Hanger retraction device for constructing stiffening girders on long suspension bridges

Info

Publication number
JPS595721B2
JPS595721B2 JP21313481A JP21313481A JPS595721B2 JP S595721 B2 JPS595721 B2 JP S595721B2 JP 21313481 A JP21313481 A JP 21313481A JP 21313481 A JP21313481 A JP 21313481A JP S595721 B2 JPS595721 B2 JP S595721B2
Authority
JP
Japan
Prior art keywords
girder
hanger
rope
socket
retractable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP21313481A
Other languages
Japanese (ja)
Other versions
JPS58117107A (en
Inventor
昌憲 松田
明 矢部
勝彦 桑本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Zosen KK
Original Assignee
Mitsui Zosen KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Zosen KK filed Critical Mitsui Zosen KK
Priority to JP21313481A priority Critical patent/JPS595721B2/en
Publication of JPS58117107A publication Critical patent/JPS58117107A/en
Publication of JPS595721B2 publication Critical patent/JPS595721B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】 本発明は長大吊橋の架設工事に際し主塔頂部間に張架し
たケーブルと主塔下部間に架設する補剤術とを、ケーブ
ルから垂下した/・ンガケーブルで結合するために引寄
せる補剤桁架設用ハンガ引込み装置に関するものである
[Detailed Description of the Invention] The present invention connects the cable stretched between the tops of the main towers and the supplementary material installed between the lower parts of the main towers using cables hanging from the cables during the construction work of long suspension bridges. This invention relates to a hanger retraction device for erecting replenishment girders.

長大吊橋は、第1図にその架設中の概要図を示すように
、基礎1上に立設された主塔2と、隣接する主塔2の頂
部間に張架されたケーブル3と、ケーブル3から複数条
のハンガロープ4で吊下された補剤術5とで主要部を構
成されており、このうちの補剤術5の架設には、逐次剛
結法と称される工法が基本工法とし1広(採用されてい
る。
As shown in Figure 1, which is a schematic diagram of the long suspension bridge under construction, the bridge consists of a main tower 2 erected on a foundation 1, a cable 3 stretched between the tops of the adjacent main tower 2, and a cable 3. The main part of the construction is composed of a auxiliary material 5 suspended from a plurality of hanger ropes 4, and a construction method called the successive stiffening method is the basic construction method for the construction of the auxiliary material 5. Toshi 1 Hiro (adopted)

この工法は、ケーブル3から所定の長さに設定した複数
条のハンガロープ4を予め垂下しておき、主塔または既
設の補剤術5側からクレーン等で吊り下げた補剤術5と
ハンガロープ4の下端部とを結合しながら図に矢印Aで
示すように隣接する主塔2間の中央部へ向って逐次架設
を進めていくものである。
In this construction method, a plurality of hanger ropes 4 set to a predetermined length are hung from a cable 3 in advance, and a supplementary material 5 and hanger ropes 4 are hung from the main tower or an existing supplementary material 5 side with a crane or the like. While joining the lower ends of the main towers, the construction is progressed sequentially toward the center between adjacent main towers 2, as shown by arrow A in the figure.

この場合、ハンガロープ4の下端と補剛桁5とを結合す
るためにケーブル3と補剛桁5とを互に引寄せる装置と
じ℃ハンガ引込み装置が用いられる。
In this case, in order to connect the lower end of the hanger rope 4 and the stiffening girder 5, a hanger drawing device is used, which pulls the cable 3 and the stiffening girder 5 together.

第2図は従来のハンガ引込み装置を示し、図aは仮ハン
ガ式引込み装置、図すはソケット直列き式引込み装置の
それぞれ概要構成図である。
FIG. 2 shows a conventional hanger retracting device, FIG. 2A is a schematic diagram of a temporary hanger type retracting device, and FIG.

先ず図aにおいて、ケーブル3には、/・ンガロープ4
が逆U字状に吊下されており、その両下端にはソケット
6が強固に固定されている。
First, in Figure a, the cable 3 has /・Nga rope 4
is suspended in an inverted U-shape, and sockets 6 are firmly fixed to both lower ends thereof.

