Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS5823530B2 - How to assemble and install a large hanging boiler - Google Patents
[go: Go Back, main page]

JPS5823530B2 - How to assemble and install a large hanging boiler - Google Patents

How to assemble and install a large hanging boiler

Info

Publication number
JPS5823530B2
JPS5823530B2 JP52050504A JP5050477A JPS5823530B2 JP S5823530 B2 JPS5823530 B2 JP S5823530B2 JP 52050504 A JP52050504 A JP 52050504A JP 5050477 A JP5050477 A JP 5050477A JP S5823530 B2 JPS5823530 B2 JP S5823530B2
Authority
JP
Japan
Prior art keywords
steel frame
boiler
auxiliary base
auxiliary
assemble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP52050504A
Other languages
Japanese (ja)
Other versions
JPS53136101A (en
Inventor
西岡和正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Engineering and Shipbuilding Co Ltd
Original Assignee
Mitsui Engineering and Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Engineering and Shipbuilding Co Ltd filed Critical Mitsui Engineering and Shipbuilding Co Ltd
Priority to JP52050504A priority Critical patent/JPS5823530B2/en
Publication of JPS53136101A publication Critical patent/JPS53136101A/en
Publication of JPS5823530B2 publication Critical patent/JPS5823530B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 本発明は大型吊下式ボイラの組立据付方法に関するもの
である。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for assembling and installing a large hanging boiler.

従来、大型吊下式ボイラの組立据付は第1図および第2
図に示すような方法を採っていた。
Conventionally, the assembly and installation of large hanging boilers was performed using the methods shown in Figures 1 and 2.
The method shown in the figure was adopted.

すなわち、まずボイラ設置現地において鉄骨組立用のク
レーン1を垂設し、このクレーン1を用いて鉄骨部材2
を吊上げ下方から順次上方に向って鉄骨フレーム3を組
立てる。
That is, first, a crane 1 for assembling the steel frame is installed vertically at the boiler installation site, and this crane 1 is used to assemble the steel frame members 2.
The steel frame 3 is assembled from the bottom upwards.

鉄骨フレーム3の組立が完了したのち、鉄骨フレームの
頂部に吊下げクレーン4を設置し、この吊下げクレーン
4によってボイラドラム5等のボイラ構成部材を順次重
下げて組立、据付を行う。
After the assembly of the steel frame 3 is completed, a suspension crane 4 is installed on the top of the steel frame, and the boiler components such as the boiler drum 5 are sequentially lowered and assembled and installed using the suspension crane 4.

以上のような従来の組立、据付方法を採用すると、鉄骨
部材を1個ずつ吊下げて組立て、さらにボイラ部材も1
個ずつ吊上げて充分な設備もない現地での組立てを行な
うという繁雑で長期にわたる工程を必要とし、しかもこ
れが高所作業であることも加わって危険であり、経済的
にも極めて不利であった。
If the conventional assembly and installation method described above is adopted, the steel members will be hung and assembled one by one, and the boiler members will also be assembled one by one.
This required a complicated and long-term process of lifting the parts one by one and assembling them on-site without adequate equipment, which was dangerous due to the fact that the work was carried out at heights, and was extremely disadvantageous economically.

本発明はこのような欠点を解消するためになされたもの
であり、設置現場での工数が少なく、しかも高所での作
業を著しく軽減した大型吊下式ボイラの組立据付方法を
提供するものである。
The present invention has been made to eliminate these drawbacks, and provides a method for assembling and installing a large hanging boiler that requires less man-hours at the installation site and significantly reduces work at heights. be.

以下、図面に示す実施例を使って本発明の詳細な説明す
る。
Hereinafter, the present invention will be described in detail using embodiments shown in the drawings.

第3図〜第7図は本発明に係る組立据付方法を説明する
ためのもので、図において符号6で示すものは鉄骨フレ
ームを示し、この鉄骨フレーム6は工場内において組立
てられ、横倒状態で船舶やパージなどに積んでボイラ設
置現場へ搬送される。
FIGS. 3 to 7 are for explaining the assembly and installation method according to the present invention. In the figures, the reference numeral 6 indicates a steel frame, and this steel frame 6 is assembled in a factory and placed in a horizontal position. It is then loaded onto a ship or purge vehicle and transported to the boiler installation site.

現地においては、第3図に示すように鉄骨フレーム6は
横倒状態にあり、その先端(垂設した状態では上端)が
予めボイラ設置際に垂設された補助基10近くに位置す
るように配置される。
At the site, as shown in Fig. 3, the steel frame 6 is lying on its side, and its tip (or upper end in the vertically installed state) is positioned near the auxiliary base 10 that was previously installed vertically when the boiler was installed. Placed.

このときすでに鉄骨フレーム6の一隅には移動車輪7が
取付けられ、鉄骨フレーム6の下側の中央部すなわち鉄
骨フレーム6の高さ方向の中間部および移動車輪Tと反
対側の隅部には滑車8,9が取付けられている。
At this time, a moving wheel 7 is already attached to one corner of the steel frame 6, and a pulley is installed at the lower central part of the steel frame 6, that is, the middle part of the steel frame 6 in the height direction, and the corner opposite to the moving wheel T. 8 and 9 are installed.

