbalance price when a power surplus occurs. The imbalance price forecasting unit 410 may forecast the first imbalance price forecast value based on the first actual imbalance price, which is the actual imbalance price when a power shortage occurs, and forecast the second imbalance price forecast value based on the second actual imbalance price, which is the actual imbalance price when a power surplus occurs. Furthermore, the imbalance unit price forecasting unit 410 may forecast the first imbalance forecast unit price for the second period based on the supply reserve ratio information for the second period and a table that associates the supply reserve ratio information with the first imbalance price, and may forecast the second imbalance forecast unit price for the second period based on the supply reserve ratio information and a table that associates the supply reserve ratio information with the second imbalance price.

インバランス損失推定部420は、調整電力量およびインバランス予測単価に基づいて、卸電力取引市場に対して調整電力量の取引を行なわず、インバランスを発生させた場合の損失額(インバランス推定損失)をデマンド時限単位で推定する。インバランス損失推定部420は、調整電力量を卸電力取引市場から調整しない場合のインバランス推定損失を推定する。具体的には、インバランス損失推定部420は、調整電力量に不足が発生すると予測される場合、その調整電力量を卸電力取引市場から調達しないときに発生する損失額を推定し、調整電力量に余剰が発生すると予測される場合、その調整電力量を卸電力取引市場に売却しないときに発生する損失額を推定する。インバランス損失推定部420はインバランス損失取得部の一例である。 The imbalance loss estimation unit 420 estimates the amount of loss (estimated imbalance loss) in demand time units when an imbalance occurs because the adjusted power amount is not traded with the wholesale power market, based on the adjusted power amount and the predicted imbalance unit price. The imbalance loss estimation unit 420 estimates the estimated imbalance loss when the adjusted power amount is not adjusted from the wholesale power market. Specifically, when a shortage of adjusted power is predicted, the imbalance loss estimation unit 420 estimates the amount of loss that would occur if the adjusted power amount is not procured from the wholesale power market, and when a surplus of adjusted power is predicted, it estimates the amount of loss that would occur if the adjusted power amount is not sold to the wholesale power market. The imbalance loss estimation unit 420 is an example of an imbalance loss acquisition unit.

インバランス損失推定部420は、例えば、以下の(式5)に基づいてインバランス推定損失を算出することで、インバランス推定損失を推定する。インバランス損失推定部420は、(式5)を用いてデマンド時限単位ごとにインバランス推定損失を算出する。 The imbalance loss estimation unit 420 estimates the imbalance loss by, for example, calculating the imbalance loss based on the following (Equation 5). The imbalance loss estimation unit 420 calculates the imbalance loss for each demand time unit using (Equation 5).

インバランス推定損失=調整電力量×インバランス予測単価 ・・・(式5) Estimated Imbalance Loss = Adjusted Power Amount × Predicted Imbalance Unit Price ... (Equation 5)

インバランス損失推定部420は、例えば、調整電力量に不足が発生すると予測される場合、(式5)のインバランス予測単価に第1インバランス価格予測値を用いてインバランス損失を算出し、調整電力量に余剰が発生すると予測される場合、(式5)のインバランス予測単価に第2インバランス価格予測値を用いてインバランス損失を算出する。 The imbalance loss estimation unit 420 calculates the imbalance loss using the first imbalance price prediction value in the imbalance prediction unit price of (Equation 5) when a shortage in the adjustment power amount is predicted, and calculates the imbalance loss using the second imbalance price prediction value in the imbalance prediction unit price of (Equation 5) when a surplus in the adjustment power amount is predicted.

また、本実施の形態では、調整計画作成部170は、スポット市場調整推定損益、時間前市場調整推定損益およびインバランス推定損失に基づいて調整計画を作成する。 Furthermore, in this embodiment, the adjustment plan creation unit 170 creates an adjustment plan based on the estimated spot market adjustment profit/loss, the estimated pre-hour market adjustment profit/loss, and the estimated imbalance loss.

[4-2.電力調整計画作成装置の動作]
続いて、上記のように構成される電力調整計画作成装置100cの動作(電力調整計画作成方法)について、図9を参照しながら説明する。図9は、本実施の形態に係る電力調整計画作成装置100cの動作を示すフローチャートである。図9に示すフローチャートは、図2に示すフローチャートに加えて、ステップS401~S403を含む。なお、図9では、図2と同様、スポット市場調整推定損益のうちスポット市場調達推定損益のみを推定し、時間前市場調整推定損益のうち時間前市場調達推定損益のみを推定する場合の動作例を示している。
[4-2. Operation of the Power Adjustment Planning Device]
Next, the operation of the power adjustment plan creation device 100c configured as described above (power adjustment plan creation method) will be explained with reference to Figure 9. Figure 9 is a flowchart showing the operation of the power adjustment plan creation device 100c according to this embodiment. The flowchart shown in Figure 9 includes steps S401 to S403 in addition to the flowchart shown in Figure 2. Note that, as in Figure 2, Figure 9 shows an example of operation when only the spot market procurement estimated profit and loss is estimated from the spot market adjustment estimated profit and loss, and only the time-before market procurement estimated profit and loss is estimated from the time-before market adjustment estimated profit and loss.

図9に示すように、情報取得部は、電力供給予備率およびインバランス実績価格を取得する(S401)。電力供給予備率(供給予備率情報)およびインバランス実績価格を取得するタイミングは特に限定されず、例えば、互いに異なるタイミングで取得される。なお、ステップS401では、電力供給予備率およびインバランス実績価格の少なくとも1つが取得されればよい。情報取得部は、取得した電力供給予備率およびインバランス実績価格をインバランス単価予測部410に出力する。なお、情報取得部は、ステップS401において、少なくとも電力供給予備率を取得すればよい。 As shown in Figure 9, the information acquisition unit acquires the power supply reserve ratio and the actual imbalance price (S401). The timing of acquiring the power supply reserve ratio (supply reserve ratio information) and the actual imbalance price is not particularly limited; for example, they may be acquired at different times. In step S401, it is sufficient to acquire at least one of the power supply reserve ratio and the actual imbalance price. The information acquisition unit outputs the acquired power supply reserve ratio and actual imbalance price to the imbalance unit price forecasting unit 410. In step S401, the information acquisition unit only needs to acquire the power supply reserve ratio.

次に、インバランス単価予測部410は、電力供給予備率およびインバランス実績価格の少なくとも1つと、気象情報とに基づいて、第2期間のデマンド時限単位ごとのインバランス予測単価を予測する(S402)。インバランス単価予測部410は、予測したインバランス単価をインバランス損失推定部420に出力する。 Next, the imbalance unit price forecasting unit 410 forecasts the imbalance forecast unit price for each demand time unit in the second period based on at least one of the power supply reserve rate and the actual imbalance price, as well as weather information (S402). The imbalance unit price forecasting unit 410 outputs the forecasted imbalance unit price to the imbalance loss estimation unit 420.

