Switch

Info

Publication number
JPS5836684B2
JPS5836684B2 JP50129068A JP12906875A JPS5836684B2 JP S5836684 B2 JPS5836684 B2 JP S5836684B2 JP 50129068 A JP50129068 A JP 50129068A JP 12906875 A JP12906875 A JP 12906875A JP S5836684 B2 JPS5836684 B2 JP S5836684B2
Authority
JP
Japan
Prior art keywords
well
formwork
cylindrical
water stop
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP50129068A
Other languages
Japanese (ja)
Other versions
JPS5252448A (en
Inventor
政治 岩沙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Hume Corp
Original Assignee
Nippon Hume Pipe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Hume Pipe Co Ltd filed Critical Nippon Hume Pipe Co Ltd
Priority to JP50129068A priority Critical patent/JPS5836684B2/en
Publication of JPS5252448A publication Critical patent/JPS5252448A/en
Publication of JPS5836684B2 publication Critical patent/JPS5836684B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】 本発明は水中における橋脚の構築方法に関するものであ
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing a bridge pier underwater.

従来の水中における橋脚の構築方法では鋼矢板などによ
る締切工により、または築島などによつて流水が作業現
場に流入するのを防止している。
In conventional methods of constructing bridge piers underwater, running water is prevented from flowing into the work site by cofferdams made of steel sheet piles or by built-in islands.

第1図は上記締切工による従来の構築方法を示したもの
である。
FIG. 1 shows a conventional construction method using the above-mentioned cofferdam.

この方法は、まず鋼矢板aなどで締切工を行ない、その
囲堰内で基礎用ウエルbおよび橋脚基部用ウエルCを沈
設し、該基部用ウエルCの底部に蓋dをしかつ橋脚の型
枠e(図示せず)を組み、それらによって形成された中
空部にコンクリートを打設し、コンクリートが固化した
後に脱型し、さらに上記鋼矢板aを撤去するものである
In this method, a cofferdam is first constructed using steel sheet piles a, etc., a foundation well b and a pier base well C are sunk inside the weir, a lid d is placed on the bottom of the base well C, and the pier shape is A frame e (not shown) is assembled, concrete is poured into the hollow space formed by the frame e, and after the concrete has solidified, it is demolded, and the steel sheet pile a is removed.

本発明は上記従来方法における鋼矢板などによる締切工
およびその撤去作業をなくシ、さらに型枠の組付け、取
外しをなくシ、もって工期の短縮、工事費の節減をはか
った水中における橋脚の構築方法を提供するものであり
、その特徴とするところは、基礎用ウエル、橋脚基部用
ウエル、円筒形型枠および止水用ウエルを順次沈設し、
さらに上記止水用ウエル内の上記円筒形型枠上に型枠用
円筒コンクリート管を配設し、それらによって形成され
た中空部に鉄筋を配してコンクリートを打設し、次いで
上記止水用ウエルを撤去することにある。
The present invention eliminates the cofferdam using steel sheet piles and the like and its removal in the conventional method, and also eliminates the assembly and removal of formwork, thereby shortening the construction period and construction costs for constructing underwater bridge piers. The method is characterized by: sequentially depositing a foundation well, a pier base well, a cylindrical formwork, and a water stop well;
Furthermore, a cylindrical concrete pipe for formwork is placed on the cylindrical formwork in the water stop well, reinforcing bars are placed in the hollow space formed by the pipes, and concrete is poured, and then concrete is poured into the hollow part formed by the pipes. The purpose is to remove the well.

以下図面に示した実施例を参照しながら本発明を説明す
る。
The present invention will be described below with reference to embodiments shown in the drawings.

本発明に係る水中における橋脚の構築方法は、第2図に
示したようにまず基礎用ウエル1、続いて橋脚基部用ウ
エル2、円筒形型枠3および止水用ウエル4を順次沈設
する。
In the underwater construction method of a pier according to the present invention, as shown in FIG. 2, first, a foundation well 1, then a pier base well 2, a cylindrical formwork 3, and a water stop well 4 are sequentially deposited.

上記工程において、図示していないが、各部材間にゴム
パッキンなどを配設して止水を充分に行なう。
In the above steps, although not shown, a rubber packing or the like is provided between each member to sufficiently shut off water.

また基礎用ウエル1および橋脚基部用ウエル2にはPC
鋼棒5を挿貫し、それらの部材にブレストレツシングを
施し、PC鋼棒5の上部を円筒形型枠3内で定着する。
In addition, PC is installed in foundation well 1 and pier base well 2.
The steel rod 5 is inserted, those members are subjected to breast stressing, and the upper part of the PC steel rod 5 is fixed within the cylindrical formwork 3.

