Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS58767B2 - Construction method of underground continuous water-stop wall - Google Patents
[go: Go Back, main page]

JPS58767B2 - Construction method of underground continuous water-stop wall - Google Patents

Construction method of underground continuous water-stop wall

Info

Publication number
JPS58767B2
JPS58767B2 JP52151027A JP15102777A JPS58767B2 JP S58767 B2 JPS58767 B2 JP S58767B2 JP 52151027 A JP52151027 A JP 52151027A JP 15102777 A JP15102777 A JP 15102777A JP S58767 B2 JPS58767 B2 JP S58767B2
Authority
JP
Japan
Prior art keywords
asphalt
coated
crushed stone
construction method
underground continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP52151027A
Other languages
Japanese (ja)
Other versions
JPS5482809A (en
Inventor
宮下崇
藤田建二
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON KOWAN KONSARUTANTO KK
Original Assignee
NIPPON KOWAN KONSARUTANTO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON KOWAN KONSARUTANTO KK filed Critical NIPPON KOWAN KONSARUTANTO KK
Priority to JP52151027A priority Critical patent/JPS58767B2/en
Publication of JPS5482809A publication Critical patent/JPS5482809A/en
Publication of JPS58767B2 publication Critical patent/JPS58767B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 この発明は地中連続止水壁の施工法に関する。[Detailed description of the invention] The present invention relates to a construction method for an underground continuous water-stop wall.

従来一般に実施されている矢板護岸、ケーシング内は、
その目地部分等より土砂、廃棄物の吸出し、あるいは流
失の恐れがある。
The inside of the sheet pile revetment and casing, which has been commonly implemented in the past,
There is a risk that dirt and waste may be sucked out or washed away from the joints, etc.

この発明は前記従来の問題点を解決するために鋼矢板鋼
管矢板護岸等の護岸埋立側に、前記矢板に沿って実施す
る止水性、撓み性の大きい地中連続壁を開発したもので
ある。
In order to solve the above-mentioned conventional problems, this invention has developed an underground continuous wall with high water-stopping properties and high flexibility, which is installed along the revetment side of the revetment, such as steel sheet piles and steel pipe sheet piles.

以下この発明を実施例によって説明すると、先ず地盤上
にボーリングマシン1を設置し、ケーシングチューブ2
を建て込み、ケーシングチューブ2内の土砂をハンマー
グラブバケット3で掘削排出し、かつケーシングチュー
ブ2をボーリングマシン1により振動圧入する。
The present invention will be described below with reference to examples. First, a boring machine 1 is installed on the ground, and a casing tube 2 is installed on the ground.
The soil inside the casing tube 2 is excavated and discharged using a hammer grab bucket 3, and the casing tube 2 is vibrated and press-fitted using a boring machine 1.

(第1図乃至第3図参照) 次いでそのケーシングチューブ2内に有孔パイプ4およ
び連続壁の厚さ方向に平行に王室に分ける仕切板5,5
を挿入し、次いでケーシングチューブ2の上端に設置し
たホッパー6へ、グラブバケットの使用にアスファルト
プレコート砕石8゜9を投入する。
(See Figures 1 to 3) Next, inside the casing tube 2, there is a perforated pipe 4 and partition plates 5, 5 that divide the continuous wall into sections parallel to the thickness direction.
is inserted, and then asphalt precoated crushed stone 8°9 is charged into the hopper 6 installed at the upper end of the casing tube 2 using a grab bucket.

この場合仕切板5,5間の中央室には大粒径アスファル
トプレコート砕石8を中詰し、また両側室には小粒径ア
スファルトプレコート砕石9を中詰する。
In this case, the central chamber between the partition plates 5, 5 is filled with large-grain asphalt pre-coated crushed stone 8, and the both side chambers are filled with small-grain pre-coated asphalt crushed stone 9.

さらに前記アスファルトプレコート砕石8,9を中詰し
つつケーシングチューブ2および仕切板5,5を引抜く
Further, the casing tube 2 and the partition plates 5, 5 are pulled out while filling the asphalt precoated crushed stones 8, 9 inside.

