Stress transfer structure of cast-in-place steel pipe concrete piles

Info

Publication number
JP7845665B2
JP7845665B2 JP2022071777A JP2022071777A JP7845665B2 JP 7845665 B2 JP7845665 B2 JP 7845665B2 JP 2022071777 A JP2022071777 A JP 2022071777A JP 2022071777 A JP2022071777 A JP 2022071777A JP 7845665 B2 JP7845665 B2 JP 7845665B2
Authority
JP
Japan
Prior art keywords
steel pipe
concrete
pile
holes
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022071777A
Other languages
Japanese (ja)
Other versions
JP2022168856A (en
Inventor
豊 久保
由春 小林
雄吉 兼平
義隆 中西
峻也 藤田
建太郎 坪川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
System Measure Co., Ltd.
Original Assignee
System Measure Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by System Measure Co., Ltd. filed Critical System Measure Co., Ltd.
Publication of JP2022168856A publication Critical patent/JP2022168856A/en
Application granted granted Critical
Publication of JP7845665B2 publication Critical patent/JP7845665B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、鋼管とコンクリートとによって形成される場所打ち鋼管コンクリート杭の応力伝達構造に関するものである。 This invention relates to a stress transmission structure for cast-in-place steel pipe concrete piles formed from steel pipes and concrete.

杭の上部を鋼管コンクリート杭にし、下部を場所打ちコンクリート杭にした場所打ち鋼管コンクリート杭が知られている(特許文献1-3など参照)。このような複合構造の杭では、鋼管コンクリート部と鉄筋コンクリート部との境界に継手部が発生する。 A cast-in-place steel pipe concrete pile is known, in which the upper part of the pile is made of steel pipe concrete and the lower part is made of cast-in-place concrete (see Patent Documents 1-3, etc.). In such a composite pile structure, a joint occurs at the boundary between the steel pipe concrete section and the reinforced concrete section.

通常、杭には鉛直荷重が主に作用することになり、継手部が存在しても鉛直荷重に対しては支障をきたすことはない。しかしながら、地震時において、杭頭に大きな水平力が作用すると、杭に曲げモーメント及びせん断力が作用し、継手部が弱部となるおそれがある。 Normally, piles are primarily subjected to vertical loads, and the presence of joints does not impede the vertical load. However, during an earthquake, if a large horizontal force acts on the pile head, bending moment and shear force will act on the pile, potentially making the joint a weak point.

そこで、特許文献1-3では、鋼管コンクリート部と鉄筋コンクリート部との継手部を補強するための継手構造を設けている。すなわち、鋼管の内空に充填するコンクリートとの付着力(摩擦抵抗)を大きくするために、鋼管の内周面に凸部を設けている。 Therefore, Patent Documents 1-3 provide a joint structure for reinforcing the joint between the steel pipe concrete section and the reinforced concrete section. Specifically, to increase the adhesion force (frictional resistance) with the concrete filling the interior of the steel pipe, protrusions are provided on the inner surface of the steel pipe.

特許第5717118号公報Patent No. 5717118 特開2006-138095号公報Japanese Patent Publication No. 2006-138095 特公平5-62171号公報Special Publication No. 5-62171

しかしながら、鋼管の内周面に凸部を設けるのは、製作作業が困難で手間がかかる場合がある。一方、特許文献3には、鋼管の外周にもコンクリートを回り込ませることができるように、鋼管の周壁に側面視長方形の開口を設けた構造が記載されている。 However, creating a protrusion on the inner surface of a steel pipe can be difficult and time-consuming during manufacturing. On the other hand, Patent Document 3 describes a structure in which a rectangular opening is provided in the circumferential wall of the steel pipe, allowing concrete to flow around the outer circumference of the pipe.

側面視長方形の開口は、鋼管の外側から穿孔作業ができるため、鋼管の内周面に凸部を設けるよりは作業性がよいが、四辺を切断することになるので1開口当たりの工数が多く、複数の開口を設けるには、それなりに手間がかかる。 A rectangular opening in side view allows for drilling from the outside of the steel pipe, which is more efficient than creating a protrusion on the inner surface of the pipe. However, since all four sides are cut, the number of steps required per opening is high, and creating multiple openings is quite time-consuming.

また、長方形の開口の隅角部には、コンクリートのブリージングが溜まりやすく、硬化後のコンクリート部に空洞ができやすいという課題もある。こうした空洞がコンクリート部にできないようにするためには、特殊な添加剤を充填するコンクリートに混入させるなどの対策が必要になる。 Furthermore, a challenge exists in that concrete bleeding tends to accumulate in the corners of rectangular openings, leading to the formation of voids in the hardened concrete. To prevent these voids from forming in the concrete, measures such as mixing special additives into the concrete are necessary.

そこで、本発明は、簡単に製作できてブリージングの影響が生じないうえに、応力伝達性能に優れた場所打ち鋼管コンクリート杭の応力伝達構造を提供することを目的としている。 Therefore, the present invention aims to provide a stress transmission structure for cast-in-place steel pipe concrete piles that is easy to manufacture, does not suffer from bleeding effects, and has excellent stress transmission performance.

前記目的を達成するために、本発明の場所打ち鋼管コンクリート杭の応力伝達構造は、鋼管とコンクリートとによって形成される場所打ち鋼管コンクリート杭の応力伝達構造であって、周囲及び内部にコンクリートが充填される円筒形の鋼管の端部に、周方向に間隔を置いて複数の側面視略円形又は側面視で上側に頂点が形成される多角形の貫通穴が設けられていることを特徴とする。 To achieve the above objective, the stress transmission structure for a cast-in-place steel pipe concrete pile of the present invention is a stress transmission structure for a cast-in-place steel pipe concrete pile formed by a steel pipe and concrete, characterized in that multiple through holes, which are approximately circular in side view or polygonal in side view with their vertices facing upwards, are provided at intervals in the circumferential direction at the ends of a cylindrical steel pipe filled with concrete around its periphery and interior.

ここで、前記貫通穴は、鋼管サイズに応じて周方向に等間隔で4箇所から32箇所が設けられる構成とすることができる。また、前記貫通穴は、前記鋼管の軸方向に間隔を置いて1段から10段の任意の段数が設けられる構成とすることができる。 Here, the through-holes can be configured to be provided at equal intervals in the circumferential direction, from 4 to 32 locations, depending on the size of the steel pipe. Furthermore, the through-holes can be configured to be provided at intervals in the axial direction of the steel pipe, in any number of stages from 1 to 10.

さらに、こうした場所打ち鋼管コンクリート杭における前記鋼管の端部は、鋼管コンクリート部と鉄筋コンクリート部との境界付近、拡底杭の拡底部又は中間拡径杭の拡径部のいずれかに配置されることが好ましい。 Furthermore, in such cast-in-place steel pipe concrete piles, it is preferable that the end of the steel pipe be positioned near the boundary between the steel pipe concrete section and the reinforced concrete section, at the enlarged base of an enlarged-base pile, or at the enlarged diameter section of an intermediate enlarged-diameter pile.

また、前記貫通穴に対して、前記鋼管の外周側及び内部に突出する補強管が挿入されている構成とすることができる。もしくは、前記貫通穴の周囲に鋼材を溶接することで開口補強部を設けた構成とすることができる。 Furthermore, the structure can be configured such that reinforcing pipes protruding from the outer circumference and into the interior of the steel pipe are inserted into the through-hole. Alternatively, the structure can be configured such that a reinforcing section for the opening is provided by welding steel material around the through-hole.

このように構成された本発明の場所打ち鋼管コンクリート杭の応力伝達構造は、周囲及び内部にコンクリートが充填される円筒形の鋼管の端部に、周方向に間隔を置いて複数の側面視略円形又は側面視で上側に頂点が形成される多角形の貫通穴が設けられている。 The stress transmission structure of the cast-in-place steel pipe concrete pile of the present invention, configured as described above, has multiple through-holes at intervals in the circumferential direction at the ends of a cylindrical steel pipe filled with concrete around its periphery and interior. These through-holes are approximately circular in side view or polygonal in side view, with their vertices facing upwards.

側面視略円形又は側面視で上側に頂点が形成される多角形の貫通穴は、鋼管の外側から簡単な作業で穿孔できるうえに、円形又は上側に頂点が形成される多角形の貫通穴の周りにコンクリートが充填されても、ブリージングが溜まってしまうことがない。さらに、鋼管の内外のコンクリートが貫通穴を通して繋がることで、鋼管とコンクリートとの付着力を増大させることができる。 Through-holes that are roughly circular in side view or polygonal with their vertices on the upper side in side view can be easily drilled from the outside of the steel pipe. Furthermore, even when concrete is filled around these circular or polygonal through-holes, bleeding does not accumulate. Additionally, the connection between the concrete inside and outside the steel pipe through the through-hole increases the adhesion between the steel pipe and the concrete.

また、鋼管サイズに応じて周方向に等間隔で4箇所から32箇所の貫通穴を設けるのであれば、杭の周方向に偏りがない状態で付着力が得られるようになるうえに、鋼管21の耐力の低下も許容範囲内に抑えることができる。 Furthermore, by providing 4 to 32 through-holes at equal intervals in the circumferential direction, depending on the size of the steel pipe, it becomes possible to obtain adhesive force without bias in the circumferential direction of the pile, and the reduction in the load-bearing capacity of the steel pipe 21 can be kept within an acceptable range.

