Tunnel face excavation method

Info

Publication number
JPS5945074B2
JPS5945074B2 JP15399581A JP15399581A JPS5945074B2 JP S5945074 B2 JPS5945074 B2 JP S5945074B2 JP 15399581 A JP15399581 A JP 15399581A JP 15399581 A JP15399581 A JP 15399581A JP S5945074 B2 JPS5945074 B2 JP S5945074B2
Authority
JP
Japan
Prior art keywords
face
antibody
excavation method
tunnel
retaining plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP15399581A
Other languages
Japanese (ja)
Other versions
JPS5858394A (en
Inventor
恒夫 竹内
満 辻田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hazama Ando Corp
Original Assignee
Hazama Gumi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hazama Gumi Ltd filed Critical Hazama Gumi Ltd
Priority to JP15399581A priority Critical patent/JPS5945074B2/en
Publication of JPS5858394A publication Critical patent/JPS5858394A/en
Publication of JPS5945074B2 publication Critical patent/JPS5945074B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】 この発明はトンネル切羽の掘削工法に関するものである
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a tunnel face excavation method.

一般に砂土又は砂質土などの未固結層からなる軟弱な土
層においてトンネルを掘進する場合、切羽の崩壊の危険
が少なくない。
Generally, when excavating a tunnel in a soft soil layer consisting of an unconsolidated layer such as sandy soil or sandy soil, there is a considerable risk of the face collapsing.

そのためこのような土層においては従来側壁導坑先進リ
ングカット工法にてトンネル周壁部をリングカット施工
し、このリングカット部の切羽を矢板で防護しながら施
工を行なっているが、掘進に応じてその都度矢板の建込
み及び解体撤去作業を要するため、掘進速度が非常に遅
くなっているのが現状である。
Therefore, in such soil layers, the tunnel peripheral wall is ring-cut using the conventional sidewall tunnel advanced ring-cut method, and construction is carried out while protecting the ring-cut face with sheet piles. The current situation is that the excavation speed is extremely slow because it is necessary to erect and dismantle the sheet piles each time.

さらに、条件の悪い地質の場合は、トンネルの外周に数
段の小坑導を掘削し、トンネルの外周を固めた後施工す
る場合もあるが、前記同様に掘進速度が非常に遅く、工
期、工費が増大するのが現状である。
Furthermore, in the case of poor geological conditions, several stages of small shafts may be excavated around the outer periphery of the tunnel, and construction may be carried out after the outer periphery of the tunnel has been solidified. The current situation is that construction costs are increasing.

この発明は前記従来の課題を解決するために、切羽の崩
壊を防止しながら、容易かつ能率的に掘進することを可
能としたトンネル切羽の掘削工法を提供せんとするもの
である。
In order to solve the above-mentioned conventional problems, the present invention aims to provide a method for excavating a tunnel face that enables easy and efficient excavation while preventing the face from collapsing.

以下この発明を図により説明すると、図示の実施例では
砂土又は砂質土などの未固結層からなる切羽を掘削する
場合を示したもので、切羽1に上下、左右に所定間隔を
置いて複数本の杭体2を打込むと共に、各杭体2の後部
にはそれぞれ土留板3を取付け、これら各土留板3によ
り切羽1を被覆する。
The present invention will be explained below using the drawings. The illustrated embodiment shows a case where a face made of an unconsolidated layer such as sandy soil or sandy soil is excavated. At the same time, a plurality of pile bodies 2 are driven in, and a retaining plate 3 is attached to the rear of each pile body 2, and the face 1 is covered with each retaining plate 3.

杭体2は、例えば第2図に示す如く先端を先鋭状とした
鋼管又は鋼棒を用い、その側面に前後に多少の間隙4を
設けて土留板3の滑り止部材5及びウィング5′が突設
されている。
For example, as shown in FIG. 2, the pile body 2 is made of a steel pipe or steel rod with a sharp tip, and some gaps 4 are provided in the front and rear sides of the pile body so that the anti-slip member 5 and wings 5' of the retaining plate 3 can be secured. It is installed protrudingly.

