JPS5810531B2 JP49135359A JP13535974A JPS5810531B2 JP S5810531 B2 JPS5810531 B2 JP S5810531B2 JP 49135359 A JP49135359 A JP 49135359A JP 13535974 A JP13535974 A JP 13535974A JP S5810531 B2 JPS5810531 B2 JP S5810531B2
Authority
JP
Japan
Prior art keywords
earth auger
earth
concrete
auger
notch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP49135359A
Other languages
Japanese (ja)
Other versions
JPS5161122A (en
Inventor
榎敏男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP49135359A priority Critical patent/JPS5810531B2/en
Publication of JPS5161122A publication Critical patent/JPS5161122A/en
Publication of JPS5810531B2 publication Critical patent/JPS5810531B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 この発明は、場所打ちコンクリートによる土留工法に関
するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an earth retaining method using cast-in-place concrete.

地下壁を構築するだめの土留工法として、従来から種々
の工法が開発されているが、この発明は無騒音、無振動
工法により土留壁を構築する工法を提供することを目的
としている。
Although various methods have been developed as earth retaining methods for constructing underground walls, the object of the present invention is to provide a method for constructing earth retaining walls without noise or vibration.

以下、この発明の実施例を添付図面に基づいて説明する
Embodiments of the present invention will be described below with reference to the accompanying drawings.

図において、Aは掘削機を示している。In the figure, A indicates an excavator.

この掘削機Aは、自走式の台車1と、この台車1によっ
て垂直に支持されたリーグマスト2と、このリーダマス
ト2に昇降可能に取付けた駆動装置3と、この駆動装置
3に着脱自在に連結されたアースオーガ4とによって構
成されている。
This excavator A includes a self-propelled truck 1, a league mast 2 vertically supported by the truck 1, a drive device 3 attached to the leader mast 2 so as to be able to rise and fall, and a drive device 3 that can be freely attached to and detached from the leader mast 2. and an earth auger 4 connected to the earth auger 4.

上記のアースオーガ4は中空であり、その外周にら旋状
に設けられたスクリュウ5は、第2図に示すように、ア
ースオーガ4の中心線に沿い、下端から上端に亘る範囲
において切欠かれている。
The above-mentioned earth auger 4 is hollow, and the screw 5 provided spirally around its outer periphery is notched along the center line of the earth auger 4 in a range from the lower end to the upper end, as shown in FIG. ing.

その切欠き部8は、スクリュウ5の曲率半径にほぼ等し
て円弧状をなしている。
The notch 8 has an arcuate shape approximately equal to the radius of curvature of the screw 5.

しだがって、同一構造の2本のアースオーガのうち、1
本を停止し、他方のものをそれに沿わせて並行に移動さ
せた場合、移動するアースオーガのスクリュウの一部は
、上記の切欠部8に丁度はまり合って移動し、相互に干
渉することがない。
Therefore, of the two earth augers with the same structure, one
When the book is stopped and the other one is moved parallel to it, part of the screw of the moving earth auger will fit into the above-mentioned notch 8 and move, causing mutual interference. do not have.

また、上記のアースオーガ4は、その先端に円錐半径の
蓋7が開閉自在に取付けられている。
Further, the earth auger 4 has a conical radius lid 7 attached to its tip so as to be openable and closable.

この蓋7はアースオーガ4を地中に貫入する際は、地盤
から受ける抵抗によって閉塞されるが、地盤から離れる
方向に引抜くと、自重によって開放するようになってい
る。
When the earth auger 4 penetrates into the ground, this cover 7 is closed by the resistance received from the ground, but when it is pulled out in a direction away from the ground, it is opened by its own weight.

なお、第1図において、9は駆動装置3に支持されたホ
ッパであり、クレーンのアーム10で吊上げたコンテナ
11内の生コンクリートをこのホッパ9内に投入し、ア
ースオーガ4の中空部に生コンクリートを流下させるよ
うになっている。
In FIG. 1, reference numeral 9 denotes a hopper supported by the drive device 3, into which the fresh concrete in the container 11 lifted by the arm 10 of the crane is poured into the hollow part of the earth auger 4. It is designed to allow concrete to flow down.

次に、上記の掘削機Aを用いて土留壁を構築する方法に
ついて説明する。
Next, a method for constructing an earth retaining wall using the excavator A described above will be explained.

