Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7850643B2 - Heat supply system, heat supply management server, operating method and program - Google Patents
[go: Go Back, main page]

JP7850643B2 - Heat supply system, heat supply management server, operating method and program - Google Patents

Heat supply system, heat supply management server, operating method and program

Info

Publication number
JP7850643B2
JP7850643B2 JP2022160256A JP2022160256A JP7850643B2 JP 7850643 B2 JP7850643 B2 JP 7850643B2 JP 2022160256 A JP2022160256 A JP 2022160256A JP 2022160256 A JP2022160256 A JP 2022160256A JP 7850643 B2 JP7850643 B2 JP 7850643B2
Authority
JP
Japan
Prior art keywords
heat
power
heat supply
management server
aforementioned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022160256A
Other languages
Japanese (ja)
Other versions
JP2023111820A (en
Inventor
陵平 家田
俊晴 畑谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rinnai Corp
Original Assignee
Rinnai Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rinnai Corp filed Critical Rinnai Corp
Publication of JP2023111820A publication Critical patent/JP2023111820A/en
Application granted granted Critical
Publication of JP7850643B2 publication Critical patent/JP7850643B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Description

本明細書で開示する技術は、熱供給システム、熱供給管理サーバ、動作方法およびプログラムに関する。 The technologies disclosed herein relate to heat supply systems, heat supply management servers, operating methods, and programs.

特許文献1に、複数の熱供給装置と、再生可能エネルギーを利用して発電した電力を前記複数の熱供給装置に供給可能な発電設備と、熱供給管理サーバを備える熱供給システムが開示されている。前記複数の熱供給装置のそれぞれは、熱媒を蓄える蓄熱ユニットと、電力を利用して前記熱媒を加熱する熱源ユニットを備えている。前記複数の熱供給装置のそれぞれは、前記熱源ユニットにより前記熱媒を加熱して、加熱された前記熱媒を前記蓄熱ユニットへ蓄える蓄熱運転を実行可能である。前記熱供給管理サーバは、前記発電設備から前記複数の熱供給装置へ供給可能な電力である供給可能電力の経時的変化を示す供給可能電力データを取得し、前記供給可能電力データに基づいて、前記複数の熱供給装置のそれぞれについて、前記蓄熱運転を実行する時間帯を設定するスケジューリング処理を実行するように構成されている。 Patent Document 1 discloses a heat supply system comprising a plurality of heat supply devices, a power generation facility capable of supplying electricity generated using renewable energy to the plurality of heat supply devices, and a heat supply management server. Each of the plurality of heat supply devices includes a heat storage unit for storing a heat medium and a heat source unit for heating the heat medium using electricity. Each of the plurality of heat supply devices is capable of performing a heat storage operation in which the heat source unit heats the heat medium and the heated heat medium is stored in the heat storage unit. The heat supply management server is configured to acquire supplyable power data showing the change over time of supplyable power, which is the electricity that can be supplied from the power generation facility to the plurality of heat supply devices, and to perform scheduling processing to set the time period for performing the heat storage operation for each of the plurality of heat supply devices based on the supplyable power data.

特開2020-169789号公報Japanese Patent Publication No. 2020-169789

発電設備が発電する電力が当初の想定よりも減少し、供給可能電力が当初の想定よりも減少することがある。このような場合に、複数の熱供給装置の蓄熱運転の消費電力の総和に対して供給可能電力が不足すると、電力の不足分は電力市場から調達して賄う必要がある。このため、電力市場価格が高い時間帯において供給可能電力が不足してしまうと、電力の調達コストが増大するおそれがある。本明細書では、発電設備の供給可能電力が当初の想定よりも減少した場合に、電力の不足分の調達コストの増大を抑制することが可能な技術を提供する。 The amount of electricity generated by a power generation facility may decrease compared to the initial assumptions, resulting in a decrease in the amount of electricity that can be supplied. In such cases, if the amount of electricity that can be supplied falls short of the total power consumption of multiple heat supply devices operating in thermal storage mode, the shortfall must be covered by procuring electricity from the electricity market. Therefore, if the amount of electricity that can be supplied falls short during periods of high electricity market prices, the cost of procuring electricity may increase. This specification provides a technology that can suppress the increase in procurement costs for the shortfall when the amount of electricity that can be supplied by a power generation facility decreases compared to the initial assumptions.

本明細書は熱供給システムを開示する。第1の態様では、熱供給システムは、複数の熱供給装置と、再生可能エネルギーを利用して発電した電力を前記複数の熱供給装置に供給可能な発電設備と、熱供給管理サーバを備えていてもよい。前記複数の熱供給装置のそれぞれは、熱媒を蓄える蓄熱ユニットと、電力を利用して前記熱媒を加熱する熱源ユニットを備えていてもよい。前記複数の熱供給装置のそれぞれは、前記熱源ユニットにより前記熱媒を加熱して、加熱された前記熱媒を前記蓄熱ユニットへ蓄える蓄熱運転を実行可能であってもよい。前記複数の熱供給装置のそれぞれは、複数のグループのうちの何れか1つに属していてもよい。前記熱供給管理サーバは、前記発電設備から前記複数の熱供給装置へ供給可能な電力である供給可能電力の経時的変化を示す供給可能電力データを取得し、補正電力の経時的変化を示す補正電力データを設定し、前記供給可能電力から前記補正電力を減算した判定基準電力の経時的変化を示す判定基準電力データを算出し、前記判定基準電力データに基づいて、前記複数のグループのそれぞれについて、前記蓄熱運転の実行を許可する時間帯である運転許可時間帯を設定するスケジューリング処理を実行するように構成されていてもよい。前記補正電力データは、電力市場価格が高い時間帯において前記補正電力が大きく、前記電力市場価格が低い時間帯において前記補正電力が小さくなるように設定されてもよい。 This specification discloses a heat supply system. In a first embodiment, the heat supply system may include a plurality of heat supply devices, a power generation facility capable of supplying electricity generated using renewable energy to the plurality of heat supply devices, and a heat supply management server. Each of the plurality of heat supply devices may include a heat storage unit for storing a heat medium and a heat source unit for heating the heat medium using electricity. Each of the plurality of heat supply devices may be capable of performing a heat storage operation in which the heat source unit heats the heat medium and stores the heated heat medium in the heat storage unit. Each of the plurality of heat supply devices may belong to any one of a plurality of groups. The heat supply management server may be configured to acquire supplyable power data showing the change over time of supplyable power, which is the power that can be supplied from the power generation facility to the multiple heat supply devices; set correction power data showing the change over time of correction power; calculate judgment criterion power data showing the change over time of judgment criterion power obtained by subtracting the correction power from the supplyable power; and, based on the judgment criterion power data, execute a scheduling process to set the operating permission time period, which is the time period during which the heat storage operation is permitted for each of the multiple groups. The correction power data may be set so that the correction power is large during times when electricity market prices are high and small during times when electricity market prices are low.

本明細書は、熱供給管理サーバも開示する。前記熱供給管理サーバは、複数の熱供給装置と、再生可能エネルギーを利用して発電した電力を前記複数の熱供給装置に供給可能な発電設備と、前記熱供給管理サーバを備える熱供給システムで使用されてもよい。前記複数の熱供給装置のそれぞれは、熱媒を蓄える蓄熱ユニットと、電力を利用して前記熱媒を加熱する熱源ユニットを備えていてもよい。前記複数の熱供給装置のそれぞれは、前記熱源ユニットにより前記熱媒を加熱して、加熱された前記熱媒を前記蓄熱ユニットへ蓄える蓄熱運転を実行可能であってもよい。前記複数の熱供給装置のそれぞれは、複数のグループのうちの何れか1つに属していてもよい。前記熱供給管理サーバは、前記発電設備から前記複数の熱供給装置へ供給可能な電力である供給可能電力の経時的変化を示す供給可能電力データを取得し、補正電力の経時的変化を示す補正電力データを設定し、前記供給可能電力から前記補正電力を減算した判定基準電力の経時的変化を示す判定基準電力データを算出し、前記判定基準電力データに基づいて、前記複数のグループのそれぞれについて、前記蓄熱運転の実行を許可する時間帯である運転許可時間帯を設定するスケジューリング処理を実行するように構成されていてもよい。前記補正電力データは、電力市場価格が高い時間帯において前記補正電力が大きく、前記電力市場価格が低い時間帯において前記補正電力が小さくなるように設定されてもよい。 This specification also discloses a heat supply management server. The heat supply management server may be used in a heat supply system comprising a plurality of heat supply devices, a power generation facility capable of supplying electricity generated using renewable energy to the plurality of heat supply devices, and the heat supply management server. Each of the plurality of heat supply devices may include a heat storage unit for storing a heat medium and a heat source unit for heating the heat medium using electricity. Each of the plurality of heat supply devices may be capable of performing a heat storage operation in which the heat source unit heats the heat medium and stores the heated heat medium in the heat storage unit. Each of the plurality of heat supply devices may belong to any one of a plurality of groups. The heat supply management server may be configured to acquire supplyable power data showing the change over time of supplyable power, which is the power that can be supplied from the power generation facility to the multiple heat supply devices; set correction power data showing the change over time of correction power; calculate judgment criterion power data showing the change over time of judgment criterion power obtained by subtracting the correction power from the supplyable power; and, based on the judgment criterion power data, execute a scheduling process to set the operating permission time period, which is the time period during which the heat storage operation is permitted for each of the multiple groups. The correction power data may be set so that the correction power is large during times when electricity market prices are high and small during times when electricity market prices are low.

本明細書は、熱供給管理サーバの動作方法も開示する。前記熱供給管理サーバは、複数の熱供給装置と、再生可能エネルギーを利用して発電した電力を前記複数の熱供給装置に供給可能な発電設備と、前記熱供給管理サーバを備える熱供給システムで使用されてもよい。前記複数の熱供給装置のそれぞれは、熱媒を蓄える蓄熱ユニットと、電力を利用して前記熱媒を加熱する熱源ユニットを備えていてもよい。前記複数の熱供給装置のそれぞれは、前記熱源ユニットにより前記熱媒を加熱して、加熱された前記熱媒を前記蓄熱ユニットへ蓄える蓄熱運転を実行可能であってもよい。前記複数の熱供給装置のそれぞれは、複数のグループのうちの何れか1つに属していてもよい。前記動作方法は、前記発電設備から前記複数の熱供給装置へ供給可能な電力である供給可能電力の経時的変化を示す供給可能電力データを取得することと、補正電力の経時的変化を示す補正電力データを設定することと、前記供給可能電力から前記補正電力を減算した判定基準電力の経時的変化を示す判定基準電力データを算出することと、前記判定基準電力データに基づいて、前記複数のグループのそれぞれについて、前記蓄熱運転の実行を許可する時間帯である運転許可時間帯を設定するスケジューリング処理を実行することを備えていてもよい。前記補正電力データは、電力市場価格が高い時間帯において前記補正電力が大きく、前記電力市場価格が低い時間帯において前記補正電力が小さくなるように設定されてもよい。 This specification also discloses a method for operating a heat supply management server. The heat supply management server may be used in a heat supply system comprising a plurality of heat supply devices, a power generation facility capable of supplying electricity generated using renewable energy to the plurality of heat supply devices, and the heat supply management server. Each of the plurality of heat supply devices may include a heat storage unit for storing a heat medium and a heat source unit for heating the heat medium using electricity. Each of the plurality of heat supply devices may be capable of performing a heat storage operation in which the heat source unit heats the heat medium and stores the heated heat medium in the heat storage unit. Each of the plurality of heat supply devices may belong to any one of a plurality of groups. The aforementioned operating method may include: acquiring supplyable power data showing the time-dependent change in supplyable power, which is the power that can be supplied from the power generation equipment to the multiple heat supply devices; setting correction power data showing the time-dependent change in correction power; calculating judgment criterion power data showing the time-dependent change in judgment criterion power obtained by subtracting the correction power from the supplyable power; and executing a scheduling process to set an operating permission time period, which is the time period during which the heat storage operation is permitted, for each of the multiple groups based on the judgment criterion power data. The correction power data may be set such that the correction power is large during times when electricity market prices are high and small during times when electricity market prices are low.

本明細書は、熱供給管理サーバのためのプログラムも開示する。前記熱供給管理サーバは、複数の熱供給装置と、再生可能エネルギーを利用して発電した電力を前記複数の熱供給装置に供給可能な発電設備と、前記熱供給管理サーバを備える熱供給システムで使用されてもよい。前記複数の熱供給装置のそれぞれは、熱媒を蓄える蓄熱ユニットと、電力を利用して前記熱媒を加熱する熱源ユニットを備えていてもよい。前記複数の熱供給装置のそれぞれは、前記熱源ユニットにより前記熱媒を加熱して、加熱された前記熱媒を前記蓄熱ユニットへ蓄える蓄熱運転を実行可能であってもよい。前記複数の熱供給装置のそれぞれは、複数のグループのうちの何れか1つに属していてもよい。前記プログラムは、前記熱供給管理サーバに、前記発電設備から前記複数の熱供給装置へ供給可能な電力である供給可能電力の経時的変化を示す供給可能電力データを取得するステップと、補正電力の経時的変化を示す補正電力データを設定するステップと、前記供給可能電力から前記補正電力を減算した判定基準電力の経時的変化を示す判定基準電力データを算出するステップと、前記判定基準電力データに基づいて、前記複数のグループのそれぞれについて、前記蓄熱運転の実行を許可する時間帯である運転許可時間帯を設定するスケジューリング処理を実行するステップを実行させてもよい。前記補正電力データは、電力市場価格が高い時間帯において前記補正電力が大きく、前記電力市場価格が低い時間帯において前記補正電力が小さくなるように設定されてもよい。 This specification also discloses a program for a heat supply management server. The heat supply management server may be used in a heat supply system comprising a plurality of heat supply devices, a power generation facility capable of supplying electricity generated using renewable energy to the plurality of heat supply devices, and the heat supply management server. Each of the plurality of heat supply devices may include a heat storage unit for storing a heat medium and a heat source unit for heating the heat medium using electricity. Each of the plurality of heat supply devices may be capable of performing a heat storage operation in which the heat source unit heats the heat medium and stores the heated heat medium in the heat storage unit. Each of the plurality of heat supply devices may belong to any one of a plurality of groups. The program may cause the heat supply management server to perform the following steps: acquire supplyable power data showing the change over time of supplyable power, which is the power that can be supplied from the power generation facility to the multiple heat supply devices; set correction power data showing the change over time of correction power; calculate judgment criterion power data showing the change over time of judgment criterion power obtained by subtracting the correction power from the supplyable power; and perform scheduling processing to set the operating permission time period, which is the time period during which the heat storage operation is permitted, for each of the multiple groups based on the judgment criterion power data. The correction power data may be set so that the correction power is large during times when electricity market prices are high and small during times when electricity market prices are low.

上記の構成では、供給可能電力から補正電力を減算した判定基準電力の経時的変化に基づいて、それぞれのグループの運転許可時間帯が設定される。この際に、電力市場価格が高い時間帯では補正電力が大きな値となり、電力市場価格が低い時間帯では補正電力が小さな値となるので、判定基準電力は、電力市場価格が高い時間帯では供給可能電力よりも大幅に小さな値となり、電力市場価格が低い時間帯では供給可能電力と同じか、供給可能電力よりもわずかに小さな値となる。上記の構成では、このような判定基準電力データに基づいてそれぞれのグループの運転許可時間帯が設定されるので、電力市場価格が高い時間帯については、複数の熱供給装置の蓄熱運転の消費電力の総和に対する供給可能電力の余裕が比較的大きく、電力市場価格が低い時間帯については、複数の熱供給装置の蓄熱運転の消費電力の総和に対する供給可能電力の余裕が比較的小さいようなスケジューリングが実現される。従って、発電設備が発電する電力が当初の想定よりも減少し、供給可能電力が当初の想定よりも減少する場合であっても、電力市場価格が高い時間帯で供給可能電力の不足を生じにくくすることができる。このような構成とすることによって、発電設備の供給可能電力が当初の想定よりも減少した場合に、電力の不足分の調達コストの増大を抑制することができる。 In the above configuration, the operating hours permitted for each group are set based on the time-dependent change in the judgment criterion power, which is obtained by subtracting correction power from the available power. In this case, the correction power is a large value when the electricity market price is high and a small value when the electricity market price is low. Therefore, the judgment criterion power is significantly smaller than the available power when the electricity market price is high, and is the same as or slightly smaller than the available power when the electricity market price is low. In the above configuration, the operating hours permitted for each group are set based on this judgment criterion power data. As a result, scheduling is achieved such that, when the electricity market price is high, there is a relatively large margin of available power relative to the sum of the power consumption of the thermal storage operation of multiple heat supply devices, and when the electricity market price is low, there is a relatively small margin of available power relative to the sum of the power consumption of the thermal storage operation of multiple heat supply devices. Therefore, even if the power generated by the power generation equipment decreases more than initially expected, and the available power decreases more than initially expected, it is possible to make it less likely for a shortage of available power to occur when the electricity market price is high. This configuration helps to mitigate the increase in procurement costs for electricity shortages if the power supply capacity of the power generation facility falls below initial expectations.

