JP7853199B2 - Common expense allocation processing device, common expense allocation processing method, and common expense allocation processing program - Google Patents
[go: Go Back, main page]

JP7853199B2 - Common expense allocation processing device, common expense allocation processing method, and common expense allocation processing program - Google Patents

Common expense allocation processing device, common expense allocation processing method, and common expense allocation processing program

Info

Publication number
JP7853199B2
JP7853199B2 JP2022203044A JP2022203044A JP7853199B2 JP 7853199 B2 JP7853199 B2 JP 7853199B2 JP 2022203044 A JP2022203044 A JP 2022203044A JP 2022203044 A JP2022203044 A JP 2022203044A JP 7853199 B2 JP7853199 B2 JP 7853199B2
Authority
JP
Japan
Prior art keywords
expenses
project
planned
common
contracts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022203044A
Other languages
Japanese (ja)
Other versions
JP2024088064A (en
Inventor
努 岩品
剛光 上野
Original Assignee
株式会社オービック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オービック filed Critical 株式会社オービック
Priority to JP2022203044A priority Critical patent/JP7853199B2/en
Publication of JP2024088064A publication Critical patent/JP2024088064A/en
Application granted granted Critical
Publication of JP7853199B2 publication Critical patent/JP7853199B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、共通費配賦処理装置、共通費配賦処理方法、及び、共通費配賦処理プログラムに関する。 This invention relates to a common expense allocation processing device, a common expense allocation processing method, and a common expense allocation processing program.

今日における、例えば建設業、IT業(IT:Information Technology)、広告業等では、プロジェクト(PJ)毎の共通費をプロジェクトの各契約単位に配賦する必要がある。従来では、共通費をプロジェクト毎に発生額を認識し、プロジェクトの各契約を指定して、指定の配賦基準に従い配賦処理を行っていた。 In today's industries, such as construction, IT (Information Technology), and advertising, it's necessary to allocate common costs for each project to each contract unit within that project. Traditionally, common costs were recognized for each project, and then allocated according to a specified allocation standard, with each contract within the project being identified.

また、特許文献1(特開2022-117133号公報)に開示されている会計処理システムは、仕訳手段が、会計明細データの複数の項目に対し、項目の名称に基づき、少なくとも第1費目、第2費目及び第3費目を割り当てる。按分手段は、第1費目が割り当てられた各項目の金額を、按分先金額割合の按分率に基づき、第2費目及び(又は)第3費目が割り当てられた各項目に対し按分し、按分結果の金額を出力する。提案手段は、按分結果が出力された各項目に対し、少なくとも項目の名称に基づき、詳細情報の1以上の候補を提案する。これにより、会計処理の効率化、作業の標準化及び品質向上を可能としている。 Furthermore, the accounting processing system disclosed in Patent Document 1 (Japanese Patent Publication No. 2022-117133) uses a journal entry means to assign at least a first expense item, a second expense item, and a third expense item to multiple items of accounting detail data based on the names of the items. The apportionment means apportions the amount of each item to which the first expense item is assigned to each item to which the second expense item and/or third expense item is assigned, based on the apportionment rate of the apportionment amount ratio, and outputs the apportionment result amounts. The proposed means proposes one or more candidate detailed information items for each item from which the apportionment result has been output, based at least on the name of the item. This enables increased efficiency in accounting processing, standardization of work, and improved quality.

特開2022-117133号公報Japanese Patent Publication No. 2022-117133

しかし、従来のように、共通費をプロジェクト毎に発生額を認識し、現場の各契約を指定して、指定の配賦基準に従い配賦処理を行う場合、契約毎に適切な配賦がされず、本来賦課されない契約に共通費が計上される等、契約毎の正確な予実の管理が困難となる問題があった。 However, when common costs are recognized for each project and allocated according to designated allocation criteria, as in the conventional method, there are problems such as inappropriate allocation for each contract, resulting in common costs being recorded for contracts that should not be subject to such allocation, and making accurate budget and actuals management for each contract difficult.

本発明は、上述の課題に鑑みてなされたものであり、契約毎に適切な共通費の配賦を行うことで正確な予実管理を可能とした共通費配賦処理装置、共通費配賦処理方法、及び、共通費配賦処理プログラムの提供を目的とする。 This invention has been made in view of the above-mentioned problems, and aims to provide a common cost allocation processing device, a common cost allocation processing method, and a common cost allocation processing program that enable accurate budget-to-actual management by appropriately allocating common costs for each contract.

上述の課題を解決し、目的を達成するために、本発明に係る共通費配賦処理装置は、一つのプロジェクトで履行される一つ又は複数の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、プロジェクトに対して設定された現場共通費の予定配賦率を取得する取得部と、各契約の発生直接原価の予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する算出部と、各契約の発生直接原価、及び、算出された各契約の発生直接原価に対応する予定配賦現場共通費を含む、プロジェクトの原価明細データを生成するデータ生成部と、を有し、データ生成部は、借方において予定配賦現場共通費を仕掛経費とし、貸方において予定配賦現場共通費を原価配賦振替とした仕訳データを生成する。 To solve the above-mentioned problems and achieve the objective, the common cost allocation processing device according to the present invention includes: an acquisition unit that acquires the incurred direct costs recorded as costs incurred for one or more contracts performed in a single project, and the planned allocation rate of on-site common costs set for the project; a calculation unit that calculates the planned allocated on-site common costs, which are expenses equivalent to the planned allocation rate of the incurred direct costs for each contract; and a data generation unit that generates project cost detail data including the incurred direct costs for each contract and the planned allocated on-site common costs corresponding to the calculated incurred direct costs for each contract. The data generation unit generates journal entry data in which the planned allocated on-site common costs are debited as work-in-progress expenses and the planned allocated on-site common costs are credited as cost allocation transfers.

また、上述の課題を解決し、目的を達成するために、本発明に係る共通費配賦処理装置の共通費配賦処理方法は、取得部が、一つのプロジェクトで履行される一つ又は複数の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、プロジェクトに対して設定された現場共通費の予定配賦率を取得する取得ステップと、算出部が、各契約の発生直接原価の予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する算出ステップと、データ生成部が、各契約の発生直接原価、及び、算出された各契約の発生直接原価に対応する予定配賦現場共通費を含む、プロジェクトの原価明細データを生成するデータ生成ステップと、を有し、データ生成ステップでは、借方において予定配賦現場共通費を仕掛経費とし、貸方において予定配賦現場共通費を原価配賦振替とした仕訳データを生成する。 Furthermore, in order to solve the above-mentioned problems and achieve the objective, the common cost allocation processing method of the common cost allocation processing device according to the present invention includes an acquisition step in which an acquisition unit acquires the incurred direct costs recorded as costs incurred for one or more contracts performed in a single project, and the planned allocation rate of on-site common costs set for the project; a calculation step in which a calculation unit calculates the planned allocated on-site common costs, which are expenses equivalent to the planned allocation rate of the incurred direct costs for each contract; and a data generation step in which a data generation unit generates project cost detail data including the incurred direct costs for each contract and the planned allocated on-site common costs corresponding to the calculated incurred direct costs for each contract. In the data generation step, journal entry data is generated in which the planned allocated on-site common costs are debited as work-in-progress expenses and the planned allocated on-site common costs are credited as cost allocation transfers.

また、上述の課題を解決し、目的を達成するために、本発明に係る共通費配賦処理プログラムは、コンピュータを、一つのプロジェクトで履行される一つ又は複数の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、プロジェクトに対して設定された現場共通費の予定配賦率を取得する取得部と、各契約の発生直接原価の予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する算出部と、各契約の発生直接原価、及び、算出された各契約の発生直接原価に対応する予定配賦現場共通費を含む、プロジェクトの原価明細データを生成するデータ生成部として機能させ、データ生成部は、借方において予定配賦現場共通費を仕掛経費とし、貸方において予定配賦現場共通費を原価配賦振替とした仕訳データを生成する。 Furthermore, in order to solve the above-mentioned problems and achieve the objectives, the common cost allocation processing program according to the present invention functions as follows: an acquisition unit that acquires the incurred direct costs recorded as costs incurred for one or more contracts performed in a single project, and the planned allocation rate of on-site common costs set for the project; a calculation unit that calculates the planned allocated on-site common costs, which are expenses equivalent to the planned allocation rate of the incurred direct costs for each contract; and a data generation unit that generates project cost detail data including the incurred direct costs for each contract and the planned allocated on-site common costs corresponding to the calculated incurred direct costs for each contract . The data generation unit generates journal entry data in which the planned allocated on-site common costs are debited as work-in-progress expenses and the planned allocated on-site common costs are credited as cost allocation transfers.

本発明は、契約毎に適切な共通費の配賦を行うことで正確な予実管理を可能とすることができる。 This invention enables accurate budget-versus-actual management by appropriately allocating common costs for each contract.

