JPS5851104B2 - Stair construction method and support device - Google Patents
[go: Go Back, main page]

JPS5851104B2 - Stair construction method and support device - Google Patents

Stair construction method and support device

Info

Publication number
JPS5851104B2
JPS5851104B2 JP53150190A JP15019078A JPS5851104B2 JP S5851104 B2 JPS5851104 B2 JP S5851104B2 JP 53150190 A JP53150190 A JP 53150190A JP 15019078 A JP15019078 A JP 15019078A JP S5851104 B2 JPS5851104 B2 JP S5851104B2
Authority
JP
Japan
Prior art keywords
floor
stairs
staircase
support
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP53150190A
Other languages
Japanese (ja)
Other versions
JPS5578755A (en
Inventor
精文 横森
肇 小泉
繁幸 秋浜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Yokomori Manufacturing Co Ltd
Original Assignee
Kajima Corp
Yokomori Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Yokomori Manufacturing Co Ltd filed Critical Kajima Corp
Priority to JP53150190A priority Critical patent/JPS5851104B2/en
Publication of JPS5578755A publication Critical patent/JPS5578755A/en
Publication of JPS5851104B2 publication Critical patent/JPS5851104B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Description

【発明の詳細な説明】 この発明は既製の階段をコンクリート建造物内へ設置す
ることを目的とした階段構築方法および支持装置に関す
るものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing a staircase and a support device for installing a ready-made staircase into a concrete building.

従来コンクリート建造物内の階段は殆んど現場打設コン
クリートによって構築されているので、踏板部の型枠を
構成するのに特殊技術を要するのみならず、熟練技術者
でなげれば精度の高い製品を得ることはむづかしく、か
つコンクリートの硬化をまたなげれば通路として使用し
得ないなど、工期短縮の隘路となっていたのである。
Conventionally, most of the stairs in concrete buildings are constructed using concrete cast on site, so constructing the formwork for the treads not only requires special techniques, but also requires highly accurate construction by skilled engineers. It was difficult to obtain the finished product, and once the concrete had hardened, it could not be used as a passageway, creating a bottleneck in shortening the construction period.

然るにこの発明によれば、既製の階段をフロアと踊場お
よび踊場とフロア間に仮設し、フロア等を構築後順次上
部階へ施工することができるので、階段に対する型枠が
不用となったのみならず、施工後短期に使用開始が可能
となり、かつ階段自体は工場生産で高精度かつ多量生産
が可能となり、現場では特殊技術者に依存することなく
仮設構築できるなど前記従来の問題点を悉く改善したの
である。
However, according to this invention, ready-made stairs can be temporarily installed between the floor and the landing, and between the landing and the floor, and can be constructed sequentially to the upper floors after the floors, etc. are constructed. First, it is possible to start using it in a short period of time after construction, and the stairs themselves can be manufactured in factories with high precision and mass production, and temporary construction can be performed on site without relying on special engineers, all of the problems of the conventional method have been improved. That's what I did.

即ちこの発明を実施例について説明すれば、一階のフロ
ア1上へ二本の支柱2,3を所定間隔で垂直に設置し、
支柱2には踊場4とはg同一高さにブラケット5を嵌装
して固定し、支柱3には二階フロア6とはg同一高さに
ブラケット7を嵌装固定する。
That is, to explain this invention with reference to an embodiment, two pillars 2 and 3 are vertically installed on the first floor 1 at a predetermined interval,
A bracket 5 is fitted and fixed to the column 2 at the same height as the landing 4, and a bracket 7 is fitted and fixed to the column 3 at the same height as the second floor 6.

前記ブラケット5,7は同一構造であるから、以下ブラ
ケット5について説明すると、ブラケット5は締付ボル
ト8、支柱への嵌装部材9および支柱と当接する為の蓋
部材10からなり、蓋部材10の下端に設けた水平鍔1
1に調節ボルト12を螺合し、調節ボルト12は支柱2
に固定した支持盤13上へ当接して高さの微調整ができ
るようにしである。
Since the brackets 5 and 7 have the same structure, the bracket 5 will be explained below. The bracket 5 consists of a tightening bolt 8, a member 9 for fitting onto the support, and a cover member 10 for contacting the support. Horizontal collar 1 installed at the lower end of
1, and the adjusting bolt 12 is screwed onto the support column 2.
The height can be finely adjusted by coming into contact with a support plate 13 fixed to the top.

