JPS5933757B2 - Method for expanding small diameter holes using muddy water - Google Patents
Method for expanding small diameter holes using muddy waterInfo
- Publication number
- JPS5933757B2 JPS5933757B2 JP5028780A JP5028780A JPS5933757B2 JP S5933757 B2 JPS5933757 B2 JP S5933757B2 JP 5028780 A JP5028780 A JP 5028780A JP 5028780 A JP5028780 A JP 5028780A JP S5933757 B2 JPS5933757 B2 JP S5933757B2
- Authority
- JP
- Japan
- Prior art keywords
- hole
- muddy water
- drilling
- small diameter
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Earth Drilling (AREA)
Description
【発明の詳細な説明】
この発明は、地中に設けられた彎曲あるいは水平の小径
孔を、泥水により掘削土を搬出しながら拡孔する方法に
関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for enlarging a curved or horizontal small diameter hole provided underground while carrying out excavated soil using muddy water.
従来、地中に設けられた彎曲あるいは水平の小径孔を拡
孔する方法においては、第1図および第2図に示すよう
に、泥水により掘削土を拡掘孔8と後続ドリルバイブロ
または鞘管16との間隙と、先行彎曲小径孔1と先行ド
リルパイプ2との間隙とを通して搬出している。Conventionally, in the method of enlarging a curved or horizontal small diameter hole provided underground, as shown in Figs. 16 and the gap between the preceding curved small diameter hole 1 and the preceding drill pipe 2.
しかるに、前記従来の方法の場合は、拡掘孔と管の間を
掘削土を含んだ泥水が流れるため、掘削土が滞留したり
、洗掘により拡掘孔が拡大するという恐れがある。However, in the case of the conventional method, since muddy water containing excavated soil flows between the excavated hole and the pipe, there is a fear that the excavated soil may remain or the enlarged hole may become enlarged due to scouring.
そこで本発明者は、前述の問題を解決する方法として、
第3図に示すように拡孔用ビット5に掘削土を回収する
ための掘削土回収孔3を設け、掘削用泥水噴出孔9と先
行ドリルパイプ2に泥水量調節装置4により泥水量を調
整分流させ、掘削用泥水噴出孔9から出た泥水を用いて
掘削し、ドリルパイプ内泥水流水孔10を通過する泥水
に上記掘削土回収孔3より回収された掘削土を混ぜて流
送し、掘削士混りの泥水を前方地上に排出しながら全区
間にわたって拡孔掘削を行なう方法を提案した。Therefore, as a method for solving the above-mentioned problem, the present inventors
As shown in FIG. 3, an excavated soil recovery hole 3 for recovering excavated soil is provided in the hole expansion bit 5, and the amount of muddy water is adjusted by a muddy water volume adjustment device 4 in the drilling mud water spout hole 9 and the preceding drill pipe 2. Dividing the flow, drilling using the muddy water coming out of the drilling muddy water spouting hole 9, mixing the muddy water passing through the muddy water flow hole 10 in the drill pipe with the excavated soil collected from the excavated soil recovery hole 3, and flowing it. We proposed a method in which hole expansion is carried out over the entire section while draining muddy water mixed with the drilling crew to the ground ahead.
しかるに、この方法の場合は、全区間の拡孔掘削を完了
するまでの間、後方地上から泥水を圧送して前方地上に
排出するので、泥水使用量が著しく多くなる。However, in this method, muddy water is pumped from the rear ground and discharged to the front ground until completion of the hole expansion excavation of the entire section, which significantly increases the amount of muddy water used.
このため拡孔掘削のコストが高くなり、かつ泥水タンク
等の泥水設備が大型になると共に、広い泥水設備設置ス
ペースを必要とするという問題がある。For this reason, there are problems in that the cost of drilling for hole expansion becomes high, muddy water equipment such as a muddy water tank becomes large-sized, and a large space is required for installing the muddy water equipment.
この発明は前述の問題を有利に解決した泥水を用いて彎
曲あるいは水平の小径孔を拡孔する方法を提供すること
を目的とするものである。It is an object of the present invention to provide a method for expanding curved or horizontal small diameter holes using muddy water, which advantageously solves the above-mentioned problems.
次にこの発明を図示の例によって詳細に説明する。Next, the present invention will be explained in detail using illustrated examples.
