JPS5836123B2 - sand pile creation equipment - Google Patents
sand pile creation equipmentInfo
- Publication number
- JPS5836123B2 JPS5836123B2 JP55119714A JP11971480A JPS5836123B2 JP S5836123 B2 JPS5836123 B2 JP S5836123B2 JP 55119714 A JP55119714 A JP 55119714A JP 11971480 A JP11971480 A JP 11971480A JP S5836123 B2 JPS5836123 B2 JP S5836123B2
- Authority
- JP
- Japan
- Prior art keywords
- outer casing
- plate
- sand
- fixed
- air spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
【発明の詳細な説明】
本発明は、軟弱地盤を改良するために軟弱地盤中に砂杭
を造成する砂杭造成装置に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a sand pile construction device for constructing sand piles in soft ground in order to improve the soft ground.
従来から軟弱地盤中に砂杭を造成する砂杭造戒装置は種
々あるが、その1つとして、外ケーシングと内ケーシン
グとからなる2重管構造であって、良質の砂杭を造或す
ることができる砂杭造成装置がある。There have been various types of sand pile construction equipment for creating sand piles in soft ground, one of which is a double pipe structure consisting of an outer casing and an inner casing, and is capable of creating high quality sand piles. There is a sand pile creation device that can do this.
かかる砂杭造成装置は、中空状の外ケーシングと、その
外ケーシングの上方にエアバネを介して昇降可能に配設
した起振機と、上端を前記起振機に固定し、その上端よ
り下方部分を前記外ケーシング中に垂下させた内ケーシ
ングとからなるものであって、前記エアバネ中に圧力空
気を充満させて前記起振機と外ケーシングとを一体的に
固定し、前記起振機の上下方向の振動により外ケーシン
グ(内ケーシングも含む)を地盤中に貫入させる。Such a sand pile construction device includes a hollow outer casing, an exciter disposed above the outer casing so as to be movable up and down via an air spring, an upper end of which is fixed to the exciter, and a portion below the upper end of the exciter. an inner casing suspended in the outer casing, the air spring is filled with pressurized air to integrally fix the exciter and the outer casing, and the The outer casing (including the inner casing) penetrates into the ground due to directional vibration.
それから、前記エアバネ中の圧力空気を徐々に抜いて起
振機と外ケーシングとの縁を切って外ケーシングに起振
機の振動が伝わらないように、すなわち振動が外ケーシ
ングを介して外ケーシングの周囲の地盤に伝わって地盤
が攪拌されないようにし、内ケーシングのみを起振機の
振動により上下動させて外ケーシング中の砂を締固める
と共に、エアバネ中に圧力空気を外ケーシングと一体に
ならない程度圧大したり抜いたりし、内ケーシングを起
振機による上下動と独立して上下動させ、外ケーシンク
沖の締固めた砂を外ケーシングから地盤中に押出す。Then, the pressurized air in the air spring is gradually released and the edge between the exciter and the outer casing is cut to prevent the vibration of the exciter from being transmitted to the outer casing. To prevent the ground from being agitated by the vibrations transmitted to the surrounding ground, only the inner casing is moved up and down by the vibration of the exciter to compact the sand in the outer casing, and the pressurized air is pumped into the air spring to the extent that it does not become one with the outer casing. The inner casing is moved up and down independently of the up-and-down movement by the vibrator, and the compacted sand off the outer casing is pushed out from the outer casing into the ground.
次にエアバネ中に圧力空気を再び充満させて外ケーシン
グに起振機の振動を伝播させて外ケーシングを引き抜き
、以下上述の操作を繰返して地盤中に砂杭を造成する。Next, the air spring is again filled with pressurized air to propagate the vibrations of the exciter to the outer casing, and the outer casing is pulled out, and the above-mentioned operations are repeated to create a sand pile in the ground.
ところが、前述の従来の砂杭造成装置は、内ケーシング
を起振機とは別個に上下動させるエアバネのストローク
が短かいため、外ケーシングを地盤中に所要深度まで貫
入させた際に、外ケーシング中に軟弱な土砂がエアバネ
のストローク長より高く入り込んでしまうと、砂杭を造
成することができなくなる。However, in the conventional sand pile construction equipment described above, the stroke of the air spring that moves the inner casing up and down separately from the vibrator is short, so when the outer casing is penetrated into the ground to the required depth, the outer casing If soft earth and sand get into the air spring at a height higher than the stroke length of the air spring, it becomes impossible to create a sand pile.
すなわち、土砂が外ケーシング中にエアバネのストロー
ク長より高く入り込んでしまうと、内ケーシングの昇降
ストローク長よりも外ケーシング中に入り込んだ土砂の
高さの方が高いので、エアバネを作動させて内ケーシン
グを昇降させても、内ケーシングの下端の砂突き固め押
し出し部は外ケーシング中に入り込んだ土砂中において
昇降するだけである。In other words, if dirt gets into the outer casing higher than the stroke length of the air spring, the height of the dirt that got into the outer casing is higher than the lifting stroke length of the inner casing, so the air spring is actuated to move the inner casing away. Even if the sand tamping and extruding part at the lower end of the inner casing is raised and lowered, it only moves up and down in the earth and sand that has entered the outer casing.