次に、インバランス損失推定部420は、調整電力量と、予測されたインバランス単価とに基づいて、第2期間のデマンド時限単位ごとのインバランス推定損失を推定する(S403)。インバランス損失推定部420は、例えば、デマンド時限単位ごとに(式5)の計算を行うことで、デマンド時限単位ごとのインバランス推定損失を推定する。インバランス損失推定部420は、推定したインバランス推定損失を調整計画作成部170に出力する。 Next, the imbalance loss estimation unit 420 estimates the imbalance loss for each demand time unit in the second period based on the adjusted power amount and the predicted imbalance unit price (S403). The imbalance loss estimation unit 420 estimates the imbalance loss for each demand time unit, for example, by performing the calculation (Equation 5) for each demand time unit. The imbalance loss estimation unit 420 outputs the estimated imbalance loss to the adjustment plan creation unit 170.

次に、調整計画作成部170は、調整計画を作成する(S107)。本実施の形態では、調整計画作成部170は、スポット市場調整推定損益、時間前市場調整推定損益およびインバランス推定損失を比較し、比較結果に基づいて調整計画を作成する。例えば、卸電力取引市場が需要過多となり市場価格が高騰して売電単価を上回る場合、インバランスを発生させた方が小売電気事業者の損失が小さくなる場合がある。調整計画作成部170は、スポット市場調整推定損益および時間前市場調整推定損益のそれぞれが損失である場合、損失額の小さい方と、インバランス推定損失とを比較し、さらにその小さい方に応じた行動を含む調整計画を作成する。このように、調整計画作成部170は、ある時間帯において損失が発生する場合、損失額を最小化する行動を行うように調整計画を作成してもよい。なお、ここでの行動とは、調整電力量をスポット市場で取引するか、時間前市場で取引するか、または、調整電力量の調整を行わずインバランスを発生させる(インバランス料金を支払う)かのいずれかを含む。 Next, the adjustment plan creation unit 170 creates an adjustment plan (S107). In this embodiment, the adjustment plan creation unit 170 compares the estimated profit/loss for spot market adjustments, the estimated profit/loss for advance market adjustments, and the estimated imbalance loss, and creates an adjustment plan based on the comparison results. For example, if the wholesale electricity trading market experiences excessive demand and market prices soar above the electricity selling price, it may be possible to reduce the retail electricity business operator's losses by creating an imbalance. If both the estimated profit/loss for spot market adjustments and the estimated profit/loss for advance market adjustments are losses, the adjustment plan creation unit 170 compares the smaller loss with the estimated imbalance loss, and then creates an adjustment plan that includes actions corresponding to the smaller loss. In this way, the adjustment plan creation unit 170 may create an adjustment plan that minimizes the amount of loss if a loss occurs during a certain time period. The actions here include trading the adjustment amount in the spot market, trading it in the advance market, or creating an imbalance (paying an imbalance fee) without adjusting the adjustment amount.

なお、ステップS401~S403は、ステップS104で推定されたスポット市場調整推定損益およびステップS106で推定された時間前市場調整推定損益のそれぞれが損失である場合、または、所定の利益以下である場合に実行されてもよい。例えば、調整計画作成部170は、ステップS104で推定されたスポット市場調整推定損益およびステップS106で推定された時間前市場調整推定損益に基づいて、ステップS401~S403の処理を実行するか否かを判定し、実行すると判定した場合のみステップS401~S403を実行してもよい。 Steps S401 to S403 may be executed if the estimated spot market adjusted profit/loss estimated in step S104 and the estimated pre-hour market adjusted profit/loss estimated in step S106 are both losses or below a predetermined profit. For example, the adjustment plan creation unit 170 may determine whether or not to execute the processes in steps S401 to S403 based on the estimated spot market adjusted profit/loss estimated in step S104 and the estimated pre-hour market adjusted profit/loss estimated in step S106, and execute steps S401 to S403 only if it determines that it should be executed.

[4-3.効果等]
以上のように、本実施の形態に係る電力調整計画作成装置100cは、卸電力取引市場に対して調整電力量の取引を行わず、インバランスを発生させた場合の損失を示すインバランス推定損失をデマンド時限単位で取得するインバランス損失推定部420(インバランス損失取得部の一例)をさらに備える。そして、調整計画作成部170は、スポット市場調整推定損益、時間前市場調整推定損益およびインバランス推定損失を比較した比較結果に基づいて調整計画を作成する。
[4-3. Effects, etc.]
As described above, the power adjustment plan creation device 100c according to this embodiment further includes an imbalance loss estimation unit 420 (an example of an imbalance loss acquisition unit) that acquires an estimated imbalance loss in demand time units, which indicates the loss when an imbalance occurs without trading the amount of adjustment power with respect to the wholesale power trading market. The adjustment plan creation unit 170 then creates an adjustment plan based on the comparison results obtained by comparing the spot market adjustment estimated profit and loss, the time-ahead market adjustment estimated profit and loss, and the imbalance estimated loss.

これにより、電力調整計画作成装置100cは、例えば、スポット市場調整推定損益および時間前市場調整推定損益のそれぞれが損失となる時間帯がある場合、スポット市場調整推定損益、時間前市場調整推定損益およびインバランス推定損失の比較により損失が小さくなるように電力の調整先を決定することができる。つまり、電力調整計画作成装置100cは、損失が発生する場合の損失額を低くすることが可能である。よって、電力調整計画作成装置100cは、経済性がさらに高い電力調整計画を作成可能である。 This allows the power adjustment planning device 100c to determine the power adjustment destination in a way that minimizes losses, for example, when there are time periods in which both the estimated spot market adjustment profit/loss and the estimated pre-hour market adjustment profit/loss result in losses, by comparing the estimated spot market adjustment profit/loss, the estimated pre-hour market adjustment profit/loss, and the estimated imbalance loss. In other words, the power adjustment planning device 100c can reduce the amount of loss when losses occur. Therefore, the power adjustment planning device 100c can create a more economically efficient power adjustment plan.

また、電力調整計画作成装置100cは、第2期間の供給予備率情報を取得する情報取得部と、供給予備率情報に基づいて、第2期間におけるインバランス予測単価を予測するインバランス単価予測部410とをさらに備える。そして、インバランス損失推定部420は、インバランス予測単価および調整電力量に基づいて、インバランス推定損失をデマンド時限単位で推定する。 Furthermore, the power adjustment plan creation device 100c further includes an information acquisition unit that acquires supply reserve rate information for the second period, and an imbalance unit price prediction unit 410 that predicts the imbalance forecast unit price for the second period based on the supply reserve rate information. The imbalance loss estimation unit 420 then estimates the imbalance forecast loss in demand time units based on the imbalance forecast unit price and the amount of adjusted power.