図1は、実施の形態の共通費配賦処理装置のハードウェア構成を示すブロック図である。Figure 1 is a block diagram showing the hardware configuration of the common expense allocation processing device according to the embodiment. 図2は、プロジェクトと契約の関係を示す図である。Figure 2 shows the relationship between a project and a contract. 図3は、プロジェクトに対して設定される予定配賦率の一例を示す図である。Figure 3 shows an example of a planned allocation rate set for a project. 図4は、プロジェクトに対して設定された予定配賦率に基づいて契約毎に算出された現場共通費の一例を示す図である。Figure 4 shows an example of on-site common costs calculated for each contract based on the predetermined allocation rate set for the project. 図5は、契約毎に計上される直接原価、及び、実際に発生した現場共通費の一例を示す図である。Figure 5 shows an example of direct costs recorded for each contract and actual on-site common expenses incurred. 図6は、現場共通費の予定配賦処理の一例を示す図である。Figure 6 shows an example of the planned allocation process for on-site common expenses. 図7は、予定配賦処理された現場共通費の仕訳データの一例を示す図である。Figure 7 shows an example of journal entry data for on-site common expenses that have been allocated according to a predetermined schedule. 図8は、実際に発生した現場共通費と、予定配賦処理された現場共通費との差異となる間接原価差異の一例を示す図である。Figure 8 shows an example of an indirect cost variance, which is the difference between the actual on-site common costs incurred and the on-site common costs that were allocated according to a predetermined plan. 図9は、予定配賦率等が設定される部門予定配賦率マスタの一例を示す図である。Figure 9 shows an example of a departmental planned allocation rate master where planned allocation rates are set. 図10は、プロジェクト基本データのフォーマットの一例を示す図である。Figure 10 shows an example of the format for project basic data. 図11は、プロジェクト受注データのフォーマットの一例を示す図である。Figure 11 shows an example of a project order data format. 図12は、プロジェクト基本データの一例を示す図である。Figure 12 shows an example of basic project data. 図13は、契約情報が入力された工事001のプロジェクト受注データの一例を示す図である。Figure 13 shows an example of project order data for construction 001 with contract information entered. 図14は、契約情報が入力された工事002のプロジェクト受注データの一例を示す図である。Figure 14 shows an example of project order data for construction 002 with contract information entered. 図15は、契約情報が入力された工事003のプロジェクト受注データの一例を示す図である。Figure 15 shows an example of project order data for construction 003 with contract information entered. 図16は、契約情報が入力された工事004のプロジェクト受注データの一例を示す図である。Figure 16 shows an example of project order data for construction 004 with contract information entered. 図17は、予算入力が行われた工事001の予算データの一例を示す図である。Figure 17 shows an example of budget data for construction project 001 for which budget input has been performed. 図18は、予算入力が行われた工事002の予算データの一例を示す図である。Figure 18 shows an example of budget data for construction project 002 for which budget input has been performed. 図19は、予算入力が行われた工事003の予算データの一例を示す図である。Figure 19 shows an example of budget data for construction project 003 for which budget input has been performed. 図20は、仕入入力が行われた工事001の仕入データの一例を示す図である。Figure 20 shows an example of procurement data for construction project 001 for which procurement input has been performed. 図21は、仕入入力が行われた工事002の仕入データの一例を示す図である。Figure 21 shows an example of procurement data for construction project 002, for which procurement input has been performed. 図22は、仕入入力が行われた工事003の仕入データの一例を示す図である。Figure 22 shows an example of procurement data for construction project 003, for which procurement input has been performed. 図23は、現場共通費の仕入データの一例を示す図である。Figure 23 shows an example of procurement data for common site expenses. 図24は、工事毎の主要材料費及び予定配賦処理された現場共通費を示す図である。Figure 24 shows the main material costs and planned allocated site common costs for each construction project. 図25は、予定配賦処理結果に基づいて生成された仕訳データの一例を示す図である。Figure 25 shows an example of journal entry data generated based on the results of the planned allocation process. 図26は、工事台帳の出力イメージを示す図である。Figure 26 shows an example of the output of the construction ledger.

以下、本発明を適用した実施の形態となる共通費配賦処理装置を、図面に基づいて詳細に説明する。なお、本発明は、以下の実施の形態に限定されるものではない。 The following describes in detail, based on the drawings, a common expense allocation processing device that is an embodiment of the present invention. However, the present invention is not limited to the following embodiments.

(ハードウェア構成)
図1に示すように、実施の形態の共通費配賦処理装置1は、記憶部2、制御部3、通信インターフェース部4及び入出力インターフェース部5を備えている。入出力インターフェース部5には、入力装置6及び出力装置7が接続されている。出力装置7としては、モニタ装置(家庭用テレビを含む)等の表示部、スピーカ装置等が相当する。入力装置6としては、キーボード装置、マウス装置及びマイクロホン装置等の他、マウス装置と協働してポインティングデバイス機能を実現するモニタ装置等を用いることができる。通信インターフェース部4は、例えばインターネット等の広域網又はLAN(Local Area Network)等のプライベート網等のネットワークに接続される。
(Hardware configuration)
As shown in Figure 1, the common expense allocation processing device 1 of this embodiment includes a storage unit 2, a control unit 3, a communication interface unit 4, and an input/output interface unit 5. An input device 6 and an output device 7 are connected to the input/output interface unit 5. The output device 7 may be a display unit such as a monitor device (including a household television), a speaker device, etc. The input device 6 may be a keyboard device, a mouse device, a microphone device, etc., or a monitor device that works in cooperation with a mouse device to realize a pointing device function. The communication interface unit 4 is connected to a network such as a wide-area network such as the Internet or a private network such as a LAN (Local Area Network).

記憶部2としては、例えばROM(Read Only Memory)、RAM(Random Access Memory)、HDD(Hard Disk Drive)又はSSD(Solid State Drive)等の記憶装置を用いることができる。記憶部2には、所定のプロジェクトの契約毎に適切な共通費の配賦を行い、正確な予実管理を可能とする共通費配賦処理プログラムが記憶されている。 The memory unit 2 can use, for example, a ROM (Read Only Memory), RAM (Random Access Memory), HDD (Hard Disk Drive), or SSD (Solid State Drive). The memory unit 2 stores a common cost allocation processing program that appropriately allocates common costs for each contract of a given project, enabling accurate budget-to-actual management.

また、記憶部2には、部門予定配賦率マスタ11が記憶さえる。また、記憶部2には、後述するプロジェクト基本データ、プロジェクト受注データ、予算データ、仕入データ、プロジェクト原価明細データ、仕訳データ、及び、間接原価差異データ等が記憶される。 Furthermore, the memory unit 2 stores the departmental planned allocation rate master 11. The memory unit 2 also stores project basic data, project order data, budget data, procurement data, project cost detail data, journal entry data, and indirect cost variance data, as described later.

(共通費配賦処理装置の機能構成)
次に、制御部3は、記憶部2に記憶されている共通費配賦処理プログラムを実行することで、図1に示すように、取得部21、算出部22、データ生成部23、表示制御部24、記憶制御部25、及び、通信制御部26として機能する。
(Functional configuration of the common expense allocation processing device)
Next, the control unit 3 executes the common expense allocation processing program stored in the storage unit 2, and functions as an acquisition unit 21, calculation unit 22, data generation unit 23, display control unit 24, storage control unit 25, and communication control unit 26, as shown in Figure 1.

取得部21は、一例として所定の現場の工事等を行う一つのプロジェクトで履行される一つ又は複数の工事等の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、プロジェクトに対して設定された現場共通費の予定配賦率を取得する。 The acquisition unit 21 acquires, for example, the incurred direct costs recorded as costs for one or more construction contracts performed in a single project involving construction work at a specified site, and the planned allocation rate for site common expenses set for the project.

算出部22は、各契約の発生直接原価の予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する。 The calculation unit 22 calculates the planned allocation site common expenses, which are the amount of expenses corresponding to the planned allocation rate of the direct costs incurred for each contract.

データ生成部23は、各契約の発生直接原価、及び、算出された各契約の発生直接原価に対応する予定配賦現場共通費を含む、プロジェクトの原価明細データを生成する。 The data generation unit 23 generates project cost detail data, including the direct costs incurred for each contract and the planned allocated site common expenses corresponding to the calculated direct costs incurred for each contract.

また、データ生成部23は、借方において予定配賦現場共通費を仕掛経費とし、貸方において予定配賦現場共通費を原価配賦振替とした仕訳データを生成する。 Furthermore, the data generation unit 23 generates journal entry data where the planned allocated site common expenses are debited as work-in-progress expenses, and the planned allocated site common expenses are credited as cost allocation transfers.

また、算出部22は、現場で実際に発生した現場共通費と、各契約の予定配賦現場共通費の合計額との差額である間接原価差異の金額を算出する。データ生成部23は、算出された間接原価差異の金額を示す間接原価差異データを生成する。 Furthermore, the calculation unit 22 calculates the amount of indirect cost variance, which is the difference between the actual on-site common costs incurred and the total amount of planned allocated on-site common costs for each contract. The data generation unit 23 generates indirect cost variance data showing the calculated amount of indirect cost variance.

表示制御部24は、データ生成部23で生成された原価明細データ、仕訳データ及び間接原価差異データ等を、表示部の一例である出力装置7を介して表示する。記憶制御部25は、データ生成部23で生成された原価明細データ、仕訳データ及び間接原価差異データ等を記憶部2に記憶制御する。また、通信制御部26は、データ生成部23により生成された仕訳データを、通信インターフェース部4に接続されたネットワーク上のサーバ装置の会計システムに計上する。なお、仕訳データ等は、記憶部2内に設けられた会計システムに計上してもよい。 The display control unit 24 displays the cost detail data, journal entry data, and indirect cost variance data generated by the data generation unit 23 via the output device 7, which is an example of a display unit. The storage control unit 25 stores the cost detail data, journal entry data, and indirect cost variance data generated by the data generation unit 23 in the storage unit 2. The communication control unit 26 records the journal entry data generated by the data generation unit 23 into the accounting system of a server device on the network connected to the communication interface unit 4. Note that the journal entry data may also be recorded in an accounting system provided within the storage unit 2.

