JP7851277B2 - Energy management system, energy management program, and energy management method - Google Patents
Energy management system, energy management program, and energy management methodInfo
- Publication number
- JP7851277B2 JP7851277B2 JP2023137885A JP2023137885A JP7851277B2 JP 7851277 B2 JP7851277 B2 JP 7851277B2 JP 2023137885 A JP2023137885 A JP 2023137885A JP 2023137885 A JP2023137885 A JP 2023137885A JP 7851277 B2 JP7851277 B2 JP 7851277B2
- Authority
- JP
- Japan
- Prior art keywords
- energy
- processing unit
- plan
- period processing
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Description
本発明は、エネルギーマネジメントシステム、エネルギーマネジメントプログラム、およびエネルギーマネジメント方法に関する。 This invention relates to an energy management system, an energy management program, and an energy management method.
従来、地域における電力を管理するための技術としては、例えば、下記の特許文献1が知られている。特許文献1に記載された電力管理システムは、所定区域に設けられる第1電力管理装置(CEMS)が、所定区域に存在する各需要家側の装置と通信し、所定区域での電力の需給バランスを予測する。第1電力管理装置は、需給バランスの予測結果から余剰電力を算出し、余剰電力の消費を各需要家に促す。これにより、電力管理システムは、所定区域で発電された電力を、その区域内で優先的に消費させている。 Conventionally, as a technology for managing electricity in a region, for example, Patent Document 1 described below is known. The power management system described in Patent Document 1 involves a first power management device (CEMS) installed in a predetermined area, which communicates with devices on the consumer side within that area to predict the supply and demand balance of electricity in the predetermined area. The first power management device calculates surplus electricity from the predicted supply and demand balance and encourages each consumer to consume the surplus electricity. In this way, the power management system prioritizes the consumption of electricity generated in a predetermined area within that area.
また、電力管理システムは、短周期リアルタイムフィードバック制御機能と、中周期リアルタイムフィードバック制御機能と、長周期予測機能とを備えている。短周期リアルタイムフィードバック制御機能は、例えば、PV及び蓄電池等を、短周期で(例えば、秒単位で)監視してフィードバック制御している。中周期リアルタイムフィードバック制御機能は、例えば、蓄熱器のような装置を、中周期で(例えば、時間単位で)監視してフィードバック制御している。長周期予測機能は、地域内の各分散電源の発電量、電力需要、系統間の連系量等を、長周期で(例えば、数時間単位で)予測している。 Furthermore, the power management system is equipped with short-period real-time feedback control, medium-period real-time feedback control, and long-period prediction functions. The short-period real-time feedback control function monitors and provides feedback control to devices such as PV systems and storage batteries at short intervals (e.g., in seconds). The medium-period real-time feedback control function monitors and provides feedback control to devices such as thermal storage units at medium intervals (e.g., in hours). The long-period prediction function predicts the power generation amount of each distributed power source within the region, power demand, and the amount of interconnection between grids at long intervals (e.g., in several hours).
地域EMS(地域エネルギーマネジメントシステム)は、地域などのエリアにおいて、エネルギーの供給先である複数の建物からなる建物群のエネルギー関連のデータを収集および蓄積し、データ分析により予測、最適計画、最適制御などのエネルギー運用を支援している。地域EMSにおいて、地域において管理が求められているエネルギーは電力に限らず燃料エネルギーや熱エネルギーといった多種のエネルギーがある。地域EMSは、これらの多種のエネルギーの供給を管理し、各エネルギー供給設備から各エネルギー供給先設備にエネルギーを供給する必要がある。しかしながら、特許文献1に記載された電力管理システムは、地域内の各分散電源の発電量や電力需要等を長周期で予測して中周期および短周期でフィードバック制御をしており、多種類のエネルギー管理に対応することができない。 A regional Energy Management System (EMS) collects and stores energy-related data from a group of buildings that receive energy within a region or area. Through data analysis, it supports energy management through prediction, optimal planning, and optimal control. In a regional EMS, the energy required for management is not limited to electricity; it includes various types of energy such as fuel energy and thermal energy. The regional EMS must manage the supply of these various types of energy and supply energy from each energy supply facility to each energy recipient facility. However, the power management system described in Patent Document 1 predicts the power generation and electricity demand of each distributed power source within the region over long periods and performs feedback control over medium and short periods, making it incapable of managing multiple types of energy.
また、地域内でエネルギーを融通して利用する場合は、各エネルギー供給設備のおけるエネルギーの種類および供給効率が異なり、エネルギー供給先設備で消費されるエネルギーの種類、量(流量、供給差圧、温度)の要求も異なることがある。さらに、エネルギー供給設備300の配置先やエネルギー供給先設備は、場所の異なる建物に分散され、建物や設備の管理主体が異なることもある。このように複数の建物間で多種多様なエネルギーの需給関係があり、エネルギー供給設備やエネルギー供給先設備もエリアに分散されているため、高度なエネルギー管理が求められている。しかしながら、エネルギー管理が複雑になると、エネルギー生成効率の悪い機器を使用したり、エネルギー搬送効率の悪い運用が行われることがあった。 Furthermore, when energy is shared and utilized within a region, the types and supply efficiencies of energy at each energy supply facility may differ, and the requirements for the type and amount of energy consumed at the energy recipient facilities (flow rate, supply differential pressure, temperature) may also vary. Moreover, the locations of the energy supply facilities 300 and the energy recipient facilities are dispersed across different buildings, and the management entities for these buildings and facilities may differ. Thus, a wide variety of energy supply and demand relationships exist among multiple buildings, and the energy supply and energy recipient facilities are dispersed across the area, requiring sophisticated energy management. However, the complexity of energy management has sometimes led to the use of inefficient equipment for energy generation or inefficient energy transport operations.
さらに、地域EMSにおいてはオペレータがエネルギー供給設備300の運用計画を立案してエネルギー供給設備300からエネルギー供給先設備600へのエネルギー供給を制御していた。しかしながら、一日の計画を立てても実運用が需要と合っていないと、オペレータの負荷が高くなることがあった。 Furthermore, in regional Energy Management Systems (EMS), operators were responsible for planning the operation of the energy supply equipment 300 and controlling the energy supply from the energy supply equipment 300 to the energy recipient equipment 600. However, even with a daily plan, if actual operation did not match demand, the operator's workload could increase.
本開示は、このような事情に鑑みてなされたものであり、対象エリアに対して安定供給を維持しつつ、経済性または環境性を向上する、または、経済性と環境性の両方を向上するように多種類のエネルギーを高度に管理することができるエネルギーマネジメントシステム、エネルギーマネジメントプログラム、およびエネルギーマネジメント方法を提供することを目的としている。 This disclosure is made in light of these circumstances and aims to provide an energy management system, energy management program, and energy management method that can improve economic efficiency or environmental efficiency, or improve both economic efficiency and environmental efficiency, while maintaining a stable supply to the target area and enabling advanced management of various types of energy.
本開示は上述した課題を解決するためになされたもので、本開示の一態様は、対象エリアに配置されたエネルギー供給設備を制御するエネルギーマネジメントシステムであって、前記対象エリアのエネルギー需要予測情報を算出し、算出した前記エネルギー需要予測情報に基づいてエネルギーの購入計画、販売計画、および蓄エネルギー計画を算出する長周期処理部と、前記長周期処理部により算出された前記エネルギー需要予測情報および前記エネルギーの購入計画、販売計画、および蓄エネルギー計画に従って前記エネルギー供給設備に含まれる機器の起動停止計画を算出する中周期処理部と、前記長周期処理部により算出された前記蓄エネルギー計画および前記中周期処理部により算出された前記起動停止計画に従って制御目標情報を算出する短周期処理部と、を備えるエネルギーマネジメントシステムである。 This disclosure was made to solve the aforementioned problems. One aspect of this disclosure is an energy management system for controlling energy supply equipment located in a target area, comprising: a long-period processing unit that calculates energy demand forecast information for the target area and calculates an energy purchase plan, a sales plan, and an energy storage plan based on the calculated energy demand forecast information; a medium-period processing unit that calculates a start-up and stop-down plan for equipment included in the energy supply equipment according to the energy demand forecast information and the energy purchase plan, sales plan, and energy storage plan calculated by the long-period processing unit; and a short-period processing unit that calculates control target information according to the energy storage plan calculated by the long-period processing unit and the start-up and stop-down plan calculated by the medium-period processing unit.
本開示の他の態様は、コンピュータを、対象エリアのエネルギー需要予測情報を算出し、算出した前記エネルギー需要予測情報に基づいてエネルギーの購入計画、販売計画、および蓄エネルギー計画を算出する長周期処理部、前記長周期処理部により算出された前記エネルギー需要予測情報および前記エネルギーの購入計画、販売計画、および蓄エネルギー計画に従って、前記対象エリアに配置されたエネルギー供給設備に含まれる機器の起動停止計画を算出する中周期処理部、前記長周期処理部により算出された前記蓄エネルギー計画および前記中周期処理部により算出された前記起動停止計画に従って制御目標情報を算出する短周期処理部、として機能させる、プログラムである。 Another aspect of this disclosure is a program that causes a computer to function as a long-period processing unit that calculates energy demand forecast information for a target area and calculates energy purchase plans, sales plans, and energy storage plans based on the calculated energy demand forecast information; a medium-period processing unit that calculates start-up and stop-down plans for equipment included in energy supply facilities located in the target area, according to the energy demand forecast information and energy purchase plans, sales plans, and energy storage plans calculated by the long-period processing unit; and a short-period processing unit that calculates control target information according to the energy storage plans calculated by the long-period processing unit and the start-up and stop-down plans calculated by the medium-period processing unit.