さらにまた止水用ウェル4には各ウエル4間を強固に圧
着するための鋼棒6を挿貫し、その下端を円筒形型枠3
内で袋ナット7等によって定着している。
Furthermore, a steel rod 6 is inserted into the water stop well 4 for firmly crimping between the wells 4, and its lower end is inserted into the cylindrical formwork 3.
It is fixed inside with a cap nut 7 or the like.

なお、図において8は定着用ナット、9はカブラーであ
る。
In the figure, 8 is a fixing nut and 9 is a coupler.

次いで、上記止水用ウエル4によって形威される中空部
4′において上記円筒形型枠3の上に型枠用円筒コンク
リート管10を配設する。
Next, a cylindrical concrete pipe 10 for formwork is placed above the cylindrical formwork 3 in the hollow portion 4' formed by the water stop well 4.

型枠用円筒コンクリート管10は、円筒形型枠3の通し
孔12′とほぼ同軸的に配設する。
The cylindrical concrete pipe 10 for formwork is arranged substantially coaxially with the through hole 12' of the cylindrical formwork 3.

このようにして型枠用円筒コンクリート管10を配設す
るとともに上記橋脚基部用ウエル2の底部に蓋11をし
、これらによって形成される中空部12(図において斜
線部)に鉄筋(図示せず)を配してコンクリートを打設
する。
In this way, the cylindrical concrete pipe 10 for the formwork is arranged, a lid 11 is placed on the bottom of the well 2 for the pier base, and a reinforcing bar (not shown) is placed in the hollow part 12 (shaded part in the figure) formed by these. ) and pour concrete.

ここで橋脚基部用ウエル2は内部に段13を設け、この
段に蓋11を載置するようにしている。
Here, the pier base well 2 is provided with a step 13 inside, and the lid 11 is placed on this step.

また円筒形型枠3は金属製で橋脚の基部の主要部を成形
するためのものであり、上記通し孔12′の周囲上面に
上記型枠用円筒コンクリート管10の載置部12“を備
える。
The cylindrical formwork 3 is made of metal and is used to form the main part of the base of the pier, and is provided with a mounting part 12'' for the formwork cylindrical concrete pipe 10 on the upper surface around the through hole 12'. .

型枠用円筒コンクリート管10は、ヒューム管を順次連
結し、その肉厚部に挿貫したPC鋼棒14を緊張して管
10にブレストレツシングを施す。
The cylindrical concrete pipe 10 for formwork is made by sequentially connecting Hume pipes, and applying tension to the pipe 10 by tensioning a PC steel rod 14 inserted into the thick part of the Hume pipe.

なお図において15は定着ナット、16はカブラーであ
る。
In the figure, 15 is a fixing nut, and 16 is a coupler.

次いで鋼棒6を回転して袋ナット7から外して止水用ウ
エル4を撤去し、作業は完了する。
Next, the steel rod 6 is rotated and removed from the cap nut 7, and the water stop well 4 is removed, completing the work.

施工後、型枠用円筒コンクリート管10は、橋脚の一部
を構成することとなる。
After construction, the cylindrical concrete pipe 10 for formwork will constitute a part of the bridge pier.

本発明に係る橋脚の構築方法は、上記のように締切工お
よびその撤去並びに型枠の組付けおよびその取外し作業
がないので工期の短縮、工事費の節減に極めて効を奏す
る。
The method for constructing a bridge pier according to the present invention is extremely effective in shortening the construction period and reducing construction costs because there is no need for cofferdams and their removal, and formwork assembly and removal as described above.

また上記止水用ウエルは、上方から単に積み重ねられて
行くだけであり、引き上げも容易なので、傷みが少なく
再利用が可能である。
Furthermore, the water stop wells are simply stacked from above and can be easily pulled up, so they are less likely to be damaged and can be reused.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は従来工法を示した縦断面図、第2図は本発明に
係る橋脚の構築方法を示した縦断面図である。 1・・・・・・基礎用ウエル、2・・・・・・橋脚基部
用ウエル、3・・・・・・円筒形型枠、4・・・・・・
止水用ウエル、11・・・・・・蓋、12・・・・・・
中空部。
FIG. 1 is a longitudinal sectional view showing a conventional construction method, and FIG. 2 is a longitudinal sectional view showing a method of constructing a bridge pier according to the present invention. 1... Well for foundation, 2... Well for pier base, 3... Cylindrical formwork, 4...
Water stop well, 11... Lid, 12...
Hollow part.