(動作概要)
次に、このような構成を有する共通費配賦処理装置1の動作の概要を説明する。なお、各用語は、下記の意とする。
(Operation overview)
Next, we will explain the general operation of the common expense allocation processing device 1 having the above configuration. The terms used here have the following meanings.

現場:プロジェクトと同意
システム画面:工事基本情報入力
テーブル名:プロジェクト基本データ
工事:契約の一例
システム画面:契約情報入力
テーブル名:プロジェクト受注ヘッダ、プロジェクト受注明細
直接原価:システム画面:仕入入力
間接原価:現場共通費
プロジェクト:システム画面:プロジェクト基本情報入力
契約:契約情報と同意
Site: Agreement with the project System screen: Input basic construction information Table name: Project basic data Construction: Example of a contract System screen: Input contract information Table name: Project order header, Project order details Direct cost: System screen: Input purchases Indirect cost: Site common expenses Project: System screen: Input basic project information Contract: Agreement with contract information

まず、「プロジェクト」は、例えば建設業、IT業(IT:Information Technology)、広告業等のプロジェクトであり、「契約」は、このプロジェクトで履行される一つ又は複数の契約である。プロジェクトと契約の関係は、図2に示すように、例えば〇〇プロジェクトに対して、契約001~契約003等の複数の契約が含まれる関係となっている。各契約の契約金額は、契約情報の入力時に業務オペレータにより入力される。この図2の例の場合、契約001~契約003の契約金額は、それぞれ「100万円」、「200万円」、「300万円」である。なお、この契約情報の入力の時点では、現場共通費用004は「0円」で入力される。 First, a "project" refers to a project in fields such as construction, IT (Information Technology), or advertising, while a "contract" is one or more contracts performed within that project. As shown in Figure 2, the relationship between a project and contracts is such that, for example, a project might include multiple contracts, such as Contract 001 to Contract 003. The contract amount for each contract is entered by the business operator when the contract information is entered. In the example in Figure 2, the contract amounts for Contract 001 to Contract 003 are "1 million yen," "2 million yen," and "3 million yen," respectively. Note that at the time of entering this contract information, the common site expenses 004 are entered as "0 yen."

次に、部門予定配賦率マスタ11には、図3に示すようにプロジェクトに対する共通費の予定配賦率が登録される。図3の例は、〇〇プロジェクトに対して「5%」の予定配賦率が設定された例である。 Next, the planned allocation rate for common expenses for the project is registered in the Department Planned Allocation Rate Master 11, as shown in Figure 3. Figure 3 shows an example where a planned allocation rate of "5%" is set for the XX project.

次に、図4に示すように契約毎に実行予算が登録される。この図4の例の場合、契約001~契約003の実行予算は、それぞれ「84万円」、「168万円」、「252万円」である。また、これら実行予算のうち、契約001の「84万円」の実行予算の内訳は、直接原価が「80万円」、現場共通費が「80万円×5%=4万円」である。同様に、契約002の「168万円」の実行予算の内訳は、直接原価が「160万円」、現場共通費が「160万円×5%=8万円」である。同様に、契約003の「252万円」の実行予算の内訳は、直接原価が「240万円」、現場共通費が「240万円×5%=12万円」である。 Next, as shown in Figure 4, an execution budget is registered for each contract. In the example in Figure 4, the execution budgets for contracts 001 to 003 are "840,000 yen," "1,680,000 yen," and "2,520,000 yen," respectively. Of these execution budgets, the breakdown of the "840,000 yen" budget for contract 001 is "800,000 yen" for direct costs and "800,000 yen x 5% = 40,000 yen" for on-site common expenses. Similarly, the breakdown of the "1,680,000 yen" budget for contract 002 is "1,600,000 yen" for direct costs and "1,600,000 yen x 5% = 80,000 yen" for on-site common expenses. Likewise, the breakdown of the "2,520,000 yen" budget for contract 003 is "2,400,000 yen" for direct costs and "2,400,000 yen x 5% = 120,000 yen" for on-site common expenses.

次に、図5に示すように契約毎に原価計上を行う。図5の例は、契約001の直接原価として「40万円」が計上され、契約002の直接原価として「100万円」が計上され、契約003の直接原価として「200万円」が計上された例である。また、図5の例は、現場共通費として「30万円」が発生し、この「30万円」が、現場共通費の直接原価として計上された例である。 Next, as shown in Figure 5, costs are accounted for for each contract. The example in Figure 5 shows that "400,000 yen" is accounted for as direct cost for contract 001, "1,000,000 yen" for contract 002, and "2,000,000 yen" for contract 003. Furthermore, Figure 5 shows an example where "300,000 yen" was incurred as site-wide common expenses, and this "300,000 yen" was accounted for as direct cost of site-wide common expenses.

次に、図6に示すように、現場共通費を原価計算で予定配賦する。この図6に示すように、契約001の場合、発生した直接原価が「40万円」であるため、「40万円×5%=2万円」の現場共通費が予定配賦される。同様に、契約002の場合、発生した直接原価が「100万円」であるため、「100万円×5%=5万円」の現場共通費が予定配賦される。同様に、契約003の場合、発生した直接原価が「200万円」であるため、「200万円×5%=10万円」の現場共通費が予定配賦される。 Next, as shown in Figure 6, site-wide common costs are allocated using cost accounting. As shown in Figure 6, in the case of contract 001, the incurred direct costs are "400,000 yen," so "400,000 yen x 5% = 20,000 yen" is allocated as site-wide common costs. Similarly, in the case of contract 002, the incurred direct costs are "1,000,000 yen," so "1,000,000 yen x 5% = 50,000 yen" is allocated as site-wide common costs. Similarly, in the case of contract 003, the incurred direct costs are "2,000,000 yen," so "2,000,000 yen x 5% = 100,000 yen" is allocated as site-wide common costs.

次に、図7に示すように、契約毎に予定配賦された現場共通費、及び、実際に発生した現場共通費の仕訳データを生成する。契約毎に予定配賦された現場共通費に対しては、借方を仕掛経費とし、貸方を原価配賦振替とした仕訳データが生成される。また、実際に発生した現場共通費に対しては、借方を現場共通費とし、貸方を未払金とした仕訳データが生成される。 Next, as shown in Figure 7, journal entries are generated for the planned and actual on-site common expenses allocated per contract. For the planned and allocated on-site common expenses, a journal entry is generated with a debit to work-in-progress expenses and a credit to cost allocation transfer. For the actual on-site common expenses, a journal entry is generated with a debit to on-site common expenses and a credit to accounts payable.

次に、図8(a)に示すように、契約001~契約003に予定配賦された現場共通費の合計額は、上述の仕訳データの借方における仕掛経費で「計17万円」となる。また、図8(c)に示すように、契約001~契約003に予定配賦された現場共通費の合計額は、上述の仕訳データの貸方における原価配賦振替で「計17万円」となる。これに対して、この例の場合、図8(b)に示すように、実際に発生した現場共通費は「30万円」である。 Next, as shown in Figure 8(a), the total amount of site-wide common expenses allocated to contracts 001 to 003 is "170,000 yen" in the debit side of the journal entry data for work-in-progress expenses. Also, as shown in Figure 8(c), the total amount of site-wide common expenses allocated to contracts 001 to 003 is "170,000 yen" in the credit side of the journal entry data for cost allocation transfers. In contrast, in this example, as shown in Figure 8(b), the actual site-wide common expenses incurred were "300,000 yen".

このため、図8(b)及び図8(c)に示すように、予定配賦済の現場共通費の合計額である「17万円」を、実際に発生した現場共通費である「30万円」から減算処理することで(30万円-17万円=13万円)、「13万円」の間接原価差異を算出する。なお、この間接原価差異は、会計上科目でとらえる。 Therefore, as shown in Figures 8(b) and 8(c), the total amount of planned allocated on-site common expenses, "170,000 yen," is subtracted from the actual on-site common expenses incurred, "300,000 yen" (300,000 yen - 170,000 yen = 130,000 yen), resulting in an indirect cost variance of "130,000 yen." This indirect cost variance is recorded as an accounting item.

ここで、上述の予定配賦率が設定される部門予定配賦率マスタ11を、図9に例示する。この図9に示すように、部門予定配賦率マスタ11には、部門コード、原価分類種別、配賦率、配賦プロジェクトコード、配賦プロジェクト原価科目、発生基準区分、及び、予定配賦区分が記憶される。 Here, Figure 9 illustrates the departmental planned allocation rate master 11 in which the aforementioned planned allocation rates are set. As shown in Figure 9, the departmental planned allocation rate master 11 stores the department code, cost classification type, allocation rate, allocation project code, allocation project cost account, accrual basis classification, and planned allocation classification.

原価分類種別は、予定配賦額を表示する原価分類である。図9の例は、予定配賦額を「4:直接原価(経費)」の原価分類で表示することが指定された例である。配賦率としては、一例として「5%」の予定配賦率が設定される。プロジェクトで予定配賦率が指定されていない場合、この配賦率に対して「採用」が設定される。 The cost classification type is the cost classification that displays the planned allocation amount. The example in Figure 9 shows an example where the planned allocation amount is specified to be displayed under the cost classification "4: Direct Costs (Expenses)". As an example, a planned allocation rate of "5%" is set. If a planned allocation rate is not specified in the project, "Adopted" is set for this allocation rate.