第2の態様では、第1の態様の前記熱供給システムにおいて、前記補正電力データは、前記電力市場価格が第1所定値を下回る時間帯において前記補正電力がゼロとなり、前記電力市場価格が前記第1所定値以上の時間帯において前記補正電力が正の値となるように設定されてもよい。 In a second embodiment, in the heat supply system of the first embodiment, the corrected power data may be set such that the corrected power becomes zero during the time period when the electricity market price is below a first predetermined value, and the corrected power becomes a positive value during the time period when the electricity market price is above the first predetermined value.

上記の構成によれば、電力市場価格が第1所定値よりも低い時間帯については、判定基準電力を供給可能電力と一致させることができる。想定される供給可能電力データにより合わせたスケジューリングを実現することができる。 According to the above configuration, during periods when the electricity market price is lower than the first predetermined value, the judgment criterion power can be matched with the available power supply. This allows for scheduling that is more aligned with the anticipated available power supply data.

第3の態様では、第1又は第2の態様の前記熱供給システムにおいて、前記熱供給管理サーバは、前記スケジューリング処理において、前記複数のグループのそれぞれについて、前記電力市場価格が第2所定値以上となる時間帯を前記運転許可時間帯が含まないように、前記運転許可時間帯を設定するように構成されていてもよい。 In a third embodiment, in the heat supply system of the first or second embodiment, the heat supply management server may be configured, in the scheduling process, to set the permitted operating time periods for each of the plurality of groups such that the permitted operating time periods do not include the time periods in which the electricity market price is equal to or greater than a second predetermined value.

上記の構成によれば、電力市場価格が第2所定値以上となる時間帯については、運転許可時間帯が設定されない(言い換えれば、電力市場価格が第2所定値以上となる時間帯は全てのグループについて蓄熱運転を禁止する)ようにすることができる。従って、発電設備が発電する電力が当初の想定よりも減少し、供給可能電力が当初の想定よりも減少する場合であっても、電力市場価格が第2所定値以上となる時間帯で供給可能電力の不足を生じることを確実に防止することができる。 According to the above configuration, during periods when the electricity market price exceeds the second predetermined value, no operating hours are set (in other words, thermal storage operation is prohibited for all groups during periods when the electricity market price exceeds the second predetermined value). Therefore, even if the power generated by the power generation facility decreases compared to the initial assumption, and the available power supply decreases compared to the initial assumption, it is possible to reliably prevent a shortage of available power supply during periods when the electricity market price exceeds the second predetermined value.

第4の態様では、第1から第3の何れか一つの態様の前記熱供給システムにおいて、前記複数の熱供給装置のそれぞれは、燃料を利用して前記熱媒を加熱する補助熱源ユニットをさらに備えていてもよい。前記熱供給管理サーバは、前記スケジューリング処理を実行した後、前記供給可能電力から使用予定電力を減算した使用可能電力が所定のしきい値に満たない時間帯である超過時間帯が存在するか否かを判定し、前記超過時間帯が存在する場合に、前記運転許可時間帯に前記超過時間帯を含むグループを取消候補グループとして特定し、前記取消候補グループに属する前記熱供給装置が前記運転許可時間帯において前記蓄熱運転を実行した場合の熱供給コストを第1コストとして算出し、前記取消候補グループに属する前記熱供給装置が前記運転許可時間帯において前記蓄熱運転を実行せず、代わりに前記補助熱源ユニットを使用する場合の熱供給コストを第2コストとして算出し、前記第1コストが前記第2コストよりも高い場合に、前記取消候補グループについて設定された前記運転許可時間帯を取り消すように構成されていてもよい。 In a fourth embodiment, in the heat supply system of any one of the first to third embodiments, each of the plurality of heat supply devices may further include an auxiliary heat source unit that uses fuel to heat the heat transfer medium. The heat supply management server, after executing the scheduling process, determines whether there is an excess period during which the available power (calculated by subtracting the planned power usage from the available power) falls below a predetermined threshold. If such an excess period exists, the server identifies the group containing the excess period within the permitted operating time period as a cancellation candidate group. The server calculates the heat supply cost as a first cost if the heat supply device belonging to the cancellation candidate group performs the thermal storage operation during the permitted operating time period, and calculates the heat supply cost as a second cost if the heat supply device belonging to the cancellation candidate group does not perform the thermal storage operation during the permitted operating time period but instead uses the auxiliary heat source unit. If the first cost is higher than the second cost, the server may be configured to cancel the permitted operating time period set for the cancellation candidate group.

上記の構成によれば、超過時間帯が存在する場合に、補助熱源ユニットによって熱供給を行う場合の熱供給コストと、熱源ユニットによって蓄熱運転を行った上で熱供給を行う場合の熱供給コストを比較して、熱供給コストがより低くなるように、取消候補グループの運転許可時間帯を取り消すか否かが決定される。このような構成とすることによって、熱供給システムにおける熱供給コストを低減することができる。 According to the above configuration, when there is an excess time period, the heat supply cost when heat is supplied by the auxiliary heat source unit is compared with the heat supply cost when heat is supplied after thermal storage operation by the heat source unit. The decision of whether or not to cancel the operating time period of the cancellation candidate group is made based on whether the heat supply cost is lower. This configuration reduces the heat supply cost in the heat supply system.

第5の態様では、第1から第3の何れか一つの態様の前記熱供給システムにおいて、前記複数の熱供給装置のそれぞれは、燃料を利用して前記熱媒を加熱する補助熱源ユニットをさらに備えていてもよい。前記熱供給管理サーバは、前記スケジューリング処理を実行した後、前記供給可能電力から使用予定電力を減算した使用可能電力が所定のしきい値に満たない時間帯である超過時間帯が存在するか否かを判定し、前記超過時間帯が存在する場合に、前記運転許可時間帯に前記超過時間帯を含むグループを短縮候補グループとして特定し、前記短縮候補グループに属する前記熱供給装置が前記運転許可時間帯において前記蓄熱運転を実行した場合の熱供給コストを第1コストとして算出し、前記短縮候補グループに属する前記熱供給装置が前記運転許可時間帯において前記蓄熱運転を実行せず、代わりに前記補助熱源ユニットを使用する場合の熱供給コストを第2コストとして算出し、前記第1コストが前記第2コストよりも高い場合に、前記短縮候補グループについて設定された前記運転許可時間帯を、前記超過時間帯を含まないように短縮するように構成されていてもよい。 In a fifth embodiment, in the heat supply system of any one of the first to third embodiments, each of the plurality of heat supply devices may further include an auxiliary heat source unit that uses fuel to heat the heat transfer medium. The heat supply management server, after executing the scheduling process, determines whether there is an excess period during which the available power (calculated by subtracting the planned power usage from the available power) falls below a predetermined threshold. If such an excess period exists, the server identifies a group whose permitted operating time includes the excess period as a candidate shortening group. The server calculates the heat supply cost as a first cost if the heat supply devices belonging to the candidate shortening group perform the heat storage operation during the permitted operating time. The server calculates the heat supply cost as a second cost if the heat supply devices belonging to the candidate shortening group do not perform the heat storage operation during the permitted operating time and instead use the auxiliary heat source unit. If the first cost is higher than the second cost, the server may be configured to shorten the permitted operating time set for the candidate shortening group so as not to include the excess period.

上記の構成によれば、超過時間帯が存在する場合に、補助熱源ユニットによって熱供給を行う場合の熱供給コストと、熱源ユニットによって蓄熱運転を行った上で熱供給を行う場合の熱供給コストを比較して、熱供給コストがより低くなるように、短縮候補グループの運転許可時間帯を短縮するか否かが決定される。このような構成とすることによって、熱供給システムにおける熱供給コストを低減することができる。 According to the above configuration, when there is an excess period, the heat supply cost when heat is supplied by the auxiliary heat source unit is compared with the heat supply cost when heat is supplied after thermal storage operation by the heat source unit. The decision of whether or not to shorten the operating period of the candidate shortening group is then made to reduce the heat supply cost. This configuration allows for a reduction in the heat supply cost of the heat supply system.

第6の態様では、第4または第5の態様の前記熱供給システムにおいて、前記第1コストは、前記電力市場価格を前記熱源ユニットの熱効率で除算した値に基づいていてもよい。前記第2コストは、燃料ガス市場価格を前記補助熱源ユニットの熱効率で除算した値に基づいていてもよい。 In the sixth embodiment, in the heat supply system of the fourth or fifth embodiment, the first cost may be based on the value obtained by dividing the electricity market price by the thermal efficiency of the heat source unit. The second cost may be based on the value obtained by dividing the fuel gas market price by the thermal efficiency of the auxiliary heat source unit.

上記の構成によれば、簡易な計算によって、第1コストと第2コストをそれぞれ算出することができる。 According to the above configuration, the first and second costs can be calculated using a simple calculation.

第7の態様では、第6の態様の前記熱供給システムにおいて、前記熱源ユニットは、外気から吸熱して前記熱媒を加熱するヒートポンプ熱源を備えていてもよい。前記熱源ユニットの前記熱効率は、前記運転許可時間帯における外気温度に基づいて設定されてもよい。 In the seventh embodiment, the heat supply system of the sixth embodiment may include a heat pump heat source that absorbs heat from the outside air to heat the heat transfer medium. The thermal efficiency of the heat source unit may be set based on the outside air temperature during the permitted operating time period.

外気から吸熱して熱媒を加熱するヒートポンプ熱源の熱効率は、外気温度に応じて変化する。上記の構成によれば、第1コストをより正確に算出することができる。 The thermal efficiency of a heat pump heat source, which heats a heat transfer medium by absorbing heat from the outside air, changes depending on the outside air temperature. With the above configuration, the first cost can be calculated more accurately.

実施例の給湯システム100の構成を模式的に示す図である。This diagram schematically shows the configuration of the hot water supply system 100 in the embodiment. 実施例の貯湯式給湯器104の構成を模式的に示す図である。This diagram schematically shows the configuration of the storage-type water heater 104 in the embodiment. 実施例の給湯管理サーバ116が実行する運転許可時間帯のスケジューリング処理のフローチャートである。This is a flowchart of the scheduling process for the permitted operating time period executed by the hot water supply management server 116 in the embodiment. 比較例の給湯管理サーバ116によるスケジューリング結果と、想定される余剰電力の関係の例を示す図である。This figure shows an example of the relationship between the scheduling results from the hot water supply management server 116 in the comparative example and the expected surplus power. 比較例の給湯管理サーバ116によるスケジューリング結果と、実際の余剰電力の関係の例を示す図である。This figure shows an example of the relationship between the scheduling results from the hot water supply management server 116 in the comparative example and the actual surplus power. 実施例の給湯管理サーバ116によるスケジューリング結果と、想定される余剰電力の関係の例を示す図である。This figure shows an example of the relationship between the scheduling results from the hot water supply management server 116 in the embodiment and the expected surplus power. 実施例の給湯管理サーバ116によるスケジューリング結果と、実際の余剰電力の関係の例を示す図である。This figure shows an example of the relationship between the scheduling results from the hot water supply management server 116 in the embodiment and the actual surplus power. 実施例の給湯管理サーバ116によるスケジューリング結果と、想定される余剰電力の関係の別の例を示す図である。This figure shows another example of the relationship between the scheduling results from the hot water supply management server 116 in the embodiment and the expected surplus power. 実施例の給湯管理サーバ116が実行する別の運転許可時間帯のスケジューリング処理のフローチャートである。This is a flowchart of the scheduling process for another permitted operating time period executed by the hot water supply management server 116 in the embodiment. 実施例の給湯管理サーバ116によるスケジューリング結果と、想定される余剰電力の関係のさらに別の例を示す図である。This figure shows yet another example of the relationship between the scheduling results from the hot water supply management server 116 in the embodiment and the expected surplus power.

(実施例)
図1に示すように、本実施例に係る給湯システム100は、複数の住居102a、102b、・・・のそれぞれに設置された複数の貯湯式給湯器104a、104b、・・・および複数のホームゲートウェイ106a、106b、・・・と、エネルギー事業者108により管理される発電設備110および電力管理サーバ112と、貯湯式給湯器104a、104b、・・・の製造事業者114により管理される給湯管理サーバ116を備えている。複数のホームゲートウェイ106a、106b、・・・と、電力管理サーバ112と、給湯管理サーバ116は、それぞれ、インターネット118に接続されている。
(Examples)
As shown in Figure 1, the hot water supply system 100 according to this embodiment includes multiple storage-type water heaters 104a, 104b, ... and multiple home gateways 106a, 106b, ... installed in each of multiple residences 102a, 102b, ..., as well as power generation equipment 110 and a power management server 112 managed by an energy company 108, and a hot water supply management server 116 managed by a manufacturer 114 of the storage-type water heaters 104a, 104b, .... The multiple home gateways 106a, 106b, ..., the power management server 112, and the hot water supply management server 116 are each connected to the Internet 118.

なお、以降の説明では、複数の住居102a、102b、・・・のそれぞれ、複数の貯湯式給湯器104a、104b、・・・のそれぞれ、複数のホームゲートウェイ106a、106b、・・・のそれぞれを、単に住居102、貯湯式給湯器104、ホームゲートウェイ106と表記することがある。 In the following explanation, each of the multiple residences 102a, 102b, ..., each of the multiple storage-type water heaters 104a, 104b, ..., and each of the multiple home gateways 106a, 106b, ... may simply be referred to as residence 102, storage-type water heater 104, and home gateway 106.

(貯湯式給湯器104)
図2に示すように、本実施例に係る貯湯式給湯器104は、HP(ヒートポンプ)ユニット4と、タンクユニット6と、バーナユニット8を備えている。
(Storage-type water heater 104)
As shown in Figure 2, the storage-type water heater 104 according to this embodiment includes an HP (heat pump) unit 4, a tank unit 6, and a burner unit 8.

(HPユニット4)
HPユニット4は、電力を利用して、外気から吸熱して水を加熱する熱源である。HPユニット4は、圧縮機10と、凝縮器12と、膨張弁14と、蒸発器16からなるHP熱源17を備えている。HPユニット4は、冷媒(例えばフロン系冷媒)を、圧縮機10、凝縮器12、膨張弁14、蒸発器16の順に循環させることで、外気から吸熱して水を加熱する。圧縮機10は、冷媒を加圧して高温高圧にする。凝縮器12は、水との熱交換により冷媒を冷却する。凝縮器12の水流路の両端部には、それぞれ、HP往き経路19とHP戻り経路21が接続されている。膨張弁14は、冷媒を減圧して低温低圧にする。蒸発器16は、外気との熱交換により冷媒を加熱する。HPユニット4はさらに、凝縮器12に水を循環させる循環ポンプ18と、凝縮器12に流れ込む水の温度を検出する往きサーミスタ20と、凝縮器12から流れ出る水の温度を検出する戻りサーミスタ22と、外気温度を検出する外気温度サーミスタ23と、HPユニット4の各構成要素の動作を制御するHPコントローラ24を備えている。
(HP Unit 4)
HP Unit 4 is a heat source that uses electricity to heat water by absorbing heat from the outside air. HP Unit 4 is equipped with an HP heat source 17 consisting of a compressor 10, a condenser 12, an expansion valve 14, and an evaporator 16. HP Unit 4 heats water by absorbing heat from the outside air by circulating a refrigerant (for example, a fluorocarbon refrigerant) in the order of compressor 10, condenser 12, expansion valve 14, and evaporator 16. The compressor 10 pressurizes the refrigerant to high temperature and high pressure. The condenser 12 cools the refrigerant by heat exchange with water. HP supply path 19 and HP return path 21 are connected to both ends of the water flow path of the condenser 12, respectively. The expansion valve 14 reduces the pressure of the refrigerant to low temperature and low pressure. The evaporator 16 heats the refrigerant by heat exchange with the outside air. The HP unit 4 further includes a circulation pump 18 for circulating water to the condenser 12, a supply thermistor 20 for detecting the temperature of the water flowing into the condenser 12, a return thermistor 22 for detecting the temperature of the water flowing out of the condenser 12, an ambient temperature thermistor 23 for detecting the ambient temperature, and an HP controller 24 for controlling the operation of each component of the HP unit 4.

