JPS5942796B2 - Tunnel NATM method - Google Patents
[go: Go Back, main page]

JPS5942796B2 - Tunnel NATM method - Google Patents

Tunnel NATM method

Info

Publication number
JPS5942796B2
JPS5942796B2 JP54083819A JP8381979A JPS5942796B2 JP S5942796 B2 JPS5942796 B2 JP S5942796B2 JP 54083819 A JP54083819 A JP 54083819A JP 8381979 A JP8381979 A JP 8381979A JP S5942796 B2 JPS5942796 B2 JP S5942796B2
Authority
JP
Japan
Prior art keywords
hole
tunnel
rock
drilling
shoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP54083819A
Other languages
Japanese (ja)
Other versions
JPS569595A (en
Inventor
俊 荻生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP54083819A priority Critical patent/JPS5942796B2/en
Publication of JPS569595A publication Critical patent/JPS569595A/en
Publication of JPS5942796B2 publication Critical patent/JPS5942796B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Rock Bolts (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 従来のトンネルNATM施工ではさく孔位置の測量・さ
く孔、装薬・発破・掘削土砂搬出・支保工建て込み・鉄
網張り・吹付コンクリート・ロックボルト打込み等を1
サイクルとして作業を進めるが発破より吹付コンクリー
トまでは落盤などの危険作業であるが、本発明ではさく
孔位置の測量及び鉄網張り等の作業が省略でき、かつ、
落盤防止用矢をさし込んである故に作業が安全になりま
す。
[Detailed Description of the Invention] Conventional tunnel NATM construction involves surveying the drilling position, drilling, charging, blasting, transporting excavated earth and sand, erecting shoring, laying iron mesh, spraying concrete, driving rock bolts, etc. in one step.
The work is carried out as a cycle, but the process from blasting to shotcrete is dangerous work such as cave-ins, but with the present invention, work such as surveying the drilling position and laying iron netting can be omitted, and
Work is safer because arrows are inserted to prevent cave-ins.

つぎに本発明工法の実施例を図面に基づいて説明すれば
、第1図1の鋼製支保工に2の穴を開けた鋼製支保工を
第2図の如く建て込み4の掘削面より鋼製支保工2の穴
より削岩機ののみを差し込み6のさく孔をし、7の掘削
予定線まで掘削するように装薬し発破を掛けた後、鋼製
支保工2の穴と6の先端部分に5の落盤防止用矢をさし
込んで8の吹付コンクリートを3の掘削面に施工し発破
による掘削土砂を盤出し、9のロックボルトの打込みを
行うまでを1サイクルとして作業を進める工法でありま
す。
Next, an embodiment of the construction method of the present invention will be explained based on the drawings.The steel shoring shown in Fig. 1 is constructed by drilling holes 2 in the steel shoring shown in Fig. 1. Insert the chisel of a rock drill into the hole in steel shoring 2 and drill hole 6. After charging and blasting so as to drill to the planned excavation line in 7, One cycle of work consists of inserting the rock fall prevention arrow (5) into the tip of the rock, applying shotcrete (8) on the excavation surface (3), ejecting the excavated soil by blasting, and driving the rock bolts (9). This is a construction method that will continue.

【図面の簡単な説明】[Brief explanation of the drawing]

図はこの発明のトンネルNATM工法実施例を示すもの
で、第1図鋼層支保工、第2図トンネルNATM工法の
施工断面図を示す。 1・・・鋼製支保工、2・・・鋼製支保工に開けた穴、
3・・・トンネル掘削断面、4・・・掘削面、5・・・
落盤防止用矢、6・・・落盤防止用矢のさし込み穴、7
・・・掘削予定線、8・・・吹付コンクリート、9・・
・ロックボルト。
The figures show an embodiment of the tunnel NATM construction method of the present invention, and FIG. 1 shows a steel layer support, and FIG. 2 shows a construction sectional view of the tunnel NATM construction method. 1... Steel shoring, 2... Hole drilled in the steel shoring,
3... Tunnel excavation cross section, 4... Excavation surface, 5...
Arrow for cave-in prevention, 6... Hole for inserting arrow for cave-in prevention, 7
...Excavation schedule line, 8...Shotcrete, 9...
・Rock bolt.