配賦プロジェクトコード及び配賦プロジェクト原価科目は、それぞれ予定配賦額を表示する費目である。図9の例は、予定配賦額を「現場共通費」として表示することが指定された例である。発生基準区分は、予定配賦率の計算対象である。図9の例は、発生基準区分として、「0:原価」が設定された例である。予定配賦区分は、共通費の予定配賦をプロジェクト別に計算するか、又は、部門単位で計算するか、ということを指定する。図9の例は、「1:PJ別」に設定され、共通費の予定配賦をプロジェクト別に計算する設定となっている。 The allocated project code and allocated project cost item are expense items that display the planned allocated amount, respectively. The example in Figure 9 shows an example where the planned allocated amount is specified as "Field Common Costs." The accrual basis category is the item used to calculate the planned allocation rate. The example in Figure 9 shows an example where "0: Cost" is set as the accrual basis category. The planned allocation category specifies whether the planned allocation of common costs is calculated on a project basis or on a departmental basis. In the example in Figure 9, it is set to "1: By Project," meaning the planned allocation of common costs is calculated on a project basis.

なお、実施の形態の共通費配賦処理装置1は、この予定配賦区分に対して「2:部門別」の設定を行うことで、共通費の予定配賦を部門単位で計算することも可能となっている。 Furthermore, the common expense allocation processing device 1 of this embodiment can also calculate the planned allocation of common expenses on a departmental basis by setting "2: Departmental" to this planned allocation category.

(具体的な動作)
次に、実施の形態の共通費配賦処理装置1の動作を、具体例を用いて説明する。なお、以下、一例として、プロジェクトは、例えば「〇〇ビル空調工事」等の建設業のプロジェクトであり、このプロジェクトには、契約の一例である複数の工事が含まれることとして説明を行う。この建設業のプロジェクト以外であっても、IT業(IT:Information Technology)のプロジェクト又は広告業のプロジェクト等でもよい。
(Specific actions)
Next, the operation of the common cost allocation processing device 1 of the embodiment will be explained using a specific example. For the purposes of this explanation, the project will be assumed to be a construction project, such as "Air Conditioning Work for XX Building," and will include multiple construction works as an example of a contract. However, the project could also be an IT (Information Technology) project or an advertising project, etc.

まず、図10に、工事基本情報の入力を行うことで生成されるプロジェクト基本データのフォーマットの一例を示す。この図10に示すように、プロジェクト基本データは、プロジェクト番号、プロジェクト名、得意先コード、担当者コード、期間開始日、期間終了日及び上述の予定配賦率等を含んで構成される。 First, Figure 10 shows an example of the format of the project basic data generated by inputting the basic construction information. As shown in Figure 10, the project basic data consists of the project number, project name, customer code, person in charge code, start date, end date, and the aforementioned planned allocation rate.

また、図11は、工事毎の契約情報を入力することで生成されるプロジェクト受注データのフィーマットの一例である。このうち、図11(a)は、プロジェクト受注データのヘッダデータ(プロジェクト受注ヘッダデータ)であり、図11(b)は、プロジェクト受注データの明細データ(プロジェクト受注明細データ)である。 Furthermore, Figure 11 shows an example of a format for project order data generated by inputting contract information for each construction project. Figure 11(a) shows the header data (project order header data), and Figure 11(b) shows the detail data (project order detail data).

図11(a)に示すプロジェクト受注ヘッダデータは、プロジェクト番号、受注番号、会計年月、得意先コード、伝票売上本体金額、伝票売上消費税額、伝票原価金額、及び、伝票粗利金額等を含んで構成される。 The project order header data shown in Figure 11(a) includes project number, order number, accounting year and month, customer code, invoice sales amount, invoice sales consumption tax amount, invoice cost amount, and invoice gross profit amount, etc.

図11(b)に示すプロジェクト受注明細データは、受注番号、受注行番号、商品コード、商品名、債権科目区分、消費税率区分、受注数、売上本体価格、売上本体金額、売上消費税額、原価単価、原価金額、及び、粗利金額等を含んで構成される。 The project order details data shown in Figure 11(b) includes the order number, order line number, product code, product name, receivable account classification, consumption tax rate classification, quantity ordered, sales price, sales amount, sales consumption tax amount, cost per unit, cost amount, and gross profit amount, etc.

次に、実施の形態の共通費配賦処理装置1は、記憶部2に記憶されている共通費配賦処理プロジェクトに基づいて、制御部3が、下記のステップの処理を実行する。 Next, the common expense allocation processing device 1 of this embodiment, based on the common expense allocation processing project stored in the storage unit 2, has the control unit 3 execute the following steps.

ステップS1→入力された工事基本情報に基づくプロジェクト基本データの生成処理
ステップS2→入力された各工事の契約情報に基づくプロジェクト受注データの生成処理
ステップS3→入力された各工事の実行予算に基づく予算データの生成処理
ステップS4→仕入入力に基づく仕入データの生成処理
ステップS5→予定配賦率に基づく共通費の予定配賦計算処理
ステップS6→仕訳データの生成処理
ステップS7→間接原価差異データの生成処理
Step S1 → Process to generate project basic data based on the entered basic construction information Step S2 → Process to generate project order data based on the entered contract information for each construction Step S3 → Process to generate budget data based on the entered execution budget for each construction Step S4 → Process to generate purchase data based on purchase input Step S5 → Process to calculate the planned allocation of common costs based on the planned allocation rate Step S6 → Process to generate journal entry data Step S7 → Process to generate indirect cost variance data

すなわち、ステップS1では、業務オペレータにより入力装置6を介して入力された工事基本情報を取得部21が取得し、データ生成部23が、図12に示すプロジェクト基本データを生成する。このプロジェクト基本データには、図10及び図12に示すように、例えば「5%」等の予定配賦率が登録される。 In other words, in step S1, the acquisition unit 21 acquires the basic construction information entered by the business operator via the input device 6, and the data generation unit 23 generates the project basic data shown in Figure 12. As shown in Figures 10 and 12, the project basic data includes a planned allocation rate, such as "5%".

次に、ステップS2では、業務オペレータにより入力装置6を介して入力された各工事の契約情報を取得部21が取得し、データ生成部23が、図13~図16に示すように、工事毎にプロジェクト受注データを生成する。このうち、図13(a)及び図13(b)は、受注番号として「JY0001」が自動採番された工事001のプロジェクト受注ヘッダデータ、及び、プロジェクト受注明細データであり、売上本体金額は「100万円」である。 Next, in step S2, the acquisition unit 21 acquires the contract information for each construction project entered by the business operator via the input device 6, and the data generation unit 23 generates project order data for each construction project, as shown in Figures 13 to 16. Figures 13(a) and 13(b) show the project order header data and project order detail data for construction project 001, which has been automatically assigned the order number "JY0001," with a sales amount of "1 million yen."

また、図14(a)及び図14(b)は、受注番号として「JY0002」が自動採番された工事002のプロジェクト受注ヘッダデータ、及び、プロジェクト受注明細データであり、売上本体金額は「200万円」である。 Furthermore, Figures 14(a) and 14(b) show the project order header data and project order detail data for construction project 002, which was automatically assigned the order number "JY0002," with a sales amount of "2 million yen."

また、図15(a)及び図15(b)は、受注番号として「JY0003」が自動採番された工事003のプロジェクト受注ヘッダデータ、及び、プロジェクト受注明細データであり、売上本体金額は「300万円」である。 Furthermore, Figures 15(a) and 15(b) show the project order header data and project order detail data for construction project 003, which was automatically assigned the order number "JY0003," with a sales amount of "3 million yen."

これらに対して、図16(a)及び図16(b)は、現場共通費のプロジェクト受注ヘッダデータ、及び、プロジェクト受注明細データである。この図16の例の場合、現場共通費のプロジェクト受注データは、受注番号として「JY0004」が自動採番されている。この契約情報の入力の時点では、現場共通費は発生していないため、売上本体金額は「0円」で登録される。 In contrast, Figures 16(a) and 16(b) show the project order header data and project order detail data for on-site common expenses. In the example in Figure 16, the project order data for on-site common expenses is automatically assigned the order number "JY0004". Since no on-site common expenses were incurred at the time of this contract information entry, the sales amount is registered as "0 yen".

次に、ステップS3では、業務オペレータにより入力装置6を介して工事毎に入力された実行予算を取得部21が取得し、データ生成部23が、図17~図19に示すように工事毎に予算データを生成する。この予算データは、図17(a)、図18(a)及び図19(a)に示す予算ヘッダデータ、及び、図17(b)、図18(b)及び図19(b)に示す予算明細データで構成される。 Next, in step S3, the acquisition unit 21 acquires the execution budget entered for each project by the business operator via the input device 6, and the data generation unit 23 generates budget data for each project as shown in Figures 17 to 19. This budget data consists of budget header data shown in Figures 17(a), 18(a), and 19(a), and budget detail data shown in Figures 17(b), 18(b), and 19(b).

図17(a)及び図17(b)は、受注番号が「JY0001」の工事001の予算データであり、予算金額は「84万円」に設定されている。また、この「84万円」の予算金額の内訳は、「80万円」が「主要材料費」、「80万円×5%の予定配賦率=4万円」が「現場共通費」となっている。 Figures 17(a) and 17(b) show the budget data for construction project 001 with order number "JY0001," where the budget amount is set at "840,000 yen." The breakdown of this "840,000 yen" budget is as follows: "800,000 yen" is for "main material costs," and "800,000 yen x 5% planned allocation rate = 40,000 yen" is for "site common expenses."