従って、外ケーシング中に投入した砂はもとより外ケー
シング沖に入り込んだ土砂を外ケーシングより外に吐出
させることができず、この結果砂杭を造成することが不
可能となるのである。Therefore, not only the sand thrown into the outer casing, but also the earth and sand that has entered the outer casing cannot be discharged from the outer casing, and as a result, it becomes impossible to construct sand piles.
かかる上述の土砂の外ケーシング中への侵入は、外ケー
シングの下端に開閉シューを設けたり、または貫入させ
る前に外ケーシンク沖に砂を予め投入させておくポイン
ト砂を施したりしても起り得るものである。Such intrusion of the above-mentioned earth and sand into the outer casing can occur even if an opening/closing shoe is provided at the lower end of the outer casing, or a point sand is applied in which sand is previously introduced into the outer casing offshore before intrusion. It is something.
これは、外ケーシングを起振機の上下振動により地盤中
に貫入させる砂杭造成装置であるから、上述の起振機の
上下振動により開閉シューが開閉を繰り返し、開閉シュ
ーが開状態の時に土砂が外ケーシング中に入り込み、ま
た起振機の上下振動によりポイント砂が流動し、土砂が
外ケーシング中に入り込んでしまうのである。This is a sand pile construction device that penetrates the outer casing into the ground by the vertical vibration of the vibrator, so the opening/closing shoe repeats opening and closing due to the vertical vibration of the vibrating machine, and when the opening/closing shoe is in the open state, it is possible to create sand piles. The sand gets into the outer casing, and the point sand flows due to the vertical vibration of the exciter, causing the dirt to get into the outer casing.
この問題は起振機の上下振動により外ケーシングを地盤
中に貫入させる上述の砂杭造成装置の宿命的な問題であ
る。This problem is a fateful problem of the above-mentioned sand pile construction device in which the outer casing penetrates into the ground by the vertical vibration of the exciter.
そして、上述の外ケーシング中に入り込む土砂の高さは
土質により異なるが通常約500〜1000mmであり
、一方エアバネのストローク長は200〜300mmで
あり、従って上述の従来の砂杭造成装置では砂杭を造成
することはできないのが実情である。The height of the earth and sand that enters the outer casing described above varies depending on the soil quality, but is usually about 500 to 1000 mm, while the stroke length of the air spring is 200 to 300 mm. The reality is that it is not possible to create.
また、外ケーシング中に入り込んだ土砂の高さがエアバ
ネのストローク長より低く、内ケーシングの昇降により
外ケーシング中の土砂や砂の吐出が可能な場合でも、エ
アバネのストローク長が短かいため、外ケーシンク沖の
締固めた砂の押出量が少なく、従って作業性が悪く、シ
かも締固めた砂をさらに十分に突き固めたりすることが
難しい。In addition, even if the height of the dirt and sand that has entered the outer casing is lower than the stroke length of the air spring and it is possible to discharge the dirt and sand from the outer casing by raising and lowering the inner casing, the stroke length of the air spring is short, so The amount of compacted sand off the coast of Kasink is small, so workability is poor, and it is difficult to further compact the compacted sand.
本発明は、上述の諸欠点を改善した砂杭造成装置を提供
せんとするものである。The present invention aims to provide a sand pile construction device that improves the above-mentioned drawbacks.
本発明は、貫入の際に起振機の上下振動により、土砂が
外ケーシング中に入り込んでしまう砂杭造成装置に関し
、ベローズが1段のエアバネを使用した従来の砂杭造成
装置では、エアバネのストローク長が外ケーシング中に
入り込んだ土砂の高さより低いため、外ケーシング中の
土砂を吐出させることができず、しかも砂を強固にかつ
能率良く突き固め押し出すことができないことに鑑み、
ベローズを上下に複数段重ねた長ストロークのエアバネ
を使用し、内ケーシングを長ストローク昇降させるよう
に構成したことを特徴とする。The present invention relates to a sand pile construction device in which earth and sand enters the outer casing due to the vertical vibration of an exciter during penetration. In view of the fact that the stroke length is lower than the height of the earth and sand that has entered the outer casing, the earth and sand in the outer casing cannot be discharged, and furthermore, the sand cannot be compacted and pushed out firmly and efficiently.
It is characterized by using a long stroke air spring with bellows stacked vertically in multiple stages, and configured to move the inner casing up and down over a long stroke.
以下、本発明の砂杭造成装置の一実施例を添付図面を参
照して説明する。EMBODIMENT OF THE INVENTION Hereinafter, one embodiment of the sand pile construction apparatus of the present invention will be described with reference to the accompanying drawings.
