Dryer steam pressure operation method during paper change in paper machine

Info

Publication number
JPS5911718B2
JPS5911718B2 JP2393879A JP2393879A JPS5911718B2 JP S5911718 B2 JPS5911718 B2 JP S5911718B2 JP 2393879 A JP2393879 A JP 2393879A JP 2393879 A JP2393879 A JP 2393879A JP S5911718 B2 JPS5911718 B2 JP S5911718B2
Authority
JP
Japan
Prior art keywords
change
steam pressure
output
paper
moisture content
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP2393879A
Other languages
Japanese (ja)
Other versions
JPS55116894A (en
Inventor
真人 山本
芳樹 佐野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yokogawa Electric Corp
Original Assignee
Yokogawa Hokushin Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yokogawa Hokushin Electric Corp filed Critical Yokogawa Hokushin Electric Corp
Priority to JP2393879A priority Critical patent/JPS5911718B2/en
Publication of JPS55116894A publication Critical patent/JPS55116894A/en
Publication of JPS5911718B2 publication Critical patent/JPS5911718B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Paper (AREA)

Description

【発明の詳細な説明】 本発明は、抄紙機における抄替え時のドライヤ蒸気圧操
作方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for operating a dryer vapor pressure during a paper change in a paper machine.

抄紙プロセスにおいて、紙の坪量と水分率は、紙の品質
を決める重要な要素なので、これらがそれぞれ所定の規
格を満足する−ように抄紙機の制御が行われる。
In the papermaking process, paper basis weight and moisture content are important factors that determine the quality of paper, so the papermaking machine is controlled so that each of these satisfies predetermined standards.

紙の規格を変更するとき、抄替えが行われる。When changing the paper standard, a paper change is performed.

抄替えは、抄紙機を止めることなく、坪量や秒速を新た
な値に連続的に移行させることにより行われる。
Paper making is performed by continuously changing the basis weight and speed per second to new values without stopping the paper machine.

抄替え時の制御も自動化されている。Control during paper changing is also automated.

抄紙機とその制御系は、例えば第1図のように構成され
る。
A paper machine and its control system are configured as shown in FIG. 1, for example.

すなわち、ヘッド・ボックスHBから吐き出された原料
は、ワイヤ・パートWPを通過することによって搾水さ
れ、ドライヤDRを通過することによって乾燥され、リ
ールRLに巻取られる。
That is, the raw material discharged from the head box HB is squeezed by passing through the wire part WP, dried by passing through the dryer DR, and wound onto the reel RL.

ワイヤ・パー)WPの搾水による白水はピットPTで受
けられ、ファン・ポンプPMPによってヘッド・ボック
スHBに還元される。
White water from water extraction from the wire par) WP is received at the pit PT and returned to the head box HB by the fan pump PMP.

坪量と水分率は、リールRLの直前において、測定器B
Mによってそれぞれ測定されて、計算制御装置CMTに
入力される。
The basis weight and moisture content are measured using measuring device B just before the reel RL.
M and are respectively measured and input to the calculation control unit CMT.

計算制御装置CMTは、それら測定値と設定値との偏差
に基づいて、種流量操作量およびドライヤの蒸気圧操作
量を計算し、それらをそれぞれ種口弁VLVおよびドラ
イヤの蒸気圧調節計PRCに与えて、坪量および水分率
をそれぞれの設定値に一致するように制御する。
The calculation control device CMT calculates the seed flow rate operation amount and the dryer steam pressure operation amount based on the deviation between the measured value and the set value, and sends them to the seed port valve VLV and the dryer steam pressure controller PRC, respectively. and control the basis weight and moisture content to match their respective set values.

抄替えを行うときは、計算制御装置CMTは、ヘッド・
ボックスHBに注入する種の流量や抄速、および、蒸気
圧操作量を変更する。
When performing a paper change, the calculation control unit CMT controls the head
The flow rate and machine speed of the seeds injected into the box HB, and the amount of steam pressure operation are changed.

種口弁VLVとヘッド・ボックスHBの間に距離がある
ため、種口弁VLVの操作がヘッド・ボックスHB中の
原料濃度に影響をおよぼすまでにむだ時間がある。
Due to the distance between the seed opening valve VLV and the head box HB, there is a dead time before the operation of the seed opening valve VLV affects the raw material concentration in the head box HB.