(タンクユニット6)
タンクユニット6は、タンク30と、混合弁32と、バイパス制御弁34を備えている。タンク30は、外側が断熱材で覆われており、内部に水を蓄える密閉型の容器である。本実施例のタンク30の容量は、例えば100リットルである。HPユニット4の循環ポンプ18が駆動すると、タンク30の底部の水が、タンク往き経路31およびHP往き経路19を介して、凝縮器12へ送られる。凝縮器12で加熱されて高温となった水は、HP戻り経路21およびタンク戻り経路33を介して、タンク30の頂部からタンク30内に戻される。HPユニット4によって加熱された水がタンク30に流れ込むと、タンク30の内部には、低温の水の層の上に高温の水の層が積み重なった温度成層が形成される。タンク30には、上部の水の温度を検出する上部サーミスタ36と、中間部の水の温度を検出する中間部サーミスタ37と、下部の水の温度を検出する下部サーミスタ38が取り付けられている。
(Tank unit 6)
The tank unit 6 includes a tank 30, a mixing valve 32, and a bypass control valve 34. The tank 30 is a sealed container that stores water inside, with its exterior covered with insulating material. The capacity of the tank 30 in this embodiment is, for example, 100 liters. When the circulation pump 18 of the HP unit 4 is driven, the water at the bottom of the tank 30 is sent to the condenser 12 via the tank supply path 31 and the HP supply path 19. The water, heated to a high temperature in the condenser 12, is returned to the tank 30 from the top via the HP return path 21 and the tank return path 33. When the water heated by the HP unit 4 flows into the tank 30, a temperature stratification is formed inside the tank 30, in which a layer of high-temperature water is stacked on top of a layer of low-temperature water. The tank 30 is equipped with an upper thermistor 36 for detecting the temperature of the water at the top, an intermediate thermistor 37 for detecting the temperature of the water in the middle, and a lower thermistor 38 for detecting the temperature of the water at the bottom.

タンクユニット6には、給水経路40を介して水道水が供給される。給水経路40には、給水圧力を減圧する減圧弁42と、給水温度を検出する入水サーミスタ44が取り付けられている。給水経路40は、タンク30の底部に連通するタンク給水経路46と、混合弁32に連通するタンクバイパス経路48に分岐している。タンク給水経路46とタンクバイパス経路48には、それぞれ、逆止弁50、52が取り付けられている。また、タンクバイパス経路48には、混合弁32に流入する水道水の流量を検出する水側水量センサ54が取り付けられている。タンク30の頂部と混合弁32は、タンク出湯経路56を介して連通している。タンク出湯経路56には、逆止弁58と、混合弁32に流入するタンク30からの水の流量を検出する湯側水量センサ60が取り付けられている。 The tank unit 6 is supplied with tap water via a water supply path 40. The water supply path 40 is equipped with a pressure reducing valve 42 for reducing the water supply pressure and an inlet thermistor 44 for detecting the water supply temperature. The water supply path 40 branches into a tank water supply path 46, which communicates with the bottom of the tank 30, and a tank bypass path 48, which communicates with the mixing valve 32. Check valves 50 and 52 are installed in both the tank water supply path 46 and the tank bypass path 48, respectively. A water-side water flow sensor 54 is also installed in the tank bypass path 48 to detect the flow rate of tap water flowing into the mixing valve 32. The top of the tank 30 and the mixing valve 32 are connected via a tank hot water outlet path 56. The tank hot water outlet path 56 is equipped with a check valve 58 and a hot water-side water flow sensor 60 to detect the flow rate of water from the tank 30 flowing into the mixing valve 32.

混合弁32は、タンクバイパス経路48から流れ込む水道水と、タンク出湯経路56から流れ込むタンク30からの水を混合して、第1給湯経路62に送り出す。混合弁32は、図示しないステッピングモータによって弁体を駆動し、タンクバイパス経路48側の開度(水側の開度)と、タンク出湯経路56側の開度(湯側の開度)を調整する。第1給湯経路62には、混合弁32から送り出される水の温度を検出する混合サーミスタ64が取り付けられている。 The mixing valve 32 mixes tap water flowing in from the tank bypass path 48 with water from tank 30 flowing in from the tank hot water outlet path 56, and sends the mixture to the first hot water supply path 62. The mixing valve 32 is driven by a stepping motor (not shown) to adjust the opening degree on the tank bypass path 48 side (cold water side) and the opening degree on the tank hot water outlet path 56 side (hot water side). A mixing thermistor 64 is installed in the first hot water supply path 62 to detect the temperature of the water sent out from the mixing valve 32.

タンクユニット6からは、第2給湯経路66を介して、台所やシャワー、カラン等の給湯箇所への給湯が行われる。第2給湯経路66には、給湯箇所へ供給される水の温度を検出する給湯出口サーミスタ68と、逆止弁70が取り付けられている。第1給湯経路62と第2給湯経路66の間は、給湯バイパス経路72によって連通している。給湯バイパス経路72には、バイパス制御弁34が取り付けられている。タンクユニット6は、さらに、タンクユニット6の各構成要素の動作を制御するタンクコントローラ74を備えている。 Hot water is supplied from the tank unit 6 to hot water outlets such as kitchens, showers, and faucets via the second hot water supply route 66. The second hot water supply route 66 is equipped with a hot water outlet thermistor 68 for detecting the temperature of the water supplied to the hot water outlets, and a check valve 70. The first hot water supply route 62 and the second hot water supply route 66 are connected by a hot water bypass route 72. A bypass control valve 34 is installed in the hot water bypass route 72. The tank unit 6 also includes a tank controller 74 that controls the operation of each component of the tank unit 6.

(バーナユニット8)
バーナユニット8は、バーナ80と、熱交換器82と、バイパスサーボ84と、水量サーボ86と、湯はり弁88を備えている。バーナ80は、燃料ガス(例えば都市ガス)の燃焼によって熱交換器82を流れる水を加熱する補助熱源機である。バーナ80には、ガス供給管(図示省略)を介して燃料ガスが供給される。熱交換器82には、バーナ往路90を介して、タンクユニット6の第1給湯経路62からの水が流れ込む。熱交換器82を通過した水は、バーナ復路92を介して、タンクユニット6の第2給湯経路66へ流れ出る。バーナ往路90には、バーナ往路90を流れる水の流量を調整する水量サーボ86と、バーナ往路90を流れる水の流量を検出する水量センサ91が取り付けられている。バーナ往路90とバーナ復路92の間は、バーナバイパス経路94を介して連通している。バーナ往路90とバーナバイパス経路94の接続部に、バイパスサーボ84が取り付けられている。バイパスサーボ84は、バーナ往路90からバーナバイパス経路94へ流れる水の流量を調整する。バーナ復路92には、熱交換器82から流れ出る水の温度を検出するバーナ給湯サーミスタ96が取り付けられている。バーナ復路92からは、湯はり経路98が分岐している。湯はり経路98には、湯はり弁88が取り付けられている。バーナユニット8からは、湯はり経路98を介して、給湯箇所である浴槽への湯はりが行われる。
(Burner unit 8)
The burner unit 8 includes a burner 80, a heat exchanger 82, a bypass servo 84, a water flow servo 86, and a hot water supply valve 88. The burner 80 is an auxiliary heat source that heats the water flowing through the heat exchanger 82 by burning fuel gas (e.g., city gas). Fuel gas is supplied to the burner 80 via a gas supply pipe (not shown). Water from the first hot water supply path 62 of the tank unit 6 flows into the heat exchanger 82 via the burner forward path 90. The water that has passed through the heat exchanger 82 flows out to the second hot water supply path 66 of the tank unit 6 via the burner return path 92. The burner forward path 90 is equipped with a water flow servo 86 that adjusts the flow rate of water flowing through the burner forward path 90, and a water flow sensor 91 that detects the flow rate of water flowing through the burner forward path 90. The burner forward path 90 and the burner return path 92 are connected via a burner bypass path 94. A bypass servo 84 is installed at the connection point between the burner supply path 90 and the burner bypass path 94. The bypass servo 84 adjusts the flow rate of water from the burner supply path 90 to the burner bypass path 94. A burner hot water thermistor 96 is installed on the burner return path 92 to detect the temperature of the water flowing out of the heat exchanger 82. A hot water filling path 98 branches off from the burner return path 92. A hot water filling valve 88 is installed on the hot water filling path 98. Hot water is supplied from the burner unit 8 to the bathtub, which is the hot water supply point, via the hot water filling path 98.

バーナユニット8はさらに、バーナコントローラ97と、バーナコントローラ97と通信可能なリモコン99と、を備えている。バーナコントローラ97は、バーナユニット8の各構成要素の動作を制御する。リモコン99は、スイッチやボタン等を介して、ユーザからの各種の操作入力を受け入れる。また、リモコン99は、表示や音声によってユーザに貯湯式給湯器104の設定や動作に関する各種の情報を通知する。 The burner unit 8 further includes a burner controller 97 and a remote control 99 capable of communicating with the burner controller 97. The burner controller 97 controls the operation of each component of the burner unit 8. The remote control 99 accepts various operational inputs from the user via switches, buttons, etc. The remote control 99 also notifies the user of various information regarding the settings and operation of the storage-type water heater 104 through displays and voice prompts.

HPコントローラ24、タンクコントローラ74、バーナコントローラ97、リモコン99は、何れも、CPU、ROM、RAM等の制御部と、EEPROM等の記憶部を備えており、記憶部に記憶されているプログラムに従って制御部が各種の処理を実行する。HPコントローラ24とタンクコントローラ74は、互いに通信可能である。タンクコントローラ74とバーナコントローラ97は、互いに通信可能である。従って、HPコントローラ24と、タンクコントローラ74と、バーナコントローラ97が協調して制御を行うことで、貯湯式給湯器104は沸上運転、給湯運転等の各種の動作を行うことができる。以下では、HPコントローラ24と、タンクコントローラ74と、バーナコントローラ97を総称して、単にコントローラとも呼ぶ。 The HP controller 24, tank controller 74, burner controller 97, and remote control 99 each have a control unit such as a CPU, ROM, and RAM, and a storage unit such as an EEPROM. The control unit executes various processes according to the program stored in the storage unit. The HP controller 24 and the tank controller 74 can communicate with each other. The tank controller 74 and the burner controller 97 can also communicate with each other. Therefore, by the coordinated control of the HP controller 24, tank controller 74, and burner controller 97, the storage-type water heater 104 can perform various operations such as boiling and hot water supply. Hereafter, the HP controller 24, tank controller 74, and burner controller 97 will be collectively referred to simply as "controllers."

(沸上運転)
沸上運転では、貯湯式給湯器104は、HPユニット4を駆動して、タンク30内の水を加熱する。沸上運転が開始されると、コントローラは、HP熱源17の圧縮機10を駆動して、圧縮機10、凝縮器12、膨張弁14、蒸発器16の順に冷媒を循環させるとともに、循環ポンプ18を駆動して、タンク30と凝縮器12の間で水を循環させる。これによって、タンク30の底部から吸い出された水は、凝縮器12において沸上目標温度まで加熱されて、タンク30の頂部に戻される。コントローラは、往きサーミスタ20で検出される温度が沸上目標温度に達すると、タンク30内の水が全て沸上目標温度まで加熱された水で置き換えられたと判断して、沸上運転を終了する。
(Boiling operation)
During boiling operation, the storage-type water heater 104 drives the HP unit 4 to heat the water in the tank 30. When boiling operation starts, the controller drives the compressor 10 of the HP heat source 17 to circulate the refrigerant in the order of compressor 10, condenser 12, expansion valve 14, and evaporator 16, and also drives the circulation pump 18 to circulate water between the tank 30 and the condenser 12. As a result, the water drawn from the bottom of the tank 30 is heated to the target boiling temperature in the condenser 12 and returned to the top of the tank 30. When the temperature detected by the supply thermistor 20 reaches the target boiling temperature, the controller determines that all the water in the tank 30 has been replaced with water heated to the target boiling temperature and terminates the boiling operation.

(給湯運転)
給湯運転では、給湯設定温度の水を給湯箇所へ供給する。給湯設定温度は、ユーザによって設定される温度である。コントローラは、水側水量センサ54で検出される流量と、湯側水量センサ60で検出される流量を合算した流量(給湯流量ともいう)が最低動作流量以上となると、カランの開栓や浴槽への湯はりなどにより給湯箇所への給湯が開始されたものと判断する。コントローラは、上部サーミスタ36で検出される温度に応じて、以下の非燃焼給湯運転または燃焼給湯運転を実行する。
(Hot water supply operation)
During hot water supply operation, water at the set hot water temperature is supplied to the hot water supply location. The set hot water temperature is set by the user. When the controller determines that the sum of the flow rate detected by the water-side water flow sensor 54 and the flow rate detected by the hot water-side water flow sensor 60 (also called the hot water supply flow rate) is equal to or greater than the minimum operating flow rate, it determines that hot water supply to the hot water supply location has started, such as by opening a faucet or filling a bathtub with hot water. The controller then performs either non-combustion hot water supply operation or combustion hot water supply operation according to the temperature detected by the upper thermistor 36.

コントローラは、上部サーミスタ36で検出される温度が給湯設定温度以上である場合、非燃焼給湯運転を実行する。非燃焼給湯運転では、コントローラは、バーナ80の燃焼運転を禁止するとともに、混合サーミスタ64で検出される温度が給湯設定温度となるように、混合弁32の開度を調整する。これによって、給湯箇所に給湯設定温度に温度調整された水が供給される。 The controller executes non-combustion hot water supply operation if the temperature detected by the upper thermistor 36 is equal to or above the hot water supply set temperature. In non-combustion hot water supply operation, the controller prohibits combustion operation of the burner 80 and adjusts the opening of the mixing valve 32 so that the temperature detected by the mixing thermistor 64 becomes the hot water supply set temperature. This ensures that water, temperature-adjusted to the hot water supply set temperature, is supplied to the hot water supply location.

また、コントローラは、上部サーミスタ36で検出される温度が給湯設定温度未満の場合、燃焼給湯運転を実行する。燃焼給湯運転では、コントローラは、バーナ80の燃焼運転を許可するとともに、混合サーミスタ64で検出される温度が、給湯設定温度よりもバーナ80の最小加熱能力の分だけ低い温度となるように、混合弁32の開度を調整する。この場合、タンク30の上部から供給される高温の水と、給水経路40から供給される低温の水が、混合弁32において混合された後、バーナ80によって給湯設定温度まで加熱されて、給湯箇所へ供給される。なお、燃焼給湯運転には、混合弁32がタンク30側に全閉状態に固定されている場合も含まれる。この場合、コントローラは、バーナ80によって加熱された水が給湯設定温度になるように、バーナ80の加熱能力を調整する。 Furthermore, the controller executes combustion-based hot water supply operation if the temperature detected by the upper thermistor 36 is below the hot water supply set temperature. In combustion-based hot water supply operation, the controller permits combustion operation of the burner 80 and adjusts the opening of the mixing valve 32 so that the temperature detected by the mixing thermistor 64 is lower than the hot water supply set temperature by the minimum heating capacity of the burner 80. In this case, the high-temperature water supplied from the top of the tank 30 and the low-temperature water supplied from the water supply path 40 are mixed in the mixing valve 32, then heated to the hot water supply set temperature by the burner 80 and supplied to the hot water supply location. Note that combustion-based hot water supply operation also includes the case where the mixing valve 32 is fixed in a fully closed position on the tank 30 side. In this case, the controller adjusts the heating capacity of the burner 80 so that the water heated by the burner 80 reaches the hot water supply set temperature.