この実施例における本発明の砂杭造成装置は、外ケーシ
ング1と、その外ケーシング1に固設した支柱2と、そ
の支柱2に昇降可能に装着した起振機3と、その起振機
3と外ケーシング1との間に介装した長ストロークのエ
アバネ4と、前記起振機3に固定し、前記外ケーシング
1中に垂下させた内ケーシング5と、前記支柱2の途中
に介装したショツクアブソーバ−6とを備える。The sand pile building device of the present invention in this embodiment includes an outer casing 1, a support 2 fixed to the outer casing 1, an exciter 3 attached to the support 2 so as to be able to rise and fall, and an exciter 3 attached to the support and the outer casing 1, an inner casing 5 fixed to the exciter 3 and suspended in the outer casing 1, and an air spring 4 interposed in the middle of the support 2. A shock absorber 6 is provided.
前記外ケーシング1は円筒形状をなし、その上端に同じ
く円筒形状の短管10を固定し、その短管10の左右両
側に砂投入用のホッパ−11をそれぞれ固設すると共に
、外ケーシング1、短管10およびホッパ−11を連通
させる。The outer casing 1 has a cylindrical shape, and a short pipe 10 having a similar cylindrical shape is fixed to the upper end thereof, and hoppers 11 for feeding sand are fixed on both left and right sides of the short pipe 10, and the outer casing 1, The short pipe 10 and the hopper 11 are communicated with each other.
前記短管10およびホッパ−11の上面4隅部に前記支
柱2を固定し、該4本の支柱2を外ケーシング1の上端
より外ケーシング1の中心軸方向に上方に延設すると共
に、前記エアバネ4の上下伸縮ストロークが長くとれる
ようにする。The pillars 2 are fixed to the four corners of the upper surface of the short pipe 10 and the hopper 11, and the four pillars 2 are extended upward from the upper end of the outer casing 1 in the direction of the central axis of the outer casing 1. To enable a long vertical expansion/contraction stroke of an air spring 4.
該支柱2の下端に長方形状の固定板70を固定すると共
に、この柱2に同じく長方形状の昇降板71を昇降自在
に装着する。A rectangular fixing plate 70 is fixed to the lower end of the column 2, and a similarly rectangular elevating plate 71 is attached to the column 2 so as to be movable up and down.
前記固定板TO上に円柱形状のエアバネ保護体72を固
設すると共に、前記昇降板71上に前記起振機3を搭載
する。A cylindrical air spring protector 72 is fixed on the fixed plate TO, and the exciter 3 is mounted on the elevating plate 71.
前記固定板70と昇降板T1との間に前記エアバネ4を
2個介装すると共に、該昇降板71にガイドパイプ73
の上端を固定し、このガイドパイプ73を前記固定板7
0に貫挿させ、該ガイドパイプ73の下端にストッパー
74を取付ける。Two air springs 4 are interposed between the fixed plate 70 and the elevating plate T1, and a guide pipe 73 is installed on the elevating plate 71.
The upper end of the guide pipe 73 is fixed to the fixing plate 7.
0, and a stopper 74 is attached to the lower end of the guide pipe 73.
前記エアバネ4は第4図乃至第6図に示すように、所謂
4連式であって、2枚の円形状の端板41と、この端板
41の径より若干小さい径の円形状をなす適宜枚数、例
えば3枚の中間板42と、ゴムなどの弾性部材よりなり
4条の蛇腹形状をなす適宜所要数、例えば4個のべロー
ズ43およびクッションリング430とを備える。As shown in FIGS. 4 to 6, the air spring 4 is of a so-called four-ring type, and has two circular end plates 41 and a circular shape with a diameter slightly smaller than the diameter of the end plates 41. It is provided with an appropriate number of intermediate plates 42, for example three, and an appropriate number of bellows 43, for example four, and a cushion ring 430, which are made of an elastic member such as rubber and have a four-line bellows shape.
前記端板41の一面に前記ベローズ43の端部を密着係
合する係合爪410を環状に突設すると共に、その端板
41の係合爪410より外側の箇所に取付孔411を適
宜に設ける。An engaging claw 410 that closely engages the end of the bellows 43 is protruded in an annular shape on one surface of the end plate 41, and a mounting hole 411 is appropriately provided at a location outside the engaging claw 410 of the end plate 41. establish.
前記中間板42の両面に前記ベローズ43の端部を密着
係合する係合爪420を端板41の係合爪410と同径
の環状に突設すると共に、その中間板42の係合爪42
0より内側の中心部にエア流通用の透孔421を設け、
一方該中間板42の外周端にガイド腕44を2組設ける
。Engagement claws 420 that closely engage the ends of the bellows 43 are protruded on both sides of the intermediate plate 42 in an annular shape having the same diameter as the engagement claws 410 of the end plate 41, and the engagement claws of the intermediate plate 42. 42
A through hole 421 for air circulation is provided in the center inside the 0,
On the other hand, two sets of guide arms 44 are provided at the outer peripheral end of the intermediate plate 42.
このガイド腕44は中間板42の外周端に固定した略長
方形状の固定板440と、略三角形状のスライド板44
1と、そのスライド板441に固定した半環状形状のガ
イド部材442と、固定ボルト443およびナット44
4とからなり、前記固定板440に前記固定ボルト44
3を挿通するための透孔445を2個設ける一方、前記
スライド板441に前記固定ボルト443が挿通し得る
長孔446を前記固定板440の透孔445に対応し、
かつ長孔446の長手方向と中間板42の径方向とが一
致するように2個設け、かくしてなる固定板440の透
孔445とスライド板441の長孔446とにおいて固
定ボルト443とナット444とを締付し、スライド板
441を固定板440に中間板42の径方向に若干スラ
イド可能に取付ける。This guide arm 44 includes a substantially rectangular fixed plate 440 fixed to the outer peripheral end of the intermediate plate 42 and a substantially triangular sliding plate 44.