なおウィング5′は未固結層の切羽に打ちこむため設け
られているが、切羽への杭体2の打込みが困難な場合、
これを取りはずすことも可能である。
The wing 5' is provided for driving into the unconsolidated layer face, but if it is difficult to drive the pile body 2 into the face,
It is also possible to remove this.

一方これに取付ける土留板3は第3図に示す如く鋼板等
から四角形等所要形状に形成され、その中央に杭体2を
挿通可能な透孔6が設けられ、その周囲には滑り止部材
5を挿通可能な切欠孔7が設けられている。
On the other hand, the earth retaining plate 3 to be attached to this is formed from a steel plate or the like into a required shape such as a rectangular shape as shown in FIG. A notch hole 7 is provided through which the material can be inserted.

この切欠孔7は杭体2の滑り止部材5に一致し、回転す
ることによって、土留板3を切羽に密着させ崩壊を防止
するため、切欠孔7の形状は図示以外に十字や円形等も
考えられる。
This notch hole 7 corresponds to the anti-slip member 5 of the pile body 2, and by rotating, the retaining plate 3 is brought into close contact with the face to prevent collapse. Conceivable.

そして、土留板3はその透孔6に杭体2を挿通すると共
に、切欠孔7に滑り止部材5を挿通し、間隙4の位置に
おいて多少回転させることにより滑り止部材5に係止さ
れて脱落不能に取付けることができ、また逆の操作を行
なうことにより容易に杭体2から取外すことができる。
Then, the retaining board 3 is secured to the non-slip member 5 by inserting the pile body 2 into the through-hole 6, inserting the non-slip member 5 into the notch hole 7, and slightly rotating it at the position of the gap 4. It can be attached so as not to fall off, and can be easily removed from the pile body 2 by performing the reverse operation.

なお、必要に応じ滑り止部材5を杭体2の前後に複数設
けておけば第4図に示すごとく、土留板3の取付は位置
を調節することができる。
Incidentally, if a plurality of anti-slip members 5 are provided before and after the pile body 2 as required, the mounting position of the retaining board 3 can be adjusted as shown in FIG.

このように切羽1に杭体2を打込むことにより切羽1は
多少圧密化されると共に各杭体2によって支持されるこ
とになり、しかも切羽表面は土留板3によって被覆され
るため、崩壊することなく、きわめて安定した状態とな
る。
By driving the pile bodies 2 into the face 1 in this way, the face 1 is consolidated to some extent and is supported by each pile body 2, and the face surface is covered by the retaining plate 3, so that it does not collapse. It is in an extremely stable state.

掘削に際しては、第5図a、b、cに示す如く先づ切羽
上部から施工し、上部の杭体2の土留板3を回転し、そ
の切欠孔7を滑り止部材5の位置に合致させて取外した
後、この杭体2の周辺の土砂を掘削し、杭体2を掘り出
し、再び土留板3を杭体2に挿通し、掘削面にあて、杭
体2をハンマーあるいは機械でおし込み、滑り止部材5
に土留板3をとりつける。
When excavating, start from the upper part of the face as shown in Fig. 5 a, b, c, and rotate the retaining plate 3 of the upper pile body 2 to align the notch hole 7 with the position of the anti-slip member 5. After removing the pile body 2, excavate the earth and sand around the pile body 2, dig out the pile body 2, insert the retaining plate 3 into the pile body 2 again, apply it to the excavated surface, and push the pile body 2 with a hammer or machine. Including, anti-slip member 5
Attach the retaining board 3 to the

そして、順次横方向に隣接する杭体2の周辺部を同様に
掘削し、各掘削部分の新たな切羽1にさらに杭体2を打
込み、それぞれに取付けた土留板3で被覆することによ
り崩壊を防止する。
Then, the surrounding areas of the laterally adjacent pile bodies 2 are excavated in the same way, and further pile bodies 2 are driven into the new face 1 of each excavated part, and the collapse is prevented by covering each with the retaining plate 3 attached to each part. To prevent.