本開示の他の態様は、対象エリアに配置されたエネルギー供給設備を制御するエネルギーマネジメント方法であって、エネルギーマネジメントシステムが、前記対象エリアのエネルギー需要予測情報を算出し、算出した前記エネルギー需要予測情報に基づいてエネルギーの購入計画、販売計画、および蓄エネルギー計画を算出するステップと、前記エネルギーマネジメントシステムが、算出された前記エネルギー需要予測情報および前記エネルギーの購入計画、販売計画、および蓄エネルギー計画に従って前記エネルギー供給設備に含まれる機器の起動停止計画を算出するステップと、前記エネルギーマネジメントシステムが、算出された前記蓄熱計画および算出された前記起動停止計画に従って制御目標情報を算出するステップと、を含むエネルギーマネジメント方法である。 Another aspect of this disclosure is an energy management method for controlling energy supply equipment located in a target area, comprising the steps of: an energy management system calculating energy demand forecast information for the target area and calculating an energy purchase plan, a sales plan, and an energy storage plan based on the calculated energy demand forecast information; an energy management system calculating a start-up and stop-down plan for equipment included in the energy supply equipment in accordance with the calculated energy demand forecast information and the energy purchase plan, sales plan, and energy storage plan; and an energy management system calculating control target information in accordance with the calculated heat storage plan and the calculated start-up and stop-down plan.
本発明の一態様によれば、対象エリアに対して多種類のエネルギーを高度に管理することができる。 According to one aspect of the present invention, various types of energy can be precisely controlled for a target area.
以下、本発明を適用したエネルギーマネジメントシステム、エネルギーマネジメントプログラム、およびエネルギーマネジメント方法を、図面を参照して説明する。 The energy management system, energy management program, and energy management method to which the present invention is applied will be described below with reference to the drawings.
図1は、実施の形態におけるエネルギーマネジメントシステム1の一例を示すブロック図である。
エネルギーマネジメントシステム1は、例えば、エネルギー管理装置100と、オペレータ端末装置200と、エネルギー供給設備300と、電力供給設備400と、燃料供給設備500と、エネルギー供給先設備600を備える。エネルギー管理装置100、オペレータ端末装置200、エネルギー供給設備300、電力供給設備400、燃料供給設備500、およびエネルギー供給先設備600は、インターネット等の通信ネットワークに接続するためのNIC(Network Interface Card)または無線通信モジュールなどの通信インターフェース(不図示)を有する。ネットワークは、例えばインターネット等の汎用ネットワーク、およびローカル5GまたはWiFi(登録商標)などのプライベートなネットワークを含んでよい。エネルギーマネジメントシステム1は、対象エリアに配置されたエネルギー供給設備300に制御目標情報を送信する。対象エリアは、例えば、各所にエネルギー供給設備300およびエネルギー供給先設備600が配置されたエリアである。
Figure 1 is a block diagram showing an example of an energy management system 1 in an embodiment.
The energy management system 1 includes, for example, an energy management device 100, an operator terminal device 200, energy supply equipment 300, power supply equipment 400, fuel supply equipment 500, and energy supply destination equipment 600. The energy management device 100, operator terminal device 200, energy supply equipment 300, power supply equipment 400, fuel supply equipment 500, and energy supply destination equipment 600 have a communication interface (not shown), such as a NIC (Network Interface Card) or wireless communication module, for connecting to a communication network such as the Internet. The network may include, for example, a general-purpose network such as the Internet, and a private network such as local 5G or Wi-Fi (registered trademark). The energy management system 1 transmits control target information to the energy supply equipment 300 located in the target area. The target area is, for example, an area in which energy supply equipment 300 and energy supply destination equipment 600 are located at various locations.
エネルギー管理装置100は、通信ネットワークを介して情報を取得し、各種の処理を行う情報処理装置である。エネルギー管理装置100は、例えば、長周期処理部110と、中周期処理部120と、短周期処理部130とを備える。長周期処理部110、中周期処理部120、および短周期処理部130は、例えばCPU(Central Processing Unit)等のコンピュータがプログラムメモリに格納されたエネルギーマネジメントプログラムを実行することにより実現される。なお、長周期処理部110、中周期処理部120、および短周期処理部130は、エネルギー管理装置100に備えられているが、これに限定されず、エネルギーマネジメントシステム1に含まれる複数の装置に分散されて配置されてよい。 The energy management device 100 is an information processing device that acquires information via a communication network and performs various processing tasks. The energy management device 100 includes, for example, a long-period processing unit 110, a medium-period processing unit 120, and a short-period processing unit 130. The long-period processing unit 110, the medium-period processing unit 120, and the short-period processing unit 130 are implemented, for example, by a computer such as a CPU (Central Processing Unit) executing an energy management program stored in program memory. While the long-period processing unit 110, the medium-period processing unit 120, and the short-period processing unit 130 are provided in the energy management device 100, the system is not limited to this and may be distributed and arranged across multiple devices included in the energy management system 1.
長周期処理部110は、対象エリアのエネルギー需要予測情報を算出し、算出したエネルギー需要予測情報や設備モデル、設備特性情報に基づいて、運用コスト最小化を目的とした数理最適化計算を行うことでエネルギーの購入計画、販売計画、および蓄エネルギー計画を算出する。数理最適化計算とは、目的関数が最小(もしくは最大)もしくは極力最小(もしくは極力最大)になる解を定義域から選択する計算である。数理最適化計算の解法は問題に応じて自由に選択してよく、例えば単体法、有効制約法、内点法、タブサーチ、遺伝的アルゴリズム、最急降下法がある。実施の形態におけるエネルギーは、例えば、燃料、電力、媒体がもつ熱などを含む。媒体は、例えば、蒸気、温水、冷水などのエネルギー供給設備300において循環される媒体である。実施形態におけるエネルギーは、電力および燃料に限定されず、水素、アンモニアなどの他のエネルギーであってよい。エネルギー需要予測情報は、例えば、1日における1分単位のエネルギー需要量の予測値を含む情報である。エネルギーの購入計画は、例えば、1日における10~30分単位のエネルギーの購入量を示す情報である。エネルギーの販売計画は、例えば、1日における10~30分単位のエネルギーの販売量を示す情報である。蓄熱計画などの蓄エネルギー計画は、例えば、1日における10~30分単位のエネルギー供給設備300内の蓄エネルギー量を示す情報である。 The long-period processing unit 110 calculates energy demand forecast information for the target area and, based on the calculated energy demand forecast information, equipment model, and equipment characteristic information, calculates an energy purchase plan, sales plan, and energy storage plan by performing mathematical optimization calculations aimed at minimizing operating costs. Mathematical optimization calculation is a calculation that selects a solution from the defined domain that minimizes (or maximizes) or minimizes (or maximizes) the objective function as much as possible. The solution method for mathematical optimization calculation can be freely selected depending on the problem, and examples include the simplex method, effective constraint method, interior point method, tab search, genetic algorithm, and steepest descent method. Energy in the embodiment includes, for example, fuel, electricity, and heat contained in a medium. The medium is, for example, a medium circulated in the energy supply equipment 300, such as steam, hot water, or chilled water. Energy in the embodiment is not limited to electricity and fuel, but may be other energies such as hydrogen or ammonia. Energy demand forecast information includes, for example, information that includes predicted values of energy demand in one-minute increments over a day. An energy purchase plan is information that shows, for example, the amount of energy purchased in 10-30 minute intervals throughout the day. An energy sales plan is information that shows, for example, the amount of energy sold in 10-30 minute intervals throughout the day. An energy storage plan, such as a thermal storage plan, is information that shows, for example, the amount of energy stored within the energy supply equipment 300 in 10-30 minute intervals throughout the day.
中周期処理部120は、長周期処理部110により算出されたエネルギー需要予測情報およびエネルギーの購入計画、販売計画、蓄エネルギー計画、設備モデル、設備特性情報に基づいて、運用コスト最小化を目的とした数理最適化計算を行うことでエネルギー供給設備300に含まれる複数の機器の起動停止計画を算出する。起動停止計画は、例えば1分単位のエネルギー供給設備300に含まれる機器ごとの起動タイミングおよび停止タイミングを含む情報である。 The medium-period processing unit 120 calculates the start-up and shutdown plans for multiple pieces of equipment included in the energy supply facility 300 by performing mathematical optimization calculations aimed at minimizing operating costs, based on the energy demand forecast information and energy purchase, sales, storage, equipment model, and equipment characteristic information calculated by the long-period processing unit 110. The start-up and shutdown plans include information such as the start-up and shutdown timings for each piece of equipment included in the energy supply facility 300, for example, in one-minute increments.
