JPS5829378B2 - Anchor construction method - Google Patents
Anchor construction methodInfo
- Publication number
- JPS5829378B2 JPS5829378B2 JP54122566A JP12256679A JPS5829378B2 JP S5829378 B2 JPS5829378 B2 JP S5829378B2 JP 54122566 A JP54122566 A JP 54122566A JP 12256679 A JP12256679 A JP 12256679A JP S5829378 B2 JPS5829378 B2 JP S5829378B2
- Authority
- JP
- Japan
- Prior art keywords
- casing pipe
- injection
- pipe
- injection material
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Rock Bolts (AREA)
- Piles And Underground Anchors (AREA)
Description
【発明の詳細な説明】
本発明は周壁に多数の透孔の穿設された有孔ケーシング
パイプ内より圧力流体を噴射して前記ケーシングパイプ
を地山に貫入せしめ、次いで先端にパッカーを有する注
入材注入パイプを前記ケーシングパイプ内に挿入して同
ケーシングパイプ内に注入材を圧入充填するとともに、
前記パッカーにかかる注入材圧入反力によって注入材注
入パイプを有孔ケーシングパイプの開口端部1で押し戻
すことを特徴とするアンカー工法に係り、その目的とす
る処は簡単な施工で而も信頼度の高い改良されたアンカ
ー工法を供する点にある。DETAILED DESCRIPTION OF THE INVENTION The present invention involves injecting pressurized fluid from within a perforated casing pipe with a large number of through holes in the peripheral wall to penetrate the casing pipe into the ground, and then injecting the casing pipe with a packer at the tip. Inserting a material injection pipe into the casing pipe and press-filling the injection material into the casing pipe,
The anchor construction method is characterized in that the injection material injection pipe is pushed back at the open end 1 of the perforated casing pipe by the injection material injection reaction force applied to the packer, and its purpose is to achieve simple construction and high reliability. The purpose of this invention is to provide an improved anchor construction method with a high level of performance.
本発明に卦いてはアンカー工法にあ−いて地山に碇着さ
れるボルトに代えて周壁に多数の透孔が穿設された有孔
ケーシングパイプを使用し、同有孔ケーシングパイプ内
より地山に圧力流体を噴射して地山を掘削することによ
って前記ケーシングパイプを容易に地山に貫入せしめる
ものである。In the present invention, instead of bolts that are anchored to the ground as in the anchor method, a perforated casing pipe with a large number of through holes bored in the surrounding wall is used, and the earth is ground from within the perforated casing pipe. The casing pipe is easily penetrated into the ground by injecting pressure fluid into the mountain and excavating the ground.
而して前記ケーシングパイプが地山の所定深度捷で貫入
したのち、同ケーシングパイプをその11の位置に残留
せしめ、次いで先端にパッカーを有する注入材注入パイ
プを前記ケーシングパイプ内に挿入して注入材を圧入す
るようにしたので、同注入材は前記ケーシングパイプ内
に充填されると同時に同ケーシングパイプの周壁に穿設
された透孔を介して地山内に浸透し、かくして前記ケー
シングパイプは地山に一体に碇着される。After the casing pipe has penetrated the ground to a predetermined depth, the casing pipe is left in position 11, and then an injection material injection pipe with a packer at the tip is inserted into the casing pipe and injected. Since the material is press-fitted, the injection material is filled into the casing pipe and at the same time permeates into the ground through the through hole drilled in the peripheral wall of the casing pipe, and thus the casing pipe is inserted into the ground. It is anchored in one piece on the mountain.
なかこの際、前記注入材注入パイプ先端のパッカーには
注入材圧入時の反力が作用し、注入パイプは前記ケーシ
ングパイプ内を押し戻され、これに伴って同ケーシング
パイプ内外に注入材が途切れることなく連続して注入填
装されるものである。At this time, a reaction force at the time of press-fitting the injection material acts on the packer at the tip of the injection material injection pipe, and the injection pipe is pushed back inside the casing pipe, and as a result, the injection material is interrupted inside and outside the casing pipe. It is continuously injected and loaded.
かくして有孔ケーシングパイプを地山に碇着したのち、
公知の方法で同ケーシングパイプにプレストレスを導入
してアンカー工法を完了するものである。After anchoring the perforated casing pipe to the ground,
The anchor construction method is completed by introducing prestress into the casing pipe using a known method.
本発明に釦いてはこのようにアンカーボルトを代用する
有孔ケーシングパイプ内より圧力流体を噴射することに
よって同ケーシングパイプを地山に貫入せしめるように
したので、削孔とアンカーボルトの挿入とを同一工程で
行なうこととなり、施工を簡略化しつるものである。According to the present invention, the casing pipe is penetrated into the ground by injecting pressurized fluid from inside the perforated casing pipe which substitutes for the anchor bolt, so drilling holes and inserting the anchor bolt are not necessary. It will be done in the same process, simplifying the construction.