これにより、電力調整計画作成装置100cは、インバランス予測単価を推定し、さらに当該インバランス予測単価に基づいてインバランス推定損失を推定することができる。つまり、電力調整計画作成装置100cは、電力取引市場に対して調整電力量の取引を行わず、インバランスを発生させた場合のインバランス推定損失を推定することができる。 This allows the power adjustment planning device 100c to estimate the predicted imbalance unit price and, based on that predicted unit price, estimate the imbalance loss. In other words, the power adjustment planning device 100c can estimate the imbalance loss in the event of an imbalance occurring without trading the adjustment amount in the power trading market.

また、インバランス単価予測部410は、さらに、気象情報に基づいて、インバランス予測単価を予測する。 Furthermore, the imbalance unit price forecasting unit 410 forecasts the imbalance unit price based on weather information.

これにより、さらに、気象情報を用いてインバランス予測単価が算出されるので、インバランス予測単価の予測精度が向上することが期待される。 This will further improve the accuracy of the imbalance forecast, as the imbalance forecast unit price will be calculated using weather information.

(その他の実施の形態)
以上、一つまたは複数の態様に係る電力調整計画作成装置等について、各実施の形態に基づいて説明したが、本発明は、この各実施の形態に限定されるものではない。本発明の趣旨を逸脱しない限り、当業者が思いつく各種変形を本実施の形態に施したものや、異なる実施の形態における構成要素を組み合わせて構築される形態も、本発明に含まれてもよい。
(Other embodiments)
Although power adjustment planning devices and the like according to one or more embodiments have been described above based on each embodiment, the present invention is not limited to these embodiments. As long as it does not depart from the spirit of the present invention, various modifications that a person skilled in the art can conceive of may be applied to these embodiments, and forms constructed by combining components from different embodiments may also be included in the present invention.

例えば、上記各実施の形態等では、電力調整計画提示システムが備える提示部が1つである例について説明したが、提示部の数は特に限定されず、複数であってもよい。 For example, in the embodiments described above, an example was described in which the power adjustment plan presentation system has one presentation unit. However, the number of presentation units is not particularly limited and may be multiple.

また、上記各実施の形態等では、各取得部は、キーボード、ボタン、タッチパネル等で構成され管理者等の操作を入力として受け付ける例について説明したが、マイクロフォン等の集音装置等により構成され管理者等の音声を入力として受け付けてもよい。 Furthermore, while the above embodiments described examples of each acquisition unit being composed of a keyboard, buttons, touch panel, etc., and receiving input from an administrator, etc., they may also be composed of a sound collection device such as a microphone, and receiving voice input from an administrator, etc.

また、上記各実施の形態における調整電力量取得部は、調整電力量を予測することにより調整電力量を取得する例について説明したがこれに限定されず、調整電力量を管理者等の入力により取得してもよい。この場合、調整電力量取得部は、キーボード、ボタン、タッチパネル等を含んで構成されてもよいし、音声による入力を受け付ける集音装置等を含んで構成されてもよい。 Furthermore, while the above embodiments describe an example where the adjusted power amount acquisition unit acquires the adjusted power amount by predicting it, the unit is not limited to this. The adjusted power amount may also be acquired through input from an administrator or other user. In this case, the adjusted power amount acquisition unit may include a keyboard, buttons, a touch panel, or a sound collection device that accepts voice input.

また、上記各実施の形態におけるスポット市場調整損益取得部は、スポット市場調整推定損益を予測することによりスポット市場調整推定損益を取得する例について説明したがこれに限定されず、スポット市場調整推定損益を管理者等の入力により取得してもよい。この場合、スポット市場調整損益取得部は、キーボード、ボタン、タッチパネル等を含んで構成されてもよいし、音声による入力を受け付ける集音装置等を含んで構成されてもよい。 Furthermore, while the above embodiments describe an example where the spot market adjustment profit/loss acquisition unit acquires the spot market adjustment estimated profit/loss by predicting it, the unit is not limited to this example. The spot market adjustment estimated profit/loss may also be acquired through input from an administrator or other user. In this case, the spot market adjustment profit/loss acquisition unit may include a keyboard, buttons, a touch panel, or a sound collection device that accepts voice input.

また、上記各実施の形態における時間前市場調整損益取得部は、時間前市場調整推定損益を推定することにより時間前市場調整推定損益を取得する例について説明したがこれに限定されず、時間前市場調整推定損益を管理者等の入力により取得してもよい。この場合、時間前市場調整損益取得部は、キーボード、ボタン、タッチパネル等を含んで構成されてもよいし、音声による入力を受け付ける集音装置等を含んで構成されてもよい。 Furthermore, while the above-described embodiments explain how the pre-time market adjustment profit/loss acquisition unit acquires estimated pre-time market adjustment profit/loss by estimating it, the unit is not limited to this example. Estimated pre-time market adjustment profit/loss may also be acquired through input from an administrator or other user. In this case, the pre-time market adjustment profit/loss acquisition unit may include a keyboard, buttons, a touch panel, or a sound collection device that accepts voice input.

また、上記実施の形態4におけるインバランス価格取得部は、インバランス予測価格を予測することによりインバランス予測価格を取得する例について説明したが、これに限定されず、インバランス予測価格を管理者等の入力により取得してもよい。この場合、インバランス価格取得部は、キーボード、ボタン、タッチパネル等を含んで構成されてもよいし、音声による入力を受け付ける集音装置等を含んで構成されてもよい。 Furthermore, while the example of acquiring the imbalance price in Embodiment 4 described above involves acquiring the predicted imbalance price by predicting the predicted imbalance price, the invention is not limited to this, and the predicted imbalance price may also be acquired through input by an administrator or the like. In this case, the imbalance price acquisition unit may include a keyboard, buttons, a touch panel, etc., or it may include a sound collection device that accepts voice input, etc.

また、上記実施の形態4におけるインバランス損失取得部は、インバランス推定損失を推定することによりインバランス推定損失を取得する例について説明したがこれに限定されず、インバランス推定損失を管理者等の入力により取得してもよい。この場合、インバランス損失取得部は、キーボード、ボタン、タッチパネル等を含んで構成されてもよいし、音声による入力を受け付ける集音装置等を含んで構成されてもよい。 Furthermore, while the above-described embodiment 4 describes an example where the imbalance loss acquisition unit acquires the estimated imbalance loss by estimating the estimated imbalance loss, it is not limited to this example. The estimated imbalance loss may also be acquired through input from an administrator or other user. In this case, the imbalance loss acquisition unit may include a keyboard, buttons, a touch panel, or a sound collection device that accepts voice input.