短周期処理部130は、長周期処理部110により算出された蓄エネルギー計画および中周期処理部120により算出された起動停止計画に従って制御目標情報を算出する。短周期処理部130は、は、算出した制御目標情報をオペレータ端末装置200に出力してよい。これにより短周期処理部130は、オペレータ端末装置200によって制御目標情報を表示させることができる。短周期処理部130は、算出した制御目標情報をエネルギー供給設備300に含まれる機器に出力し、機器を制御することができる。 The short-period processing unit 130 calculates control target information according to the energy storage plan calculated by the long-period processing unit 110 and the start-up/stop-down plan calculated by the medium-period processing unit 120. The short-period processing unit 130 may output the calculated control target information to the operator terminal device 200. This allows the operator terminal device 200 to display the control target information. The short-period processing unit 130 can then output the calculated control target information to the equipment included in the energy supply equipment 300, thereby controlling the equipment.
短周期処理部130は、エネルギー供給設備300に含まれる機器に制御目標情報を出力し、エネルギー供給設備300からのフィードバック情報に基づいて起動停止計画に応じた各機器の制御目標情報を変更する。短周期処理部130は、例えば数10秒間隔で機器の制御目標情報を出力し、および機器の制御目標情報の変更を行う。フィードバック情報は、例えば、エネルギー供給設備300に含まれる機器の動作状態、エネルギー供給設備300において循環されている媒体のエネルギー量および流量等のセンサ値である。短周期処理部130は、蓄エネルギー計画を満たし起動停止計画に従いつつ、フィードバック情報に基づいて機器の動作状態および媒体のエネルギー量および流量を制御する制御目標情報を出力する。フィードバック情報は、エネルギー供給先設備600からの予期しない要求であってよい。短周期処理部130は、エネルギー供給先設備600からの予期しない要求に応じ、当該要求を満たすように起動停止計画に応じた各機器の制御目標情報を変更する。 The short-period processing unit 130 outputs control target information to the equipment included in the energy supply equipment 300 and modifies the control target information of each piece of equipment according to the start-up/shutdown plan based on feedback information from the energy supply equipment 300. The short-period processing unit 130 outputs the equipment's control target information and modifies it at intervals of, for example, several tens of seconds. The feedback information includes, for example, the operating status of the equipment included in the energy supply equipment 300, and sensor values such as the energy amount and flow rate of the medium circulating in the energy supply equipment 300. The short-period processing unit 130 outputs control target information that controls the operating status of the equipment and the energy amount and flow rate of the medium based on the feedback information, while satisfying the energy storage plan and following the start-up/shutdown plan. The feedback information may be an unexpected request from the energy supply destination equipment 600. In response to an unexpected request from the energy supply destination equipment 600, the short-period processing unit 130 modifies the control target information of each piece of equipment according to the start-up/shutdown plan to satisfy the request.
短周期処理部130は、フィードバック情報、起動停止計画に応じた各機器の制御目標情報の変更を示す情報、およびフィードバック情報に応じた各機器の制御目標情報の変更を示す情報をオペレータ端末装置200に通知する。 The short-period processing unit 130 notifies the operator terminal device 200 of feedback information, information indicating changes to the control target information of each device according to the start-up/stop-down plan, and information indicating changes to the control target information of each device according to the feedback information.
オペレータ端末装置200は、対象エリアにおけるオペレータに操作される情報処理装置である。オペレータ端末装置200は、フィードバック情報、起動停止計画に応じた各機器の制御目標情報の変更を示す情報、およびフィードバック情報に応じた各機器の制御目標情報の変更を示す情報を含む通知情報を受信する。オペレータ端末装置200は、通知情報に基づいて表示を行う。オペレータ端末装置200は、オペレータの操作を受け付けたことに応じてエネルギー供給設備300に含まれる機器の制御指示情報をエネルギー管理装置100に送信する。短周期処理部130は、制御指示情報に従ってエネルギー供給設備300に含まれる機器を制御する。 The operator terminal device 200 is an information processing device operated by an operator in the target area. The operator terminal device 200 receives notification information including feedback information, information indicating changes to the control target information of each device according to the start-up/stop-down plan, and information indicating changes to the control target information of each device according to the feedback information. The operator terminal device 200 displays information based on the notification information. Upon receiving an operator's operation, the operator terminal device 200 transmits control instruction information for the equipment included in the energy supply equipment 300 to the energy management device 100. The short-period processing unit 130 controls the equipment included in the energy supply equipment 300 according to the control instruction information.
エネルギー供給設備300は、エネルギーをエネルギー供給先設備600に供給する。エネルギー供給設備300に含まれる機器は、例えば、ボイラ302、CGS(コージェネレーションシステム)304、冷却塔306、吸収冷凍機308、ターボ冷凍機310、放熱用熱交換器312、蓄熱槽314、および、これらの機器に付随するポンプ、弁などの媒体移送装置である。本実施の形態においてエネルギー供給設備300に含まれる機器は、電力供給設備400から供給された電力および/または燃料供給設備500から供給された燃料を用いてエネルギーを生成する。例えば、ボイラ302およびCGS304は、媒体を加熱する加熱装置である。例えば冷却塔306、吸収冷凍機308、ターボ冷凍機310、放熱用熱交換器312は、媒体を冷却する冷却装置である。エネルギー供給設備300は、それぞれの機器の出力を制御するための制御装置を有する。制御装置は、例えば機器専用の出力制御装置、中央監視と呼ばれる中央集約型の制御装置、DCS(Distributed Control System)、PLC(Programable Control System)などの制御端末を含んでよい。エネルギー管理装置100は、エネルギー供給設備300の制御装置に対して制御目標情報を送信し、機器の動作を変更する。 The energy supply equipment 300 supplies energy to the energy recipient equipment 600. The equipment included in the energy supply equipment 300 includes, for example, a boiler 302, a CGS (cogeneration system) 304, a cooling tower 306, an absorption chiller 308, a turbo chiller 310, a heat exchanger for heat dissipation 312, a thermal storage tank 314, and media transfer devices such as pumps and valves associated with these devices. In this embodiment, the equipment included in the energy supply equipment 300 generates energy using electricity supplied from the power supply equipment 400 and/or fuel supplied from the fuel supply equipment 500. For example, the boiler 302 and the CGS 304 are heating devices that heat the medium. For example, the cooling tower 306, absorption chiller 308, turbo chiller 310, and heat exchanger for heat dissipation 312 are cooling devices that cool the medium. The energy supply equipment 300 has a control device for controlling the output of each piece of equipment. The control device may include, for example, a dedicated output control device for the equipment, a centralized control device called a central monitoring system, a DCS (Distributed Control System), a PLC (Programmable Control System), and other control terminals. The energy management device 100 transmits control target information to the control device of the energy supply equipment 300 and modifies the operation of the equipment.
電力供給設備400は、エネルギー供給設備300に電力を供給する。燃料供給設備500は、エネルギー供給設備300に燃料を供給する。 The power supply equipment 400 supplies electricity to the energy supply equipment 300. The fuel supply equipment 500 supplies fuel to the energy supply equipment 300.
エネルギー供給先設備600は、エネルギー供給設備300から供給されたエネルギーを消費する需要家設備である。エネルギー供給先設備600は、例えば対象エリアに配置されたビル設備などである。 The energy supply recipient facility 600 is a consumer facility that consumes the energy supplied from the energy supply facility 300. The energy supply recipient facility 600 is, for example, building equipment located in the target area.
図2は、実施の形態におけるエネルギーマネジメントシステム1の動作の流れの一例を示す図であり、図3は、実施の形態におけるエネルギーマネジメントシステム1の動作内容の一例を示す図である。 Figure 2 shows an example of the operation flow of the energy management system 1 in the embodiment, and Figure 3 shows an example of the operation content of the energy management system 1 in the embodiment.
長周期処理部110は、例えば、1日(翌日)の演算周期で蓄熱槽314の運用計画および電力の売電または買電計画を算出する(ステップS100、S100A)。蓄熱槽314の運用計画は、例えば10~30分の時間粒度での蓄熱槽314の蓄熱量の目標値を示し、電力の売電または買電計画は、例えば30分の時間粒度での売電量および買電量の目標値を示す。長周期処理部110は、翌日の蓄熱量の目標値、売電量および買電量の目標値をオペレータ端末装置200に通知(ガイダンス)する(ステップS100A)。 The long-period processing unit 110 calculates, for example, the operation plan for the heat storage tank 314 and the electricity sales or purchase plan with a calculation cycle of one day (the next day) (steps S100, S100A). The operation plan for the heat storage tank 314 indicates, for example, the target value of the heat storage amount in the heat storage tank 314 at a time granularity of 10 to 30 minutes, and the electricity sales or purchase plan indicates, for example, the target value of the amount of electricity sold and purchased at a time granularity of 30 minutes. The long-period processing unit 110 notifies (guidances) the operator terminal device 200 of the target values for the heat storage amount, electricity sold, and electricity purchased for the next day (step S100A).
中周期処理部120は、例えば、30分の演算周期でターボ冷凍機310および放熱用熱交換器312の熱量と流量の計画、バイパス流量の計画、および吸収冷凍機308の起動停止計画を算出する(ステップS200)。中周期処理部120は、例えば1分の時間粒度でターボ冷凍機310および放熱用熱交換器312の熱量と流量の目標値、バイパス流量の目標値、および吸収冷凍機308の起動停止状態を決定し、オペレータ端末装置200に通知(ガイダンス)する(ステップS200A)。 The intermediate cycle processing unit 120 calculates, for example, the heat quantity and flow rate plan for the turbo chiller 310 and heat exchanger 312, the bypass flow rate plan, and the start/stop plan for the absorption chiller 308 with a calculation cycle of 30 minutes (step S200). The intermediate cycle processing unit 120 determines the target values for the heat quantity and flow rate of the turbo chiller 310 and heat exchanger 312, the target value for the bypass flow rate, and the start/stop state of the absorption chiller 308 with a time granularity of, for example, 1 minute, and notifies (guidances) the operator terminal device 200 (step S200A).
