JPS5810272B2 - Offshore factory for ship dismantling - Google Patents
Offshore factory for ship dismantlingInfo
- Publication number
- JPS5810272B2 JPS5810272B2 JP2960776A JP2960776A JPS5810272B2 JP S5810272 B2 JPS5810272 B2 JP S5810272B2 JP 2960776 A JP2960776 A JP 2960776A JP 2960776 A JP2960776 A JP 2960776A JP S5810272 B2 JPS5810272 B2 JP S5810272B2
- Authority
- JP
- Japan
- Prior art keywords
- hull
- purge
- ship
- dismantling
- barge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000010926 purge Methods 0.000 claims description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 239000007769 metal material Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000007796 conventional method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Landscapes
- Ship Loading And Unloading (AREA)
- Working Measures On Existing Buildindgs (AREA)
Description
【発明の詳細な説明】
本発明は船体を解体する際に使用する浮上式の解体工場
に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a floating dismantling factory used when dismantling ship hulls.
船体には一般に高級な金属材料が大量に使用されており
、廃船になった際にはこれを解体して板材、棒材、型材
等の金属材料として商品化したり、スクラップ材として
いる。Generally, a large amount of high-grade metal materials are used in the hull of a ship, and when a ship is scrapped, it is dismantled and commercialized as metal materials such as plates, bars, and shapes, or as scrap material.
従来の船体の解体工法としては、適当な港に廃船を浮べ
ておき、海上に浮上している船体の水面上に出た部分を
まず大きな塊に切断し、(一般に大バラシと称している
)これを海上クレーンあるいは陸上よりの張り出しクレ
ーンを利用して吊上げて陸上に並べ、この大きな塊を所
定の大きさの小塊に切断している。The conventional method of dismantling a ship's hull is to float the scrapped ship in a suitable port, and first cut the part of the hull that is above the water surface into large pieces (generally called large pieces). ) This is lifted using a marine crane or an overhanging crane from land and lined up on land, and this large block is cut into small blocks of a predetermined size.
(一般に小バラシと称している)前記解体作業により水
面上に浮上していた船体部分が解体されたならば、残り
の船体(没水部)の部分は、浅瀬に洩航し、干渉時を待
って、水面上に現われた船体を前記と同様な方法で解体
作業が実施される。(Generally referred to as small scraps) Once the hull part that was floating above the water surface has been dismantled, the remaining hull (submerged part) will leak into shallow water and avoid interference in the event of interference. After waiting, the hull that appeared on the water surface is dismantled in the same manner as described above.
前記従来の船体解体法においては、船体を係留する場所
と適当な浅瀬、更に解体物を並べ、小片に切断する陸揚
げ場所が必要であり、そのために特定の場所でしか作業
を実施することができない。The conventional ship dismantling method described above requires a place to moor the ship, suitable shallow water, and a landing place to arrange the dismantled products and cut them into small pieces, and for this reason, work can only be carried out in specific places. .
このことは、我国のように港湾施設を効率的に利用しな
ければならないところでは、著しい制約を受けざるを得
ないと共に、解体原価の高騰の一原因にもなっている。In countries such as Japan, where port facilities must be used efficiently, this is not only a significant constraint, but is also one of the causes of soaring demolition costs.
さらに別の大きな問題としては、大バラシと小バラシと
いうように、解体作業を2個所の離れた場所で行なう関
係上海上クレーンあるいは張り出しクレーンによる吊上
げ運搬作業が必要であり、これに要する工数が全体の解
体工数の30%にも及んでいる。Another big problem is that because the demolition work is carried out in two separate locations, such as large and small disassembly, it is necessary to use a marine crane or an overhang crane to lift and transport the work, which increases the overall man-hours required. This accounts for 30% of the total demolition work.
また、前記のように解体場所が複数の個所に分れている
関係上多くの作業者を必要とするという問題がある。Further, as mentioned above, there is a problem in that a large number of workers are required because the dismantling site is divided into a plurality of locations.
前記のような事情から従来の解体法においては、解体場
所に著しい制約を受けると共に、多くの人員を必要とし
たので、得られた金属材料やスクラップが必然的に高価
なものになってしまうという欠点があったのである。Due to the above-mentioned circumstances, conventional demolition methods are subject to significant restrictions on the location of demolition and require a large number of personnel, making the metal materials and scrap obtained inevitably expensive. There were drawbacks.
