Hollow pipe burial method for pillar construction

Info

Publication number
JPS5910463B2
JPS5910463B2 JP1802380A JP1802380A JPS5910463B2 JP S5910463 B2 JPS5910463 B2 JP S5910463B2 JP 1802380 A JP1802380 A JP 1802380A JP 1802380 A JP1802380 A JP 1802380A JP S5910463 B2 JPS5910463 B2 JP S5910463B2
Authority
JP
Japan
Prior art keywords
hole
hollow pipe
water
pipe
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1802380A
Other languages
Japanese (ja)
Other versions
JPS56115472A (en
Inventor
忠士 城戸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP1802380A priority Critical patent/JPS5910463B2/en
Publication of JPS56115472A publication Critical patent/JPS56115472A/en
Publication of JPS5910463B2 publication Critical patent/JPS5910463B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Fencing (AREA)

Description

【発明の詳細な説明】 本発明は舗装面から地中に向って動力穿孔機で孔を穿孔
し、孔の下部に骨材による透水部を形成し、同透水部の
上部に粘土等による不透水層を形成し、同層上にセメン
トミルク又はセメントモルタル等を載置し、同ミルク又
はモルタルの硬化前に有底パイプを上記孔内に挿入し同
パイプの底部を上記不透水層に接し、その後底部から透
水部に至る通水孔を穿設することを特徴とする中空パイ
プ埋設法に関するものであって舗装面に迅速簡便に建柱
用透水パイプ孔を施工することを目的とするものである
DETAILED DESCRIPTION OF THE INVENTION The present invention involves drilling holes from the pavement surface into the ground using a power drilling machine, forming a water-permeable part made of aggregate at the bottom of the hole, and forming an impregnation made of clay or the like in the upper part of the water-permeable part. A permeable layer is formed, cement milk or cement mortar is placed on the layer, and before the milk or mortar hardens, a bottomed pipe is inserted into the hole and the bottom of the pipe is brought into contact with the impermeable layer. This relates to a hollow pipe burying method characterized by subsequently drilling a water passage hole from the bottom to the water permeable part, and the purpose is to quickly and easily construct a water permeable pipe hole for pillar erection on a paved surface. It is.

従来、既設のコンクリート舗装、アスファルト舗装、ブ
ロック舗装又はタイル舗装等の舗装面上に車止めチエン
棚の昇降自在支柱、フェンス等の着脱式支柱を建柱する
だめの埋設パイプ孔を施工する場合には既設舗装のはつ
りおよび除去作業、人力による穴掘り、栗石および自涜
し砂利の敷設パイプ建柱、土砂の埋戻し、芯出し、埋戻
し土砂の搗き固め、型枠施工、コンクリート打設、型枠
撤去、コンクリート周囲の埋戻しおよび舗装、残土処分
等の多くの労力および複雑な工程を必要とし、工期中駐
車場やガソリンスタンド等の閉鎖や入場制限を行う必要
があるばかりでなく埋設中空パイプ中に雨水、排水等が
留り排除し難い欠陥があった。
Conventionally, when constructing a buried pipe hole for erecting a removable support such as a liftable support for a car stopper chain shelf or a removable support for a fence, etc. on the existing concrete pavement, asphalt pavement, block pavement, or tile pavement, etc. Chilling and removal of existing pavement, manual digging of holes, laying of chestnut stone and gravel, pipe erection, backfilling of earth and sand, centering, pounding and hardening of backfill earth and sand, formwork construction, concrete pouring, formwork It requires a lot of labor and complicated processes such as removal, backfilling and paving around the concrete, and disposal of the remaining soil, and during the construction period, it is not only necessary to close parking lots and gas stations and restrict entry, but also to close down parking lots and gas stations, etc. There was a defect in which rainwater, drainage water, etc. were trapped and it was difficult to eliminate.