前記支持盤13は一側上部に支承板14を有し、他側は
掛止杆15を側板16と支柱2の掛止孔17とへ貫通し
て固定する。
The support plate 13 has a support plate 14 at the upper part of one side, and a locking rod 15 is passed through the side plate 16 and the locking hole 17 of the support column 2 on the other side and fixed thereto.

前記ブラケット5,7の上部には支持杆18.19をボ
ルト26で水平に固着しである。
Support rods 18 and 19 are horizontally fixed to the upper portions of the brackets 5 and 7 with bolts 26.

そこで、前記支持杆18,19へ既製の階段20,21
の上端を懸架し、階段20の下端はフロア1上へ固着し
、階段21の下端は支持杆18上へ支持固定させる。
Therefore, ready-made stairs 20, 21 are attached to the support rods 18, 19.
The upper end of the staircase 20 is suspended, the lower end of the staircase 20 is fixed on the floor 1, and the lower end of the staircase 21 is supported and fixed on the support rod 18.

また階段20の上端部および階段21の上下端部にはア
ンカー鉄筋22,23を踊場4又は2階フロア6側へ水
平に突設し、踊場4又は2階フロア6の鉄筋(図示して
ない)と共にコンクリート24.25内へ埋設する。
In addition, anchor reinforcing bars 22 and 23 are provided at the upper end of the staircase 20 and the upper and lower ends of the staircase 21 to protrude horizontally toward the landing 4 or the second floor 6. ) in concrete 24.25.

このようにしてコンク!J−)24.25が成程度硬化
すれば、2階までの階段の構築を終り、各フロアと階段
とを同時に構築して、逐次上部階に移るのであるが、フ
ロアの型枠の撤去前にも構築済の階段を使用することが
できるので、建設作業上きわめて便利であり、工期も短
縮することができる。
Conch like this! J-) When 24.25 has hardened to a certain degree, the construction of the stairs to the second floor will be completed, and each floor and staircase will be constructed at the same time, and the next step will be to move to the upper floors, but before the floor formwork is removed. Since it is possible to use already constructed stairs, it is extremely convenient for construction work, and the construction period can also be shortened.

またこの発明の支柱に取付けたブラケットには昇降量微
調整装置が取付けであるので、階段架設時の精度を一層
向上することができる。
In addition, since a lifting amount fine adjustment device is attached to the bracket attached to the column of the present invention, the accuracy when constructing the stairs can be further improved.

前記ブラケット5,7に支持杆18,19を固定する構
造は色々考えられるが、この実施例においては、ブラケ
ットの蓋部材10の上部にL状の段部27を設け、この
段部27に支持杆18,19を載置し、ボルト26で固
定しである。
Various structures are possible for fixing the support rods 18 and 19 to the brackets 5 and 7, but in this embodiment, an L-shaped step 27 is provided at the top of the lid member 10 of the bracket, and the support rods 18 and 19 are provided on this step 27. The rods 18 and 19 are placed and fixed with bolts 26.

前記支柱2,3は階段構築後取外すことができるので、
構築用機材として再使用し得ることは勿論であり、その
取外しに際し、各部がボルトによって組立固定されてい
るので、能率よく小容積に解体することができる。
Since the pillars 2 and 3 can be removed after the staircase is constructed,
Of course, it can be reused as construction equipment, and when it is removed, it can be efficiently disassembled into a small volume because each part is assembled and fixed with bolts.

次に階段上端部の支持高さを調節するには、支柱上の所
定高さに支持盤13を嵌め、その側板16と掛止孔17
へ掛止杆15を貫通して支持盤13を固定する。
Next, to adjust the support height of the upper end of the stairs, fit the support plate 13 at a predetermined height on the column, and connect the side plate 16 and the latching hole 17.
The support plate 13 is fixed by passing through the hooking rod 15.

