Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS5820327B2 - Ice drilling platform - Google Patents
[go: Go Back, main page]

JPS5820327B2 - Ice drilling platform - Google Patents

Ice drilling platform

Info

Publication number
JPS5820327B2
JPS5820327B2 JP14887578A JP14887578A JPS5820327B2 JP S5820327 B2 JPS5820327 B2 JP S5820327B2 JP 14887578 A JP14887578 A JP 14887578A JP 14887578 A JP14887578 A JP 14887578A JP S5820327 B2 JPS5820327 B2 JP S5820327B2
Authority
JP
Japan
Prior art keywords
ice
platform
oil drilling
frame
icing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14887578A
Other languages
Japanese (ja)
Other versions
JPS5575009A (en
Inventor
八島信良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Engineering and Shipbuilding Co Ltd
Original Assignee
Mitsui Engineering and Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Engineering and Shipbuilding Co Ltd filed Critical Mitsui Engineering and Shipbuilding Co Ltd
Priority to JP14887578A priority Critical patent/JPS5820327B2/en
Priority to US06/097,933 priority patent/US4295758A/en
Priority to CA340,908A priority patent/CA1111318A/en
Publication of JPS5575009A publication Critical patent/JPS5575009A/en
Priority to CA376,749A priority patent/CA1125581A/en
Publication of JPS5820327B2 publication Critical patent/JPS5820327B2/en
Expired legal-status Critical Current

Links

Description

【発明の詳細な説明】 本発明は氷海域に設置する石油掘削作業台に関し、詳し
くは定着氷あるいは流氷の移動量が、石油掘削期間中に
数〜数Iom程度である水海に設置するのに適した石油
掘削作業台に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an oil drilling platform to be installed in an icy area, and more specifically, to an oil drilling platform installed in a water ocean where the movement of fast ice or drift ice during an oil drilling period is on the order of several to several Iom. Regarding oil drilling workbench suitable for.

例えば北極海域などの定着氷海域では、定着氷の移動量
は少な(、−冬の間に最大20m程度である。
For example, in fast ice areas such as the Arctic Ocean, the movement of fast ice is small (up to about 20 m during winter).

このような定着氷海域で、かつ水深が浅い(20m程度
以下)海域における石油掘削に際しては、従来は、砂、
砂利あるいは水盤を利用した人工島を建設し、この人工
島に石油掘削設備を設置している。
Conventionally, when drilling for oil in areas with fast ice and shallow water depth (approximately 20 m or less), sand,
An artificial island is constructed using gravel or a basin of water, and oil drilling equipment is installed on this artificial island.

しかしこの場合には、げ)石油掘削機器や資材を、全て
人工島建設後に陸から運ばねばならない。
However, in this case, all oil drilling equipment and materials would have to be transported from land after the artificial island is constructed.

(ロ)人工島の建設に1〜2ケ月掛る。(b) It will take one to two months to construct an artificial island.

←J 浅い海域にしか適用できない。←J Applicable only to shallow waters.

に)流水の乗り上げや水力に耐える構造形式にしなげれ
ばならない。
2) The structure must be designed to withstand running water and hydraulic forces.

住)人工島や砂や砂利で建設した場合には、掘削完了後
の撤去が困難であり、環境汚染の問題がある。
(Residence) If an artificial island is constructed using sand or gravel, it is difficult to remove it after excavation is completed, and there is a problem of environmental pollution.

(へ)人工島を水盤により建設した場合には、掘削可能
期間が冬期の1〜2ケ月間に限られる。
(f) When an artificial island is constructed using a water basin, the period during which excavation is possible is limited to one to two months during the winter season.

等の多くの解決すべき問題点がある。There are many problems that need to be solved.

本発明の目的は、上述した従来技術の問題点を解消し、
定着氷海域において、水深の深浅に拘らず、冬期及び夏
期に、安全に、かつ経済的に石油掘削を行うことのでき
る氷海用石油掘削作業台を提供することにある。
The purpose of the present invention is to solve the problems of the prior art described above,
To provide an oil drilling workbench for ice seas, which enables oil drilling to be carried out safely and economically in winter and summer, regardless of the water depth, in fast ice sea areas.

実施例につき、図面を参照しながら以下に説明する。Examples will be described below with reference to the drawings.

第1図及び第2図は、水深の深い氷海域に適した石油掘
削作業台(第1実施例)を示す。
FIGS. 1 and 2 show an oil drilling platform (first embodiment) suitable for deep icy areas.