短周期処理部130は、例えば、10秒の演算周期でターボ冷凍機310および放熱用熱交換器312の熱量と流量、バイパス流量、および吸収冷凍機308の起動停止を制御する(ステップS300)。短周期処理部130は、吸収冷凍機308およびターボ冷凍機310における起動停止操作直前における温度、流量等を設定変更する制御およびガイダンスを行う。また、短周期処理部130は、予測できない流量需要の変化に対する流量の制御目標値を増減する。 The short-period processing unit 130 controls, for example, the heat quantity and flow rate of the turbo chiller 310 and the heat exchanger 312, the bypass flow rate, and the start and stop of the absorption chiller 308 with a calculation cycle of 10 seconds (step S300). The short-period processing unit 130 performs control and guidance to change the temperature, flow rate, etc., immediately before the start and stop operations of the absorption chiller 308 and the turbo chiller 310. Furthermore, the short-period processing unit 130 increases or decreases the flow rate control target value in response to unpredictable changes in flow rate demand.
図4は、実施の形態における長周期処理により算出された蓄熱計画の一例を示す図である。
蓄熱計画は、例えば以下のようになる。1日におけるT1(例えば当日22:00)から蓄熱槽314に蓄熱を行うことによって蓄熱槽314の蓄熱量を増加させる。翌日のT2(例えば8:00)における蓄熱量を抑えてよいためターボ冷凍機310を停止し、蓄熱槽314を放熱に切り替える。T2以降において需要が高くなる時間帯において放熱量を高く調整すると、蓄熱槽314の蓄熱量は低下する。このような蓄熱計画によって、蓄熱槽314の蓄熱量および放熱量を決定することができる。
Figure 4 shows an example of a heat storage plan calculated by long-period processing in the embodiment.
A thermal storage plan might look like this: From T1 on a given day (for example, 22:00 on the same day), thermal storage is performed in the thermal storage tank 314 to increase the amount of thermal storage in the tank 314. At T2 on the following day (for example, 8:00), the amount of thermal storage can be reduced, so the turbo chiller 310 is stopped and the thermal storage tank 314 is switched to heat release. If the amount of heat released is adjusted to be higher during periods of high demand from T2 onward, the amount of thermal storage in the thermal storage tank 314 will decrease. With such a thermal storage plan, the amount of thermal storage and heat release of the thermal storage tank 314 can be determined.
長周期処理部110は、蓄熱槽314の蓄熱計画を算出する。中周期処理部120は、蓄熱槽314の蓄熱計画に基づいて、加熱装置または冷却装置の起動停止計画を算出する。短周期処理部130は、中周期処理部120により算出された起動停止計画に基づいて加熱装置または冷却装置の起動または停止の制御を行い、フィードバック情報としての媒体熱量および媒体流量の検出値および需要値に応じて短周期で加熱装置または冷却装置の制御目標情報の変更および設定変更を行う。ここで中周期処理部120における加熱装置または冷却装置の起動停止周期は短周期処理部130における制御周期よりも長い。なお、実施の形態における媒体熱量は、媒体が持つエネルギー量の一例であり、媒体熱量を媒体エネルギー量と読み替えてよい。 The long-period processing unit 110 calculates the heat storage plan for the heat storage tank 314. The medium-period processing unit 120 calculates the start-up/stop-down plan for the heating or cooling device based on the heat storage plan for the heat storage tank 314. The short-period processing unit 130 controls the start-up or stop-down of the heating or cooling device based on the start-up/stop-down plan calculated by the medium-period processing unit 120, and modifies the control target information and settings of the heating or cooling device at short intervals according to the detected and demanded values of the heat quantity and flow rate of the fluid as feedback information. Here, the start-up/stop-down cycle of the heating or cooling device in the medium-period processing unit 120 is longer than the control cycle in the short-period processing unit 130. Note that the heat quantity of the fluid in this embodiment is an example of the amount of energy possessed by the fluid, and may be read as the amount of fluid energy.
図5は、実施の形態における中周期処理により決定された起動停止計画による蓄熱槽314の蓄熱量、放熱用熱交換器312の媒体流量、エネルギー供給元設備内で循環させるバイパス系統に流れるバイパス流量、流量の需給バランスおよび冷水需要予測の一例を示す図である。中周期処理部120は、例えば3時間の計算期間において、長周期処理部110により算出された対象エリアのエネルギー需要予測情報に基づいて、ボイラ302およびCGS304から出力される蒸気熱量、吸収冷凍機308の媒体流量、ターボ冷凍機310の媒体流量等を決定する。 Figure 5 shows an example of the heat storage capacity of the thermal storage tank 314, the media flow rate of the heat exchanger 312, the bypass flow rate that circulates in the bypass system within the energy supply equipment, the supply and demand balance of the flow rate, and the chilled water demand forecast, based on the start-up and shutdown plan determined by the medium-cycle processing in the embodiment. The medium-cycle processing unit 120 determines, for example, the amount of steam heat output from the boiler 302 and CGS 304, the media flow rate of the absorption chiller 308, the media flow rate of the turbo chiller 310, etc., based on the energy demand forecast information for the target area calculated by the long-cycle processing unit 110, over a calculation period of, for example, 3 hours.
中周期処理部120は、時刻T10からT12の間においてバイパス流量を増加させることにより吸収冷凍機308-1(AR)における流量、吸収冷凍機308-2(AR)における流量を増加させることを決定する。中周期処理部120は、時刻T12においてエネルギー需要予測が高くなることに応じて放熱用熱交換器312の流量を増加させてバイパス流量を少なくすることを決定する。中周期処理部120は、時刻T14においてエネルギー需要予測が低くなることに応じて放熱用熱交換器312の流量を減少させてバイパス流量を増加することを決定する。その後、中周期処理部120は、吸収冷凍機308-1(AR)および吸収冷凍機308-2(AR)を停止させることを決定する。このように、中周期処理部120は、エネルギー供給設備300に含まれる機器が供給する媒体熱量および媒体流量の計画を、運用コスト最小化を目的とした数理最適化計算を用いて算出する。 The intermediate cycle processing unit 120 decides to increase the flow rate in absorption chillers 308-1 (AR) and 308-2 (AR) by increasing the bypass flow rate between times T10 and T12. At time T12, the intermediate cycle processing unit 120 decides to increase the flow rate in the heat exchanger 312 and decrease the bypass flow rate in response to the rising energy demand forecast. At time T14, the intermediate cycle processing unit 120 decides to decrease the flow rate in the heat exchanger 312 and increase the bypass flow rate in response to the falling energy demand forecast. Subsequently, the intermediate cycle processing unit 120 decides to shut down absorption chillers 308-1 (AR) and 308-2 (AR). In this way, the intermediate cycle processing unit 120 calculates the planned amount of heat and flow rate of the fluid supplied by the equipment included in the energy supply facility 300 using mathematical optimization calculations aimed at minimizing operating costs.
短周期処理部130は、中周期処理部120により算出された媒体熱量および媒体流量の計画に応じたエネルギー供給設備300に含まれる機器の設定を変更する。短周期処理部130は、長周期処理部110により算出された蓄熱計画および中周期処理部120により算出された起動停止計画、媒体熱量および媒体流量の計画に従ってエネルギー供給設備300に含まれる機器に制御目標情報を出力する。このとき、短周期処理部130は、温度センサT、流量センサF、差圧センサΔP等(図7参照)の検出値を含むフィードバック情報に基づいて、中周期処理部120により算出された起動停止計画、媒体熱量および媒体流量の計画に従ってエネルギー供給設備300に含まれる機器の制御目標情報を変更する。また、短周期処理部130は、エネルギー供給先設備600の需要の変化に応じて吸収冷凍機308の冷水熱量、ターボ冷凍機310の冷水熱量、放熱用熱交換器312の冷水熱量、および蓄熱槽314の放熱量または蓄熱量を変更する。 The short-period processing unit 130 modifies the settings of the equipment included in the energy supply equipment 300 according to the plan of the heat quantity and flow rate of the medium calculated by the medium-period processing unit 120. The short-period processing unit 130 outputs control target information to the equipment included in the energy supply equipment 300 according to the heat storage plan calculated by the long-period processing unit 110 and the start-up/stop plan, heat quantity and flow rate plan of the medium calculated by the medium-period processing unit 120. At this time, the short-period processing unit 130 modifies the control target information of the equipment included in the energy supply equipment 300 according to the start-up/stop plan, heat quantity and flow rate plan of the medium calculated by the medium-period processing unit 120, based on feedback information including detected values from temperature sensor T, flow sensor F, differential pressure sensor ΔP, etc. (see Figure 7). In addition, the short-period processing unit 130 modifies the chilled water heat quantity of the absorption chiller 308, the chilled water heat quantity of the turbo chiller 310, the chilled water heat quantity of the heat dissipation heat exchanger 312, and the heat dissipation or heat storage quantity of the heat storage tank 314 according to changes in the demand of the energy supply destination equipment 600.
