Control method for top pressure recovery turbine power generation equipment

Info

Publication number
JPS5950853B2
JPS5950853B2 JP1879881A JP1879881A JPS5950853B2 JP S5950853 B2 JPS5950853 B2 JP S5950853B2 JP 1879881 A JP1879881 A JP 1879881A JP 1879881 A JP1879881 A JP 1879881A JP S5950853 B2 JPS5950853 B2 JP S5950853B2
Authority
JP
Japan
Prior art keywords
top pressure
turbine
power
furnace top
flow rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1879881A
Other languages
Japanese (ja)
Other versions
JPS57131828A (en
Inventor
武二 浅井
敦啓 溝田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Kanadevia Corp
Original Assignee
Hitachi Zosen Corp
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp, Sumitomo Metal Industries Ltd filed Critical Hitachi Zosen Corp
Priority to JP1879881A priority Critical patent/JPS5950853B2/en
Publication of JPS57131828A publication Critical patent/JPS57131828A/en
Publication of JPS5950853B2 publication Critical patent/JPS5950853B2/en
Expired legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C9/00Controlling gas-turbine plants; Controlling fuel supply in air- breathing jet-propulsion plants
    • F02C9/16Control of working fluid flow

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Blast Furnaces (AREA)

Description

【発明の詳細な説明】 本発明は炉頂圧回収タービン発電設備の制御方法に関し
、電力系統が停電した場合の高炉保安用電力を炉頂圧回
収タービン発電設備により得られる電力で゛まかなうこ
とを目的としたもので゛ある。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for controlling a furnace top pressure recovery turbine power generation facility, and is intended to cover blast furnace safety power in the event of a power outage with the power obtained by the furnace top pressure recovery turbine power generation facility. It is a purpose.

従来この保安用電力は別に設けられた設備により供給さ
れているが、製鉄所は一般に複数の高炉を備えているた
め、一つの保安用電力供給設備で全高炉の保安用電力を
まかなおうとすれば、送電線布設費が高価になる他、保
安用電力確保に供される自家発電設備(一般に効率が高
くない)の通常送電力量を高めることを要し、エネルギ
ー消費の点からも好ましくない。
Traditionally, this safety power has been supplied by separate equipment, but since steelworks are generally equipped with multiple blast furnaces, it is difficult to cover the safety power for all blast furnaces with a single safety power supply facility. For example, in addition to the high cost of laying power transmission lines, it is also necessary to increase the amount of power normally transmitted by private power generation equipment (generally not highly efficient) used to secure power for security, which is undesirable from the point of view of energy consumption.

電力系統が停電した場合の高炉保安用電力の主たる供給
先は高炉炉体冷却用送水ポンプおよび熱風弁冷却用送水
ポンプであり、一般に500〜4000KW程度の電力
を要する。
In the event of a power outage in the power system, the main sources of power for blast furnace safety are the water pump for cooling the blast furnace body and the water pump for cooling the hot air valve, which generally require about 500 to 4000 KW of power.

炉頂圧回収タービン発電設備を設置して高炉ガスのエネ
ルギー回収を図った場合、高炉の容量および圧力によっ
て相当の差はあるが、最大出力は該保安用電力の2〜5
倍に相当するものが得られる。
If a furnace top pressure recovery turbine power generation equipment is installed to recover energy from blast furnace gas, the maximum output will be 2 to 5 times the power for safety, although there will be considerable differences depending on the capacity and pressure of the blast furnace.
You get twice as much.

しかし、高炉操業中の原料装入時やコークス装入時およ
びそれに付随する均圧操作時に高炉ガスの体積流量が一
時的に低下する結果、炉頂圧回収タービン発電設備の出
力が変動し、その最少値は該保安用電力以下に達するこ
とがある。
However, as a result of a temporary decrease in the volumetric flow rate of blast furnace gas during raw material charging, coke charging, and accompanying pressure equalization operations during blast furnace operation, the output of the furnace top pressure recovery turbine power generation equipment fluctuates. The minimum value may reach less than the security power.

このことは、停電時に高炉への送風が止まり、高炉ガス
流量が低下した時にも、同様に起こり、保安用電力以下
になる。
This also happens when the blast furnace gas flow rate decreases during a power outage due to the stoppage of air blowing to the blast furnace, resulting in less than the safety power.