そして、貫通穴が設けられた鋼管の端部が、鋼管コンクリート部と鉄筋コンクリート部との境界付近に配置されることで、鉄筋コンクリート部の鉄筋の引張力を鋼管コンクリート部の鋼管に効果的に伝達させることが可能になり、応力伝達性能を高めることができる。 Furthermore, by positioning the end of the steel pipe, which has a through-hole, near the boundary between the concrete-framed steel pipe section and the reinforced concrete section, it becomes possible to effectively transmit the tensile force of the reinforcing bars in the reinforced concrete section to the steel pipe in the concrete-framed steel pipe section, thereby improving stress transmission performance.

一方、貫通穴が設けられた鋼管の端部が、拡底杭の拡底部や中間拡径杭の拡径部に配置されることで、拡幅されて地盤に接する傾斜部分の引抜き耐力を、鋼管コンクリート部の鋼管に効果的に伝達させることができるようになる。 On the other hand, by positioning the end of the steel pipe with the through-hole in the enlarged base of the enlarged-base pile or the enlarged diameter of the intermediate enlarged-diameter pile, the pull-out resistance of the widened, inclined portion in contact with the ground can be effectively transmitted to the steel pipe in the concrete section of the steel pipe.

また、貫通穴に対して、鋼管の外周側及び内部に突出する補強管が挿入されていれば、貫通穴の穿孔による鋼管の耐力低下を抑えることができるうえに、支圧抵抗を増加させることができるようになる。ここで、貫通穴の周囲に鋼材を溶接することで開口補強部を設けることでも、鋼管の耐力低下を抑えることができる。 Furthermore, if reinforcing pipes protruding from the outer circumference and into the interior of the steel pipe are inserted into the through-hole, the reduction in the steel pipe's load-bearing capacity due to the drilling of the through-hole can be suppressed, and the bearing resistance can be increased. Here, the reduction in the steel pipe's load-bearing capacity can also be suppressed by providing an opening reinforcement section by welding steel material around the through-hole.

本実施の形態の場所打ち鋼管コンクリート杭の全体構成を示した説明図である。This is an explanatory diagram showing the overall configuration of the cast-in-place steel pipe concrete pile of this embodiment. 場所打ち鋼管コンクリート杭の鋼管コンクリート部の構成を示した説明図である。This is an explanatory diagram showing the structure of the concrete pipe section of a cast-in-place steel pipe concrete pile. 図2Aとは貫通穴の数が異なる鋼管コンクリート部の構成を例示した説明図である。Figure 2A is an explanatory diagram illustrating the configuration of a steel pipe concrete section with a different number of through-holes. 実施例1の拡底杭の拡底部付近の構成を示した説明図である。This is an explanatory diagram showing the configuration near the enlarged base of the enlarged base pile of Example 1. 貫通穴を設けたことによる効果を確認した模型実験の供試体を説明する図であって、(a)は直杭の供試体の説明図、(b)は拡底杭の供試体の説明図である。These diagrams illustrate the specimens used in a model experiment to confirm the effects of providing through holes. (a) is an explanatory diagram of a straight pile specimen, and (b) is an explanatory diagram of an enlarged-base pile specimen. 実験結果を変位と荷重との関係で示したグラフである。This graph shows the relationship between displacement and load in relation to the experimental results. 実験結果を貫通穴の広さ(窓総面積)と最大荷重との関係で示したグラフである。This graph shows the experimental results in relation to the size of the through-hole (total window area) and the maximum load. 実験結果を貫通穴の広さ(窓総面積)とせん断応力との関係で示したグラフである。This graph shows the relationship between the size of the through-hole (total window area) and the shear stress, based on the experimental results. 実施例2の中間拡径杭の拡径部付近の構成を示した説明図である。This is an explanatory diagram showing the configuration near the enlarged diameter portion of the intermediate enlarged diameter pile in Example 2. 実施例2の別の中間拡径杭の全体構成を示した説明図である。This is an explanatory diagram showing the overall configuration of another intermediate enlarged-diameter pile in Example 2. 実施例3の鋼管の貫通穴に補強管が挿入された構成を示した説明図である。This is an explanatory diagram showing the configuration in which a reinforcing pipe is inserted into the through-hole of the steel pipe in Example 3. 実施例3の補強管の作用を概念的に示した説明図である。This is an explanatory diagram conceptually illustrating the function of the reinforcing pipe in Example 3. 拡底杭の場合の補強管の作用を概念的に示した説明図である。This is a conceptual diagram illustrating the function of reinforcing pipes in the case of enlarged-base piles. 補強管のない貫通穴の作用を概念的に示した説明図である。This is a conceptual diagram illustrating the function of a through-hole without reinforcing pipes. 拡底杭の場合の補強管のない貫通穴の作用を概念的に示した説明図である。This is a conceptual diagram illustrating the function of a through-hole without reinforcing pipes in the case of an enlarged-base pile. 実施例4の鋼管の貫通穴の周囲に開口補強部を設けた構成を示した説明図である。This is an explanatory diagram showing the configuration in which an opening reinforcement portion is provided around the through-hole of the steel pipe in Example 4.

以下、本発明の実施の形態について図面を参照して説明する。図1は、本実施の形態の場所打ち鋼管コンクリート杭1の全体構成を示した説明図である。また、図2Aは、場所打ち鋼管コンクリート杭1の鋼管コンクリート部2の構成を示した説明図である。 The embodiments of the present invention will be described below with reference to the drawings. Figure 1 is an explanatory diagram showing the overall configuration of the cast-in-place steel pipe concrete pile 1 of this embodiment. Figure 2A is an explanatory diagram showing the configuration of the steel pipe concrete section 2 of the cast-in-place steel pipe concrete pile 1.

まず、全体構成から説明すると、場所打ち鋼管コンクリート杭1は、図1に示すように、上部に形成される鋼管コンクリート部2と、下部に形成される鉄筋コンクリート部3とを備えている。また、本実施の形態で説明する場所打ち鋼管コンクリート杭1は、鉄筋コンクリート部3の下端に截頭円錐状の拡底部11が設けられる拡底杭である。 First, to explain the overall structure, the cast-in-place steel pipe concrete pile 1, as shown in Figure 1, comprises a steel pipe concrete section 2 formed at the top and a reinforced concrete section 3 formed at the bottom. Furthermore, the cast-in-place steel pipe concrete pile 1 described in this embodiment is an enlarged-base pile, with a truncated conical enlarged base section 11 provided at the lower end of the reinforced concrete section 3.

そして、場所打ち鋼管コンクリート杭1の頭部は、鉄筋コンクリート製のフーチング6に接続される。建物などの基礎に作用する上載荷重は、このフーチング6を介して場所打ち鋼管コンクリート杭1に伝達される。 The head of the cast-in-place steel pipe concrete pile 1 is connected to a reinforced concrete footing 6. The superimposed load acting on the foundation of a building or other structure is transmitted to the cast-in-place steel pipe concrete pile 1 via this footing 6.

このフーチング6の下方に形成される鋼管コンクリート部2は、円筒形の鋼管21と、その内空及び外周に充填されるコンクリート4とによって主に構成される。ここで、鋼管21には、例えば直径が600mm-2500mm程度の鋼製の管材が使用できる。 The steel pipe concrete section 2 formed below the footing 6 is mainly composed of a cylindrical steel pipe 21 and concrete 4 filling its interior and exterior. Here, for example, a steel pipe material with a diameter of approximately 600 mm to 2500 mm can be used for the steel pipe 21.

また、この鋼管21の上端の外周面には、複数の杭頭定着筋12が溶接などによって取り付けられる。この鋼管21から上方に向けて突出された杭頭定着筋12は、フーチング6内に埋設される。 Furthermore, multiple pile head anchoring bars 12 are attached to the outer surface of the upper end of the steel pipe 21 by welding or other means. These pile head anchoring bars 12, which protrude upward from the steel pipe 21, are embedded within the footing 6.

一方、地震時には、このフーチング6が杭下部より大きく水平移動することによって、鋼管コンクリート部2と鉄筋コンクリート部3との接合部(継手部)に、曲げモーメントやせん断力が作用することになる。 On the other hand, during an earthquake, the footing 6 moves significantly horizontally from the bottom of the pile, causing bending moments and shear forces to act on the joint between the steel pipe concrete section 2 and the reinforced concrete section 3.

そこで、このような力に対抗させるために、鋼管21の下側の端部21a付近に、コンクリート4との付着耐力を増加させるための貫通穴22を穿孔する。この貫通穴22は、側面視略円形で、鋼管21の周方向に間隔を置いて複数が設けられる。 Therefore, to counteract such forces, through-holes 22 are drilled near the lower end 21a of the steel pipe 21 to increase the adhesion strength with the concrete 4. These through-holes 22 are approximately circular in side view and multiple holes are provided at intervals around the circumferential direction of the steel pipe 21.

貫通穴22の直径は、コンクリート4の通過のしやすさや、1箇所で得られる付着力の大きさとの関係などを考慮して、コンクリート4の最大骨材径の3倍以上に設定することが好ましい。目安としては、直径75mm-250mm程度、例えば直径150mm程度の貫通穴22を設けることができる。 The diameter of the through-hole 22 should preferably be set to at least three times the maximum aggregate diameter of the concrete 4, taking into consideration factors such as the ease with which the concrete 4 can pass through and the magnitude of the adhesion force obtained at one location. As a guideline, a through-hole 22 with a diameter of approximately 75mm-250mm, for example, approximately 150mm in diameter, can be provided.