ついでブラケット5,7の締付ボルト8を弛めてから、
調節ボルト12を回転し、その下端を前記支持盤13の
支承板14上へ当接すると共に、ブラケット5,7で支
承されている支持杆18゜19の高さを見乍ら前記調節
ボルト12を回転すれば、ブラケットは支承板14の上
面に対し、調節ボルト120回転方向および回転量に応
じて第4図中矢示28のように昇降する。
Next, after loosening the tightening bolts 8 of the brackets 5 and 7,
Rotate the adjustment bolt 12 so that its lower end touches the support plate 14 of the support plate 13, and while checking the height of the support rods 18 and 19 supported by the brackets 5 and 7, tighten the adjustment bolt 12. When rotated, the bracket moves up and down relative to the upper surface of the support plate 14 as shown by arrow 28 in FIG. 4, depending on the direction and amount of rotation of the adjustment bolt 120.

このようにして階段の上端部が設計高さに正確に支承さ
れたならば、締付ボルト8を緊締し、ブラケットを支柱
へ固定する。
Once the upper end of the staircase has been correctly supported at the design height in this manner, the tightening bolt 8 is tightened to fix the bracket to the support column.

換言すれば、ブラケット5,70大凡の高さは支持盤1
3の高さで決め、掛止孔の間隔内に入る微小高さは調節
ボルトで調節するので、結局階段をきわめて高精度に架
設することができる。
In other words, the approximate height of the brackets 5 and 70 is the support plate 1.
Since the height is determined by the height of step 3 and the minute height that falls within the interval between the locking holes is adjusted using the adjustment bolt, it is possible to construct the stairs with extremely high precision.

前記施工例における階段20,21は、さ工ら桁29,
30に踏板31,32を順次固定して構成してあり、か
つ高強度コンクリート製踏板を用いたが、さ工ら桁およ
び踏板の材質、形状又は階段自体の形状構造に関係な(
、この発明の方法を実施し得ることは勿論である。
The stairs 20 and 21 in the construction example have a spiral girder 29,
Although treads 31 and 32 are fixed in sequence to 30, and treads made of high-strength concrete are used, there are no problems with the material and shape of the girders and treads, or the shape and structure of the staircase itself.
, it goes without saying that the method of this invention can be implemented.

また支柱についても施工例の材質構造に限定されるもの
でなく、要は階段の仮架設に際し、堅固確実に支承し得
ると共に、組立て解体できるものであれば同様に使用す
ることができる。
Further, the support columns are not limited to the material structure shown in the construction example, but any material that can be firmly and reliably supported during the temporary erection of the stairs and can be assembled and dismantled can be used in the same manner.

次に支柱2,3は所定長さの規格物を用い、必要に応じ
て連結使用するのであるが、第7図によりその一例を説
明する。
Next, the pillars 2 and 3 are made of standard materials having a predetermined length, and are connected to each other as necessary. An example of this will be explained with reference to FIG. 7.

即ち下部支柱2の上端に、平面コ字状の継手33.33
aの下半分を向き合わせて嵌装すると共に、上部支柱2
aの下端を挿入し、ボルト34゜34aを貫通して締付
固定する。
That is, at the upper end of the lower support 2, there is a U-shaped joint 33.
At the same time as fitting the lower halves of a to face each other,
Insert the lower end of a, pass through the bolts 34 and 34a, and tighten and secure.

この場合にポル)34,34aは支柱2,2aの掛止孔
17゜17aに夫々挿通し得るように、継手33 、3
3aにはボルト孔35,35aが穿設してあり、かつ継
手33.33aの内側中央部にはストッパー36.36
aが横設しである。
In this case, the joints 33, 34a are inserted into the locking holes 17°17a of the columns 2, 2a, respectively.
Bolt holes 35, 35a are drilled in 3a, and a stopper 36.36 is provided at the center inside the joint 33.33a.
A is installed horizontally.

従って上下部支柱の夫々の端部はストッパーを挟んで対
向することになる。
Therefore, the respective ends of the upper and lower supports are opposed to each other with the stopper in between.

次に第9図および第10図はさ工ら桁37と踏板38の
他の取付構造を示すものである。
Next, FIGS. 9 and 10 show other mounting structures for the cross beam 37 and the footboard 38.