図18(a)及び図18(b)は、受注番号が「JY0002」の工事002の予算データであり、予算金額は「168万円」に設定されている。また、この「168万円」の予算金額の内訳は、「160万円」が「主要材料費」、「160万円×5%の予定配賦率=8万円」が「現場共通費」となっている。 Figures 18(a) and 18(b) show the budget data for construction project 002 with order number "JY0002," where the budget amount is set at "1.68 million yen." The breakdown of this "1.68 million yen" budget is as follows: "1.6 million yen" is for "main material costs," and "1.6 million yen x 5% planned allocation rate = 80,000 yen" is for "site common expenses."

図19(a)及び図19(b)は、受注番号が「JY0003」の工事003の予算データであり、予算金額は「252万円」に設定されている。また、この「252万円」の予算金額の内訳は、「240万円」が「主要材料費」、「240万円×5%の予定配賦率=12万円」が「現場共通費」となっている。 Figures 19(a) and 19(b) show the budget data for construction project 003 with order number "JY0003," where the budget amount is set at "2.52 million yen." The breakdown of this "2.52 million yen" budget is as follows: "2.4 million yen" for "main material costs" and "2.4 million yen x 5% planned allocation rate = 120,000 yen" for "site common expenses."

次に、ステップS4では、業務オペレータにより入力装置6を介して工事毎に入力された仕入金額を取得部21が取得し、データ生成部23が、図20~図23に示すように工事毎に仕入データを生成する。この仕入データは、図20(a)、図21(a)、図22(a)及び図23(a)に示す仕入伝票ヘッダデータ、及び、図20(b)、図21(b)、図22(b)及び図23(b)に示す仕入明細データで構成される。 Next, in step S4, the acquisition unit 21 acquires the purchase amount entered for each construction project by the business operator via the input device 6, and the data generation unit 23 generates purchase data for each construction project as shown in Figures 20 to 23. This purchase data consists of purchase slip header data shown in Figures 20(a), 21(a), 22(a), and 23(a), and purchase detail data shown in Figures 20(b), 21(b), 22(b), and 23(b).

図20(a)及び図20(b)は、受注番号が「JY0001」の工事001の仕入データであり、主要材料費の仕入金額として「40万円」が計上されている。 Figures 20(a) and 20(b) show the procurement data for construction project 001 with order number "JY0001," where the procurement amount for major materials is recorded as "400,000 yen."

図21(a)及び図21(b)は、受注番号が「JY0002」の工事002の仕入データであり、主要材料費の仕入金額として「100万円」が計上されている。 Figures 21(a) and 21(b) show the procurement data for construction project 002 with order number "JY0002," where the procurement amount for major materials is recorded as "1,000,000 yen."

図22(a)及び図22(b)は、受注番号が「JY0003」の工事003の仕入データであり、主要材料費の仕入金額として「200万円」が計上されている。 Figures 22(a) and 22(b) show the procurement data for construction project 003 with order number "JY0003," where the procurement amount for major materials is recorded as "2 million yen."

これらに対して、図23(a)及び図23(b)は、受注番号が「JY0004」の現場共通費の仕入データであり、主要材料費の仕入金額として「30万円」が計上されている。 In contrast, Figures 23(a) and 23(b) show procurement data for site-wide common expenses with order number "JY0004," where "300,000 yen" is recorded as the procurement amount for major material costs.

次に、ステップS5では、算出部22が、図24に示すように、予定配賦率に基づく共通費の予定配賦計算処理を行う。具体的には、まず、取得部21が、図24(a)に示すように各工事の直接原価を取得すると共に、図24(b)に示すように部門予定配賦率マスタ11に設定されている予定配賦率(この例は「5%」)を取得する。 Next, in step S5, the calculation unit 22 performs the calculation of the planned allocation of common costs based on the planned allocation rate, as shown in Figure 24. Specifically, first, the acquisition unit 21 acquires the direct costs of each construction project, as shown in Figure 24(a), and also acquires the planned allocation rate (in this example, "5%") set in the departmental planned allocation rate master 11, as shown in Figure 24(b).

算出部22は、各工事の直接原価及び予定配賦率に基づいて下記の演算を行うことで、図24(c)に示すように工事毎に予定配賦金額を算出する。 The calculation unit 22 calculates the planned allocation amount for each construction project, as shown in Figure 24(c), by performing the following calculations based on the direct costs and planned allocation rates for each project.

直接費集計サブクエリの原価金額×工事基本情報の予定配賦率÷100 Direct cost aggregation subquery cost amount × Planned allocation rate from basic construction information ÷ 100

このように予定配賦金額が算出されると、データ生成部23は、図24(c)に示すように、対象月、プロジェクト番号、受注番号、件名(工事名)、原価科目区分、及び、金額等を含むプロジェクト原価明細データを生成する。この際、データ生成部23は、算出された予定配賦金額を、図24(c)に示すように部門予定配賦率マスタ11に設定されている費目(配賦プロジェクト種別コード、配賦プロジェクト原価科目)で、直接経費として原価計上したプロジェクト原価明細データを生成する。 Once the planned allocation amount is calculated in this way, the data generation unit 23 generates project cost detail data including the target month, project number, order number, subject (project name), cost account category, and amount, as shown in Figure 24(c). At this time, the data generation unit 23 generates project cost detail data in which the calculated planned allocation amount is recorded as a direct expense using the cost items (allocated project type code, allocated project cost account) set in the departmental planned allocation rate master 11, as shown in Figure 24(c).

次に、ステップS6では、データ生成部23が、このような予定配賦処理結果に基づいて、図25(a)~図25(d)に例示するように、各工事及び現場共通費の仕訳データを生成する。 Next, in step S6, the data generation unit 23 generates journal entry data for each construction project and site common expenses, as illustrated in Figures 25(a) to 25(d), based on the results of this planned allocation process.

このうち、図25(a)は、受注番号が「JY0001」の工事001の仕訳データであり、データ生成部23は、「40万円」の主要材料費に対して、借方を「40万円」の未成工事主要材料費とし、貸方を「40万円」の「工事未払金」とした仕訳データを生成する。また、データ生成部23は、「2万円」の現場共通費に対して、借方を「2万円」の未成工事経費とし、貸方を「2万円」の「原価配賦振替」とした仕訳データを生成する。 Of these, Figure 25(a) shows the journal entry data for construction project 001 with order number "JY0001". The data generation unit 23 generates journal entry data for the main material cost of "400,000 yen," with a debit of "400,000 yen" for uncompleted construction main material costs and a credit of "400,000 yen" for "Construction Accounts Payable." The data generation unit 23 also generates journal entry data for the site common expenses of "20,000 yen," with a debit of "20,000 yen" for uncompleted construction expenses and a credit of "20,000 yen" for "Cost Allocation Transfer."

同様に、図25(b)は、受注番号が「JY0002」の工事002の仕訳データであり、データ生成部23は、「100万円」の主要材料費に対して、借方を「100万円」の未成工事主要材料費とし、貸方を「100万円」の「工事未払金」とした仕訳データを生成する。また、データ生成部23は、「5万円」の現場共通費に対して、借方を「5万円」の未成工事経費とし、貸方を「5万円」の「原価配賦振替」とした仕訳データを生成する。 Similarly, Figure 25(b) shows the journal entry data for construction project 002 with order number "JY0002". The data generation unit 23 generates a journal entry for the main material cost of "1 million yen," with a debit of "1 million yen" for uncompleted construction main material costs and a credit of "1 million yen" for "Construction Accounts Payable." The data generation unit 23 also generates a journal entry for the site common expenses of "50,000 yen," with a debit of "50,000 yen" for uncompleted construction expenses and a credit of "50,000 yen" for "Cost Allocation Transfer."

同様に、図25(c)は、受注番号が「JY0003」の工事003の仕訳データであり、データ生成部23は、「200万円」の主要材料費に対して、借方を「200万円」の未成工事主要材料費とし、貸方を「200万円」の「工事未払金」とした仕訳データを生成する。また、データ生成部23は、「10万円」の現場共通費に対して、借方を「10万円」の未成工事経費とし、貸方を「10万円」の「原価配賦振替」とした仕訳データを生成する。 Similarly, Figure 25(c) shows the journal entry data for construction project 003 with order number "JY0003". The data generation unit 23 generates a journal entry for the main material cost of "2 million yen," with a debit of "2 million yen" for uncompleted construction main material costs and a credit of "2 million yen" for "Construction Accounts Payable." The data generation unit 23 also generates a journal entry for the site common expenses of "100,000 yen," with a debit of "100,000 yen" for uncompleted construction expenses and a credit of "100,000 yen" for "Cost Allocation Transfer."

これらに対して、図25(d)は、受注番号が「JY0004」の現場共通費の仕訳データであり、データ生成部23は、実際に発生した「30万円」の現場共通費に対して、借方を「30万円」の現場共通費とし、貸方を「30万円」の「工事未払金」とした仕訳データを生成する。 In contrast, Figure 25(d) shows the journal entry data for site common expenses with order number "JY0004". The data generation unit 23 generates journal entry data for the actually incurred site common expenses of "300,000 yen," with a debit of "300,000 yen" for site common expenses and a credit of "300,000 yen" for "accounts payable for construction work."

