JPS5947084B2 - Connection structure of pavement slab - Google Patents
[go: Go Back, main page]

JPS5947084B2 - Connection structure of pavement slab - Google Patents

Connection structure of pavement slab

Info

Publication number
JPS5947084B2
JPS5947084B2 JP7072680A JP7072680A JPS5947084B2 JP S5947084 B2 JPS5947084 B2 JP S5947084B2 JP 7072680 A JP7072680 A JP 7072680A JP 7072680 A JP7072680 A JP 7072680A JP S5947084 B2 JPS5947084 B2 JP S5947084B2
Authority
JP
Japan
Prior art keywords
pavement
slabs
paving
connecting hole
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7072680A
Other languages
Japanese (ja)
Other versions
JPS56167005A (en
Inventor
勝久 佐藤
晴雄 犬飼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PII ESU KONKURIITO KK
UNYUSHO KOWAN GIJUTSU KENKYUSHOCHO
Original Assignee
PII ESU KONKURIITO KK
UNYUSHO KOWAN GIJUTSU KENKYUSHOCHO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PII ESU KONKURIITO KK, UNYUSHO KOWAN GIJUTSU KENKYUSHOCHO filed Critical PII ESU KONKURIITO KK
Priority to JP7072680A priority Critical patent/JPS5947084B2/en
Publication of JPS56167005A publication Critical patent/JPS56167005A/en
Publication of JPS5947084B2 publication Critical patent/JPS5947084B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Description

【発明の詳細な説明】 本発明は、プレキャストもしくは現場打ちの舗装版の連
結構造に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a connection structure for precast or cast-in-place pavement slabs.

一般にあらかじめ、工場生産もしくは現場にて打設、脱
型された鉄筋コンクリート等のいわゆるプレキャスト舗
装版を複数枚敷設して道路や飛行場などの舗装2面を形
成する場合、あるいは現場において、適宜広さに区分し
たコンクリート舗装版をコンクリート打ちして舗装面を
形成する場合にこれらの舗装版相互を連結する方法はい
くつかのものが提案されている。
In general, when two or more so-called precast pavement slabs of reinforced concrete, etc., which are produced in a factory or poured and demolished at the site are laid in advance to form two surfaces of pavement such as a road or an airport, or on-site, the pavement is spread to an appropriate width. Several methods have been proposed for connecting the divided concrete pavement slabs to each other when forming a paved surface by pouring concrete into the concrete pavement slabs.

その一つとして、第1図に示す如く、複数枚の舗装版1
,1・・・をP、C鋼@2,2・・・で版の面内方向に
縦横に緊張して連結する方法があるが、この場合は舗装
面の四周に和尚幅にわたり、P、C鋼線にプレストレス
を導入する機器の設置場所をとる必要があり、特に道路
幅が狭い所などでは、幅員方向の舗装幅が制限をうける
等の問題がある。
As one example, as shown in Fig. 1, a plurality of paving plates 1
, 1... are connected using P, C steel @ 2, 2... by tensioning them vertically and horizontally in the in-plane direction of the plate, but in this case, P, It is necessary to find a place to install the equipment that introduces prestress into the C steel wire, and there are problems such as restrictions on the pavement width in the width direction, especially in places where the road width is narrow.

また、他の連結方法として、第2図に示す如く舗装版1
,1・・・の端部を相互にボルト3,3・・・をもって
結合する方法や、第3図の如く一方の舗装版1の接合端
面に鉄筋4を突出させておき、他方の舗装版1の切欠部
5において、当該鉄筋4の突出部分を内包する如く充填
材6で埋め込んで連結する方法などあるが、これらはい
ずれも当該ボルト3や鉄筋4等の強度、あるいは充填材
との接着強度に依存するため連結部の耐力が十分でない
という欠点を有していた。
In addition, as another connection method, as shown in Figure 2, the pavement plate 1
, 1... are connected to each other with bolts 3, 3..., or as shown in Fig. 3, reinforcing bars 4 are made to protrude from the joint end surface of one pavement slab 1, and the reinforcing bars 4 are connected to the other pavement slab. There is a method of embedding and connecting the protruding part of the reinforcing bar 4 in the notch 5 of 1 with a filler 6, but these methods depend on the strength of the bolt 3, reinforcing bar 4, etc., or the adhesion with the filler. Since it depends on the strength, it has the disadvantage that the proof strength of the connecting part is not sufficient.

