JPS5916052B2 - Slime processing method and device - Google Patents
Slime processing method and deviceInfo
- Publication number
- JPS5916052B2 JPS5916052B2 JP9354280A JP9354280A JPS5916052B2 JP S5916052 B2 JPS5916052 B2 JP S5916052B2 JP 9354280 A JP9354280 A JP 9354280A JP 9354280 A JP9354280 A JP 9354280A JP S5916052 B2 JPS5916052 B2 JP S5916052B2
- Authority
- JP
- Japan
- Prior art keywords
- slime
- bag
- processing method
- storage bag
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000003672 processing method Methods 0.000 title claims description 10
- 230000003014 reinforcing effect Effects 0.000 claims description 11
- 238000009412 basement excavation Methods 0.000 claims description 7
- 238000000034 method Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000001556 precipitation Methods 0.000 description 2
- 238000004062 sedimentation Methods 0.000 description 2
- 238000011282 treatment Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000007788 roughening Methods 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Description
【発明の詳細な説明】 本発明は、スライム処理方法ならびに装置に関する。[Detailed description of the invention] The present invention relates to a slime processing method and apparatus.
一般に、アースドリル工法等による場所打ち杭において
は、スライムの沈澱及び処理が杭精度上及び作業上、最
もネックとなっている。Generally, in cast-in-place piles using the earth drilling method, sedimentation and treatment of slime is the biggest bottleneck in terms of pile accuracy and work.
例えば、鋼製パケットを掘削終了直後に孔底に沈めてス
ライムの沈澱を待ち、沈澱終了後、前記パケットの引上
げにより底ざらいを行なうスライム処理方法は、エヤー
リフトを利用した場合のようにスライムをいたずらに攪
拌分散させることがなく、簡便にして最も確実な処理法
であるとされているが、この方法においても、沈澱待ち
(通常30〜90分位である)による作業時間のロスが
大きく、シかも、底ざらい後、コンクリートの打設まで
の間にもスライムが沈澱し、殊に、交通事情によって生
コン車の現場到着が遅れる等、何らかの原因によってコ
ンクリートの打設が遅れた場合には、かなりの沈澱量と
なり、精度上好ましくない等々の問題が残されている。For example, a slime processing method in which a steel packet is sunk to the bottom of the hole immediately after drilling is completed, waits for the slime to settle, and after the settling is completed, the bottom is scraped by pulling up the packet, which is similar to using an air lift to disturb the slime. It is said to be the simplest and most reliable treatment method as it does not require stirring and dispersion. However, even with this method, there is a large loss of working time due to waiting for precipitation (usually about 30 to 90 minutes), and the process is difficult. In addition, slime may settle even after the bottom has reached the bottom and before the concrete is poured, and this can be especially severe if the concrete is delayed for some reason, such as when the ready-mixed concrete truck arrives at the site due to traffic conditions. However, there are still problems such as the amount of precipitation resulting in unfavorable accuracy.
本発明は、このような問題を解決できるスライム処理方
法とその装置を提供するものである。The present invention provides a slime processing method and apparatus that can solve these problems.
以下、本発明の実施例を図面に基づいて説明する。Embodiments of the present invention will be described below based on the drawings.
先ず、本発明に係るスライム処理装置について説明する
と、第1図はスライム処理装置を示し、1はワイヤーロ
ープ等によって構成される吊り具で、その下端には、タ
ーポリンシート(商品名)、キャンパス等の可撓性材料
よりなるスライム収納用袋2が口部を上にして連結され
ている。First, to explain the slime processing device according to the present invention, FIG. 1 shows the slime processing device, and 1 is a hanging device made of a wire rope or the like, and at the lower end, a tarpaulin sheet (product name), canvas, etc. A slime storage bag 2 made of a flexible material is connected with its mouth facing upward.
前記袋2には、ゴムホース等を材料とする上下一対のゴ
ムリング3a、3bと、上下両端に前記ゴムリング3a
、3bが各々挿通される鋼製リング4a。The bag 2 includes a pair of upper and lower rubber rings 3a and 3b made of rubber hose or the like, and the rubber rings 3a at both upper and lower ends.