1, a semi-annular guide member 442 fixed to the slide plate 441, a fixing bolt 443 and a nut 44.
4, and the fixing bolt 44 is attached to the fixing plate 440.
3 are provided, and elongated holes 446 through which the fixing bolts 443 can be inserted in the slide plate 441 correspond to the through holes 445 of the fixing plate 440,
Two elongated holes 446 are provided so that the longitudinal direction of the intermediate plate 42 coincides with the radial direction of the intermediate plate 42, and the fixing bolts 443 and nuts 444 are inserted between the through holes 445 of the fixed plate 440 and the elongated holes 446 of the slide plate 441. , and the slide plate 441 is attached to the fixed plate 440 so as to be able to slide slightly in the radial direction of the intermediate plate 42.
そして、前記2枚の端板41を係合爪410を内側にし
て適宜間隙をおいて対向させ、その2枚の端板41の間
に前記3枚の中間板42を配すると共に、その中間板4
2と端板41の間および中間板42と中間板42の間に
前記4個のべローズ43を配し、そのベローズ43の両
端部を端板41の係合爪410と中間板42の係合爪4
20又は中間板42の係合爪420と中間板42の係合
爪420にそれぞれ密着嵌合し、そのベローズ43の谷
部にクッションリング430を嵌合し、前記下端板41
の中心にエア流通用の透孔412を設ける。Then, the two end plates 41 are placed facing each other with an appropriate gap between them with the engaging claws 410 inside, and the three intermediate plates 42 are arranged between the two end plates 41, and Board 4
The four bellows 43 are arranged between the end plate 41 and the intermediate plate 42 and between the intermediate plate 42 and the intermediate plate 42, and both ends of the bellows 43 are engaged with the engaging claw 410 of the end plate 41 and the intermediate plate Matching claw 4
20 or the engaging claws 420 of the intermediate plate 42 and the engaging claws 420 of the intermediate plate 42, respectively, and a cushion ring 430 is fitted into the valley of the bellows 43, and the lower end plate 41
A through hole 412 for air circulation is provided in the center.
かくしてなるエアバネ4の上下両端板41を固定板70
と昇降板71とにそれぞれ固定し、エアバネ4のガイド
部材442をガイド支柱73にそれぞれ係合させ、エア
バネ4の下7HH 1のエア流通用の透孔412にエア
流通管 せず)よりの枝管(図示せず)を接続する
。The upper and lower end plates 41 of the air spring 4 thus formed are fixed to the fixing plate 70.
and the lifting plate 71 respectively, and the guide members 442 of the air spring 4 are respectively engaged with the guide struts 73, and the branches from the air circulation pipe are inserted into the through holes 412 for air circulation in the lower part 7HH1 of the air spring 4. Connect tubing (not shown).
このエア流通管に設けたエア送気口とエア排出口とにコ
ンプレツサ(図示せず)からのエア・ホース等(図示せ
ず)をソレノイドバルブ等(図示せず)を介して接続す
る。An air hose or the like (not shown) from a compressor (not shown) is connected to an air inlet and an air outlet provided in this air distribution pipe via a solenoid valve or the like (not shown).
このソレノイドバルブ等の切換によりコンプレッサーか
らのエアをエアバネ4に圧大したり抜いたりしてエアバ
ネ4を伸縮させて、それにより前記起振機3および内ケ
ーシング5が上昇、落下するように構成する。By switching the solenoid valve or the like, air from the compressor is compressed into or released from the air spring 4, causing the air spring 4 to expand or contract, thereby causing the vibrator 3 and the inner casing 5 to rise and fall. .
上述のエアバネ4のストローク長は、貫入の際に外ケー
シング中に入り込んだ土砂の高さより長くする。The stroke length of the air spring 4 mentioned above is made longer than the height of the earth and sand that has entered the outer casing during penetration.
例えば、1,200〜1,500朋とする。前記内ケー
シング5は円筒形状をなし、その上端を前記昇降板T1
の下面中央に固定すると共に、上端より下方の部分を前
記外ケーシング1および短管10中に垂下させたもので
あって、下端にジェットノズル50を固定し、かつ内側
面にジェットエア送給パイプ51を内ケーシング5の中
心軸方向に固定し、そのジェットエア送給パイプ51の
下端を前記ジェットノズル50に連結すると共に、前記
ジェットエア送給パイプ51の上端にコンプレッサー(
図示せず)からのエアホース等(図示せず)を連結し、
前記ジェットノズル50からエアーが噴射されるように
構成し、該内ケーシング5の最下端に突き固め体52を
固設する。For example, it is 1,200 to 1,500. The inner casing 5 has a cylindrical shape, and its upper end is connected to the elevating plate T1.