そこで、抄替え所要時間を短縮するために、むだ時間の
分だけ、種口弁の操作は、抄速変更に先行して行われる
Therefore, in order to shorten the time required for paper changeover, the seed opening valve is operated prior to changing the papermaking speed by the amount of dead time.

また、ドライヤ系統は大きな遅れ時定数を持ち、これを
操作する蒸気圧系統は、瞬時に大出力を発することがで
きない構造になっているので、水分率安定時間の短縮と
断紙予防のために、予想されるドライヤの負荷変動に応
じて、蒸気圧操作は抄速変更より先行して開始される。
In addition, the dryer system has a large delay time constant, and the steam pressure system that operates it is structured so that it cannot instantly generate a large output. , steam pressure operation is initiated prior to the change in paper speed, depending on expected dryer load fluctuations.

従来は、蒸気圧操作の先行時間は経験的に定めるように
していたが、抄替えの合理化の見地からは問題がある。
Conventionally, the lead time for steam pressure manipulation has been determined empirically, but this poses a problem from the standpoint of streamlining paper changeover.

本発明の目的は、先行時間を必要最小限とした合理的な
蒸気圧操作方法を提供することにある。
An object of the present invention is to provide a rational steam pressure control method that minimizes lead time.

本発明は、抄替えを行うに当り、予め、抄替え期間の終
了時点において紙の水分率を目標値に一致させるための
蒸気圧操作出力を計算し、この出力計算値が所定の限度
以内ならば、それに従って蒸気圧を操作し、この出力計
算値が所定の限度を越えていれば、それを所定の限度以
内に納めるに足る程度に操作開始時点を先行させた訂正
蒸気圧操作出力を計算し直し、それに従って蒸気圧を操
作するようにしたものである。
The present invention calculates in advance the steam pressure operation output to match the moisture content of the paper to a target value at the end of the papermaking period when performing papermaking change, and if this output calculation value is within a predetermined limit, For example, the steam pressure is manipulated accordingly, and if this calculated output value exceeds a predetermined limit, a corrected steam pressure manipulated output is calculated with the operation start point advanced enough to bring it within the predetermined limit. The steam pressure was adjusted accordingly.

以下、図面によって本発明を説明する。The present invention will be explained below with reference to the drawings.

第2図は、水分率制御に着目したときの、プロセス・モ
デルである。
FIG. 2 is a process model focusing on moisture content control.

第2図において、外乱V(S)の影響は、伝達関数σ(
S)で水分率変化A(S)として表われ、これに対して
、計算制御装置CMTによる一定周期の間欠的な水分率
操作出力I)秦(Z)は、蒸気圧調節計PRCに伝達関
数H(S)で保持され、その影響がドライヤ・プロセス
の伝達関数G(S)により水分率変化B(S)として表
われ、結局、両者の合成として水分率変化C(S)が定
まる。
In Figure 2, the influence of the disturbance V(S) is expressed by the transfer function σ(
S) is expressed as a moisture content change A(S), whereas the intermittent moisture content manipulation output I) by the calculation control device CMT at a fixed period (Z) is a transfer function to the vapor pressure controller PRC. H(S), and its influence is expressed as moisture content change B(S) by the transfer function G(S) of the dryer process, and eventually the moisture content change C(S) is determined as a combination of both.

抄替え時には、ドライヤに対する負荷の変更が外乱V(
S)となるが、負荷の変更は直線的に行われるので、水
分率の変化A(S)も直線的になる。
When changing the paper, changing the load on the dryer causes disturbance V (
S), but since the load is changed linearly, the change in moisture content A(S) is also linear.

そこで、操作による水分率変化B(S)を、外乱による
水分率変化A(S)とは逆方向に直線的に変化させるよ
うにすると、両者の合成としての水分率変化C(S)を
零にすることができる。
Therefore, if the moisture content change B(S) due to operation is made to change linearly in the opposite direction to the moisture content change A(S) due to disturbance, the moisture content change C(S) as a combination of both becomes zero. It can be done.