本発明は、上述の点に鑑みてなされたものであり、これ
らの欠点を解消しうる新規な舗装版の連結構造を提供し
うるものである。
The present invention has been made in view of the above points, and is capable of providing a novel pavement slab connection structure that can eliminate these drawbacks.

即ち、本発明の要旨とするところは互いに連結する両舗
装版の接合端面間に連通させ、かつ両端が前記両舗装版
の表側面に開口させた弧状の連結孔を備え、該連結孔内
に前記両舗装版にまたがらせて弧状の連結棒を挿通ずる
とともに、前記連結孔内に充填材を充填して、前記連結
棒を連結孔内に埋設固定してなる舗装版の連結構造に存
する。
That is, the gist of the present invention is to provide an arc-shaped connecting hole that communicates between the joint end surfaces of both paving slabs that are connected to each other, and whose both ends are open to the front side of the paving slabs, and in which the connecting hole is provided. The connecting structure of the paving slabs consists of inserting an arc-shaped connecting rod across both the paving slabs, filling the connecting hole with a filler, and burying and fixing the connecting rod in the connecting hole. .

以下に本発明の実施例を図面について説明する。Embodiments of the present invention will be described below with reference to the drawings.

まず、本発明をプレキャスト舗装版の連結に用いた第1
実施例を第4図〜第7図について説明する。
First, the first method using the present invention for connecting precast pavement slabs.
An embodiment will be described with reference to FIGS. 4 to 7.

図中Aはプレキャスト舗装版である。A in the figure is a precast pavement version.

この舗装版Aは第4図に示すように、その接合端面10
及び表側面11に両端を開口させた弧状をなす連結孔1
2をあらかじめ形成している。
As shown in FIG. 4, this pavement version A has a joint end surface 10
and an arc-shaped connecting hole 1 with both ends open on the front side 11.
2 is formed in advance.

この連結孔12は舗装版Aの端部に沿って適宜な間隔で
複数個形成されており、その間隔や数は設計条件よりし
て、必要とされる接合部の強度や施工条件等により決定
する。
A plurality of these connecting holes 12 are formed at appropriate intervals along the edge of the pavement slab A, and the interval and number are determined based on the design conditions, the required strength of the joint, construction conditions, etc. do.

しかして、複数枚のこの舗装版Aを連結するには、第5
図に示すように互いに連結する舗装版A。
Therefore, in order to connect a plurality of paving plates A, it is necessary to
Paving slabs A are connected to each other as shown in the figure.

A・・・を相対向する連結孔12,12の接口端面開口
12a、12aを相互に一致させて接合端面10.10
を接合させる。
The connecting end surfaces 10.10 are made so that the openings 12a, 12a of the connecting holes 12, 12 facing each other are aligned with each other.
to join.

なお、その接合に際しては例えば第5図に示すように固
定具13を舗装版A、A間に跨架して設置し、あらかじ
め表側面11に埋設された複数のアンカーナツト14.
14・・・にボルト15.15・・・を螺合することに
より締結固定し、舗装版A。
When joining, for example, as shown in FIG. 5, the fixing device 13 is installed across the pavement slabs A and A, and a plurality of anchor nuts 14.
14... are fastened and fixed by screwing bolts 15, 15... to paving plate A.

A間の平面変を一定にするとともに相互の位置のずれを
防止する。
The plane change between A and A is made constant and mutual positional deviation is prevented.

しかる後に、第6図に示すように互いに接合されて連通
した連結孔12.12内に連結棒16を表側面開口12
bより挿入横架する。
Thereafter, as shown in FIG. 6, the connecting rod 16 is inserted into the connecting hole 12.
Insert from b and hang horizontally.

連結棒16は上述の如く、一対のプレキャスト舗装版A
、Aの相対向する連結孔12.12が連通されて形成さ
れる円弧状の孔に対応する円弧状の断面形状をなしてい
る。
As described above, the connecting rod 16 is connected to a pair of precast pavement plates A.
, A has an arc-shaped cross-sectional shape corresponding to the arc-shaped hole formed by communicating the opposing connecting holes 12, 12 of A.