上記の非燃焼給湯運転または燃焼給湯運転を実行中に、給湯流量が最低動作流量を下回ると、コントローラは、カランの閉栓や浴槽への湯はりの終了などにより給湯箇所への給湯が終了したものと判断して、給湯運転を終了する。 During the non-combustion or combustion hot water supply operation described above, if the hot water flow rate falls below the minimum operating flow rate, the controller will determine that the hot water supply to the hot water source has ended (e.g., due to closing a faucet or completing the filling of a bathtub) and will terminate the hot water supply operation.

(ホームゲートウェイ106)
図1に示すように、ホームゲートウェイ106は、例えば無線LAN等を介して、貯湯式給湯器104のコントローラと通信可能である。貯湯式給湯器104のコントローラは、ホームゲートウェイ106を介して、インターネット118に接続可能である。
(Home Gateway 106)
As shown in Figure 1, the home gateway 106 can communicate with the controller of the storage-type water heater 104, for example, via a wireless LAN. The controller of the storage-type water heater 104 can connect to the internet 118 via the home gateway 106.

(発電設備110)
発電設備110は、太陽光、風力、波力・潮力、流水・潮汐等の、再生可能エネルギーを利用して発電を行う設備である。エネルギー事業者108は、発電設備110によって発電される電力を、複数の住居102a、102b、・・・や、他の需要者に供給する。なお、エネルギー事業者108は、発電設備110以外の他の発電設備からも、電力市場を介して電力を調達して、複数の住居102a、102b、・・・に電力を供給可能であるが、発電設備110によって発電される電力が利用可能である場合には、発電設備110によって発電される電力を優先して供給する。また、エネルギー事業者108は、燃料ガス市場を介して燃料ガスを調達して、複数の住居102a、102b、・・・に燃料ガスを供給可能である。
(Power generation equipment 110)
The power generation facility 110 is a facility that generates electricity using renewable energy sources such as solar power, wind power, wave power/tidal power, and flowing water/tides. The energy provider 108 supplies the electricity generated by the power generation facility 110 to multiple residences 102a, 102b, ... and other consumers. In addition, the energy provider 108 can also procure electricity from other power generation facilities other than the power generation facility 110 through the electricity market and supply electricity to multiple residences 102a, 102b, ... but when electricity generated by the power generation facility 110 is available, the energy provider 108 will prioritize the supply of electricity generated by the power generation facility 110. Furthermore, the energy provider 108 can procure fuel gas through the fuel gas market and supply fuel gas to multiple residences 102a, 102b, ...

(電力管理サーバ112)
電力管理サーバ112は、CPU、ROM、RAM等の制御部と、HDD、SSD等の記憶部を備えており、記憶部に記憶されているプログラムに従って制御部が各種の処理を実行する。電力管理サーバ112は、過去の所定期間(例えば1年間)に発電設備110が発電した電力の実績に基づいて、当日に発電設備110が発電する発電電力の経時的変化を示す発電電力データを推定する。なお、電力管理サーバ11は、過去の所定期間における気象データと発電設備110が発電した発電電力の実績、および当日の気象予測データに基づいて、当日に発電設備110が発電する発電電力の経時的変化を示す発電電力データを推定してもよい。また、電力管理サーバ112は、過去の所定期間(例えば1年間)に発電設備110から複数の住居102a、102b、・・・以外の需要者に供給した供給電力の実績に基づいて、当日に発電設備110から複数の住居102a、102b、・・・以外の需要者に供給する供給予定電力の経時的変化を示す供給予定電力データを推定する。なお、電力管理サーバ11は、過去の所定期間における気象データと発電設備110から複数の住居102a、102b、・・・以外の需要者に供給した供給電力の実績、および当日の気象予測データに基づいて、当日に発電設備110から複数の住居102a、102b、・・・以外の需要者に供給する供給予定電力の経時的変化を示す供給予定電力データを推定してもよい。電力管理サーバ112は、毎日、所定時刻(例えば0時)に、発電電力データと供給予定電力データに基づいて、当日に発電設備110から複数の住居102a、102b、・・・に供給可能な余剰電力の経時的変化を示す余剰電力データを推定する。
(Power management server 112)
The power management server 112 includes a control unit such as a CPU, ROM, and RAM, and a storage unit such as an HDD or SSD. The control unit executes various processes according to the programs stored in the storage unit. Based on the actual power generated by the power generation equipment 110 over a predetermined past period (for example, one year), the power management server 112 estimates power generation data that shows the time-series change in the power generated by the power generation equipment 110 on the current day. Alternatively, the power management server 11 may estimate power generation data that shows the time-series change in the power generated by the power generation equipment 110 on the current day based on weather data over a predetermined past period, the actual power generated by the power generation equipment 110, and the weather forecast data for the current day. Furthermore, the power management server 112 estimates planned power supply data showing the time-series changes in the planned power supply to be supplied from the power generation facility 110 to multiple customers other than residences 102a, 102b, ... on the current day, based on the actual power supply data supplied from the power generation facility 110 to multiple customers other than residences 102a, 102b, ... over a predetermined period in the past (for example, one year). Alternatively, the power management server 11 may estimate planned power supply data showing the time-series changes in the planned power supply to be supplied from the power generation facility 110 to multiple customers other than residences 102a, 102b, ... on the current day, based on weather data from a predetermined period in the past, the actual power supply data supplied from the power generation facility 110 to multiple customers other than residences 102a, 102b, ..., and the weather forecast data for the current day. The power management server 112 estimates surplus power data, which shows the change over time of the surplus power that can be supplied from the power generation facility 110 to multiple residences 102a, 102b, ... on that day, at a predetermined time each day (for example, 0:00), based on the power generation data and the planned power supply data.

(給湯管理サーバ116)
給湯管理サーバ116は、CPU、ROM、RAM等の制御部と、HDD、SSD等の記憶部を備えており、記憶部に記憶されているプログラムに従って制御部が各種の処理を実行する。給湯管理サーバ116は、インターネット118を介して、電力管理サーバ112と通信可能である。また、給湯管理サーバ116は、インターネット118を介して、複数の貯湯式給湯器104a、104b、・・・のコントローラのそれぞれと通信可能である。給湯管理サーバ116は、複数の貯湯式給湯器104a、104b、・・・のそれぞれを、複数のグループのうちの1つに分類して管理している。複数のグループのそれぞれには、複数の貯湯式給湯器104a、104b、・・・のうちの1つまたは複数が属している。例えば、貯湯式給湯器104aはグループAに属しており、貯湯式給湯器104bはグループBに属しており、他の貯湯式給湯器104も対応するグループにそれぞれ属している。
(Hot water supply management server 116)
The hot water supply management server 116 is equipped with a control unit such as a CPU, ROM, and RAM, and a storage unit such as an HDD and SSD. The control unit executes various processes according to the programs stored in the storage unit. The hot water supply management server 116 can communicate with the power management server 112 via the internet 118. The hot water supply management server 116 can also communicate with each of the controllers of the multiple storage-type water heaters 104a, 104b, ... via the internet 118. The hot water supply management server 116 classifies and manages each of the multiple storage-type water heaters 104a, 104b, ... into one of multiple groups. Each of the multiple groups contains one or more of the multiple storage-type water heaters 104a, 104b, ... For example, storage-type water heater 104a belongs to group A, storage-type water heater 104b belongs to group B, and the other storage-type water heaters 104 each belong to their corresponding groups.

給湯管理サーバ116は、複数の貯湯式給湯器104a、104b、・・・のそれぞれについて、HPユニット4の平均的な熱効率と、バーナユニット8の平均的な熱効率を、予め記憶している。ここでいうHPユニット4の熱効率は、HPユニット4で水を加熱する際に、水に加えられる熱量(例えば、kWh換算)をHPユニット4で消費する電力量(例えば、kWh換算)で除算したものである。また、ここでいうバーナユニット8の熱効率は、バーナユニット8で水を加熱する際に、水に加えられる熱量(例えば、kWh換算)をバーナユニット8で消費する燃料ガス量(例えば、kWh換算)で除算したものである。 The hot water supply management server 116 pre-stores the average thermal efficiency of the HP unit 4 and the average thermal efficiency of the burner unit 8 for each of the multiple storage-type water heaters 104a, 104b, ... The thermal efficiency of the HP unit 4 is calculated by dividing the amount of heat added to the water (e.g., in kWh equivalent) when the HP unit 4 heats the water by the amount of electricity consumed by the HP unit 4 (e.g., in kWh equivalent). The thermal efficiency of the burner unit 8 is calculated by dividing the amount of heat added to the water (e.g., in kWh equivalent) when the burner unit 8 heats the water by the amount of fuel gas consumed by the burner unit 8 (e.g., in kWh equivalent).

給湯管理サーバ116は、インターネット118を介して、当日にエネルギー事業者108が電力市場から電力を調達する際の電力市場価格の経時的な変化を示す電力市場価格データを取得可能である。また、給湯管理サーバ116は、インターネット118を介して、当日にエネルギー事業者108が燃料ガス市場から燃料ガスを調達する際の燃料ガス市場価格の経時的な変化を示す燃料ガス市場価格データを取得可能である。 The hot water supply management server 116 can obtain electricity market price data via the internet 118, showing the time-series changes in electricity market prices when the energy company 108 procures electricity from the electricity market on a given day. Furthermore, the hot water supply management server 116 can obtain fuel gas market price data via the internet 118, showing the time-series changes in fuel gas market prices when the energy company 108 procures fuel gas from the fuel gas market on a given day.

(運転許可時間帯のスケジューリング)
給湯管理サーバ116は、複数の貯湯式給湯器104a、104b、・・・で消費される電力について、発電設備110で発電された電力の利用割合が高くなるように、複数のグループのそれぞれについて、そのグループに属する貯湯式給湯器104の沸上運転の実行を許可する運転許可時間帯のスケジューリング処理を行う。複数の貯湯式給湯器104a、104b、・・・は、現在時刻が運転許可時間帯に含まれる場合には、必要に応じて沸上運転を実行し、現在時刻が運転許可時間帯に含まれない場合には、沸上運転を実行しない。給湯管理サーバ116は、毎日、所定時刻(例えば2時)になると、図3に示す処理を行う。
(Scheduling of permitted driving hours)
The hot water supply management server 116 performs scheduling for the operating permission time period for each of the multiple groups of hot water storage heaters 104a, 104b, ..., so that the proportion of electricity used by electricity generated by the power generation equipment 110 is high. The hot water supply management server 116 performs the operating permission time period for each of the multiple groups of hot water storage heaters 104a, 104b, ... if the current time falls within the operating permission time period, it performs the operating permission time period as needed, and does not perform the operating permission time period if the current time falls outside of the operating permission time period. Every day at a predetermined time (for example, 2 o'clock), the hot water supply management server 116 performs the processing shown in Figure 3.

S2では、給湯管理サーバ116は、電力管理サーバ112から、余剰電力データを取得する。本実施例では、給湯管理サーバ116から電力管理サーバ112に、余剰電力データの問合せを行い、電力管理サーバ112から給湯管理サーバ116に、問い合わせに対する応答として、余剰電力データが送信される。これとは異なり、余剰電力データは、電力管理サーバ112から給湯管理サーバ116に、定期的に(例えば1日に1回)送信されてもよい。 In S2, the hot water supply management server 116 obtains surplus power data from the power management server 112. In this embodiment, the hot water supply management server 116 queries the power management server 112 for surplus power data, and the power management server 112 sends the surplus power data to the hot water supply management server 116 as a response to the query. Alternatively, the surplus power data may be sent periodically (for example, once a day) from the power management server 112 to the hot water supply management server 116.

S4では、給湯管理サーバ116は、電力市場価格データに基づいて、補正電力の経時的変化を示す補正電力データを設定する。例えば、給湯管理サーバ116は、全ての時刻において、電力市場価格に所定の係数を乗算した値を補正電力として算出することで、補正電力データを設定してもよい。あるいは、給湯管理サーバ116は、電力市場価格が第1所定値を下回る時間帯については、補正電力をゼロとし、電力市場価格が第1所定値以上の時間帯については、電力市場価格に所定の係数を乗算した値を補正電力として算出することで、補正電力データを設定してもよい。 In S4, the hot water supply management server 116 sets correction power data that shows the change in correction power over time, based on electricity market price data. For example, the hot water supply management server 116 may set the correction power data by calculating the correction power as a value obtained by multiplying the electricity market price by a predetermined coefficient for all time periods. Alternatively, the hot water supply management server 116 may set the correction power data by setting the correction power to zero during time periods when the electricity market price is below a first predetermined value, and by calculating the correction power as a value obtained by multiplying the electricity market price by a predetermined coefficient during time periods when the electricity market price is above the first predetermined value.

S6では、給湯管理サーバ116は、電力市場価格データに基づいて、運転許可時間帯を設定することを禁止する時間帯である運転禁止時間帯を設定する。例えば、給湯管理サーバ116は、電力市場価格が第2所定値以上となる時間帯が存在するか否かを判断し、そのような時間帯が存在する場合には、その時間帯を運転禁止時間帯に設定する。ここで、第2所定値は第1所定値よりも高い値に設定されている。 In S6, the hot water supply management server 116 sets an operating prohibition period, which is a period during which the operating permission period is prohibited, based on electricity market price data. For example, the hot water supply management server 116 determines whether there is a period during which the electricity market price is equal to or higher than a second predetermined value, and if such a period exists, it sets that period as an operating prohibition period. Here, the second predetermined value is set to a value higher than the first predetermined value.

S8では、給湯管理サーバ116は、まだ運転許可時間帯を設定していないグループの中から、運転許可時間帯の設定対象とするグループを設定対象グループとして特定する。 In S8, the hot water supply management server 116 identifies the groups to be included in the setting of permitted operating time periods from among the groups for which operating time periods have not yet been set.

S10では、給湯管理サーバ116は、S2で取得された余剰電力データと、S4で設定された補正電力データと、使用予定電力データに基づいて、使用可能電力データを算出する。本実施例において、使用予定電力データは、すでに運転許可時間帯が設定されたグループに属する貯湯式給湯器104の沸上運転で使用される予定の電力である使用予定電力の経時的変化を示している。給湯管理サーバ116は、当日の各時刻について、余剰電力から補正電力と使用予定電力を減算した使用可能電力を算出することで、使用可能電力の経時的変化を示す使用可能電力データを算出する。 In S10, the hot water supply management server 116 calculates available power data based on the surplus power data acquired in S2, the correction power data set in S4, and the planned power usage data. In this embodiment, the planned power usage data represents the time-dependent change in planned power usage, which is the power that will be used for the boiling operation of the storage-type water heater 104 belonging to a group for which operating permission time slots have already been set. For each time point on the day, the hot water supply management server 116 calculates available power data that shows the time-dependent change in available power by subtracting the correction power and planned power usage from the surplus power to calculate the available power.

S12では、給湯管理サーバ116は、S6で設定された運転禁止時間帯と、S10で算出された使用可能電力データに基づいて、設定対象グループの運転許可時間帯を設定する。例えば、給湯管理サーバ116は、運転禁止時間帯における使用可能電力をゼロに補正した上で、設定対象グループの運転許可時間帯が、使用可能電力に最も余裕がある時間帯に割り当てられるように、設定対象グループの運転許可時間帯を設定する。例えば、給湯管理サーバ116は、使用可能電力が最も大きい時刻が運転許可時間帯に含まれるように、設定対象グループの運転許可時間帯を設定してもよい。 In S12, the hot water supply management server 116 sets the permitted operating time periods for the target group based on the no-operation time period set in S6 and the available power data calculated in S10. For example, the hot water supply management server 116 corrects the available power during the no-operation time period to zero and then sets the permitted operating time periods for the target group so that they are allocated to the time period with the most available power. Alternatively, the hot water supply management server 116 may set the permitted operating time periods for the target group so that the time with the highest available power is included within the permitted operating time period.