ハンガロープ4の隣接位置には、ケーブル3上方の吊り
桁1と補剛桁5上方の引込み桁8およびこれら両桁1゜
8を連結する仮ハンガ9とで構成された引込み具10が
、補剛桁5との間を引込みジヤツキ11で連結されて設
けられている。
At a position adjacent to the hanger rope 4, a retraction device 10, which is composed of a suspension girder 1 above the cable 3, a retraction girder 8 above the stiffening girder 5, and a temporary hanger 9 that connects both girders 1°8, is installed. It is connected to the girder 5 by a retractable jack 11.

図は引込みを終ったところを示すもので、引込みジヤツ
キ11は引込み具10を下方へ引張っており、また、ハ
ンガロープ4は補剛桁5に設けた孔に挿通されてそのソ
ケット6が孔の下方へ突出している。
The figure shows the state where the retracting has been completed, and the retracting jack 11 is pulling the retracting tool 10 downward, and the hanger rope 4 is inserted into a hole provided in the stiffening girder 5, and its socket 6 is positioned below the hole. protrudes to.

このようにしてケーブル3と補剛桁5とを引寄せたのち
、ソケット6と補剛桁5との間へ孔よりも大径の定着金
具12を挿入し、引込みジヤツキ11をわずかに戻すと
、ソケット6が定着金具12を介して補剛桁5に圧着さ
れ結合が完了する。
After pulling the cable 3 and the stiffening girder 5 together in this way, insert the fixing metal fitting 12 with a larger diameter than the hole between the socket 6 and the stiffening girder 5, and return the retracting jack 11 slightly. , the socket 6 is crimped onto the stiffening girder 5 via the fixing fitting 12, and the connection is completed.

このあと、引込みジヤツキ11をさらに伸ばし1引込み
具10をケーブル3から遊離させ、引込み具10とジヤ
ツキ11との解体、移動、組立を順次行なって前記動作
を繰返すことにより補剛桁5の架設が進められる。
After this, the retracting jack 11 is further extended to release the retracting tool 1 10 from the cable 3, and the retracting tool 10 and jack 11 are sequentially disassembled, moved, and assembled, and the above operations are repeated to construct the stiffening girder 5. You can proceed.

しかしながら、このような従来の引込み装置におい又は
、引込みジヤツキ11で引込み具10を引っ張るときの
仮ハンガ9の伸び代と、結合後の荷Nによるハンガロー
プ4の伸び代との分だけ余計に引込まなければならない
ので、一般的に荷重が引込み量に比例することからして
引込みジヤツキ110ストロークと荷重とが大きくなり
、引込みジヤツキ11および仮ハンガ引込が著しく大型
化するばかりでなく、引込み具10にも大きな荷重が作
用することによりその各部材7,8.9が大型化し、全
体の設備費が著しく増大するという欠点がある。
However, in such a conventional retracting device, the temporary hanger 9 is extended when the retracting tool 10 is pulled by the retracting jack 11, and the hanger rope 4 is extended by the load N after being connected. Since the load is generally proportional to the amount of retraction, the stroke and load of the retraction jack 110 become large, and not only does the retraction jack 11 and the temporary hanger retraction become significantly larger, but the retraction tool 10 However, each member 7, 8, 9 becomes large in size due to the large load acting thereon, and the overall equipment cost increases significantly.

また、引込み具10および引込みジヤツキ11を移動す
るたびにきわめて高位置のケーブル3近傍の足場上で作
業をしたり、移動のために足場が邪魔になってこれを移
動したりしなげればならず、さらに架設の進捗にしたが
い第1図で明らかなように仮ハンガ9の長さを逐次短縮
させねばならないので、移動作業がきわめて面倒で長時
間を要するという欠点があった。
Also, each time you move the retracting tool 10 and the retracting jack 11, you have to work on a scaffold near the cable 3 which is located at an extremely high position, or you have to move the scaffold because it gets in the way. Furthermore, as the construction progresses, the length of the temporary hanger 9 must be gradually shortened, as shown in FIG.

次に、図すに示すものにおいては、図aに示す引込み具
10が設けられておらず、引込みジヤツキ11は補剛桁
5の下方に固定した反力桁13に装着されており、その
引込みロッド14がソケット6に接続されている。
Next, in the case shown in the figure, the retraction tool 10 shown in Fig. a is not provided, and the retraction jack 11 is attached to the reaction girder 13 fixed below the stiffening girder 5, and the retraction A rod 14 is connected to the socket 6.