また連結棒16の径は、連結孔12の径よりも小さくし
て、連結棒16と連結孔12の周面間に一定の隙間がで
きるものを使用し、連結孔12゛の中心に位置させ位置
決めする。
Also, the diameter of the connecting rod 16 is smaller than the diameter of the connecting hole 12, so that there is a certain gap between the connecting rod 16 and the peripheral surface of the connecting hole 12, and the connecting rod 16 is positioned at the center of the connecting hole 12. Position.

また、材質的には鋼製のものが望ましく、後述する充填
材との付着性を高めるため、いわゆる異形棒鋼を用いて
もよい。
In terms of material, it is preferable to use steel, and so-called deformed steel bars may be used in order to improve adhesion with the filler described later.

また、連結棒16は、強度上舗装版相互を十分強固に連
結しうる長さであればよく、必ずしも連通ずる連結孔1
2.12の全長に等しく形成する必要はない。
In addition, the connecting rod 16 may have a length that can connect the paving plates sufficiently firmly in terms of strength, and does not necessarily have to be long enough to connect the connecting holes 16 that communicate with each other.
It is not necessary to form it equal to the total length of 2.12.

しかして、連結棒16を設置した後に連結孔12の表側
面開口12bより適宜手段により充填材17を充填し、
凝固さぜ連結棒16及び両舗装版を一体化させ舗装版A
、A相互の連結が完了する。
After installing the connecting rod 16, filler material 17 is filled by an appropriate means through the opening 12b on the front side of the connecting hole 12,
Pavement version A is created by integrating the solidification sill connecting rod 16 and both pavement versions.
, A mutual connection is completed.

その後、第7図に示すように固定具13を取り外し、必
要に応じてアンカーナツト14の孔をmめる。
Thereafter, as shown in FIG. 7, the fixture 13 is removed, and the hole in the anchor nut 14 is drilled as necessary.

充填材17は急結性セメントなど、短時間のうちに凝固
し、強明を発揮するものが好ましいが通常のセメントモ
ルタルを使用してもよいものであり、上述した連結棒1
6と連結孔12の周面間の隙間にも十分に充填されて連
結棒16とプレキャスト舗装版Aのコンクリート本体と
が一体に寸着して十分な強度を保持しうるだけの性能を
有することが条件とされている。
The filling material 17 is preferably one that solidifies in a short time and exhibits strong strength, such as quick-setting cement, but ordinary cement mortar may also be used.
6 and the circumferential surface of the connecting hole 12, so that the connecting rod 16 and the concrete body of the precast paving slab A can fit together and maintain sufficient strength. is a condition.

上述した第1実施例ではプレキャスト舗装版Aに連結孔
12を直接開口させたものを示しているが、この連結孔
12は第8図、第9図に示す第2実施例のようにポリ塩
化ビニル等の合成樹脂製の中空管20をプレキャスト舗
装版Aにあらかじめ埋設して開口させてもよく、この場
合第9図に示すように、第1実施例と同様、中空管20
の接合端面開口20a、20aを互いに連通させて両舗
装版A、Aを接合させ、その中空管20内に連結棒16
を挿入し、充填材17を注入して埋設固定する。
In the first embodiment described above, the connecting holes 12 are directly opened in the precast pavement version A, but these connecting holes 12 are made of polychloride as in the second embodiment shown in FIGS. 8 and 9. A hollow tube 20 made of synthetic resin such as vinyl may be buried in the precast pavement plate A in advance and opened. In this case, as shown in FIG. 9, the hollow tube 20 made of synthetic resin such as vinyl
The connecting end openings 20a, 20a of the paving plates A, A are connected to each other by communicating with each other, and the connecting rod 16 is inserted into the hollow tube 20.
is inserted, and the filling material 17 is injected to embed and fix.

なお、この場合、中空管20は第9図に示すように全長
に渡って等径のものを使用する他、第10図の第3実施
例に示すように舗装版Aの接合端面開口12aを最大径
とし、表側面開口12bを小径にしたテーパー状のもの
を使用してもよいものである。
In this case, as shown in FIG. 9, the hollow tube 20 has the same diameter over its entire length, and in addition, as shown in the third embodiment of FIG. It is also possible to use a tapered one in which the diameter is the maximum diameter and the opening 12b on the front side is made small in diameter.