また、上記各実施の形態において調整計画作成部は、デマンド時限単位ごとにスポット市場および時間前市場のいずれで調整電力量を取引するかを判定する例について説明したが、デマンド時限単位ごとであることに限定されず、例えば、任意の時間ごとに調整電力量の調整先を判定してもよい。 Furthermore, while the above embodiments described an example in which the adjustment plan creation unit determines whether to trade the adjustment amount in the spot market or the advance market for each demand time unit, it is not limited to each demand time unit. For example, the destination for the adjustment amount may be determined at any time interval.

また、上記各実施の形態では、電力調整計画作成装置と、提示部とは別体である例について説明したが、一体であってもよい。つまり、電力調整計画作成装置は、ユーザインタフェースとして提示部を備えていてもよい。この場合、電力調整計画作成装置が備える提示部は、上記各実施の形態で説明した電力調整計画提示システムが備える提示部と同様の機能を有する。電力調整計画作成装置が備える提示部は、例えば、図3に示す調整計画を提示する機能を有する。また、電力調整計画作成装置が備える提示部と、受付部とは、一体のユーザインタフェースとして実現されてもよい。 Furthermore, although the above embodiments describe examples where the power adjustment plan creation device and the presentation unit are separate entities, they may be integrated. That is, the power adjustment plan creation device may include a presentation unit as a user interface. In this case, the presentation unit of the power adjustment plan creation device has the same functions as the presentation unit of the power adjustment plan presentation system described in the above embodiments. For example, the presentation unit of the power adjustment plan creation device has the function of presenting the adjustment plan shown in Figure 3. Also, the presentation unit and the reception unit of the power adjustment plan creation device may be implemented as an integrated user interface.

また、上記各実施の形態における調整電力量予測部、スポット市場単価予測部、時間前市場単価予測部およびインバランス単価予測部の少なくとも1つは、例えば、機械学習モデルを用いて予測を行ってもよい。調整電力量予測部は、例えば、あらかじめ過去一定期間の販売電力量を用いて学習された機械学習モデルにより、将来の電力需要量を予測した上で、電力需要量と計画値との差異から調整電力量を予測してもよい。また、例えば、スポット市場単価予測部は、例えば、あらかじめ過去一定期間のスポット市場取引実績価格と気象情報とを用いて学習された機械学習モデルにより、将来のスポット市場取引単価を予測してもよい。また、例えば、時間前市場単価予測部は、例えば、あらかじめ過去一定期間の時間前市場取引実績価格と気象情報とを用いて学習された機械学習モデルにより、将来の時間前市場取引単価を予測してもよい。また、例えば、インバランス単価予測部は、例えば、あらかじめ過去一定期間のインバランス発生時におけるインバランス単価と電力供給予備率と気象情報とを用いて学習された機械学習モデルにより、将来のインバランス単価を予測してもよい。 Furthermore, at least one of the adjustment power quantity prediction unit, spot market unit price prediction unit, time-ahead market unit price prediction unit, and imbalance unit price prediction unit in each of the above embodiments may, for example, perform predictions using a machine learning model. The adjustment power quantity prediction unit may, for example, predict future power demand using a machine learning model trained in advance using power sales data for a certain past period, and then predict the adjustment power quantity from the difference between power demand and the planned value. Also, for example, the spot market unit price prediction unit may predict future spot market transaction prices using a machine learning model trained in advance using actual spot market transaction prices for a certain past period and weather information. Also, for example, the time-ahead market unit price prediction unit may predict future time-ahead market transaction prices using a machine learning model trained in advance using actual time-ahead market transaction prices for a certain past period and weather information. Also, for example, the imbalance unit price prediction unit may predict future imbalance prices using a machine learning model trained in advance using imbalance unit prices at the time of imbalance occurrences for a certain past period, power supply reserve ratio, and weather information.

また、上記各実施の形態における需要家は、例えば電力負荷が極めて大きい1件の大口需要家(例えば工場)であってもよいし、電力負荷が小さい複数の需要家(例えば一般住宅)であってもよいし、それらの組み合わせであってもよい。 Furthermore, the consumer in each of the above embodiments may be, for example, a single large-scale consumer with an extremely high power load (e.g., a factory), multiple consumers with low power loads (e.g., a typical residential home), or a combination thereof.

また、上記各実施の形態では、電力調整計画作成装置は、(式1)~(式5)を用いて算出する例について説明したが、(式1)~(式5)は例示であり、これらの算出式を用いることに限定されない。 Furthermore, while the above embodiments described examples of power adjustment plan creation devices using equations (1) to (5), equations (1) to (5) are illustrative examples, and the use of these calculation formulas is not limited to them.

また、上記各実施の形態において、各構成要素は、専用のハードウェアで構成されるか、各構成要素に適したソフトウェアプログラムを実行することによって実現されてもよい。各構成要素は、CPUまたはプロセッサなどのプログラム実行部が、ハードディスクまたは半導体メモリなどの記録媒体に記録されたソフトウェアプログラムを読み出して実行することによって実現されてもよい。 Furthermore, in each of the above embodiments, each component may be implemented by dedicated hardware or by executing a software program suitable for each component. Each component may also be implemented by a program execution unit, such as a CPU or processor, reading and executing a software program recorded on a recording medium such as a hard disk or semiconductor memory.

また、フローチャートにおける各ステップが実行される順序は、本発明を具体的に説明するために例示するためのものであり、上記以外の順序であってもよい。また、上記ステップの一部が他のステップと同時(並列)に実行されてもよいし、上記ステップの一部は実行されなくてもよい。 Furthermore, the order in which each step in the flowchart is executed is illustrative for the purpose of specifically illustrating the present invention, and may be in a different order. Also, some of the above steps may be executed simultaneously (in parallel) with other steps, and some of the above steps may not be executed.

また、機能ブロック図における機能ブロックの分割は一例であり、複数の機能ブロックを一つの機能ブロックとして実現したり、一つの機能ブロックを複数に分割したり、一部の機能を他の機能ブロックに移してもよい。また、類似する機能を有する複数の機能ブロックの機能を単一のハードウェアまたはソフトウェアが並列または時分割に処理してもよい。 Furthermore, the division of functional blocks in the functional block diagram is just one example; multiple functional blocks can be implemented as a single functional block, a single functional block can be divided into multiple parts, or some functions can be moved to other functional blocks. Additionally, the functions of multiple functional blocks with similar capabilities may be processed in parallel or time-sharing by a single piece of hardware or software.