このようにして上部の横一列の掘削施工を終了した後、
さらに下方の各列の杭体2の部分を順次同様に掘削施工
し、第5図a +b + cに示す工程を繰返しながら
掘進する。
After completing the horizontal row of excavation work in this way,
Further, the pile bodies 2 in each row below are excavated in the same manner, and the excavation is continued while repeating the steps shown in FIG. 5 a + b + c.

なお、図示の例では砂土又は砂質土などの未固結層から
成る切羽に応用した場合を示したが、この方法に限らず
崩壊性の斜面の一部を開削する場合、土留杭を打てない
場合にもこの発明を実施できることは言うまでもない。
The illustrated example shows a case where the application is applied to a face made of unconsolidated layers such as sandy soil or sandy soil, but this method is not limited to this method.When excavating a part of a collapsible slope, earth retaining piles can be used. It goes without saying that this invention can be carried out even when you cannot hit the ball.

以上の通りこの発明によれば、切羽に複数本抗体を打込
むことにより切羽部分の土砂を多少圧密化することがで
きると共に、各抗体によって切羽土砂が支持され、しか
も土留板によって切羽表面が被覆されるので、軟弱な土
層においても切羽の崩壊を防止することができる。
As described above, according to the present invention, by driving a plurality of antibodies into the face, the earth and sand at the face can be somewhat compacted, and the earth and sand at the face are supported by each antibody, and the face surface is covered by the retaining plate. Therefore, collapse of the face can be prevented even in soft soil layers.

そして、このように崩壊を防止しながら、各抗体周辺を
順次部分的に掘削するので、掘削時の崩壊もなく定全に
掘削施工することができると共に、抗体の打込みと土留
板の着脱操作のみの簡単な作業で済み、抗体及び土留板
も繰返し使用するので、工費、工期を削減して能率的か
つ経適的に施工することが可能となった。
In this way, while preventing collapse, the area around each antibody is partially excavated one after another, so the excavation can be carried out in a consistent manner without collapse during excavation, and all that is required is driving the antibody and attaching/detaching the retaining plate. This is a simple process, and the antibodies and retaining plates are used repeatedly, making it possible to reduce construction costs and construction time, making it possible to perform construction efficiently and cost-effectively.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は抗体打込み状態を示す正面図、第2図はこの発
明に係る抗体の斜視図、第3図は覆土板の斜視図、第4
図は抗体の打込み状態を示す縦断面図、第5図a、b、
cはこの発明工法による施工状態を示す縦断面図である
。 1・・・・・・切羽、2・・・・・・杭体、3・・・・
・・土留板、4・・・・・・間隙、5・・・・・・滑り
止部材、5′、5“・・・・・・ウィングあるいは滑り
止部材、6・・・・・・透孔、7・・・・・・切欠孔。
FIG. 1 is a front view showing the antibody implanted state, FIG. 2 is a perspective view of the antibody according to the present invention, FIG. 3 is a perspective view of the soil covering plate, and FIG.
The figure is a longitudinal cross-sectional view showing the state of antibody implantation, Figures 5a, b,
c is a longitudinal cross-sectional view showing the construction state according to the invention construction method. 1... Face, 2... Pile body, 3...
・・Earth retaining plate, 4・・・・Gap, 5・・・・Slip member, 5′, 5″・・・Wing or anti-slip member, 6・・・・Transparent Hole, 7... Notch hole.