図6は、実施の形態におけるエネルギー管理装置100における最適化処理100#の一例を示す図である。最適化処理100#は、長周期処理部110において行う長周期処理、中周期処理部120において行う中周期処理、および短周期処理部130において行う短周期処理に含まれる。最適化処理100#は、エネルギー供給設備300の構成に対応した複数の処理を含み、エネルギー供給設備300に含まれる機器の接続関係に対応して処理間で情報を授受する。したがって、最適化処理100#は、エネルギー供給設備300に含まれる機器およびエネルギー供給設備300に含まれる機器の接続関係に応じて異なる構成となる。図6は、エネルギー供給設備300が、ボイラ302、CGS304、2台の吸収冷凍機308、ターボ冷凍機310、および蓄熱槽314を備える場合の最適化処理100#を表している。 Figure 6 shows an example of the optimization process 100# in the energy management device 100 in the embodiment. The optimization process 100# includes long-period processing performed in the long-period processing unit 110, medium-period processing performed in the medium-period processing unit 120, and short-period processing performed in the short-period processing unit 130. The optimization process 100# includes multiple processes corresponding to the configuration of the energy supply equipment 300, and information is exchanged between processes in accordance with the connection relationships of the equipment included in the energy supply equipment 300. Therefore, the optimization process 100# will have different configurations depending on the equipment included in the energy supply equipment 300 and the connection relationships of the equipment included in the energy supply equipment 300. Figure 6 shows the optimization process 100# when the energy supply equipment 300 includes a boiler 302, a CGS 304, two absorption chillers 308, a turbo chiller 310, and a thermal storage tank 314.
図6に示す最適化処理100#は、例えば、ボイラ特性処理140、CGS特性処理142、吸収冷凍機特性処理144A、144B、ターボ冷凍機特性処理148、加算処理150、および乗算処理152が含まれる。ボイラ特性処理140は、燃料使用量情報を入力し、ボイラ302の特性に基づいて蒸気熱量情報を出力する。CGS特性処理142は、燃料使用量情報を入力し、CGS304の特性に基づいて蒸気熱量情報、温水熱量情報(不図示)、および売電量情報を出力する。加算処理150aは、ボイラ特性処理140から出力された蒸気熱量情報およびCGS特性処理142から出力された蒸気熱量情報を加算した蒸気熱量情報を出力する。吸収冷凍機特性処理144A、144Bは、加算処理150aから蒸気熱量情報を入力し、吸収冷凍機308の特性に基づいて冷水熱量情報および補機電力情報を出力する。ターボ冷凍機特性処理148は、長周期処理部110により決定された電力の売電または買電計画に基づく電力量情報を入力し、冷水熱量情報および補機電力情報を出力する。 The optimization process 100# shown in Figure 6 includes, for example, a boiler characteristics process 140, a CGS characteristics process 142, absorption chiller characteristics processes 144A and 144B, a turbo chiller characteristics process 148, an addition process 150, and a multiplication process 152. The boiler characteristics process 140 takes fuel usage information as input and outputs steam heat quantity information based on the characteristics of the boiler 302. The CGS characteristics process 142 takes fuel usage information as input and outputs steam heat quantity information, hot water heat quantity information (not shown), and electricity sales information based on the characteristics of the CGS 304. The addition process 150a outputs steam heat quantity information obtained by adding the steam heat quantity information output from the boiler characteristics process 140 and the steam heat quantity information output from the CGS characteristics process 142. The absorption chiller characteristics processes 144A and 144B take steam heat quantity information from the addition process 150a and output chilled water heat quantity information and auxiliary power information based on the characteristics of the absorption chiller 308. The turbo chiller characteristic processing unit 148 receives power quantity information based on the power sales or purchase plan determined by the long-period processing unit 110, and outputs chilled water heat quantity information and auxiliary equipment power information.
加算処理150bは、長周期処理部110により決定された蓄熱槽314の運用計画に基づく放熱情報(正の熱量情報)または蓄熱情報(負の熱量情報)とターボ冷凍機特性処理148から出力された冷水熱量情報とを加算した熱量情報を出力する。加算処理150cは、吸収冷凍機特性処理144A、144Bから出力された冷水熱量情報と加算処理150bから出力された熱量情報とを加算した熱量情報を出力する。加算処理150cから出力された冷水熱量は冷水需要熱量に相当する。 The addition process 150b outputs heat quantity information obtained by adding the heat dissipation information (positive heat quantity information) or heat storage information (negative heat quantity information) based on the operation plan of the heat storage tank 314 determined by the long-period processing unit 110, and the chilled water heat quantity information output from the turbo chiller characteristic processing unit 148. The addition process 150c outputs heat quantity information obtained by adding the chilled water heat quantity information output from the absorption chiller characteristic processing units 144A and 144B, and the heat quantity information output from the addition process 150b. The chilled water heat quantity output from the addition process 150c corresponds to the chilled water heat demand.
加算処理150dは、吸収冷凍機特性処理144A、144Bから出力された補機電力情報、ターボ冷凍機特性処理148から出力された補機電力情報を加算した補機電力情報を出力する。加算処理150eは、加算処理150dから出力された補機電力情報と長周期処理部110により決定された電力の売電または買電計画に基づく電力量情報とを加算した電力量情報を出力する。 The addition process 150d outputs auxiliary power information obtained by adding the auxiliary power information output from the absorption chiller characteristic processes 144A and 144B and the auxiliary power information output from the turbo chiller characteristic process 148. The addition process 150e outputs energy quantity information obtained by adding the auxiliary power information output from the addition process 150d and the energy quantity information based on the power sales or purchase plan determined by the long-period processing unit 110.
加算処理150eから出力された電力情報は、乗算処理152cによって従量料金と乗算されたコスト情報として加算処理150fに出力される。燃料使用量情報は、乗算処理152aによって燃料単価と乗算されたコスト情報として加算処理150fに出力される。CGS特性処理142から出力された売電量情報は、乗算処理152bによって電力販売単価と乗算されたコスト情報として加算処理150fに出力される。加算処理150fは、乗算処理152a、乗算処理152b、および乗算処理152cのそれぞれから出力されたコスト情報を加算した運用コスト情報を出力する。 The power information output from the addition process 150e is multiplied by the usage charge via the multiplication process 152c and output to the addition process 150f as cost information. Fuel usage information is multiplied by the fuel unit price via the multiplication process 152a and output to the addition process 150f as cost information. The electricity sales amount information output from the CGS characteristic process 142 is multiplied by the electricity sales unit price via the multiplication process 152b and output to the addition process 150f as cost information. The addition process 150f outputs operational cost information obtained by adding the cost information output from each of the multiplication processes 152a, 152b, and 152c.
燃料使用量情報は、乗算処理152dによってCO2(二酸化炭素)排出係数と乗算される。長周期処理部110により決定された電力の売電または買電計画に基づく電力量情報は、乗算処理152eによってCO2排出係数と乗算される。乗算処理152dの出力および乗算処理152eの出力は、加算処理150gによって加算され、CO2排出量情報として出力される。CO2排出量情報は、エネルギー供給設備300が動作するときの制約条件の一つである。 Fuel usage information is multiplied by the CO2 (carbon dioxide) emission factor by multiplication process 152d. Electricity usage information based on the electricity sales or purchase plan determined by the long-period processing unit 110 is multiplied by the CO2 emission factor by multiplication process 152e. The outputs of multiplication processes 152d and 152e are added together by addition process 150g and output as CO2 emission information. CO2 emission information is one of the constraints when the energy supply equipment 300 operates.
運用コスト情報は、長周期処理部110および中周期処理部120において最小化するように調整される目的関数である。運用コスト情報には目標値が設定される。長周期処理部110は、少なくとも加熱装置または冷却装置が消費する電力(補機電力)を含む対象エリアにおいて消費される電力コストまたは燃料コストの合計である運用コストを最小化するように電力の売電または買電計画を算出してよい。中周期処理部120は、長周期処理部110により算出された電力コストまたは燃料コストの目標値に応じて、加熱装置または冷却装置の起動停止計画および媒体の熱量および流量を算出する。 The operating cost information is an objective function adjusted to be minimized in the long-period processing unit 110 and the medium-period processing unit 120. A target value is set for the operating cost information. The long-period processing unit 110 may calculate a power sales or purchase plan to minimize the operating cost, which is the sum of the power costs or fuel costs consumed in the target area, including at least the power consumed by the heating or cooling device (auxiliary power). The medium-period processing unit 120 calculates the start-up/stop-down plan for the heating or cooling device, as well as the heat quantity and flow rate of the medium, according to the target value of the power cost or fuel cost calculated by the long-period processing unit 110.