The jet nozzle 50 is fixed to the lower end, and the jet air supply pipe is fixed to the inner surface. A compressor (
Connect an air hose etc. (not shown) from the
Air is injected from the jet nozzle 50, and a tamping body 52 is fixed to the lowermost end of the inner casing 5.
この突き固め体52は内ケーシング50の外周側面から
3枚のリブ520を植設し、そのリブ520に短管52
1の内周側面を固定したものである。This tamped body 52 has three ribs 520 implanted from the outer peripheral side of the inner casing 50, and a short pipe 52 is attached to the ribs 520.
The inner peripheral side surface of 1 is fixed.
前記ショツクアブソーバ−6は、第7図に示すように、
前記支柱2の上端に中空状の円筒管60の下端を固定し
、その円筒管60の上端から該円筒管60中に軸部材6
1を昇降自在に挿入し、その軸部材61の下端にスプリ
ング受62を取付け、このスプリング受62と前記円筒
管60との間に圧縮スプリング63を介装し、一方前記
軸部材61の上端に連結部材64を固定し、この連結部
材64上にシーブ65を取付ける。The shock absorber 6, as shown in FIG.
The lower end of a hollow cylindrical tube 60 is fixed to the upper end of the support column 2, and the shaft member 6 is inserted into the cylindrical tube 60 from the upper end of the cylindrical tube 60.
A spring receiver 62 is attached to the lower end of the shaft member 61, and a compression spring 63 is interposed between the spring receiver 62 and the cylindrical tube 60. The connecting member 64 is fixed, and the sheave 65 is mounted on the connecting member 64.
この実施例における本発明の砂杭造成装置は、以上の如
き構成よりなり、以下その施工作業について第8図を参
照して説明する。The sand pile building apparatus of the present invention in this embodiment has the above-mentioned configuration, and its construction work will be explained below with reference to FIG. 8.
(a) まず、本発明の砂杭造成装置をシーブ65を
介してリーダー(図示せず)に吊持し、これを改良する
軟弱地盤Gの所定位置に位置させる。(a) First, the sand pile construction device of the present invention is suspended from a leader (not shown) via the sheave 65, and positioned at a predetermined position on the soft ground G to be improved.
次に、エアバネ4中にエアを圧大してガイドパイプ13
のストッパー74を固定板TOに係合させ、外ケーシン
グ1と起振機3とを一体的に固定し、前記起振機3を作
動させることにより、起振機3の上下方向の強制振動が
外ケーシング1に伝わり、該外ケーシング1(内ケーシ
ング5も含む)が地盤G中に貫入する。Next, the air is compressed in the air spring 4 and the guide pipe 13 is
By engaging the stopper 74 with the fixing plate TO, fixing the outer casing 1 and the exciter 3 integrally, and operating the exciter 3, the forced vibration of the exciter 3 in the vertical direction is caused. It is transmitted to the outer casing 1, and the outer casing 1 (including the inner casing 5) penetrates into the ground G.
このとき、支柱2の途中に設けたショツクアブソーバ−
6は、起振機3からガイドパイプ73、固定板70およ
び支柱2を介して伝播した振動を吸収する。At this time, the shock absorber installed in the middle of the pillar 2
6 absorbs vibrations propagated from the exciter 3 via the guide pipe 73, the fixed plate 70, and the support column 2.
従って、外ケーシング1貫入時中、起振機3の振動がリ
ーダーに伝わるようなことはない。Therefore, while the outer casing 1 is being penetrated, the vibration of the vibrator 3 is not transmitted to the leader.
また、エアバネ4中にエアを圧大して外ケーシング1と
起振機3とを一体にしたとしても、このエアバネ4は完
全なる剛体ではない。Further, even if the air is compressed in the air spring 4 and the outer casing 1 and the exciter 3 are integrated, the air spring 4 is not a completely rigid body.
従って、エアバネ4はケーシング貫入時中常にエアの圧
入抜きによる伸縮以外に伸縮し、このエアバネ4の伸縮
により外ケーシング1が常時上下運動している。Therefore, the air spring 4 always expands and contracts during the penetration of the casing in addition to the expansion and contraction due to the press-in and release of air, and the outer casing 1 is constantly moving up and down due to the expansion and contraction of the air spring 4.
このために、外ケーシング1の先端が固い地盤に当った
としても、外ケーシング1はその上下運動、すなわち動
摩擦により固い地盤を打ち砕いてさらに深く貫入するこ
とができる。Therefore, even if the tip of the outer casing 1 hits hard ground, the outer casing 1 can break through the hard ground and penetrate deeper due to its vertical movement, that is, dynamic friction.
この結果、本発明の砂杭造成装置は、効率良くケーシン
グ等を地磐中に貫入させることができる。As a result, the sand pile construction device of the present invention can efficiently penetrate the casing etc. into the rock.
例えば、同一能力の起振機を直接外ケーシングの頂端に
搭載したものとの貫入能率を比較してみると、本発明の
外ケーシングと起振機との間に長ストロークのエアバネ
を介装した砂杭造成装置の方が約1,5倍程度速くケー
シング等を貫入させることができる。For example, when comparing the penetration efficiency with a vibrator with the same capacity mounted directly on the top of the outer casing, it was found that the long-stroke air spring interposed between the outer casing and the vibrator of the present invention A sand pile making device can penetrate casing etc. about 1.5 times faster.