図は引込みを終ったところを示すもので、引込みジヤツ
キ11がハンガロープ4を下方へ引っ張っており、ソケ
ット6が補剛桁5の孔から下方へ突出している。
The figure shows the end of retraction, with the retraction jack 11 pulling the hanger rope 4 downward, and the socket 6 protruding downward from the hole in the stiffening girder 5.

このあとは図aに示すものと同様に定着金具12を挿入
し又引込みジヤツキ11を戻すことにより、定着金具1
2を介してソケット6を補剛桁5に圧着させ、引込みロ
ッド14をソケット6から外すことによつ℃定着が完了
する。
After this, by inserting the fixing metal fitting 12 and returning the retracting jack 11 in the same way as shown in Figure a, the fixing metal fitting 1
C. fixing is completed by crimping the socket 6 to the stiffening girder 5 via 2 and removing the retraction rod 14 from the socket 6.

しかしこの方法は補剛桁5の下方が一般に複雑な構造と
なってい℃障害物が多く、反力桁13や引込みジヤツキ
11を設けることが実際上不可能な場合が多いばかりで
なく、たとえ設けたとじ又も装置全体がきわめて大形化
し、橋体の補強のための費用が嵩むという欠点があった
However, in this method, the lower part of the stiffening girder 5 generally has a complicated structure and there are many obstacles, and it is often not only practically impossible to install the reaction force girder 13 or the retraction jack 11, but even if it is However, there was a drawback that the entire device became extremely large and the cost for reinforcing the bridge body increased.

本発明は以上のような点に鑑みなされたもので、補剛桁
の下方に着脱自在に固定した反力桁と補剛桁上方に設け
た引込み桁とを引込みジヤツキで連結し、引込み桁と補
剛桁との挿通孔を通って垂下されたハンガロープの下端
部にソケットを固着して引込み時に補剛桁下方へ突出さ
せるとともに、押込みスリーブを引込み桁とソケットと
の間に位置させてハンガロープに嵌装し、かつ少なくと
も一部が押込みスリーブに対し着脱自在な定着金具を、
ハンガロープ引込み時に補剛桁とソケットとの間に位置
させ又押込みスリーブに嵌装し、ハンガ引込み時には先
ず引込み桁と一体となって下降する押込みスリーブとソ
ケットとを補剛桁の挿通孔へ押込み、しかるのち挿通孔
から突出したソケットと補剛桁との間に定着金具を介挿
し℃定着させるように構成することにより、仮ハンガ引
込み具を用いることなくストロークの小さい引込みジヤ
ツキとハンガロープの保持具とを補剛桁上方の低位置に
設けることを可能ならしめ又、メーンケ−プル周辺およ
び補剤桁下方の作業を省略し引込みジヤツキの小容量化
を計るとともに、引込み桁側と補剤桁側とを伸縮自在な
連結装置で連結することにより引込み時に傾斜する補剤
桁と引込み桁との平行度を調整し℃引込み動作の円滑化
を計った長尺吊橋の補剤桁架設ハンガ用引込み装置を提
供するものである。
The present invention was made in view of the above points, and the reaction girder detachably fixed below the stiffening girder and the retractable girder provided above the stiffening girder are connected by a retractable jack, and the retractable girder and A socket is fixed to the lower end of the hanger rope that hangs down through the insertion hole with the stiffening girder so that it protrudes below the stiffening girder when it is pulled in, and a push-in sleeve is positioned between the pull-in girder and the socket to attach the hanger rope to the hanger rope. A fixing fitting that is fitted and at least partially detachable from the push-in sleeve;
When the hanger rope is drawn in, it is positioned between the stiffening girder and the socket, and is fitted into the push-in sleeve, and when the hanger is drawn in, the push-in sleeve and socket, which descend together with the draw-in girder, are first pushed into the insertion hole of the stiffening girder. After that, by inserting the fixing metal fitting between the socket protruding from the insertion hole and the stiffening girder and fixing it at ℃, it is possible to create a pull-in jack with a small stroke and a hanger rope holder without using a temporary hanger pull-in tool. In addition, the work around the main cable and below the supplementary girder can be omitted, reducing the capacity of the retracting jack, and the This is a retracting device for hangers used to erect supplementary girders on long suspension bridges, which adjusts the parallelism between the supplementary girder and the retractable girder, which tilt during retraction, by connecting them with a telescopic connecting device, thereby smoothing the retracting operation. This is what we provide.