S14では、給湯管理サーバ116は、S12で運転許可時間帯が設定された設定対象グループに属する貯湯式給湯器104の消費電力と、S12で設定された運転許可時間帯に基づいて、使用予定電力データを更新する。 In S14, the hot water supply management server 116 updates the planned power usage data based on the power consumption of the storage-type water heaters 104 belonging to the target group for which the permitted operating time period was set in S12, and the permitted operating time period set in S12.

S16では、給湯管理サーバ116は、全てのグループについてスケジューリングが完了したか否かを判断する。全てのグループについてスケジューリングが完了していない場合(NOの場合)、処理はS8へ戻る。 In S16, the hot water supply management server 116 determines whether scheduling has been completed for all groups. If scheduling has not been completed for all groups (NO), the process returns to S8.

S8からS16までの処理を繰り返し実行することによって、それぞれのグループの運転許可時間帯が設定される。この際に、仮に補正電力データを考慮せずに、余剰電力データと使用予定電力データのみから使用可能電力データを算出する場合、図4に示すように、電力市場価格が高い時間帯において、余剰電力と使用予定電力の間にあまり余裕がないスケジューリングが行われることがある。この場合、図5に示すように、実際の余剰電力が想定していた余剰電力よりも少なくなると、電力市場価格が高い時間帯で、余剰電力の不足が生じるおそれがある。このような時間帯において余剰電力に不足が生じると、エネルギー事業者108は電力市場から高価格で電力を調達しなければならなくなり、調達コストの増大を招いてしまう。 By repeatedly executing processes S8 through S16, the operating time zones for each group are set. If, in this case, the available power data is calculated using only surplus power data and planned power usage data, without considering correction power data, scheduling may occur with insufficient margin between surplus power and planned power usage during periods of high electricity market prices, as shown in Figure 4. In this case, as shown in Figure 5, if the actual surplus power is less than the expected surplus power, a shortage of surplus power may occur during periods of high electricity market prices. If a shortage of surplus power occurs during such periods, the energy provider 108 will have to procure electricity from the electricity market at high prices, leading to increased procurement costs.

これに対して、本実施例の給湯システム100では、余剰電力データと使用予定電力データだけではなく、補正電力データについても考慮して、使用可能電力データを算出する。これによって、図6に示すように、電力市場価格が低い時間帯については、余剰電力と使用予定電力の間にあまり余裕を持たせず、電力市場価格が高い時間帯については、余剰電力と使用予定電力の間に十分な余裕を持たせたスケジューリングを実現することができる。この場合、図7に示すように、実際の余剰電力が想定していた余剰電力よりも少なくなっても、余剰電力の不足は、電力市場価格が高い時間帯では生じず、電力市場価格が低い時間帯で生じることになる。このような時間帯において余剰電力に不足が生じる場合、エネルギー事業者108は電力市場から低価格で電力を調達すればよいので、それほど大きな調達コストの増大を招くことは無い。 In contrast, the hot water supply system 100 of this embodiment calculates usable power data by considering not only surplus power data and planned power usage data, but also correction power data. As a result, as shown in Figure 6, scheduling can be achieved that leaves little margin between surplus power and planned power usage during periods of low electricity market prices, and provides sufficient margin between surplus power and planned power usage during periods of high electricity market prices. In this case, as shown in Figure 7, even if the actual surplus power is less than the expected surplus power, the shortage of surplus power will not occur during periods of high electricity market prices, but rather during periods of low electricity market prices. If a shortage of surplus power occurs during such periods, the energy provider 108 can simply procure electricity from the electricity market at a low price, thus avoiding a significant increase in procurement costs.

図3のS16で、全てのグループについてスケジューリングが完了すると(YESとなると)、処理はS18へ進む。S18では、給湯管理サーバ116は、余剰電力データと使用予定電力データに基づいて、超過時間帯が存在するか否かを判断する。本実施例において、超過時間帯は、余剰電力から使用予定電力を減算した使用可能電力の値が所定のしきい値(例えばゼロ)に満たない時間帯である。なお、所定のしきい値は、ゼロ以外の値であってもよい。超過時間帯が存在しない場合(NOの場合)、処理はS30へ進む。超過時間帯が存在する場合(YESの場合)、処理はS20へ進む。 In Figure 3, at S16, once scheduling is complete for all groups (YES), the process proceeds to S18. In S18, the hot water supply management server 116 determines whether or not there are excess time periods based on the surplus power data and the planned power usage data. In this embodiment, an excess time period is a period where the value of available power (surplus power minus planned power usage) falls below a predetermined threshold (e.g., zero). Note that the predetermined threshold may be a value other than zero. If no excess time periods exist (NO), the process proceeds to S30. If excess time periods exist (YES), the process proceeds to S20.

S20では、給湯管理サーバ116は、運転許可時間帯の取消を行う候補となるグループを、取消候補グループとして特定する。本実施例では、給湯管理サーバ116は、運転許可時間帯に超過時間帯が含まれるグループの中から、取消候補グループを特定する。例えば、図8に示すように、超過時間帯T1と、超過時間帯T2が存在する場合、給湯管理サーバ116は、超過時間帯T1に関して、運転許可時間帯に超過時間帯T1が含まれるグループCおよびグループGの中の1つ(例えばグループG)を取消候補グループとして特定し、超過時間帯T2に関して、運転許可時間帯に超過時間帯T2が含まれるグループE、グループFおよびグループHの中の1つ(例えばグループH)を取消候補グループとして特定する。 In S20, the hot water supply management server 116 identifies groups that are candidates for cancellation of the permitted operating time period as cancellation candidate groups. In this embodiment, the hot water supply management server 116 identifies cancellation candidate groups from among groups whose permitted operating time period includes an overtime period. For example, as shown in Figure 8, if there are overtime periods T1 and T2, the hot water supply management server 116 identifies one of groups C and G (for example, group G) whose permitted operating time period includes overtime period T1 as a cancellation candidate group for overtime period T1, and identifies one of groups E, F, and H (for example, group H) whose permitted operating time period includes overtime period T2 as a cancellation candidate group for overtime period T2.

図3のS22では、給湯管理サーバ116は、取消候補グループに属する貯湯式給湯器104が、運転許可時間帯において沸上運転を実行する場合の給湯コストを、第1コストとして算出する。例えば、第1コストは、以下の式により算出される。
(第1コスト)=(電力市場価格)÷(HPユニット4の熱効率)
ここで、電力市場価格は、例えば、1kWhあたりの価格である。
In S22 of Figure 3, the hot water supply management server 116 calculates the hot water supply cost as the first cost when a storage-type water heater 104 belonging to the cancellation candidate group performs boiling operation during the permitted operating time period. For example, the first cost is calculated using the following formula.
(First cost) = (Electricity market price) ÷ (Thermal efficiency of HP unit 4)
Here, the electricity market price is, for example, the price per kWh.

一般に、HPユニット4の熱効率は、外気温度に応じて変化する。このため、給湯管理サーバ116は、インターネット118を介して当日の気象データを取得し、取消候補グループに属する貯湯式給湯器104が設置された住居102での運転許可時間帯における外気温度を特定し、予め記憶されているHPユニット4の平均的な熱効率と、特定された外気温度に基づいて、第1コストの算出に用いるHPユニット4の熱効率を特定してもよい。 Generally, the thermal efficiency of the HP unit 4 changes depending on the outside temperature. Therefore, the hot water supply management server 116 may obtain weather data for the day via the internet 118, identify the outside temperature during the permitted operating time period at the residence 102 where the storage-type water heater 104 belonging to the cancellation candidate group is installed, and then determine the thermal efficiency of the HP unit 4 to be used in calculating the first cost, based on the average thermal efficiency of the HP unit 4 stored in advance and the identified outside temperature.

S24では、給湯管理サーバ116は、取消候補グループに属する貯湯式給湯器104が、運転許可時間帯において沸上運転を実行せず、代わりにバーナユニット8による水の加熱を実行する場合の給湯コストを、第2コストとして算出する。例えば、第2コストは、以下の式により算出される。
(第2コスト)=(燃料ガス市場価格)÷(バーナユニット8の熱効率)
なお、一般的には、都市ガス等の燃料ガスについての燃料ガス市場価格は1mあたりの価格で取引されるが、本実施例では、第1コストとの比較を行うため、燃料ガス市場価格として、1kWhあたりの価格に換算した値を用いている。ただし、第1コストと第2コストの単位が同じであれば、1kWhあたりの価格に限らず、1MJあたりの価格、1kcalあたりの価格等、種々の単位を用いることができる。
In S24, the hot water supply management server 116 calculates the hot water supply cost as a second cost when a storage-type water heater 104 belonging to the cancellation candidate group does not perform boiling operation during the permitted operating time period, but instead heats water using the burner unit 8. For example, the second cost is calculated using the following formula.
(Second cost) = (Fuel gas market price) ÷ (Thermal efficiency of burner unit 8)
Generally, the market price of fuel gases such as city gas is traded at a price per cubic meter . However, in this embodiment, in order to compare with the first cost, the market price of fuel gas is converted to a price per kWh. However, as long as the units of the first cost and the second cost are the same, various units can be used, not limited to the price per kWh, such as the price per MJ or the price per kcal.

S26では、給湯管理サーバ116は、S22で算出された第1コストが、S24で算出された第2コストを上回る取消候補グループが存在するか否かを判断する。第1コストが第2コストを上回る取消候補グループが存在しない場合(NOの場合)、処理はS30へ進む。第1コストが第2コストを上回る取消候補グループが存在する場合(YESの場合)、処理はS28へ進む。 In S26, the hot water supply management server 116 determines whether there are any cancellation candidate groups where the first cost calculated in S22 exceeds the second cost calculated in S24. If there are no cancellation candidate groups where the first cost exceeds the second cost (NO), the process proceeds to S30. If there are cancellation candidate groups where the first cost exceeds the second cost (YES), the process proceeds to S28.

S28では、給湯管理サーバ116は、第1コストが第2コストを上回る取消候補グループについて、設定された運転許可時間帯を取り消す。運転許可時間帯が取り消されたグループに属する貯湯式給湯器104は、当日の沸上運転の実行が禁止される。S28の後、処理はS30へ進む。 In S28, the hot water supply management server 116 cancels the set operating permission time slots for groups of cancellation candidates where the first cost exceeds the second cost. The storage-type water heaters 104 belonging to the groups whose operating permission time slots have been canceled are prohibited from performing boiling operations for that day. After S28, the process proceeds to S30.

図8に示すように、電力市場価格は、1日の間で時間により変動する。これに対して、図示はしていないが、燃料ガス市場価格は、1日の間で時間による変動がない。このため、例えば、超過時間帯T1に関する取消候補グループGについては、運転許可時間帯における電力市場価格が低いので、第1コストが第2コスト以下となる。この場合、グループGの運転許可時間帯は取り消されず、グループGに属する貯湯式給湯器104は運転許可時間帯において沸上運転を実行する。これに対して、例えば、超過時間帯T2に関する取消候補グループHについては、運転許可時間帯における電力市場価格が高いので、第1コストが第2コストを上回る。この場合、グループHの運転許可時間帯が取り消され、グループHに属する貯湯式給湯器104は、超過時間帯における沸上運転の実行が禁止される。なお、この場合に、グループHに属する貯湯式給湯器104については、他の時間帯において沸上運転の実行を許可するように構成してもよい。 As shown in Figure 8, the electricity market price fluctuates throughout the day. In contrast, although not shown in the figure, the fuel gas market price does not fluctuate throughout the day. Therefore, for example, for group G, a candidate for cancellation regarding the excess time period T1, the electricity market price during the permitted operating time period is low, so the first cost is less than or equal to the second cost. In this case, the permitted operating time period for group G is not cancelled, and the storage-type water heater 104 belonging to group G performs boiling operation during the permitted operating time period. Conversely, for example, for group H, a candidate for cancellation regarding the excess time period T2, the electricity market price during the permitted operating time period is high, so the first cost exceeds the second cost. In this case, the permitted operating time period for group H is cancelled, and the storage-type water heater 104 belonging to group H is prohibited from performing boiling operation during the excess time period. Note that in this case, the storage-type water heater 104 belonging to group H may be configured to allow boiling operation during other time periods.

図3のS30では、給湯管理サーバ116は、それぞれのグループについてスケジューリングした運転許可時間帯を、それぞれのグループに属する貯湯式給湯器104のコントローラに送信する。なお、給湯管理サーバ116は、それぞれのグループについてスケジューリングした運転許可時間帯を、スケジューリングテーブルとして記憶しておいてもよく、貯湯式給湯器104が、必要に応じて、自身が属するグループの運転許可時間帯を給湯管理サーバ116に問い合わせてもよい。S30の後、図3の処理は終了する。 In S30 of Figure 3, the hot water supply management server 116 transmits the scheduled operating time slots for each group to the controllers of the storage-type water heaters 104 belonging to each group. The hot water supply management server 116 may also store the scheduled operating time slots for each group in a scheduling table, and the storage-type water heaters 104 may query the hot water supply management server 116 for the operating time slots of the group to which they belong, as needed. After S30, the process in Figure 3 ends.

なお、給湯管理サーバ116は、図3に示す処理の代わりに、図9に示す処理を実行してもよい。例えば、給湯管理サーバ116は、毎日、所定時刻(例えば2時)になると、図9に示す処理を行う。 The hot water supply management server 116 may perform the process shown in Figure 9 instead of the process shown in Figure 3. For example, the hot water supply management server 116 performs the process shown in Figure 9 every day at a predetermined time (e.g., 2:00).

図9のS2からS18までの処理と、S30の処理は、図3のS2からS18までの処理と、S30の処理と同様である。図9のS18の処理において、超過時間帯が存在しない場合(NOの場合)、処理はS30へ進む。超過時間帯が存在する場合(YESの場合)、処理はS32へ進む。 The processes from S2 to S18 and S30 in Figure 9 are the same as those from S2 to S18 and S30 in Figure 3. In the process of S18 in Figure 9, if there is no excess time period (NO), the process proceeds to S30. If there is an excess time period (YES), the process proceeds to S32.

S32では、給湯管理サーバ116は、運転許可時間帯の短縮を行う候補となるグループを、短縮候補グループとして特定する。本実施例では、給湯管理サーバ116は、運転許可時間帯に超過時間帯が含まれるグループのうちで、最後にスケジューリングが行われたグループを短縮候補グループとして特定する。例えば、図8に示すように、超過時間帯T1と、超過時間帯T2が存在する場合、給湯管理サーバ116は、超過時間帯T1に関して、運転許可時間帯に超過時間帯T1が含まれるグループCおよびグループGのうちで最後にスケジューリングが行われたグループ(例えばグループG)を短縮候補グループとして特定し、超過時間帯T2に関して、運転許可時間帯に超過時間帯T2が含まれるグループE、グループFおよびグループHのうちで最後にスケジューリングが行われたグループ(例えばグループH)を短縮候補グループとして特定する。 In S32, the hot water supply management server 116 identifies groups that are candidates for shortening the permitted operating time period as shortening candidate groups. In this embodiment, the hot water supply management server 116 identifies the group that was last scheduled among the groups whose permitted operating time period includes the excess time period as the shortening candidate group. For example, as shown in Figure 8, if there are excess time periods T1 and T2, the hot water supply management server 116 identifies the group that was last scheduled among groups C and G whose permitted operating time period includes the excess time period T1 (e.g., group G) as the shortening candidate group for excess time period T1, and the group that was last scheduled among groups E, F, and H whose permitted operating time period includes the excess time period T2 (e.g., group H) as the shortening candidate group for excess time period T2.