このように生成された仕訳データは、記憶制御部25により、記憶部2に一旦記憶され、業務オペレータの操作のタイミングで、通信制御部26により、インターネット等の広域網又はLAN(Local Area Network)等のプライベート網上に設けられたサーバ装置の会計システムに計上される。なお、記憶部2に会計システムを設け、この記憶部2の会計システムに上述の仕訳データを計上してもよい。 The journal entry data generated in this manner is temporarily stored in the storage unit 2 by the storage control unit 25. At the timing of the business operator's operation, the communication control unit 26 records the data in the accounting system of a server device located on a wide-area network such as the Internet or a private network such as a LAN (Local Area Network). Alternatively, an accounting system could be installed in the storage unit 2, and the aforementioned journal entry data could be recorded in this system.

また、表示制御部24は、図24(c)に示すプロジェクト原価明細データを、表示部の一例である出力装置7を介して表示する。これにより、業務オペレータは、各工事の原価及び共通費を容易に把握して管理することができる。 Furthermore, the display control unit 24 displays the project cost details data shown in Figure 24(c) via the output device 7, which is an example of a display unit. This allows the project operator to easily grasp and manage the costs and common expenses for each construction project.

また、データ生成部23は、図26に示す工事毎の工事台帳データを生成する。図26は、工事001の工事台帳データのイメージである。この図26に示すように、工事台帳データは、プロジェクト種別、原価科目、予算金額、当月発生原価、及び、直接経費等を含んで構成される。この工事001の場合、主要材料費の予算金額に「80万円」が入力され、当月発生原価として「40万円」が入力される。また、現場共通費の予算金額として、上述の「5%」の予定配賦率で算出された「4万円」が入力され、直接経費として「2万円」が入力される。 Furthermore, the data generation unit 23 generates project ledger data for each project, as shown in Figure 26. Figure 26 is an image of the project ledger data for project 001. As shown in Figure 26, the project ledger data consists of project type, cost item, budget amount, current month's incurred costs, and direct expenses. In the case of project 001, "800,000 yen" is entered as the budget amount for major material costs, and "400,000 yen" is entered as the current month's incurred costs. In addition, "40,000 yen," calculated using the aforementioned "5%" planned allocation rate, is entered as the budget amount for site common expenses, and "20,000 yen" is entered as direct expenses.

記憶制御部25は、このような工事台帳データを記憶部2に記憶する。また、表示制御部24は、工事毎の工事台帳データを、出力装置7を介して表示する。これにより、業務オペレータは、各工事の原価及び共通費を容易に把握して管理することができる。 The memory control unit 25 stores this construction ledger data in the memory unit 2. The display control unit 24 displays the construction ledger data for each construction project via the output device 7. This allows the operations operator to easily grasp and manage the costs and overhead for each construction project.

次に、データ生成部23は、間接原価差異データを生成する。図8(a)を用いて説明したすように、工事001~工事003に予定配賦された現場共通費の合計額は、上述の仕訳データの借方における未成工事経費で「計17万円」となる。また、図8(c)に示すように、工事001~工事003に予定配賦された現場共通費の合計額は、上述の仕訳データの貸方における原価配賦振替で「計17万円」となる。これに対して、この例の場合、図8(b)に示すように、実際に発生した現場共通費は「30万円」である。 Next, the data generation unit 23 generates indirect cost variance data. As explained using Figure 8(a), the total amount of site common expenses allocated to projects 001 to 003 is "170,000 yen" in the debit side of the journal entry data for work-in-progress expenses. Also, as shown in Figure 8(c), the total amount of site common expenses allocated to projects 001 to 003 is "170,000 yen" in the credit side of the journal entry data for cost allocation transfers. In contrast, in this example, as shown in Figure 8(b), the actual site common expenses incurred are "300,000 yen".

このため、データ生成部23は、図8(b)及び図8(c)に示したように、予定配賦済の現場共通費の合計額である「17万円」を、実際に発生した現場共通費である「30万円」から減算処理することで(30万円-17万円=13万円)、「13万円」の間接原価差異を算出する。データ生成部23は、この算出結果に基づいて、「13万円」の間接原価差異を示す間接原価差異データを生成する。 Therefore, as shown in Figures 8(b) and 8(c), the data generation unit 23 calculates an indirect cost variance of "130,000 yen" by subtracting the total amount of planned allocated on-site common expenses, "170,000 yen," from the actual on-site common expenses incurred, "300,000 yen" (300,000 yen - 170,000 yen = 130,000 yen). Based on this calculation result, the data generation unit 23 generates indirect cost variance data showing an indirect cost variance of "130,000 yen."

表示制御部24は、生成された間接原価差異データを、出力装置7を介して表示する。これにより、業務オペレータは、実際に発生した現場共通費と、予定配賦率に基づいて算出された現場共通費の合計額との差異を容易に把握することができる。 The display control unit 24 displays the generated indirect cost variance data via the output device 7. This allows the operations operator to easily understand the difference between the actual on-site common expenses incurred and the total on-site common expenses calculated based on the planned allocation rate.

(実施の形態の効果)
共通費は間接原価として部門内で実額配賦することで工事等の契約毎の原価が計上され、会計年月度で未成及び完成を認識する処理が考えられるが、現場毎に発生する共通費が異なり、部門内で実額配賦すると、各契約に対して正しく共通費が反映されない不都合を生ずる。従来は、プロジェクト毎に共通費の発生額を認識し、プロジェクトの契約を指定して、指定の配賦基準に従い配賦処理を行ってきたが、実額配賦を行うことで各契約に適切な配賦が行われず、本来賦課されない契約に共通費が計上される等、契約毎の収支の認識が困難となる不都合を生じていた。
(Effects of the embodiment)
Common costs are considered indirect costs and allocated within departments based on actual costs. This allows for the recording of costs for each construction contract, and the recognition of work-in-progress and completed projects by accounting month. However, common costs vary from site to site, and allocating them within departments based on actual costs results in the inconvenience of not correctly reflecting common costs in each contract. Traditionally, the amount of common costs incurred was recognized for each project, and the project contracts were specified and allocated according to the designated allocation criteria. However, this method of allocation based on actual costs resulted in inappropriate allocation to each contract, such as common costs being recorded for contracts that should not be subject to them, making it difficult to recognize the revenue and expenses for each contract.

また、予定配賦率を各部門単位で設定する仕組みが考えられるが、実際には契約毎に共通費の発生額が異なるため、予定配賦額と実額との差が大きくなることがある。 Furthermore, while a system for setting predetermined allocation rates for each department is conceivable, in reality, the amount of common expenses differs for each contract, which can lead to a large discrepancy between the predetermined allocation and the actual amount.

実施の形態の共通費配賦処理装置1は、現場単位で予定配賦率を設定し、プロジェクトの契約毎に予定配賦金額を計算し、原価計上している。このため、契約毎に適切な共通費の配賦を行うことができ、正確な予実管理を可能とすることができる。また、予定配賦額と実額との差(間接原価差異)を、小さくすることができる。 The common cost allocation processing device 1 of this embodiment sets a planned allocation rate on a site-by-site basis, calculates the planned allocation amount for each project contract, and records it as cost. Therefore, it is possible to allocate common costs appropriately for each contract, enabling accurate budget-to-actual management. Furthermore, the difference between the planned allocation amount and the actual amount (indirect cost variance) can be minimized.

また、現場共通費は、現場における各々の間接原価の要素が大きいため、実施の形態の共通費配賦処理装置1は、契約毎に予定配賦率を設定し、各契約の直接原価に対して計算を行う。そして、現場共通費発生について、実行予算にて予実を認識し、会計にて間接原価差異を把握する。これにより、各契約おける予実の責任範囲と現場における予実の責任範囲を適切に認識して管理可能とすることができる。 Furthermore, since site-wide common costs largely consist of individual indirect costs at the site, the common cost allocation processing device 1 in this embodiment sets a predetermined allocation rate for each contract and performs calculations on the direct costs of each contract. Then, the actual cost of site-wide common costs is recognized in the execution budget, and the indirect cost variance is identified in accounting. This allows for appropriate recognition and management of the scope of responsibility for the actual cost of each contract and the scope of responsibility for the actual cost of each contract at the site.

[国連が主導する持続可能な開発目標(SDGs)への貢献]
本実施形態により、業務効率化や企業の適切な経営判断を推進することに寄与することができるので、SDGsの目標8及び目標9に貢献することが可能となる。
[Contribution to the United Nations-led Sustainable Development Goals (SDGs)]
This embodiment can contribute to improving operational efficiency and promoting appropriate management decisions by companies, thereby contributing to SDG Goals 8 and 9.

また、本実施形態により、廃棄ロス削減や、ペーパレス・電子化を推進することに寄与することができるので、SDGsの目標12、目標13及び目標15に貢献することが可能となる。 Furthermore, this embodiment can contribute to reducing waste and promoting paperless and digital processes, thereby contributing to SDGs Goals 12, 13, and 15.

また、本実施形態により、統制、ガバナンス強化に寄与することができるので、SDGsの目標16に貢献することが可能となる。 Furthermore, this embodiment can contribute to strengthening control and governance, thereby enabling contributions to SDG Goal 16.

[他の実施の形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[Other embodiments]
In addition to the embodiments described above, the present invention may be implemented in various different embodiments within the scope of the technical idea described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部又は一部を手動的に行うこともでき、或いは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of those described as being performed automatically can be performed manually, or all or part of those described as being performed manually can be performed automatically using known methods.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 Furthermore, the processing procedures, control procedures, specific names, information including registration data and search conditions for each process, screen examples, and database configuration shown in this specification and in the drawings may be modified at will unless otherwise specified.