従って電力系統が停電した場合の高炉保安用電力を炉頂
圧回収タービン発電設備により得られる電力でまかなう
場合に問題が残る。
Therefore, a problem remains when the power for blast furnace safety in the event of a power outage in the power system is covered by the power obtained from the furnace top pressure recovery turbine power generation equipment.

本発明は上記のように電力系統が停電した場合で、かつ
炉頂圧回収タービン発電設備の出力を保安用電力として
使用している時に、高炉ガスの体積流量が低下して炉頂
圧回収タービン発電設備の出力が変動しても、その最少
値が保安用電力を下廻ることのないように、該最少値を
高めることができる炉頂圧回収タービン発電設備の制御
方法を提案するものである。
The present invention is designed to reduce the volumetric flow rate of blast furnace gas when the power system is out of power as described above and the output of the top pressure recovery turbine power generation equipment is used as power for safety purposes. This purpose proposes a control method for top pressure recovery turbine power generation equipment that can increase the minimum value so that even if the output of the power generation equipment fluctuates, the minimum value does not fall below the safety power. .

以下本発明の一実施例を図面に基づいて説明する。An embodiment of the present invention will be described below based on the drawings.

第1図において、高炉1から排出される高炉ガスは例え
ばダストキャツチャ2で粗粒除塵され、次いで例えばバ
グフィルタ3で細粒除塵され、バイパス弁4を介してガ
スホルダー5に導かれる。
In FIG. 1, blast furnace gas discharged from a blast furnace 1 is subjected to coarse particle removal by, for example, a dust catcher 2, then fine particle dust is removed by, for example, a bag filter 3, and then guided to a gas holder 5 via a bypass valve 4.

一方炉頂圧回収タービン発電設備のタービン6は流量制
御弁7を介してバイパス弁4に並列に接続され、タービ
ン6により駆動される発電機8はその出力を遮断器9を
通して主送電系10に供給される。
On the other hand, the turbine 6 of the furnace top pressure recovery turbine power generation equipment is connected in parallel to the bypass valve 4 via the flow control valve 7, and the generator 8 driven by the turbine 6 sends its output to the main power transmission system 10 through the circuit breaker 9. Supplied.

タービン6を使用しない時の高炉1の炉頂圧力はバイパ
ス弁4によって制御され、圧力検出器11で検出された
高炉1の炉頂圧力が所定の炉頂圧力設定値P。
The furnace top pressure of the blast furnace 1 when the turbine 6 is not used is controlled by the bypass valve 4, and the furnace top pressure of the blast furnace 1 detected by the pressure detector 11 is a predetermined furnace top pressure setting value P.

になるように、圧力制御器A12が所定の許容偏差設定
値上△P1をもってバイパス弁4の開度を制御する。
The pressure controller A12 controls the opening degree of the bypass valve 4 by a predetermined allowable deviation setting value ΔP1 so that

タービン6を使用する時の炉頂圧力はタービン6に取り
付けられた流量制御弁7によって制御され、圧力検出器
11で検出された炉頂圧力が所定の炉頂圧力設定値P。
The furnace top pressure when the turbine 6 is used is controlled by a flow control valve 7 attached to the turbine 6, and the furnace top pressure detected by the pressure detector 11 is a predetermined furnace top pressure set value P.

になるように、圧力制御器B13が所定の許容偏差設定
値上△P1をもって流量制御弁7の開度を制御する。
The pressure controller B13 controls the opening degree of the flow rate control valve 7 by a predetermined allowable deviation setting value ΔP1 so that

そして圧力検出器11の検出出力は選択器14によりタ
ービン6を使用しない時は圧力制御器A12側に、また
タービン6を使用する時は圧力制御器B13側に切換え
られて供給される。
The detection output of the pressure detector 11 is switched and supplied to the pressure controller A12 side by the selector 14 when the turbine 6 is not used, and to the pressure controller B13 side when the turbine 6 is used.

なお通常は、タービン6を使用しない時は流量制御弁7
は全閉され、タービン6を使用する時はバイパス弁4は
全閉またはそれに近い状態にされる。
Note that normally, when the turbine 6 is not used, the flow control valve 7 is
is fully closed, and when the turbine 6 is used, the bypass valve 4 is fully closed or close to it.