図において、浮遊式かつ四角形のプラットフォーム1を
、その上面に固定したウィンチ2に、一端を巻き付け、
かつ他端にアンカ3を取り付けたワイヤ(あるいはチェ
ーン)4により、海底Aに係留する。
In the figure, one end of a floating square platform 1 is wrapped around a winch 2 fixed on its upper surface.
It is moored to the seabed A by a wire (or chain) 4 with an anchor 3 attached to the other end.

プラットフォーム1上にやぐら5その他の掘削用機器(
図示しない)を設置し、この機器から掘削用のバイブロ
を海底A中に挿し込む。
Tower 5 and other excavation equipment (
(not shown) is installed, and a vibro for drilling is inserted into the seabed A from this device.

プラットフォーム1の海面方向の四周に空間を介在させ
、この空間のさらに四周に、例えば4分割した鉄あるい
はコンクリート製の浮遊式の枠体7゜8.7.8をジヨ
イント9で取り外し自在に連結した浮遊式の防氷枠10
を、プラットフォーム1を取り囲んで配置し、この防氷
枠10もワイヤ(あるいはチェーン)11及びアンカ1
2により海底Aに係留する。
A space is provided around the four peripheries of the platform 1 in the direction of the sea surface, and a floating frame 7° 8. Floating anti-icing frame 10
are arranged surrounding the platform 1, and this anti-icing frame 10 is also equipped with a wire (or chain) 11 and an anchor 1.
2, it is moored to seabed A.

プラン「フオーム1と防氷枠10の間の空間を、それぞ
れ布あるいはゴムなどの緩衝材あるいは柔軟材からなる
シートを上下二重13.14に張り巡らせて、空間を覆
い、この空間内の海面と空気とを遮蔽あるいは断熱する
Plan ``The space between the form 1 and the anti-icing frame 10 is covered with sheets made of cushioning material or flexible material such as cloth or rubber in a double layer 13 and 14, and the sea level in this space is and air to be shielded or insulated.

必要であれば、この二重のシーN3,14の内部に温風
あるいは熱風を供給する加熱装置(図示しない)を設け
る。
If necessary, a heating device (not shown) for supplying warm air or hot air to the interior of the double seas N3, 14 is provided.

上記氷海用石油掘削作業台の建造方法は、別のドックそ
の他でプラットフォーム1上に石油掘削設備を投載し、
これを目的地である氷海域まで曳航し、ワイヤ4により
係留する。
The method of constructing the above-mentioned oil drilling platform for ice-cold waters is to load the oil drilling equipment onto platform 1 at another dock or other location,
This is towed to its destination, an icy area, and moored with a wire 4.

同様に別途建造された分割された個々の枠体5,6を曳
航あるいは船で輸送し、目的地において、プラットフォ
ーム1の周囲にジヨイント9により連結して防氷枠10
を建造し、ワイヤ11により係留する。
Similarly, the separately constructed separate frames 5 and 6 are transported by tow or ship, and at the destination, they are connected around the platform 1 with joints 9 to form an anti-icing frame 10.
is constructed and moored with wire 11.

次いでプラットフォーム1と防氷枠10の間の空間に、
上下2層のシード13.14を張設し、空間を覆う。
Next, in the space between the platform 1 and the anti-icing frame 10,
Two layers of upper and lower seeds 13 and 14 are stretched to cover the space.

建設の時期は、氷の融ける夏期が最も好ましいが、装置
自体の大きさや、目的地域の氷の厚さその他の状況によ
っては、氷の張った冬期においても、適宜砕氷などして
建設することは可能である。
The best time to construct is in the summer when the ice is melting, but depending on the size of the equipment itself, the thickness of the ice in the target area, and other conditions, it may not be possible to construct the equipment even in the winter when there is ice by crushing the ice as appropriate. It is possible.

装置の作用あるいは機能は、第1に上下2重の柔軟シー
ト13.14により、海面と空気とを遮蔽し、あるいは
断熱1て、プラットフォーム1と防氷枠10との間に、
冬期であっても氷を張らせないことにある。
The operation or function of the device is as follows: First, the upper and lower double flexible sheets 13 and 14 are used to shield the sea surface from the air, or to provide insulation between the platform 1 and the anti-icing frame 10.
The key is to not let ice build up even in the winter.

この場合に必要であれば、2重の柔軟シーH3,14の
内部に加熱装置により温風あるいは熱風を供給すれば、
氷が張ることは完全に阻止できる。
In this case, if necessary, warm air or hot air can be supplied to the inside of the double flexible seams H3 and 14 using a heating device.
Ice formation can be completely prevented.