S34では、給湯管理サーバ116は、超過時間帯を所定の時間長さ(例えば30分間)を有する時間枠に分割して、それぞれの時間枠について、短縮候補グループに属する貯湯式給湯器104が沸上運転を実行する場合の給湯コストを、第1コストとして算出する。S34での第1コストの計算は、図3のS22での第1コストの計算と同様であるので、詳細な説明は省略する。 In S34, the hot water supply management server 116 divides the excess time period into time slots of a predetermined length (e.g., 30 minutes), and for each time slot, calculates the hot water supply cost as the first cost when the storage-type water heater 104 belonging to the shortening candidate group performs a boiling operation. The calculation of the first cost in S34 is the same as the calculation of the first cost in S22 in Figure 3, so a detailed explanation is omitted.

S36では、給湯管理サーバ116は、上記したそれぞれの時間枠について、短縮候補グループに属する貯湯式給湯器104が沸上運転を実行せず、代わりにバーナユニット8による水の加熱を実行する場合の給湯コストを、第2コストとして算出する。S36での第2コストの計算は、図3のS24での第2コストの計算と同様であるので、詳細な説明は省略する。 In S36, the hot water supply management server 116 calculates the hot water supply cost as a second cost for each of the above-mentioned time slots, assuming that the storage-type water heater 104 belonging to the shortened candidate group does not perform boiling operation, but instead heats the water using the burner unit 8. The calculation of the second cost in S36 is the same as the calculation of the second cost in S24 of Figure 3, so a detailed explanation is omitted.

S38では、給湯管理サーバ116は、S34で算出された第1コストが、S36で算出された第2コストを上回る時間枠が存在するか否かを判断する。第1コストが第2コストを上回る時間枠が存在しない場合(NOの場合)、処理はS30へ進む。第1コストが第2コストを上回る時間枠が存在する場合(YESの場合)、処理はS40へ進む。 In S38, the hot water supply management server 116 determines whether there is a time frame in which the first cost calculated in S34 exceeds the second cost calculated in S36. If there is no time frame in which the first cost exceeds the second cost (NO), the process proceeds to S30. If there is a time frame in which the first cost exceeds the second cost (YES), the process proceeds to S40.

S40では、給湯管理サーバ116は、短縮候補グループについて設定されている運転許可時間帯から、第1コストが第2コストを上回る時間枠を削除して、短縮候補グループの運転許可時間帯を短縮する。S40の後、処理はS30へ進む。 In S40, the hot water supply management server 116 shortens the operating permission period for the candidate shortening group by removing the time frame where the first cost exceeds the second cost from the operating permission period set for the candidate shortening group. After S40, the process proceeds to S30.

図10に示す例では、超過時間帯T1に関する取消候補グループGについては、運転許可時間帯における電力市場価格が低いので、超過時間帯のどの時間枠においても第1コストが第2コスト以下となる。この場合、グループGの運転許可時間帯は短縮されない。これに対して、例えば、超過時間帯T2に関する取消候補グループHについては、運転許可時間帯における電力市場価格が高いので、超過時間帯のどの時間枠においても第1コストが第2コストを上回る。この場合、グループHの運転許可時間帯が、超過時間帯を含まないように短縮される。 In the example shown in Figure 10, for Group G, a candidate for cancellation regarding the excess time period T1, the electricity market price during the permitted operating hours is low, so the first cost is less than or equal to the second cost in every time slot within the excess period. In this case, Group G's permitted operating hours are not shortened. In contrast, for Group H, a candidate for cancellation regarding the excess time period T2, the electricity market price during the permitted operating hours is high, so the first cost exceeds the second cost in every time slot within the excess period. In this case, Group H's permitted operating hours are shortened to exclude the excess period.

(変形例)
上記の実施例では、熱供給システムとして給湯システム100を例とし、熱供給装置として貯湯式給湯器104を例として説明したが、熱供給システムおよび熱供給装置は暖房等の他の用途で使用される熱を供給するものであってもよい。この場合、熱媒は不凍液等の水以外の熱媒であってもよい。また、上記の実施例では、蓄熱ユニットとしてタンクユニット6を例として説明したが、蓄熱ユニットは他の形態で熱媒を蓄えるものであってもよい。さらに、上記の実施例では、熱源ユニットとして、HPユニット4を例として説明したが、熱源ユニットは電気ヒータ等の他の形態で熱媒を加熱するものであってもよい。
(Variant)
In the above embodiment, a hot water supply system 100 was described as an example of a heat supply system, and a storage-type water heater 104 was described as an example of a heat supply device. However, the heat supply system and heat supply device may supply heat for other purposes such as heating. In this case, the heat transfer medium may be a heat transfer medium other than water, such as antifreeze. Also, in the above embodiment, a tank unit 6 was described as an example of a heat storage unit, but the heat storage unit may store the heat transfer medium in other forms. Furthermore, in the above embodiment, an HP unit 4 was described as an example of a heat source unit, but the heat source unit may heat the heat transfer medium in other forms such as an electric heater.

上記の実施例では、電力管理サーバ112から給湯管理サーバ116へ、当日に発電設備110から複数の貯湯式給湯器104a、104b、・・・へ供給可能な電力の経時的変化を示すデータとして、発電設備110の余剰電力の経時的な変化を示す余剰電力データを送信する構成について説明した。これとは異なり、電力管理サーバ112から給湯管理サーバ116へ、当日に発電設備110から複数の貯湯式給湯器104a、104b、・・・へ供給可能な電力の経時的変化を示すデータとして、発電設備110の発電電力の経時的変化を示す発電電力データを送信する構成としてもよい。 In the above embodiment, a configuration was described in which the power management server 112 transmits surplus power data, which shows the change over time of surplus power of the power generation equipment 110, to the hot water supply management server 116, as data showing the change over time of the amount of power that can be supplied from the power generation equipment 110 to multiple storage-type water heaters 104a, 104b, ... on a given day. Alternatively, the power management server 112 may transmit power generation data, which shows the change over time of power generated by the power generation equipment 110, to the hot water supply management server 116, as data showing the change over time of the amount of power that can be supplied from the power generation equipment 110 to multiple storage-type water heaters 104a, 104b, ... on a given day.

上記の実施例では、複数の貯湯式給湯器104a、104b、・・・のそれぞれが、HPユニット4と、タンクユニット6と、バーナユニット8を備える構成について説明した。これとは異なり、複数の貯湯式給湯器104a、104b、・・・のうち、一部の貯湯式給湯器104’が、HPユニット4と、タンクユニット6と、バーナユニット8を備えており、残りの貯湯式給湯器104’’が、HPユニット4と、タンクユニット6を備えるものの、バーナユニット8を備えていない構成としてもよい。この場合、バーナユニット8を備える貯湯式給湯器104’と、バーナユニット8を備えていない貯湯式給湯器104’’は別々のグループに分類され、図3のS20-S28の処理や図9のS32-S40の処理は、バーナユニット8を備える貯湯式給湯器104’が属するグループのみを対象として行われる。 In the above embodiment, a configuration was described in which each of the multiple storage-type water heaters 104a, 104b, ... is equipped with an HP unit 4, a tank unit 6, and a burner unit 8. Alternatively, among the multiple storage-type water heaters 104a, 104b, ..., some storage-type water heaters 104' are equipped with an HP unit 4, a tank unit 6, and a burner unit 8, while the remaining storage-type water heaters 104'' are equipped with an HP unit 4 and a tank unit 6, but lack a burner unit 8. In this case, the storage-type water heaters 104' equipped with a burner unit 8 and the storage-type water heaters 104'' without a burner unit 8 are classified into separate groups, and the processes S20-S28 in Figure 3 and S32-S40 in Figure 9 are performed only on the group to which the storage-type water heaters 104' equipped with a burner unit 8 belong.

上記の実施例では、給湯管理サーバ116が、全ての時間帯(例えば、当日の2時から翌日の2時まで)を対象として、それぞれのグループの運転許可時間帯を設定し、現在時刻が運転許可時間帯に含まれる場合に沸上運転の実行を許可し、現在時刻が運転許可時間帯に含まれない場合に沸上運転を禁止する構成について説明した。これとは異なり、給湯管理サーバ116は、余剰電力が多くなる特定の時間帯(例えば当日の6時から18時まで)のみを対象として、それぞれのグループの運転許可時間帯を設定し、現在時刻が運転許可時間帯に含まれる場合に沸上運転の実行を許可し、現在時刻が運転許可時間帯に含まれない場合に沸上運転を禁止する構成としてもよい。この場合、上記以外の時間帯(例えば当日の2時から6時までと、当日の18時から翌日の2時まで)については、全てのグループについて沸上運転の実行が許可されてもよい。 In the above embodiment, the hot water supply management server 116 was configured to set permitted operating time zones for each group, covering all time periods (for example, from 2:00 AM to 2:00 AM the following day). It permitted boiling operation if the current time falls within the permitted operating time zone and prohibited boiling operation if the current time falls outside of it. Alternatively, the hot water supply management server 116 may be configured to set permitted operating time zones for each group only during specific time periods when surplus power is high (for example, from 6:00 AM to 6:00 PM the following day). It may permit boiling operation if the current time falls within the permitted operating time zone and prohibit boiling operation if the current time falls outside of it. In this case, boiling operation may be permitted for all groups during other time periods (for example, from 2:00 AM to 6:00 AM and from 6:00 PM to 2:00 AM the following day).

以上のように、一またはそれ以上の実施形態において、給湯システム100(熱供給システムの例)は、複数の貯湯式給湯器104(熱供給装置の例)と、再生可能エネルギーを利用して発電した電力を複数の貯湯式給湯器104に供給可能な発電設備110と、給湯管理サーバ116(熱供給管理サーバ)を備えている。複数の貯湯式給湯器104のそれぞれは、水(熱媒の例)を蓄えるタンクユニット6(蓄熱ユニットの例)と、電力を利用して水を加熱するHPユニット4(熱源ユニットの例)を備えている。複数の貯湯式給湯器104のそれぞれは、HPユニット4により水を加熱して、加熱された水をタンクユニット6へ蓄える沸上運転(蓄熱運転の例)を実行可能である。複数の貯湯式給湯器104のそれぞれは、複数のグループのうちの何れか1つに属している。給湯管理サーバ116は、発電設備110から複数の貯湯式給湯器104へ供給可能な電力である余剰電力(供給可能電力の例)の経時的変化を示す余剰電力データ(供給可能電力データの例)を取得し、補正電力の経時的変化を示す補正電力データを設定し、余剰電力から補正電力を減算した判定基準電力の経時的変化を示す判定基準電力データを算出し、判定基準電力データに基づいて、複数のグループのそれぞれについて、沸上運転の実行を許可する時間帯である運転許可時間帯を設定するスケジューリング処理を実行するように構成されている。補正電力データは、電力市場価格が高い時間帯において補正電力が大きく、電力市場価格が低い時間帯において補正電力が小さくなるように設定される。 As described above, in one or more embodiments, the hot water supply system 100 (an example of a heat supply system) comprises a plurality of storage-type water heaters 104 (an example of a heat supply device), a power generation facility 110 capable of supplying electricity generated using renewable energy to the plurality of storage-type water heaters 104, and a hot water supply management server 116 (a heat supply management server). Each of the plurality of storage-type water heaters 104 comprises a tank unit 6 (an example of a heat storage unit) for storing water (an example of a heat transfer medium) and an HP unit 4 (an example of a heat source unit) for heating water using electricity. Each of the plurality of storage-type water heaters 104 is capable of performing a boiling operation (an example of a heat storage operation) in which the HP unit 4 heats water and stores the heated water in the tank unit 6. Each of the plurality of storage-type water heaters 104 belongs to one of a plurality of groups. The hot water supply management server 116 is configured to acquire surplus power data (example of supplyable power data) showing the time-dependent changes in surplus power (example of supplyable power), which is the power that can be supplied from the power generation equipment 110 to multiple storage-type hot water heaters 104. It then sets correction power data showing the time-dependent changes in correction power, calculates judgment criterion power data showing the time-dependent changes in judgment criterion power by subtracting correction power from surplus power, and, based on the judgment criterion power data, executes a scheduling process to set the permitted operating time periods for each of the multiple groups, which are the time periods during which boiling operation is permitted. The correction power data is set so that the correction power is large during times when electricity market prices are high and small during times when electricity market prices are low.

上記の構成では、余剰電力から補正電力を減算した判定基準電力の経時的変化に基づいて、それぞれのグループの運転許可時間帯が設定される。この際に、電力市場価格が高い時間帯では補正電力が大きな値となり、電力市場価格が低い時間帯では補正電力が小さな値となるので、判定基準電力は、電力市場価格が高い時間帯では余剰電力よりも大幅に小さな値となり、電力市場価格が低い時間帯では余剰電力と同じか、余剰電力よりもわずかに小さな値となる。上記の構成では、このような判定基準電力データに基づいてそれぞれのグループの運転許可時間帯が設定されるので、電力市場価格が高い時間帯については、複数の貯湯式給湯器104の沸上運転の消費電力の総和に対する余剰電力の余裕が比較的大きく、電力市場価格が低い時間帯については、複数の貯湯式給湯器104の沸上運転の消費電力の総和に対する余剰電力の余裕が比較的小さいようなスケジューリングが実現される。従って、発電設備110が発電する電力が当初の想定よりも減少し、余剰電力が当初の想定よりも減少する場合であっても、電力市場価格が高い時間帯で余剰電力の不足を生じにくくすることができる。このような構成とすることによって、発電設備110の余剰電力が当初の想定よりも減少した場合に、電力の不足分の調達コストの増大を抑制することができる。 In the above configuration, the permitted operating time periods for each group are set based on the time-dependent change in the judgment criterion power, which is obtained by subtracting correction power from surplus power. In this case, the correction power is a large value during periods when electricity market prices are high, and a small value during periods when electricity market prices are low. Therefore, the judgment criterion power is significantly smaller than the surplus power during periods when electricity market prices are high, and is the same as or slightly smaller than the surplus power during periods when electricity market prices are low. In the above configuration, since the permitted operating time periods for each group are set based on this judgment criterion power data, scheduling is achieved such that during periods when electricity market prices are high, there is a relatively large margin of surplus power relative to the sum of the power consumption of the boiling operations of the multiple storage-type water heaters 104, and during periods when electricity market prices are low, there is a relatively small margin of surplus power relative to the sum of the power consumption of the boiling operations of the multiple storage-type water heaters 104. Therefore, even if the power generated by the power generation equipment 110 decreases more than initially expected, and the surplus power decreases more than initially expected, it is possible to make it less likely for a shortage of surplus power to occur during periods when electricity market prices are high. This configuration allows for the suppression of increased procurement costs for the power shortage if the surplus power from the power generation facility 110 decreases more than initially anticipated.

一またはそれ以上の実施形態において、補正電力データは、電力市場価格が第1所定値を下回る時間帯において補正電力がゼロとなり、電力市場価格が第1所定値以上の時間帯において補正電力が正の値となるように設定される。 In one or more embodiments, the corrected power data is set such that the corrected power is zero during periods when the electricity market price is below a first predetermined value, and a positive value during periods when the electricity market price is above the first predetermined value.

上記の構成によれば、電力市場価格が第1所定値よりも低い時間帯については、判定基準電力を余剰電力と一致させることができる。想定される余剰電力データにより合わせたスケジューリングを実現することができる。 According to the above configuration, during periods when the electricity market price is lower than the first predetermined value, the judgment criterion power can be matched with the surplus power. This allows for scheduling that is more aligned with anticipated surplus power data.

一またはそれ以上の実施形態において、給湯管理サーバ116は、スケジューリング処理において、複数のグループのそれぞれについて、電力市場価格が第2所定値以上となる時間帯を運転許可時間帯が含まないように、運転許可時間帯を設定するように構成されている。 In one or more embodiments, the hot water supply management server 116 is configured, in its scheduling process, to set the permitted operating time periods for each of the multiple groups such that the permitted operating time periods do not include time periods in which the electricity market price is equal to or greater than a second predetermined value.