さらに、周方向に間隔を置いて複数が設けられる貫通穴22を1段とすると、鋼管21の軸方向(杭軸方向)に間隔を置いて、1段から5段の任意の段数で、鋼管21の端部21aに設けることができる。図1は、鋼管21の下側の端部21aに、3段の貫通穴22が設けられた例を図示している。 Furthermore, if multiple through-holes 22 are provided at intervals in the circumferential direction, they can be provided at any number of intervals from one to five at the end 21a of the steel pipe 21, at intervals in the axial direction (pile axis direction). Figure 1 illustrates an example in which three stages of through-holes 22 are provided at the lower end 21a of the steel pipe 21.

また図2Aに示すように、貫通穴22は、周方向に等間隔で設けられる。この図では、周方向に等間隔で4箇所に貫通穴22を設けた例を図示している。貫通穴22を設ける数はこれに限定されるものではない。例えば図2Bに示すように、鋼管21Aの下側の端部21aに、周方向に等間隔で8箇所の貫通穴22を設けることもできる。 Furthermore, as shown in Figure 2A, the through-holes 22 are provided at equal intervals in the circumferential direction. This figure illustrates an example where four through-holes 22 are provided at equal intervals in the circumferential direction. The number of through-holes 22 is not limited to this. For example, as shown in Figure 2B, eight through-holes 22 can be provided at equal intervals in the circumferential direction at the lower end 21a of the steel pipe 21A.

すなわち貫通穴22は、鋼管サイズに応じて4箇所から32箇所の任意の数を、周方向に等間隔で設けることができる。等間隔で貫通穴22を設けることで、杭の周方向で得られる付着力を偏りがない状態にすることができる。例えば、直径が600mmの鋼管21であれば4箇所、直径が2500mmの鋼管21であれば24箇所の貫通穴22を、1段あたりに設けることができる。通常は、4箇所から8箇所程度の貫通穴22が、周方向に等間隔で設けられる。 In other words, the through-holes 22 can be provided at equal intervals in the circumferential direction, in any number from 4 to 32, depending on the size of the steel pipe. By providing the through-holes 22 at equal intervals, the adhesion force obtained in the circumferential direction of the pile can be made uniform. For example, a steel pipe 21 with a diameter of 600 mm can have 4 through-holes 22 per row, while a steel pipe 21 with a diameter of 2500 mm can have 24 through-holes 22 per row. Typically, 4 to 8 through-holes 22 are provided at equal intervals in the circumferential direction.

一方、場所打ち鋼管コンクリート杭1の下部に形成される鉄筋コンクリート部3は、図1に示すように、軸方向に延設される鉄筋籠31と、その周囲に充填されるコンクリート4とを備えている。 On the other hand, the reinforced concrete section 3 formed at the lower part of the cast-in-place steel pipe concrete pile 1 comprises, as shown in Figure 1, a reinforcing cage 31 extending in the axial direction and concrete 4 filled around it.

この鉄筋籠31は、円筒状に製作されるもので、図2Aに示すように周方向に間隔を置いて配置される複数の主鉄筋31bと、図1に示すように杭軸方向に間隔を置いて配置される環状の帯鉄筋31cとによって主に構成される。 This reinforcing cage 31 is manufactured in a cylindrical shape and is mainly composed of multiple main reinforcing bars 31b arranged at intervals in the circumferential direction as shown in Figure 2A, and annular stirrups 31c arranged at intervals in the pile axis direction as shown in Figure 1.

また、鉄筋籠31の上端部31aは、鋼管21の内部に収容される。この鋼管21の下部(端部21a)に収容された上端部31aは、図1に示すように、3段の貫通穴22が設けられた範囲と略同じ範囲に配置されることによって、ラップされたことになる。 Furthermore, the upper end portion 31a of the reinforcing cage 31 is housed inside the steel pipe 21. The upper end portion 31a, housed in the lower part (end portion 21a) of the steel pipe 21, is positioned in approximately the same area as the three-tiered through-holes 22, as shown in Figure 1, thus effectively overlapping them.

例えば主鉄筋31bの直径をdとすると、貫通穴22が設けられる鋼管21の端部21aの軸方向の範囲(長さ)は、40d-45d程度の範囲とすることができる。なお、貫通穴22の直径については、鋼管21の直径(鋼管サイズ)によって、鋼管21の耐力を損なうことなく適切に設けることができる大きさを考慮して設定することもできる。また、必要に応じて、後述するように貫通穴22の周囲を補強することもできる。 For example, if the diameter of the main reinforcing bar 31b is d, the axial range (length) of the end 21a of the steel pipe 21 where the through-hole 22 is provided can be approximately 40d-45d. The diameter of the through-hole 22 can also be set considering the diameter (steel pipe size) of the steel pipe 21, ensuring that it is appropriately provided without compromising the load-bearing capacity of the steel pipe 21. Furthermore, the area around the through-hole 22 can be reinforced as needed, as described later.

そして、鉄筋籠31の上端部31aを、貫通穴22が設けられた範囲と略同じ範囲に配置してラップさせることで、主鉄筋31bの引張力を鋼管21に効果的に伝達させることができるようになる。 Furthermore, by positioning the upper end 31a of the reinforcing cage 31 in approximately the same area as the area where the through-holes 22 are provided, and overlapping them, the tensile force of the main reinforcement 31b can be effectively transmitted to the steel pipe 21.

さらに、図1に示すように、鋼管21の上側の端部21bを鉄筋コンクリート部と接続する場合も、貫通穴22を設けて鉄筋との応力伝達性能を高めることができる。詳細には、上部がフーチング6に埋設される杭頭補強筋121の下部を、鋼管21の上側の端部21bの内空に挿入して、貫通穴22が設けられた範囲にラップさせる。こうすることで、杭頭補強筋121の引張力を、鋼管21に効果的に伝達させることができるようになる。 Furthermore, as shown in Figure 1, even when connecting the upper end 21b of the steel pipe 21 to the reinforced concrete section, a through-hole 22 can be provided to improve stress transfer performance with the reinforcement. Specifically, the lower part of the pile head reinforcement bar 121, whose upper part is embedded in the footing 6, is inserted into the cavity of the upper end 21b of the steel pipe 21, overlapping with the area where the through-hole 22 is provided. This allows the tensile force of the pile head reinforcement bar 121 to be effectively transferred to the steel pipe 21.

また、図1には、鋼管21の上側の端部21bに3段の貫通穴22を設ける場合を図示したが、貫通穴22の穿孔による鋼管21の耐力低下が懸念される場合は、貫通穴22の周囲に環状の鋼板を溶接するなどして開口補強部23を設けることで、端部21bの耐力低下を抑えることができる。この開口補強部23は、鋼管21の外周面又は内周面のいずれか一方に環状の鋼板を固定する、又は鋼管21の外周面及び内周面の両方に環状の鋼板を固定するなどして設けることができる。 Furthermore, Figure 1 illustrates a case where three through-holes 22 are provided in the upper end 21b of the steel pipe 21. However, if there is concern about a reduction in the load-bearing capacity of the steel pipe 21 due to the drilling of the through-holes 22, the reduction in load-bearing capacity of the end 21b can be suppressed by providing an opening reinforcement section 23, such as by welding an annular steel plate around the through-holes 22. This opening reinforcement section 23 can be provided by fixing an annular steel plate to either the outer or inner circumferential surface of the steel pipe 21, or by fixing annular steel plates to both the outer and inner circumferential surfaces of the steel pipe 21.

次に、本実施の形態の場所打ち鋼管コンクリート杭1の構築方法について説明する。
まず施工前に、鋼管21の下側となる端部21a付近に、側面視略円形となる貫通穴22を、設計した数と間隔で穿孔する。
Next, the method for constructing the cast-in-place steel pipe concrete pile 1 of this embodiment will be described.
First, before construction, through holes 22, which are roughly circular in shape when viewed from the side, are drilled near the lower end 21a of the steel pipe 21, at the number and spacing specified in the design.

側面視略円形の貫通穴22は、鋼管21の外周面に円の中心となる目印だけ付ければ、その中心点にポンチを打ち込んでガス切断機を自動的に回転させることで、簡単に穿孔することができる。 The through-hole 22, which is roughly circular in side view, can be easily drilled by simply marking the center of the circle on the outer surface of the steel pipe 21, then punching a punch at that center point and automatically rotating the gas cutting machine.

一方、施工箇所においては、地盤Gにアースドリル工法やリバース工法などによって、杭孔5を掘削する。そして、クレーンによって杭孔5の上方に鋼管21を吊り上げ、杭孔5の上部に鋼管21を建て込む。この段階では、鋼管21の内側は、空洞又は掘削用の安定液で満たされた状態となっている。 Meanwhile, at the construction site, pile holes 5 are excavated in the ground G using methods such as earth drilling or reverse drilling. Then, a steel pipe 21 is lifted above the pile holes 5 by a crane and installed in the upper part of the pile holes 5. At this stage, the inside of the steel pipe 21 is either hollow or filled with stabilizing fluid for excavation.

続いて、杭孔5の上方に鉄筋籠31を吊り上げ、鋼管21の中に鉄筋籠31を挿入し、沈降させる。ここで、図示していないが、鉄筋籠31の上端部31aには、鋼管21より長い吊り筋が接続されており、この吊り筋を介して鉄筋籠31を吊り下げることによって、鉄筋籠31を図1に示す位置まで沈降させることができる。 Next, the reinforcing cage 31 is lifted above the pile hole 5, inserted into the steel pipe 21, and then lowered. Although not shown in the diagram, a suspension bar longer than the steel pipe 21 is connected to the upper end 31a of the reinforcing cage 31. By suspending the reinforcing cage 31 via this suspension bar, the reinforcing cage 31 can be lowered to the position shown in Figure 1.