外乱による水分率変化A(S)!ま、抄替えのスケジュ
ールに基づいて予測できるので、それに対応して、操作
による水分率変化B(S)を定めることができ、そのよ
うな水分率変化B(S)を行わせるための操作出力D=
1 (Z)を求めることができる。
Moisture content change A(S) due to disturbance! Well, since it can be predicted based on the paper changing schedule, the moisture content change B(S) due to the operation can be determined accordingly, and the operation output for causing such a moisture content change B(S) can be determined. D=
1 (Z) can be found.

操作出力I)帯(Z)の求めがたは次のとおりである。The calculation of the operation output I) band (Z) is as follows.

第2図のプロセス・モデルにおいて、次式が成立する。In the process model of FIG. 2, the following equation holds.

D =l(Z)−H(S) ・G(S)= B(S)
(1)ここでB(S)をZ変換の形で
表わすと、B屹)=αOZ0+α1Z−1+α2Z−2
+・・・ (2)となり、これが、直線的に変化しなけ
ればならないから、α。
D = l (Z) - H (S) ・G (S) = B (S)
(1) Here, when B(S) is expressed in the form of Z transformation, B 屹)=αOZ0+α1Z-1+α2Z-2
+... (2) Since this must change linearly, α.

、α1.α2.・・・は等差の数列となる。伝達関数H
(S)・G(S)をZ変換の形で表わすと、H(S)−
!、零次ホールド系、G(S)ま1次遅れ系であるから
、 となる。
, α1. α2. ... is an arithmetic sequence. Transfer function H
When (S)・G(S) is expressed in the form of Z transformation, H(S)−
! , is a zero-order hold system, and G(S) is a first-order lag system, so it becomes as follows.

ただし、ε−er、L:サンプリング時間、T:ドライ
ヤの時定数である。
However, ε-er, L: sampling time, T: time constant of the dryer.

したがって、操作出力D 4N(Z)は、となる。Therefore, the operation output D4N(Z) becomes.

ただし、αo=0とする。したがって、; n番目の操
作出力Dnは、 となり、差分形で出力するときは、 となる。
However, it is assumed that αo=0. Therefore, the n-th operation output Dn is as follows, and when outputting in differential form, it becomes as follows.

これらは、1次遅れ系の出力を直線的に変化させるとき
の、操作出力の一般的形式である。
These are general formats of the manipulated output when linearly changing the output of the first-order lag system.

操作出力りの時間的推移を示せば、例えば第3図のよう
になる。
For example, the time course of the operation output is shown in Fig. 3.

すなわち、抄替えに伴なうaのような水分率変化に対応
して、操作による水分率変化をbのようにするために、
操作出力はCのようになる。
In other words, in order to make the moisture content change due to the operation as shown in b, in response to the change in moisture content as shown in a due to paper change,
The operation output will be as shown in C.

このような操作出力りは、水分率を整定させる直前にお
いてピークを持ち、その後このピークより値の小さい新
たな定常値となる。
Such an operating output has a peak just before the moisture content is stabilized, and then reaches a new steady value smaller than this peak.

水分率の変化が大きいほど、操作出力りのピークおよび
出力の差分が大きくなる。
The greater the change in moisture content, the greater the peak of the operating output and the greater the difference in output.

このような操作出力りが、抄替えの実施に先立って、計
算制御装置CMTにおいて求められ、操作出力りのピー
クが、所定の限度Eを越えていないかどうか調べられる
This operating output is determined in the calculation control unit CMT prior to carrying out the paper change, and it is checked whether the peak of the operating output exceeds a predetermined limit E.

そして、限度を越えていなげれば、抄替え開始とともに
、この操作出力りで水分率を操作し、もし、限度を越え
ていれば、次のようにして、新たな操作出力びを計算し
直し、それによって水分率を操作する。
If the limit has not been exceeded, the moisture content is manipulated using this operating output at the start of paper reshaping, and if the limit has been exceeded, the new operating output is recalculated as follows. , thereby manipulating the moisture content.

操作出力の限度Eは、例えば、整定後の定常操作出力に
対するパーセントで表わされるとすると操作出力りのピ
ークは、この限度以下でなければならない。
If the limit E of the operating output is expressed, for example, as a percentage of the steady operating output after settling, the peak of the operating output must be below this limit.