以下、本発明の実施例を図面に基いて詳細に説明する。Embodiments of the present invention will be described in detail below with reference to the drawings.

第3図ないし第7図は本発明に係る補剤桁架設用ハンガ
引込み装置の実施例を示し、第3図はその一部破断正面
図、第4図は第3図のB視測面図とCC断面図との合成
図、第5図はケーブルロープ先端部の平面図と正面図、
第6図は押込みスリーブ先端部と強化座金および定着座
金のそれぞれ平面図、第7図は動作説明図である。
3 to 7 show an embodiment of the hanger retracting device for constructing a replenishment girder according to the present invention, FIG. 3 is a partially cutaway front view thereof, and FIG. 4 is a view from B in FIG. 3. Figure 5 is a composite view of the cross-sectional view of the cable rope and the CC cross-sectional view,
FIG. 6 is a plan view of the tip end of the push-in sleeve, the reinforcing washer, and the fixing washer, and FIG. 7 is an explanatory diagram of the operation.

吊橋全体の構造ならびに動作説明上必要あるときは第1
図を用いて説明する。
When it is necessary to explain the structure and operation of the entire suspension bridge, the first
This will be explained using figures.

これらの図において、補剤桁5の下面には、一対の反力
桁21が着脱自在に固定されており、各反力桁21の両
端部には、合計4個の引込みジヤツキ22が、ピン23
を抜き挿しすることにより着脱自在に形成されて下端部
を枢支されている。
In these figures, a pair of reaction force girders 21 are detachably fixed to the lower surface of the supplementary material girder 5, and a total of four retraction jacks 22 are attached to both ends of each reaction force girder 21. 23
It is formed so that it can be attached and detached by inserting and removing it, and its lower end is pivotally supported.

各引込みジヤツキ22は、上方へ向って進退するピスト
ンロッド24を備えており、その作用端には、ピン25
を抜き挿しすることにより着脱自在に形成された引込み
桁26が枢支されている。
Each retraction jack 22 is equipped with a piston rod 24 that moves upward and back, and has a pin 25 at its working end.
A retractable girder 26 is pivotally supported, and is formed to be detachable by inserting and removing.

この引込み桁26は、長方形箱状の側板26aと、その
両端部を着脱自在に連結して角筒状に形成された一対の
桁26bとで一体的に形成されており、各桁26bの内
側には、内方へ開口するU字状に形成された一対のロー
プ溝27が設けられている。
This retractable girder 26 is integrally formed with a rectangular box-shaped side plate 26a and a pair of girders 26b formed into a rectangular tube shape by removably connecting both ends of the side plate 26a, and is provided inside each girder 26b. A pair of rope grooves 27 are provided in the U-shape and open inward.

一方、ケーブル3には、第1図に示すように予め所定の
長さに設定された多数のハンガロープ4がロープバンド
で支点を固定され℃垂下されており、このハンガロープ
40両下端には、ソケット6が固定されている。
On the other hand, as shown in FIG. 1, a large number of hanger ropes 4 whose fulcrums are fixed with rope bands are suspended from the cable 3 at a predetermined length as shown in FIG. 6 is fixed.

4本のハンガロープ4は、各ロープ溝27に係合されて
おり、これには押込みスリーブ28が桁26aとソケッ
ト6との間に位置して介挿されている。
The four hanger ropes 4 are engaged with each rope groove 27, and a push-in sleeve 28 is inserted between the girder 26a and the socket 6.

押込みスリーブ28は、前記補剤桁5に外方へ開口する
よ5U字状に形成されて設けられたロープ溝29と引込
み時に係合するものであって、このロープ溝29よりも
小径の角筒状に形成されており、ハンガロープ4に対し
て着脱できるように半割状に形成されてボルト30で結
合されている。
The pushing sleeve 28 engages with a rope groove 29 formed in a 5U shape and opening outward in the supplementary material girder 5 when being pulled in, and has a corner having a diameter smaller than that of the rope groove 29. It is formed in a cylindrical shape, and is formed in half so that it can be attached to and detached from the hanger rope 4, and is connected with bolts 30.