本発明を図面に示す実施例について説明すると、舗装面
1上の所定位置に穿孔芯を表記(マーキング)シ、クレ
ーンプーム2の先端でドリフタ−ガイド3を垂直に圧下
支持し、同ガイド3に昇降自在に支持したドリフタ−4
に中空ロッド5を装着し同ロッド5の下端に150冨冨
直径のビット6を設け、上記ドリフタ−4を動作して上
記穿孔芯から舗装面1上から垂直方向に約2m深さの孔
7を穿孔する。
To explain the embodiment of the present invention shown in the drawings, a perforation core is marked at a predetermined position on a paved surface 1, and a drifter guide 3 is vertically rolled down and supported at the tip of a crane poom 2. Drifter 4 supported so that it can be raised and lowered freely
A hollow rod 5 is attached to the rod 5, a bit 6 with a diameter of 150 mm is installed at the lower end of the rod 5, and the drifter 4 is operated to drill a hole 7 approximately 2 m deep from the drilling core in the vertical direction from above the paved surface 1. perforate.

その穿孔時間は3分間程度であった。上記孔7には骨材
即ちバラス8を投入し、バラス8の上に砂9を投入して
透水部10を形成した後粘土を投入して搗き固めて周囲
の土と密着させて不透水層11を形成するものである。
The drilling time was about 3 minutes. Aggregate, that is, balas 8, is put into the hole 7, and sand 9 is put on top of the balas 8 to form a permeable part 10, and then clay is put in and pounded and hardened to make it adhere to the surrounding soil to form an impermeable layer. 11.

この状態においてセメントミルク又はセメントモルタル
12を孔7内に注入又は投入すると同ミルク又はモルタ
ル12は上記不透水層11のため下方の骨材8゜9に浸
入することはない。
In this state, when cement milk or cement mortar 12 is injected or thrown into the hole 7, the milk or mortar 12 will not penetrate into the aggregate 8.9 below because of the impermeable layer 11.

次に木製又は合成樹脂製逆円錐キャップによる底部13
を接着剤14で接着したパイプ15(外径140mm)
を底部13から上記ミルク又はモルタル12の硬化前に
孔7に挿入し同底部13を不透水層11に接すると上記
ミルク又はモルタル12は孔7の内面とパイプ15の外
面との間隙を上昇して同間隙に充満する。
Next, the bottom part 13 is made of wood or synthetic resin with an inverted conical cap.
Pipe 15 (outer diameter 140 mm) glued with adhesive 14
is inserted into the hole 7 from the bottom part 13 before the milk or mortar 12 hardens, and when the bottom part 13 contacts the impermeable layer 11, the milk or mortar 12 rises through the gap between the inner surface of the hole 7 and the outer surface of the pipe 15. and fills the same gap.

そして木槌16でパイプ15の上端面を叩打すると底部
13が不透水層11に進入しパイプ15の上端面が舗装
面1の水準に一致する。
Then, when the upper end surface of the pipe 15 is hit with a mallet 16, the bottom portion 13 enters the impermeable layer 11, and the upper end surface of the pipe 15 matches the level of the paved surface 1.

その後先端に穿孔用螺旋17を設けた所謂ぎむね18を
底部13に挿入し同ぎむね18を手動で圧下回動させる
と底部13に通水孔19が穿設され同通水孔19を透水
部10まで至らせるものである。
After that, a so-called gimlet 18 having a perforation spiral 17 at its tip is inserted into the bottom part 13 and the gimlet 18 is manually pushed down and a water passage hole 19 is bored in the bottom part 13 and water permeates through the water passage hole 19. This will lead to Part 10.

舗装面1上に溢出したモルタル12′(第7図)は排除
し仕上げられる。
The mortar 12' (FIG. 7) overflowing onto the paved surface 1 is removed and finished.