第2に、掘削作業が冬期で、周囲に定着氷や流氷Bがあ
る場合に、定着氷や流氷の海面に沿う方向の移動により
、この水力が防氷枠10の外周の側面に掛るが、この水
力は、柔軟シート13.14が撓むことと、このシート
13.14部分に上述したごとく氷が張らないこととの
ために、このシート13.14により吸収され、したが
って水力の影響がプラットフォーム1には及ばないこと
である。
Second, when the excavation work is carried out in the winter and there is fast ice or drift ice B around, the movement of the fast ice or drift ice in the direction along the sea surface causes this hydraulic force to be applied to the side surface of the outer periphery of the anti-icing frame 10. This hydraulic force is absorbed by the flexible sheet 13.14 due to its deflection and the fact that ice does not form on the sheet 13.14 as described above, and therefore the influence of the hydraulic force is reduced to the platform. This is not even close to 1.

したがってプラットフォーム1に設けられた諸機器、特
に掘削用パイプ6に曲げ力が作用せず、バイブロその他
を折損することな(、安全に掘削作業が行える。
Therefore, no bending force is applied to the equipment installed on the platform 1, especially the excavation pipe 6, and the excavation work can be carried out safely without damaging the vibro or the like.

なお、海面から掛かる水圧pは、下側のシート14によ
り受ける。
Note that the water pressure p applied from the sea surface is received by the lower sheet 14.

この場合に、プラットフォーム1と防氷枠10の間の空
間の大きさ、シーN3,14の柔軟さの程度や撓み量な
どは、石油掘削期間(通常は2゜3ケ月)やその間の氷
の移動量(例えば北極海域では、−冬の間に最大20m
程度である。
In this case, the size of the space between the platform 1 and the anti-icing frame 10, the degree of flexibility and amount of deflection of the seams N3 and 14, etc. will depend on the oil drilling period (usually 2 to 3 months) and the amount of ice formed during that period. displacement (e.g. in Arctic waters - up to 20 m during winter)
That's about it.

)などに応じて選定する。), etc.

氷の移動する方向や移動量が予め判っている場合には、
防氷枠10に対してプラットフォーム1が移動方向の一
端側から反対側端部に移動するごと(、考慮することが
できる。
If the direction and amount of ice movement are known in advance,
Each time the platform 1 moves from one end to the opposite end in the movement direction with respect to the anti-icing frame 10 (this can be considered).

第3図により第2実施例を説明すると、プラットフォー
ム1と防氷枠10との間に、上下2重の伸縮自在の蛇腹
部材15.16を張設する。
The second embodiment will be described with reference to FIG. 3. Between the platform 1 and the anti-icing frame 10, double-layered bellows members 15 and 16, which are vertically expandable and contractible, are stretched.

この蛇腹部材は布やゴム製などがよいが、特に材料は限
定されず、鋼板などを伸縮自在な蛇腹状構造にしたもの
でもよい。
The bellows material is preferably made of cloth or rubber, but the material is not particularly limited, and may be made of a steel plate or the like with a stretchable bellows-like structure.

その他の構成は、前述した第1実施例における構成がそ
のまま適用でき、装置全体の建設方法や蛇腹部材の作用
や機能もほぼ同様である。
For the rest of the configuration, the configuration of the first embodiment described above can be applied as is, and the construction method of the entire device and the function and function of the bellows member are also almost the same.

第4図は水深が浅い氷海域に設置される作業台(第3実
施例)を示し、プラットフォーム17の高さを水深に応
じて設定し、かつその底部にスカートあるいは突起18
を形成し、このスカート18を海底Aに突き挿してプラ
ットフォーム17を着底し、固定する。
FIG. 4 shows a work platform (third embodiment) installed in an icy area with shallow water depth, in which the height of the platform 17 is set according to the water depth, and a skirt or protrusion 18 is provided at the bottom of the platform 17.
This skirt 18 is inserted into the seabed A, and the platform 17 is brought to the bottom and fixed.

一方浮遊式防氷枠19は海面上に浮かせて、ワイヤ20
により係留する。
On the other hand, the floating anti-icing frame 19 is floated on the sea surface, and the wire 20
mooring.

柔軟部材としては前箱1及び第2実施例で説明した柔軟
シーN3,14あるいは蛇腹部材15.16が適用され
る。
As the flexible member, the flexible seams N3 and 14 or the bellows members 15 and 16 described in the front box 1 and the second embodiment are applied.