いま、第2図に示すように、炉頂圧力が所定の炉頂圧力
設定値P。
Now, as shown in FIG. 2, the furnace top pressure is at a predetermined furnace top pressure setting value P.

になるように所定の許容偏差設定値上△P1をもって制
御される定常状態の場合の操業中のガス流量の変化を示
すと第3図の実線のようになる。
The solid line in FIG. 3 shows the change in the gas flow rate during operation in a steady state in which the gas flow rate is controlled to be above a predetermined allowable deviation setting value ΔP1.

すなわち操業中の原料装入時やコークス装入時およびそ
れに付随する均圧操作時に高炉ガスの体積流量は一時的
に低下することがわかる。
That is, it can be seen that the volumetric flow rate of blast furnace gas temporarily decreases during raw material charging, coke charging, and associated pressure equalization operations during operation.

従ってかかるガス流量によって得られる回収電力も第4
図の実線のように変動し、その最少電力値は保安用電力
以下になることもあり得る。
Therefore, the recovered power obtained by such a gas flow rate is also the fourth
It fluctuates as shown by the solid line in the figure, and the minimum power value may be less than the security power.

次に士△P1より大きい士△P2を許容偏差設定値に設
定した場合を考えると、炉頂圧力の許容変動幅が大きく
なることから制御速度は遅くなり、操業中のガス流量の
変化は第3図の点線のようになり、最少ガス流量値は小
さい許容偏差設定値上△P1の場合(実線)よりは大き
くなる。
Next, if we consider the case where the allowable deviation setting value is set to ΔP2, which is larger than ΔP1, the control speed becomes slower because the range of allowable variation in the furnace top pressure becomes larger, and the change in gas flow rate during operation becomes slower. As shown by the dotted line in FIG. 3, the minimum gas flow rate value is larger than in the case of ΔP1 above the small allowable deviation setting value (solid line).

従ってこれにより得られる回収電力は第4図の点線のよ
うに変動し、その最少電力値も小さい許容偏差設定値上
△P1の場合(実線)よりは大きくなり、保安用電力以
下になる恐れもなくなることがわかる。
Therefore, the recovered power obtained by this will fluctuate as shown by the dotted line in Figure 4, and the minimum power value will also be larger than in the case of △P1 above the small allowable deviation setting value (solid line), and there is a risk that it will fall below the security power. I know it will disappear.

このように、炉頂圧力設定値の許容偏差設定値と密接な
関係で最少ガス流量値は変動し、この結果が回収電力の
変化となって現われることを考慮に入れて電力系統が停
電し、高炉への送風が止まり、高炉ガス流量が低下した
場合に、第1図において炉頂圧回収タービン発電設備を
次のように制御する。
In this way, the minimum gas flow rate value fluctuates in close relation to the allowable deviation set value of the furnace top pressure set value, and this result appears as a change in the recovered power. When the air blowing to the blast furnace stops and the blast furnace gas flow rate decreases, the furnace top pressure recovery turbine power generation equipment in FIG. 1 is controlled as follows.

電力系統が停電した場合に先づ遮断器9を切って主送電
系10への給電を停止し、発電機8の出力を保安用電力
送電系15に送る。
In the event of a power outage in the power system, the circuit breaker 9 is first turned off to stop power supply to the main power transmission system 10, and the output of the generator 8 is sent to the safety power transmission system 15.

と同時に遮断器9の遮断信号aにより選択器14を圧力
制御器A12側に切換えかつ圧力制御器A12の許容偏
差設定値を士△P2と大きく設定し直す。
At the same time, the selector 14 is switched to the pressure controller A12 side by the cutoff signal a of the circuit breaker 9, and the allowable deviation setting value of the pressure controller A12 is reset to a larger value of ΔP2.

従って上述した如く、高炉1からのガス流量は第3図の
点線のようになり、結果としてタービン6を流れるガス
流量は第3図の点線に見合ったものとなり、その結果タ
ービン6の発生電力の最少値は第4図の点線のように高
められる。
Therefore, as mentioned above, the gas flow rate from the blast furnace 1 is as shown by the dotted line in FIG. 3, and as a result, the gas flow rate flowing through the turbine 6 is commensurate with the dotted line in FIG. The minimum value is increased as indicated by the dotted line in FIG.

