Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS5930842B2 - How to build a long concrete bridge - Google Patents
[go: Go Back, main page]

JPS5930842B2 - How to build a long concrete bridge - Google Patents

How to build a long concrete bridge

Info

Publication number
JPS5930842B2
JPS5930842B2 JP50099550A JP9955075A JPS5930842B2 JP S5930842 B2 JPS5930842 B2 JP S5930842B2 JP 50099550 A JP50099550 A JP 50099550A JP 9955075 A JP9955075 A JP 9955075A JP S5930842 B2 JPS5930842 B2 JP S5930842B2
Authority
JP
Japan
Prior art keywords
girder
concrete
girders
constructed
concrete bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP50099550A
Other languages
Japanese (ja)
Other versions
JPS5223831A (en
Inventor
誠治 保坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ORIENTAL CONCRETE CO
Original Assignee
ORIENTAL CONCRETE CO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ORIENTAL CONCRETE CO filed Critical ORIENTAL CONCRETE CO
Priority to JP50099550A priority Critical patent/JPS5930842B2/en
Publication of JPS5223831A publication Critical patent/JPS5223831A/en
Publication of JPS5930842B2 publication Critical patent/JPS5930842B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】 この発明は長大コンクリート橋の施工の際、適当な区分
長さづつコンクリート桁を打ち継いで行く方法に関する
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of pouring concrete girders in appropriate section lengths during construction of a long concrete bridge.

従来コンクリート橋の桁断面は橋脚間が比較的長径間に
なると第1図の1室或は第2図の2室などのような箱継
面の桁aが用いられる。
Conventionally, when the girder cross section of a concrete bridge has a relatively long span between the piers, a box-jointed girder a is used, such as the one chamber shown in FIG. 1 or the two chambers shown in FIG. 2.

これを施工するには第3図に示す如く、橋脚すの上部の
桁C上に移動架設機dを設け、該移動架設機dより型枠
eを吊し、該型枠e内にコンクリートを流し込んで第1
図或は第2図のような箱型の桁aを適当な区分長さ毎に
打設し、これを順次打ち継いで桁を構築する。
To construct this, as shown in Figure 3, a mobile construction machine d is installed on the girder C at the top of the pier, a formwork e is suspended from the mobile construction machine d, and concrete is poured into the formwork e. Pour the first
A box-shaped girder a as shown in the figure or FIG. 2 is cast for each appropriate section length, and the girders are constructed by successively joining them.

しかしながら橋脚す間の距離すなわち径間が例えば20
0メートル以上などと非常に長い場合、又は車輌荷重が
極端に大きい場合、強度上から桁の高さhが大きくなる
ので、前記の移動荷投機も型枠も巨大なものとなり、施
工が困難であると共にコストも高くなる。
However, the distance between the piers, or the span, is, for example, 20
If the girder is very long, such as 0 meters or more, or if the vehicle load is extremely large, the height h of the girder will be large from the viewpoint of strength, so the above-mentioned mobile load speculator and formwork will be huge, making construction difficult. Along with this, the cost also increases.

この発明の目的は従来の架設機を使用し、しかも長大径
間の桁を施工できるようにすることである。
The object of this invention is to enable the construction of girders with long and large spans using conventional erection machines.

この発明はコンクリート桁を、適当な区分長さ毎にコン
クリートを打ち継いで施工するコンクリート橋において
、コンクリート桁を上部桁と上部桁とに分けて症工し始
めに上面にスラブを有する上部桁を施工して行くと共に
その施工した下部桁上に後追いするかたちで上部桁を施
工して上部桁と上部桁とが一体のコンクリート桁となる
ように施工することを特徴とする長大コンクリート橋の
構築方法である。
This invention is a concrete bridge in which concrete girders are constructed by pouring concrete into sections of appropriate length, and the concrete girders are divided into upper girders and upper girders. A method for constructing a long concrete bridge characterized by constructing an upper girder in a manner that follows the constructed lower girder as the bridge is constructed so that the upper girder and the upper girder become an integrated concrete girder. It is.

以下図面をもとに説明する。This will be explained below based on the drawings.

施工が完了したコンクリート桁1の断面は第4図に示す
ように上下二車の縦並びの形状となり第5図に示した如
く、上部桁2は上面にスラブ4を設けた箱断面とし、上
部桁は一点鎖線で示した如くπ型の断面形状とする。
The cross-section of the concrete girder 1 that has been completed has the shape of two wheels arranged vertically, as shown in Fig. 4.As shown in Fig. 5, the upper girder 2 has a box cross-section with a slab 4 on the upper surface. The girder has a π-shaped cross section as shown by the dashed line.

これを構築するには、第6図のように橋脚5上に施工し
た上部桁2aから第3図で説明した如く移動架設機に吊
した型枠にて順次上部桁2を適当な区分長さtごとに打
ち継いで行く。
To construct this, from the upper girder 2a constructed on the pier 5 as shown in Fig. 6, the upper girder 2 is successively divided into appropriate section lengths using a formwork suspended from a mobile construction machine as explained in Fig. 3. Repeat every t.