まず、台車1の駆動装置3に1本のアースオーガ4の上
端を連結し、地表面Bに垂直に立て、回転を付与しつつ
掘削を行なう。
First, the upper end of one earth auger 4 is connected to the drive device 3 of the truck 1, and the ground auger 4 is erected perpendicularly to the ground surface B, and excavation is performed while being rotated.

上記の掘削によってアースオーガ4が所定の深度に達す
れば、アースオーガ4の回転を停止し、その切欠部8を
土留壁構築の進行方向に向けておく。
When the earth auger 4 reaches a predetermined depth through the above-mentioned excavation, the rotation of the earth auger 4 is stopped, and the notch 8 is directed in the direction in which the earth retaining wall construction is proceeding.

次に、上記のアースオーガ4と駆動装置3との連結を解
き、台車1を適宜移動させて、2本目のアースオーガ4
′を駆動装置3に連結し、先に埋設したアースオーガ4
の切欠部8に、スクリュウの一部をはめ合わせて前記と
同様に回転を付与し、所定深度まで掘削する。
Next, the earth auger 4 and the drive device 3 are uncoupled, the cart 1 is moved appropriately, and the second earth auger 4 is connected.
' is connected to the drive device 3, and the earth auger 4 buried earlier is
A part of the screw is fitted into the notch 8 and rotated in the same manner as described above to excavate to a predetermined depth.

この場合、先順位のアースオーガ4の切欠部8は、スク
リュウ5の曲率半径にほぼ等しい曲率半径をもった円弧
状であるから、後順位のアースオーガ4′が先順位のア
ースオーガ4と平行に掘削し進入する限り、相互に干渉
することがない。
In this case, the notch 8 of the earth auger 4 in the first order is in the shape of an arc with a radius of curvature approximately equal to the radius of curvature of the screw 5, so the earth auger 4' in the second order is parallel to the earth auger 4 in the first order. As long as they are excavated and entered, there will be no interference with each other.

このようにして後順位のアースオーガ4′による掘削を
終了すると、この場合も前記と同様に、その切欠部8′
を土留壁構築の進行方向に向けておく(第3図口参照)
When the excavation by the earth auger 4' of the next order is completed in this way, the notch 8'
Point it in the direction of progress of constructing the retaining wall (see the entrance in Figure 3).
.

このようにして、2本のアースオーガ4,4′による掘
削を終了したのち、先順位のアースオーガ4の上端を駆
動装置3に連結し、コンテナ11から生コンクリートを
ホッパ9を利用してアースオーガ4の中空部に投入する
と共に、このアースオーガ4の引抜きを開始する。
After completing the excavation by the two earth augers 4 and 4' in this way, the upper end of the earth auger 4 in the preceding order is connected to the drive device 3, and the fresh concrete is poured from the container 11 into the ground using the hopper 9. The earth auger 4 is inserted into the hollow part, and at the same time, the extraction of the earth auger 4 is started.

アースオーガ4を若干引上げると、先端の蓋Iが開放し
、生コンクリートがその開放部分を通じて孔a内に注入
される。
When the earth auger 4 is pulled up slightly, the lid I at the tip opens, and ready-mixed concrete is poured into the hole a through the open part.

アースオーガ4を徐々に引上げていくと、そのスクリュ
ウ5間に詰っている掘削土壌も共に引上げられるが、切
欠部8の部分においては掘削土壌が残ることになるので
、アースオーガ4を引抜くことによって、はぼ欠円形の
孔aが形成されることになり、その孔aに生コンクリー
トが充填されるため、長さ方向に円弧状凹所すをもった
コンクリート柱Cが形成される(第3図口参照)。
When the earth auger 4 is gradually pulled up, the excavated soil stuck between the screws 5 is also pulled up, but since the excavated soil will remain in the notch 8, it is necessary to pull out the earth auger 4. As a result, a hollow circular hole a is formed, and as the hole a is filled with fresh concrete, a concrete column C having an arcuate recess in the length direction is formed (No. (See Figure 3).

次に、引抜いたアースオーガ4を後順位のアースオーガ
4′の後位に、前述の場合と同様の製置で埋入し、アー
スオーガ4′を引抜き、先に形成されたコンクリート柱
Cの凹所すに一部分オーバラップしたコンクリート柱C
′を形成する。
Next, the pulled out earth auger 4 is buried behind the next earth auger 4' in the same way as in the case described above, and the earth auger 4' is pulled out and the concrete pillar C that was formed earlier is buried. Concrete column C that partially overlaps the recess
′ is formed.