捷た地山に貫入された前記ケーシングパイプによって同
パイプの外周の土壌の削孔部内への崩落が防止され、こ
の後のパイプ内へのモルタル注入充填作業に悪影響を及
ぼす惧れがない。The casing pipe penetrated into the broken ground prevents the soil on the outer periphery of the pipe from collapsing into the excavated part, and there is no risk of adversely affecting the subsequent mortar injection filling operation into the pipe.
更に本発明にあ−いては地山に貫入された有孔ケーシン
グパイプに、先端にパッカーを有する注入材注入パイプ
を挿入して注入材を圧入するようにしたので、同注入材
の注入反力が前記パッカーにかかり、注入材の注入充填
作業の進捗に伴って注入材の注入は前記ケーシングパイ
プより開口端部側に押戻され、同ケーシングパイプ内に
注入材が密実に充填されるとともに、注入材の一部は有
孔ケーシングパイプ周壁の透孔より周辺土壌に浸透し、
かくして前記ケーシングパイプは地山に一体に碇着され
、同ケーシングパイプの引抜抵抗が増大するものである
。Furthermore, in the present invention, the injection material is press-fitted by inserting the injection material injection pipe having a packer at the tip into the perforated casing pipe penetrated into the ground, so that the injection reaction force of the injection material is reduced. is applied to the packer, and as the injection filling operation progresses, the injection material is pushed back from the casing pipe to the open end side, and the casing pipe is densely filled with the injection material, A part of the injection material penetrates into the surrounding soil through the holes in the perforated casing pipe peripheral wall,
In this way, the casing pipe is anchored integrally to the earth, and the resistance to pulling out the casing pipe is increased.
以下本発明を図示の実施例について説明する。The present invention will be described below with reference to the illustrated embodiments.
1は円形、多角形等の所要断面形状の有孔ケーシングパ
イプで、その周壁に任意形状の透孔2が多数穿設されて
いる。Reference numeral 1 denotes a perforated casing pipe having a desired cross-sectional shape such as circular or polygonal, and a large number of through holes 2 of arbitrary shapes are bored in its peripheral wall.
而して前記ケーシングパイプ1にエアパイプ3を挿入し
、同エアパイプ3に接続されたポンプ(図示せず)を介
してエアパイプ3より圧力空気を噴射して地山4を掘進
するとともに前記ケーシングパイプ1を地山4に貫入せ
しめ、(第2図参照)同ケーシングパイプ1が所定長貫
入したときエアパイプ3を引抜き、前記ケーシングパイ
プ1の内径に略々等しい外径を有する弾性資材よりなる
パッカー5を先端に有するモルタル注入バイブロを前記
ケーシングパイプ1の先端に1で挿入し、(第3図参照
)モルタル注入バイブロに接続されたモルタル注入機(
図示せず)を介してモルタ、ルアを圧入すると、同モル
タル7は有孔ケーシングパイプ1内に充填されるととも
に、その一部は透孔2を介して地山4にわける前記ケー
シングパイプ1外周の土壌に浸入し、一方モルタル注入
圧の反力が前記パッカー5にかかり、モルタル圧入の進
捗に伴ってモルタル注入バイブロは有孔ケーシングパイ
プ1の開口端部側に押戻される。Then, an air pipe 3 is inserted into the casing pipe 1, and pressurized air is injected from the air pipe 3 through a pump (not shown) connected to the casing pipe 3 to dig into the ground 4, and the casing pipe 1 is penetrated into the ground 4 (see Fig. 2), and when the casing pipe 1 has penetrated a predetermined length, the air pipe 3 is pulled out and a packer 5 made of an elastic material having an outer diameter approximately equal to the inner diameter of the casing pipe 1 is inserted. Insert the mortar injection vibro provided at the tip into the tip of the casing pipe 1 (see Figure 3), and insert the mortar injection machine (see Fig. 3) connected to the mortar injection vibro.
When mortar and lua are press-fitted through a hole (not shown), the mortar 7 is filled into the perforated casing pipe 1, and a part of the mortar 7 is divided into the earth 4 through the through hole 2 around the outer circumference of the casing pipe 1. On the other hand, the reaction force of the mortar injection pressure is applied to the packer 5, and the mortar injection vibro is pushed back toward the open end side of the perforated casing pipe 1 as mortar press-in progresses.
前記モルタル注入作業の完了後、モルタル注入バイブロ
を取外し、(第4図参照)公知の方法で前記ケーシング
パイプ1にプレストレスを導入シて全工程を完了する。After completing the mortar injection work, the mortar injection vibro is removed (see FIG. 4), and prestress is introduced into the casing pipe 1 by a known method to complete the entire process.
なお本発明にわいては前記圧力空気の代りに圧力水をケ
ーシングパイプ内より地山に噴射してもよく、また注入
材としてはモルタル以外にその他のグラウト、注入剤を
使用しつるものである。In the present invention, pressurized water may be injected into the ground from within the casing pipe instead of the pressurized air, and other grouts or injection agents may be used in addition to mortar as the injection material. .