そしてその他の構成、建設方法あるいは作用や機能もほ
ぼ同様である。
Other configurations, construction methods, functions, and functions are also almost the same.

第5図は第4実施例を示し、プラットフォーム21を円
形にし、浮遊式防氷枠22も、例えば4分割した4半円
状の枠体23をジヨイント24により連結して円環状に
構成し、両者の間の空間に上下シー)25.26あるい
は蛇腹部材を張り渡す。
FIG. 5 shows a fourth embodiment, in which the platform 21 is made circular, and the floating anti-icing frame 22 is also formed into an annular shape, for example, by connecting four semicircular frame bodies 23 divided into four parts by a joint 24, Spread the upper and lower seams (25.26) or bellows material in the space between the two.

プラットフォーム21は係留式にしても、また着定式に
してもよい。
The platform 21 may be of a moored type or a fixed type.

第6図及び第7図により第5実施例を説明すると、プラ
ットフォーム1と防氷枠10の間の海面に、空気を密封
した複数個の空気袋27〜34゜27′〜34′を敷き
詰める。
The fifth embodiment will be described with reference to FIGS. 6 and 7. A plurality of sealed air bags 27 to 34 degrees 27' to 34' are spread on the sea surface between the platform 1 and the anti-icing frame 10.

各空気袋はその浮力と釣り合う重り39〜42を釣り下
げ、更に内部の窒気圧を調整し、あるいは一定値以上の
内圧で開いて内部の空気を放出する弁43を摩り付ける
Each air bag suspends weights 39 to 42 that balance its buoyancy, and is fitted with a valve 43 that adjusts the internal nitrogen pressure or opens when the internal pressure exceeds a certain value to release the air inside.

空気袋は装置の設置の初期状態では 適当な内圧1 を与えて、プラントフオーム1の外側面と防氷枠10の
内a面との間で、海面に沿う方向に一定の変形あるいは
撓みを与えておく。
In the initial state of installation of the device, the air bag applies an appropriate internal pressure 1 to cause a certain deformation or deflection in the direction along the sea surface between the outer surface of the plant form 1 and the inner surface a of the anti-icing frame 10. I'll keep it.

作用は、この空気袋によりプラットフォーム1と防氷枠
10の間の空間に氷を張らせないことと、ある方向に周
囲の氷が移動した際に、プラットフォーム1の氷の移動
方向の上流側の空気袋(例えば27〜30)が防氷枠1
0により押されてその内圧が一定値以上になった場合に
、弁43が開いて内部の空気を放出して空気袋自体が収
縮し、氷の移動量だけ防氷枠10を移動させて移動量を
空気袋により吸収し、プラットフォーム1への影響を無
くす。
The function of this air bag is to prevent ice from forming in the space between the platform 1 and the anti-icing frame 10, and to prevent ice from forming in the space between the platform 1 and the anti-icing frame 10, and to prevent ice from forming on the upstream side of the platform 1 in the direction of ice movement when the surrounding ice moves in a certain direction. The air bag (for example 27-30) is the anti-icing frame 1
0 and the internal pressure exceeds a certain value, the valve 43 opens and releases the internal air, the air bag itself contracts, and the anti-icing frame 10 is moved by the amount of ice movement. The amount is absorbed by the air bag, eliminating the influence on the platform 1.

この時、プラットフォーム1の氷の移動方向の下流側の
空気袋(27′〜3σ)は海面方向に膨張して、防氷枠
10の移動に伴う海面の面積増加分をも覆う。
At this time, the air bladders (27' to 3σ) on the downstream side of the platform 1 in the direction of ice movement expand toward the sea surface to cover the increased area of the sea surface due to the movement of the anti-icing frame 10.

本第5実施例は、水深が深い場合に、ワイヤ4によりプ
ラットフォーム1を係留するものであるが、第8図に示
す第6実施例は、上記第5実施例による空気袋の思想を
、水深の浅い氷海域においてスカート18によりプラッ
トフォーム17を着底させたものに適用した場合を示す
In the fifth embodiment, the platform 1 is moored by the wire 4 when the water depth is deep, but in the sixth embodiment shown in FIG. This figure shows a case in which the platform 17 is brought to the bottom by means of a skirt 18 in a shallow icy sea area.