そして、吊り筋の杭孔5からの突出量を計測することで、鉄筋籠31の上端部31aを、鋼管21の端部21aの貫通穴22を設けた範囲に合せることができる。このように鋼管21と鉄筋籠31を杭孔5の所定の位置に配置した後に、杭孔5にトレミー管を建て込んで、トレミー管を使ってコンクリート4を打設する。コンクリート4は、孔底から鋼管21の上端まで連続して打ち上げる。 Then, by measuring the amount of protrusion of the reinforcing bars from the pile hole 5, the upper end 31a of the reinforcing cage 31 can be aligned with the area where the through-hole 22 of the end 21a of the steel pipe 21 is provided. After positioning the steel pipe 21 and the reinforcing cage 31 in the predetermined location in the pile hole 5 in this way, a tremie pipe is installed in the pile hole 5, and concrete 4 is poured using the tremie pipe. The concrete 4 is poured continuously from the bottom of the hole up to the upper end of the steel pipe 21.

そして、このコンクリート4の打設によって、鉄筋コンクリート部3と鋼管コンクリート部2とを備え、鋼管21の端部21aに穿孔された貫通穴22を介して、コンクリート4と鋼管21との付着力の耐力が確保される場所打ち鋼管コンクリート杭1の応力伝達構造が構築される。 Then, by pouring this concrete 4, a stress transmission structure for a cast-in-place steel pipe concrete pile 1 is constructed, comprising a reinforced concrete section 3 and a steel pipe concrete section 2, with the load-bearing capacity of the adhesion force between the concrete 4 and the steel pipe 21 ensured through the through-hole 22 drilled in the end 21a of the steel pipe 21.

次に、本実施の形態の場所打ち鋼管コンクリート杭1の応力伝達構造の作用について説明する。
このように構成された本実施の形態の場所打ち鋼管コンクリート杭1の応力伝達構造は、周囲及び内部にコンクリート4が充填される円筒形の鋼管21の端部21aに、周方向に間隔を置いて複数の側面視略円形の貫通穴22が設けられている。
Next, the operation of the stress transfer structure of the cast-in-place steel pipe concrete pile 1 of this embodiment will be explained.
In this embodiment, the stress transmission structure of the cast-in-place steel pipe concrete pile 1 is configured such that a plurality of through holes 22, which are approximately circular in side view, are provided at intervals in the circumferential direction at the end 21a of the cylindrical steel pipe 21, which is filled with concrete 4 around and inside.

側面視略円形の貫通穴22は、ガス切断機などを使って、鋼管21の外側から少ない工数の簡単な作業で、穿孔することができる。また、円形の貫通穴22の周りにコンクリート4が充填されても、その周囲にブリージングが溜まることはできず、コンクリート4に空洞が生じるのを防ぐことができる。 The approximately circular through-hole 22, when viewed from the side, can be drilled from the outside of the steel pipe 21 using a gas cutting machine or similar tool, with minimal effort and ease. Furthermore, even when concrete 4 is filled around the circular through-hole 22, bleeding cannot accumulate around it, preventing the formation of voids in the concrete 4.

そして、鋼管21の内外のコンクリート4が、貫通穴22を通して繋がることで、鋼管21とコンクリート4との付着力を増大させることができる。すなわち、鋼管21の端部21aが鉄筋コンクリート部3と鋼管コンクリート部2との境界付近に配置されることで、鉄筋籠31の主鉄筋31bの引張力を、鋼管コンクリート部2の鋼管21に効果的に伝達させることが可能になり、応力伝達性能を高めることができる。 Furthermore, by connecting the concrete 4 inside and outside the steel pipe 21 through the through-hole 22, the adhesion force between the steel pipe 21 and the concrete 4 can be increased. In other words, by positioning the end 21a of the steel pipe 21 near the boundary between the reinforced concrete section 3 and the steel pipe concrete section 2, the tensile force of the main reinforcement 31b of the reinforcing cage 31 can be effectively transmitted to the steel pipe 21 of the steel pipe concrete section 2, thereby improving stress transmission performance.

また、鋼管サイズに応じて鋼管21の周方向に等間隔で4箇所から32箇所の貫通穴22を設けるのであれば、杭の周方向に偏りがない状態で付着力が得られるようになるうえに、貫通穴22を穿孔したことによる鋼管21の耐力の低下も許容範囲内に抑えることができる。 Furthermore, if four to 32 through-holes 22 are provided at equal intervals in the circumferential direction of the steel pipe 21, depending on the size of the steel pipe, the adhesion force can be obtained without bias in the circumferential direction of the pile, and the reduction in the load-bearing capacity of the steel pipe 21 due to the drilling of the through-holes 22 can be kept within an acceptable range.

以下、前記した実施の形態の場所打ち鋼管コンクリート杭1とは別の実施形態の場所打ち鋼管コンクリート杭について、図3を参照しながら説明する。なお、前記実施の形態で説明した内容と同一乃至均等な部分の説明については、同一用語又は同一符号を付して説明する。 The following describes a cast-in-place steel pipe concrete pile in an embodiment different from the cast-in-place steel pipe concrete pile 1 of the above-described embodiment, with reference to Figure 3. Note that parts identical or equivalent to those described in the above embodiment will be described using the same terms or reference numerals.

この実施例1では、場所打ち鋼管コンクリート杭としての拡底杭1Aについて説明する。本実施例1の拡底杭1Aは、上部に形成される鋼管コンクリート部2Aと、下部に形成される截頭円錐状の拡底部11Aとを備えている。 This first embodiment describes an enlarged-base pile 1A as a cast-in-place steel pipe concrete pile. The enlarged-base pile 1A of this first embodiment comprises a steel pipe concrete section 2A formed at the top and a truncated conical enlarged-base section 11A formed at the bottom.

鋼管コンクリート部2Aは、円筒形の鋼管21と、その内空に充填されるコンクリート4とによって主に構成される。ここで、鋼管21には、例えば直径が600mm-2500mm程度の鋼製の管材が使用できる。 The steel pipe concrete section 2A is mainly composed of a cylindrical steel pipe 21 and concrete 4 filled inside it. Here, for example, a steel pipe material with a diameter of approximately 600 mm to 2500 mm can be used for the steel pipe 21.

そして、鋼管21の下側の端部21a付近には、拡底部11Aの拡底傾斜部の引抜き耐力を、コンクリート4を介して鋼管21に伝達させるための貫通穴22が穿孔される。この貫通穴22は、側面視略円形で、鋼管21の周方向に間隔を置いて複数が設けられる。 Furthermore, near the lower end 21a of the steel pipe 21, through-holes 22 are drilled to transmit the pull-out resistance of the enlarged base inclined portion of the enlarged base 11A to the steel pipe 21 via the concrete 4. These through-holes 22 are approximately circular in side view and multiple holes are provided at intervals around the circumferential direction of the steel pipe 21.

本実施例1では、拡底部11Aの内部に埋設させた鋼管21の端部21aに、周方向に間隔を置いて複数が設けられる貫通穴22を1段として、鋼管21の軸方向に間隔を置いて6段の貫通穴22が設けられている。 In this embodiment 1, the end 21a of the steel pipe 21 embedded inside the enlarged base 11A has multiple through holes 22 spaced circumferentially, forming one stage, and six stages of through holes 22 spaced axially along the steel pipe 21.

このような構成となる拡底杭1Aの応力伝達構造であれば、貫通穴22が設けられた鋼管21の端部21aが拡底杭1Aの拡底部11Aに配置されることで、拡底部11Aの傾斜部分の引抜き耐力を鋼管21に効果的に伝達させることができるようになる。 With this configuration of the stress transmission structure for the enlarged-base pile 1A, the end portion 21a of the steel pipe 21, which has a through-hole 22, is positioned at the enlarged base portion 11A of the enlarged-base pile 1A. This allows for effective transmission of the pull-out resistance of the inclined portion of the enlarged base portion 11A to the steel pipe 21.

すなわち、杭孔5にトレミー管などを使って打設されるコンクリート4が、下から打ちあがってくる際に、貫通穴22を通って鋼管21の内外に充填されるとともに、地盤Gに接する拡底部11Aの傾斜部分にも一体となるコンクリート4が充填されることで、引抜き耐力が鋼管21に確実に伝達される構造にすることができる。 In other words, as the concrete 4 poured into the pile hole 5 using a tremie pipe or the like rises from below, it fills the inside and outside of the steel pipe 21 through the through-hole 22, and the concrete 4 also fills the inclined portion of the enlarged base 11A that contacts the ground G, thus creating a structure in which the pull-out resistance is reliably transmitted to the steel pipe 21.

ここで、拡底部11Aの引抜き耐力を鋼管21に効果的に伝達させるには、鋼管21の端部21aを拡底部11Aの下部まで埋設させ、通常は3段から5段程度、場合によっては10段程度の貫通穴22を設ける。 To effectively transfer the pull-out strength of the enlarged base 11A to the steel pipe 21, the end 21a of the steel pipe 21 is embedded down to the bottom of the enlarged base 11A, and through holes 22 are provided in approximately 3 to 5 stages, and in some cases, approximately 10 stages.

以下では、前記実施の形態で説明した場所打ち鋼管コンクリート杭1及び本実施例1の拡底杭1Aにおける貫通穴22の効果を確認するために行った実験について、図4-図7を参照しながら説明する。 The following describes the experiments conducted to confirm the effects of the through-holes 22 in the cast-in-place steel pipe concrete pile 1 described in the above embodiment and in the enlarged-base pile 1A of this embodiment 1, with reference to Figures 4-7.