本発明者は、前記従来技術の欠点を解消するために、海
上において小バラシまで一貫して解体する方法を開発し
たが、本発明はこの海上で行なう解体作業用の海上工場
を提供するものである。In order to eliminate the drawbacks of the prior art, the present inventor has developed a method for consistently dismantling even small pieces at sea, but the present invention provides a marine factory for dismantling work carried out at sea. be.
海上工場の具備すべき条件としては、それ自体に浮力を
有し、解体すべき船体に接近した状態で浮上できること
。The requirements for a floating factory are that it has its own buoyancy and can float close to the hull to be dismantled.
船底の一部に接触し、これを押し上げるような力が与え
られること。A force that comes into contact with a part of the bottom of a ship and pushes it up.
船体の長さ方向に船体との相対的な移動ができること。Ability to move relative to the hull in the longitudinal direction of the hull.
船体および海上工場が風あるいは波の作用を受けても両
者が接触して破損することのないような支持手段を有す
ること等である。The ship's hull and offshore factory must have support means that will prevent them from coming into contact and being damaged even if they are exposed to the action of wind or waves.
本発明は、前記条件を具備した海上解体工場を提供する
ものであって、以下図面を参照して本発明の詳細な説明
する。The present invention provides a marine demolition factory that satisfies the above conditions, and will be described in detail below with reference to the drawings.
第1図は船体を解体する作業を開始するに先立って、船
首に位置させた海上工場を示す側面図、第2図は第1図
の位置における平面図、第3図は解体作業中の状態を示
す側面図である。Figure 1 is a side view showing the offshore factory located at the bow of the ship prior to the start of work to dismantle the hull, Figure 2 is a plan view at the position shown in Figure 1, and Figure 3 is the state during dismantling work. FIG.
又、第4図は海上工場の斜視図で、第5図、第6図は夫
々、その断面図及び平面図である。Further, FIG. 4 is a perspective view of the offshore factory, and FIGS. 5 and 6 are a sectional view and a plan view thereof, respectively.
Fは海上工場で、本体部分を構成するバージ1上に下記
する各種の機器装置が設けられている。F is an offshore factory, and the following various equipments are installed on the barge 1 that constitutes the main body.
バージ1は、浮ドツクに類似してその浮揚、沈下がバー
ジのタンク内への注排水によって行なえるもので正面よ
りみて1字形をしており、その両側の垂直部分1a、1
bが船体の舷側に、また水平部分1cが船底に位置する
。The barge 1 is similar to a floating dock and can be floated and lowered by injecting water into the barge's tank, and is shaped like a letter when viewed from the front, with vertical parts 1a and 1 on both sides.
b is located on the side of the hull, and horizontal portion 1c is located on the bottom of the ship.
前記バージ1の垂直部分1a、1bには舷側押え装置2
とウィンチ3(搬入装置)とが設けられている。The vertical parts 1a and 1b of the barge 1 are equipped with side holding devices 2.
and a winch 3 (carrying device).
また前記ウィンチ3等が設けられて、いる部分より一段
低い垂直部分1a′、1b′上にはレール13が設けら
れ、この上を解体装置4が船体の長さ方向に移動できる
ようになっている。Furthermore, rails 13 are provided on the vertical parts 1a' and 1b', which are one level lower than the part where the winch 3 and the like are installed, on which the demolition equipment 4 can move in the longitudinal direction of the ship. There is.
バージ1の水平部分1c上には空気ばね5が設けられ、
これの上方にパージ荷受台6(浮動支持装置)が設けら
れ、さらにこれの上方にはキャリヤローラ7が配設され
、これを利用して船体8の底部を支持するようになって
いる。An air spring 5 is provided on the horizontal portion 1c of the barge 1,
A purge loading platform 6 (floating support device) is provided above this, and a carrier roller 7 is provided above this, and is used to support the bottom of the hull 8.
なお、キャリヤローラ7は船体8の重量を分散し、かつ
船体8の移動を容易にするために設けたもので、船体8
をバージ1上へ引込む速度が遅い場合には枕木や板等の
滑り支持部材等通常の支持手段を採用することができる
。The carrier roller 7 is provided to distribute the weight of the hull 8 and to facilitate the movement of the hull 8.
If the speed of pulling the barge onto the barge 1 is slow, normal support means such as sliding support members such as sleepers or boards may be used.