一方、据付位置においては鉄骨フレーム6より高さの低
い補助基10が垂設されており、その頂部には滑車11
が配設されている。
On the other hand, at the installation position, an auxiliary base 10 lower in height than the steel frame 6 is vertically installed, and a pulley 11 is mounted on the top of the auxiliary base 10.
is installed.

以上のような状態のもとに鉄骨フレーム6の滑車8,9
にワイヤ12をかけ渡し、このワイヤ12な補助基10
の滑車11に添接させて図示していないウィンチに接続
する。
Under the above conditions, the pulleys 8 and 9 of the steel frame 6
The wire 12 is passed through the auxiliary group 10.
It is attached to a pulley 11 and connected to a winch (not shown).

また鉄骨フレーム6の補助基10側の頂部の隅部には補
助ワイヤ13の一端が固定されており、この補助ワイヤ
′13の他端は前記滑車11を介して同じくウィンチ方
向に導かれている。
Further, one end of an auxiliary wire 13 is fixed to the top corner of the steel frame 6 on the side of the auxiliary base 10, and the other end of this auxiliary wire '13 is similarly guided in the winch direction via the pulley 11. .

この状態でまず、ワイヤ13を引き込むと、鉄骨フレー
ム6は車輪7を転動させて補助基10方向に引寄せられ
つつ第4図に示すように次第に引起こされ、さらにワイ
ヤ12を引き込むことによって第5図に示すように補助
基10に沿って直立される。
In this state, when the wire 13 is first pulled in, the steel frame 6 is pulled toward the auxiliary base 10 by rolling the wheels 7, and is gradually raised as shown in FIG. It is erected along the auxiliary group 10 as shown in FIG.

この引起し作業中においては補助ワイヤ13には常に一
定のテンションが与えられており、鉄骨フレーム6が転
倒しないように保持している。
During this lifting operation, a constant tension is always applied to the auxiliary wire 13 to hold the steel frame 6 so that it does not fall.

鉄骨フレーム6の設置が終了したのちには第6図に示す
ように同じく工場内で組立完了なした完成ボイラ14を
横倒状態で鉄骨フレーム6の近傍にまで搬送してくる。
After the installation of the steel frame 6 is completed, as shown in FIG. 6, the completed boiler 14, which has also been assembled in the factory, is transported to the vicinity of the steel frame 6 in a horizontal position.

そして、鉄骨フレーム6の頂部に主吊上装置15および
態量上装置16を配設し、主吊上装置15と完成ボイラ
に取付けられた滑車17との間にワイヤ18をかけ、態
量上装置16と完成ボイラ14の下側端に取付けられた
滑車19との間に補助ワイヤ20をかけ、完成ボイラ1
4の先端部を鉄骨フレーム6内に引き入れさらに吊上げ
て、第7図に示すように完成ボイラ14を鉄骨フレーム
6の収容空間内に収容する。
Then, a main lifting device 15 and a weight lifting device 16 are installed on the top of the steel frame 6, and a wire 18 is placed between the main lifting device 15 and a pulley 17 attached to the completed boiler. An auxiliary wire 20 is placed between the device 16 and a pulley 19 attached to the lower end of the completed boiler 14, and the completed boiler 1
4 is pulled into the steel frame 6 and further lifted, and the completed boiler 14 is housed in the housing space of the steel frame 6 as shown in FIG.

以上の説明から明らかなように、本発明の方法によれば
、鉄骨フレームおよびボイラの双方を必要な設備が整っ
た工場内で組立て、これを横倒状態で設置位置まで搬送
し、現地において引起こすという方法を採用しているた
め、作業環境の悪い現地での工事を大幅に簡略化でき、
また高所での作業が少ないため組立工事の危険作業も大
幅に減少する。
As is clear from the above description, according to the method of the present invention, both the steel frame and the boiler are assembled in a factory equipped with the necessary equipment, transported on their side to the installation location, and then pulled on site. By adopting the method of raising the parts, construction work on-site with poor working environments can be greatly simplified.
Additionally, because there is less work to be done at heights, dangerous assembly work is also greatly reduced.

さらに現地にはボイラよりも低い補助基を立設するだけ
であるから経済的にも極めて有利となるなどの優れた効
果がある。
Furthermore, since only an auxiliary unit that is lower than the boiler is erected on-site, it has excellent effects such as being extremely advantageous economically.