また、共通費配賦処理装置1に関して、図示の各構成要素は機能概念的なものであり、必ずしも図示の如く物理的に構成されていることを要しない。 Furthermore, regarding the common expense allocation processing device 1, each component shown in the diagram is a functional concept and does not necessarily need to be physically configured as shown.

例えば、共通費配賦処理装置1が備える処理機能、特に制御部3及び制御部3にて行われる各処理機能については、その全部又は任意の一部を、CPU(Central Processing Unit)および当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。なお、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて共通費配賦処理装置1に機械的に読み取られる。すなわち、ROM又はHDD等の記憶部等には、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部3を構成する。 For example, the processing functions of the common cost allocation processing device 1, particularly the control unit 3 and the various processing functions performed by the control unit 3, may be implemented entirely or partially by a CPU (Central Processing Unit) and a program interpreted and executed by the CPU, or they may be implemented as wired logic hardware. The program is recorded on a non-temporary, computer-readable recording medium containing programmed instructions for the information processing device to execute the processing described in this embodiment, and is mechanically read by the common cost allocation processing device 1 as needed. That is, a storage unit such as ROM or HDD stores a computer program that, in cooperation with the OS, gives instructions to the CPU and performs various processing. This computer program is executed by being loaded into RAM and, in cooperation with the CPU, constitutes the control unit 3.

また、この共通費配賦処理装置1の共通費配賦処理プログラムは、共通費配賦処理装置1に対して任意のネットワークを介して接続された他のサーバ装置に記憶されていてもよく、必要に応じてその全部又は一部をダウンロードすることも可能である。 Furthermore, the common expense allocation processing program of this common expense allocation processing device 1 may be stored on another server device connected to the common expense allocation processing device 1 via any network, and it is possible to download all or part of it as needed.

また、本実施形態で説明した処理を実行するための共通費配賦処理プログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical Disk)、DVD(Digital Versatile Disk)、及び、Blu-ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 Furthermore, the common cost allocation processing program for executing the processing described in this embodiment may be stored on a non-temporary computer-readable recording medium, or it may be configured as a program product. Here, "recording medium" includes any "portable physical medium" such as memory cards, USB (Universal Serial Bus) memory, SD (Secure Digital) cards, flexible disks, magneto-optical disks, ROM, EPROM (Erasable Programmable Read Only Memory), EEPROM® (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magneto-Optical Disk), DVD (Digital Versatile Disk), and Blu-ray® Disc.

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコード又はバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施の形態に示した共通費配賦処理装置1において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 Furthermore, "program" refers to a data processing method described in any language or writing method, regardless of its format, such as source code or binary code. Note that "program" is not necessarily limited to a single, standalone structure; it also includes distributed structures consisting of multiple modules or libraries, and those that work in cooperation with other programs, such as an operating system, to achieve their functions. Regarding the specific configuration and reading procedure for reading the recording medium in the common cost allocation processing device 1 shown in the embodiment, as well as the installation procedure after reading, well-known configurations and procedures can be used.

記憶部2は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、及び、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、及び、ウェブページ用ファイル等を格納する。 The storage unit 2 comprises memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and stores various programs, tables, databases, and web page files used for various processes and website provision.

また、共通費配賦処理装置1は、既知のパーソナルコンピュータ装置又はワークステーション等の情報処理装置で構成してもよく、また、任意の周辺装置が接続された情報処理装置で構成してもよい。また、情報処理装置は、本実施形態で説明した処理を実現させるソフトウェア(プログラム又はデータ等を含む)を実装することにより実現してもよい。 Furthermore, the common cost allocation processing device 1 may be configured as a known personal computer device or workstation or other information processing device, or as an information processing device to which any peripheral devices are connected. The information processing device may also be implemented by implementing software (including programs or data, etc.) that realizes the processing described in this embodiment.

さらに、装置の分散・統合の具体的形態は図示するものに限られず、その全部又は一部を、各種の付加等に応じて又は機能負荷に応じて、任意の単位で機能的又は物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific forms of distribution and integration of the devices are not limited to those shown in the illustration. All or part of the devices can be functionally or physically distributed and integrated in any unit, depending on various additions or functional loads. In other words, the above-described embodiments may be implemented in any combination, or the embodiments may be implemented selectively.

本発明は、例えば建設業、IT業(IT:Information Technology)、イベント又は広告等のプロジェクトで収支を管理する業種に適用して好適である。 This invention is particularly suitable for applications in industries that manage revenue and expenses in projects such as construction, IT (Information Technology), events, or advertising.

1 共通費配賦処理装置
2 記憶部
3 制御部
4 通信インターフェース部
5 入出力インターフェース部
6 入力装置
7 出力装置
11 部門予定配賦率マスタ
21 取得部
22 算出部
23 データ生成部
24 表示制御部
25 記憶制御部
26 通信制御部
1. Common expense allocation processing device 2. Storage unit 3. Control unit 4. Communication interface unit 5. Input/output interface unit 6. Input device 7. Output device 11. Departmental planned allocation rate master 21. Acquisition unit 22. Calculation unit 23. Data generation unit 24. Display control unit 25. Storage control unit 26. Communication control unit

Claims (6)