Claims (1)

【特許請求の範囲】 1 切羽に複数本の抗体を打込むと共にその後部にそれ
ぞれ土留板を着脱自在に取付け、前記土留板を取外しな
がら前記各抗体周辺部を順次掘削することを特徴とする
トンネル切羽の掘削工法。 2 杭体は切羽の上下左右に複数本所定間隔を置いて打
込み、先づ切羽上部の抗体周辺部を掘削して新たな切羽
に掘り出した抗体を打込んでこれに土留板を取付けた後
、さらに下部の抗体周辺部を順次同様に施工して上部か
ら下部への施工を連続的に行ないながら掘進することを
特徴とする特許請求の範囲第1項記載のトンネル切羽の
掘削工法。
[Scope of Claims] 1. A tunnel characterized in that a plurality of antibodies are driven into a face, a retaining plate is detachably attached to the rear of each antibody, and the area around each antibody is sequentially excavated while removing the retaining plate. Excavation method for face. 2. Drive multiple piles at specified intervals on the top, bottom, left and right sides of the face. First, excavate the area around the antibody at the top of the face, drive the excavated antibody into the new face, and attach the retaining board to this. 2. The tunnel face excavation method according to claim 1, wherein the tunnel face excavation method according to claim 1, characterized in that the tunnel face excavation method is characterized in that the excavation is carried out while successively performing construction from the upper part to the lower part by performing construction in the same manner one after another around the antibody at the lower part.
JP15399581A 1981-09-30 1981-09-30 Tunnel face excavation method Expired JPS5945074B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15399581A JPS5945074B2 (en) 1981-09-30 1981-09-30 Tunnel face excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15399581A JPS5945074B2 (en) 1981-09-30 1981-09-30 Tunnel face excavation method

Publications (2)

Publication Number Publication Date
JPS5858394A JPS5858394A (en) 1983-04-06
JPS5945074B2 true JPS5945074B2 (en) 1984-11-02

Family

ID=15574609

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15399581A Expired JPS5945074B2 (en) 1981-09-30 1981-09-30 Tunnel face excavation method

Country Status (1)

Country Link
JP (1) JPS5945074B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009057801A (en) * 2007-09-03 2009-03-19 Okumura Corp Tunnel excavation method and mirror set bolt
JP2009057802A (en) * 2007-09-03 2009-03-19 Okumura Corp Mirror bolt and tunnel excavation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009057801A (en) * 2007-09-03 2009-03-19 Okumura Corp Tunnel excavation method and mirror set bolt
JP2009057802A (en) * 2007-09-03 2009-03-19 Okumura Corp Mirror bolt and tunnel excavation method

Also Published As

Publication number Publication date
JPS5858394A (en) 1983-04-06

Similar Documents

Publication Publication Date Title
JPS5945074B2 (en) Tunnel face excavation method
JPH0574677B2 (en)
JP3026134B2 (en) How to build underground structures under roads
JPH02248521A (en) Open shield method
JP2657733B2 (en) Open shield method and open shield machine
JP4279818B2 (en) Open shield method
JP2645683B2 (en) How to start the box
US2488073A (en) Forming cast-in-place concrete incasements of previously driven piles
JPS6117972B2 (en)
JP2657732B2 (en) Open shield method and open shield machine
JP2524654B2 (en) Kason deposition method
JPS5938425A (en) Cutting work of slope
JPH09221744A (en) Construction method of earth retaining wall using deep soil mixing consolidation pile and earth retaining wall structure
JPS5830479B2 (en) shield tunneling machine
JPS584027A (en) Method and apparatus for constructing take-down type sheathing wall
JPH03180614A (en) Construction of retaining wall for underground structure
JPH0524287B2 (en)
JP2788343B2 (en) Tunnel excavation method and equipment
JP2538370B2 (en) Ground improvement method associated with the construction of vertical or inclined shafts and side shafts
JPH0776448B2 (en) Vertical drain method
JPH0633462A (en) Soldier beam horizontal lagging method
JPH07119386A (en) Open shield method and open shield machine
JPS6130090B2 (en)
JP2000064766A (en) Tunnel lining method and drilling equipment
JPS594034B2 (en) How to start a shield excavator