この時のタービン6付属の流量制御弁7の開度は、ター
ビン6が定速回転するように別の制御系統により制御さ
れることは定常状態の場合と同様である。
The opening degree of the flow rate control valve 7 attached to the turbine 6 at this time is controlled by another control system so that the turbine 6 rotates at a constant speed, as in the steady state.

なお、新しく設定される許容偏差設定値上△P2の上限
偏差値子△P2と下限偏差値−△P2は1十△P21
< 1−△P21の関係にある方が最少電力値を高める
上から望ましい。
In addition, the upper limit deviation value △P2 and the lower limit deviation value -△P2 of the newly set allowable deviation setting value upper △P2 are 10 △P21
A relationship of <1-ΔP21 is desirable from the standpoint of increasing the minimum power value.

またタービン6付属の流量制御弁7はカバナー弁または
タービン可変翼等で構成される。
Further, the flow rate control valve 7 attached to the turbine 6 is composed of a cover valve, a turbine variable blade, or the like.

また、停電時に高炉への送風が止まった場合、高炉のガ
ス圧力は低下し、ガス流量が低下するので、炉頂圧力の
制御は定常運転時程の高度の精度を要求されず、本発明
の如く、炉頂圧力の許容変動幅を大きくすることが可能
である。
Furthermore, if the air blowing to the blast furnace is stopped during a power outage, the gas pressure in the blast furnace will drop and the gas flow rate will drop. Therefore, the control of the furnace top pressure does not require the high level of accuracy that is required during steady operation. Thus, it is possible to increase the permissible fluctuation range of the furnace top pressure.

以上本発明によれば、タービンを使用している時で、電
力系統が停電した時に、炉頂圧力の制御を制御弁により
行なってその許容変動幅を大きくするようになし、これ
で高炉からのガス流量の最少値を高めることができるの
で、回収電力の最少値を定常状態のときの最少値より高
めることができ、従ってこの回収電力を停電時の保安用
電力に使用しても、保安用電力以下になる恐れもなくな
る。
According to the present invention, when the turbine is in use and there is a power outage in the power system, the furnace top pressure is controlled by the control valve to increase its permissible fluctuation range, thereby reducing the pressure from the blast furnace. Since the minimum value of gas flow rate can be increased, the minimum value of recovered power can be higher than the minimum value in the steady state. Therefore, even if this recovered power is used for security power during a power outage, There is no need to worry about the power going down.

【図面の簡単な説明】 図面は本発明の一実施例を示し、第1図は全体の制御系
統図、第2図は炉頂圧力設定値に対して採用される許容
偏差設定値を比較するための説明図、第3図はガス流量
の比較を説明するガス流量推移特性図、第4図は回収電
力の比較を説明する発電可能電力推移特性図である。 1・・・・・・高炉、4・・・・・・バイパス弁、6・
・・・・・タービン、7・・・・・・流量制御弁、8・
・・・・・発電機、9・・・・・・遮断器、11・・・
・・・圧力検出器、12.13・・・・・・圧力制御器
A、 B、14・・・・・・選択器。
[BRIEF DESCRIPTION OF THE DRAWINGS] The drawings show one embodiment of the present invention, and Fig. 1 is an overall control system diagram, and Fig. 2 compares the allowable deviation set value adopted for the furnace top pressure set value. FIG. 3 is a gas flow rate transition characteristic diagram illustrating a comparison of gas flow rates, and FIG. 4 is a generateable power transition characteristic diagram illustrating a comparison of recovered power. 1...Blast furnace, 4...Bypass valve, 6.
...Turbine, 7...Flow control valve, 8.
... Generator, 9 ... Circuit breaker, 11 ...
...Pressure detector, 12.13...Pressure controller A, B, 14...Selector.