両者e、e’は、相互に結合されることが望ましいので
、先のコンクリート柱Cが硬化する以前に後のコンクリ
ート柱C′を形成する。
Since both e and e' are desirably connected to each other, the subsequent concrete column C' is formed before the previous concrete column C is hardened.

なお、各コンクリート柱e、e’には、未硬化の状態に
おいて、H型鋼等の補強芯材d、d’を挿入しておくこ
とが、柱列の補強上望ましい。
Note that it is desirable to insert reinforcing core materials d, d' such as H-shaped steel into each concrete column e, e' in an unhardened state in order to reinforce the column row.

以上の手順を繰返えすことにより、円弧状の凹所すにお
いて相互にオーバラップし連結されたコンクリート柱C
,e’による土留壁が構築されることになる。
By repeating the above steps, the concrete columns C are overlapped and connected to each other in the arc-shaped recess.
, e' will be constructed.

この発明の工法は、上述のとおりであるから、アースオ
ーガを引抜いた後の孔は欠円状であり、その孔に生コン
クリートを注入することによって形成されたコンクリー
ト柱も、その長さ方向に円弧状の凹所が形成される。
Since the construction method of this invention is as described above, the hole after pulling out the earth auger is circular, and the concrete column formed by pouring fresh concrete into the hole also extends in the length direction. An arc-shaped recess is formed.

そして、次々に形成されるコンクリート柱は、その凹所
にはまり合ってオーバラップすることになるので、遮水
性に優れた土留壁が得られる。
Since the concrete columns formed one after another fit into the recesses and overlap, an earth retaining wall with excellent water-blocking properties can be obtained.

まだ、各コンクリート柱は、それぞれオーバラップする
ことにより一体化されるので、単独のコンクリート柱を
並べたものに比べ強度がある。
However, since each concrete pillar is integrated by overlapping each other, it is stronger than a single concrete pillar lined up.

また、アースオーガのスクリュウに設けた切欠部は、ス
クリュウの曲率半径にほぼ等しい曲率半径をもった円弧
状であるため、2本のアースオーガを接近して埋入して
も、相互に干渉しあうことがなく、掘削、引抜きがスム
ーズに行なえる。
In addition, the notch provided in the screw of the earth auger has an arc shape with a radius of curvature that is approximately equal to the radius of curvature of the screw, so even if two earth augers are embedded close together, they will not interfere with each other. Excavation and extraction can be carried out smoothly without any interference.

更に、この発明は、打撃や振動を加えることがないので
、無騒音、無振動のもとに土留壁が構築できるという、
今日的な要求に応える効果がある。
Furthermore, since this invention does not apply blows or vibrations, it is possible to construct earth retaining walls without noise or vibration.
It is effective in meeting today's demands.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は掘削機の側面図、第2図はアースオーガの一部
切欠正面図、第3図イ乃至ハは施工状態を遂時的に示す
横断平面図である。 A……掘削機、4,4’……アースオーガ、5……スク
リユウ、7……蓋、8,8′……切欠部、a孔、b……
凹所、c、c′……コンクリート柱。
FIG. 1 is a side view of the excavator, FIG. 2 is a partially cutaway front view of the earth auger, and FIGS. 3A to 3C are cross-sectional plan views showing the construction state. A...excavator, 4,4'...earth auger, 5...screw, 7...lid, 8,8'...notch, hole a, b...
Recess, c, c'...concrete pillar.

Claims (1)