また、第9図に示す第7実施例は、上記第5及び第6実
施例がプラットフォーム及び防氷枠が四角形状であるも
のに対して、円形状である場合を示し、例えば4半円状
の空気袋45〜47を図示のごとく敷き詰める。
In addition, the seventh embodiment shown in FIG. 9 shows a case where the platform and anti-icing frame are circular, for example, four semicircular shapes, whereas the platform and anti-icing frame are square in the fifth and sixth embodiments. The air bags 45 to 47 are laid out as shown in the figure.

上述した本発明の氷海用石油掘削作業台によれば、次の
ような効果を得ることができる。
According to the above-described oil drilling platform for ice-cold seas of the present invention, the following effects can be obtained.

すなわち、 ■ 石油掘削設備を搭載したプラットフォームと、その
周囲を取り囲む浮遊式防氷枠の間の空間を、柔軟部材に
よりその空間部分の海面と空気とを遮蔽あるいは断熱し
て覆い、その空間部分に氷を張らせず、かつ周囲の氷の
移動を柔軟部材により吸収して、水力をプラットフォー
ム及び石油掘削設備、特に掘削用パイプに及ぼさないよ
うにしたので、パイプその他の掘削設備の折損や損傷が
なく、安全である。
In other words, ■ The space between the platform on which oil drilling equipment is mounted and the floating ice protection frame surrounding it is covered by a flexible member that shields or insulates the sea surface and air in that space, and By preventing ice from building up and absorbing the movement of surrounding ice using flexible members, hydraulic power is prevented from affecting the platform and oil drilling equipment, especially drilling pipes, thereby preventing breakage or damage to pipes and other drilling equipment. It is safe.

■ 石油掘削設備を別途プラットフォーム上に搭載した
状態で目的地まで曳航でき、現地において係留しあるい
は着底させ、防氷枠や柔軟部材を現地において据え付け
ればよいので、装置全体の現地における建設や据え付け
が極めて簡単であり、かつその工期が極く短期間である
■ Oil drilling equipment can be mounted on a separate platform and towed to the destination, moored or brought to the bottom at the site, and the anti-icing frame and flexible members installed on site, making it possible to construct the entire equipment on site. Installation is extremely easy and the construction period is extremely short.

■ 装置の解体作業も極めて容易にかつ短期間で行うこ
とができ、解体後は同一装置を別の目的地にそのまま移
動して同様に使用することができ、装置の総基数が少な
くてよく、しかも設置時及び特に解体後の現地の環境汚
染の問題は皆無である。
■ Dismantling the equipment can be done extremely easily and in a short period of time, and after dismantling, the same equipment can be moved to another destination and used in the same way, and the total number of equipment can be small. Moreover, there is no problem of environmental pollution at the site during installation or especially after demolition.

■ 氷の有無に拘らず、装置の据え付け、石油掘削及び
解体作業が行えるので、冬期及び夏期を通じて連続作業
が行える。
■ Equipment installation, oil drilling, and demolition work can be carried out regardless of the presence or absence of ice, allowing continuous work to be carried out throughout the winter and summer.

■ 水深の如何に拘らず、据え付け、掘削及び解体作業
を行うことができる。
■ Installation, excavation and demolition work can be carried out regardless of the water depth.

■ 全体として、季節や水深による影響を受けずに、安
全性が高く、コストが低廉である。
■ Overall, it is highly safe and inexpensive, not affected by seasons or water depth.

【図面の簡単な説明】[Brief explanation of drawings]

図は本発明による氷海用石油掘削作業台の実施例を示し
、第1図は第1実施例の全体平面図、第2図は第1図の
■−■線における全体縦断正面図、・第3図は第2実施
例による柔軟部材を示す部分拡大縦断正面図、第4図は
第3実施例の全体縦断正面図、第5図は第4実施例の全
体平面図、第6図は第5実施例の全体平面図、第7図は
第6図の■−■線における全体縦断正面図、第8図は第
6実施例の全体縦断正面図、第9図は第7実施例の全体
平面図である。 Li2,21・・・プラットフォーム、4 、11゜2
0・・・ワイヤ又はチェーン、5・・・やぐら、6・・
・パイプ、10,19,22・・・防氷枠、13,14
゜’25.26・・・シート、15.16・・・蛇腹部
材、27〜42 、27’〜42’、44〜47・・・
空気袋、43・・・弁、A・・・海底、B・・・氷。
The figures show an embodiment of the oil drilling workbench for ice-covered seas according to the present invention. Fig. 1 is an overall plan view of the first embodiment, Fig. 2 is an overall longitudinal sectional front view taken along the line ■-■ in Fig. 1, and Fig. 3 is a partially enlarged longitudinal sectional front view showing the flexible member according to the second embodiment, FIG. 4 is an overall longitudinal sectional front view of the third embodiment, FIG. 5 is an overall plan view of the fourth embodiment, and FIG. 5 is an overall plan view of the fifth embodiment, FIG. 7 is an overall longitudinal sectional front view taken along line ■-■ in FIG. 6, FIG. 8 is an overall longitudinal sectional front view of the sixth embodiment, and FIG. 9 is an overall longitudinal sectional front view of the seventh embodiment. FIG. Li2,21...Platform, 4, 11゜2
0... wire or chain, 5... tower, 6...
・Pipe, 10, 19, 22... Anti-icing frame, 13, 14
゜'25.26... Sheet, 15.16... Bellows part material, 27-42, 27'-42', 44-47...
Air bladder, 43... Valve, A... Seabed, B... Ice.