即ちさ工ら桁37.37aの内側下部に1状ブラケツト
39.39aを植込ボルト40,40aによって締付固
定し、踏板38の下面に埋設したナツト41へ前記ブラ
ケツ)39.39aを貫通した取付ボルト42を螺合し
たものである。
That is, a one-shaped bracket 39.39a was tightened and fixed to the inner lower part of the spiral girder 37.37a using stud bolts 40, 40a, and a nut 41 embedded in the lower surface of the footboard 38 was passed through the bracket 39.39a. A mounting bolt 42 is screwed together.

このような構造によれば、取付ボルト42を螺脱するこ
とによって踏板を一個宛取外すことができると共に、さ
工ら桁の外側で作業したり、さSら桁と壁との間へ手を
入れたりする必要がないので、きわめて狭い場所であっ
ても踏板の取付作業を容易に行うことができると共に、
任意の踏板を取換えることも可能である。
With this structure, the treads can be removed one by one by unscrewing the mounting bolts 42, and it is also possible to work on the outside of the stringer or to put your hand between the stringer and the wall. Since there is no need to insert the tread, it is easy to install the tread even in extremely narrow spaces, and
It is also possible to replace any tread.

前記実施例においては、下部フロアと踊場および踊場と
上部フロア間へ階段を構築する場合について説明したが
、下部フロアと上部フロアとへ(即ち中間に踊場を設け
ることなく)一つの階段を斜設する場合においても同様
の工法を採用することができる。
In the above embodiment, a case was explained in which stairs were constructed between the lower floor and the landing, and between the landing and the upper floor. Similar construction methods can also be used in cases where

即ちこの発明によれば、階段構築場所に所定間隔で支柱
を植設し、この支柱に既設の階段を仮架設し、この階段
とフロア又は踊場とを一体的に構築して完成させるので
、階段の現場構築に伴う型枠設置およびコンクリート打
設等に高度の技術を必要とせず、高精度の階段を通常の
作業者で能率よく構築し得ると共に、フロア等のコンク
リート型枠撤去前にも作業上の必要に応じ階段を使用す
ることができるので、工期を著しく短縮し得る効果があ
る。
That is, according to the present invention, supports are planted at predetermined intervals at a staircase construction site, existing stairs are temporarily constructed on these supports, and the stairs and the floor or landing are integrally constructed and completed. High-precision stairs can be efficiently constructed by ordinary workers without the need for advanced technology for formwork installation and concrete pouring associated with on-site construction. Since stairs can be used as needed, the construction period can be significantly shortened.

また階段は工場で多量生産できる為に、比較的廉価に所
望寸法、精度および構造のものを容易に供給できる利点
があり、構築作業上専門職を必要としない既製品を供給
し得るので、構築日程上の制限が大幅に緩和される効果
もある。
In addition, because stairs can be mass-produced in factories, they have the advantage of being able to easily supply the desired dimensions, precision, and structure at a relatively low cost. It also has the effect of significantly easing restrictions on schedules.