(第4図乃至第6図参照) 以上の作業を連続または一つ置きにラップさせながら行
ない連続砕石多柱列壁を形成する。
(See Figures 4 to 6) The above operations are performed continuously or while lapping every other piece to form a continuous crushed stone multi-column wall.

次いでアスファルトポンプ10から有孔パイプ4を通じ
てアスファルト系材料を注入し、前記アスファルトプレ
コート砕石8,9間の空隙を充填し、これを連続的に実
施して連続止水壁を形成する。
Next, an asphalt-based material is injected from the asphalt pump 10 through the perforated pipe 4 to fill the gap between the asphalt precoated crushed stones 8 and 9, and this is continuously performed to form a continuous water-stop wall.

(第7図乃至第9図参照) この発明は以上の構成からなり、掘削はオールケーシン
グ工法で実施するので護岸構造物に悪影響を与えないで
施工ができる。
(See Figures 7 to 9) The present invention has the above-described configuration, and since excavation is carried out using the all-casing method, construction can be carried out without adversely affecting the bank protection structure.

またその注入作業はアスファルト系材料を100℃程度
の高温で注入するので水中であってもアスファルトプレ
コート砕石と癒着し、固結一体化させうる。
In addition, since the asphalt-based material is injected at a high temperature of about 100° C., it can adhere to the asphalt pre-coated crushed stone even in water and become solid and integrated.

また施工された止水壁は中詰のアスファルトプレコート
砕石が噛合っており、その空隙にはアスファルト系材料
が充填しであるので剪断強度が増大し、護岸の補強にな
る。
In addition, the constructed water-stop wall is interlocked with asphalt pre-coated crushed stones, and the gaps are filled with asphalt-based material, increasing the shear strength and reinforcing the seawall.

またその充填材料がアスファルト系材料であるので特有
の粘弾性状を示し、大きな撓み性を有するので不同沈下
あるいは地震に対して塑性変形し、ひびわれの発生もな
く、止水性、安定性が大きい。
In addition, since the filling material is an asphalt-based material, it exhibits a unique viscoelastic property and has great flexibility, so it deforms plastically in response to uneven settlement or earthquakes, does not generate cracks, and has great water-stopping properties and stability.

さらに施工過程において仕切板を使用し、中央部にはア
スファルト系材料が注入しやすいように大粒径アスファ
ルトプレコート砕石が中詰してあり、両側には小粒径ア
スファルトプレコート砕石が中詰しであるので止水壁の
厚さが均一になり長期間経過してもアスファルト系材料
の自重によるフローを生じない。
Furthermore, a partition plate is used during the construction process, and the center part is filled with large-grain asphalt pre-coated crushed stone to make it easier to inject asphalt-based materials, and the sides are filled with small-grain asphalt pre-coated crushed stone. As a result, the thickness of the water-stopping wall becomes uniform, and no flow occurs due to the weight of the asphalt-based material even after a long period of time.

【図面の簡単な説明】[Brief explanation of drawings]

第1図、第2図、第3図、第4図A、第5図、第6図A
、第7図A、第8図、第9図Aは施工順序を示した縦断
面図、第4図B、C,第6図B、第7図B、第9図Bは
平面図である。 1・・・・・・ボーリングマシン、2・・・・・・ケー
シングチューブ、3・・・・・・ハンマーグラブバケッ
ト、4・・・・・・有孔パイプ、5・・・・・・仕切板
、6・・・・・・ホッパー、7・・・・・・グラブバケ
ット、8・・・・・・大粒径アスファルトプレコート砕
石、9・・・・・・小粒径アスファルトプレコート砕石
、10・・・・・・アスファルトポンプ。
Figure 1, Figure 2, Figure 3, Figure 4 A, Figure 5, Figure 6 A
, Fig. 7A, Fig. 8, and Fig. 9A are longitudinal sectional views showing the construction order, and Fig. 4B, C, Fig. 6B, Fig. 7B, and Fig. 9B are plan views. . 1... Boring machine, 2... Casing tube, 3... Hammer grab bucket, 4... Perforated pipe, 5... Partition Board, 6...Hopper, 7...Grab bucket, 8...Large particle size asphalt precoated crushed stone, 9...Small particle size asphalt precoated crushed stone, 10 ...Asphalt pump.