このように連結孔12を中空管20をもって形成するこ
とにより、連結後、一部の舗装版Aが損傷した場合等、
接合端面間の充填材17及び連結棒16を表面側より適
宜、カッターにより切断することによって一部の舗装版
Aを取り除いた際に第11図に示すように、残された舗
装版Aの中空管20もしくはその内部の充填材17及び
連結棒16を抜き取ることができることとなり、新たな
舗装版Aを携り除いた部分に嵌め込み、前述と同様に連
結することができる。
By forming the connection hole 12 with the hollow tube 20 in this way, if some of the pavement slabs A are damaged after connection, etc.
When a part of the pavement slab A is removed by cutting the filler 17 between the joint end faces and the connecting rod 16 from the surface side with a cutter, as shown in Fig. 11, inside the pavement slab A that remains. The empty pipe 20 or the filler material 17 and connecting rod 16 inside it can be removed, and a new paving slab A can be inserted into the removed portion and connected in the same manner as described above.

この場合、中空管20をテーパー状に形成することによ
って切断後の抜き取りが容易となるとともに接合端面間
における耐荷重が増強される。
In this case, by forming the hollow tube 20 in a tapered shape, it becomes easy to remove the hollow tube 20 after cutting, and the load resistance between the joint end surfaces is increased.

上述した各実施例はプレキャスト舗装版の連結に使用し
た例を示しているが、本発明は現場打の舗装版の連結に
も使用でき、第12図〜第13図に示すように連結する
現場打の両舗装版B、Bを互いに接合させた状態でコン
クリートを打設し、その際にその接合部分に両舗装版B
、Bにまたがらせて連続した中空管21を埋設し、その
両端を両舗装版B、Hの表側面11.11に開口させる
Although the above-mentioned embodiments show examples in which precast pavement slabs are connected, the present invention can also be used to connect cast-in-place pavement slabs, and as shown in Figs. Concrete is poured with both paving plates B and B connected to each other, and at that time, both paving plates B and B are placed at the joint.
A continuous hollow tube 21 is buried across the pavements B and B, and both ends thereof are opened to the front surfaces 11 and 11 of both pavement slabs B and H.

そして、舗装版B、Bのコンクリート硬化後、前述した
実施例と同様に中空管21内に連結棒16を挿入し、充
填材1γを注入して中空管21内に連結棒16を埋設す
る。
After the concrete hardens for the paving slabs B and B, the connecting rod 16 is inserted into the hollow pipe 21 in the same manner as in the embodiment described above, filler 1γ is injected, and the connecting rod 16 is buried in the hollow pipe 21. do.

図中22は舗装版B、B間の境界目地である。22 in the figure is the boundary joint between the pavement slabs B and B.

なお、この第4実施例では舗装版B、Bの成形の際にま
ず中空管21のみを埋設するようにしているが、この場
合あらかじ、め中空管21内に連結棒16を挿入し、充
填材17を注入したものを埋設するようにしてもよいも
のである。
In addition, in this fourth embodiment, only the hollow tube 21 is buried first when forming the paving slabs B and B, but in this case, the connecting rod 16 is inserted into the hollow tube 21 in advance. However, the filler 17 may be injected and buried.

またこの場合の中空管21は、第12図、第13図に示
すように中央部分を最大径とし、両端側を先細りのテー
パー状に形成し、その最大径部分を舗装版B、Hの接合
端面部分に位置させて埋設する他、第14図に示すよう
に全長に渡って等径の中空管23を使用してもよいもの
である。
In addition, the hollow tube 21 in this case has a maximum diameter at the center and a tapered shape at both ends, as shown in FIGS. 12 and 13. In addition to burying the tube at the joint end surface, a hollow tube 23 having the same diameter may be used over the entire length as shown in FIG. 14.

本発明の舗装版の連結構造は上述のように構成され、舗
装版の連結にあたって、単に連結棒を両舗装版間にまた
がらせて埋設するのではなく連結棒より太い径の連結孔
を舗装版に設け、その内部に連結棒を挿入して、充填材
をもって埋設固化させるとともに連結孔を弧状にしたこ
とによって、充填材と連結棒とが連結孔内で一体となっ
て荷重を支えることとなり、その連結部分における水平
方向及び垂直方向の応力が分散されて荷重の伝達が円滑
となり、従来に比べ遥かに大きい曲げ及び剪断強変が発
揮されることとなったものである。
The connecting structure of the paving slabs of the present invention is constructed as described above, and when connecting the paving slabs, instead of simply burying the connecting rod across both paving slabs, a connecting hole with a diameter larger than the connecting rod is installed in the pavement. By inserting a connecting rod into the plate, embedding it with the filler and solidifying it, and making the connecting hole arc-shaped, the filler and the connecting rod work together in the connecting hole to support the load. The stress in the horizontal and vertical directions at the connecting portions is dispersed, and the load is transferred smoothly, resulting in much greater bending and shear strength than in the past.

