JPS5950811B2 - Drain method - Google Patents
Drain methodInfo
- Publication number
- JPS5950811B2 JPS5950811B2 JP9932876A JP9932876A JPS5950811B2 JP S5950811 B2 JPS5950811 B2 JP S5950811B2 JP 9932876 A JP9932876 A JP 9932876A JP 9932876 A JP9932876 A JP 9932876A JP S5950811 B2 JPS5950811 B2 JP S5950811B2
- Authority
- JP
- Japan
- Prior art keywords
- weight
- drain
- drain material
- excavation
- tip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000000034 method Methods 0.000 title description 3
- 239000000463 material Substances 0.000 claims description 30
- 238000009412 basement excavation Methods 0.000 claims description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 15
- 238000010276 construction Methods 0.000 claims description 12
- 238000003780 insertion Methods 0.000 claims description 8
- 230000037431 insertion Effects 0.000 claims description 8
- 238000005553 drilling Methods 0.000 claims description 2
- 238000002347 injection Methods 0.000 description 7
- 239000007924 injection Substances 0.000 description 7
- 239000000725 suspension Substances 0.000 description 6
- 101100027969 Caenorhabditis elegans old-1 gene Proteins 0.000 description 1
- 241000238367 Mya arenaria Species 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
【発明の詳細な説明】
この発明はドレーン工法、主としてタフネルドレーン工
法、ヘーハードレーンエ法等の帯状ドレーン材を使用す
るドレーン工法に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a drain construction method, mainly a drain construction method using a strip-shaped drain material such as the Tuffnel drain construction method or the Hehard Lane method.
一般に軟弱地盤の改良強化にあたって、ペーパードレー
ン工法、タフネルドレーン工法などが採用されており、
これらのドレーン工法はマンドレル内に帯状ドレーン材
を内挿し、マンドレル先端部においてチャックした状態
で地盤中に挿入し、所定深度に達したのちドレーン材を
残したままマンドレルを引抜く方法が一般的である。In general, paper drain construction methods, tuffnel drain construction methods, etc. are used to improve and strengthen soft ground.
These drain construction methods generally involve inserting a band-shaped drain material into a mandrel, inserting it into the ground with the tip of the mandrel chucked, and then pulling out the mandrel with the drain material remaining after reaching a specified depth. be.
ところが、この場合挿入深度によっては相当長いマンド
レルを必要とし、同時に多数本のペーパーを挿入する場
合には打込み機がかなり大型化するため、軟弱な地盤上
での実施がきわめて困難となり、能率が悪い。However, in this case, a considerably long mandrel is required depending on the insertion depth, and the driving machine becomes quite large when inserting many sheets of paper at the same time, making it extremely difficult to perform on soft ground and inefficient. .
この発明は前記事情に鑑み創案されたもので、同時に多
数本のドレーン材を挿入可能とし、貫入能率の向上を図
った地盤改良工法を提案するものである。This invention was devised in view of the above circumstances, and proposes a ground improvement method that allows multiple drain materials to be inserted at the same time and improves penetration efficiency.
以下この発明を図示する実施例によって説明する。The present invention will be explained below with reference to illustrated embodiments.
第1図乃至第3図において走行自在なベースマシン1の
前部にサポートアーム2,3が取付けられ、サポートア
ーム2には互に間隔を置いてコイル状に巻回されたドレ
ーン材4が軸支されている。In FIGS. 1 to 3, support arms 2 and 3 are attached to the front part of a base machine 1 that can run freely, and a drain material 4 wound in a coil shape at intervals is attached to the support arm 2. supported.
サポートアーム3には懸吊常用リール5か斗゛レーン材
4に対応した位置に取付けられ、かつ給水ホース゛側ガ
イドリール6が取付けられてベースマシン1には高圧水
供給装置7が設けられ、これから給水ホース8がガイド
リール6を介して配されその先端に掘進重錘9がそれぞ
れ取付けられている。The support arm 3 is attached to a position corresponding to the suspension reel 5 or the drop lane material 4, and a water supply hose side guide reel 6 is attached, and the base machine 1 is equipped with a high-pressure water supply device 7. A water supply hose 8 is disposed via a guide reel 6, and excavation weights 9 are attached to the tips of the hoses.
掘進重錘9は先端部が充実状に形成され、先端部に噴射
口10が複数設けられている。The digging weight 9 has a solid tip, and a plurality of injection ports 10 are provided at the tip.
そして高圧水供給装置7から供給される高圧水が供給ホ
ース8を通じて掘進重錘9の噴射口10から噴出するよ
うになっている。High pressure water supplied from the high pressure water supply device 7 is ejected from the injection port 10 of the excavation weight 9 through the supply hose 8.
なお、噴射口10は地盤の種類あるいは軟骸席に応じて
適宜その噴射角を変更できるものとする。Note that the injection angle of the injection port 10 can be changed as appropriate depending on the type of ground or the location of the soft shell.