長周期処理部110、中周期処理部120、または短周期処理部130は、対象エリアにおける電力コストおよび燃料コストを含むすべてのコストの合計を最小化する計算を行うことが望ましい。例えば、長周期処理部110は、対象エリアにおける電力コストおよび燃料コストを含むすべてのコストの合計を最小化するようにエネルギーの購入計画、販売計画、および蓄熱計画を算出する。中周期処理部120は、対象エリアにおける電力コストおよび燃料コストを含むすべてのコストの合計を最小化するように起動停止計画を算出する。短周期処理部130は、対象エリアにおける電力コストおよび燃料コストを含むすべてのコストの合計を最小化するように機器の制御目標情報を変更する。 The long-period processing unit 110, the medium-period processing unit 120, or the short-period processing unit 130 should ideally perform calculations to minimize the total cost, including electricity and fuel costs, in the target area. For example, the long-period processing unit 110 calculates energy purchase plans, sales plans, and thermal storage plans to minimize the total cost, including electricity and fuel costs, in the target area. The medium-period processing unit 120 calculates start-up and shutdown plans to minimize the total cost, including electricity and fuel costs, in the target area. The short-period processing unit 130 modifies the equipment control target information to minimize the total cost, including electricity and fuel costs, in the target area.
長周期処理部110、中周期処理部120、または短周期処理部130のそれぞれは、対象エリアにおける燃料コスト、電力コスト、二酸化炭素排出量を組み合わせて最小化する最適化計算を行ってもよい。対象エリアにおける燃料コスト、電力コスト、二酸化炭素排出量を組み合わせて最小化するCO2排出量を最小化する最適化計算は、長周期処理部110、中周期処理部120、および短周期処理部130の少なくとも一つが行ってもよい。例えば、長周期処理部110は、対象エリアにおける燃料コスト、電力コスト、二酸化炭素排出量を組み合わせて最小化するようにエネルギーの購入計画、販売計画、および蓄熱計画を算出する。中周期処理部120は、対象エリアにおける燃料コスト、電力コスト、二酸化炭素排出量を組み合わせて最小化するように起動停止計画を算出する。短周期処理部130は、対象エリアにおける燃料コスト、電力コスト、二酸化炭素排出量を組み合わせて最小化するように機器の制御目標情報を変更する。 Each of the long-period processing unit 110, medium-period processing unit 120, or short-period processing unit 130 may perform optimization calculations to minimize a combination of fuel costs, electricity costs, and carbon dioxide emissions in the target area. The optimization calculation to minimize CO2 emissions by combining fuel costs, electricity costs, and carbon dioxide emissions in the target area may be performed by at least one of the long-period processing unit 110, medium-period processing unit 120, and short-period processing unit 130. For example, the long-period processing unit 110 calculates energy purchase plans, sales plans, and thermal energy storage plans to minimize a combination of fuel costs, electricity costs, and carbon dioxide emissions in the target area. The medium-period processing unit 120 calculates start-up and shutdown plans to minimize a combination of fuel costs, electricity costs, and carbon dioxide emissions in the target area. The short-period processing unit 130 modifies the control target information of the equipment to minimize a combination of fuel costs, electricity costs, and carbon dioxide emissions in the target area.
長周期処理部110、中周期処理部120、または短周期処理部130のそれぞれは、対象エリアの全体の消費エネルギー量の合計を最小化する最適化計算を行ってもよい。消費エネルギー量は、例えば、エネルギー供給設備300に含まれる機器、エネルギー供給先設備600に含まれる機器の消費電力量、消費燃料量、そのほかの消費エネルギーの量を含む。 Each of the long-period processing unit 110, medium-period processing unit 120, or short-period processing unit 130 may perform optimization calculations to minimize the total energy consumption of the target area. Energy consumption includes, for example, the power consumption, fuel consumption, and other energy consumption of equipment included in the energy supply facility 300 and equipment included in the energy supply destination facility 600.
図7は、実施の形態におけるエネルギー供給設備300の構成の一例を示す図である。
エネルギー供給設備300は、図4に示したエネルギー管理装置100における処理結果に基づいて動作する。エネルギー供給設備300は、例えば、2台の吸収冷凍機308-1、308-2と、放熱用熱交換器312とを備える。2台の吸収冷凍機308-1、308-2は、ボイラ302およびCGS304から蒸気または温水が供給され、エネルギー供給先設備600に冷水を供給する。放熱用熱交換器312は、冷却塔306、ターボ冷凍機310、および蓄熱槽314から冷水が供給され、エネルギー供給先設備600に冷水を供給する。
Figure 7 shows an example of the configuration of the energy supply equipment 300 in the embodiment.
The energy supply equipment 300 operates based on the processing results of the energy management device 100 shown in Figure 4. The energy supply equipment 300 includes, for example, two absorption chillers 308-1 and 308-2 and a heat exchanger 312. Steam or hot water is supplied to the two absorption chillers 308-1 and 308-2 from the boiler 302 and CGS 304, and chilled water is supplied to the energy supply destination equipment 600. Chilled water is supplied to the heat exchanger 312 from the cooling tower 306, turbo chiller 310, and thermal storage tank 314, and chilled water is supplied to the energy supply destination equipment 600.
吸収冷凍機308-1、308-2のそれぞれおよび放熱用熱交換器312は、エネルギー供給先設備600への媒体供給流路、およびエネルギー供給先設備600からの媒体排出流路を介してエネルギー供給先設備600と接続される。吸収冷凍機308-1、308-2のそれぞれ、および放熱用熱交換器312は、流量調整ポンプ308a、312aを介して冷水(媒体)を媒体供給流路に供給する。媒体供給流路と媒体排出流路との間にはエネルギー供給先設備600をバイパスするバイパス流路が接続される。エネルギー供給先設備600は、例えば冷水需要部602と、調節弁604とを含む。図4においてエネルギー供給先設備600は一つだけ図示しているが、これに限定されず、複数のエネルギー供給先設備600が接続されてよい。エネルギー供給先設備600またはバイパス流路を通過した冷水は媒体排出流路を介して放熱用熱交換器312および吸収冷凍機308-1、308-2に戻される。 Each of the absorption chillers 308-1 and 308-2, and the heat exchanger 312 for heat dissipation, are connected to the energy supply facility 600 via a medium supply channel to the energy supply facility 600 and a medium discharge channel from the energy supply facility 600. Each of the absorption chillers 308-1 and 308-2, and the heat exchanger 312 for heat dissipation, supplies chilled water (medium) to the medium supply channel via flow rate adjustment pumps 308a and 312a. A bypass channel is connected between the medium supply channel and the medium discharge channel to bypass the energy supply facility 600. The energy supply facility 600 includes, for example, a chilled water demand section 602 and a control valve 604. In Figure 4, only one energy supply facility 600 is shown, but it is not limited to this, and multiple energy supply facilities 600 may be connected. The chilled water that has passed through the energy supply facility 600 or the bypass channel is returned to the heat exchanger 312 and absorption chillers 308-1 and 308-2 via the medium discharge channel.
吸収冷凍機308-1、308-2から媒体供給流路に流れる冷水の温度は温度センサにより検出される。バイパス流路の冷水流量、媒体排出流路から放熱用熱交換器312、吸収冷凍機308-1、308-2に戻される冷水流量は流量センサFにより検出される。媒体供給流路の冷水圧力と媒体排出流路の冷水圧力との差圧は差圧センサΔPにより検出される。 The temperature of the chilled water flowing from absorption chillers 308-1 and 308-2 into the media supply channel is detected by a temperature sensor. The chilled water flow rate in the bypass channel and the chilled water flow rate returning from the media discharge channel to the heat exchanger 312 and absorption chillers 308-1 and 308-2 are detected by a flow sensor F. The pressure difference between the chilled water pressure in the media supply channel and the chilled water pressure in the media discharge channel is detected by a differential pressure sensor ΔP.
エネルギー供給設備300は、さらに、冷水流量設定部320、324と、冷水流量制御部322、326と、差圧設定部328と、供給差圧制御部330とを備える。冷水流量設定部320、324は、エネルギー管理装置100から取得した熱量情報に基づいて吸収冷凍機308-1、308-2、放熱用熱交換器312から媒体供給流路に供給する冷水流量を設定する。冷水流量設定部320、324は、エネルギー管理装置100から設定値を取得することで吸収冷凍機308-1、308-2、放熱用熱交換器312の動作を変更する。冷水流量制御部322、326は、冷水流量設定部320、324により設定された冷水流量に基づいて流量調整ポンプ308a、312aを制御する。 The energy supply equipment 300 further includes chilled water flow rate setting units 320 and 324, chilled water flow rate control units 322 and 326, differential pressure setting unit 328, and supply differential pressure control unit 330. The chilled water flow rate setting units 320 and 324 set the chilled water flow rate supplied from the absorption chillers 308-1 and 308-2 and the heat exchanger 312 to the medium supply channel based on heat quantity information acquired from the energy management device 100. The chilled water flow rate setting units 320 and 324 change the operation of the absorption chillers 308-1 and 308-2 and the heat exchanger 312 by acquiring the set value from the energy management device 100. The chilled water flow rate control units 322 and 326 control the flow rate adjustment pumps 308a and 312a based on the chilled water flow rate set by the chilled water flow rate setting units 320 and 324.
差圧設定部328は、媒体供給流路と媒体排出流路との差圧を設定する。供給差圧制御部330は、差圧センサΔPの検出値および差圧設定部328により設定された差圧に基づいて、バイパス流路に設けられた調節弁を制御することにより媒体供給流路と媒体排出流路との差圧を制御する。 The differential pressure setting unit 328 sets the differential pressure between the medium supply channel and the medium discharge channel. The supply differential pressure control unit 330 controls the differential pressure between the medium supply channel and the medium discharge channel by controlling the control valve provided in the bypass channel, based on the detected value of the differential pressure sensor ΔP and the differential pressure set by the differential pressure setting unit 328.