また支持装置は分解組立容易かつ支承高さの微調整が可
能であり、作業の能率化と構築精度の向上を容易にする
効果があり、構築後取外すことによって何度でも使用す
ることができる。
Furthermore, the support device is easy to disassemble and reassemble, and the support height can be finely adjusted, making it easier to improve work efficiency and construction accuracy, and by removing it after construction, it can be used any number of times.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明により構築する階段の中間工程におけ
る一部正面図、第2図は同じく一部側面図、第3図は同
じく一部平面図、第4図は同じくブラケットと支柱との
固定部の・一部拡大正面図、第5図は同じく正面図、第
6図は同じく一部切断平面図、第7図は同じく支柱接続
部の一部断面拡大図、第8図は同じく継手の拡大斜視図
、第9図は同じくさ工ら桁と踏板の固定状態を示す一部
断面拡大正面図、第10図は同じく一部断面拡大側面図
である。 1・・・フロア、2,3・・・支柱、4・・・踊場、5
,7・・・ブラケット、8・・・締付ボルト、9・・・
嵌装部材、10・・・蓋部材、11・・・水平鍔、12
・・・調節ボルト、13・・・支持盤、14・・・支承
板、15・・・掛止杆、16・・・側板、17・・・掛
止孔、18.19・・・支持杆、20.21・・・階段
、22.23・・・アイカー鉄筋、24.25・・・コ
ンクリート、27・・・段部、26・・・ボルト、28
・・・矢示、29,30・・・さ〜ら桁、31 、32
・・・踏板、33.33a・・・継手、34゜34a・
・・ボルト、35.35a・・・ボルト孔、36゜36
a・・・ストッパー、37.37a・・・さSら桁、3
8・・・踏板、39.39a・・・1状ブラケツト、4
0.40a・・・植込ボルト、41・・・ナツト、42
・・・取付ボルト。
Fig. 1 is a partial front view of a staircase constructed according to the present invention at an intermediate stage, Fig. 2 is a partial side view, Fig. 3 is a partial plan view, and Fig. 4 is a partial front view of the staircase constructed according to the present invention. FIG. 5 is a front view, FIG. 6 is a partially cutaway plan view, FIG. 7 is an enlarged partial cross-sectional view of the strut connection, and FIG. 8 is a partially enlarged front view of the joint. FIG. 9 is an enlarged partially sectional front view showing the fixed state of the treadle and the step board, and FIG. 10 is an enlarged partially sectional side view. 1... Floor, 2, 3... Support, 4... Landing, 5
, 7...Bracket, 8...Tightening bolt, 9...
Fitting member, 10... Lid member, 11... Horizontal collar, 12
... Adjustment bolt, 13... Support plate, 14... Support plate, 15... Latching rod, 16... Side plate, 17... Latching hole, 18.19... Support rod , 20.21... Stairs, 22.23... Eicher reinforcing bars, 24.25... Concrete, 27... Steps, 26... Bolts, 28
...Arrow, 29, 30...Saa-ra digit, 31, 32
...Treadboard, 33.33a...Joint, 34°34a.
...Bolt, 35.35a...Bolt hole, 36°36
a...Stopper, 37.37a...S stringer, 3
8...Treadboard, 39.39a...1-shaped bracket, 4
0.40a...Built bolt, 41...Nut, 42
···Mounting bolts.

Claims (1)

【特許請求の範囲】 1 階段を設置すべき一階のフロア上へ二本の支柱を所
定間隔で垂直に設置し、前記支柱に一階フロアと二階フ
ロアの中間になる踊場の位置へ階段仮設用支持杆を設け
ると共に、二階フロアとほぼ同一高さに階段仮設用支持
杆を設け、前記−階フロアと踊場位置の支持杆との間お
よび踊場位置の支持杆と二階フロアの支持杆との間へ既
製階段を夫々傾斜して仮設した後、前記踊場および二階
フロアにコンクリートを打設して、前記階段と踊場およ
び二階フロアとを一体的に連結し、前記操作を繰り返し
て必要階までを構築し、然る後支柱その他の階段支持物
を撤去することを特徴とした階段構築方法。 2 既製階段はさ工ら桁と踏板とを組み立て工構成する
ことを特徴とする特許請求の範囲第1項記載の階段構築
方法。 3 階段の端部に固着したアンカー鉄筋を踊場又はフロ
アのコンクリート内に埋設し、コンクリートを硬化する
ことを特徴とする特許請求の範囲第1項記載の階段構築
方法。 4 下端にフロアとの固着部を設けた二本の支柱に多数
の掛止孔を縦に並列穿設し、前記支柱にブラケットを昇
降調節自在に取付け、前記支柱に固定した支持盤と、前
記ブラケットに螺合した調整ボルトによりブラケットの
昇降量微調整装置を構成し前記ブラケットに階段仮設用
の支持杆を水平に固定したことを特徴とする階段構築用
支持装置。
[Scope of Claims] 1. Two pillars are vertically installed at a predetermined interval on the first floor where the stairs are to be installed, and the stairs are temporarily installed on the pillars at a landing position between the first floor and the second floor. At the same time, a support rod for temporary stairs is provided at almost the same height as the second floor, and a support rod for the temporary stairway is provided at almost the same height as the second floor, and between the support rod at the landing position and the support rod at the landing position, After temporarily constructing prefabricated stairs at an angle between the stairs, concrete is poured on the landing and the second floor to integrally connect the stairs, the landing and the second floor, and the above operation is repeated until the required floor is reached. A method of constructing a staircase, which comprises constructing a staircase, and then removing a support post or other staircase support. 2. The method of constructing a staircase according to claim 1, wherein the ready-made staircase is constructed by assembling the coroner girder and the tread. 3. The method for constructing stairs according to claim 1, characterized in that the anchor reinforcing bars fixed to the ends of the stairs are buried in concrete of a landing or floor, and the concrete is hardened. 4. A support plate fixed to the pillars by drilling a large number of hanging holes vertically in parallel on two pillars each having a fixing part to the floor at the lower end, and attaching a bracket to the pillars so as to be adjustable up and down; 1. A support device for constructing stairs, characterized in that an adjusting bolt screwed into the bracket constitutes a device for finely adjusting the amount of elevation of the bracket, and a support rod for temporary staircase construction is horizontally fixed to the bracket.
JP53150190A 1978-12-04 1978-12-04 Stair construction method and support device Expired JPS5851104B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP53150190A JPS5851104B2 (en) 1978-12-04 1978-12-04 Stair construction method and support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP53150190A JPS5851104B2 (en) 1978-12-04 1978-12-04 Stair construction method and support device