まず第1図に示すように、両端部が地表に開口している
円弧状の彎曲あるいは水平の小径孔1が従来の方法によ
り設けられ、かつその彎曲あるいは水平の小径孔1に挿
入きれている先行ドリルパイプ2の後端部には、拡孔用
ビット5の前部中実軸部が連結され(連結部の図示を省
略した)、その拡孔用ビット5には、掘削土回収孔3、
調節弁からなる泥水量調節装置4、掘削用泥水噴出孔9
およびドリルパイプ内泥水流出孔10が設けられており
、拡孔用ビット5の後部中実軸部には前記先行ドリルパ
イプ2とほぼ同程度の剛性を有する鋼管からなる後続ド
リルバイブロの前端部が連結され、その後続ドリルバイ
ブロの後端部は回転推進装置7により把持されて回転さ
れながら推進される。First, as shown in Fig. 1, a curved or horizontal small-diameter hole 1 in the form of an arc with both ends open to the ground surface is prepared by a conventional method, and the hole 1 is completely inserted into the curved or horizontal small-diameter hole 1. A front solid shaft portion of a hole expansion bit 5 is connected to the rear end of the preceding drill pipe 2 (the connection portion is not shown), and the hole expansion bit 5 is connected to an excavated soil recovery hole 3. ,
Mud water amount adjustment device 4 consisting of a control valve, mud water spout hole 9 for drilling
A mud water outflow hole 10 in the drill pipe is provided, and the front end of a subsequent drill vibro made of a steel pipe having approximately the same rigidity as the preceding drill pipe 2 is attached to the rear solid shaft portion of the hole expanding bit 5. The rear end of the subsequent drill vibro is gripped by the rotary propulsion device 7 and propelled while being rotated.
推進時の泥水の流れは、第5図に示すように後続ドリル
バイブロの後端から送られた泥水がビット内に備えられ
た掘削用泥水噴出孔9と泥水量調節装置4を有するドリ
ルパイプ内泥水流出孔10とに分岐され、掘削用泥水噴
出孔9へ流れた泥水は掘削面前面へ噴出されて掘削土と
混合され、その泥水混合掘削土は、掘削土回収孔3より
回収され、ドリルパイプ内泥水流出孔10に分流された
泥水流に伴われて先行ドリルパイプ2内を流動し前方地
表に排出される。As shown in FIG. 5, the flow of mud during propulsion is carried out through the drill pipe, which has a mud water spout hole 9 for drilling and a mud water volume adjustment device 4, which is provided in the bit. The muddy water that flows into the muddy water spouting hole 9 is spouted out to the front of the excavation surface and mixed with the excavated soil, and the muddy mixed excavated soil is collected from the excavated soil recovery hole 3 and sent to the drill. The mud flows in the preceding drill pipe 2 along with the mud flow divided into the in-pipe mud water outflow hole 10 and is discharged to the ground surface in front.
このようにして、ある長さの区間だけ拡孔掘削を行なっ
たのち、・拡孔掘削を停止し、次の拡孔掘削のために前
方地上から泥水を先行ドリルパイプ2、泥水量調節装置
4、後続ドリルバイブロ内を通して逆流させて(第6図
参照)、後方地上に奨し、次に前述のような拡孔掘削と
泥水美し作業とを交互に必要回数反復して行なって、全
区間にわたって拡孔掘削を行なう。In this way, after drilling a hole for a certain length, the drilling is stopped, and for the next drilling, mud is pumped from the ground ahead into the drill pipe 2 and the mud water amount adjustment device 4. , the flow is reversed through the subsequent drill vibro (see Figure 6), and is directed to the rear ground, and then the above-mentioned hole expansion drilling and muddy water cleaning work are repeated alternately as many times as necessary to complete the entire section. Expansion drilling will be carried out over the entire area.
なお小径孔1に対して拡孔比率が小さい場合には鞘管支
承部材12、軸受13、スラスト軸受14、支承フラン
ジ15および鞘管16を省略してもよい。Note that when the hole expansion ratio is small with respect to the small diameter hole 1, the sheath tube support member 12, the bearing 13, the thrust bearing 14, the support flange 15, and the sheath tube 16 may be omitted.
また図において、11は小径孔穿設用ビット、17は鞘
管継手である。Further, in the figure, 11 is a bit for drilling small diameter holes, and 17 is a sheath pipe joint.