以上本発明を実施例について説明したが、本発明は勿論
このよう女実施例だけに局限されるものではなく、本発
明の精神を逸脱しない範囲内で種種の設計の改変を施し
5るものである。Although the present invention has been described above with reference to embodiments, the present invention is of course not limited to such female embodiments, and may be modified in various designs without departing from the spirit of the present invention. be.
第1図乃至第4図は本発明に係るアンカー工法の一実施
例の工程を示す縦断測面図、第5図は有孔ケーシングパ
イプの一部縦断測面図、第6図はその縦断正面図である
。
1・・・・・・有孔ケーシングパイプ、2・・・・・・
透孔、3・・・・・・エアパイプ、4・・・・・・地山
、5・・・・・・パッカー6・・・・・・モルタル注入
ハイフ、7・・・・・・モルタル。Figures 1 to 4 are vertical cross-sectional views showing the steps of an embodiment of the anchor construction method according to the present invention, Figure 5 is a partial vertical cross-sectional view of a perforated casing pipe, and Figure 6 is a longitudinal front view of the same. It is a diagram. 1...Perforated casing pipe, 2...
Through hole, 3... air pipe, 4... earth, 5... packer 6... mortar injection high, 7... mortar.
Claims (1)
プ内より圧力流体を噴射して前記ケーシングパイプを地
山に貫入せしめ、次いで先端にパッカーを有する注入材
注入パイプを前記ケーシングパづ部内に挿入して同ケー
シングパイプ内に注入材を圧入充填するとともに、前記
パッカーにかかる注入材圧入反力によって注入材注入パ
イプを有孔ケーシングパイプの開口端部1で押し戻すこ
とを特徴とするアンカー工法。1. Pressurized fluid is injected from inside a perforated casing pipe with a large number of through holes in the surrounding wall to penetrate the casing pipe into the ground, and then the injection material injection pipe having a packer at the tip is inserted into the casing pad part. An anchor construction method characterized by inserting the injection material into the casing pipe and press-filling the injection material into the same casing pipe, and pushing back the injection material injection pipe at the open end 1 of the perforated casing pipe by the injection material press-in reaction force applied to the packer. .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP54122566A JPS5829378B2 (en) | 1979-09-26 | 1979-09-26 | Anchor construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP54122566A JPS5829378B2 (en) | 1979-09-26 | 1979-09-26 | Anchor construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5648431A JPS5648431A (en) | 1981-05-01 |
| JPS5829378B2 true JPS5829378B2 (en) | 1983-06-22 |
Family
ID=14839059
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP54122566A Expired JPS5829378B2 (en) | 1979-09-26 | 1979-09-26 | Anchor construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5829378B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0351370Y2 (en) * | 1986-04-22 | 1991-11-05 | ||
| CN104963710A (en) * | 2015-07-16 | 2015-10-07 | 尤洛卡(山东)深部地压防治安全技术有限公司 | Hollow grouting anchor rod with anti-shock constant-resistance performance and using method thereof |
| JP2021055506A (en) * | 2019-10-01 | 2021-04-08 | 恒己 小林 | Guidance apparatus of fluidized object |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5148168B2 (en) * | 1972-04-28 | 1976-12-18 | ||
| FR2313506A1 (en) * | 1975-02-04 | 1976-12-31 | Brami Pierre | Tubular grouted ground anchor - has perforations for passage of cement grout and end load spreading plate (BR310876) |
-
1979
- 1979-09-26 JP JP54122566A patent/JPS5829378B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5648431A (en) | 1981-05-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR20220053956A (en) | Constructing method of grouting steel pipe having cocking packer module and grouting steel pipe having cocking packer module | |
| JP2006219933A (en) | Rock bolt and supporting method using the same | |
| JP2004293090A (en) | Friction pile for weak ground and construction method for friction pile | |
| JPS5829378B2 (en) | Anchor construction method | |
| KR20190143205A (en) | Construction method of composite pile with extensioned tip | |
| JPS622120B2 (en) | ||
| US3855804A (en) | Apparatus and method for distending the distensible body of an earth anchor | |
| JP2546733B2 (en) | Anchor construction method for consolidation ground | |
| KR100775552B1 (en) | Earthen sheet pile and construction method | |
| JPS6128770B2 (en) | ||
| JP2695319B2 (en) | Tunnel construction method | |
| JPH07216883A (en) | Pipe rod process | |
| JPS5937400B2 (en) | Lock bolt construction method | |
| KR790001349B1 (en) | Multi-stage anchoring method anchor method | |
| JP3048320B2 (en) | Ground anchor construction method | |
| JPS55155825A (en) | Burying method for pile with extension shoe | |
| JP3962171B2 (en) | Basic treatment method for collapsible geology | |
| JPS573915A (en) | Method and apparatus for construction of reaction resistor body underground | |
| JP2789370B2 (en) | Piling method | |
| JP3017941U (en) | Support device for tunnel ground | |
| JPS586903Y2 (en) | embedded pile | |
| JPH0372764B2 (en) | ||
| JPH04221200A (en) | Anchoring of rock bolt | |
| JPH0791170A (en) | Shield construction method | |
| JPH0427012A (en) | Construction of earth anchor |