Claims (1)

【特許請求の範囲】[Claims] 1 la製支保工に掘削のさく孔位置を示す穴を開けこ
の穴よりさく岩用のみをさし込み掘削予定線より余分に
長い穴を岩盤に開は鋼製支保工の穴と掘削予定線より余
分に開けた穴との間に落盤防止用矢をさし込んで掘削面
に吹付コンクリート及び、ロックボルトを施工するトン
ネル工法。
1 Drill a hole in the LA shoring to indicate the drilling position. Insert a rock drilling chisel into this hole. Open a hole in the bedrock that is longer than the planned drilling line. A tunnel construction method that involves inserting arrows to prevent cave-ins between the extra holes and installing shotcrete and rock bolts on the excavated surface.
JP54083819A 1979-07-02 1979-07-02 Tunnel NATM method Expired JPS5942796B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP54083819A JPS5942796B2 (en) 1979-07-02 1979-07-02 Tunnel NATM method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP54083819A JPS5942796B2 (en) 1979-07-02 1979-07-02 Tunnel NATM method

Publications (2)

Publication Number Publication Date
JPS569595A JPS569595A (en) 1981-01-31
JPS5942796B2 true JPS5942796B2 (en) 1984-10-17

Family

ID=13813287

Family Applications (1)

Application Number Title Priority Date Filing Date
JP54083819A Expired JPS5942796B2 (en) 1979-07-02 1979-07-02 Tunnel NATM method

Country Status (1)

Country Link
JP (1) JPS5942796B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074529B (en) * 2013-08-02 2016-09-07 河北工程大学 A kind of cave continuous bivalve, lane, deep reinforcement means
CN103982197B (en) * 2014-05-28 2016-06-08 河北工程大学 A kind of deep tunnel discontinuous bivalve reinforcement means

Also Published As

Publication number Publication date
JPS569595A (en) 1981-01-31

Similar Documents

Publication Publication Date Title
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
KR101054380B1 (en) Tunnel Excavation Method
CN107060803B (en) Tunnel construction method by utilizing pipe curtain grouting
CN111425207B (en) Inclined shaft construction method and equipment
EA000555B1 (en) Undercut excavation with protection against seismic events or excessive ground movement
CN105909262B (en) A kind of underground tunnel excavation method
CN113605893A (en) A method for controlling surrounding rock of prefilled completely gob-side roadway
JPH09217594A (en) How to support the tunnel
JP2614396B2 (en) Shaft excavation method by pre-boring
CN115263319B (en) Steep bedding limestone stratum tunnel hole-out construction method
JPH0835391A (en) Preceding leg reinforcing type fore piling method by heading
CN106884660A (en) A kind of method that protection pillar base angle presplit blasting release controls roadway deformation
JP3155471B2 (en) Tunnel construction method and tunnel support structure
JPS5942796B2 (en) Tunnel NATM method
KR20190011887A (en) Method for digging huge tunnel using tnnnel boring mechine
KR101283663B1 (en) Method for digging two arch type tunnel
CN114810099B (en) Ultra-thin rock stratum ultra-large span high-speed rail tunnel excavation construction method
JPH0424398A (en) Construction of underground space with arched member
JP4281983B2 (en) Tunnel excavation method using advanced shaft
JPH07103700A (en) Underground space formation blasting method
JP2846227B2 (en) Tunnel excavation method
JP2002180789A (en) Jumbo tunnel excavation method
JPH08184284A (en) Top tunnel advanced construction method
JPS6124511B2 (en)
JPH0813997A (en) Tunnel construction method