また、連結作業はすべて舗装版の表側面からなしうるも
のであるから、施工性が非常に良好であり、かつ、余分
な作業スペースも必要としない。
Moreover, since all the connection work can be done from the front side of the pavement slab, the workability is very good and no extra work space is required.

またボルトによる連結にあっては連結孔の位置が少しで
もずれた場合には連結が不可能となるが本発明では連結
孔に多少のずれが生じても確実に結合することができる
等、種々の有用な効果を奏するものである。
In addition, in connection with bolts, if the position of the connecting hole is shifted even slightly, the connection becomes impossible, but with the present invention, even if the connecting hole is slightly shifted, the connection can be made reliably. It has the following useful effects.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし第3図は、従来のプレキャスト舗装版の連
結方法を示す縦断面図であり、第4図は本発明の第1実
施例に使用するプレキャスト舗装版の部分斜視図、第5
図は同プレキャスト舗装版の連結状態の縦断面図、第6
図は同連結状態を示す縦断面図、第7図は同連結完成状
態の縦断面図、第8図は本発明の第2実施例1こ使用す
るプレキャスト舗装版の部分斜視図、第9図は同連結完
成状態の縦断面図、第10図は第3実施例の連結完成状
態を示す縦断面図、第11図は連結後部分的に抜き出し
後の状態を示す部分斜視図、第12図は第4実施例の中
空管理設状態を示す縦断面図、第13図は同連結完成後
の状態を示す縦断面図、第14図は第4実施例に使用す
る他の中空管を示す部分縦断正面図である。 A・・・・・・プレキャスト舗装版、B・・・・・・現
場打舗装版、10・・・・・・接合端面、11・・・・
・・表側面、12・・・・・・連結孔、16・・・・・
・連結棒、17・・・・・・充填材、20.21,23
・・・・・・中空管。
1 to 3 are vertical sectional views showing a conventional method of connecting precast pavement slabs, FIG. 4 is a partial perspective view of a precast pavement slab used in the first embodiment of the present invention, and FIG.
The figure is a vertical cross-sectional view of the connected state of the same precast pavement slab, No. 6
The figure is a vertical sectional view showing the connected state, FIG. 7 is a vertical sectional view of the completed connected state, FIG. 8 is a partial perspective view of the precast pavement used in the second embodiment of the present invention, and FIG. 9 is a vertical sectional view showing the connected state. 10 is a vertical sectional view showing the completed connection state of the third embodiment, FIG. 11 is a partial perspective view showing the state after being partially extracted after connection, and FIG. 12 13 is a longitudinal cross-sectional view showing the state of the hollow pipe in the fourth embodiment, FIG. 13 is a vertical cross-sectional view showing the state after the connection is completed, and FIG. 14 is a longitudinal cross-sectional view showing the state of the hollow tube in the fourth embodiment. FIG. 3 is a partially longitudinal front view. A: Precast pavement version, B: Cast-in-place pavement version, 10: Joint end surface, 11:
...Front side, 12...Connection hole, 16...
・Connecting rod, 17... Filler, 20.21, 23
...Hollow tube.

Claims (1)

