Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS5854210B2 - Chichiyurenzokuhekisekouhou - Google Patents
[go: Go Back, main page]

JPS5854210B2 - Chichiyurenzokuhekisekouhou - Google Patents

Chichiyurenzokuhekisekouhou

Info

Publication number
JPS5854210B2
JPS5854210B2 JP48091196A JP9119673A JPS5854210B2 JP S5854210 B2 JPS5854210 B2 JP S5854210B2 JP 48091196 A JP48091196 A JP 48091196A JP 9119673 A JP9119673 A JP 9119673A JP S5854210 B2 JPS5854210 B2 JP S5854210B2
Authority
JP
Japan
Prior art keywords
sheet
water
reinforcing bar
concrete
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP48091196A
Other languages
Japanese (ja)
Other versions
JPS5038914A (en
Inventor
徹 豊島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP48091196A priority Critical patent/JPS5854210B2/en
Publication of JPS5038914A publication Critical patent/JPS5038914A/ja
Publication of JPS5854210B2 publication Critical patent/JPS5854210B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 この発明は地中連続壁の施工法に関するもので、その目
的は地下水の影響を受けることなく容易にしかも完全な
地中壁を構築することができる施工法を提供することに
ある。
[Detailed Description of the Invention] This invention relates to a construction method for an underground continuous wall, and its purpose is to provide a construction method that can easily and completely construct an underground wall without being affected by groundwater. There is a particular thing.

一般に地中に連続壁を施工する場合には施工位置を所定
深さまで掘削し、配筋をおこない、コンクリートを充填
して構築されるが、しばしかコンクリートが地下水に流
水して強度上問題があった。
Generally, when constructing a continuous wall underground, the construction site is excavated to a predetermined depth, reinforcement is placed, and then filled with concrete. Ta.

この発明は、前記従来の問題点に対処するために提案さ
れたものである。
This invention has been proposed to address the above-mentioned conventional problems.

以下図示する実施例により説明すると、掘削孔内に垂直
に配設された縦筋1の外側に格子状鉄筋網2を添接する
To describe the embodiment shown below, a lattice-like reinforcing bar network 2 is attached to the outside of a vertical bar 1 vertically disposed in an excavated hole.

そして更にこの鉄筋網2の外側を被覆するように、比較
曲目の粗い透水性布よりなるシート3を取付ける。
Further, a sheet 3 made of a water-permeable cloth with a relatively coarse curve is attached so as to cover the outside of the reinforcing bar net 2.

次いでシート3内に浸透してくる地下水等の水を汲み上
げ、しかる後シート3内にコンクリートを打設する。
Next, water such as groundwater that has permeated into the sheet 3 is pumped up, and then concrete is poured into the sheet 3.

この際シート3は透水性布からなるので、シート3内に
土砂が侵入するのを防止できる。
At this time, since the sheet 3 is made of water-permeable cloth, it is possible to prevent dirt from entering the sheet 3.

以上のような操作を順次繰り返し、所定の長さ連続壁を
構築するものである。
The above operations are repeated in sequence to construct a continuous wall of a predetermined length.

この発明は以上の構成からなり、シートは透水性の商よ
りなるので、打設されたコンクリートが流出することな
く、僅かにその水分が外部に浸透し、掘削孔壁にシート
が密着することにより、孔壁の崩落を防止しながら施工
することができる。
This invention has the above-mentioned structure, and since the sheet is made of water-permeable material, the poured concrete does not flow out, but a slight amount of water permeates to the outside, and the sheet adheres to the wall of the excavation hole. , construction can be carried out while preventing the hole wall from collapsing.

またシート内には地下水等の水が浸透してくるが、スラ
イムは入ってこないので、水を汲み上げることによりス
ライムの影響を受けずに完全にドライな状態でコンクリ
ート打設を行なうことができ、また水を汲み上げること
なく水中コンクリート打設も可能である。
In addition, although water such as groundwater permeates into the sheet, slime does not enter the sheet, so by pumping up the water, concrete can be placed in a completely dry state without being affected by slime. It is also possible to place concrete underwater without pumping up water.

そして水を汲み上げる際にシートは掘削孔壁の土庄を受
けるが、鉄筋網、および縦筋によって補強されているの
で、土庄に充分耐えうる。
When pumping up water, the sheet is exposed to the soil of the borehole wall, but since it is reinforced with a reinforcing bar net and vertical bars, it can withstand the soil.

【図面の簡単な説明】[Brief explanation of the drawing]

図面はこの発明の実施例を示すもので、第1図は横断面
図、第2図は縦断面図である。 1・・・・・・縦筋、2・・・・・・鉄筋網、3・・・
・・・シート。
The drawings show an embodiment of the invention, and FIG. 1 is a cross-sectional view, and FIG. 2 is a vertical cross-sectional view. 1... Vertical reinforcement, 2... Rebar network, 3...
...Sheet.