図4は、前記実施の形態の場所打ち鋼管コンクリート杭1の鋼管コンクリート部2(直杭)と、本実施例1の拡底杭1Aを模した、実験で使用した供試体を説明する図である。図4(a)は、4つの直杭の供試体を示している。これらの供試体は、実物の杭を1/10程度の大きさに縮尺した模型大の試験体である。 Figure 4 illustrates the steel pipe concrete section 2 (straight pile) of the cast-in-place steel pipe concrete pile 1 of the above embodiment, and the test specimens used in the experiment, which are modeled after the enlarged-base pile 1A of this embodiment 1. Figure 4(a) shows four straight pile test specimens. These test specimens are model-sized specimens, scaled down to approximately 1/10th the size of actual piles.

図4(a)の左端の「直-10」の供試体は、直径101.6mmの鋼管21を直径125.0mmの円柱状のコンクリート4に埋設させた供試体であって、鋼管21の下縁から軸方向に23.0mm上方の位置に、直径15.0mmの貫通穴22が穿孔されている。貫通穴22は、周方向に等間隔で8箇所(8方向)が設けられており、1段の貫通穴22が設けられた構成となっている。 The specimen labeled "Straight-10" at the far left of Figure 4(a) is a steel pipe 21 with a diameter of 101.6 mm embedded in a cylindrical concrete 4 with a diameter of 125.0 mm. A through-hole 22 with a diameter of 15.0 mm is drilled 23.0 mm above the lower edge of the steel pipe 21 in the axial direction. Eight through-holes 22 are provided at equal intervals in the circumferential direction (eight directions), forming a single-stage through-hole configuration.

一方、「直-10」の右隣の供試体「直-11」は、最下段の貫通穴22から軸方向に65.0mm間隔で、さらに2段、合計3段の貫通穴22が設けられた構成となっている。それ以外の構成は、「直-10」と同じである。 On the other hand, test specimen "Cho-11," located to the right of "Cho-10," has a configuration in which two more through-holes 22 are provided at 65.0 mm intervals in the axial direction from the lowest through-hole 22, for a total of three through-holes 22. The rest of the configuration is the same as "Cho-10."

また、「直-12」の供試体は、最下段の貫通穴22から軸方向に32.0mm間隔で、さらに4段、合計5段の貫通穴22が設けられた構成となっている。それ以外の構成は、「直-10」と同じである。これに対して、「直-13」の供試体は、貫通穴22が周方向に等間隔で4箇所(4方向)が設けられた構成となっており、それ以外の構成は、「直-12」と同じである。 Furthermore, the "Straight-12" specimen has a configuration in which four more through-holes 22 are provided at 32.0 mm intervals in the axial direction from the lowest through-hole 22, for a total of five through-holes 22. The rest of the configuration is the same as "Straight-10". In contrast, the "Straight-13" specimen has a configuration in which four through-holes 22 are provided at equal intervals in the circumferential direction (four locations in four directions), and the rest of the configuration is the same as "Straight-12".

そして、図4(b)の「拡-4」の供試体は、直径101.6mmの鋼管21の下部を、底面の直径265.0mm、高さ145.0mmの截頭円錐状の拡底部11Aのコンクリート4に埋設させた、拡底杭1Aを模した試験体である。 Furthermore, the specimen labeled "Expand-4" in Figure 4(b) is a test specimen that simulates an expanded-base pile 1A, in which the lower part of a 101.6 mm diameter steel pipe 21 is embedded in concrete 4 with a truncated conical expanded base section 11A having a base diameter of 265.0 mm and a height of 145.0 mm.

この拡底部11Aの下端には、高さ25.0mmの円盤状の底部が設けられている。この拡底部11Aに埋設された鋼管21の下縁から軸方向に23.0mm上方の位置から、軸方向に32.0mm間隔で、合計5段の貫通穴22が設けられている。また、各段においては、貫通穴22は、周方向に等間隔で8箇所(8方向)が設けられている。 The lower end of the enlarged base 11A is provided with a disc-shaped base with a height of 25.0 mm. A total of five through-holes 22 are provided, starting 23.0 mm axially above the lower edge of the steel pipe 21 embedded in the enlarged base 11A, and spaced 32.0 mm apart in the axial direction. Furthermore, within each stage, eight through-holes 22 are provided at equal intervals in the circumferential direction (eight directions).

これらの供試体を使って、圧縮試験と純曲げ試験を行った。圧縮試験を行った理由は、供試体の形状からして、付着力の確認は圧縮力を加えた方が不利になるためである。純曲げ試験では、所要の付着力を有していれば、鉄筋コンクリート部3で破壊するため、破壊形式の確認を行った。 Compression tests and pure bending tests were performed using these specimens. The reason for performing the compression test was that, given the shape of the specimens, applying compressive force would be disadvantageous for confirming the adhesion strength. In the pure bending test, if the required adhesion strength was present, failure would occur at reinforced concrete section 3, thus confirming the failure mode.

図5は、各供試体を使った純曲げ試験の実験結果を、変位と荷重との関係でまとめて示したグラフである。これらの結果を見ると、いずれの供試体においても、降伏耐力が認められる。そして、直杭の中では、貫通穴22の数が最も多い「直-12」で、最も大きな降伏耐力が得られることがわかった。さらに、拡底杭1Aの供試体「拡-4」については、「直-12」よりもさらに大きな降伏耐力が得られることがわかった。 Figure 5 is a graph summarizing the experimental results of the pure bending test using each specimen, showing the relationship between displacement and load. These results show that yield strength was observed in all specimens. Furthermore, among the straight piles, the specimen with the most through-holes 22, "Straight-12," was found to have the greatest yield strength. Additionally, specimen "Enlarged-4" of the enlarged-base pile 1A was found to have an even greater yield strength than "Straight-12."

一方、図6及び図7では、圧縮試験の結果を、貫通穴22の総開口面積である窓総面積(mm2)を横軸にしてまとめた。すなわち図6は、窓総面積ΣWAと最大荷重Pmax(kN)との関係で実験結果を示したグラフである。また、図7は、窓総面積ΣWAとせん断応力τmax(mm2)との関係で実験結果を示したグラフである。 On the other hand, Figures 6 and 7 summarize the results of the compression test with the total window area ( mm² ), which is the total opening area of the through-holes 22, on the horizontal axis. Specifically, Figure 6 is a graph showing the experimental results in relation to the total window area ΣWA and the maximum load P max (kN). Figure 7 is a graph showing the experimental results in relation to the total window area ΣWA and the shear stress τ max ( mm² ).

図6のグラフを見ると、直杭の中では、窓総面積の増加と最大荷重の増加とが直線的な比例関係にあることがわかる。また、拡底杭(「拡-4」)となると、直杭の比例関係より大きな最大荷重が得られることがわかる。 As can be seen from the graph in Figure 6, in the case of straight piles, there is a linear proportional relationship between the increase in total window area and the increase in maximum load. Furthermore, it can be seen that with enlarged-base piles ("Enlarged-4"), a larger maximum load can be obtained than that of straight piles.

また、図7のグラフを見ると、直杭の中では、窓総面積が増加すると、せん断応力が減少する傾向にあることがわかる。ただし、拡底杭(「拡-4」)については、直杭よりもかなり大きなせん断応力が得られることがわかる。 Furthermore, as can be seen from the graph in Figure 7, in straight piles, the shear stress tends to decrease as the total window area increases. However, for enlarged-base piles ("Enlarged-4"), a considerably larger shear stress is obtained compared to straight piles.

このように、場所打ち鋼管コンクリート杭1であっても、拡底杭1Aであっても、コンクリート4に埋設する鋼管21の端部21aに貫通穴22を設けることによって、付着耐力や引抜き耐力の増加が見込めることが確認できた。 Thus, it was confirmed that, whether it is a cast-in-place steel pipe concrete pile 1 or an enlarged-base pile 1A, providing a through hole 22 in the end 21a of the steel pipe 21 embedded in the concrete 4 can be expected to increase the bond strength and pull-out strength.

なお、他の構成及び作用効果については、前記実施の形態又は他の実施例と略同様であるので説明を省略する。 Furthermore, since the other configurations and effects are substantially the same as those of the above embodiment or other examples, their explanation will be omitted.

以下、前記した実施の形態の場所打ち鋼管コンクリート杭1及び実施例1の拡底杭1Aとは別の実施形態の場所打ち鋼管コンクリート杭について、図8,9を参照しながら説明する。なお、前記実施の形態又は実施例1で説明した内容と同一乃至均等な部分の説明については、同一用語又は同一符号を付して説明する。 The following description will refer to a cast-in-place steel pipe concrete pile in an embodiment different from the cast-in-place steel pipe concrete pile 1 of the above-described embodiment and the enlarged-base pile 1A of Example 1, with reference to Figures 8 and 9. Note that descriptions of parts that are the same or equivalent to those described in the above-described embodiment or Example 1 will be denoted by the same terms or reference numerals.

この実施例2では、場所打ち鋼管コンクリート杭としての中間拡径杭1B,1Cについて説明する。本実施例2の中間拡径杭1B,1Cは、図8,9に示すように、杭軸方向の端部ではない中間部に、拡径部13を備えている。 This second embodiment describes intermediate enlarged-diameter piles 1B and 1C, which are cast-in-place steel pipe concrete piles. As shown in Figures 8 and 9, the intermediate enlarged-diameter piles 1B and 1C of this second embodiment are equipped with an enlarged-diameter section 13 in the intermediate portion, not at the end in the pile axis direction.