(b) 外ケーシング1を地盤G中に所定深度まで貫
入させたならば、ホッパ−11より砂を外ケーシング1
中に投入する。(b) Once the outer casing 1 has penetrated into the ground G to a predetermined depth, sand is poured into the outer casing 1 from the hopper 11.
Throw it inside.
(C) それから、エアバネ4からエアを抜いてガイ
ドパイプT3のストッパー14を固定板70より離し、
外ケーシング1と起振機3との縁を切?、外ケーシング
1に起振機3からの振動が伝わらないようにし、内ケー
シング5のみを起振機3により上下動させると共に、エ
アバネ4中にエアをガイドパイプ13のストッパー14
が固定板70に係合しない程度に圧大したり抜いたりし
、内ケーシング5を起振機3による上下動と別個に上下
動させる。(C) Then, remove the air from the air spring 4, release the stopper 14 of the guide pipe T3 from the fixed plate 70,
Cut the connection between outer casing 1 and exciter 3? , while preventing vibrations from the vibrator 3 from being transmitted to the outer casing 1, only the inner casing 5 is moved up and down by the vibrator 3, and air is introduced into the air spring 4 by the stopper 14 of the guide pipe 13.
is compressed or removed to such an extent that it does not engage with the fixed plate 70, and the inner casing 5 is moved up and down separately from the up and down movement by the vibrator 3.
すると、外ケーシング1の周囲の地盤Gが外ケーシング
1により攪拌されずに保護されると共に、外ケーシング
1中の砂が内ケーシング5により突き固められると共に
外ケーシング1の先端から押し出される。Then, the ground G around the outer casing 1 is protected from being stirred by the outer casing 1, and the sand in the outer casing 1 is compacted by the inner casing 5 and pushed out from the tip of the outer casing 1.
このとき、エアバネ4の伸縮昇降ストローク長は従来の
砂杭造成装置のエアバネに比較して極めて長く、シかも
貫入の際に外ケーシング1中に入り込む土砂の高さより
も長いので、上述の(a)の操作により外ケーシング1
を所要深度まで貫入させた際に、軟弱な土砂が外ケーシ
ング1中に入り込んだとしても、その外ケーシング1中
の土砂を内ケーシング5の昇降により外ケーシング1か
ら外へと吐出させることができる。At this time, the telescopic lifting stroke length of the air spring 4 is extremely long compared to the air spring of conventional sand pile construction equipment, and is also longer than the height of the earth and sand that enters the outer casing 1 during penetration. ), the outer casing 1
Even if soft earth and sand enters the outer casing 1 when the earth and sand penetrate to the required depth, the earth and sand in the outer casing 1 can be discharged out from the outer casing 1 by raising and lowering the inner casing 5. .
また、内ケーシング5を長ストローク上下動させること
ができるので、内ケーシング5は外ケーシング1中に締
固めた砂をさ叱十分に突き固めることができ、しかも外
ケーシング1中に締固めた砂を一度に大量に押出すとW
FCき、作業性が向上される。In addition, since the inner casing 5 can be moved up and down over a long stroke, the inner casing 5 can sufficiently tamp down the compacted sand in the outer casing 1, and also If you extrude a large amount at once, W
FC and work efficiency is improved.
そして、内ケーシング5で外ケーシング1中の砂を締め
固めながら、外ケーシング1を徐々に引き抜く。Then, while the sand in the outer casing 1 is being compacted by the inner casing 5, the outer casing 1 is gradually pulled out.
このようにすることにより、砂の出が良く、シかも外ケ
ーシング1の引き抜きを止める必要がないので作業能率
を向上させることができる。By doing this, the sand comes out well and there is no need to stop pulling out the outer casing 1, so the work efficiency can be improved.
また、ジェットノズル50からエアを噴射させれば、砂
が外ケーシング1の先端から押し出され、前記内ケーシ
ング5の押し出し、突き固めと相俟ってさらに強固な砂
杭を早く造或することができる。Furthermore, by injecting air from the jet nozzle 50, the sand is pushed out from the tip of the outer casing 1, and together with the pushing out and tamping of the inner casing 5, a stronger sand pile can be quickly built. can.
また、外ケーシング1が最初のうち容易に引き抜けなか
ったならば、エアバネ4中にエアを圧入して外ケーシン
グ1と起振機3とを一体化して外ケーシング1に振動を
伝えることにより、外ケーシング1の周囲の地盤Gの抵
抗が減少し、外ケーシング1を引き抜くことができる。Furthermore, if the outer casing 1 cannot be pulled out easily at first, air can be press-fitted into the air spring 4 to integrate the outer casing 1 and the vibrator 3 to transmit vibration to the outer casing 1. The resistance of the ground G around the outer casing 1 is reduced, and the outer casing 1 can be pulled out.