上記の構成によれば、電力市場価格が第2所定値以上となる時間帯については、運転許可時間帯が設定されない(言い換えれば、電力市場価格が第2所定値以上となる時間帯は全てのグループについて沸上運転を禁止する)ようにすることができる。従って、発電設備110が発電する電力が当初の想定よりも減少し、余剰電力が当初の想定よりも減少する場合であっても、電力市場価格が第2所定値以上となる時間帯で余剰電力の不足を生じることを確実に防止することができる。 According to the above configuration, during periods when the electricity market price exceeds the second predetermined value, no operating hours are set (in other words, boiling operation is prohibited for all groups during periods when the electricity market price exceeds the second predetermined value). Therefore, even if the power generated by the power generation facility 110 decreases compared to the initial assumption, and the surplus power decreases compared to the initial assumption, it is possible to reliably prevent a shortage of surplus power during periods when the electricity market price exceeds the second predetermined value.

一またはそれ以上の実施形態において、複数の貯湯式給湯器104のそれぞれは、燃料を利用して水を加熱するバーナユニット8(補助熱源ユニットの例)をさらに備えている。給湯管理サーバ116は、スケジューリング処理を実行した後、供給可能電力から使用予定電力を減算した使用可能電力が所定のしきい値に満たない時間帯である超過時間帯T1,T2が存在するか否かを判定し、超過時間帯T1,T2が存在する場合に、運転許可時間帯に超過時間帯T1,T2を含むグループを取消候補グループとして特定し、取消候補グループに属する貯湯式給湯器104が運転許可時間帯において沸上運転を実行した場合の給湯コスト(熱供給コストの例)を第1コストとして算出し、取消候補グループに属する貯湯式給湯器104が運転許可時間帯において沸上運転を実行せず、代わりにバーナユニット8を使用する場合の給湯コストを第2コストとして算出し、第1コストが第2コストよりも高い場合に、取消候補グループについて設定された運転許可時間帯を取り消すように構成されている。 In one or more embodiments, each of the multiple storage-type water heaters 104 further comprises a burner unit 8 (an example of an auxiliary heat source unit) that heats water using fuel. After performing scheduling processing, the hot water management server 116 determines whether there are excess time periods T1 and T2, which are periods when the available power (calculated by subtracting the planned power usage from the available power) falls below a predetermined threshold. If excess time periods T1 and T2 exist, the server identifies groups containing these excess time periods as cancellation candidate groups. The server calculates the hot water cost (an example of heat supply cost) when the storage-type water heaters 104 belonging to the cancellation candidate group perform boiling operations during the permitted operation period as the first cost. The server then calculates the hot water cost when the storage-type water heaters 104 belonging to the cancellation candidate group do not perform boiling operations during the permitted operation period and instead use the burner unit 8 as the second cost. If the first cost is higher than the second cost, the server cancels the permitted operation period set for the cancellation candidate group.

上記の構成によれば、超過時間帯T1,T2が存在する場合に、バーナユニット8によって給湯を行う場合の給湯コストと、HPユニット4によって沸上運転を行った上で給湯を行う場合の給湯コストを比較して、給湯コストがより低くなるように、取消候補グループの運転許可時間帯を取り消すか否かが決定される。このような構成とすることによって、給湯システム100における給湯コストを低減することができる。 According to the above configuration, when excess time periods T1 and T2 exist, the hot water supply cost when hot water is supplied by the burner unit 8 is compared with the hot water supply cost when hot water is supplied after boiling operation by the HP unit 4. The decision of whether or not to cancel the operating permission time period of the cancellation candidate group is made based on whether the hot water supply cost is lower. This configuration makes it possible to reduce the hot water supply cost in the hot water supply system 100.

一またはそれ以上の実施形態において、複数の貯湯式給湯器104のそれぞれは、燃料を利用して水を加熱するバーナユニット8(補助熱源ユニットの例)をさらに備えている。給湯管理サーバ116は、スケジューリング処理を実行した後、供給可能電力から使用予定電力を減算した使用可能電力が所定のしきい値に満たない時間帯である超過時間帯T1,T2が存在するか否かを判定し、超過時間帯T1,T2が存在する場合に、運転許可時間帯に超過時間帯T1,T2を含むグループを短縮候補グループとして特定し、短縮候補グループに属する貯湯式給湯器104が運転許可時間帯において沸上運転を実行した場合の給湯コスト(熱供給コストの例)を第1コストとして算出し、短縮候補グループに属する貯湯式給湯器104が運転許可時間帯において沸上運転を実行せず、代わりにバーナユニット8を使用する場合の給湯コストを第2コストとして算出し、第1コストが第2コストよりも高い場合に、短縮候補グループについて設定された運転許可時間帯を、超過時間帯を含まないように短縮するように構成されている。 In one or more embodiments, each of the multiple storage-type water heaters 104 further comprises a burner unit 8 (an example of an auxiliary heat source unit) that heats water using fuel. After performing scheduling processing, the hot water management server 116 determines whether there are excess time periods T1 and T2, which are periods when the available power (calculated by subtracting the planned power usage from the available power) falls below a predetermined threshold. If excess time periods T1 and T2 exist, the server identifies groups that include these excess time periods T1 and T2 within the permitted operating time period as shortened candidate groups. The server calculates the hot water cost (an example of heat supply cost) when the storage-type water heaters 104 belonging to the shortened candidate group perform boiling operations during the permitted operating time period as the first cost. The server then calculates the hot water cost when the storage-type water heaters 104 belonging to the shortened candidate group do not perform boiling operations during the permitted operating time period and instead use the burner unit 8 as the second cost. If the first cost is higher than the second cost, the server is configured to shorten the permitted operating time period set for the shortened candidate group so that it does not include the excess time periods.

上記の構成によれば、超過時間帯T1,T2が存在する場合に、バーナユニット8によって給湯を行う場合の給湯コストと、HPユニット4によって沸上運転を行った上で給湯を行う場合の給湯コストを比較して、給湯コストがより低くなるように、短縮候補グループの運転許可時間帯を短縮するか否かが決定される。このような構成とすることによって、給湯システム100における給湯コストを低減することができる。 According to the above configuration, when excess time periods T1 and T2 exist, the hot water supply cost when hot water is supplied by the burner unit 8 is compared with the hot water supply cost when hot water is supplied after boiling operation by the HP unit 4. The decision is then made whether or not to shorten the permitted operating time period of the shortened candidate group so that the hot water supply cost is lower. This configuration allows for a reduction in the hot water supply cost in the hot water supply system 100.

一またはそれ以上の実施形態において、第1コストは、電力市場価格をHPユニット4の熱効率で除算した値に基づいている。第2コストは、燃料ガス市場価格をバーナユニット8の熱効率で除算した値に基づいている。 In one or more embodiments, the first cost is based on the electricity market price divided by the thermal efficiency of the HP unit 4. The second cost is based on the fuel gas market price divided by the thermal efficiency of the burner unit 8.

上記の構成によれば、簡易な計算によって、第1コストと第2コストをそれぞれ算出することができる。 According to the above configuration, the first and second costs can be calculated using a simple calculation.

一またはそれ以上の実施形態において、HPユニット4は、外気から吸熱して水を加熱するヒートポンプ熱源を備えている。HPユニット4の熱効率は、運転許可時間帯における外気温度に基づいて設定される。 In one or more embodiments, the HP unit 4 includes a heat pump heat source that absorbs heat from the outside air to heat water. The thermal efficiency of the HP unit 4 is set based on the outside air temperature during the permitted operating time period.

外気から吸熱して熱媒を加熱するヒートポンプ熱源の熱効率は、外気温度に応じて変化する。上記の構成によれば、第1コストをより正確に算出することができる。 The thermal efficiency of a heat pump heat source, which heats a heat transfer medium by absorbing heat from the outside air, changes depending on the outside air temperature. With the above configuration, the first cost can be calculated more accurately.

以上、各実施例について詳細に説明したが、これらは例示に過ぎず、特許請求の範囲を限定するものではない。特許請求の範囲に記載の技術には、以上に例示した具体例を様々に変形、変更したものが含まれる。本明細書または図面に説明した技術要素は、単独であるいは各種の組合せによって技術的有用性を発揮するものであり、出願時請求項記載の組合せに限定されるものではない。また、本明細書または図面に例示した技術は複数目的を同時に達成し得るものであり、そのうちの一つの目的を達成すること自体で技術的有用性を持つものである。 The above descriptions of each embodiment are illustrative and do not limit the scope of the claims. The technologies described in the claims include various modifications and changes to the specific examples illustrated above. The technical elements described in this specification or drawings exhibit technical usefulness individually or in various combinations, and are not limited to the combinations described in the claims at the time of filing. Furthermore, the technologies illustrated in this specification or drawings can achieve multiple objectives simultaneously, and achieving even one of these objectives constitutes technical usefulness.

4 :HPユニット
6 :タンクユニット
8 :バーナユニット
10 :圧縮機
12 :凝縮器
14 :膨張弁
16 :蒸発器
17 :HP熱源
18 :循環ポンプ
19 :HP往き経路
20 :往きサーミスタ
21 :HP戻り経路
22 :戻りサーミスタ
23 :外気温度サーミスタ
24 :HPコントローラ
30 :タンク
31 :タンク往き経路
32 :混合弁
33 :タンク戻り経路
34 :バイパス制御弁
36 :上部サーミスタ
37 :中間部サーミスタ
38 :下部サーミスタ
40 :給水経路
42 :減圧弁
44 :入水サーミスタ
46 :タンク給水経路
48 :タンクバイパス経路
50 :逆止弁
52 :逆止弁
54 :水側水量センサ
56 :タンク出湯経路
58 :逆止弁
60 :湯側水量センサ
62 :第1給湯経路
64 :混合サーミスタ
66 :第2給湯経路
68 :給湯出口サーミスタ
70 :逆止弁
72 :給湯バイパス経路
74 :タンクコントローラ
80 :バーナ
82 :熱交換器
84 :バイパスサーボ
86 :水量サーボ
88 :湯はり弁
90 :バーナ往路
91 :水量センサ
92 :バーナ復路
94 :バーナバイパス経路
96 :バーナ給湯サーミスタ
97 :バーナコントローラ
98 :湯はり経路
99 :リモコン
100 :給湯システム
102 :住居
102a :住居
102b :住居
104 :貯湯式給湯器
104’ :貯湯式給湯器
104’’:貯湯式給湯器
104a :貯湯式給湯器
104b :貯湯式給湯器
106 :ホームゲートウェイ
106a :ホームゲートウェイ
106b :ホームゲートウェイ
108 :電力事業者
110 :発電設備
112 :電力管理サーバ
114 :製造事業者
116 :給湯管理サーバ
118 :インターネット
4: HP unit 6: Tank unit 8: Burner unit 10: Compressor 12: Condenser 14: Expansion valve 16: Evaporator 17: HP heat source 18: Circulation pump 19: HP supply path 20: Supply thermistor 21: HP return path 22: Return thermistor 23: Ambient temperature thermistor 24: HP controller 30: Tank 31: Tank supply path 32: Mixing valve 33: Tank return path 34: Bypass control valve 36: Upper thermistor 37: Intermediate thermistor 38: Lower thermistor 40: Water supply path 42: Pressure reducing valve 44: Inlet water thermistor 46: Tank water supply path 48: Tank bypass path 50: Check valve 52: Check valve 54: Water side water volume sensor 56: Tank hot water outlet path 58: Check valve 60 : Hot water side water volume sensor 62 : First hot water supply route 64 : Mixing thermistor 66 : Second hot water supply route 68 : Hot water outlet thermistor 70 : Check valve 72 : Hot water bypass route 74 : Tank controller 80 : Burner 82 : Heat exchanger 84 : Bypass servo 86 : Water volume servo 88 : Hot water filling valve 90 : Burner forward route 91 : Water volume sensor 92 : Burner return route 94 : Burner bypass route 96 : Burner hot water thermistor 97 : Burner controller 98 : Hot water filling route 99 : Remote control 100 : Hot water supply system 102 : Residence 102a : Residence 102b : Residence 104 : Storage type water heater 104' : Storage type water heater 104'' : Storage type water heater 104a : Storage type water heater 104b : Storage-type water heater 106 : Home gateway 106a : Home gateway 106b : Home gateway 108 : Power company 110 : Power generation equipment 112 : Power management server 114 : Manufacturer 116 : Water supply management server 118 : Internet

Claims (10)