本発明では上記埋設中空パイプ15に車輛進入防止用チ
ェノ又はフェンス等の昇降自在又はフェンスとの着脱式
支柱を挿入して上記チェノ又はフェンスを取外して車輛
進入路を開略し、支柱を上記埋設パイプ15から上昇固
定させて同支柱を建柱し、同支柱にチェノやフェンスを
張設して車輌進入路を閉路するものである。
In the present invention, a prop for preventing vehicle entry that can be raised and lowered or that can be attached to the fence is inserted into the buried hollow pipe 15, and the prop is inserted into the buried hollow pipe 15, and the prop is inserted into the buried hollow pipe 15. The pillar will be raised and fixed from No. 15, and a fence or fence will be attached to the pillar to close off the vehicle access road.

本発明は上述のように舗装面1から動力穿孔機4.5.
6によって地中に孔7を穿孔するので岩石又はコンクリ
ート舗装面1に容易に穿孔しさらに地中深い透水層20
(第3図)に至るまで迅速に穿孔し得ると共に建柱用中
空パイプ15を迅速に埋設し得るし同パイプ15の底部
13から通水孔19を経て透水部10に排出されパイプ
15内に水が留ることのない建柱孔が得られる効果があ
る。
As described above, the present invention operates from the paving surface 1 to the power drilling machine 4.5.
Since the holes 7 are drilled in the ground by the hole 6, the holes 7 can be easily drilled into the rock or concrete pavement surface 1, and the permeable layer 20 deep underground can be easily drilled.
(Fig. 3), the hollow pipe 15 for pillar erection can be buried quickly, and the hollow pipe 15 for pillar erection can be quickly buried. This has the effect of providing a pillar hole that does not trap water.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の建柱用中空パイプ埋設法の穿孔状態を
示す図、第2図は有底パイプの一部拡大縦断面図、第3
図は孔に透水部および不透水層を形成した状態の縦断面
図、第4図はセメントミルク又はモルタル投入状態の縦
断面図、第5図は中空有底パイプ打込状態の縦断面図、
第6図は通水孔穿孔状態の縦断面図、第7図は通水孔開
通状態の縦断面図である。 1・・・・・・舗装面、4・・・・・・動力穿孔機、7
・・・・・・孔、8.9・・・・・・骨材、10・・・
・・・透水部、11・・・・・・不透水層、12・・・
・・・セメントモルタル、15・・・・・・有底パイプ
、13・・・・・・底部、19・・・・・・通水孔。
Fig. 1 is a diagram showing the drilling state of the hollow pipe burying method for pillar erection according to the present invention, Fig. 2 is a partially enlarged vertical cross-sectional view of the bottomed pipe, and Fig. 3
The figure is a vertical cross-sectional view of a state in which a permeable part and an impermeable layer are formed in a hole, Figure 4 is a vertical cross-sectional view of a state in which cement milk or mortar is poured, and Figure 5 is a vertical cross-sectional view of a hollow bottomed pipe driven in.
FIG. 6 is a longitudinal sectional view of the water passage hole in a state where it is drilled, and FIG. 7 is a longitudinal sectional view of the water passage hole in its open state. 1...Paved surface, 4...Power drilling machine, 7
...hole, 8.9 ... aggregate, 10 ...
... Permeable part, 11 ... Impermeable layer, 12 ...
... Cement mortar, 15 ... Bottom pipe, 13 ... Bottom, 19 ... Water hole.

Claims (1)