また、上記各実施の形態に係る電力調整計画作成装置は、単一の装置として実現されてもよいし、複数の装置により実現されてもよい。電力調整計画作成装置が複数の装置によって実現される場合、当該電力調整計画作成装置が有する各構成要素は、複数の装置にどのように振り分けられてもよい。電力調整計画作成装置が複数の装置で実現される場合、当該複数の装置間の通信方法は、特に限定されず、無線通信であってもよいし、有線通信であってもよい。また、装置間では、無線通信および有線通信が組み合わされてもよい。 Furthermore, the power adjustment planning device according to each of the above embodiments may be implemented as a single device or as a plurality of devices. When the power adjustment planning device is implemented as a plurality of devices, the components of the power adjustment planning device may be distributed among the plurality of devices in any manner. When the power adjustment planning device is implemented as a plurality of devices, the communication method between the plurality of devices is not particularly limited and may be wireless communication or wired communication. Furthermore, wireless and wired communication may be combined between the devices.

また、これらの全般的または具体的な態様は、システム、方法、集積回路、コンピュータプログラムまたはコンピュータで読み取り可能なCD-ROM等の非一時的記録媒体で実現されてもよく、システム、方法、集積回路、コンピュータプログラムまたは記録媒体の任意な組み合わせで実現されてもよい。プログラムは、記録媒体に予め記憶されていてもよいし、インターネット等を含む広域通信網を介して記録媒体に供給されてもよい。 Furthermore, these general or specific embodiments may be implemented using systems, methods, integrated circuits, computer programs, or non-temporary recording media such as computer-readable CD-ROMs, or any combination of systems, methods, integrated circuits, computer programs, or recording media. The program may be pre-stored on the recording media or supplied to the recording media via a wide-area communication network, including the Internet.

また、上記各実施の形態で説明した各構成要素は、ソフトウェアとして実現されても良いし、典型的には、集積回路であるLSIとして実現されてもよい。これらは、個別に1チップ化されてもよいし、一部または全てを含むように1チップ化されてもよい。ここでは、LSIとしたが、集積度の違いにより、IC、システムLSI、スーパーLSI、ウルトラLSIと呼称されることもある。また、集積回路化の手法はLSIに限るものではなく、専用回路(専用のプログラムを実行する汎用回路)または汎用プロセッサで実現してもよい。LSI製造後に、プログラムすることが可能なFPGA(Field Programmable Gate Array)または、LSI内部の回路セルの接続若しくは設定を再構成可能なリコンフィギュラブル・プロセッサを利用してもよい。更には、半導体技術の進歩または派生する別技術によりLSIに置き換わる集積回路化の技術が登場すれば、当然、その技術を用いて構成要素の集積化を行ってもよい。 Furthermore, each component described in the above embodiments may be implemented as software, or typically as an integrated circuit (LSI). These may be individually integrated onto a single chip, or some or all of them may be integrated onto a single chip. While the term LSI is used here, depending on the degree of integration, they may also be referred to as IC, system LSI, super LSI, or ultra LSI. Moreover, the method of integrated circuit implementation is not limited to LSI; it may also be implemented using a dedicated circuit (a general-purpose circuit that executes a dedicated program) or a general-purpose processor. After LSI manufacturing, a programmable FPGA (Field Programmable Gate Array) or a reconfigurable processor capable of reconfiguring the connections or settings of circuit cells within the LSI may be used. Furthermore, if advances in semiconductor technology or derived technologies lead to the emergence of integrated circuit implementation technologies that replace LSIs, then naturally, those technologies may be used to integrate the components.

システムLSIは、複数の処理部を1個のチップ上に集積して製造された超多機能LSIであり、具体的には、マイクロプロセッサ、ROM(Read Only Memory)、RAM(Random Access Memory)などを含んで構成されるコンピュータシステムである。ROMには、コンピュータプログラムが記憶されている。マイクロプロセッサが、コンピュータプログラムに従って動作することにより、システムLSIは、その機能を達成する。 A system LSI is a highly functional LSI manufactured by integrating multiple processing units onto a single chip. Specifically, it is a computer system comprising a microprocessor, ROM (Read Only Memory), RAM (Random Access Memory), and other components. The ROM stores the computer program. The system LSI achieves its function by operating according to the computer program, with the microprocessor performing its operations.

また、本発明の一態様は、図2、図5、図7および図9のいずれかに示される電力調整計画作成方法に含まれる特徴的な各ステップをコンピュータに実行させるコンピュータプログラムであってもよい。 Furthermore, one aspect of the present invention may be a computer program that causes a computer to execute each characteristic step included in the power adjustment plan creation method shown in any of Figures 2, 5, 7, and 9.

また、例えば、プログラムは、コンピュータに実行させるためのプログラムであってもよい。また、本発明の一態様は、そのようなプログラムが記録された、コンピュータ読み取り可能な非一時的な記録媒体であってもよい。例えば、そのようなプログラムを記録媒体に記録して頒布または流通させてもよい。例えば、頒布されたプログラムを、他のプロセッサを有する装置にインストールして、そのプログラムをそのプロセッサに実行させることで、その装置に、上記各処理を行わせることが可能となる。 Furthermore, for example, the program may be a program to be executed by a computer. Also, in one aspect of the present invention, such a program may be recorded on a computer-readable, non-temporary recording medium. For example, such a program may be recorded on a recording medium and distributed or made available. For example, by installing the distributed program into a device having another processor and having that processor execute the program, it becomes possible to have that device perform the above-mentioned processes.

100、100a、100b、100c 電力調整計画作成装置
110a 販売電力量取得部
110b 気象情報取得部
110c 市場取引価格取得部
110d 供給予備率取得部(情報取得部)
110e インバランス価格取得部(情報取得部)
120 調整電力量予測部(調整電力量取得部)
130 スポット市場単価予測部(前日市場単価予測部)
140 時間前市場単価予測部(当日市場単価予測部)
150 スポット市場調整損益推定部(前日市場調整損益取得部)
160 時間前市場調整損益推定部(当日市場調整損益取得部)
170 調整計画作成部
180 出力部
191 需要家マスターテーブル(需要家情報)
210 受付部
310 市場入札部
410 インバランス単価予測部
420 インバランス損失推定部(インバランス損失取得部)
100, 100a, 100b, 100c Power adjustment plan creation device 110a Sales electricity volume acquisition unit 110b Weather information acquisition unit 110c Market transaction price acquisition unit 110d Supply reserve ratio acquisition unit (information acquisition unit)
110e Imbalance Price Acquisition Unit (Information Acquisition Unit)
120 Adjusted Power Quantity Prediction Unit (Adjusted Power Quantity Acquisition Unit)
130 Spot Market Price Forecast Department (Previous Day Market Price Forecast Department)
140-hour prior market price forecast section (Today's market price forecast section)
150 Spot Market Adjusted Profit/Loss Estimation Section (Previous Day Market Adjusted Profit/Loss Acquisition Section)
160 Hourly Market Adjusted Profit and Loss Estimation Department (Same Day Market Adjusted Profit and Loss Acquisition Department)
170 Adjustment Plan Creation Unit 180 Output Unit 191 Customer Master Table (Customer Information)
210 Reception Department 310 Market Bidding Department 410 Imbalance Unit Price Forecasting Department 420 Imbalance Loss Estimation Department (Imbalance Loss Acquisition Department)