操作出力りのピークは、定常出力値1/にと最終回の差
分出力値△DNの絶対値の和であるから、次式が成り立
つ。
Since the peak of the operation output is the sum of the absolute value of the steady output value 1/ and the final differential output value ΔDN, the following equation holds true.

ここで、 であり、かつ、絶対値記号の中が負であるから、α9式
は、 となる。
Here, and since the inside of the absolute value symbol is negative, the α9 formula is as follows.

すなわち、操作出力の出力回数Nを、(12)式を満足
するように定めれば、操作出力のピークを限度以下にす
ることができる。
That is, if the number N of outputs of the manipulated output is determined so as to satisfy equation (12), the peak of the manipulated output can be made below the limit.

その回数は(12)式となる。The number of times is expressed as equation (12).

この回数Nは、操作出力りのピークを制限しないときの
出力回数よりも多くなる。
This number of times N is greater than the number of outputs when the peak of the operation output is not limited.

操作の周期は一定であるから、回数がふえた分だけ操作
開始点が早められる。
Since the operation cycle is constant, the operation start point is advanced by the increase in the number of operations.

そして、この早められた時点から、第3図すの点線のよ
うに、操作による水分率を変化させることとし、それに
対応した新たなαの数列に基づき、(8式により、操作
出力びを求める。
Then, from this earlier point in time, we will change the moisture content by operation as shown by the dotted line in Figure 3, and based on the corresponding new sequence of α, we will calculate the operation output by using equation (8). .

そうすると、そのときの操作用カゴは、例えば、第3図
dのようになり、必要最小限の先行時間で、ピークが限
度以下に納まるものとなる。
In this case, the operating cage at that time will be, for example, as shown in FIG. 3d, and the peak will be within the limit with the minimum required advance time.

したがって、このような出力で操作したとき、蒸気圧系
統は充分に応じることができ、抄替え終了の時点におい
て、水分率は所定の目標値に一致する。
Therefore, when operated at such an output, the steam pressure system can sufficiently respond, and the moisture content matches the predetermined target value at the end of the paper change.

蒸気圧系統の性質上、操作出力の限度は、出力の変化率
についても規定されうる。
Due to the nature of steam pressure systems, operating power limits may also be specified for the rate of change of power.

その場合は、操作出力の差分とその限度について、上記
と同様な考えかたを適用すればよい。
In that case, the same concept as above may be applied to the difference in operation output and its limit.

このように、本発明は、抄替えを行うに当り、予め、抄
替え期間の終了時点において紙の水分率を目標値に一致
させるための蒸気圧操作出力を計算し、この出力計算値
のピークおよびまたは変化率が所定の限度以内ならば、
それに従って蒸気圧を操作し、この出力計算値のピーク
およびまたは変化率が限度を越えていれば、ピークおよ
びまたは変化率を限度以内に納めるに足る程度に操作開
始時点を先行させた訂正蒸気圧操作出力を計算し直し、
それに従って蒸気圧を操作するようにした。
As described above, the present invention calculates in advance the steam pressure operation output to match the moisture content of the paper to the target value at the end of the papermaking period, and calculates the peak of this calculated output value. and or if the rate of change is within predetermined limits,
Manipulate the steam pressure accordingly, and if the peak and/or rate of change of this calculated output value exceeds the limit, correct the steam pressure by advancing the operation start point sufficiently to bring the peak and/or rate of change within the limit. Recalculate the operation output,
The steam pressure was controlled accordingly.

このため、先行時間を必要最小限とした、合理的な蒸気
圧操作が行える。
Therefore, rational steam pressure operation can be performed with minimum lead time required.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、抄紙機とその制御系の概念的構成図、第2図
は、水分率に着目したときのプロセス・モデル、第3図
は、本発明による蒸気圧操作の動作説明図である。
Figure 1 is a conceptual block diagram of a paper machine and its control system, Figure 2 is a process model focusing on moisture content, and Figure 3 is an explanatory diagram of the steam pressure operation according to the present invention. .