バージ1にはアンカーロープ9が設けられて解体作業中
に海上工場が移動するのを阻止する。An anchor rope 9 is provided on the barge 1 to prevent the offshore factory from moving during demolition work.
10は浮力体であり、使用前にはこれの空気を抜いてお
き、船底に取り付けたのちこれの中に空気を供給して膨
張させ、その浮力によって船体8を浮上させる。Reference numeral 10 denotes a buoyant body, which is deflated before use, and after being attached to the bottom of the ship, air is supplied into the buoyant body to inflate it, and its buoyancy causes the hull 8 to float.
舷側押え装置2は先端にゴムローラ等の回転体を取付け
、これを伸縮する腕に取り付けた装置である。The side holding device 2 is a device in which a rotating body such as a rubber roller is attached to the tip, and this is attached to an extendable arm.
バージ荷受台6の上方にはキャリヤローラ7が配列され
て船体8と海上工場との間の移動を容易にすると共に、
パージ荷受台6の下方に設けた空気ばね5によってバー
ジの水平部分1cに面圧力を作用させて大きな荷重を受
けるように構成されている。Carrier rollers 7 are arranged above the barge loading platform 6 to facilitate movement between the hull 8 and the offshore factory.
It is constructed so that surface pressure is applied to the horizontal portion 1c of the barge by an air spring 5 provided below the purge loading platform 6, so that it receives a large load.
前記海上工場Fを使用して船体を解体する際には、第1
図に示すように、船体8の船首の底(あるいは船尾の底
)に浮力体10を取り付けてこれの浮力で船体8の一方
を浮上させ、次いでバージ1を船底に当てX船体8に設
けた滑車11とウィンチ3の間に張ったワイヤ12を利
用してバージ1を船底に位置させ、必要に応じてバージ
1の浮力を増加して船体8の1部を確実に支持しておく
。When dismantling a ship using the offshore factory F,
As shown in the figure, a buoyancy body 10 is attached to the bottom of the bow (or the bottom of the stern) of the hull 8, and one side of the hull 8 is floated by the buoyancy of the body 8, and then the barge 1 is placed on the bottom of the hull 8 and installed on the X hull 8. A barge 1 is positioned at the bottom of the ship using a wire 12 stretched between a pulley 11 and a winch 3, and the buoyancy of the barge 1 is increased as necessary to securely support a part of the ship body 8.
第1図のように海上工場が配置されると解体作業が開始
される。Once the offshore factory is located as shown in Figure 1, demolition work will begin.
解体作業は3次元にわたる切断、運搬が可能な解体装置
4によって安全且つ能率的に行なわれる。The dismantling work is carried out safely and efficiently using the dismantling device 4 which is capable of cutting and transporting in three dimensions.
又、この解体作業は船体の船首または船尾より開始され
、船体の長さを短縮するように解体してい匂解体作業の
進行にともなって行なわれる船体8の海上工場Fへの引
込み移動は、ウィンチ3と動力付きのキャリヤローラー
7の回転と浮力体10の後方(第1図左方へ)への順次
移動によって行なわれる。In addition, this dismantling work starts from the bow or stern of the ship, and as the ship is being dismantled to shorten the length of the ship, the pulling and moving of the ship's hull 8 to the offshore factory F, which is carried out as the demolition work progresses, is carried out using a winch. 3 and the motorized carrier roller 7, and the sequential movement of the buoyancy body 10 rearward (toward the left in FIG. 1).
発明者らの実験によれば、この解体作業は船首または船
尾よりはじめ、ある距離解体したら前記と逆の方向より
解体を進めるのがよく、最終段階では第3図のような状
態で作業を進めるのがよい。According to the inventors' experiments, it is best to start this dismantling work from the bow or stern, and after dismantling a certain distance, proceed in the opposite direction, and at the final stage, proceed with the work in the state shown in Figure 3. It is better.
本発明に係る海上工場は前記のように構成されているの
で、次の効果を奏する。Since the offshore factory according to the present invention is configured as described above, it has the following effects.
(イ)バージ1は垂直部分1aと1bとが設けられ、解
体すべき船体8の重量の一部を支持する浮力を有し、こ
のバージ1上に船体8を引込んで支持した状態で解体作
業を行なうことができるので、船体8とバージ1との相
対関係を確実に維持することができ、安全かつ確実に解
体作業を進行することができる。(a) The barge 1 is provided with vertical parts 1a and 1b, and has buoyancy to support part of the weight of the hull 8 to be dismantled, and the dismantling work is carried out with the hull 8 pulled onto the barge 1 and supported. Therefore, the relative relationship between the hull 8 and the barge 1 can be maintained reliably, and the dismantling work can proceed safely and reliably.