Claims (10)

電力の小売を行う事業者が需要家に電力供給を行うときの電力の調整計画を作成する、プロセッサおよびメモリを備える電力調整計画作成装置であって、
前日市場および当日市場を含む電力取引市場と調整が必要な電力量を示す調整電力量を取得する調整電力量取得部と、
前記調整電力量を前記前日市場で取引するときの損益を示す前日市場調整推定損益をデマンド時限単位で取得する前日市場調整損益取得部と、
前記調整電力量を前記当日市場で取引するときの損益を示す当日市場調整推定損益を前記デマンド時限単位で取得する当日市場調整損益取得部と、
前記前日市場調整推定損益および前記当日市場調整推定損益を前記デマンド時限単位のそれぞれで比較し、利益が大きい方の市場で調整電力量を取引するように前記調整計画を作成する調整計画作成部と、
前記調整計画を提示装置に出力することで前記提示装置に前記調整計画を提示させる出力部と、を備え、
前記調整電力量取得部、前記前日市場調整損益取得部、前記当日市場調整損益取得部、前記調整計画作成部、および、前記出力部は、前記プロセッサが前記メモリに記憶されたプログラムを実行することにより実現され
前記電力取引市場に対して前記調整電力量の取引を行なわず、インバランスを発生させた場合の損失を示すインバランス推定損失を前記デマンド時限単位で取得するインバランス損失取得部をさらに備え、
前記調整計画作成部は、前記前日市場調整推定損益、および、前記当日市場調整推定損益に基づく損失額と、前記インバランス推定損失とを比較し、損失が小さくなるように前記調整計画を作成し、
前記インバランス損失取得部は、前記プロセッサが前記メモリに記憶されたプログラムを実行することにより実現される
電力調整計画作成装置。
A power adjustment planning device comprising a processor and memory for creating a power adjustment plan when a power retailer supplies power to a consumer,
An adjustment power acquisition unit that acquires an adjustment power amount indicating the amount of electricity that needs to be adjusted with the electricity trading market, including the previous day market and the current day market,
A previous day market adjusted profit/loss acquisition unit that acquires the previous day market adjusted estimated profit/loss, which shows the profit or loss when the adjusted amount of electricity is traded in the previous day market, on a demand time-limited basis,
A unit for acquiring daily market adjustment profit and loss, which acquires the daily market adjustment estimated profit and loss, which shows the profit and loss when the adjusted amount of electricity is traded in the daily market, for each demand time period,
An adjustment plan creation unit compares the estimated profit/loss of the previous day's market adjustment and the estimated profit/loss of the current day's market adjustment for each of the demand time units, and creates an adjustment plan to trade the amount of adjusted electricity in the market with the larger profit.
The system includes an output unit that outputs the adjustment plan to a display device, thereby causing the display device to display the adjustment plan,
The adjustment power acquisition unit, the previous day market adjustment profit/loss acquisition unit, the current day market adjustment profit/loss acquisition unit, the adjustment plan creation unit, and the output unit are realized by the processor executing a program stored in the memory .
The system further includes an imbalance loss acquisition unit that acquires an estimated imbalance loss in the demand time unit, which indicates the loss that would occur if the adjusted amount of electricity were not traded with the aforementioned electricity trading market and an imbalance were to occur.
The adjustment plan creation unit compares the estimated profit/loss based on the previous day's market adjustment and the estimated profit/loss based on the current day's market adjustment with the estimated imbalance loss, and creates the adjustment plan so as to reduce the loss.
The imbalance loss acquisition unit is realized by the processor executing a program stored in the memory.
Power adjustment plan creation device.
前記需要家への過去の第1期間における販売電力の実績を示す販売電力量を取得する販売電力量取得部と、
前記第1期間の電力取引市場価格の実績を示す取引実績価格を取得する市場取引価格取得部と、
前記需要家への供給可能な電力量の計画値および前記需要家への電力の売電単価を記憶する記憶部と、
前記取引実績価格に含まれる第1価格に基づいて、前記前日市場で約定する前日市場取引予測単価を前記デマンド時限単位で予測する前日市場単価予測部と、
前記取引実績価格に含まれる第2価格に基づいて、将来の電力供給の対象となる第2期間の前記当日市場で約定する当日市場取引予測単価を前記デマンド時限単位で予測する当日市場単価予測部と、をさらに備え、
前記調整電力量取得部は、前記販売電力量および前記計画値に基づいて、前記第2期間における前記調整電力量を予測し、
前記前日市場調整損益取得部は、前記売電単価、前記前日市場取引予測単価および前記調整電力量に基づいて、前記前日市場調整推定損益を前記デマンド時限単位で推定し、
前記当日市場調整損益取得部は、前記売電単価、前記当日市場取引予測単価および前記調整電力量に基づいて、前記当日市場調整推定損益を前記デマンド時限単位で推定し、
前記販売電力量取得部、前記市場取引価格取得部、前記前日市場単価予測部、および、前記当日市場単価予測部は、前記プロセッサが前記メモリに記憶されたプログラムを実行することにより実現される
請求項1に記載の電力調整計画作成装置。
A sales electricity volume acquisition unit that acquires the sales electricity volume showing the actual sales performance of electricity to the aforementioned customer during the first period in the past,
A market transaction price acquisition unit that acquires actual transaction prices showing the actual electricity market prices for the first period,
A storage unit that stores the planned amount of electricity that can be supplied to the customer and the unit price for selling electricity to the customer,
A previous day market price forecasting unit predicts the previous day market transaction forecasting unit price to be executed in the previous day market based on the first price included in the transaction actual price, in the demand time unit,
The system further includes a daily market price forecasting unit that forecasts the daily market transaction forecast unit price to be executed in the daily market for the second period covered by future power supply, based on the second price included in the aforementioned transaction history price, in the aforementioned demand time unit,
The adjustment power acquisition unit predicts the adjustment power amount for the second period based on the sales power amount and the planned value,
The aforementioned previous day market adjustment profit/loss acquisition unit estimates the previous day market adjustment estimated profit/loss in the demand time unit based on the electricity sales price, the previous day market transaction forecast price, and the adjusted electricity amount.
The aforementioned daily market adjustment profit/loss acquisition unit estimates the daily market adjustment estimated profit/loss in the demand time unit based on the electricity sales price, the daily market transaction forecast price, and the adjusted electricity amount.
The power adjustment plan creation device according to claim 1, wherein the sales power quantity acquisition unit, the market transaction price acquisition unit, the previous day market price forecasting unit, and the current day market price forecasting unit are realized by the processor executing a program stored in the memory.
前記第2期間の供給予備率情報を取得する情報取得部と、
前記供給予備率情報に基づいて、前記第2期間におけるインバランス予測単価を予測するインバランス単価予測部と、をさらに備え、
前記インバランス損失取得部は、前記インバランス予測単価および前記調整電力量に基づいて、前記インバランス推定損失を前記デマンド時限単位で推定し、
前記情報取得部、および、前記インバランス単価予測部は、前記プロセッサが前記メモリに記憶されたプログラムを実行することにより実現される
請求項に記載の電力調整計画作成装置。
An information acquisition unit that acquires supply reserve rate information for the second period,
The system further includes an imbalance unit price prediction unit that predicts the imbalance unit price in the second period based on the supply reserve rate information,
The imbalance loss acquisition unit estimates the imbalance loss in the demand time unit based on the predicted imbalance unit price and the adjusted power amount,
The power adjustment plan creation device according to claim 2 , wherein the information acquisition unit and the imbalance unit price prediction unit are realized by the processor executing a program stored in the memory.
前記第1期間および前記第2期間の気象情報を取得する気象情報取得部をさらに備え、
前記記憶部は、さらに、前記需要家の施設の地点情報および営業日情報の少なくとも一方を含む需要家情報を記憶し、