Claims (1)

【特許請求の範囲】[Claims] 1 炉頂圧回収タービンに付属の流量制御機構およびタ
ービンをバイパスする流路に設けた制御弁を有し、高炉
の定常運転時でタービンを使用しない時は、炉頂圧力を
、炉頂圧力設定値に対し所要許容偏差設定値内になるよ
うに前記制御弁により制御し、高炉の定常運転時でター
ビンを使用する時は、炉頂圧力を、炉頂圧力設定値に対
し所要許容偏差設定値内になるように前記タービン付属
の流量制御機構により制御してエネルギーを回収する炉
頂圧回収タービン発電設備の制御方法であって、電力系
統が停電した時に、炉頂圧力を、炉頂圧力設定値に対し
、前記所要許容偏差設定値より大きい許容偏差設定値内
になるように制御するとともに、タービンの定速回転を
前記タービン付属の流量制御機構により制御し、炉頂圧
回収タービンの回収電力の最少値を高めることを特徴と
する炉頂圧回収タービン発電設備の制御方法。
1 It has a flow rate control mechanism attached to the furnace top pressure recovery turbine and a control valve installed in a flow path that bypasses the turbine, and when the turbine is not used during steady operation of the blast furnace, the furnace top pressure is adjusted to the furnace top pressure setting When using the turbine during steady operation of the blast furnace, the furnace top pressure is controlled within the required allowable deviation set value with respect to the furnace top pressure set value. A control method for a furnace top pressure recovery turbine power generation equipment in which energy is recovered by controlling a flow rate control mechanism attached to the turbine so that the furnace top pressure is In addition, the constant speed rotation of the turbine is controlled by the flow rate control mechanism attached to the turbine, and the power recovered by the top pressure recovery turbine is A control method for a furnace top pressure recovery turbine power generation equipment, characterized by increasing the minimum value of.
JP1879881A 1981-02-10 1981-02-10 Control method for top pressure recovery turbine power generation equipment Expired JPS5950853B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1879881A JPS5950853B2 (en) 1981-02-10 1981-02-10 Control method for top pressure recovery turbine power generation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1879881A JPS5950853B2 (en) 1981-02-10 1981-02-10 Control method for top pressure recovery turbine power generation equipment

Publications (2)

Publication Number Publication Date
JPS57131828A JPS57131828A (en) 1982-08-14
JPS5950853B2 true JPS5950853B2 (en) 1984-12-11

Family

ID=11981605

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1879881A Expired JPS5950853B2 (en) 1981-02-10 1981-02-10 Control method for top pressure recovery turbine power generation equipment

Country Status (1)

Country Link
JP (1) JPS5950853B2 (en)

Also Published As

Publication number Publication date
JPS57131828A (en) 1982-08-14

Similar Documents

Publication Publication Date Title
KR870001550B1 (en) Adaptive gain compressor surge control system
US4067557A (en) System for changing over of blast furnace top pressure control
CN102652891A (en) Energy-saving automatic control device of cloth-bag dust removal system and control method for blast furnace dust removal
EP0301577B1 (en) Apparatus for recovering high temperature blast furnace gas
US4072006A (en) Chemical reaction furnace system
JPS5950853B2 (en) Control method for top pressure recovery turbine power generation equipment
US4069660A (en) Chemical reaction furnace system
GB2049820A (en) Utilising blast furnace gas
JPS5950854B2 (en) Control method for top pressure recovery turbine power generation equipment
US4461142A (en) Method of recovery of excess gas energy of blast furnace gas
US4184323A (en) Method and apparatus for recovering energy possessed by exhaust gas from blast furnace by turbine
GB1603808A (en) Throat-gas cleaning installations for pressurised blast furnaces
JPS6025608B2 (en) Reactor gas energy recovery power generation system
JPS5950855B2 (en) Control method for top pressure recovery turbine power generation equipment
KR820001481B1 (en) Method for recovering energy possesed by exhaust gas from blast furnace by turbine
JP3141641B2 (en) Operating device of turbine generator with different capacity
JPH0314884B2 (en)
JPH06159608A (en) Recirculation flow rate control device for water-feeding pump
JPS62185809A (en) Method for controlling recovery of blast furnace top pressure
JPS62158807A (en) Electric power generator by recovering blast furnace top pressure
JPS5948290B2 (en) Blast furnace top pressure power recovery method using dry dust remover
JP3368480B2 (en) Compressor control method and device
JPS62245998A (en) Drying pulverizing system for waste
JPS5948289B2 (en) Blast furnace top pressure power recovery method using dry dust remover
JPH11280495A (en) Blast furnace furnace top pressure power generation equipment and its power generation method