(ロ)バージ1上へ船体8を搬入する手段として、ウィ
ンチ3とワイヤ12とを利用してバージ1と船体8とを
相対的に移動させるように構成しているので、船体8を
バージ1上へ引込む距離が長くても簡単に船体8を移動
させることができ、更に例えば波力や風力を受けてバー
ジ1と船体8との間に相対運動があったとしても安全に
引込み作業を行なうことができる。(b) As a means for carrying the hull 8 onto the barge 1, the winch 3 and the wire 12 are used to move the barge 1 and the hull 8 relatively. Even if the distance to be pulled upward is long, the hull 8 can be easily moved, and even if there is relative movement between the barge 1 and the hull 8 due to wave force or wind power, for example, the pulling work can be performed safely. be able to.
(ハ)バージ1上には空気ばね5とバージ荷受台6とを
含む浮動支持装置が設けられているので、船体8の重量
の1部を支持すると共に、船体8が波浪によって動揺し
てもこれに追従することができる。(c) Since a floating support device including an air spring 5 and a barge loading platform 6 is provided on the barge 1, it supports part of the weight of the hull 8 and even if the hull 8 is shaken by waves. This can be followed.
に)バージ1の垂直部分1a、1bには、舷側押え装置
2が設けられているので、船体8をバージ1内に引き込
む際のガイドとして作用すると共に、風や波による船体
8の水平方向の回転に対してバージ1を追従させること
ができるので船体8もしくはバージ1を損傷することが
なく解体作業を円滑に行なうことができる。2) The vertical parts 1a and 1b of the barge 1 are provided with side holding devices 2, which act as guides when pulling the hull 8 into the barge 1, and also prevent horizontal movement of the hull 8 due to wind and waves. Since the barge 1 can follow the rotation, the dismantling work can be carried out smoothly without damaging the hull 8 or the barge 1.
(ホ)解体装置4はレール13上を走行し、枠体15が
上下する。(E) The dismantling device 4 runs on the rails 13, and the frame 15 moves up and down.
この枠体に取付けられたゴンドラ17及びホイスト18
を使用して3次元にわたる解体切断作業が安全に、しか
も能率よく施工することが出来る。Gondola 17 and hoist 18 attached to this frame
Using this, three-dimensional demolition and cutting work can be carried out safely and efficiently.
第1図は船首部に海上工場を位置させた状態を示す側面
図、第2図は第1図における船首部と海上工場の関係を
示す平面図、第3図は解体作業中の状態を示す側面図で
ある。
又、第4図は海上工場の斜視図で、第5図、第6図は夫
々、その断面図及び平面図である。
F・・・・・・海上工場、1・・・・・・バージ、1a
、1b・・・・・・垂直部分、1c・・・・・・水平部
分、2・・・・・舷側押え装置、3・・・・・・ウィン
チ、4・・・・・・解体装置、5・・・・・・空気はね
、6・・・・・・バージ荷受台、7・・・・・・キャリ
ヤローラ、8・・・・・・船体、9・・・・・・アンカ
ーロープ、10・・・・・・浮力体、11・・・・・・
滑車、12・・・・・・ワイヤ、13・・・・・・レー
ル、14・・・・・・コロ・コンベアー、15・・・・
・・枠体、16・・・・・・ゴンドラ、17・・・・・
・ゴンドラ、18・・・・・・ホイスト。Figure 1 is a side view showing the offshore factory located at the bow of the ship, Figure 2 is a plan view showing the relationship between the bow and the offshore factory in Figure 1, and Figure 3 is the state during dismantling work. FIG. Further, FIG. 4 is a perspective view of the offshore factory, and FIGS. 5 and 6 are a sectional view and a plan view thereof, respectively. F... Offshore factory, 1... Barge, 1a
, 1b... Vertical portion, 1c... Horizontal portion, 2... Broadside holding device, 3... Winch, 4... Demolition device, 5... Air splash, 6... Barge loading platform, 7... Carrier roller, 8... Hull, 9... Anchor rope. , 10... Buoyant body, 11...
Pulley, 12...wire, 13...rail, 14...roller conveyor, 15...
...Frame, 16...Gondola, 17...
・Gondola, 18...Hoist.