前記調整電力量取得部は、さらに、前記気象情報および前記需要家情報の少なくとも1つに基づいて、前記調整電力量を予測し、
前記気象情報取得部は、前記プロセッサが前記メモリに記憶されたプログラムを実行することにより実現される
請求項に記載の電力調整計画作成装置。
The system further includes a weather information acquisition unit that acquires weather information for the first period and the second period,
The storage unit further stores customer information, which includes at least one of the location information and business day information of the customer's facility.
The adjustment power acquisition unit further predicts the adjustment power amount based on at least one of the weather information and the customer information,
The power adjustment plan creation device according to claim 3 , wherein the weather information acquisition unit is realized by the processor executing a program stored in the memory.
前日市場単価予測部は、さらに前記気象情報に基づいて、前記前日市場取引予測単価を予測し、
当日市場単価予測部は、さらに前記気象情報に基づいて、前記当日市場取引予測単価を予測する
請求項に記載の電力調整計画作成装置。
The previous day market price forecasting unit further forecasts the previous day market transaction forecast unit price based on the weather information,
The power adjustment plan creation device according to claim 4 , wherein the day-to-day market price forecasting unit further forecasts the day-to-day market transaction forecast unit price based on the weather information.
前記インバランス単価予測部は、さらに、前記気象情報に基づいて、前記インバランス予測単価を予測する
請求項またはに記載の電力調整計画作成装置。
The power adjustment plan creation device according to claim 4 or 5 , wherein the imbalance unit price prediction unit further predicts the imbalance prediction unit price based on the weather information.
前記出力部が前記調整計画を出力した後に、調整電力量、前日市場取引予測単価、当日市場取引予測単価およびインバランス予測単価の少なくとも1つの入力を受け付ける受付部をさらに備え、
前記調整計画作成部は、前記受付部が受け付けた前記少なくとも1つに基づいて、前記調整計画を更新し、
前記受付部は、前記プロセッサが前記メモリに記憶されたプログラムを実行することにより実現される
請求項からのいずれか一項に記載の電力調整計画作成装置。
After the output unit outputs the adjustment plan, the system further includes a receiving unit that receives at least one input of the adjustment amount, the previous day's market trading forecast unit price, the current day's market trading forecast unit price, and the imbalance forecast unit price.
The adjustment plan creation unit updates the adjustment plan based on the at least one received by the reception unit.
The power adjustment plan creation device according to any one of claims 3 to 6 , wherein the receiving unit is realized by the processor executing a program stored in the memory.
前記調整計画作成部は、前記前日市場調整推定損益および前記当日市場調整推定損益を前記デマンド時限単位のそれぞれで比較し、前記事業者の損益が最大となる行動を含む前記調整計画を作成する
請求項1からのいずれか一項に記載の電力調整計画作成装置。
The power adjustment plan creation device according to any one of claims 1 to 7, wherein the adjustment plan creation unit compares the estimated profit and loss of the previous day's market adjustment and the estimated profit and loss of the current day's market adjustment for each of the demand time units and creates the adjustment plan that includes the action that maximizes the profit and loss of the business operator.
前記電力取引市場に対して前記調整電力量を入札する市場入札部と、
前記市場入札部による前記電力取引市場への入札に関する入札情報を取得する入札情報取得部と、をさらに備え、
前記市場入札部、および、前記入札情報取得部は、前記プロセッサが前記メモリに記憶されたプログラムを実行することにより実現される
請求項1からのいずれか一項に記載の電力調整計画作成装置。
A market bidding unit that submits the adjusted electricity amount to the aforementioned electricity trading market,
The system further comprises a bidding information acquisition unit that acquires bidding information related to bids made by the market bidding unit to the aforementioned electricity trading market,
The power adjustment plan creation device according to any one of claims 1 to 8 , wherein the market bidding unit and the bidding information acquisition unit are realized by the processor executing a program stored in the memory.
電力の小売を行う事業者が需要家に電力供給を行うときの電力の調整計画を作成する電力調整計画作成装置が実行する電力調整計画作成方法であって、
前日市場および当日市場を含む電力取引市場と調整が必要な電力量を示す調整電力量を取得する第1取得ステップと、
前記調整電力量を前日市場で取引するときの損益を示す前日市場調整推定損益をデマンド時限単位で取得する第2取得ステップと、
前記調整電力量を当日市場で取引するときの損益を示す当日市場調整推定損益を前記デマンド時限単位で取得する第3取得ステップと、
前記前日市場調整推定損益および前記当日市場調整推定損益を前記デマンド時限単位のそれぞれで比較し、利益が大きい方の市場で調整電力量を取引するように前記調整計画を作成する作成ステップと、
前記調整計画を提示装置に出力することで前記提示装置に前記調整計画を提示させる出力ステップと、を含み、
さらに、前記電力取引市場に対して前記調整電力量の取引を行なわず、インバランスを発生させた場合の損失を示すインバランス推定損失を前記デマンド時限単位で取得し、
前記作成ステップでは、前記前日市場調整推定損益、および、前記当日市場調整推定損益に基づく損失額と、前記インバランス推定損失とを比較し、損失が小さくなるように前記調整計画を作成し、
前記インバランス推定損失を前記デマンド時限単位で取得することは、前記電力調整計画作成装置が備えるプロセッサが、前記電力調整計画作成装置が備えるメモリに記憶されたプログラムを実行することにより実現される
電力調整計画作成方法。
A method for creating a power adjustment plan, which is performed by a power adjustment plan creation device that creates a power adjustment plan when a power retailer supplies power to consumers,
The first acquisition step involves obtaining an adjusted amount of electricity, which indicates the amount of electricity that needs to be adjusted with the electricity trading market, including the previous day market and the current day market.
A second acquisition step involves acquiring the estimated profit/loss adjusted for the previous day market, which shows the profit/loss when the adjusted amount of electricity is traded in the previous day market, in units of demand time,
A third acquisition step involves acquiring the estimated profit or loss for the day's market adjustment, which shows the profit or loss when the adjusted amount of electricity is traded in the market on that day, for each demand time unit.
A creation step involves comparing the estimated profit/loss of the previous day's market adjustment and the estimated profit/loss of the current day's market adjustment for each of the demand time units, and creating an adjustment plan to trade the amount of adjusted electricity in the market with the larger profit,
The output step includes outputting the adjustment plan to a display device, thereby causing the display device to display the adjustment plan,
Furthermore, an estimated imbalance loss is obtained in the demand time unit, which represents the loss that would occur if the adjusted amount of electricity were not traded with the electricity trading market and an imbalance were to occur.
In the creation step, the estimated profit/loss for market adjustments from the previous day and the estimated profit/loss for market adjustments on the current day are compared with the estimated imbalance loss, and the adjustment plan is created so as to minimize the loss.
The acquisition of the imbalance estimate loss in the demand time unit is achieved by the processor of the power adjustment planning device executing a program stored in the memory of the power adjustment planning device.
Method for creating a power adjustment plan.
JP2021186990A 2021-11-17 2021-11-17 Power adjustment plan creation device and power adjustment plan creation method Active JP7843444B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021186990A JP7843444B2 (en) 2021-11-17 2021-11-17 Power adjustment plan creation device and power adjustment plan creation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021186990A JP7843444B2 (en) 2021-11-17 2021-11-17 Power adjustment plan creation device and power adjustment plan creation method