以上の構成において、ドレーン材4の挿入に際しては、
複数本の掘進重錘9を地盤に同時に挿入し、噴射口10
から高圧水を噴射させつつ周囲地盤をほぐして掘進させ
て掘削孔11を穿設する。In the above configuration, when inserting the drain material 4,
Multiple excavation weights 9 are inserted into the ground at the same time, and the injection port 10 is
The excavation hole 11 is drilled by loosening the surrounding ground while injecting high-pressure water from the excavation hole 11.
ここで、重錘9の先端周囲の地盤は高圧水によってほぐ
され、軟弱地盤に加えてさに軟らかくなり、したがって
重錘9はその自重により沈下する状態となって掘削孔1
1が形成される。Here, the ground around the tip of the weight 9 is loosened by the high-pressure water, and becomes extremely soft in addition to the soft ground, so that the weight 9 sinks due to its own weight, and the hole 1
1 is formed.
所定深度に達したのち重錘9を懸吊索12により吊上げ
る。After reaching a predetermined depth, the weight 9 is lifted up by the suspension rope 12.
なお、懸吊索12はリール5を介してベースマシン1上
に設けられた巻上機(図示なし)に連結されている。Note that the suspension rope 12 is connected to a hoist (not shown) provided on the base machine 1 via a reel 5.
次いで、掘削(旧1内にドレーン材4を挿入して完了す
る。Next, excavation (drain material 4 is inserted into the old 1) is completed.
その際、ドレーン材4の先端に固定用重錘13を取付け
ておく。At that time, a fixing weight 13 is attached to the tip of the drain material 4.
これによって挿入が円滑となり、孔11のの底部に固定
しやすくなる。This allows smooth insertion and facilitates fixation to the bottom of the hole 11.
また、第4図a、 l)、 cに示す実施例におい
て、重錘9′の中央部には上下に貫通するドレーン材挿
通孔14が設けられている。Furthermore, in the embodiments shown in FIGS. 4a, 1) and 4c, a drain material insertion hole 14 is provided in the center of the weight 9', penetrating vertically.
ドレーン材4の挿入に際しては、重錘9′の挿通孔14
にドレーン材4を挿通させ、重錘9′の先端側に突出し
たドレーン材4の端部に固定用重錘13を取付けておき
、次いで地盤中に挿入する。When inserting the drain material 4, use the insertion hole 14 of the weight 9'.
The drain material 4 is inserted through the drain material 4, and the fixing weight 13 is attached to the end of the drain material 4 protruding toward the tip side of the weight 9', and then the drain material 4 is inserted into the ground.
次いで、重錘9′の噴射口10′から高圧水を噴射させ
つつ複数本の重錘9′を同時に掘進させて掘削孔11′
を穿設する。Next, while injecting high-pressure water from the injection port 10' of the weight 9', a plurality of weights 9' are simultaneously excavated to form the excavated hole 11'.
to be drilled.
所定深度に達したのちドレーン材4を重錘9′の先端か
ら外し、ドレーン材4を残したまま懸吊索12′により
吊上げて完了する。After reaching a predetermined depth, the drain material 4 is removed from the tip of the weight 9', and the drain material 4 is lifted up by the suspension rope 12', leaving the drain material 4 in place.
その際、重錘9′を吊上げながら高圧水を噴射して掘削
孔11′の内壁をくずすことによりドレーン材4を順次
埋設することもできる。At this time, the drain material 4 can be sequentially buried by jetting high-pressure water while lifting the weight 9' to break the inner wall of the excavated hole 11'.
以上の通りこの発明によれば、先端から高圧水を噴射可
能な掘進重錘によって、その周囲地盤がほぐされ、重錘
はその自重により地盤中を掘進するので、容易に掘削孔
を穿設することができ、さらに掘削孔にドレーン材を容
易に挿入することができる。As described above, according to the present invention, the surrounding ground is loosened by the excavating weight that can inject high-pressure water from the tip, and the weight excavates through the ground by its own weight, making it easy to drill an excavation hole. Furthermore, the drain material can be easily inserted into the excavated hole.
したがって、従来のようにマンドレルを使用する必要が
なく、挿入機を小型化することができ、また同時に多数
のドレーン材を挿入することができるので作業能率の向
上を図ることができる。Therefore, there is no need to use a mandrel as in the past, and the insertion machine can be downsized, and a large number of drain materials can be inserted at the same time, so that work efficiency can be improved.
第1図は施工状態を示す概要立面図、第2図はその平面
図、第3図はa、 l)施工状態要部を工程順に示す
縦断面図、第4図a、 l)、 cは他の実施例を
工程順に示す縦断面図である。
1・・・・・・ベースマシン、2,3・・・・・・サポ
ートアーム、4・・・・・・ドレーン材、5・・・・・
・懸吊常用リール、6・・・・・・ガイドリール、7・
・・・・・高圧水供給装置、8・・・・・・給水ホース
、9,9′・・曲掘進重錘、10゜10′・・・・・・
噴射口、11,11’・・曲掘削孔、12・・・・・・
懸吊索、13・・・・・・重錘、14・・間ドレーン材
挿入孔。Figure 1 is a schematic elevation view showing the construction state, Figure 2 is its plan view, Figure 3 is a, l) longitudinal sectional view showing the main parts of the construction state in the order of steps, Figure 4 a, l), c FIG. 3 is a vertical cross-sectional view showing another example in the order of steps. 1... Base machine, 2, 3... Support arm, 4... Drain material, 5...