, 3b are inserted through the steel rings 4a.
4bを有する複数本の鋼棒5・・・とからなる骨格が固
着され、該骨格によって前記袋2の口部を開放状態に付
勢すると共に、吊り具1による引上げ時に袋2に作用す
るスライムの重量、水による抵抗等の荷重によって、前
記ゴムリング3a、3bのリング形状が壊れて口部が閉
じ、しぼんだ袋状となるように構成しである。A skeleton consisting of a plurality of steel rods 5 having 4b is fixed, and the skeleton urges the opening of the bag 2 to an open state, and also prevents the slime from acting on the bag 2 when it is pulled up by the hanging tool 1. The ring shape of the rubber rings 3a, 3b is broken by loads such as the weight of the bag and the resistance due to water, and the openings of the rubber rings 3a and 3b are closed, forming a deflated bag-like shape.
4’aは袋2の口を杭中心と同心状に保持するためのガ
イドである。4'a is a guide for holding the mouth of the bag 2 concentrically with the center of the pile.
第2図、第3図は、別の実施例を示し、吊り具1の下端
に、放射状を呈し、且つ、板バネ6によって拡がる方向
に揺動付勢された複数本の支持杆7・・・を枢設し、こ
れら支持杆1・・・の各下端を袋2の口部に連結したも
のであり、この実施例によつても袋2の口部が開放状態
に付勢され、吊り具1による引上げ時には、袋2に作用
する荷重によって、口部が閉じ、しぼんだ袋状となる。FIGS. 2 and 3 show another embodiment, in which a plurality of support rods 7 are provided at the lower end of the hanging device 1 in a radial shape and are biased to swing in the expanding direction by a leaf spring 6. The lower ends of these support rods 1 are connected to the mouth of the bag 2. In this embodiment, the mouth of the bag 2 is also biased to the open state, and the bag 2 is suspended. When the bag 2 is pulled up by the tool 1, the load acting on the bag 2 closes the mouth part, forming a deflated bag-like shape.
尚、上記両実施例において、引上げ時に袋2がしぼみや
すいように、袋2の底に鉄板を敷設してもよい。Incidentally, in both of the above embodiments, an iron plate may be placed at the bottom of the bag 2 so that the bag 2 easily deflates when being pulled up.
次に、本発明に係るスライム処理方法を工程順に説明す
る。Next, the slime processing method according to the present invention will be explained step by step.
■ 掘削終了後、直ちに上述した如きスライム処理装置
を掘削孔に挿入し、スライム収納用袋2を孔底にセット
する。(2) Immediately after the excavation is completed, the slime processing device as described above is inserted into the excavation hole, and the slime storage bag 2 is set at the bottom of the hole.
吊り具1の最上部は、第4図イに示す如く、ケーシング
天端又はその近辺に設置した適当な補助具8に止めてお
く。The top of the hanging tool 1 is fixed to a suitable auxiliary tool 8 installed at or near the top of the casing, as shown in FIG. 4A.
■ 第4図口、ハ、二に示す如く、袋2のセット後、す
ぐに鉄筋篭9を掘削孔に挿入する。- As shown in Figure 4, Part 3, C, 2, immediately after setting the bag 2, insert the reinforcing bar basket 9 into the excavation hole.
この場合)予め鉄筋篭9の中にワイヤロープ10を1本
通しておき、これを袋2の吊り具1と接続することによ
って、鉄筋篭9の挿入を支障なく行なうことができる。In this case), by passing one wire rope 10 through the reinforcing bar basket 9 in advance and connecting it to the hanger 1 of the bag 2, the reinforcing bar basket 9 can be inserted without any trouble.
また、鉄筋篭9は孔底まで挿入してもよい力ζ この実
施例では、袋2の口部にガイド4′aを設けであるため
、鋼管等よりなる保持具9′を用いて、鉄筋篭9下端位
置を袋2よりも上方の適当なレベルhに保持している。In addition, the reinforcing bar cage 9 can be inserted to the bottom of the hole with sufficient force ζ In this embodiment, since a guide 4'a is provided at the mouth of the bag 2, a holder 9' made of a steel pipe or the like is used to insert the reinforcing bar The lower end position of the basket 9 is maintained at an appropriate level h above the bag 2.