Publications (2)

Publication Number Publication Date
JP2023074177A JP2023074177A (en) 2023-05-29
JP7843444B2 true JP7843444B2 (en) 2026-04-10

Family

ID=86537785

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021186990A Active JP7843444B2 (en) 2021-11-17 2021-11-17 Power adjustment plan creation device and power adjustment plan creation method

Country Status (1)

Country Link
JP (1) JP7843444B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7533809B1 (en) * 2024-06-03 2024-08-14 富士電機株式会社 Information processing device, information processing method, and information processing program

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019040483A (en) 2017-08-28 2019-03-14 三菱電機株式会社 Electricity transaction formulation apparatus
JP2019046467A (en) 2017-08-29 2019-03-22 国立大学法人九州大学 Power transaction support apparatus and power transaction support method
JP2019200594A (en) 2018-05-16 2019-11-21 株式会社日立製作所 Electric power planning support device
JP2020195281A (en) 2017-11-07 2020-12-03 株式会社東芝 Information processing device, information processing method and computer program
JP2021140487A (en) 2020-03-05 2021-09-16 株式会社東芝 Information processing apparatus, information processing method, and computer program
JP2021149282A (en) 2020-03-17 2021-09-27 Kddi株式会社 Electric power trading assistance device, electric power trading assistance method and program
JP2021157724A (en) 2020-03-30 2021-10-07 日本電気株式会社 Information processing equipment, information processing methods, and programs

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019040483A (en) 2017-08-28 2019-03-14 三菱電機株式会社 Electricity transaction formulation apparatus
JP2019046467A (en) 2017-08-29 2019-03-22 国立大学法人九州大学 Power transaction support apparatus and power transaction support method
JP2020195281A (en) 2017-11-07 2020-12-03 株式会社東芝 Information processing device, information processing method and computer program
JP2019200594A (en) 2018-05-16 2019-11-21 株式会社日立製作所 Electric power planning support device
JP2021140487A (en) 2020-03-05 2021-09-16 株式会社東芝 Information processing apparatus, information processing method, and computer program
JP2021149282A (en) 2020-03-17 2021-09-27 Kddi株式会社 Electric power trading assistance device, electric power trading assistance method and program
JP2021157724A (en) 2020-03-30 2021-10-07 日本電気株式会社 Information processing equipment, information processing methods, and programs

Also Published As

Publication number Publication date
JP2023074177A (en) 2023-05-29

Similar Documents

Publication Publication Date Title
US9134353B2 (en) Comfort-driven optimization of electric grid utilization
Longstaff et al. Electricity forward prices: a high‐frequency empirical analysis
US8280799B2 (en) Method and systems for predicting solar energy production
US20190130423A1 (en) Management apparatus and management method
US20100332373A1 (en) System and method for participation in energy-related markets
US10796254B2 (en) Systems, methods and apparatus for integrated optimal outage coordination in energy delivery systems
US20050004858A1 (en) Energy advisory and transaction management services for self-serving retail electricity providers
US20100218108A1 (en) System and method for trading complex energy securities
US20100217642A1 (en) System and method for single-action energy resource scheduling and participation in energy-related securities
US20100217550A1 (en) System and method for electric grid utilization and optimization
JP7470833B2 (en) Demand adjustment system, demand adjustment method and program
JP5695848B2 (en) Simultaneous equal amount apparatus, control method thereof and program thereof
Kwon et al. Optimization-based bidding in day-ahead electricity auction markets: A review of models for power producers
US8818889B2 (en) Technique for aggregating an energy service
JP6803596B1 (en) Power trading system, power trading method and power trading program
JP4154373B2 (en) Power supply business risk management support system
JP7792608B2 (en) Electricity rate unit price determination device and electricity rate unit price determination method
JP2021191191A (en) Power transaction system, power transaction method, and power transaction program
JP7724447B2 (en) Power procurement profit and loss estimation device and power procurement profit and loss estimation method
JP5835675B2 (en) Collective trading support system for small power and aggregate trading support method for small power
JP7843444B2 (en) Power adjustment plan creation device and power adjustment plan creation method
JP7323673B2 (en) Management device and management method
JP2019205304A (en) Power trade system and method thereof
JP2005284420A (en) Power resource transaction system and power resource transaction management server
JP2003067457A (en) Electric power vending system and processing program therefor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240904

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250527

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250530

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250709

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250930

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20251022

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20260113

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20260213

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260303

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260316

R150 Certificate of patent or registration of utility model

Ref document number: 7843444

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150