符号31で示すものは定着金具であって、本実施例の場
合別体で設けられた定着座金32と強化座金33とで形
成されており、このうちの強化座金33はソケット6に
隣接してハンガロープ4に遊装され℃いる。
What is indicated by the reference numeral 31 is a fixing metal fitting, and in this embodiment, it is formed of a fixing washer 32 and a reinforcing washer 33, which are provided separately. It's hanging out on Hunger Rope 4.

また、定着座金32は、押込みスリーブ28に対して着
脱できるようにU字状に形成されており、第4図に鎖線
で示す引込み時に押込みスリーブ28の下端部に形成さ
れた小径円筒部28aへ嵌装されて強化座金33ととも
にハンガロープ4の移動を係止するように構成されてい
る。
Further, the fixing washer 32 is formed in a U-shape so that it can be attached to and removed from the push-in sleeve 28, and when pulled in as shown by the chain line in FIG. It is configured to be fitted together with the reinforcing washer 33 to stop the hanger rope 4 from moving.

以上のように構成されたハンガ引込み装置には、角折れ
調整装置34が設げられている。
The hanger retracting device configured as described above is provided with a corner bending adjustment device 34.

すなわち、第1図に示すように、補剤桁5が傾斜するこ
とにより、これとハンガロープ4とのなす角度が変化し
、引込みジヤツキ22のピストンロッド24を彎曲させ
ようとする力が作用するので、引込み桁26を逆方向へ
引っ張ることによりハンガロープ4を屈曲させ又引込み
ジヤツキ22の動作を円滑にするものである。
That is, as shown in FIG. 1, when the replenishment girder 5 is tilted, the angle between it and the hanger rope 4 changes, and a force acts to bend the piston rod 24 of the retraction jack 22. By pulling the retractable girder 26 in the opposite direction, the hanger rope 4 is bent and the retractable jack 22 operates smoothly.

この角折れ調整装置3.Nζ引込み桁26に枢着された
プーリ35と、補剤桁5に枢着されたプーリ(図示せず
)およびこれら両プーリ間に張架されたロープ36とで
形成されて引込み桁26と補剤桁5とを伸縮自在に連結
している。
This corner bend adjustment device 3. NζIt is formed by a pulley 35 pivotally connected to the retracting girder 26, a pulley (not shown) pivotally connected to the supplementary agent girder 5, and a rope 36 stretched between these two pulleys, and is connected to the retracting girder 26. It is telescopically connected to the agent girder 5.

また、引込み桁26の桁26b上面には、屈曲するハン
ガロープ4案内用のテーパ孔を備えた屈折パツキン37
が貼着されている。
Further, on the upper surface of the girder 26b of the retractable girder 26, a bending packing 37 is provided with a tapered hole for guiding the bending hanger rope 4.
is pasted.

なお、かかる角折れ調整装置34は油圧シリンダ機構を
用いることもできる。
Note that a hydraulic cylinder mechanism can also be used as the corner bending adjustment device 34.

以上のように構成されたハンガ引込み装置による引込み
動作を説明する。
The retracting operation by the hanger retracting device configured as above will be explained.

図に示すように引込み装置を引込もうとする4本のハン
ガロープ4の周囲に組立てて固定し、ハンガロープ4を
引込み桁26のロープ溝27へ内側から挿入して係合さ
せるとともに、角折れ調整装置34のロープ36を緊張
させる。
As shown in the figure, the retracting device is assembled and fixed around the four hanger ropes 4 to be retracted, and the hanger ropes 4 are inserted from the inside into the rope groove 27 of the retracting girder 26 and engaged, and the corner bending adjustment device 34 ropes 36 are tensioned.

そして、引込みジヤツキ22のピストンロッド24を収
縮させて引込み桁26を下降させると、ケーブル3の張
力により引込み桁26の桁26bが押込みスリーブ28
に圧着されるので、押込みスリーブ28とソケット6付
きのハンガロープ4とが一体となって押下げられる。
Then, when the piston rod 24 of the retraction jack 22 is contracted and the retraction spar 26 is lowered, the spar 26b of the retraction spar 26 is moved toward the push-in sleeve 28 by the tension of the cable 3.
Since the push-in sleeve 28 and the hanger rope 4 with the socket 6 are pressed down together.