・Suspension regular reel, 6... Guide reel, 7.
...High pressure water supply device, 8...Water supply hose, 9,9'...Curved excavation weight, 10°10'...
Injection port, 11, 11'...Curved drilling hole, 12...
Suspension cable, 13... Weight, 14... Drain material insertion hole.
Claims (1)
進重錘を設け、この掘進重錘にドレーン材の先端を固着
し、掘進重錘の先端から高圧水を噴射しつつ地盤中を掘
進させて掘削孔を穿設するとともにドレーン材を挿入し
、所定深度に達したのちドレーン材を外して掘削孔内に
設置し、次いで掘進重錘を吊上げることを特徴とするド
レーン工法。 2 掘進重錘に上下に貫通したドレーン材挿通孔を設け
たことを特徴とする特許請求の範囲第1項記載のドレー
ン工法。 3 ドレーン材を掘進重錘のドレーン材挿通孔に挿通し
て係止することを特徴とする特許請求の範囲第2項記載
のドレーン工法。 4 ドレーン材の先端に固定用重錘を取付けたことを特
徴とする特許請求の範囲第1項記載のドレーン工法。[Scope of Claims] 1. An excavation weight capable of injecting high-pressure water from its tip through a water supply hose is provided, the tip of a drain material is fixed to this excavation weight, and the ground is ground while injecting high-pressure water from the tip of the excavation weight. A drain construction method characterized by drilling an excavation hole, inserting a drain material, and removing the drain material after reaching a predetermined depth and installing it inside the excavation hole, and then lifting an excavation weight. . 2. The drain construction method according to claim 1, characterized in that the excavation weight is provided with a drain material insertion hole that penetrates vertically. 3. The drain construction method according to claim 2, characterized in that the drain material is inserted and locked into the drain material insertion hole of the digging weight. 4. The drain construction method according to claim 1, characterized in that a fixing weight is attached to the tip of the drain material.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9932876A JPS5950811B2 (en) | 1976-08-19 | 1976-08-19 | Drain method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9932876A JPS5950811B2 (en) | 1976-08-19 | 1976-08-19 | Drain method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5325010A JPS5325010A (en) | 1978-03-08 |
| JPS5950811B2 true JPS5950811B2 (en) | 1984-12-11 |
Family
ID=14244558
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP9932876A Expired JPS5950811B2 (en) | 1976-08-19 | 1976-08-19 | Drain method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5950811B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5415309A (en) * | 1977-07-07 | 1979-02-05 | Aoki Construction | Method of water jet type paper drain driving construction and its driving shoe |
-
1976
- 1976-08-19 JP JP9932876A patent/JPS5950811B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5325010A (en) | 1978-03-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4904119A (en) | Process for placing a piling in the ground, a drilling machine and an arrangement for implementing this process | |
| JP2017223066A (en) | Pile construction management method | |
| JP5632981B1 (en) | Method for extracting buried pile buried in the ground, and drilling casing structure used therefor | |
| CN110273413A (en) | A kind of efficient construction method of prefabricated pile | |
| JP2009263966A (en) | Removal method of existing pile | |
| JPS5950811B2 (en) | Drain method | |
| JP2008202369A (en) | Ground improvement method and ground improvement device | |
| KR102178354B1 (en) | Pile pullout apparatus | |
| JP5745663B1 (en) | Slant pile withdrawal assist device | |
| JPH02125016A (en) | Hollow drilling grouting method | |
| JP2681760B2 (en) | Sediment removal device in cast steel pipe pile and method for removing sediment in the steel pipe pile | |
| JPH0726867A (en) | Bucket self-lifting excavator | |
| JPH068440U (en) | Existing pile extraction casing | |
| JP3938440B2 (en) | Pile penetration method and apparatus | |
| JPH06299774A (en) | Excavator for foundation work | |
| JPH11229740A (en) | Subsoil excavation method and device | |
| JPS5938427A (en) | How to install a cylindrical structure | |
| JPH0224419A (en) | Pile extraction and backfilling method and pile extraction machine | |
| JPS615121A (en) | Drawing work of existing pile | |
| JPH0738458Y2 (en) | Mouth casing mechanism | |
| JP2004316237A (en) | Underground exploration hole drilling equipment | |
| CN108589727A (en) | The construction method of bored concrete pile broken pile head | |
| JPS6033148Y2 (en) | Pile driving device | |
| JPS6033154Y2 (en) | Guide device for excavation shaft in excavator | |
| JPH0230807A (en) | Execution of cast-in-place concrete piling work |