そして、外ケーシング1を若干(1〜2m位)引き抜い
たならば、エアバネ4よりエアを抜いて外ケーシング1
と起振機3との縁を切り、内ケーシング5で砂を締め固
めながら外ケーシング1を引き抜く。Then, after pulling out the outer casing 1 a little (about 1 to 2 m), remove the air from the air spring 4 and remove the outer casing 1.
The outer casing 1 is pulled out while compacting the sand with the inner casing 5.
Cd) 上述のようにして軟弱地盤G中に強固な砂杭
が造成される。Cd) Strong sand piles are constructed in the soft ground G as described above.
以上の実施例からも明らかなように、本発明の砂杭造成
装置は、長ストロークのエアバネを用いて内ケーシング
を長ストローク上下させるように構戒したものであるか
ら、貫入の際に土砂が外ケーシング中に入り込んだとし
ても、内ケーシングの昇降によりその外ケーシング中の
土砂を外ケーシングから外に吐出させることができ、従
って砂杭を造成することができる。As is clear from the above examples, the sand pile construction device of the present invention is designed to move the inner casing up and down over a long stroke using a long stroke air spring, so that the sand pile construction device of the present invention is designed to move the inner casing up and down over a long stroke. Even if it gets into the outer casing, the earth and sand in the outer casing can be discharged from the outer casing by raising and lowering the inner casing, and therefore a sand pile can be created.
また内ケーシングの昇降ストロークが長いので、外ケー
シング中の締固めた砂をさらに十分に突き固めることが
でき、しかも外ケーシング中の締固めた砂を一度に大量
に押出すことができ、従って強固な砂杭が得られると共
に、作業性が向上される。In addition, since the inner casing has a long lifting stroke, the compacted sand in the outer casing can be compacted even more thoroughly, and a large amount of compacted sand in the outer casing can be pushed out at once, resulting in a strong Not only can sand piles with high quality be obtained, but also workability is improved.
しかも、装置全体をショツクアブソーバーを介して吊持
したので、外ケーシング等の貫入時における起振機の上
下振動を吸収し、リーダー等に伝わるのを防ぐことがで
きる。Furthermore, since the entire device is suspended via a shock absorber, vertical vibrations of the exciter when penetrating the outer casing etc. can be absorbed and prevented from being transmitted to the reader etc.
さらに、外ケーシングと起振機との間に長ストロークの
エアバネを介装したので、このエアバネのエアの圧入抜
きによる伸縮以外の伸縮により外ケーシングが常時上下
運動し、この外ケーシングの上下運動、すなわち動摩擦
によりケーシング等を非常に効率よく地盤中に貫入させ
ることができる。Furthermore, since a long-stroke air spring is interposed between the outer casing and the exciter, the outer casing constantly moves up and down due to expansion and contraction other than the expansion and contraction caused by press-in and release of air from this air spring. That is, dynamic friction allows the casing etc. to penetrate into the ground very efficiently.
なお、当然のことながら、本発明の砂杭造成装置は上述
の実施例にのみ限定されるものではない。Note that, as a matter of course, the sand pile construction apparatus of the present invention is not limited to the above-mentioned embodiments.
添付図面は本発明の砂杭造成装置の一実施例を示し、第
1図は正面図、第2図および第3図は第1図における■
−■線断面図およびI−1線断面図、第4図はエアバネ
の一部断面図、第5図は第4図における■矢視図、第6
図は第5図における■矢視図、第7図はショツクアブソ
ーバの断面図、第8図a,b,c,dは本発明の砂杭造
或装置の施工作業の説明図である。
1・・・・・・外ケーシング、2・・・・・・支柱、3
・・・・・・起振機、4・・・・・・エアバネ、5・・
・・・・内ケーシング、6・・・・・・ショツクアブソ
ーバー。The attached drawings show an embodiment of the sand pile building apparatus of the present invention, and FIG. 1 is a front view, and FIGS.
-■ line sectional view and I-1 line sectional view, Fig. 4 is a partial sectional view of the air spring, Fig. 5 is a view in the direction of the ■ arrow in Fig. 4,
The drawings are a view taken in the direction of the ■ arrow in FIG. 5, FIG. 7 is a sectional view of the shock absorber, and FIGS. 8a, b, c, and d are explanatory diagrams of the construction work of the sand pile building apparatus of the present invention. 1...Outer casing, 2...Strut, 3
...Exciter, 4...Air spring, 5...
...Inner casing, 6...Shock absorber.