【特許請求の範囲】[Claims] 1 中空状のアースオーガの外周面に設けたスクリュウ
を、その中心線に沿った位置で部分的に切欠き、その切
欠き部をスクリュウの曲率半径とほぼ等しい曲率半径を
もった円弧状に形成し、上記のアースオーガによって地
中の所定深さまで掘削し、その切欠部を土留壁構築の進
行方向に一致させて停止し、次に上記と同様のアースオ
ーガを先のアースオーガの切欠部に嵌め合わせて掘削し
、上記後順位のアースオーガもその切欠部を土留壁構築
の進行方向に一致させて停止し、その後に先順位のアー
スオーガを引き抜きつつ引抜きによって生じた孔内に生
コンクリートをアースオーガ内を通して注入することに
よって、長さ方向に円弧状凹入部を有するコンクリート
柱を形成し、以後同様にアースオーガによる掘削と先順
位のアースオーガの引抜き、生コンクリートの充填を繰
返えして、コンクリート柱の凹入部において相互にオー
バラップした土留壁を形成することを特徴とする場所打
コンクリート土留工法。
1 A screw provided on the outer peripheral surface of a hollow earth auger is partially cut out at a position along its center line, and the cutout is formed into an arc shape with a radius of curvature approximately equal to the radius of curvature of the screw. Then, use the earth auger described above to excavate to a predetermined depth in the ground, align the notch with the advancing direction of the earth retaining wall construction, and then stop. Next, use the same earth auger as above to the notch of the previous earth auger. The earth auger of the following order is also stopped with its notch aligned with the direction of movement of the earth retaining wall construction, and then the earth auger of the previous order is pulled out and ready-mixed concrete is poured into the hole created by the pulling out. By injecting concrete through the earth auger, a concrete column having an arcuate concave portion in the length direction is formed, and thereafter, the process of excavating with the earth auger, pulling out the earth auger of the priority order, and filling with ready-mixed concrete is repeated in the same manner. A cast-in-place concrete earth retaining method characterized by forming earth retaining walls that overlap each other in the recessed part of a concrete column.
JP49135359A 1974-11-22 1974-11-22 Bashiyochi Concrete Dodomekouhou Expired JPS5810531B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP49135359A JPS5810531B2 (en) 1974-11-22 1974-11-22 Bashiyochi Concrete Dodomekouhou

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP49135359A JPS5810531B2 (en) 1974-11-22 1974-11-22 Bashiyochi Concrete Dodomekouhou

Publications (2)

Publication Number Publication Date
JPS5161122A JPS5161122A (en) 1976-05-27
JPS5810531B2 true JPS5810531B2 (en) 1983-02-26

Family

ID=15149892

Family Applications (1)

Application Number Title Priority Date Filing Date
JP49135359A Expired JPS5810531B2 (en) 1974-11-22 1974-11-22 Bashiyochi Concrete Dodomekouhou

Country Status (1)

Country Link
JP (1) JPS5810531B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61110934U (en) * 1984-12-26 1986-07-14

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5968429A (en) * 1982-10-12 1984-04-18 Fudo Constr Co Ltd Connecting work for pile by stirring-mixing treatment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61110934U (en) * 1984-12-26 1986-07-14

Also Published As

Publication number Publication date
JPS5161122A (en) 1976-05-27

Similar Documents

Publication Publication Date Title
JPS6130089B2 (en)
JPS5810531B2 (en) Bashiyochi Concrete Dodomekouhou
KR102627320B1 (en) Inclined grouting equipment for reinforcement of soft ground
JP2000220140A (en) Cast-in-place steel pipe concrete pile and its construction method
JPS5827366B2 (en) Head reinforcement pile construction equipment
JPS58213915A (en) Underground formation work of foundation pile, particularly friction pile
JP3091859B2 (en) Piling method for shafts with openings at the top
JPS60238515A (en) Formation of foundation pile in soft ground and the like
JPS61134425A (en) Method of forming foundation pile
JPS5918487B2 (en) Construction method and equipment for cast-in-place knot piles
JP2001355382A (en) Treatment method for surplus soil
JPS5820825A (en) Pile formation work and device therefor
JP7297726B2 (en) Construction method of piles in contaminated soil
JPS601451B2 (en) Water stop mountain stop wall construction method using Benoto pile excavator
JPS59150822A (en) Erection work of pre-fabricated pile
JP2858050B2 (en) Shaft excavation method
JPH025845B2 (en)
JPS6338500B2 (en)
JPS6012492B2 (en) Root hardening method using ready-made piles
JPS602305Y2 (en) Excavation device for pipe burial
JP3128673B2 (en) How to improve the underwater ground and how to construct the underwater tunnel.
JPS63223215A (en) In-situ concrete piling work
JPS6211126B2 (en)
JPS6035489B2 (en) Construction method and equipment for cast-in-place knot piles
JPH0782740A (en) Inside cutting machine for steel pipe pile, excavation for steel pipe pile used for inside cutting machine and hollow excavation piling foot protection method by means thereof