複数の熱供給装置と、再生可能エネルギーを利用して発電した電力を前記複数の熱供給装置に供給可能な発電設備と、熱供給管理サーバを備える熱供給システムであって、
前記複数の熱供給装置のそれぞれは、
熱媒を蓄える蓄熱ユニットと、
電力を利用して前記熱媒を加熱する熱源ユニットを備えており、
前記複数の熱供給装置のそれぞれは、前記熱源ユニットにより前記熱媒を加熱して、加熱された前記熱媒を前記蓄熱ユニットへ蓄える蓄熱運転を実行可能であり、
前記複数の熱供給装置のそれぞれは、複数のグループのうちの何れか1つに属しており、
前記熱供給管理サーバは、
前記発電設備から前記複数の熱供給装置へ供給可能な電力である供給可能電力の経時的変化を示す供給可能電力データを取得し、
補正電力の経時的変化を示す補正電力データを設定し、
前記供給可能電力から前記補正電力を減算した判定基準電力の経時的変化を示す判定基準電力データを算出し、
前記判定基準電力データに基づいて、前記複数のグループのそれぞれについて、前記蓄熱運転の実行を許可する時間帯である運転許可時間帯を設定するスケジューリング処理を実行するように構成されており、
前記補正電力データは、電力市場価格が高い時間帯において前記補正電力が大きく、前記電力市場価格が低い時間帯において前記補正電力が小さくなるように設定される、熱供給システム。
A heat supply system comprising multiple heat supply devices, a power generation facility capable of supplying electricity generated using renewable energy to the multiple heat supply devices, and a heat supply management server,
Each of the aforementioned heat supply devices is
A heat storage unit that stores a heat transfer medium,
It is equipped with a heat source unit that uses electricity to heat the heat transfer medium,
Each of the aforementioned plurality of heat supply devices is capable of performing a heat storage operation in which the heat source unit heats the heat medium and stores the heated heat medium in the heat storage unit.
Each of the aforementioned heat supply devices belongs to one of the groups,
The aforementioned heat supply management server,
The power generation equipment acquires power supply data that shows the change over time of the available power supply, which is the power that can be supplied from the power generation equipment to the plurality of heat supply devices.
Set correction power data that shows the change in correction power over time,
The judgment criterion power data is calculated, showing the change over time of the judgment criterion power obtained by subtracting the correction power from the available power supply.
Based on the aforementioned determination criteria power data, the system is configured to perform a scheduling process to set an operating permission period, which is a period of time during which the heat storage operation is permitted, for each of the multiple groups.
A heat supply system in which the corrected power data is set such that the corrected power is large during periods when electricity market prices are high and small during periods when electricity market prices are low.
前記補正電力データは、前記電力市場価格が第1所定値を下回る時間帯において前記補正電力がゼロとなり、前記電力市場価格が前記第1所定値以上の時間帯において前記補正電力が正の値となるように設定されている、請求項1の熱供給システム。 The heat supply system according to claim 1, wherein the corrected power data is set such that the corrected power becomes zero during periods when the electricity market price is below a first predetermined value, and becomes a positive value during periods when the electricity market price is above the first predetermined value. 前記熱供給管理サーバは、前記スケジューリング処理において、前記複数のグループのそれぞれについて、前記電力市場価格が第2所定値以上となる時間帯を前記運転許可時間帯が含まないように、前記運転許可時間帯を設定するように構成されている、請求項1の熱供給システム。 The heat supply management server is configured, in the scheduling process, to set the permitted operating time periods for each of the plurality of groups such that the permitted operating time periods do not include the time period in which the electricity market price is equal to or greater than a second predetermined value, according to claim 1. 前記複数の熱供給装置のそれぞれは、燃料を利用して前記熱媒を加熱する補助熱源ユニットをさらに備えており、
前記熱供給管理サーバは、前記スケジューリング処理を実行した後、前記供給可能電力から使用予定電力を減算した使用可能電力が所定のしきい値に満たない時間帯である超過時間帯が存在するか否かを判定し、
前記超過時間帯が存在する場合に、
前記運転許可時間帯に前記超過時間帯を含むグループを取消候補グループとして特定し、
前記取消候補グループに属する前記熱供給装置が前記運転許可時間帯において前記蓄熱運転を実行した場合の熱供給コストを第1コストとして算出し、
前記取消候補グループに属する前記熱供給装置が前記運転許可時間帯において前記蓄熱運転を実行せず、代わりに前記補助熱源ユニットを使用する場合の熱供給コストを第2コストとして算出し、
前記第1コストが前記第2コストよりも高い場合に、前記取消候補グループについて設定された前記運転許可時間帯を取り消すように構成されている、請求項1の熱供給システム。
Each of the aforementioned plurality of heat supply devices further comprises an auxiliary heat source unit that uses fuel to heat the heat transfer medium,
After executing the scheduling process, the heat supply management server determines whether there is an excess period in which the available power, obtained by subtracting the planned power usage from the available power supply, falls below a predetermined threshold.
If the aforementioned excess time period exists,
Groups whose operating permit period includes the aforementioned excess period are identified as groups for cancellation.
The first cost is calculated as the heat supply cost when the heat supply device belonging to the group of cancellation candidates performs the heat storage operation during the permitted operating time period.
The second cost is calculated for the heat supply when the heat supply device belonging to the group of cancellation candidates does not perform the heat storage operation during the permitted operating time period, but instead uses the auxiliary heat source unit.
The heat supply system according to claim 1, configured to cancel the operating permit time period set for the cancellation candidate group if the first cost is higher than the second cost.
前記複数の熱供給装置のそれぞれは、燃料を利用して前記熱媒を加熱する補助熱源ユニットをさらに備えており、
前記熱供給管理サーバは、前記スケジューリング処理を実行した後、前記供給可能電力から使用予定電力を減算した使用可能電力が所定のしきい値に満たない時間帯である超過時間帯が存在するか否かを判定し、
前記超過時間帯が存在する場合に、
前記運転許可時間帯に前記超過時間帯を含むグループを短縮候補グループとして特定し、
前記短縮候補グループに属する前記熱供給装置が前記運転許可時間帯において前記蓄熱運転を実行した場合の熱供給コストを第1コストとして算出し、
前記短縮候補グループに属する前記熱供給装置が前記運転許可時間帯において前記蓄熱運転を実行せず、代わりに前記補助熱源ユニットを使用する場合の熱供給コストを第2コストとして算出し、
前記第1コストが前記第2コストよりも高い場合に、前記短縮候補グループについて設定された前記運転許可時間帯を、前記超過時間帯を含まないように短縮するように構成されている、請求項1の熱供給システム。
Each of the aforementioned plurality of heat supply devices further comprises an auxiliary heat source unit that uses fuel to heat the heat transfer medium,
After executing the scheduling process, the heat supply management server determines whether there is an excess period in which the available power, obtained by subtracting the planned power usage from the available power supply, falls below a predetermined threshold.
If the aforementioned excess time period exists,
Groups whose operating permit time period includes the aforementioned excess time period are identified as candidate groups for shortening the operating period.
The first cost is calculated as the heat supply cost when the heat supply device belonging to the shortened candidate group performs the heat storage operation during the permitted operating time period.
The heat supply cost is calculated as a second cost when the heat supply device belonging to the shortened candidate group does not perform the heat storage operation during the permitted operating time period, but instead uses the auxiliary heat source unit.
The heat supply system according to claim 1, wherein, if the first cost is higher than the second cost, the operating permission period set for the shortening candidate group is shortened so as not to include the excess period.
前記第1コストが、前記電力市場価格を前記熱源ユニットの熱効率で除算した値に基づいており、
前記第2コストが、燃料ガス市場価格を前記補助熱源ユニットの熱効率で除算した値に基づいている、請求項4または5の熱供給システム。
The first cost is based on the value obtained by dividing the electricity market price by the thermal efficiency of the heat source unit.
The heat supply system according to claim 4 or 5, wherein the second cost is based on the value obtained by dividing the fuel gas market price by the thermal efficiency of the auxiliary heat source unit.
前記熱源ユニットが、外気から吸熱して前記熱媒を加熱するヒートポンプ熱源を備えており、
前記熱源ユニットの前記熱効率が、前記運転許可時間帯における外気温度に基づいて設定される、請求項6の熱供給システム。
The heat source unit includes a heat pump heat source that absorbs heat from the outside air to heat the heat transfer medium.
The heat supply system according to claim 6, wherein the thermal efficiency of the heat source unit is set based on the outside air temperature during the permitted operating time period.
熱供給管理サーバであって、
前記熱供給管理サーバは、複数の熱供給装置と、再生可能エネルギーを利用して発電した電力を前記複数の熱供給装置に供給可能な発電設備と、前記熱供給管理サーバを備える熱供給システムで使用され、
前記複数の熱供給装置のそれぞれは、
熱媒を蓄える蓄熱ユニットと、
電力を利用して前記熱媒を加熱する熱源ユニットを備えており、
前記複数の熱供給装置のそれぞれは、前記熱源ユニットにより前記熱媒を加熱して、加熱された前記熱媒を前記蓄熱ユニットへ蓄える蓄熱運転を実行可能であり、
前記複数の熱供給装置のそれぞれは、複数のグループのうちの何れか1つに属しており、
前記熱供給管理サーバは、
前記発電設備から前記複数の熱供給装置へ供給可能な電力である供給可能電力の経時的変化を示す供給可能電力データを取得し、
補正電力の経時的変化を示す補正電力データを設定し、
前記供給可能電力から前記補正電力を減算した判定基準電力の経時的変化を示す判定基準電力データを算出し、
前記判定基準電力データに基づいて、前記複数のグループのそれぞれについて、前記蓄熱運転の実行を許可する時間帯である運転許可時間帯を設定するスケジューリング処理を実行するように構成されており、
前記補正電力データは、電力市場価格が高い時間帯において前記補正電力が大きく、前記電力市場価格が低い時間帯において前記補正電力が小さくなるように設定される、熱供給管理サーバ。
It is a heat supply management server,
The heat supply management server is used in a heat supply system comprising a plurality of heat supply devices, a power generation facility capable of supplying electricity generated using renewable energy to the plurality of heat supply devices, and the heat supply management server.
Each of the aforementioned heat supply devices is
A heat storage unit that stores a heat transfer medium,
It is equipped with a heat source unit that uses electricity to heat the heat transfer medium,
Each of the aforementioned plurality of heat supply devices is capable of performing a heat storage operation in which the heat source unit heats the heat medium and stores the heated heat medium in the heat storage unit.
Each of the aforementioned heat supply devices belongs to one of the groups,
The aforementioned heat supply management server,
The power generation equipment acquires power supply data that shows the change over time of the available power supply, which is the power that can be supplied from the power generation equipment to the plurality of heat supply devices.
Set correction power data that shows the change in correction power over time,
The judgment criterion power data is calculated, showing the change over time of the judgment criterion power obtained by subtracting the correction power from the available power supply.
Based on the aforementioned determination criteria power data, the system is configured to perform a scheduling process to set an operating permission period, which is a period of time during which the heat storage operation is permitted, for each of the multiple groups.
The heat supply management server is configured such that the corrected power data is large during periods when electricity market prices are high, and small during periods when electricity market prices are low.
熱供給管理サーバの動作方法であって、
前記熱供給管理サーバは、複数の熱供給装置と、再生可能エネルギーを利用して発電した電力を前記複数の熱供給装置に供給可能な発電設備と、前記熱供給管理サーバを備える熱供給システムで使用され、
前記複数の熱供給装置のそれぞれは、
熱媒を蓄える蓄熱ユニットと、
電力を利用して前記熱媒を加熱する熱源ユニットを備えており、
前記複数の熱供給装置のそれぞれは、前記熱源ユニットにより前記熱媒を加熱して、加熱された前記熱媒を前記蓄熱ユニットへ蓄える蓄熱運転を実行可能であり、
前記複数の熱供給装置のそれぞれは、複数のグループのうちの何れか1つに属しており、
前記動作方法は、
前記発電設備から前記複数の熱供給装置へ供給可能な電力である供給可能電力の経時的変化を示す供給可能電力データを取得することと、
補正電力の経時的変化を示す補正電力データを設定することと、
前記供給可能電力から前記補正電力を減算した判定基準電力の経時的変化を示す判定基準電力データを算出することと、
前記判定基準電力データに基づいて、前記複数のグループのそれぞれについて、前記蓄熱運転の実行を許可する時間帯である運転許可時間帯を設定するスケジューリング処理を実行することを備えており、
前記補正電力データは、電力市場価格が高い時間帯において前記補正電力が大きく、前記電力市場価格が低い時間帯において前記補正電力が小さくなるように設定される、動作方法。
A method for operating a heat supply management server,
The heat supply management server is used in a heat supply system comprising a plurality of heat supply devices, a power generation facility capable of supplying electricity generated using renewable energy to the plurality of heat supply devices, and the heat supply management server.
Each of the aforementioned heat supply devices is
A heat storage unit that stores a heat transfer medium,
It is equipped with a heat source unit that uses electricity to heat the heat transfer medium,
Each of the aforementioned plurality of heat supply devices is capable of performing a heat storage operation in which the heat source unit heats the heat medium and stores the heated heat medium in the heat storage unit.
Each of the aforementioned heat supply devices belongs to one of the groups,
The aforementioned operation method is,
To acquire supplyable power data that shows the change over time of supplyable power, which is the power that can be supplied from the power generation facility to the plurality of heat supply devices,
Setting correction power data that shows the change in correction power over time,
To calculate judgment criterion power data showing the change over time of the judgment criterion power obtained by subtracting the correction power from the available power supply,
The system includes performing a scheduling process to set an operating permission period, which is a period of time during which the heat storage operation is permitted, for each of the multiple groups based on the aforementioned determination criterion power data.
The correction power data is set to be large during periods when electricity market prices are high, and small during periods when electricity market prices are low.
熱供給管理サーバのためのプログラムであって、
前記熱供給管理サーバは、複数の熱供給装置と、再生可能エネルギーを利用して発電した電力を前記複数の熱供給装置に供給可能な発電設備と、前記熱供給管理サーバを備える熱供給システムで使用され、
前記複数の熱供給装置のそれぞれは、
熱媒を蓄える蓄熱ユニットと、
電力を利用して前記熱媒を加熱する熱源ユニットを備えており、
前記複数の熱供給装置のそれぞれは、前記熱源ユニットにより前記熱媒を加熱して、加熱された前記熱媒を前記蓄熱ユニットへ蓄える蓄熱運転を実行可能であり、
前記複数の熱供給装置のそれぞれは、複数のグループのうちの何れか1つに属しており、
前記プログラムは、前記熱供給管理サーバに、
前記発電設備から前記複数の熱供給装置へ供給可能な電力である供給可能電力の経時的変化を示す供給可能電力データを取得するステップと、
補正電力の経時的変化を示す補正電力データを設定するステップと、
前記供給可能電力から前記補正電力を減算した判定基準電力の経時的変化を示す判定基準電力データを算出するステップと、
前記判定基準電力データに基づいて、前記複数のグループのそれぞれについて、前記蓄熱運転の実行を許可する時間帯である運転許可時間帯を設定するスケジューリング処理を実行するステップを実行させ、
前記補正電力データは、電力市場価格が高い時間帯において前記補正電力が大きく、前記電力市場価格が低い時間帯において前記補正電力が小さくなるように設定される、プログラム。
A program for a heat supply management server,
The heat supply management server is used in a heat supply system comprising a plurality of heat supply devices, a power generation facility capable of supplying electricity generated using renewable energy to the plurality of heat supply devices, and the heat supply management server.
Each of the aforementioned heat supply devices is
A heat storage unit that stores a heat transfer medium,
It is equipped with a heat source unit that uses electricity to heat the heat transfer medium,
Each of the aforementioned plurality of heat supply devices is capable of performing a heat storage operation in which the heat source unit heats the heat medium and stores the heated heat medium in the heat storage unit.
Each of the aforementioned heat supply devices belongs to one of the groups,
The program is transmitted to the heat supply management server.
The steps include: acquiring supplyable power data that shows the change over time of supplyable power, which is the power that can be supplied from the power generation facility to the plurality of heat supply devices;
The steps include setting correction power data that shows the change in correction power over time,
The steps include: calculating judgment criterion power data that shows the change over time of the judgment criterion power obtained by subtracting the correction power from the available power supply;
Based on the aforementioned determination criteria power data, the system executes a scheduling process to set an operating permission period, which is a period of time during which the heat storage operation is permitted, for each of the multiple groups.
The program sets the corrected power data such that the corrected power is large during periods when electricity market prices are high and small during periods when electricity market prices are low.
JP2022160256A 2022-01-31 2022-10-04 Heat supply system, heat supply management server, operating method and program Active JP7850643B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022012777 2022-01-31
JP2022012777 2022-01-31

Publications (2)

Publication Number Publication Date
JP2023111820A JP2023111820A (en) 2023-08-10
JP7850643B2 true JP7850643B2 (en) 2026-04-23

Family

ID=87551410

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022160256A Active JP7850643B2 (en) 2022-01-31 2022-10-04 Heat supply system, heat supply management server, operating method and program

Country Status (1)

Country Link
JP (1) JP7850643B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015116408A2 (en) 2014-01-31 2015-08-06 Steffes Corporation Energy storage device power consumption management
US20160181806A1 (en) 2014-12-22 2016-06-23 Battelle Memorial Institute Hierarchical operational control of aggregated load management resources
WO2020163749A1 (en) 2019-02-08 2020-08-13 8Me Nova, Llc Coordinated control of renewable electric generation resource and charge storage device
WO2021160343A1 (en) 2020-02-10 2021-08-19 Eaton Intelligent Power Limited Disconnect load control receiver for resistive heating loads

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7123711B2 (en) * 2018-09-19 2022-08-23 大和ハウス工業株式会社 system
JP7734064B2 (en) * 2021-12-13 2025-09-04 リンナイ株式会社 Heat supply system, heat supply management server, operation method and program

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015116408A2 (en) 2014-01-31 2015-08-06 Steffes Corporation Energy storage device power consumption management
US20160181806A1 (en) 2014-12-22 2016-06-23 Battelle Memorial Institute Hierarchical operational control of aggregated load management resources
WO2020163749A1 (en) 2019-02-08 2020-08-13 8Me Nova, Llc Coordinated control of renewable electric generation resource and charge storage device
WO2021160343A1 (en) 2020-02-10 2021-08-19 Eaton Intelligent Power Limited Disconnect load control receiver for resistive heating loads

Also Published As

Publication number Publication date
JP2023111820A (en) 2023-08-10

Similar Documents

Publication Publication Date Title
US8600563B2 (en) Hybrid heating system
US9127866B2 (en) Hybrid heating system
US20110082593A1 (en) System and method for controlling hydronic systems having multiple sources and multiple loads
JP5861568B2 (en) Hot water system
JP7734064B2 (en) Heat supply system, heat supply management server, operation method and program
JP6086014B2 (en) Heat pump water heater
KR101621168B1 (en) Hot water supply system
JP6678347B2 (en) Power management system
JP2013174408A (en) Heat pump type water heater
KR20160003677A (en) In-line heated solar thermal storage collector
JP5590188B1 (en) Hybrid hot water supply system
JP6712505B2 (en) Heat medium heating device
JP7850643B2 (en) Heat supply system, heat supply management server, operating method and program
JP2005223964A (en) Cogeneration system operation control system
JP7850645B2 (en) Heat supply system, heat supply management server, operating method and program
US10830494B2 (en) Water heater appliance and methods of operation
EP4235040A1 (en) A temperature management system
JP7236333B2 (en) Water heater
JP6513498B2 (en) Hot water supply system
JP6782130B2 (en) Thermal equipment
JP5370521B2 (en) Hot water storage water heater
JP2012084380A (en) Fuel cell system
JP2017194214A (en) Storage water heater
US20250347444A1 (en) Machine learning of heat pump system water usage patterns for optimized heat pump performance
JP2013174421A (en) Heat pump apparatus energy management device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250822

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20260325

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260331

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260413

R150 Certificate of patent or registration of utility model

Ref document number: 7850643

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150