Claims (1)
の支柱に昇降可能に装備した起振機と、その起振機と前
記固定板との間に介装したエアバネと、前記固定板の下
面に上端を固定して垂下させた外ケーシングと、前記起
振機に上端を固定して前記外ケーシング中に垂下させた
内ケーシングと、前記支柱と装置全体を吊持する手段と
の間に介装したショツクアブソーバーとを備え、前記エ
アバネを伸長させて起振機と外ケーシングとを一体にし
、前記起振機を作動させて外ケーシングおよび内ケーシ
ングを地盤中に貫入させ、前記起振機を作動させながら
前記エアバネを伸縮させ、前記外ケーシング中の砂を内
ケーシングにより突き固めると共に押し出しながら外ケ
ーシングおよび内ケーシングを引き抜いて地盤中に砂杭
を造成する砂杭造成装置において、前記エアバネは、前
記起振機に上端板を固定し、一方前記固定板に下端板を
固定し、その上端板と下端との間に1枚もしくは複数枚
の中間板を配設し、前記上端板の下面と中間板の上面と
の間、前記下端板の上面と中間板の下面との間もしくは
中間板と中間板との間にベローズを、伸縮可能にかつ気
密に介装し、前記中間板のべローズより内側の箇所にエ
ア流通用の透孔を設けると共に、前記上下両端板および
ベローズに囲まれたエア室内をエア供給部に連通させて
なるもので、前記エア室内にエアを供給したり抜いたり
することにより、前記エアバネが伸縮して前記内ケーシ
ングが長ストローク昇降できるように構成したことを特
徴とする砂杭造成装置。1. A fixed plate, a column installed on the upper surface of the fixed plate, an exciter mounted on the prop so that it can be raised and lowered, an air spring interposed between the exciter and the fixed plate, and the fixed plate. an outer casing whose upper end is fixed to the lower surface of the plate and suspended; an inner casing whose upper end is fixed to the vibrator and suspended within the outer casing; and means for suspending the support and the entire apparatus. a shock absorber interposed therebetween; the air spring is extended to integrate the exciter and the outer casing; the exciter is operated to penetrate the outer casing and the inner casing into the ground; In the sand pile construction device, the air spring is expanded and contracted while operating a vibrator, and the sand in the outer casing is tamped and pushed out by the inner casing while pulling out the outer casing and the inner casing to create a sand pile in the ground. The air spring has an upper end plate fixed to the vibration exciter, a lower end plate fixed to the fixed plate, one or more intermediate plates arranged between the upper end plate and the lower end, and the upper end plate fixed to the fixed plate. A bellows is extendably and airtightly interposed between the lower surface and the upper surface of the intermediate plate, between the upper surface of the lower end plate and the lower surface of the intermediate plate, or between the intermediate plates, and A through hole for air circulation is provided inside the bellows, and an air chamber surrounded by the upper and lower end plates and the bellows is communicated with an air supply section, and air is supplied into the air chamber. A sand pile making device characterized in that the air spring is expanded and contracted by dipping and pulling, so that the inner casing can be raised and lowered over a long stroke.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP55119714A JPS5836123B2 (en) | 1980-09-01 | 1980-09-01 | sand pile creation equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP55119714A JPS5836123B2 (en) | 1980-09-01 | 1980-09-01 | sand pile creation equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5748012A JPS5748012A (en) | 1982-03-19 |
| JPS5836123B2 true JPS5836123B2 (en) | 1983-08-06 |
Family
ID=14768286
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP55119714A Expired JPS5836123B2 (en) | 1980-09-01 | 1980-09-01 | sand pile creation equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5836123B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0633442A (en) * | 1992-03-17 | 1994-02-08 | Nakatomi Kurimoto | Sand pile building equipment |
| JP4838940B2 (en) * | 2001-02-23 | 2011-12-14 | ユニタック株式会社 | Reamer |
-
1980
- 1980-09-01 JP JP55119714A patent/JPS5836123B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5748012A (en) | 1982-03-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4426175A (en) | Method of and apparatus for reinforcing piling structure and improved precast concrete pile suitable for use in said method | |
| KR20100101568A (en) | Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix | |
| JP2006509136A (en) | Method for building a peer in soil and a peer structure | |
| US4634316A (en) | Compacted deep foundation structure, method of and apparatus for building the same | |
| KR20080005424A (en) | Mandrel with slot for lateral displacement peers and method of use | |
| US4152089A (en) | Method and apparatus for forming a cast-in-place support column | |
| US20160177528A1 (en) | Method and Apparatus for Ground Improvement Using Compacted Aggregate Columns | |
| JPS5836123B2 (en) | sand pile creation equipment | |
| US2507259A (en) | Pile | |
| JPS61500365A (en) | A method for reinforcing the ground by providing a foundation and/or by laying a compensating foundation | |
| CN110359447B (en) | Pipe column | |
| KR101951684B1 (en) | Expandable cast-in-place pile construction method | |
| JP3480914B2 (en) | Sand and sand-like granular material introduction device | |
| JP2782034B2 (en) | Ground consolidation strengthening method | |
| CN117605023B (en) | Bored pile construction device and construction method thereof | |
| JPS586011B2 (en) | sand pile creation equipment | |
| JPH0251005B2 (en) | ||
| JP2747664B2 (en) | Ground compaction device using granular pile columns | |
| JPH04363410A (en) | Vibration compaction work method | |
| KR20200137907A (en) | Partially expanding apparatus for underground pipe and composite cast in place pile method using the same | |
| JPS5833329B2 (en) | sand pile creation equipment | |
| JPS5876611A (en) | Multistage pushing-in pile and pushing-in method | |
| JPS5894513A (en) | Constructing device for sand pile | |
| JP2024048982A (en) | How to remove existing piles | |
| JP2000054364A (en) | Drain column creating method and equipment |