Claims (1)

【特許請求の範囲】[Claims] 1 掘削孔内に配設された縦筋の外周に鉄筋網を添設し
、さらにこの鉄筋網の外側を被覆するようにスライムが
侵入できない透水性布からなるシートを取付け、前記シ
ート内にコンクリートを充填することを特徴とする地中
連続壁施工法。
1. A reinforcing bar net is attached to the outer periphery of the vertical bars placed in the excavation hole, and a sheet made of water-permeable cloth that prevents slime from penetrating is attached to cover the outside of this reinforcing bar net, and concrete is placed inside the sheet. An underground continuous wall construction method characterized by filling.
JP48091196A 1973-08-14 1973-08-14 Chichiyurenzokuhekisekouhou Expired JPS5854210B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP48091196A JPS5854210B2 (en) 1973-08-14 1973-08-14 Chichiyurenzokuhekisekouhou

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP48091196A JPS5854210B2 (en) 1973-08-14 1973-08-14 Chichiyurenzokuhekisekouhou

Publications (2)

Publication Number Publication Date
JPS5038914A JPS5038914A (en) 1975-04-10
JPS5854210B2 true JPS5854210B2 (en) 1983-12-03

Family

ID=14019678

Family Applications (1)

Application Number Title Priority Date Filing Date
JP48091196A Expired JPS5854210B2 (en) 1973-08-14 1973-08-14 Chichiyurenzokuhekisekouhou

Country Status (1)

Country Link
JP (1) JPS5854210B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6024212U (en) * 1983-07-22 1985-02-19 株式会社資生堂 Container for viscous liquid with application part inserted

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5397205A (en) * 1977-02-04 1978-08-25 Hazama Gumi Method of placing dry concrete under water
JPS5436962U (en) * 1977-08-19 1979-03-10
JPS55101935U (en) * 1979-01-08 1980-07-16
JPS58180923U (en) * 1982-05-26 1983-12-02 理研興業株式会社 Waterway with anti-surfacing device
JPS6319326A (en) * 1986-07-11 1988-01-27 リン ジユエイ ジエ Pit foundation discharge soil compacting construction method
JPH0247436A (en) * 1988-08-10 1990-02-16 Marutaka Concrete Kogyo Kk Concrete block laid in water channel
JPH0258645A (en) * 1988-08-24 1990-02-27 Marutaka Concrete Kogyo Kk Concrete block laid on waterway
JPH0538082U (en) * 1991-10-18 1993-05-21 鳥居化成株式会社 U-shaped groove made of synthetic resin
JPH061480U (en) * 1992-06-17 1994-01-11 キョーセー株式会社 Wastewater treatment ditch
JPH06193125A (en) * 1992-12-25 1994-07-12 Daikaron Kako:Kk Preventing device for u-shaped gutter from rising
JP6392156B2 (en) * 2015-03-30 2018-09-19 中日本ハイウェイ・エンジニアリング東京株式会社 U-shaped groove

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1221687A (en) * 1959-01-05 1960-06-03 Improved method of making piles cast in the ground
FR1311040A (en) * 1962-01-19 1962-11-30 Nibler G M B H Method of implanting building elements, by in situ concreting, or the like, in stagnant or slow-flowing liquids, and formwork usable for this implantation
FR1339485A (en) * 1962-11-27 1963-10-04 Wests Piling Construct Pile improvements

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6024212U (en) * 1983-07-22 1985-02-19 株式会社資生堂 Container for viscous liquid with application part inserted

Also Published As

Publication number Publication date
JPS5038914A (en) 1975-04-10

Similar Documents

Publication Publication Date Title
JPS5854210B2 (en) Chichiyurenzokuhekisekouhou
CN107119695A (en) Operation frame body for canceling basement exterior wall backfill and construction method
US3396546A (en) Method of producing concrete piles for foundations
JP2619704B2 (en) Underground structure lifting prevention method
JP3648299B2 (en) Consolidation promotion method for soft ground
JPS6119771B2 (en)
JPS5936058B2 (en) How to construct a structure using underground continuous walls
JP2506398B2 (en) Construction method of cast-in-place concrete pile
JPH1030228A (en) Construction method of underground continuous wall and box type steel
JP2588075B2 (en) Underground building construction method
JPH06240656A (en) Groundwater reduction method
JPS583092B2 (en) Concrete
JPS61254716A (en) Setting of in-place concrete pile
JPH03233018A (en) Steel tubular concrete pile
JPH0317314A (en) Execution of underground continuous wall
JPS6350491B2 (en)
JPH073781A (en) Construction method of foundation footing on cast-in-place concrete pile head.
JPS62242020A (en) Method for constructing underground structure
JPH0433326B2 (en)
JPH0572481B2 (en)
JPH0517952A (en) Constructing method for underground wall
JPS637416A (en) Construction of hollow concrete structure under ground
RU29734U1 (en) Concrete Dam Drainage Device
JPH10140557A (en) Construction method of cast-in-place continuous wall with hollow part
JPH0699940B2 (en) Method of constructing underground skeleton and formwork for underground skeleton construction