■ 次に、第4図ホに示すように、トレミー管11を挿
入する。(2) Next, as shown in FIG. 4E, the tremie tube 11 is inserted.
■ しかる後、第4図へ、トに示すように、吊り具1を
介して、袋2を引き上げ、袋2内に沈澱したスライムを
地上に排出する。(2) Thereafter, as shown in FIG. 4, the bag 2 is pulled up via the hanging device 1, and the slime deposited in the bag 2 is discharged to the ground.
この場合、袋2は孔底に沈められている間、口部を開い
た状態に保形されるが、引上げ時には、袋2にスライム
重量や水の抵抗等が作用するので、口部が閉じ、しぼん
だ袋状に変形する。In this case, while the bag 2 is submerged in the bottom of the hole, the mouth is kept open, but when it is pulled up, the slime weight and water resistance act on the bag 2, so the mouth closes. , transforms into a deflated bag-like shape.
従って、鉄筋篭9やトレミー管11が挿入されていても
、袋2を引き上げることができる。Therefore, even if the reinforcing bar basket 9 or the tremie tube 11 is inserted, the bag 2 can be pulled up.
尚、鉄筋篭9は、袋2がしぼんだ後、保持具9′を抜き
、孔底にまで沈めるものとする。Note that after the bag 2 is deflated, the holder 9' of the reinforcing bar cage 9 is removed and the reinforcing bar basket 9 is sunk to the bottom of the hole.
0袋2の引上げ直後に、第4図チに示す如く、トレミー
管11によりコンクリートを打設する。Immediately after pulling up the 0 bag 2, concrete is poured using the tremie pipe 11, as shown in FIG.
第5図は、上記のスライム処理方法と従来方法との比較
例を示すタイムチャートである。FIG. 5 is a time chart showing a comparative example of the slime processing method described above and the conventional method.
同図において、Aは従来方法、Bは本発明に係るスライ
ム処理方法、数値は所要時間分を示す。In the figure, A indicates the conventional method, B indicates the slime processing method according to the present invention, and the numerical values indicate the required time.
同図から明らかなように、B方法においては、スライム
の沈澱待ち時間に、鉄筋管及びトレミー管のセットが同
時に行なわれているため、待ち時間というロスがなく、
杭1本あたりの所要時間を40分程度短縮でき、しかも
、コンクリート打設の直前に底ざらいが行なわれるため
、杭の精度を向上し得るのである。As is clear from the figure, in Method B, the reinforcing steel pipes and tremie pipes are set at the same time while waiting for the slime to settle, so there is no loss in waiting time.
The time required for each pile can be reduced by about 40 minutes, and the accuracy of the piles can be improved because the bottom roughening is carried out immediately before concrete pouring.
以上のように、本発明によれば、吊り具を介してスライ
ム収納用袋を引き上げることによって、口部が閉じ、し
ぼんだ袋状となるため、鉄筋篭やトレミー管が掘削孔内
にあっても、袋を引き上げることが可能である。As described above, according to the present invention, by pulling up the slime storage bag through the hanging tool, the mouth portion closes and the bag becomes deflated, so that the reinforcing bar cage or tremie pipe is located in the excavation hole. It is also possible to pull up the bag.
従って、スライムの沈澱待ち時間に、鉄筋篭及びトレミ
ー管を挿入配置して、待ち時間という無駄な時間をなく
すことができたのであり、しかも、コンクリート打設の
直前でスライム処理(袋の引上げ)を行なうことによっ
て、精度の向上を図り得るのである。Therefore, we were able to eliminate wasted waiting time by inserting reinforcing bar baskets and tremie pipes during the waiting time for slime sedimentation, and moreover, slime processing (pulling up bags) immediately before concrete pouring. By doing so, accuracy can be improved.
図面は本発明の実施例を示し、第1図はスライム処理装
置の斜視図、第2図は別の実施例を示す斜視図、第3図
は要部断面図、第4図イ〜チはスライム処理方法の工程
図、第5図は上記スライム処理方法と従来方法とを比較
するタイムチャートである。
1・・・・・・吊り5目、2・・・・・・スライム収納
用袋。The drawings show an embodiment of the present invention; FIG. 1 is a perspective view of a slime processing device, FIG. 2 is a perspective view of another embodiment, FIG. 3 is a sectional view of the main part, and FIG. FIG. 5, which is a process diagram of the slime processing method, is a time chart comparing the above slime processing method and the conventional method. 1... Hanging 5 eyes, 2... Slime storage bag.
Claims (1)
付勢されると共に引上げ時に作用する荷重によって口部
が閉じるように構成されたスライム収納用袋を掘削孔の
底部に沈め、鉄筋篭及びトレミー管を前記掘削孔に挿入
した後、前記スライム収納用袋を引き上げることを特徴
とするスライム処理方法。 2 吊り具の下端に、口部が開放状態に付勢され、引上
げ時に作用する荷重によって口部を閉じるように構成さ
れたスライム収納用袋を連結してなるスライム処理装乱[Scope of Claims] 1. A slime storage bag connected to the lower end of the hanger and configured so that the mouth part is biased to the open state and closed by the load applied when pulling up the slime is inserted into the excavation hole. A slime processing method comprising sinking the slime storage bag into the bottom of the excavation hole, inserting a reinforcing bar basket and a tremie tube into the excavation hole, and then pulling up the slime storage bag. 2. A slime processing device in which a slime storage bag is connected to the lower end of the hanger, the opening of which is biased to an open state and whose opening is closed by the load applied when lifting.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9354280A JPS5916052B2 (en) | 1980-07-08 | 1980-07-08 | Slime processing method and device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9354280A JPS5916052B2 (en) | 1980-07-08 | 1980-07-08 | Slime processing method and device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5719419A JPS5719419A (en) | 1982-02-01 |
| JPS5916052B2 true JPS5916052B2 (en) | 1984-04-13 |
Family
ID=14085152
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP9354280A Expired JPS5916052B2 (en) | 1980-07-08 | 1980-07-08 | Slime processing method and device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5916052B2 (en) |
-
1980
- 1980-07-08 JP JP9354280A patent/JPS5916052B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5719419A (en) | 1982-02-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6998039B2 (en) | Catch basin filter | |
| JP5412501B2 (en) | Reinforcement rod erection method, buoyancy imparting device used in the method, and buoyancy body detachment device | |
| CN110904954A (en) | Suspension rack for suspending steel reinforcement cage | |
| CN103556626B (en) | Hanging structure for hoisting large-diameter hole drilling filling pile steel bar cage | |
| CN210505223U (en) | Bored concrete pile steel reinforcement cage hangs puts device | |
| JPS5916052B2 (en) | Slime processing method and device | |
| CN207727561U (en) | The lifting installation system of mini pile cages | |
| KR101747171B1 (en) | Method to Prevent Scour of Foundation and Embankment | |
| JPS6140920A (en) | Method and apparatus for placing in-place pile concrete | |
| CN209159947U (en) | A kind of tubular pole cutting operation platform | |
| JPS607393Y2 (en) | Underwater bagged sand pile driving equipment | |
| JPH0517958A (en) | Execution method for steel pipe pile | |
| CN118814787B (en) | Mould bag filling ship and filling method | |
| JP2001303559A (en) | Method and apparatus for removing extra banking on head of cast-in-place pile | |
| JPH0312839Y2 (en) | ||
| JPH0643103Y2 (en) | Opening and closing device for earth and sand bucket | |
| JP2613884B2 (en) | Bagged sand drain method | |
| JPH0330422Y2 (en) | ||
| JPS6033181Y2 (en) | excavation bucket | |
| JPH04174130A (en) | Method and device for automatically installing strut | |
| JPH03172423A (en) | Setting method for large-sized concrete product | |
| JPS5934604Y2 (en) | Sand supply device to net bag for sand pile | |
| JPS6124768A (en) | Apparatus for hanging iron wire cage | |
| JPH0551917A (en) | Matress-shaped gabion and hanging and placing device for same | |
| JPH06228950A (en) | Removing device for extra concrete |