図8は、実施の形態における対象エリアにおけるエネルギー供給設備300およびエネルギー供給先設備600の配置の一例を示す図である。
エネルギー供給設備300およびエネルギー供給先設備600は、対象エリアにおける各所に離れて配置される。複数のエネルギー供給設備300-1、300-2、300-3、300-4、および300-5、複数のエネルギー供給先設備600-1、600-2、600-3、600-4、および600-5の間は、媒体(蒸気、温水、冷水)を流す配管700、および開閉弁、調整弁、ポンプなどの流量制御装置702により接続される。
Figure 8 shows an example of the arrangement of energy supply equipment 300 and energy supply destination equipment 600 in the target area according to the embodiment.
The energy supply equipment 300 and the energy supply destination equipment 600 are arranged separately at various locations within the target area. Multiple energy supply equipment 300-1, 300-2, 300-3, 300-4, and 300-5, and multiple energy supply destination equipment 600-1, 600-2, 600-3, 600-4, and 600-5 are connected by piping 700 for carrying a medium (steam, hot water, chilled water), and flow control devices 702 such as on-off valves, control valves, and pumps.
中周期処理部120は、対象エリアにおける配管の分岐点および合流点などの各地点における媒体流量および対象エリアにおけるエネルギー供給設備300間の媒体流量を含む流量計画を算出してよい。短周期処理部130は、中周期処理部120により算出された流量計画に基づいて各地点での流量を制御する各流量制御装置702の設定を変更する。 The medium-period processing unit 120 may calculate a flow rate plan that includes the flow rate of the medium at each point in the target area, such as branching and merging points of the piping, and the flow rate of the medium between the energy supply equipment 300 in the target area. The short-period processing unit 130 modifies the settings of each flow control device 702 that controls the flow rate at each point based on the flow rate plan calculated by the medium-period processing unit 120.
以上のように、実施の形態のエネルギーマネジメントシステム1は、エネルギー需要予測情報に基づいてエネルギーの購入計画、販売計画、および蓄エネルギー計画を算出する長周期処理部110と、エネルギー需要予測情報およびエネルギーの購入計画、販売計画、および蓄エネルギー計画に従ってエネルギー供給設備に含まれる機器の起動停止計画を算出する中周期処理部120と、長周期処理部110により算出された蓄エネルギー計画および中周期処理部120により算出された起動停止計画に従って機器を制御し、エネルギー供給設備300からのフィードバック情報に基づいて起動停止計画に応じた各機器の制御を変更する短周期処理部130を備える。このエネルギーマネジメントシステム1によれば、対象エリアに対して安定供給を維持しつつ、経済性または環境性を向上する、または、経済性と環境性の両方を向上するように多種類のエネルギーを高度に管理することができる。 As described above, the energy management system 1 of this embodiment includes a long-period processing unit 110 that calculates energy purchase plans, sales plans, and energy storage plans based on energy demand forecast information; a medium-period processing unit 120 that calculates start-up and stop-down plans for equipment included in the energy supply facility according to the energy demand forecast information and the energy purchase plans, sales plans, and energy storage plans; and a short-period processing unit 130 that controls the equipment according to the energy storage plan calculated by the long-period processing unit 110 and the start-up and stop-down plans calculated by the medium-period processing unit 120, and modifies the control of each piece of equipment according to the start-up and stop-down plans based on feedback information from the energy supply facility 300. This energy management system 1 allows for sophisticated management of various types of energy to improve economic efficiency or environmental efficiency, or both, while maintaining a stable supply to the target area.
また、エネルギーマネジメントシステム1によれば、エネルギー供給設備300およびエネルギー供給先設備600が複雑に接続されていても計画の最適化により、オペレータの人件費、電力、燃料等のコスト、これらの組み合わせたコストを低減することができる。すなわち、エネルギーマネジメントシステム1は、長周期処理部110によって多種多様なエネルギー供給設備300のエネルギーの購入計画、販売計画、および蓄エネルギー計画を立案し、中周期処理部120により起動停止計画を立案し、実運用では短周期処理部130によりフィードバック制御により最適化することで、オペレータの負担を抑制することができる。さらに、エネルギーマネジメントシステム1によれば、オペレータの省人化または無人化を可能とすることで、その結果、オペレーションコストの低減に繋げることができる。 Furthermore, according to the energy management system 1, even if the energy supply equipment 300 and energy supply destination equipment 600 are intricately connected, the optimization of the plan can reduce operator labor costs, electricity costs, fuel costs, and combined costs. Specifically, the energy management system 1 uses a long-period processing unit 110 to formulate energy purchase plans, sales plans, and energy storage plans for a wide variety of energy supply equipment 300, a medium-period processing unit 120 to formulate start-up and stop-down plans, and a short-period processing unit 130 to optimize through feedback control during actual operation, thereby reducing the burden on the operator. Moreover, the energy management system 1 enables reduced or unmanned operation of the operator, resulting in a reduction in operational costs.
なお、各実施形態および変形例について説明したが、一例であってこれらに限られず、例えば、各実施形態や各変形例のうちのいずれかや、各実施形態の一部や各変形例の一部を、他の1または複数の実施形態や他の1または複数の変形例と組み合わせて本発明の一態様を実現させてもよい。 While various embodiments and modifications have been described, these are merely examples and not limiting. For example, one embodiment or modification, or a part of one embodiment or modification, may be combined with one or more other embodiments or modifications to realize one aspect of the present invention.
1…エネルギーマネジメントシステム、100…エネルギー管理装置、110…長周期処理部、120…中周期処理部、130…短周期処理部、140…ボイラ特性処理、142…CGS特性処理、144A、144B…吸収冷凍機特性処理、148…ターボ冷凍機特性処理、150a、150b、150c、150d、150e、150f、150g…加算処理、152a、152b、152c、152d、152e…乗算処理、200…オペレータ端末装置、302…ボイラ、304…CGS、306…冷却塔、308…吸収冷凍機、308a…流量調整ポンプ、310…ターボ冷凍機、312…放熱用熱交換器、312a…流量調整ポンプ、314…蓄熱槽、320、324…冷水流量設定部、322、326…冷水流量制御部、328…差圧設定部、330…供給差圧制御部、602…冷水需要部、604…調節弁、700…配管、702…流量制御装置 1...Energy management system, 100...Energy management device, 110...Long-period processing unit, 120...Medium-period processing unit, 130...Short-period processing unit, 140...Boiler characteristic processing, 142...CGS characteristic processing, 144A, 144B...Absorption chiller characteristic processing, 148...Turbo chiller characteristic processing, 150a, 150b, 150c, 150d, 150e, 150f, 150g...Addition processing, 152a, 152b, 152c, 152d, 152e...Multiplication processing, 200…Operator terminal device, 302…Boiler, 304…CGS, 306…Cooling tower, 308…Absorption chiller, 308a…Flow rate control pump, 310…Turbo chiller, 312…Heat exchanger for heat dissipation, 312a…Flow rate control pump, 314…Thermal storage tank, 320, 324…Chilled water flow rate setting unit, 322, 326…Chilled water flow rate control unit, 328…Differential pressure setting unit, 330…Supply differential pressure control unit, 602…Chilled water demand unit, 604…Control valve, 700…Piping, 702…Flow rate control device
Claims (13)
前記対象エリアのエネルギー需要予測情報を算出し、算出した前記エネルギー需要予測情報に基づいてエネルギーの購入計画、販売計画、および蓄エネルギー計画を算出する長周期処理部と、
前記長周期処理部により算出された前記エネルギー需要予測情報および前記エネルギーの購入計画、販売計画、および蓄エネルギー計画に従って前記エネルギー供給設備に含まれる機器の起動停止計画を算出する中周期処理部と、
前記長周期処理部により算出された前記蓄エネルギー計画および前記中周期処理部により算出された前記起動停止計画に従って制御目標情報を算出する短周期処理部と、
を備えるエネルギーマネジメントシステム。 An energy management system that controls energy supply equipment located in a target area,
A long-period processing unit calculates energy demand forecast information for the target area and calculates an energy purchase plan, a sales plan, and an energy storage plan based on the calculated energy demand forecast information.
A medium-period processing unit calculates a start-up and stop-down plan for equipment included in the energy supply facility according to the energy demand forecast information and the energy purchase plan, sales plan, and energy storage plan calculated by the long-period processing unit,
A short-period processing unit calculates control target information according to the energy storage plan calculated by the long-period processing unit and the start-stop plan calculated by the medium-period processing unit,
An energy management system equipped with the following features.
前記中周期処理部は、前記蓄熱槽の蓄熱計画に基づいて前記エネルギー供給設備に含まれる加熱装置または冷却装置の起動停止計画を算出し、
前記短周期処理部は、
前記中周期処理部により算出された前記起動停止計画に基づいて前記加熱装置または前記冷却装置の起動または停止の制御を行い、
前記フィードバック情報としての前記エネルギー供給設備に含まれる機器が供給する媒体エネルギー量および媒体流量の検出値および需要値に応じて短周期で前記加熱装置または前記冷却装置の前記制御目標情報の変更および設定変更を行い、
前記加熱装置または前記冷却装置の起動停止周期は前記短周期処理部の制御周期よりも長い、
請求項4に記載のエネルギーマネジメントシステム。 The long-period processing unit calculates the heat storage plan for the heat storage tank included in the energy supply equipment as the energy storage plan,
The aforementioned intermediate cycle processing unit calculates a start-up/stop-down plan for the heating or cooling device included in the energy supply equipment based on the heat storage plan of the heat storage tank.