図8に示した中間拡径杭1Bは、杭の上部に形成される鋼管コンクリート部2Bと、下部に形成される鉄筋コンクリート部3Bと、それらの境界となる中間部に形成される拡径部13とを備えている。 The intermediate enlarged-diameter pile 1B shown in Figure 8 comprises a steel pipe concrete section 2B formed at the top of the pile, a reinforced concrete section 3B formed at the bottom, and an enlarged-diameter section 13 formed in the intermediate section that forms the boundary between them.

すなわち、直杭状の鋼管コンクリート部2Bと鉄筋コンクリート部3Bとの間に、拡幅された拡径部13が設けられる。この拡径部13は、鋼管コンクリート部2Bに接続される上部は截頭円錐状に形成され、下部は鉄筋コンクリート部3Bの直径に向けて漸減する形状に形成される。 In other words, a widened diameter section 13 is provided between the straight pile-shaped steel pipe concrete section 2B and the reinforced concrete section 3B. The upper part of this widened diameter section 13, which connects to the steel pipe concrete section 2B, is formed in a truncated cone shape, while the lower part gradually tapers towards the diameter of the reinforced concrete section 3B.

鋼管コンクリート部2Bは、円筒形の鋼管21と、その内空に充填されるコンクリート4とによって主に構成される。ここで、鋼管21には、例えば直径が600mm-2500mm程度の鋼製の管材が使用できる。 The steel pipe concrete section 2B is mainly composed of a cylindrical steel pipe 21 and concrete 4 filled inside it. Here, for example, a steel pipe material with a diameter of approximately 600 mm to 2500 mm can be used for the steel pipe 21.

そして、鋼管21の下側の端部21a付近には、拡径部13の拡径傾斜部の引抜き耐力を、コンクリート4を介して鋼管21に伝達させるための貫通穴22が穿孔される。この貫通穴22は、側面視略円形で、鋼管21の周方向に間隔を置いて複数が設けられる。 Furthermore, near the lower end 21a of the steel pipe 21, through-holes 22 are drilled to transmit the pull-out strength of the enlarged diameter inclined portion of the enlarged diameter section 13 to the steel pipe 21 via the concrete 4. These through-holes 22 are approximately circular in side view and multiple holes are provided at intervals around the circumferential direction of the steel pipe 21.

本実施例2の中間拡径杭1Bでは、拡径部13の内部に埋設させた鋼管21の端部21aに、周方向に間隔を置いて複数が設けられる貫通穴22を1段として、鋼管21の軸方向に間隔を置いて4段の貫通穴22が設けられている。 In the intermediate enlarged-diameter pile 1B of this embodiment 2, the end 21a of the steel pipe 21 embedded inside the enlarged-diameter section 13 has multiple through holes 22 spaced circumferentially, forming one stage, and four stages of through holes 22 spaced axially along the steel pipe 21.

一方、図9に示した中間拡径杭1Cは、杭の上部に形成される鋼管コンクリート部2Cと、下部に形成される鉄筋コンクリート部3Cと、それらの境界となる中間部に形成される拡径部13と、杭の下端に形成される截頭円錐状の拡底部11とを備えている。 On the other hand, the intermediate enlarged-diameter pile 1C shown in Figure 9 comprises a steel pipe concrete section 2C formed at the top of the pile, a reinforced concrete section 3C formed at the bottom, an enlarged-diameter section 13 formed in the intermediate section that forms the boundary between them, and a truncated conical enlarged-base section 11 formed at the lower end of the pile.

そして、鋼管コンクリート部2Cの鋼管21の端部21a付近には、拡径部13の拡径傾斜部の引抜き耐力を、コンクリート4を介して鋼管21に伝達させるための貫通穴22が穿孔される。この貫通穴22は、側面視略円形で、鋼管21の周方向に間隔を置いて複数が設けられる。 Furthermore, near the end 21a of the steel pipe 21 in the steel pipe concrete section 2C, through-holes 22 are drilled to transmit the pull-out strength of the enlarged diameter inclined section of the enlarged diameter section 13 to the steel pipe 21 via the concrete 4. These through-holes 22 are approximately circular in side view and multiple holes are provided at intervals around the circumferential direction of the steel pipe 21.

本実施例2の中間拡径杭1Cでは、拡径部13の内部に埋設させた鋼管21の端部21aに、周方向に間隔を置いて複数が設けられる貫通穴22を1段として、鋼管21の軸方向に間隔を置いて4段の貫通穴22が設けられている。 In the intermediate enlarged-diameter pile 1C of this embodiment 2, the end 21a of the steel pipe 21 embedded inside the enlarged-diameter section 13 has multiple through holes 22 spaced circumferentially, forming one stage, and four stages of through holes 22 spaced axially along the steel pipe 21.

このような構成となる中間拡径杭1B,1Cの応力伝達構造であれば、貫通穴22が設けられた鋼管21の端部21aが中間拡径杭1B,1Cの拡径部13に配置されることで、地盤Gに接する拡径部13の傾斜部分の引抜き耐力を、鋼管21に効果的に伝達させることができるようになる。 With this configuration of the intermediate enlarged-diameter piles 1B and 1C, the end portion 21a of the steel pipe 21, which has a through hole 22, is positioned in the enlarged-diameter section 13 of the intermediate enlarged-diameter piles 1B and 1C. This allows for effective transmission of the pull-out resistance of the inclined portion of the enlarged-diameter section 13 that is in contact with the ground G to the steel pipe 21.

また、鉄筋コンクリート部3B,3Cの鉄筋籠31の上端部31aが、貫通穴22が設けられた鋼管21の端部21aとラップしていれば、主鉄筋31bの引張力を、鋼管コンクリート部2B,2Cの鋼管21に効果的に伝達させることができるようになる。 Furthermore, if the upper end 31a of the reinforcing cage 31 in the reinforced concrete sections 3B and 3C overlaps with the end 21a of the steel pipe 21, which has a through-hole 22, the tensile force of the main reinforcing bars 31b can be effectively transmitted to the steel pipe 21 in the concrete sections 2B and 2C.

なお、他の構成及び作用効果については、前記実施の形態又は他の実施例と略同様であるので説明を省略する。 Furthermore, since the other configurations and effects are substantially the same as those of the above embodiment or other examples, their explanation will be omitted.

以下、前記した実施の形態及び実施例1,2の場所打ち鋼管コンクリート杭1(1A-1C)とは別の実施形態の場所打ち鋼管コンクリート杭1について、図10-図13Bを参照しながら説明する。なお、前記実施の形態又は実施例1,2で説明した内容と同一乃至均等な部分の説明については、同一用語又は同一符号を付して説明する。 The following describes a cast-in-place steel pipe concrete pile 1 (1A-1C) of a different embodiment from the one described above in Embodiments and Examples 1 and 2, with reference to Figures 10-13B. Parts identical or equivalent to those described in the above Embodiments or Examples 1 and 2 will be described using the same terms or reference numerals.

前記実施の形態の場所打ち鋼管コンクリート杭1では、貫通穴22の穿孔による鋼管21の耐力低下が懸念される場合に、貫通穴22の周囲に環状の鋼板を溶接するなどして開口補強部23を設けることについて説明した。 In the cast-in-place steel pipe concrete pile 1 of the above embodiment, when there is concern about a reduction in the load-bearing capacity of the steel pipe 21 due to the drilling of the through hole 22, an opening reinforcement portion 23 is provided by welding an annular steel plate around the through hole 22, as described above.

この実施例3では、貫通穴22の穿孔による鋼管21の耐力低下を抑えることができるうえに、場所打ち鋼管コンクリート杭1の支圧抵抗の増加が期待できる貫通穴22の開口補強部の構成について説明する。 This third embodiment describes the configuration of the opening reinforcement for the through-hole 22, which can suppress the reduction in the load-bearing capacity of the steel pipe 21 due to the drilling of the through-hole 22, and is also expected to increase the bearing resistance of the cast-in-place steel pipe concrete pile 1.

すなわち実施例3の場所打ち鋼管コンクリート杭1では、鋼管21に穿孔された貫通穴22に対して、鋼管21の外周側及び内部に突出する補強管24が挿入されて、鋼管21に溶接するなどして固定される。 In other words, in the cast-in-place steel pipe concrete pile 1 of Example 3, reinforcing pipes 24 protruding from the outer circumference and into the interior of the steel pipe 21 are inserted into through holes 22 drilled in the steel pipe 21 and fixed to the steel pipe 21 by welding or other means.

詳細には補強管24は、図11に示すように、鋼管21に穿孔された貫通穴22の直径(d2)と同程度の外径を有する鋼管などの管材であって、鋼管21の外周側に突出(t2参照)するとともに、鋼管21の内空側にも突出(t3参照)する長さ(t1+ t2+ t3)となっている。 In detail, as shown in Figure 11, the reinforcing pipe 24 is a pipe material such as a steel pipe having an outer diameter ( d2 ) about the same as the diameter of the through hole 22 drilled in the steel pipe 21, and has a length ( t1 + t2 + t3 ) that protrudes outward from the outer side of the steel pipe 21 (see t2 ) and also protrudes inward from the inside of the steel pipe 21 (see t3 ).

前記実施の形態で説明したように、貫通穴22の直径は、コンクリート4の通過のしやすさや、1箇所で得られる付着力の大きさとの関係などを考慮して、コンクリート4の最大骨材径の3倍以上に設定することが好ましい。よって、貫通穴22に補強管24を挿入する場合は、補強管24の内径(d1)が、コンクリート4の最大骨材径の3倍以上に設定されていることが好ましい。 As described in the above embodiment, the diameter of the through hole 22 is preferably set to three times or more the maximum aggregate diameter of the concrete 4, taking into consideration the ease with which the concrete 4 can pass through and the relationship with the magnitude of the adhesion force obtained at one location. Therefore, when inserting a reinforcing pipe 24 into the through hole 22, it is preferable that the inner diameter (d 1 ) of the reinforcing pipe 24 is set to three times or more the maximum aggregate diameter of the concrete 4.

例えば直径167.5mm程度の貫通穴22に、内径(d1)が150mm程度で、長さが50mm程度の補強管24を挿入して、鋼管21の外周側にt2=20mm程度の突出をさせるとともに、鋼管21の内空側にもt3=20mm程度の突出をさせる。補強管24の突起の長さ(t2,t3)については、杭孔5と鋼管21の外周面との隙間や、鋼管21の中を通す鉄筋籠31の大きさなどとの関係を考慮して、設定することができる。 For example, a reinforcing pipe 24 with an inner diameter (d 1 ) of about 150 mm and a length of about 50 mm is inserted into a through hole 22 with a diameter of about 167.5 mm, causing a protrusion of about t 2 = 20 mm on the outer circumference side of the steel pipe 21, and also causing a protrusion of about t 3 = 20 mm on the inner side of the steel pipe 21. The lengths of the protrusions of the reinforcing pipe 24 (t 2 , t 3 ) can be set considering the relationship between the gap between the pile hole 5 and the outer surface of the steel pipe 21, and the size of the reinforcing cage 31 that passes through the steel pipe 21.

一方、図12は、前記実施例1で説明した拡底杭1Aの場合の補強管24の作用を概念的に示した説明図である。なお、図13A及び図13Bに示すように、肉厚t1=10mm程度の鋼管21に貫通穴22を設けただけでも、貫通穴22を通って鋼管21の周囲及び内部に充填されたコンクリート4の圧縮応力度σBとせん断応力度τとによって、場所打ち鋼管コンクリート杭1,1Aの応力伝達構造を構築することができる。 On the other hand, Figure 12 is a conceptual diagram illustrating the function of the reinforcing pipe 24 in the case of the enlarged-base pile 1A described in Embodiment 1. As shown in Figures 13A and 13B, even if only through holes 22 are provided in a steel pipe 21 with a wall thickness t1 = 10 mm, the stress transmission structure of the cast-in-place steel pipe concrete piles 1, 1A can be constructed by the compressive stress σB and shear stress τ of the concrete 4 filled around and inside the steel pipe 21 through the through holes 22.

さらに本実施例3のように、貫通穴22に補強管24を通すことによって、図11に上向きの矢印で図示したように、貫通穴22の中心側のコンクリート4から圧縮応力度σBを受ける範囲を、補強管24の長さに応じて広げることができる。 Furthermore, as in this embodiment 3, by passing a reinforcing pipe 24 through the through hole 22, the area receiving compressive stress σ B from the concrete 4 on the central side of the through hole 22 can be widened according to the length of the reinforcing pipe 24, as shown by the upward arrow in Figure 11.

それに加えて、補強管24の突起した部分(t2,t3)にもコンクリート4の圧縮応力度σBを受けることができるようになるため、場所打ち鋼管コンクリート杭1の支圧抵抗を大幅に増加させることができる。 In addition, the protruding portions ( t2 , t3 ) of the reinforcing pipe 24 can also receive the compressive stress σB of the concrete 4, thereby significantly increasing the bearing resistance of the cast-in-place steel pipe concrete pile 1.

特に、図12に示すように、拡底杭1Aの拡底部11Aにおいては、鋼管21の外周側に突起した補強管24(t2:図11の符号参照)の周囲にも充分にコンクリート4が充填されるので、より確実に突起部分の圧縮応力度σBを期待することができる。 In particular, as shown in Figure 12, in the enlarged base portion 11A of the enlarged base pile 1A, concrete 4 is sufficiently filled around the reinforcing pipe 24 (t 2 : see reference numeral in Figure 11) that protrudes from the outer circumference of the steel pipe 21, so the compressive stress σ B of the protruding portion can be expected more reliably.

なお、他の構成及び作用効果については、前記実施の形態又は他の実施例と略同様であるので説明を省略する。 Furthermore, since the other configurations and effects are substantially the same as those of the above embodiment or other examples, their explanation will be omitted.

以下、前記した実施の形態及び実施例1-3の場所打ち鋼管コンクリート杭1(1A-1C)とは別の実施形態の場所打ち鋼管コンクリート杭1について、図14を参照しながら説明する。なお、前記実施の形態又は実施例1-3で説明した内容と同一乃至均等な部分の説明については、同一用語又は同一符号を付して説明する。 The following description will refer to Figure 14 and describe a different embodiment of the cast-in-place steel pipe concrete pile 1 (1A-1C) from the previously described embodiment and Example 1-3. Parts identical or equivalent to those described in the previous embodiment or Example 1-3 will be described using the same terms or reference numerals.

前記実施の形態の場所打ち鋼管コンクリート杭1においても、貫通穴22の穿孔による鋼管21の耐力低下が懸念される場合に、貫通穴22の周囲に環状の鋼板を溶接するなどして開口補強部23を設けることについて説明したが、本実施例4では、図14を参照しながらより詳細に説明する。 In the previously described embodiment of the cast-in-place steel pipe concrete pile 1, when there is concern about a reduction in the load-bearing capacity of the steel pipe 21 due to the drilling of the through hole 22, an opening reinforcement portion 23 is provided by welding an annular steel plate around the through hole 22. This embodiment 4 will be explained in more detail with reference to Figure 14.

図14には、鋼管21の外周面において、貫通穴22の周囲に環状の鋼板を溶接することで開口補強部23を設けた構成を示している。要するに開口補強部23は、貫通穴22の直径と等しい内径と補強に適した幅とを有する環状の鋼板によって構成される。 Figure 14 shows a configuration in which an opening reinforcement section 23 is provided on the outer surface of the steel pipe 21 by welding an annular steel plate around the through hole 22. In short, the opening reinforcement section 23 is composed of an annular steel plate having an inner diameter equal to the diameter of the through hole 22 and a width suitable for reinforcement.

また、図示は省略するが、開口補強部は環状の鋼板に限定されるものではない。例えば、貫通穴22が鋼管21に密集して穿孔される場合は、1枚の長方形の鋼板に、貫通穴22と同じ直径の穴を複数穿孔して、貫通穴22の位置に穴の位置を合わせて鋼板を鋼管21に溶接することで、開口補強部とすることができる。この場合、鋼管21の軸方向に並んだ貫通穴22に対して1枚の帯板状の鋼板を固定してもよいし、鋼管21の周方向に並んだ貫通穴22に対して1つのリング状やアーチ状の鋼材を固定してもよい。 Furthermore, although not shown in the illustrations, the opening reinforcement is not limited to annular steel plates. For example, if the through holes 22 are densely drilled in the steel pipe 21, the opening reinforcement can be created by drilling multiple holes of the same diameter as the through holes 22 in a single rectangular steel plate, aligning the holes with the positions of the through holes 22, and welding the steel plate to the steel pipe 21. In this case, a single strip-shaped steel plate may be fixed to the through holes 22 arranged in the axial direction of the steel pipe 21, or a single ring-shaped or arch-shaped steel material may be fixed to the through holes 22 arranged in the circumferential direction of the steel pipe 21.

このように、貫通穴22の周囲に鋼材を溶接することで開口補強部を設けることによって、貫通穴22の穿孔による鋼管21の耐力低下を抑えることできる。
なお、他の構成及び作用効果については、前記実施の形態又は他の実施例と略同様であるので説明を省略する。
In this way, by welding steel material around the through hole 22 to provide an opening reinforcement section, the reduction in the load-bearing capacity of the steel pipe 21 due to the drilling of the through hole 22 can be suppressed.
Furthermore, the other configurations and effects are substantially the same as those of the above embodiment or other examples, so their explanation will be omitted.

以上、図面を参照して、本発明の実施の形態及び実施例を詳述してきたが、具体的な構成は、この実施の形態及び実施例に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。 While embodiments and examples of the present invention have been described in detail above with reference to the drawings, the specific configuration is not limited to these embodiments and examples. Any design modifications that do not depart from the spirit of the present invention are included within the scope of this invention.

例えば、前記実施の形態及び実施例では、鋼管21の周方向に等間隔で4箇所又は8箇所の貫通穴22を設ける場合について説明したが、これに限定されるものではなく、周方向に間隔を置いて設ける貫通穴22の数は、鋼管サイズに応じて4箇所から32箇所の間で任意の数に設定することができる。 For example, the above embodiments and examples described a case where four or eight through-holes 22 are provided at equal intervals in the circumferential direction of the steel pipe 21. However, the invention is not limited to this, and the number of through-holes 22 provided at intervals in the circumferential direction can be set to any number between four and thirty-two, depending on the size of the steel pipe.

また、前記実施の形態及び実施例では、鋼管21の端部21aに軸方向に間隔を置いて3段、4段、6段の貫通穴22が設けられる場所打ち鋼管コンクリート杭1(1A,1B,1C)を例に説明したが、これに限定されるものではなく、杭軸方向に間隔を置いて設ける貫通穴22の段数は、1段から10段の間で任意の段数に設定することができる。 Furthermore, while the above embodiments and examples described use cast-in-place steel pipe concrete piles 1 (1A, 1B, 1C) with three, four, and six through-holes 22 spaced axially at the end 21a of the steel pipe 21 as examples, the invention is not limited to these. The number of through-holes 22 spaced axially at the pile can be set to any number between one and ten.

さらに、前記実施の形態及び実施例では、鋼管21の端部21a,21bに側面視略円形の貫通穴22を設ける場合について説明したが、これに限定されるものではなく、側面視で上側に頂点が形成される多角形の貫通穴を鋼管21の端部21a,21bに設けることもできる。例えば三角形、菱形、五角形、六角形などの多角形の頂点が上側に配置される貫通穴であっても、貫通穴の頂点周りにブリージングが溜まることはできず、コンクリートに空洞が生じるのを防ぐことができる。 Furthermore, while the above embodiments and examples described a case where through-holes 22 with a substantially circular shape in side view are provided at the ends 21a and 21b of the steel pipe 21, the invention is not limited to this. Polygonal through-holes with vertices formed on the upper side in side view can also be provided at the ends 21a and 21b of the steel pipe 21. For example, even with through-holes where the vertices of a polygon such as a triangle, rhombus, pentagon, or hexagon are positioned on the upper side, bleeding cannot accumulate around the vertices of the through-hole, thus preventing the formation of voids in the concrete.

1 :場所打ち鋼管コンクリート杭
1A :拡底杭(場所打ち鋼管コンクリート杭)
11A :拡底部
1B,1C :中間拡径杭(場所打ち鋼管コンクリート杭)
13 :拡径部
2,2A-2C:鋼管コンクリート部
21,21A:鋼管
21a :端部
21b :端部
22 :貫通穴
23 :開口補強部
24 :補強管
3,3B,3C:鉄筋コンクリート部
4 :コンクリート
1: Cast-in-place steel pipe concrete pile 1A: Enlarged base pile (cast-in-place steel pipe concrete pile)
11A: Enlarged base section 1B, 1C: Intermediate enlarged diameter pile (cast-in-place steel pipe concrete pile)
13: Enlarged diameter section 2, 2A-2C: Steel pipe Concrete section 21, 21A: Steel pipe 21a: End section 21b: End section 22: Through hole 23: Opening Reinforcement section 24: Reinforcement pipe 3, 3B, 3C: Reinforced concrete section 4: Concrete

Claims (4)

鋼管とコンクリートとによって形成される場所打ち鋼管コンクリート杭の応力伝達構造であって、
周囲及び内部にコンクリートが充填される円筒形の鋼管の端部に、周方向に間隔を置いて複数の側面視略円形又は側面視で上側に頂点が形成される多角形の貫通穴が設けられているとともに、
前記貫通穴に対して、前記鋼管の外周側及び内部に突出する補強管が挿入されていることを特徴とする場所打ち鋼管コンクリート杭の応力伝達構造。
A stress transmission structure for a cast-in-place steel pipe concrete pile formed by steel pipes and concrete,
The end of the cylindrical steel pipe, which is filled with concrete around and inside, is provided with multiple through holes that are approximately circular in side view or polygonal in side view with their vertices facing upwards, spaced apart in the circumferential direction .
A stress transmission structure for a cast-in-place steel pipe concrete pile, characterized in that reinforcing pipes protruding from the outer circumference and into the interior of the steel pipe are inserted into the aforementioned through-hole .
前記貫通穴は、鋼管サイズに応じて周方向に等間隔で4箇所から32箇所が設けられることを特徴とする請求項1に記載の場所打ち鋼管コンクリート杭の応力伝達構造。 The stress transmission structure for a cast-in-place steel pipe concrete pile according to claim 1, characterized in that the through-holes are provided at equal intervals in the circumferential direction from 4 to 32 locations, depending on the size of the steel pipe. 前記鋼管の端部は、鋼管コンクリート部と鉄筋コンクリート部との境界付近に配置されるものであって、
前記貫通穴は、前記鋼管と前記鉄筋コンクリート部の鉄筋との応力伝達性能を高めるために、前記鋼管の軸方向に間隔を置いて1段から5段の任意の段数が設けられることを特徴とする請求項1又は2に記載の場所打ち鋼管コンクリート杭の応力伝達構造。
The end of the steel pipe is positioned near the boundary between the concrete steel pipe section and the reinforced concrete section.
The stress transmission structure for a cast-in-place steel pipe concrete pile according to claim 1 or 2, characterized in that the through holes are provided in any number of stages, from one to five, at intervals in the axial direction of the steel pipe, in order to improve the stress transmission performance between the steel pipe and the reinforcing bars of the reinforced concrete section.
前記鋼管の端部は、拡底杭の拡底部又は中間拡径杭の拡径部に配置されるものであって、
前記貫通穴は、前記拡底部又は前記拡径部の引抜き耐力を前記鋼管に伝達させるために、前記鋼管の軸方向に間隔を置いて1段から10段の任意の段数が設けられることを特徴とする請求項1又は2に記載の場所打ち鋼管コンクリート杭の応力伝達構造。
The end of the steel pipe is positioned at the enlarged base portion of the enlarged base pile or the enlarged diameter portion of the intermediate enlarged diameter pile,
The stress transmission structure for a cast-in-place steel pipe concrete pile according to claim 1 or 2, characterized in that the through holes are provided in any number of stages from one to ten at intervals in the axial direction of the steel pipe in order to transmit the pull-out strength of the enlarged base or the enlarged diameter to the steel pipe.
JP2022071777A 2021-04-26 2022-04-25 Stress transfer structure of cast-in-place steel pipe concrete piles Active JP7845665B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021074156 2021-04-26
JP2021074156 2021-04-26

Publications (2)

Publication Number Publication Date
JP2022168856A JP2022168856A (en) 2022-11-08
JP7845665B2 true JP7845665B2 (en) 2026-04-14

Family

ID=83933768

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022071777A Active JP7845665B2 (en) 2021-04-26 2022-04-25 Stress transfer structure of cast-in-place steel pipe concrete piles

Country Status (1)

Country Link
JP (1) JP7845665B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004003250A (en) 2002-03-22 2004-01-08 Fujita Corp Structure and structure construction method
JP2013040447A (en) 2011-08-11 2013-02-28 Ohbayashi Corp Combined footing pile and structuring method for combined footing pile
JP2014109175A (en) 2012-12-04 2014-06-12 Takenaka Komuten Co Ltd Construction method for steel pipe concrete pile and steel pipe pile

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4618289A (en) * 1984-05-22 1986-10-21 Federer David L Method of forming a cast-in-place support column
JPS6332018A (en) * 1986-07-23 1988-02-10 Hasegawa Komuten Co Ltd Formation of cast-in-place pile
JPH0581327U (en) * 1992-04-07 1993-11-05 株式会社竹中工務店 Cast-in-place concrete pile
JPH11190022A (en) * 1997-12-26 1999-07-13 Toshio Enoki Working method for foundation pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004003250A (en) 2002-03-22 2004-01-08 Fujita Corp Structure and structure construction method
JP2013040447A (en) 2011-08-11 2013-02-28 Ohbayashi Corp Combined footing pile and structuring method for combined footing pile
JP2014109175A (en) 2012-12-04 2014-06-12 Takenaka Komuten Co Ltd Construction method for steel pipe concrete pile and steel pipe pile

Also Published As

Publication number Publication date
JP2022168856A (en) 2022-11-08

Similar Documents

Publication Publication Date Title
JP5071916B2 (en) Casting structure connector
JP5955108B2 (en) Pile reinforcement structure of existing building and its construction method
JP3754698B1 (en) Steel tower basic structure
JP4771244B2 (en) Connection joint between steel pipe pile and concrete pile, connection pile structure between steel pipe pile and concrete pile, construction method of connection pile between steel pipe pile and concrete pile
JP2022078187A (en) Foundation construction method by pressing-in durable block for repairing foundation
JP2011137320A (en) Sc pile and method for manufacturing the same
JP5785476B2 (en) Reinforcing method and structure of existing foundation
JP3831737B2 (en) Steel tower basic structure
JP6656901B2 (en) Construction method of segments and submerged structures
JP7845665B2 (en) Stress transfer structure of cast-in-place steel pipe concrete piles
JP6102010B2 (en) Pile reinforcement structure of existing building and its construction method
JP3899094B2 (en) Foundation reinforcement method for existing structures by press-fitting steel pipe piles
CN120083248A (en) Stress detection system for precast piles and reinforcement and correction method
JP2022102970A (en) Opening method and opening reinforcement structure
KR200455415Y1 (en) Head reinforcement assembly of concrete pile for foundation work
JP4780457B2 (en) Seismic reinforcement structure for pile foundation structure and seismic reinforcement method
JP5077865B2 (en) Ready-made pile and foundation pile structure
CN212477709U (en) High-bearing large-diameter assembly type composite engineering pile
JP6224420B2 (en) Connection structure between CFT column and concrete bottom slab
JPS6233926A (en) Pile foundation of pile-up structure
JP3887248B2 (en) Support structure for concrete foundation
JP7558833B2 (en) Reinforcement structure of masonry wall and reinforcement method of masonry wall
JP7562924B2 (en) Buildings and their construction methods
JP5633525B2 (en) Pile head joint structure
JP2005105812A (en) Pile head reinforcement member and pile head reinforcement structure using it

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250409

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20251114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20251202

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20260119

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260324

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260326

R150 Certificate of patent or registration of utility model

Ref document number: 7845665

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150