Claims (1)

【特許請求の範囲】[Claims] 1 透水性地盤をケーシングを使用して掘削し、次いで
そのケーシング内に有孔パイプおよび連続壁の長さ方向
に平行に王室に分ける仕切板を挿入し、中央室には大粒
径アスファルトプレコート砕石を中詰し、両側には小粒
径アスファルトプレコート砕石を中詰し、次いでケーシ
ングおよび仕切板を引き抜きアスファルトプレコート砕
石の多柱列壁を形成し、かつ有孔パイプよりアスファル
ト系材料を注入することによってアスファルトプレコー
ト砕石間の空隙を充填して一体化させることを特徴とす
る地中連続止水壁の施工法。
1. Excavate permeable ground using a casing, then insert a perforated pipe and a partition plate parallel to the length of the continuous wall into the royal chamber, and insert large-grain asphalt pre-coated crushed stone into the central chamber. Filled with small-grain asphalt pre-coated crushed stone on both sides, then the casing and partition plates are pulled out to form a multi-column wall of pre-coated asphalt crushed stone, and asphalt-based material is injected through a perforated pipe. A construction method for underground continuous water-stop walls characterized by filling the gaps between crushed stones pre-coated with asphalt and integrating them.
JP52151027A 1977-12-15 1977-12-15 Construction method of underground continuous water-stop wall Expired JPS58767B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP52151027A JPS58767B2 (en) 1977-12-15 1977-12-15 Construction method of underground continuous water-stop wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP52151027A JPS58767B2 (en) 1977-12-15 1977-12-15 Construction method of underground continuous water-stop wall

Publications (2)

Publication Number Publication Date
JPS5482809A JPS5482809A (en) 1979-07-02
JPS58767B2 true JPS58767B2 (en) 1983-01-07

Family

ID=15509691

Family Applications (1)

Application Number Title Priority Date Filing Date
JP52151027A Expired JPS58767B2 (en) 1977-12-15 1977-12-15 Construction method of underground continuous water-stop wall

Country Status (1)

Country Link
JP (1) JPS58767B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS641821A (en) * 1987-06-22 1989-01-06 Shimizu Corp Underground-wall construction by impregnation of sealing agent
JPS641820A (en) * 1987-06-22 1989-01-06 Shimizu Corp Cut-off wall constituted of a series of piles

Also Published As

Publication number Publication date
JPS5482809A (en) 1979-07-02

Similar Documents

Publication Publication Date Title
CN113789797A (en) Steel sheet pile cofferdam construction method for deeply covering sand and gravel layer
JP3010356B1 (en) How to build a tunnel
EP0136355A1 (en) Method and apparatus for constructing reinforced concrete walls in the earth
CN101008178A (en) Soft base processing construction process using excavating and stirring method
JPS58767B2 (en) Construction method of underground continuous water-stop wall
CN108867645A (en) Nearby Structure Larsen steel sheet pile pulls out construction method in pattern foundation pit supporting structure
RU2058464C1 (en) Method for making foundation
CN119465996A (en) Water-rich thick sand layer combined anti-bypass ultra-deep underground continuous wall and its construction method
CN108677999A (en) A kind of Muddy Bottoms packeted soil barrier wall structure and construction method
CN213539046U (en) Retaining wall reverse filtering drainage structure
US1602623A (en) Dam and method of constructing the same
JPH09158158A (en) Filling concrete dam and its construction method
JP2021139123A (en) Ground strengthening and stabilization method
KR100784159B1 (en) Construction method of self-supporting earthen barrier wall
JPS5942765B2 (en) cofferdam
JPS5972321A (en) Piling work for liquefied ground
Goldberg et al. Lateral support systems and underpinning, volume III: construction methods
KR20240142317A (en) Method of improving soft ground by small vibration compaction
RU1794192C (en) Method for constructing pits
Buchanan DERWENT DAM-CONSTRUCTION.
JPH0317314A (en) Execution of underground continuous wall
JPH0434116A (en) Construction method of underground structure framework
JPH10183653A (en) Embankment culvert
JPS6049735B2 (en) How to form a basement
JPH08209685A (en) Construction work method for underground continuous wall