Claims (1)
な浮力を有し、前記船体の両側に位置する垂直部分を有
するパージと、前記パージの垂直部分に取付けられ、船
体の舷側に接触してこれを支持し案内するための舷側押
え装置と、前記パージに取付けられたウィンチとワイヤ
とから成る船体をこのパージ上に引き込むための搬入装
置と、前記パージ上に空気バネを介して支持され、船底
を支持し、その支持姿勢を変えることのできるパージ荷
受台と、前記パージ上に設けたレール上を移動し、切断
機と運搬装置とを有する枠体を昇降させる解体装置より
構成された船体解体用海上工場。1 A purge having a buoyancy capable of supporting part of the weight of the hull to be dismantled and having vertical parts located on both sides of the hull, and a purge attached to the vertical part of the purge and in contact with the side of the hull. a side holding device for supporting and guiding the purge; a carrying device for pulling the hull onto the purge, which is comprised of a winch and a wire attached to the purge; and a support device on the purge via an air spring. It consists of a purge loading platform that supports the bottom of the ship and can change its supporting posture, and a dismantling device that moves on rails provided on the purge and lifts and lowers a frame body that has a cutting machine and a transport device. Offshore factory for ship dismantling.
Priority Applications (6)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2960776A JPS5810272B2 (en) | 1976-03-18 | 1976-03-18 | Offshore factory for ship dismantling |
| US05/757,292 US4084528A (en) | 1976-03-18 | 1977-01-06 | Working method of breaking up ship |
| GB587/77A GB1533825A (en) | 1976-03-18 | 1977-01-07 | Breaking up a ship |
| NL7702335A NL7702335A (en) | 1976-03-18 | 1977-03-04 | PROCEDURE FOR THE DEMOLITION OF A SHIP. |
| ES456802A ES456802A1 (en) | 1976-03-18 | 1977-03-14 | Working method of breaking up ship |
| DE19772711333 DE2711333A1 (en) | 1976-03-18 | 1977-03-16 | WORKING PROCEDURES FOR DISMANTLING A SHIP |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2960776A JPS5810272B2 (en) | 1976-03-18 | 1976-03-18 | Offshore factory for ship dismantling |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS52112993A JPS52112993A (en) | 1977-09-21 |
| JPS5810272B2 true JPS5810272B2 (en) | 1983-02-24 |
Family
ID=12280740
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2960776A Expired JPS5810272B2 (en) | 1976-03-18 | 1976-03-18 | Offshore factory for ship dismantling |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5810272B2 (en) |
-
1976
- 1976-03-18 JP JP2960776A patent/JPS5810272B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS52112993A (en) | 1977-09-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4482268A (en) | Boat lift | |
| CA2266169C (en) | Floating structure for the transfer of cargo | |
| US4075860A (en) | Mobile ship loading and unloading facility | |
| US4829924A (en) | Semi submersible device and method to set and salvage marine superstructures | |
| CN114277827B (en) | double-GPS positioning round caisson transportation, installation and construction method | |
| US4345536A (en) | Vessel raising heavy structures | |
| US4714375A (en) | Seaplane and dock lift | |
| CN211107924U (en) | Lifting type water floating body continuous retraction device | |
| CN101337575A (en) | Anchor handling device | |
| JPS5810272B2 (en) | Offshore factory for ship dismantling | |
| EP0639133B1 (en) | Device for salvaging objects on the seabed | |
| CN101410291A (en) | Pontoons, docks and methods for use in docks | |
| US3656446A (en) | Method of constructing a ship | |
| CN113525627B (en) | Launching method of large ships | |
| US4051796A (en) | Method of breaking up ship hull | |
| US2287434A (en) | Floating drydock | |
| US10112689B2 (en) | Watercraft positioning system | |
| GB1356787A (en) | Boat | |
| CN116005707A (en) | A method for launching foundations of floating wind turbines based on crane ships and semi-submersible barges | |
| CN202557747U (en) | Dismounting ship for jacket | |
| CN106379495A (en) | Wharf pile foundation underwater maintenance operation device with self-propulsion capability | |
| JPH02183055A (en) | Unloading device of small sized ship | |
| RU231204U1 (en) | Ship device for launching/lifting underwater equipment in ice conditions | |
| JP4001255B2 (en) | Hull lifting device | |
| CN206125353U (en) | Pier pile foundation underwater maintenance operation device with self -navigation ability |