Publications (2)

Publication Number Publication Date
JPS5578755A JPS5578755A (en) 1980-06-13
JPS5851104B2 true JPS5851104B2 (en) 1983-11-14

Family

ID=15491474

Family Applications (1)

Application Number Title Priority Date Filing Date
JP53150190A Expired JPS5851104B2 (en) 1978-12-04 1978-12-04 Stair construction method and support device

Country Status (1)

Country Link
JP (1) JPS5851104B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60104605U (en) * 1983-12-21 1985-07-17 松下精工株式会社 Electric stove with fan

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58179340U (en) * 1982-05-27 1983-11-30 株式会社長谷川工務店 Mounting structure of concrete footboard
JPS5960230U (en) * 1982-10-16 1984-04-19 株式会社長谷川工務店 PC treadle mounting structure
JPH01142162A (en) * 1987-11-26 1989-06-05 Nabe Design Office:Kk Steel frame staircase
JP3634120B2 (en) * 1997-07-07 2005-03-30 株式会社竹中工務店 Construction method of RC external staircase using precast corrugated board

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5520907Y2 (en) * 1975-11-05 1980-05-20

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60104605U (en) * 1983-12-21 1985-07-17 松下精工株式会社 Electric stove with fan

Also Published As

Publication number Publication date
JPS5578755A (en) 1980-06-13

Similar Documents

Publication Publication Date Title
US5491939A (en) Prefabricated staircase unit
KR100540949B1 (en) Forming apparatus for condensing fluids for use in building construction
US3994113A (en) Stairs and railing system for multi-floored buildings and method of constructing same
JPS5851104B2 (en) Stair construction method and support device
KR0141463B1 (en) Method of prefabricating stairway
JP3421298B2 (en) Internal stairs for buildings and method of construction
US4050203A (en) Stairs and railing system for multi-floored buildings and method of constructing same
JPS5836142B2 (en) Method and device for installing supports for stair construction
JPH0380946B2 (en)
AU593917B2 (en) Building systems
JPH03279533A (en) Constructing method for rigid-frame type rc super-high building
JPS6041187B2 (en) How to fix the column base of pre-assembled column reinforcement
JPS6135656Y2 (en)
JP2650606B2 (en) Stairs outside PC
JPH0416628A (en) Base construction method and building construction method and base and anchor bolts for base
JP2811211B2 (en) Flat slab construction method
JPS637654Y2 (en)
JPH0234353Y2 (en)
JPH09268521A (en) Construction method of tubular reinforced concrete structure
JPH04281919A (en) Setting of buried type foot of steel frame post
JPH04309651A (en) Construction method for stairs
JPH02229337A (en) Concrete pillar construction method
SU614202A1 (en) Falsework for coverings
JP2759360B2 (en) Construction method of reinforced concrete building
TW202223214A (en) Reinforced concrete structure construction method using section steel to replace part of steel bars capable of easily erecting the formwork and increasing its strength, greatly saving construction time and manpower, and ensuring construction safety