上部桁2をある程度施工した後、上部桁2の上面のスラ
ブ4を利用し移動支保工などにより上部桁3を施工して
行き、第7図に示した橋脚5間の中央付近で両脚5,5
から施工した桁を接続する。
After constructing the upper girder 2 to a certain extent, the upper girder 3 is constructed using the slab 4 on the upper surface of the upper girder 2 with movable shoring, etc., and the upper girder 3 is installed near the center between the piers 5 shown in FIG. 5
Connect the girder constructed from

以上説明した如くこの発明は長大コンクリート橋を構築
するにおいて、コンクリート桁を上部桁と上部桁とに分
けて施工することにより型枠や移動架設機が従来のもの
を使用でき、しかも径間の長いコンクリート橋を構築す
ることができる。
As explained above, when constructing a long concrete bridge, this invention allows the use of conventional formwork and mobile erection machines by constructing the concrete girder separately into the upper girder and the upper girder. Concrete bridges can be built.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図、第2図は従来の桁断面を示す図、第3図は従来
の桁を施工する際の説明図、第4図、第5図はこの発明
のコンクリート桁断面を示す図、第6図、第7図はこの
発明の構築方法を示す説明図である。 1・・・・・・コンクリート桁、2・・・・・・上部桁
、3・・・・・・上部桁、4・・・・・・スラブ。
Figures 1 and 2 are diagrams showing a cross section of a conventional girder, Figure 3 is an explanatory diagram of the construction of a conventional girder, Figures 4 and 5 are diagrams showing a cross section of a concrete girder according to the present invention, 6 and 7 are explanatory diagrams showing the construction method of this invention. 1... Concrete girder, 2... Upper girder, 3... Upper girder, 4... Slab.

Claims (1)

【特許請求の範囲】[Claims] 1 適当な区分長さ毎にコンクリートを打ち継いで、コ
ンクリート桁を施工するコンクリート橋において、コン
クリート桁を上部桁と上部桁とに分けて施工し、始めに
、上面にスラブを有する上部桁を施工して行くと共にそ
の施工した下部桁上に上部桁を施工して上部桁と上部桁
とが一体のコンクリート桁となるように施工することを
特徴とする長大コンクリート橋の構築方法。
1 Concrete girders are constructed by pouring concrete into appropriate sectioned lengths.In concrete bridges, the concrete girders are divided into upper girders and upper girders, and the upper girder with a slab on the top is constructed first. This method of constructing a long concrete bridge is characterized by constructing an upper girder on top of the constructed lower girder so that the upper girder and the upper girder become an integrated concrete girder.
JP50099550A 1975-08-18 1975-08-18 How to build a long concrete bridge Expired JPS5930842B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP50099550A JPS5930842B2 (en) 1975-08-18 1975-08-18 How to build a long concrete bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP50099550A JPS5930842B2 (en) 1975-08-18 1975-08-18 How to build a long concrete bridge

Publications (2)

Publication Number Publication Date
JPS5223831A JPS5223831A (en) 1977-02-23
JPS5930842B2 true JPS5930842B2 (en) 1984-07-30

Family

ID=14250277

Family Applications (1)

Application Number Title Priority Date Filing Date
JP50099550A Expired JPS5930842B2 (en) 1975-08-18 1975-08-18 How to build a long concrete bridge

Country Status (1)

Country Link
JP (1) JPS5930842B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63158832U (en) * 1987-04-04 1988-10-18
WO2011014351A1 (en) 2009-07-31 2011-02-03 Chemtura Corporation Process for forming alkylated aryl phosphite compositions from complex hydrocarbon streams
WO2011014477A1 (en) 2009-07-31 2011-02-03 Chemtura Corporation Liquid alkylated trisaryl phosphite compositions having two alkyl groups with different carbon number
WO2011049728A1 (en) 2009-10-23 2011-04-28 Chemtura Corporation Polymers with low gel content and enhanced gas-fading

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5025268A (en) * 1973-06-11 1975-03-17

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63158832U (en) * 1987-04-04 1988-10-18
WO2011014351A1 (en) 2009-07-31 2011-02-03 Chemtura Corporation Process for forming alkylated aryl phosphite compositions from complex hydrocarbon streams
WO2011014477A1 (en) 2009-07-31 2011-02-03 Chemtura Corporation Liquid alkylated trisaryl phosphite compositions having two alkyl groups with different carbon number
WO2011049728A1 (en) 2009-10-23 2011-04-28 Chemtura Corporation Polymers with low gel content and enhanced gas-fading

Also Published As

Publication number Publication date
JPS5223831A (en) 1977-02-23

Similar Documents

Publication Publication Date Title
CN103981803B (en) The combined gate pier of precast assembly and construction method thereof
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN104674660A (en) Novel hollow plate hinge joint structure and construction method thereof
JPS5930842B2 (en) How to build a long concrete bridge
CN217105550U (en) Reinforced concrete prefabricated integral-cast house structure
CN213772939U (en) Assembled anticollision wall
CN206800165U (en) A kind of highway bridge
US4123485A (en) Stage construction of an elevated box girder and roadway structure
JP2001207410A (en) Pier structure and its constructing method
CN211692478U (en) a myeongdong structure
CN110512728A (en) A prefabricated building superimposed lotus root beam-column joint structure and its construction method
CN214061940U (en) A precast concrete prefabricated structure with a ribbed formwork structure
WO2024193073A1 (en) Application of suspended beam and false cantilever construction technology in viaduct construction
CN203878460U (en) Prefabricated assembly combined type portal pier
CN212294729U (en) Steel construction outsourcing column foot structure
CN210421625U (en) Cast-in-place combination beam structure of assembled
CN116240797A (en) Bridge wet joint structure and its construction method
CN209760057U (en) A reinforcement device for a suspension system arch bridge
JP2584418B2 (en) Overhang construction method and stress improvement device for synthetic cable-stayed bridge
JP2004332425A (en) Bridge construction method and bridge construction device
CN206667071U (en) Continuous beam end bay closing device
CN223706233U (en) A column-beam joint connection structure
JPS60133146A (en) Construction of synthetic large beam using u-shaped precast beam material
JPS6198870A (en) Construction method for precast reinforced concrete shear walls
CN217168946U (en) Cross slope adjusting mechanism and T-beam forming die