【特許請求の範囲】 1 舗装面1から地中に向って動力穿孔機4で孔7を穿
孔し、孔7の下部に骨材8,9による透水部10を形成
し、同透水部10の上部に粘土等による不透水層11を
形成し、同層11上にセメントミルク又はセメントモル
タル12等を載置し、同ミルク又はモルタル12の硬化
前に有底パイプ15を上記孔7内に挿入し同パイプ15
の底部13を上記不透水層11に接し、その後底部13
から透水部10に至る通水孔19を穿設することを特徴
とする中空パイプ埋設法。 2 骨材がバランス8および砂9である特許請求の範囲
第1項記載の中空パイプ埋設法。 3 底部13が木製又は合成樹脂製逆円錐キャップによ
り形成されている特許請求の範囲第1項記載の中空パイ
プ埋設法。
[Claims] 1. A hole 7 is drilled from the pavement surface 1 into the ground using a power drilling machine 4, and a water-permeable part 10 made of aggregates 8 and 9 is formed in the lower part of the hole 7, and the water-permeable part 10 is An impermeable layer 11 made of clay or the like is formed on the upper part, cement milk or cement mortar 12 is placed on the layer 11, and a bottomed pipe 15 is inserted into the hole 7 before the milk or mortar 12 hardens. same pipe 15
The bottom part 13 of is in contact with the impermeable layer 11, and then the bottom part 13
A hollow pipe burying method characterized by drilling a water passage hole 19 from the hole to the water permeable part 10. 2. The hollow pipe burying method according to claim 1, wherein the aggregates are balance 8 and sand 9. 3. The hollow pipe burying method according to claim 1, wherein the bottom portion 13 is formed of an inverted conical cap made of wood or synthetic resin.
JP1802380A 1980-02-16 1980-02-16 Hollow pipe burial method for pillar construction Expired JPS5910463B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1802380A JPS5910463B2 (en) 1980-02-16 1980-02-16 Hollow pipe burial method for pillar construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1802380A JPS5910463B2 (en) 1980-02-16 1980-02-16 Hollow pipe burial method for pillar construction

Publications (2)

Publication Number Publication Date
JPS56115472A JPS56115472A (en) 1981-09-10
JPS5910463B2 true JPS5910463B2 (en) 1984-03-09

Family

ID=11960062

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1802380A Expired JPS5910463B2 (en) 1980-02-16 1980-02-16 Hollow pipe burial method for pillar construction

Country Status (1)

Country Link
JP (1) JPS5910463B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2598738B2 (en) * 1992-07-10 1997-04-09 株式会社オカダ Strut fixing hole forming device

Also Published As

Publication number Publication date
JPS56115472A (en) 1981-09-10

Similar Documents

Publication Publication Date Title
US11214938B2 (en) Construction method for pouring concrete in karst cave
CN105525619B (en) A kind of water rich strata bored tunnel occlusion pipe curtain
CN104532957B (en) Existing building sets up basement reversed construction method
JP6574856B2 (en) Pavement method of hard road surface that can naturally recharge groundwater
KR20170118640A (en) Restoration construction method of road subsided by weak ground
KR20110041391A (en) Method of forming bearing reinforcement pile structure for foundation work and pile structure used therein
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN108194101A (en) A kind of constructing tunnel technique
CN110762286A (en) Drainage pipe network artificial pipe jacking construction process
CN111042121B (en) Construction method of bored backfill end pile foundation
JPS5910463B2 (en) Hollow pipe burial method for pillar construction
CN110055845B (en) Construction method for soft soil roadbed on two sides of highway bridge and culvert
JPS6146610B2 (en)
JP2001329545A (en) Bridge pier foundation construction method and floor slab for bridge pier
CN112663431B (en) Concrete pavement fracture subsidence section treatment structure and construction method
CN104674625A (en) Underway structure and construction method thereof
KR101523948B1 (en) Construction method of underground structure under the established building
SU966155A1 (en) Cast-in-place pile production method
JP2004150070A (en) Treatment method for removed soil, and removed soil-treated construction method for foundation pile
CN113502852A (en) Subway station cover excavation top-down construction structure and construction method thereof
CN113186768A (en) Construction method for improving roadbed backfill quality after existing line demolition of frame structure
SU1281635A1 (en) Drill and cast-in-place anchor and method of injecting same
JP3105706B2 (en) Construction method of piled raft foundation using existing foundation
CN116905300B (en) Soil reinforcement structure above shallow buried tunnel and construction method thereof
JPS59428A (en) Production of foundation part for container embedded in ground