Claims (1)

【特許請求の範囲】[Claims] 1 基礎ウエル、橋脚基部用ウエル、円筒形型枠および
止水用ウエルをこれら各部材間に止水工事を施しつつ順
次に沈設し、上記止水用ウエルを上記円筒形型枠の上面
にボルト、ナットによって固定する工程と、上記橋脚基
部用ウエルの底部に蓋をし、上記沈設した止水用ウエル
によって形成される中空部において上記円筒形型枠の上
面に設けた載置部に該円筒形型枠の上面の通し孔とほぼ
同軸的に型枠用円筒コンクリート管を配設する工程と、
型枠用円筒コンクリート管、円筒形型枠および橋脚基部
用ウエル内に形成された中空部に鉄筋を配してコンクリ
ートを打設する工程と、次いで上記止水用ウエルを撤去
する工程とを順次に行なうことを特徴とする水中におけ
る橋脚の構築方法。
1. Sink the foundation well, pier base well, cylindrical formwork, and water stop well in sequence while performing water stop work between these parts, and bolt the water stop well to the top surface of the cylindrical formwork. , a step of fixing with a nut, and placing a lid on the bottom of the pier base well, and placing the cylindrical cylinder on a mounting part provided on the top surface of the cylindrical form in the hollow part formed by the sunken water stop well. A step of arranging a cylindrical concrete pipe for the formwork almost coaxially with the through hole on the top surface of the formwork;
The process of placing reinforcing bars in the hollow parts formed in the cylindrical concrete pipe for formwork, the cylindrical formwork, and the well for the pier base and pouring concrete, followed by the process of removing the water stop well, are carried out sequentially. A method for constructing a bridge pier underwater, characterized by the following steps:
JP50129068A 1975-10-27 1975-10-27 Switch Expired JPS5836684B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP50129068A JPS5836684B2 (en) 1975-10-27 1975-10-27 Switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP50129068A JPS5836684B2 (en) 1975-10-27 1975-10-27 Switch

Publications (2)

Publication Number Publication Date
JPS5252448A JPS5252448A (en) 1977-04-27
JPS5836684B2 true JPS5836684B2 (en) 1983-08-11

Family

ID=15000279

Family Applications (1)

Application Number Title Priority Date Filing Date
JP50129068A Expired JPS5836684B2 (en) 1975-10-27 1975-10-27 Switch

Country Status (1)

Country Link
JP (1) JPS5836684B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5559205A (en) * 1978-10-26 1980-05-02 Nippon Hume Pipe Method of building bridge pier

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5416646B2 (en) * 1973-04-25 1979-06-23

Also Published As

Publication number Publication date
JPS5252448A (en) 1977-04-27

Similar Documents

Publication Publication Date Title
US3726950A (en) Method for producing sub-aqueous and other cast-in-place concrete structures in situ
US4571124A (en) Method of forming cast-in-place concrete pile
JP3245817B2 (en) Submerged box connection method
JPS5836684B2 (en) Switch
CN116145540B (en) A precast reinforced concrete cover slab and its construction method
JPH06228915A (en) Posts such as viaducts and construction methods
CN217460274U (en) A dismantling-free prefabricated formwork for bridge pier tie beam construction
JP4479099B2 (en) Building foundation construction method
JPH0930487A (en) Artificial island having half-floating structure
JPS5837223A (en) Constructing method for cast-in-place concrete pile
CN115573253A (en) A construction method for bridge vase piers in deep foundation pits
JP2755888B2 (en) Abutment
CN113322842B (en) Construction method for double-hole box culvert wall communicated open-hole template
JP3332595B2 (en) How to make a caisson bottom plate
JPH1171718A (en) Reinforcement method of underwater part of existing pier
SU1622527A1 (en) Method of erecting pile
CN223838578U (en) Hole die free of bar planting
CN110258576A (en) Construction method of foundation pit enclosure support system
JPH0711620A (en) Construction method of artificial ground
JPH10231517A (en) Method and apparatus for removing pile head concrete from concrete filled steel pipe pile
JPH0320548B2 (en)
JP2936130B2 (en) Construction method of steel frame concrete structure
JPH04297615A (en) How to construct a caisson bottom plate
JPH0533628Y2 (en)
JP3637506B2 (en) Concrete underwater structure construction method