Claims (1)

【特許請求の範囲】[Claims] 1 石油掘削設備を搭載したプラットフォームの海面方
向全周に空間を介在させて浮遊式防氷枠で取り囲み、該
空間を該空間部分の空気と海面とを遮蔽する柔軟部材で
覆った氷海用石油掘削作業台。
1. Oil drilling for ice-cold seas, in which a platform equipped with oil drilling equipment is surrounded by a floating anti-icing frame with a space interposed all around it in the sea direction, and the space is covered with a flexible member that shields the air in the space from the sea surface. Workbench.
JP14887578A 1978-02-10 1978-11-30 Ice drilling platform Expired JPS5820327B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP14887578A JPS5820327B2 (en) 1978-11-30 1978-11-30 Ice drilling platform
US06/097,933 US4295758A (en) 1978-02-10 1979-11-27 Working platform for oil drilling operations in ice covered sea areas
CA340,908A CA1111318A (en) 1978-11-30 1979-11-29 Working platform for oil drilling operations in ice covered sea areas
CA376,749A CA1125581A (en) 1978-11-30 1981-05-01 Working platform for oil drilling operations in ice covered sea areas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14887578A JPS5820327B2 (en) 1978-11-30 1978-11-30 Ice drilling platform

Publications (2)

Publication Number Publication Date
JPS5575009A JPS5575009A (en) 1980-06-06
JPS5820327B2 true JPS5820327B2 (en) 1983-04-22

Family

ID=15462668

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14887578A Expired JPS5820327B2 (en) 1978-02-10 1978-11-30 Ice drilling platform

Country Status (1)

Country Link
JP (1) JPS5820327B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58206482A (en) * 1982-05-24 1983-12-01 Mitsui Eng & Shipbuild Co Ltd Freezing preventive construction
BR112015016893A2 (en) * 2013-01-22 2017-07-11 Wu Zhirong tank unit consisting of steel and concrete plate, tank group and offshore platforms
US9862468B2 (en) * 2014-10-10 2018-01-09 Technip France Floating platform with an articulating keel skirt

Also Published As

Publication number Publication date
JPS5575009A (en) 1980-06-06

Similar Documents

Publication Publication Date Title
US4295758A (en) Working platform for oil drilling operations in ice covered sea areas
US6374764B1 (en) Deck installation system for offshore structures
US4422804A (en) Gravity base of offshore production platform with ice-pentrating peripheral nose sections
US4486125A (en) Modular arctic structures system
US20180163359A1 (en) Sea bed terminal for offshore activities
US4110994A (en) Marine pipeline
CA1231542A (en) Arctic offshore production platform
KR102097580B1 (en) A Method for the Construction of Offshore Structures Using General Concrete
GB1585170A (en) Forming concrete structures for underwater pipelines
CA1058893A (en) Underwater structure
US1495310A (en) Temporary structure and method of forming same
JPS5820327B2 (en) Ice drilling platform
JPH09268562A (en) Dry work method and work box used therefor
CN1318703C (en) Cellulated or half cellulated self natant jacket
US5024557A (en) Method and apparatus for constructing an offshore hollow column
KR101529091B1 (en) Submerged floating tunnel and construction method thereof
JP3288137B2 (en) Artificial island construction method
JP6128725B2 (en) breakwater
SU1405379A1 (en) Artificial island and method of installing same
JPH05311627A (en) Foundation structure for large-scale artificial island
CA1125581A (en) Working platform for oil drilling operations in ice covered sea areas
CA1086082A (en) Stressed caisson retained island
NO348526B1 (en) A method and apparatus for protecting subsea structures
JPH0739647B2 (en) Method of laying waterproof sheet
JPH0645924B2 (en) Offshore structure