この発明によれば、彎曲あるいは水平の小径孔1に挿入
されている先行ドリルパイプ2の後端部に、掘削土回収
孔3と泥水量調節装置4とが設けられている拡孔用ビッ
ト5を取付け、その拡孔用ビット5を、後続ドリルバイ
ブロを介して回転推進装置7により回転推進する小径孔
の拡孔方法において、後方地上のドリルバイブロの後端
部から送入される泥水と掘削土を拡孔用ビット5に設け
られた掘削土回収孔3を経て回収し、前記彎曲あるいは
水平の小径孔1内の先行ドリルパイプ2の内部を泥水調
節装置4により流量流速を調整されて流れる泥水により
、掘削土を前方地上まで搬出しなから拡孔掘削を行ない
、次いで拡孔掘削を停止して、次の拡孔掘削のために前
方地上の泥水を先行ドリルパイプ2、泥水量調節装置4
、後続ドリルバイブロ内を逆流させて後方地上に果し、
次に前述のような拡孔掘削および泥水美しを交互に反復
して行なって全区間にわたって拡孔するので、少量の泥
水を反復使用して長距離の拡孔掘削を行なうことができ
、そのため泥水使用による長距離の拡孔掘削を低コスト
で行なうことができ、しかも泥水タンク等の泥水設備が
小型で済むと共に、泥水設備の設置スペースも狭くて済
む等の効果が得られる。According to this invention, the hole-expanding bit 5 is provided with the excavated soil recovery hole 3 and the muddy water amount adjusting device 4 at the rear end of the preceding drill pipe 2 inserted into the curved or horizontal small-diameter hole 1. In the drilling method for a small diameter hole in which the hole expanding bit 5 is rotatably propelled by a rotary propulsion device 7 via a subsequent drill vibro, muddy water is sent from the rear end of the drill vibro on the ground and the drilling The soil is recovered through the excavated soil recovery hole 3 provided in the hole expansion bit 5, and flows inside the preceding drill pipe 2 in the curved or horizontal small diameter hole 1 with the flow rate adjusted by the muddy water regulating device 4. The muddy water is used to transport the excavated soil to the ground in front of the ground, and then the drilling is carried out, and then the drilling is stopped and the muddy water on the ground in front is transferred to the advance drill pipe 2 and the muddy water amount adjustment device for the next drilling. 4
, the flow inside the subsequent drill vibro is reversed and the air is flown backward to the ground.
Next, the holes are expanded over the entire section by repeating the above-mentioned hole expansion drilling and muddy water treatment alternately, so it is possible to drill long distances by repeatedly using a small amount of muddy water. It is possible to perform long-distance drilling using muddy water at low cost, and the muddy water equipment such as a muddy water tank can be made small, and the installation space for the muddy water equipment can also be small.
第1図は彎曲小径孔を穿設した状態を示す縦断側面図、
第2図は彎曲小径孔を拡孔している状態を示す縦断側面
図、第3図はビット部付近一部切欠概略縦断側面図、第
4図はビット前面を示す正面図、第5図は掘進時の泥水
の流れを示す一部切欠概略縦断側面図、第6図は泥水逆
送時の泥水の流れを示す一部切欠概略縦断側面図である
。
図において、1は小径孔、2は先行ドリルパイプ、3は
掘削土回収孔、4は泥水量調節装置、5は拡孔用ビット
、6は後続ドリルパイプ、7は回転推進装置、9は掘削
用泥水噴出孔、10はドリルパイプ内泥水流水孔、12
は鞘管支承部材、13は軸受、14はスラスト軸受、1
6は鞘管、17は鞘管継手である。Figure 1 is a longitudinal side view showing the state in which a curved small diameter hole is drilled;
Fig. 2 is a longitudinal side view showing a curved small-diameter hole being enlarged, Fig. 3 is a partially cutaway schematic longitudinal side view near the bit portion, Fig. 4 is a front view showing the front side of the bit, and Fig. 5 is FIG. 6 is a partially cutaway schematic vertical side view showing the flow of muddy water during excavation, and FIG. 6 is a partially cutaway schematic longitudinal side view showing the flow of muddy water when the muddy water is sent back. In the figure, 1 is a small diameter hole, 2 is a leading drill pipe, 3 is an excavated soil recovery hole, 4 is a mud water volume adjustment device, 5 is a hole expansion bit, 6 is a trailing drill pipe, 7 is a rotary propulsion device, and 9 is a drilling device. 10 is a mud water flow hole in the drill pipe, 12
1 is a sheath tube support member, 13 is a bearing, 14 is a thrust bearing, 1
6 is a sheath pipe, and 17 is a sheath pipe joint.