【特許請求の範囲】 1 互いに連結する両舗装版の接合端面間に連通させ、
かつ両端が前記両舗装版の表側面に開口させた弧状の連
結孔を備え、該連結孔内に前記両舗装版にまたがらせて
弧状の連結棒を挿通するとともに、前記連結孔内に充填
材を充填して、前記連結棒を連結孔内に埋設固定してな
る舗装版の連結構造。 2 連結孔は弧状をした中空管を舗装版に埋設して形成
してなる特許請求の範囲第1項記載の舗装版の連結構造
。 3 中空管は両舗装版の成形と同時にその両舗装版間に
またがらせて埋設してなる特許請求の範囲第2項記載の
舗装版の連結構造。 4 中空管は各舗装版の接合端面に一端を開口させかつ
、該舗装版の表側面に他端を開口させて各舗装版毎に埋
設してなる特許請求の範囲第2項記載の舗装版の連結構
造。 5 中空間は舗装版の接合端面部分を最大径にしたテー
パー状に形成してなる特許請求の範囲第2項、第3項も
しくは第4項記載の舗装版の連結構造。 6 中空間はポリ塩化ビニル等の合成樹脂材料をもって
形成してなる特許請求の範囲第2項もしくは第3項記載
の舗装版の連結構造。
[Claims] 1. Communication between the joint end surfaces of both pavement slabs that are connected to each other,
and an arc-shaped connecting hole with both ends opened on the front side of both the paving slabs, an arc-shaped connecting rod is inserted into the connecting hole so as to span both the paving slabs, and the connecting hole is filled. A connecting structure of paving slabs, which is formed by filling the connecting hole with material and fixing the connecting rod by burying it in the connecting hole. 2. A connection structure for pavement slabs according to claim 1, wherein the connecting holes are formed by embedding arc-shaped hollow pipes in the pavement slab. 3. A connecting structure for paving slabs according to claim 2, wherein the hollow tube is buried across both paving slabs at the same time as both paving slabs are formed. 4. The pavement according to claim 2, wherein the hollow tube is buried in each pavement slab with one end opened at the joint end surface of each pavement slab and the other end opened at the front side of the pavement slab. Connection structure of the plate. 5. The connecting structure of paving slabs according to claim 2, 3, or 4, wherein the hollow space is formed in a tapered shape with a maximum diameter at the joint end surface portion of the paving slabs. 6. A connecting structure for pavement slabs according to claim 2 or 3, wherein the hollow space is formed of a synthetic resin material such as polyvinyl chloride.
JP7072680A 1980-05-29 1980-05-29 Connection structure of pavement slab Expired JPS5947084B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7072680A JPS5947084B2 (en) 1980-05-29 1980-05-29 Connection structure of pavement slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7072680A JPS5947084B2 (en) 1980-05-29 1980-05-29 Connection structure of pavement slab

Publications (2)

Publication Number Publication Date
JPS56167005A JPS56167005A (en) 1981-12-22
JPS5947084B2 true JPS5947084B2 (en) 1984-11-16

Family

ID=13439829

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7072680A Expired JPS5947084B2 (en) 1980-05-29 1980-05-29 Connection structure of pavement slab

Country Status (1)

Country Link
JP (1) JPS5947084B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6233745B2 (en) * 2013-12-26 2017-11-22 株式会社ピーエス三菱 Pavement plate connection structure

Also Published As

Publication number Publication date
JPS56167005A (en) 1981-12-22

Similar Documents

Publication Publication Date Title
JP5386379B2 (en) Precast slab joints in bridges
KR20110132909A (en) Underground roadway and its construction method using ready-made concrete piles
JP2948149B2 (en) Structure and construction method of concrete protection fence
JPS5947084B2 (en) Connection structure of pavement slab
KR100509262B1 (en) The apparatus of attaching between concrete and steel structural members and attaching method
JP2885055B2 (en) Construction method of frame with precast members
JP4104453B2 (en) Reinforcing structure and reinforcing method for rectangular section underground structure
JP3406383B2 (en) Subgrade ground covering construction method
JPH0315605Y2 (en)
JP2006207129A (en) Structure pier structure
JP3239151B2 (en) Concrete wall construction method
JP3101229B2 (en) Reinforced spacer
JPH06299789A (en) Tunnel lining element and tunnel construction method using said element
JP2612600B2 (en) How to repair the median strip
JPS5941224Y2 (en) median strip
JP2009041226A (en) Precast block, method for constructing approach portion using precast block, and method for producing precast block
JPH0428844B2 (en)
KR100564067B1 (en) Repair and reinforcement of retaining wall in civil works such as construction and road
JPH082164Y2 (en) Bridge slab repair structure
JP5062418B2 (en) Plane frame structure with precast concrete girder
JP3026058B2 (en) PC composite floor slab
JPH0454037B2 (en)
JP3119117B2 (en) PC version driving formwork and formwork method
JP2914205B2 (en) Installation method of handrail wall or lumbar wall
JPS603334A (en) Arch-shaped culvert for forming concrete pipeline