【図面の簡単な説明】[Brief explanation of drawings]

第1図および第2図は従来の組立据付方法を説明するた
めの図、第3図〜第T図は本発明に係る方法を説明する
ための図である。 6・・・・・・鉄骨フレーム、7・・・・・・車輪、8
,9,11゜17.19・・・・・・滑車、10・・・
・・・補助基、12,18゜・・・・・・ワイヤ、13
,20・・・・・・補助ワイヤ、14・・・・・・完成
ボイラ、15・・・・・・主吊上装置、16・・・・・
・態量上装置。
FIGS. 1 and 2 are diagrams for explaining a conventional assembly and installation method, and FIGS. 3 to T are diagrams for explaining a method according to the present invention. 6... Steel frame, 7... Wheels, 8
,9,11゜17.19... Pulley, 10...
... Auxiliary group, 12,18° ... Wire, 13
, 20... Auxiliary wire, 14... Completed boiler, 15... Main lifting device, 16...
- Quantitative device.

Claims (1)

【特許請求の範囲】[Claims] 1 ボイラ設置位置際にボイラ14より低い高さの補助
基10を垂設し、工場内において組立てられた鉄骨フレ
ーム6を横倒状態でその先端部が前記補助基10際に位
置するように搬送し、この鉄骨フレーム6の高さ方向の
中間に接続され補助基10の滑車11に添接されたワイ
ヤ12によって鉄骨フレーム6を引起して直立状態に設
置した後予め組立てられ横倒状態で搬送されてきたボイ
ラ14を、前記鉄骨フレーム6の頂部に配設された吊上
装置15によって鉄骨フレーム6内に引入れかつ吊上げ
て収容することを特徴とする大型吊下式ボイラの組立据
付方法。
1. An auxiliary base 10 with a lower height than the boiler 14 is installed vertically at the boiler installation position, and the assembled steel frame 6 is transported in a horizontal state so that its tip is located next to the auxiliary base 10. Then, the steel frame 6 is pulled up by a wire 12 connected to the middle of the steel frame 6 in the height direction and attached to the pulley 11 of the auxiliary base 10 and installed in an upright state, and is then preassembled and transported in a sideways state. A method for assembling and installing a large hanging boiler, characterized in that the boiler 14 that has been installed is pulled into the steel frame 6 and lifted up and housed therein by a lifting device 15 disposed at the top of the steel frame 6.
JP52050504A 1977-04-30 1977-04-30 How to assemble and install a large hanging boiler Expired JPS5823530B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP52050504A JPS5823530B2 (en) 1977-04-30 1977-04-30 How to assemble and install a large hanging boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP52050504A JPS5823530B2 (en) 1977-04-30 1977-04-30 How to assemble and install a large hanging boiler

Publications (2)

Publication Number Publication Date
JPS53136101A JPS53136101A (en) 1978-11-28
JPS5823530B2 true JPS5823530B2 (en) 1983-05-16

Family

ID=12860776

Family Applications (1)

Application Number Title Priority Date Filing Date
JP52050504A Expired JPS5823530B2 (en) 1977-04-30 1977-04-30 How to assemble and install a large hanging boiler

Country Status (1)

Country Link
JP (1) JPS5823530B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62125163A (en) * 1985-11-22 1987-06-06 株式会社大林組 Method for constructing roof
JP4800843B2 (en) * 2006-05-29 2011-10-26 株式会社日立プラントテクノロジー Installation method of boiler furnace wall

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5115845Y2 (en) * 1972-02-09 1976-04-26
JPS538841B2 (en) * 1972-08-31 1978-04-01
JPS49109002U (en) * 1973-01-12 1974-09-18
JPS5116691A (en) * 1974-07-31 1976-02-10 Nippon Soda Co 2*66 jiarukirumerukaputopurinno seizoho

Also Published As

Publication number Publication date
JPS53136101A (en) 1978-11-28

Similar Documents

Publication Publication Date Title
JP4828084B2 (en) How to install the hoist
JP2753216B2 (en) Elevating safety fence device for manhole
JPS5823530B2 (en) How to assemble and install a large hanging boiler
FR2478169B1 (en)
JP2000226169A (en) Elevator installation method
CN214570333U (en) Auxiliary steel ladder lifting device of beam-forming vertical combustion equipment
JPH0455279A (en) Rail installing device of indirect type hydraulic elevator
JP3941200B2 (en) Installation method of pump barrel piping
JPH04129981A (en) Method of installing construction for hydraulic elevator
JP2021014358A (en) Crane device for pressure governor
JPS5846993B2 (en) Method of constructing a steel tower using a lifting crane
JP4804144B2 (en) Top sheave device in climbing method for construction elevators
JP2513309Y2 (en) Suspending device for hoses for fire fighting, etc.
JP3130696B2 (en) How to bring in the elevator car
JPH0522543Y2 (en)
JPS6236958B2 (en)
JPH11209026A (en) Elevator installation method
JPH08151180A (en) Elevator
JPH0412080Y2 (en)
JPH09194155A (en) Testing equipment for oil-filled shock absorbers for elevators
JPH0544386Y2 (en)
SU867875A1 (en) Method of setting long structure onto foundation
SU1104092A1 (en) Apparatus for lifting and mounting columns with holes
JPH08158486A (en) Method and device for transportation and installation of structural pillars
JP2000001993A (en) Building assembling device and lifting method therefor