Claims (1)

【特許請求の範囲】[Claims] 1 計算機によって制御される抄紙機において、抄替え
を行うに当り、予め、抄替え期間の終了時点において紙
の水分率を目標値に一致させるためのドライヤ蒸気圧操
作出力を計算し、この出力計算値のピーク値およびまた
は変化率が所定の限度以内ならば、それに従って蒸気圧
を操作し、この出力計算値のピーク値およびまたは変化
率が所定の限度を越えていれば、ピーク値およびまたは
変化率を所定の限度以内に納めるに足る程度に操作開始
時点を先行させた訂正蒸気圧操作出力を計算し直し、そ
れに従って蒸気圧を操作するようにした抄紙機における
抄替え時のドライヤ蒸気圧操作方法。
1 In a paper machine controlled by a computer, when performing a papermaking change, the dryer steam pressure operation output is calculated in advance to make the moisture content of the paper match the target value at the end of the papermaking change period, and this output calculation is performed. If the peak value and/or rate of change of the output value is within a predetermined limit, the vapor pressure is manipulated accordingly, and if the peak value and/or rate of change of this calculated output value exceeds the predetermined limit, the peak value and/or change is A dryer steam pressure operation at the time of paper change in a paper machine in which the corrected steam pressure operation output is recalculated so that the operation start point is advanced enough to keep the ratio within a predetermined limit, and the steam pressure is operated accordingly. Method.
JP2393879A 1979-02-28 1979-02-28 Dryer steam pressure operation method during paper change in paper machine Expired JPS5911718B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2393879A JPS5911718B2 (en) 1979-02-28 1979-02-28 Dryer steam pressure operation method during paper change in paper machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2393879A JPS5911718B2 (en) 1979-02-28 1979-02-28 Dryer steam pressure operation method during paper change in paper machine

Publications (2)

Publication Number Publication Date
JPS55116894A JPS55116894A (en) 1980-09-08
JPS5911718B2 true JPS5911718B2 (en) 1984-03-17

Family

ID=12124462

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2393879A Expired JPS5911718B2 (en) 1979-02-28 1979-02-28 Dryer steam pressure operation method during paper change in paper machine

Country Status (1)

Country Link
JP (1) JPS5911718B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0634960B2 (en) * 1988-04-21 1994-05-11 株式会社東芝 Coating control device
JPH07109079B2 (en) * 1988-12-16 1995-11-22 株式会社東芝 Paper machine controller

Also Published As

Publication number Publication date
JPS55116894A (en) 1980-09-08

Similar Documents

Publication Publication Date Title
CN111217203A (en) Tension control method and system for a tensioner
CN115712247A (en) Control method and control device for sand making system, processor and sand making system
JPS5911718B2 (en) Dryer steam pressure operation method during paper change in paper machine
SU1142713A1 (en) Method of automatic control of drying process
CN107183775A (en) Method for double moisture instruments linkage control of moisture in tobacco processing
JP2884696B2 (en) Apparatus and method for changing and changing papermaking speed of paper machine
SU874823A1 (en) Device for stabilizing the thickness of mica-plastic material at the outlet of manufacturing machine
SU1112070A1 (en) Device for stabilizing output of bale opener
SU434950A1 (en) METHOD FOR AUTOMATIC CONTROL OF THE PROCESS COMPLEXATION
RU159833U1 (en) SYSTEM OF AUTOMATIC REGULATION OF THE WATER LEVEL IN THE BOILER DRUM
JPH0572248B2 (en)
SU458353A1 (en) Device for automatic speed control of continuous cold rolling mill
ISHAK NURLINA SYAHIIRAH BINTI MD TAHIR
JPS5927437B2 (en) How to change the paper machine
SU412246A1 (en)
SU461372A1 (en) The method for determining the speed of rotation of a physical quantity from the required value
JPS59128603A (en) Process control device
JPH02253301A (en) Feedforward/feedback control method
JPH04203303A (en) Governor valve opening fixation control method
SU691172A1 (en) Method for automatically controlling operation of regenerator of saturated solution
JPS6117445Y2 (en)
SU753444A1 (en) Method of ion-exchange process control
SU1065021A1 (en) System of automatic stabilization of pulp densit in overflow of classifier in wet grinding
SU1330074A1 (en) Apparatus for automatic control of distribution of load between two units working in parallel
JPH0238719B2 (en) SHOSHIKISEIGYOSOCHI