Claims (1)
ドリルパイプ2の後端部に、掘削土回収孔3と泥水量調
節装置4とが設けられている拡孔用ビット5を取付け、
その拡孔用ビット5を、後続ドリルバイブロを介して回
転推進装置7により回転推進する小径孔の拡孔方法にお
いて、後方地上のドリルバイブロの後端部から送入され
る泥水と掘削土を拡孔用ビット5に設けられた掘削土回
収孔3を経て回収し、前記彎曲あるいは水平の小径孔1
内の先行ドリルパイプ2の内部を泥水調節装置4により
流量流速を調整されて流れる泥水により、掘削土を前方
地上まで搬出しなから拡孔掘削を行ない、次いで拡孔掘
削を停止して、次の拡孔掘削のために前方地上の泥水を
先行ドリルパイプ2、泥水量調節装置4、後続ドリルバ
イブロ内を逆流させて後方地上に果し、次に前述のよう
な拡孔掘削および泥水量しを交互に反復して行なって全
区間にわたって拡孔することを特徴とする泥水を用いて
小径孔を拡孔する方法。1 Attach a hole expansion bit 5 equipped with an excavated soil recovery hole 3 and a muddy water volume adjustment device 4 to the rear end of the preceding drill pipe 2 inserted into a curved or horizontal small diameter hole 1,
In a method for expanding a small diameter hole in which the hole expanding bit 5 is rotationally propelled by a rotary propulsion device 7 via a subsequent drill vibro, the muddy water and excavated soil introduced from the rear end of the drill vibro on the ground are expanded. The excavated soil is collected through the hole 3 provided in the hole bit 5, and then collected through the curved or horizontal small diameter hole 1.
The muddy water flowing inside the preceding drill pipe 2 with the flow rate adjusted by the muddy water regulating device 4 is used to transport the excavated soil to the ground in front of the ground before drilling the hole, then stopping the drilling and drilling the next hole. For the hole expansion drilling, muddy water on the ground in front is made to flow backward through the preceding drill pipe 2, the muddy water volume adjustment device 4, and the following drill vibro, and is discharged to the rear ground. A method for enlarging a small diameter hole using muddy water, which is characterized by repeating the steps alternately and enlarging the hole over the entire section.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5028780A JPS5933757B2 (en) | 1980-04-18 | 1980-04-18 | Method for expanding small diameter holes using muddy water |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5028780A JPS5933757B2 (en) | 1980-04-18 | 1980-04-18 | Method for expanding small diameter holes using muddy water |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS56150292A JPS56150292A (en) | 1981-11-20 |
| JPS5933757B2 true JPS5933757B2 (en) | 1984-08-17 |
Family
ID=12854698
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5028780A Expired JPS5933757B2 (en) | 1980-04-18 | 1980-04-18 | Method for expanding small diameter holes using muddy water |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5933757B2 (en) |
-
1980
- 1980-04-18 JP JP5028780A patent/JPS5933757B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS56150292A (en) | 1981-11-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4319648A (en) | Process for drilling underground arcuate paths and installing production casings, conduits, or flow pipes therein | |
| US4402372A (en) | Apparatus for drilling underground arcuate paths and installing production casings, conduits, or flow pipes therein | |
| CN202788617U (en) | Horizontally oriented reaming device | |
| USRE32267E (en) | Process for drilling underground arcuate paths and installing production casings, conduits, or flow pipes therein | |
| SE506773C2 (en) | Method and apparatus for filling boreholes | |
| JPS5933757B2 (en) | Method for expanding small diameter holes using muddy water | |
| JP5718083B2 (en) | Pipe installation device and pipe installation method | |
| JP2003214085A (en) | Mouth forming method on arrival of shield machine and shield machine | |
| JPH07173991A (en) | Pressure adjusting device for horizontal pit excavating device and pressure adjusting method therefor | |
| JPS6221955B2 (en) | ||
| JPH086558B2 (en) | Underground drilling equipment | |
| JP2000248893A (en) | Piping laying method by uncutting | |
| RU2637685C2 (en) | Device for removing drill fines | |
| JP3058106B2 (en) | Rock bolt method and drilling equipment for the method | |
| JP2000248891A (en) | Piping laying method by uncutting | |
| JPH11217991A (en) | Drift excavation device | |
| JPH0213720B2 (en) | ||
| JP2007314954A (en) | Sampling device and sampling method in geological boring survey | |
| JPS5811294A (en) | Method and apparatus for drilling pilot bore in non-opening drilling and pipe embedding method | |
| JP2003097174A (en) | Horizontal drainage device | |
| JPS61155595A (en) | Drilling head in non-cut-and-cover construction method | |
| JPH037796B2 (en) | ||
| JPS5948596A (en) | Method of construction of propulsion using horizontal auger and its device | |
| JPH0158320B2 (en) | ||
| JPH037798B2 (en) |