The short-period processing unit is
Based on the start/stop plan calculated by the aforementioned intermediate cycle processing unit, the start or stop of the heating device or the cooling device is controlled.
The control target information and settings of the heating device or the cooling device are changed and set in short cycles according to the detected values and demand values of the amount of medium energy and medium flow rate supplied by the equipment included in the energy supply facility, which are considered as feedback information.
The start-up/stop cycle of the heating device or the cooling device is longer than the control cycle of the short-period processing unit.
The energy management system according to claim 4.
前記短周期処理部は、前記中周期処理部により算出された媒体エネルギー量および媒体流量の計画に応じて前記エネルギー供給設備に含まれる機器の設定を変更する、
請求項1に記載のエネルギーマネジメントシステム。 The aforementioned intermediate cycle processing unit calculates the plan for the amount of media energy and the flow rate of media supplied by the equipment included in the energy supply facility.
The short-period processing unit modifies the settings of the equipment included in the energy supply facility according to the plan of the amount of medium energy and the flow rate calculated by the medium-period processing unit.
The energy management system according to claim 1.
前記短周期処理部は、前記中周期処理部により算出された媒体エネルギー量および媒体流量の計画に基づいて前記各地点での流量を制御する各流量制御装置の制御目標情報および各流量制御装置の設定を変更する、
請求項1に記載のエネルギーマネジメントシステム。 The aforementioned intermediate-period processing unit calculates the plan for the amount of media energy and the flow rate of media at each point in the target area.
The short-period processing unit modifies the control target information and settings of each flow rate control device that controls the flow rate at each point based on the media energy amount and media flow rate plan calculated by the medium-period processing unit.
The energy management system according to claim 1.
前記中周期処理部は、前記電力コストまたは燃料コストの目標値に応じて前記加熱装置または前記冷却装置の起動停止計画および媒体の熱量および流量を算出する、
請求項1に記載のエネルギーマネジメントシステム。 The long-period processing unit calculates a plan for selling or buying electricity according to a target value of the electricity cost or fuel cost consumed in the target area, including the electricity consumed by at least the heating or cooling equipment included in the energy supply facility.
The aforementioned intermediate cycle processing unit calculates the start-up and stop-down plan for the heating device or the cooling device, as well as the heat quantity and flow rate of the medium, according to the target value of the power cost or fuel cost.
The energy management system according to claim 1.
対象エリアのエネルギー需要予測情報を算出し、算出した前記エネルギー需要予測情報に基づいてエネルギーの購入計画、販売計画、および蓄エネルギー計画を算出する長周期処理部、
前記長周期処理部により算出された前記エネルギー需要予測情報および前記エネルギーの購入計画、販売計画、および蓄エネルギー計画に従って、前記対象エリアに配置されたエネルギー供給設備に含まれる機器の起動停止計画を算出する中周期処理部、
前記長周期処理部により算出された前記蓄エネルギー計画および前記中周期処理部により算出された前記起動停止計画に従って制御目標情報を算出する短周期処理部、
として機能させる、エネルギーマネジメントプログラム。 Computers,
A long-period processing unit calculates energy demand forecast information for the target area and calculates energy purchase plans, sales plans, and energy storage plans based on the calculated energy demand forecast information.
A medium-period processing unit calculates a start-up and stop-down plan for equipment included in the energy supply facilities located in the target area, in accordance with the energy demand forecast information and the energy purchase plan, sales plan, and energy storage plan calculated by the long-period processing unit.
A short-period processing unit calculates control target information according to the energy storage plan calculated by the long-period processing unit and the start-stop plan calculated by the medium-period processing unit.
An energy management program that functions as such.
エネルギーマネジメントシステムが、前記対象エリアのエネルギー需要予測情報を算出し、算出した前記エネルギー需要予測情報に基づいてエネルギーの購入計画、販売計画、および蓄エネルギー計画を算出するステップと、
前記エネルギーマネジメントシステムが、算出された前記エネルギー需要予測情報および前記エネルギーの購入計画、販売計画、および蓄エネルギー計画に従って前記エネルギー供給設備に含まれる機器の起動停止計画を算出するステップと、
前記エネルギーマネジメントシステムが、算出された前記蓄エネルギー計画および算出された前記起動停止計画に従って制御目標情報を算出するステップと、
を含むエネルギーマネジメント方法。 An energy management method for controlling energy supply equipment located in a target area,
The energy management system calculates energy demand forecast information for the target area, and calculates an energy purchase plan, a sales plan, and an energy storage plan based on the calculated energy demand forecast information.
The energy management system includes the steps of calculating a start-up and stop-down plan for equipment included in the energy supply facility in accordance with the calculated energy demand forecast information and the energy purchase plan, sales plan, and energy storage plan,
The energy management system includes the step of calculating control target information according to the calculated energy storage plan and the calculated start-up/shutdown plan,
Energy management methods including
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023137885A JP7851277B2 (en) | 2023-08-28 | 2023-08-28 | Energy management system, energy management program, and energy management method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023137885A JP7851277B2 (en) | 2023-08-28 | 2023-08-28 | Energy management system, energy management program, and energy management method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2025032557A JP2025032557A (en) | 2025-03-12 |
| JP7851277B2 true JP7851277B2 (en) | 2026-04-24 |
Family
ID=94925694
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2023137885A Active JP7851277B2 (en) | 2023-08-28 | 2023-08-28 | Energy management system, energy management program, and energy management method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7851277B2 (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2012066651A1 (en) | 2010-11-17 | 2012-05-24 | 株式会社日立製作所 | Power management system and power management method |
| JP2013062953A (en) | 2011-09-13 | 2013-04-04 | Hitachi Ltd | Power system power demand controller and power system power demand control method |
| JP2016134936A (en) | 2015-01-15 | 2016-07-25 | 住友電気工業株式会社 | Energy management system, computer program, and operation plan calculation method |
| JP2019187099A (en) | 2018-04-10 | 2019-10-24 | 株式会社東芝 | Power supply and demand control system, power supply and demand control program and power supply and demand control method |
-
2023
- 2023-08-28 JP JP2023137885A patent/JP7851277B2/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2012066651A1 (en) | 2010-11-17 | 2012-05-24 | 株式会社日立製作所 | Power management system and power management method |
| JP2013062953A (en) | 2011-09-13 | 2013-04-04 | Hitachi Ltd | Power system power demand controller and power system power demand control method |
| JP2016134936A (en) | 2015-01-15 | 2016-07-25 | 住友電気工業株式会社 | Energy management system, computer program, and operation plan calculation method |
| JP2019187099A (en) | 2018-04-10 | 2019-10-24 | 株式会社東芝 | Power supply and demand control system, power supply and demand control program and power supply and demand control method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2025032557A (en) | 2025-03-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11754984B2 (en) | HVAC system with predictive airside control | |
| Yin et al. | Exploiting internet data centers as energy prosumers in integrated electricity-heat system | |
| US7567859B2 (en) | Methods and apparatuses for control of building cooling, heating and power co-generation systems | |
| US11209184B2 (en) | Control system for central energy facility with distributed energy storage | |
| US11067955B2 (en) | HVAC system using model predictive control with distributed low-level airside optimization | |
| US9898787B2 (en) | Allocation of energy production changes to meet demand changes | |
| US20150378381A1 (en) | Systems and methods for energy cost optimization | |
| JP5934041B2 (en) | Power system, apparatus and method | |
| JP5801214B2 (en) | Control device for district heat energy supply network | |
| JP2015534229A (en) | Optimization of fuel cell fleet | |
| CN107408816A (en) | It is variable to feed out energy management | |
| JP2013156937A (en) | Optimal operation control device of energy network | |
| CN102298371B (en) | Distributed combined cooling and power supply system control method | |
| Sui et al. | Optimal use of electric energy oriented water-electricity combined supply system for the building-integrated-photovoltaics community | |
| US20230088808A1 (en) | Building hvac system with multi-level model predictive control | |
| JP7851277B2 (en) | Energy management system, energy management program, and energy management method | |
| KR20220163471A (en) | thermal network control | |
| WO2018005180A1 (en) | Hvac system using model predictive control with distributed low-level airside optimization | |
| JP2014010631A (en) | Device and method for optimal operation control of energy network | |
| JP2015169367A (en) | Air conditioning system and control method of air conditioning system | |
| JP2011198169A (en) | Operation control system of industrial plant | |
| CN118971188A (en) | Peak load optimization method, device and equipment for thermal power units based on low-carbon economic goals | |
| JP6534038B2 (en) | Demand power control apparatus and demand power control method | |
| JP4662132B2 (en) | Cogeneration system | |
| JP6257450B2 (en) | Operation plan creation apparatus and operation plan creation method for heat source equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20250603 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20260227 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20260317 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20260414 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7851277 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |