JPS591851B2 - drilling method - Google Patents
[go: Go Back, main page]

JPS591851B2 - drilling method - Google Patents

drilling method

Info

Publication number
JPS591851B2
JPS591851B2 JP18404981A JP18404981A JPS591851B2 JP S591851 B2 JPS591851 B2 JP S591851B2 JP 18404981 A JP18404981 A JP 18404981A JP 18404981 A JP18404981 A JP 18404981A JP S591851 B2 JPS591851 B2 JP S591851B2
Authority
JP
Japan
Prior art keywords
ground
earth
backhoe
embankment
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP18404981A
Other languages
Japanese (ja)
Other versions
JPS5886225A (en
Inventor
恒雄 大橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyoei Kogyo Co Ltd
Original Assignee
Kyoei Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyoei Kogyo Co Ltd filed Critical Kyoei Kogyo Co Ltd
Priority to JP18404981A priority Critical patent/JPS591851B2/en
Publication of JPS5886225A publication Critical patent/JPS5886225A/en
Publication of JPS591851B2 publication Critical patent/JPS591851B2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F1/00General working methods with dredgers or soil-shifting machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)

Description

【発明の詳細な説明】 本発明は新規な構成を有する掘削方法を提供しようとす
るものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention seeks to provide an excavation method having a novel configuration.

従来ストーンピッカーへの土砂の投入は、バックホーを
使用しているが、バックホーは深度の浅い掘削が不得意
であるため、掘削能力を充分発揮することができないな
どの問題がある。
Conventionally, backhoes are used to introduce earth and sand into stone pickers, but backhoes are not good at digging at shallow depths, so there are problems such as not being able to fully utilize their digging capacity.

本発明はかかる問題を充分解決しようとするもので、以
下図面を参照しながら、その1実施例の詳細を説明する
The present invention aims to fully solve this problem, and one embodiment thereof will be described in detail below with reference to the drawings.

掘削を所望する所定面積を有する圃場などの被処理地面
1において、処理深さに相邑する地表面1人をブルドー
ザなどで削りながら土砂を上記地面1の一部に集めて土
堤2を築堤し、との土堤2をバックホー3などにより、
当該土堤2を掘削しながら土砂をストーンピッカーなど
の処理装置4に投入するよう構成されている。
In the ground 1 to be treated, such as a farm field having a predetermined area where excavation is desired, earth and sand are collected on a part of the ground 1 while scraping the ground surface corresponding to the depth of treatment with a bulldozer, and an earth embankment 2 is built. Then, the earthen embankment 2 is removed by backhoe 3, etc.
It is configured to feed earth and sand into a processing device 4 such as a stone picker while excavating the earth embankment 2.

そして、たとえばストーンピッカーで処理された除礫ず
みの土砂はまた掘削された地面I A’上に敷きつめブ
ルドーザなどで均一になるよう均す。
Then, for example, the gravel that has been removed by a stone picker is spread over the excavated ground IA' and leveled using a bulldozer or the like.

以上は土堤2を被処理地面1の全面をブルドーザで削っ
た場合で説明したが、第6図、第7図の如く上記地面1
の一部に掘削しない部分1人“を残してこの部分1人“
上に土堤2を形成したものでもよい。
The above explanation is based on the case where the earth embankment 2 is carved out of the entire surface of the ground 1 to be treated using a bulldozer, but as shown in Figures 6 and 7, the ground 1
There is one person who does not excavate in a part of the area, and one person who does not excavate this part.
It may also have an earthen embankment 2 formed thereon.

この場合、上記掘削しない部分1A“についてはバック
ホーで処理することになる。
In this case, the portion 1A'' that is not excavated will be treated with a backhoe.

なお、第5図はバックホーが土堤上に乗った状態で処理
している場合を示しているが、第8図の如く地上にあり
ながら土堤2の長手方向へ掘削処理してもよい。
Although FIG. 5 shows a case in which the backhoe is carrying out processing while riding on the earthen embankment, it is also possible to perform excavation processing in the longitudinal direction of the earthen embankment 2 while being on the ground as shown in FIG.

本発明のものは上述の如く構成されているからA バッ
クホーの掘削能力を最大限に71″(用できる。
Since the present invention is constructed as described above, the excavation capacity of the backhoe A can be utilized to the maximum of 71''.

B ストーンピッカーへ投入する場合、当該ストーンピ
ッカーの投入シュートとバックホーの作業レベルの差が
小さくなり、ダンプ作業が容易となる。
B When dumping into a stone picker, the difference between the work level of the stone picker's charging chute and the backhoe becomes smaller, making dumping easier.

C築堤のための前処理により、床上が解かれ、バックホ
ーの掘削作業が容易になる。
Pretreatment for embankment C loosens the floor and makes it easier for backhoe excavation work.

D 築堤をしない従来工法では処理深さが浅い場合には
バックホーで土砂をかき寄せてからすぐい込む作業をし
なければならないが、本願方法ではかかる作業を不要と
するから掘削のサイクルタイムを一段と短くすることが
できる。
D With conventional methods that do not involve embankments, if the depth of treatment is shallow, it is necessary to use a backhoe to scrape up the soil and then immediately dig in. However, with the proposed method, such work is not necessary, so the excavation cycle time is further shortened. can do.

E 除礫処理した土砂をブルドーザなどで均して敷きつ
めるから、敷きつめられた土砂の底面側も表面側も均一
化する。
E: The gravel-removed soil is leveled and spread using a bulldozer, so both the bottom and surface of the spread soil are uniform.

F 雨天時には土堤にシートをかけシート養生ができ、
天候回復彼達やかに作業の再開をすることができる。
F In case of rain, you can cover the earthen embankment with a sheet for curing.
They can resume work as soon as the weather improves.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の1実施例を示すもので、第1図第2図、
第3図は土堤を形成する工程を順に示す略図的断面図、
第4図は斜視図、第5図は作業状態の斜視図、第6図、
第7図は他の実施例を示す略図的縦断面図、第8図は作
業状態の他の方法を示す略図的平面図である。 1・・・被処理地面、1人・・・地表面、2・・・土堤
The drawings show one embodiment of the present invention, and include FIG. 1, FIG. 2, and
Figure 3 is a schematic cross-sectional view showing the steps of forming an earthen embankment;
Figure 4 is a perspective view, Figure 5 is a perspective view of the working state, Figure 6,
FIG. 7 is a schematic vertical sectional view showing another embodiment, and FIG. 8 is a schematic plan view showing another method of working conditions. 1... Ground to be treated, 1 person... Ground surface, 2... Earth embankment.

Claims (1)

【特許請求の範囲】[Claims] 1 掘削を所望する所定面積の被処理地面1において、
処理深さに相邑する地表面1Aをブルドーザなどで削り
ながら土砂を上記地面1の一部に集めて土堤2を築堤し
、この土堤2をバックホー3などにより、当該土堤2を
掘削しながら土砂を当該バックホー3と伴走するストー
ンピッカーなどの処理装置4へ投入し、この処理装置4
から排出された除礫ずみの土砂5を掘削さtた地面IA
’にブルドーザなどで均一に均すことを特徴とする掘削
方法。
1. In a predetermined area of ground 1 where excavation is desired,
While scraping the ground surface 1A corresponding to the treatment depth with a bulldozer or the like, the earth and sand are collected on a part of the ground 1 to build an earth embankment 2, and this earth embankment 2 is excavated using a backhoe 3 or the like. While doing so, the earth and sand are thrown into a processing device 4 such as a stone picker that is accompanied by the backhoe 3, and this processing device 4
Ground IA where excavated soil 5 after removing gravel discharged from
An excavation method characterized by leveling the area uniformly using a bulldozer etc.
JP18404981A 1981-11-16 1981-11-16 drilling method Expired JPS591851B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18404981A JPS591851B2 (en) 1981-11-16 1981-11-16 drilling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18404981A JPS591851B2 (en) 1981-11-16 1981-11-16 drilling method

Publications (2)

Publication Number Publication Date
JPS5886225A JPS5886225A (en) 1983-05-23
JPS591851B2 true JPS591851B2 (en) 1984-01-14

Family

ID=16146470

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18404981A Expired JPS591851B2 (en) 1981-11-16 1981-11-16 drilling method

Country Status (1)

Country Link
JP (1) JPS591851B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4810116B2 (en) * 2005-04-01 2011-11-09 益田クリーンテック株式会社 Dust removal equipment

Also Published As

Publication number Publication date
JPS5886225A (en) 1983-05-23

Similar Documents

Publication Publication Date Title
CN110889163B (en) A method to control wide cracks in coal mining collapse in loess hilly areas
JPS62288218A (en) Settlement caisson
Kirsten Case histories of groundmass characterization for excavatability
JPS591851B2 (en) drilling method
RU2024753C1 (en) Method for placer dredging
JP2743055B2 (en) Liquefaction prevention method for sand ground
RU2201949C2 (en) Drilling reject burial method
US1698529A (en) Method of and apparatus for forming trenches
CN114541362A (en) Foundation treatment method and artificial foundation
SU846671A1 (en) Excavator working equipment
SU1463857A1 (en) Method of constructing trenchless drainage system
US941051A (en) Dike-building apparatus and process.
RU2093642C1 (en) Bucket of dragline excavator
SU1744256A1 (en) Stripping method for horizontal and gently dipping deposits
SU1469027A1 (en) Method of working a pit
SU1184911A1 (en) Apparatus for constructing drainage in rocky soil
SU1724814A1 (en) Embankment filling method
SU829791A1 (en) Method of making an underground profile working
SU787564A1 (en) Shovel bucket
US3890791A (en) Method of building a tunnel and tunnel built according to said method
SU667671A1 (en) Stripped soil dumping method
SU1273436A1 (en) Method of constructing dams on weak foundation
RU2107774C1 (en) Bucket of dragline excavator
SU821655A1 (en) Method of erecting pile foundation on earth-fill areas
SU1642015A1 (en) Method of mining placer deposits with dredge in complicated geological conditions