一つのプロジェクトで履行される一つ又は複数の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、前記プロジェクトに対して設定された現場共通費の予定配賦率を取得する取得部と、
各前記契約の発生直接原価の前記予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する算出部と、
各前記契約の発生直接原価、及び、算出された各前記契約の発生直接原価に対応する前記予定配賦現場共通費を含む、前記プロジェクトの原価明細データを生成するデータ生成部と、を有し、
前記データ生成部は、借方において前記予定配賦現場共通費を仕掛経費とし、貸方において前記予定配賦現場共通費を原価配賦振替とした仕訳データを生成すること、
を特徴とする共通費配賦処理装置。
An acquisition unit that acquires the incurred direct costs recorded as costs incurred for one or more contracts performed in a single project, and the planned allocation rate of on-site common expenses set for the said project,
A calculation unit that calculates the planned allocation site common expenses, which are expenses equivalent to the planned allocation rate of the direct costs incurred for each of the aforementioned contracts,
The system includes a data generation unit that generates cost detail data for the project, including the direct costs incurred for each of the aforementioned contracts and the planned allocated site common expenses corresponding to the calculated direct costs incurred for each of the aforementioned contracts.
The data generation unit generates journal entry data in which the predetermined allocated site common expenses are debited as work-in-progress expenses and the predetermined allocated site common expenses are credited as cost allocation transfers.
A common expense allocation processing device characterized by the following .
一つのプロジェクトで履行される一つ又は複数の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、前記プロジェクトに対して設定された現場共通費の予定配賦率を取得する取得部と、
各前記契約の発生直接原価の前記予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する算出部と、
各前記契約の発生直接原価、及び、算出された各前記契約の発生直接原価に対応する前記予定配賦現場共通費を含む、前記プロジェクトの原価明細データを生成するデータ生成部と、を有し、
前記算出部は、前記プロジェクトで実際に発生した現場共通費と、各前記契約の前記予定配賦現場共通費の合計額との差額である間接原価差異の金額を算出し、
前記データ生成部は、算出された前記間接原価差異の金額を示す間接原価差異データを生成すること、
を特徴とする共通費配賦処理装置。
An acquisition unit that acquires the incurred direct costs recorded as costs incurred for one or more contracts performed in a single project, and the planned allocation rate of on-site common expenses set for the said project,
A calculation unit that calculates the planned allocation site common expenses, which are expenses equivalent to the planned allocation rate of the direct costs incurred for each of the aforementioned contracts,
The system includes a data generation unit that generates cost detail data for the project, including the direct costs incurred for each of the aforementioned contracts and the planned allocated site common expenses corresponding to the calculated direct costs incurred for each of the aforementioned contracts.
The calculation unit calculates the amount of indirect cost variance, which is the difference between the actual on-site common costs incurred in the project and the total amount of the planned allocated on-site common costs for each of the contracts.
The data generation unit generates indirect cost variance data showing the amount of the calculated indirect cost variance.
A common expense allocation processing device characterized by the following.
取得部が、一つのプロジェクトで履行される一つ又は複数の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、前記プロジェクトに対して設定された現場共通費の予定配賦率を取得する取得ステップと、
算出部が、各前記契約の発生直接原価の前記予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する算出ステップと、
データ生成部が、各前記契約の発生直接原価、及び、算出された各前記契約の発生直接原価に対応する前記予定配賦現場共通費を含む、前記プロジェクトの原価明細データを生成するデータ生成ステップと、を有し、
前記データ生成ステップでは、借方において前記予定配賦現場共通費を仕掛経費とし、貸方において前記予定配賦現場共通費を原価配賦振替とした仕訳データを生成すること、
を特徴とする共通費配賦処理装置の共通費配賦処理方法。
The acquisition step involves the acquisition unit acquiring the incurred direct costs that are recorded as costs incurred for one or more contracts performed in a single project, and the planned allocation rate of on-site common expenses set for the said project.
The calculation unit performs a calculation step in which it calculates the planned allocation site common expenses, which are expenses equivalent to the planned allocation rate of the direct costs incurred for each of the aforementioned contracts,
The data generation unit includes a data generation step that generates cost detail data for the project, which includes the direct costs incurred for each of the contracts and the planned allocated site common expenses corresponding to the calculated direct costs incurred for each of the contracts .
In the data generation step, journal entry data is generated in which the predetermined allocated site common expenses are debited as work-in-progress expenses and the predetermined allocated site common expenses are credited as cost allocation transfers.
A common expense allocation processing method for a common expense allocation processing device characterized by the following .
取得部が、一つのプロジェクトで履行される一つ又は複数の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、前記プロジェクトに対して設定された現場共通費の予定配賦率を取得する取得ステップと、The acquisition step involves the acquisition unit acquiring the incurred direct costs that are recorded as costs incurred for one or more contracts performed in a single project, and the planned allocation rate of on-site common expenses set for the said project.
算出部が、各前記契約の発生直接原価の前記予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する算出ステップと、The calculation unit performs a calculation step in which it calculates the planned allocation site common expenses, which are expenses equivalent to the planned allocation rate of the direct costs incurred for each of the aforementioned contracts,
データ生成部が、各前記契約の発生直接原価、及び、算出された各前記契約の発生直接原価に対応する前記予定配賦現場共通費を含む、前記プロジェクトの原価明細データを生成するデータ生成ステップと、を有し、The data generation unit includes a data generation step that generates cost detail data for the project, which includes the direct costs incurred for each of the contracts and the planned allocated site common expenses corresponding to the calculated direct costs incurred for each of the contracts.
前記算出ステップでは、前記プロジェクトで実際に発生した現場共通費と、各前記契約の前記予定配賦現場共通費の合計額との差額である間接原価差異の金額を算出し、In the calculation step described above, the amount of the indirect cost variance is calculated, which is the difference between the actual on-site common costs incurred in the project and the total amount of the planned allocated on-site common costs for each of the aforementioned contracts.
前記データ生成ステップでは、算出された前記間接原価差異の金額を示す間接原価差異データを生成すること、The data generation step involves generating indirect cost variance data that shows the amount of the calculated indirect cost variance.
を特徴とする共通費配賦処理装置の共通費配賦処理方法。A common expense allocation processing method for a common expense allocation processing device characterized by the following.
コンピュータを、
一つのプロジェクトで履行される一つ又は複数の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、前記プロジェクトに対して設定された現場共通費の予定配賦率を取得する取得部と、
各前記契約の発生直接原価の前記予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する算出部と、
各前記契約の発生直接原価、及び、算出された各前記契約の発生直接原価に対応する前記予定配賦現場共通費を含む、前記プロジェクトの原価明細データを生成するデータ生成部として機能させ、
前記データ生成部は、借方において前記予定配賦現場共通費を仕掛経費とし、貸方において前記予定配賦現場共通費を原価配賦振替とした仕訳データを生成すること、
を特徴とする共通費配賦処理プログラム。
Computers,
An acquisition unit that acquires the incurred direct costs recorded as costs incurred for one or more contracts performed in a single project, and the planned allocation rate of on-site common expenses set for the said project,
A calculation unit that calculates the planned allocation site common expenses, which are expenses equivalent to the planned allocation rate of the direct costs incurred for each of the aforementioned contracts,
It functions as a data generation unit that generates cost detail data for the project, including the direct costs incurred for each of the aforementioned contracts and the planned allocated site common expenses corresponding to the calculated direct costs incurred for each of the aforementioned contracts.
The data generation unit generates journal entry data in which the predetermined allocated site common expenses are debited as work-in-progress expenses and the predetermined allocated site common expenses are credited as cost allocation transfers.
A common expense allocation processing program characterized by the following.
コンピュータを、Computers,
一つのプロジェクトで履行される一つ又は複数の契約に対してそれぞれ発生することで原価計上された発生直接原価、及び、前記プロジェクトに対して設定された現場共通費の予定配賦率を取得する取得部と、An acquisition unit that acquires the incurred direct costs recorded as costs incurred for one or more contracts performed in a single project, and the planned allocation rate of on-site common expenses set for the said project,
各前記契約の発生直接原価の前記予定配賦率に相当する金額の費用である予定配賦現場共通費をそれぞれ算出する算出部と、A calculation unit that calculates the planned allocation site common expenses, which are expenses equivalent to the planned allocation rate of the direct costs incurred for each of the aforementioned contracts,
各前記契約の発生直接原価、及び、算出された各前記契約の発生直接原価に対応する前記予定配賦現場共通費を含む、前記プロジェクトの原価明細データを生成するデータ生成部として機能させ、It functions as a data generation unit that generates cost detail data for the project, including the direct costs incurred for each of the aforementioned contracts and the planned allocated site common expenses corresponding to the calculated direct costs incurred for each of the aforementioned contracts.
前記算出部は、前記プロジェクトで実際に発生した現場共通費と、各前記契約の前記予定配賦現場共通費の合計額との差額である間接原価差異の金額を算出し、The calculation unit calculates the amount of indirect cost variance, which is the difference between the actual on-site common costs incurred in the project and the total amount of the planned allocated on-site common costs for each of the contracts.
前記データ生成部は、算出された前記間接原価差異の金額を示す間接原価差異データを生成すること、The data generation unit generates indirect cost variance data showing the amount of the calculated indirect cost variance.
を特徴とする共通費配賦処理プログラム。A common expense allocation processing program characterized by the following.
JP2022203044A 2022-12-20 2022-12-20 Common expense allocation processing device, common expense allocation processing method, and common expense allocation processing program Active JP7853199B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022203044A JP7853199B2 (en) 2022-12-20 2022-12-20 Common expense allocation processing device, common expense allocation processing method, and common expense allocation processing program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022203044A JP7853199B2 (en) 2022-12-20 2022-12-20 Common expense allocation processing device, common expense allocation processing method, and common expense allocation processing program

Publications (2)

Publication Number Publication Date
JP2024088064A JP2024088064A (en) 2024-07-02
JP7853199B2 true JP7853199B2 (en) 2026-04-28

Family

ID=91672533

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022203044A Active JP7853199B2 (en) 2022-12-20 2022-12-20 Common expense allocation processing device, common expense allocation processing method, and common expense allocation processing program

Country Status (1)

Country Link
JP (1) JP7853199B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007293740A (en) 2006-04-27 2007-11-08 Hitachi Software Eng Co Ltd Distribution processing system and program
JP2013065090A (en) 2011-09-15 2013-04-11 Fujitsu Marketing Ltd Accounting-data generation device, method, program, system, server apparatus, and recording medium
US20170091678A1 (en) 2015-09-28 2017-03-30 Apptio, Inc. Intermediate resource allocation tracking in data models
JP2021152877A (en) 2020-03-18 2021-09-30 株式会社オービック Cost allocation device, cost allocation method, cost allocation program

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007293740A (en) 2006-04-27 2007-11-08 Hitachi Software Eng Co Ltd Distribution processing system and program
JP2013065090A (en) 2011-09-15 2013-04-11 Fujitsu Marketing Ltd Accounting-data generation device, method, program, system, server apparatus, and recording medium
US20170091678A1 (en) 2015-09-28 2017-03-30 Apptio, Inc. Intermediate resource allocation tracking in data models
JP2021152877A (en) 2020-03-18 2021-09-30 株式会社オービック Cost allocation device, cost allocation method, cost allocation program

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
CSP APCO/原価管理解説書 (建設業総合情報システム/原価管理),第2版,日本,富士通株式会社,1990年10月31日,p.52-54

Also Published As

Publication number Publication date
JP2024088064A (en) 2024-07-02

Similar Documents

Publication Publication Date Title
JP7146492B2 (en) Advance receipt management device, advance receipt management method, and advance receipt management program
JP7591100B2 (en) Business support device, business support method, and business support program
JP2024028605A (en) Project management device, project management method, and project management program
JP2023014355A (en) Contract-related information management device, contract-related information management method, and contract-related information management program
JP7492399B2 (en) Grade management device, grade management method, and grade management program
JP7741951B2 (en) Asset management system, asset management method, and asset management program
JP7853199B2 (en) Common expense allocation processing device, common expense allocation processing method, and common expense allocation processing program
JP7220091B2 (en) Billing data generation device, billing data generation method and billing data generation program
JP7290963B2 (en) Money totaling device, money totaling method and money totaling program
JP7661204B2 (en) Salesperson performance management device, salesperson performance management method, and salesperson performance management program
JP7198708B2 (en) Costing device, costing method and costing program
JP2023132177A (en) Payroll calculation device, payroll calculation method, and payroll calculation program
JP7064388B2 (en) Factoring equipment, factoring methods, and factoring programs
JP2022155075A (en) Journalization creation device, journalization creation method and journalization creation program
JP2022097173A (en) Cost transfer device, cost transfer method, and cost transfer program
JP7332749B2 (en) Factoring device, factoring method, and factoring program
JP7550181B2 (en) Payment management device, payment management method, and payment management program
JP7804598B2 (en) Business support device, business support method, and business support program
JP7593961B2 (en) Business support device, business support method, and business support program
JP2023110719A (en) Fee calculation device, fee calculation method and fee calculation program
JP2025003014A (en) Business support device, business support method, and business support program
JP7280735B2 (en) Costing device, costing method and costing program
JP2026059997A (en) Order management device, order management method, and order management program
JP7048387B2 (en) Discount amount allocation device, discount amount allocation method, and discount amount allocation program
JP2023101260A (en) Deposit management device, deposit management method and deposit management program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241216

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250917

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20251104

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20251226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260324

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260416