ソケット6が補剤桁5のロープ溝29を通過し終ったと
ころで押込みスリーブ28を外側から補剤桁5のロープ
溝29へ挿入して係合させ、第1図aに示す状態とした
のちロープ溝29から下方へ突出している押込みスリー
ブ28の小径円筒部28aに定着座金33を嵌挿して第
1図すに示す状態にする。
When the socket 6 has passed through the rope groove 29 of the supplementary spar 5, the push-in sleeve 28 is inserted from the outside into the rope groove 29 of the supplementary spar 5 and engaged, resulting in the state shown in FIG. The fixing washer 33 is fitted into the small-diameter cylindrical portion 28a of the push-in sleeve 28 that protrudes downward from the groove 29, resulting in the state shown in FIG.

そして、引込みジヤツキ22のピストンロッド24を伸
長させると、わずかに伸長したところで定着座金33が
補剤桁5の下面に当接することによりソケット6および
これと一体のハンガロープ4の移動が係止され、さらに
ピストンロッド24を伸長させることにより引込み桁2
6が上昇して図の位置へ復帰するとともに、押込みスリ
ーブ28が軸方向へ圧着されることなく着脱可能な状態
になるので、ポルト30を弛め、第7図Cに示すように
押込みスリーブ28を取外す。
Then, when the piston rod 24 of the retracting jack 22 is extended, the fixing washer 33 comes into contact with the lower surface of the replenisher spar 5 after it is slightly extended, thereby locking the movement of the socket 6 and the hanger rope 4 integrated therewith. By further extending the piston rod 24, the retractable girder 2
6 rises and returns to the position shown in the figure, and the push-in sleeve 28 becomes detachable without being crimped in the axial direction, so the port 30 is loosened and the push-in sleeve 28 is removed as shown in FIG. 7C. Remove.

このあと、ピン23.25を抜いて引込みジヤツキ22
を装置外へ取外すとともに、ロープ36を弛め、引込み
桁26の側板26aと桁26bとの結合を解いてこれを
取外す。
After this, pull out the pins 23 and 25 and retract the jack 22.
At the same time, the rope 36 is loosened, and the side plate 26a and the girder 26b of the retractable girder 26 are uncoupled and removed.

また反力桁21を取外す。そして、解体したハンガ引込
み装置を次の4本のハンガロープ4の周囲に組立てたの
ち前記動作を繰返すことにより引込み作業ケ続行する。
Also, remove the reaction force girder 21. Then, the disassembled hanger retracting device is assembled around the next four hanger ropes 4, and the retracting operation is continued by repeating the above operation.

以上のようにして行なわれる引込み作業においては、押
込みスリーブ28を設けたことにより、ソケット6をこ
の押込みスリーブ28を介して押し下げることができる
ので、引込みジヤツキ22を補剤桁5の上方に設けるこ
とができるとともに、そのストロークはソケット6が補
剤桁5を越えるだけのストロークでよ(、引込みジヤツ
キ22を小容量のものとすることができる。
In the retracting operation performed as described above, the provision of the push-in sleeve 28 allows the socket 6 to be pushed down via this push-in sleeve 28, so the retraction jack 22 is provided above the replenishment girder 5. At the same time, the stroke is just enough for the socket 6 to cross the replenisher girder 5 (and the retracting jack 22 can be of small capacity).

したがって、引込み桁26が補剤桁5のわずかに上方の
低位置でよく、ケーブル3の上方に設けた従来のものと
比較して足場の架設や移転作業が遥かに容易になる。
Therefore, the retractable girder 26 may be located at a low position slightly above the supplementary material girder 5, and the work of erecting and relocating the scaffolding becomes much easier compared to the conventional structure provided above the cable 3.

また、補剤桁5の下方には反力桁21を設けたのみであ
るから、補剤桁5のトラスなどと干渉する虞が少なく、
移転が容易である。
In addition, since only the reaction force girder 21 is provided below the supplementary material girder 5, there is less risk of interference with the truss of the supplementary material girder 5.
Easy to relocate.

さらに、角折れ調整装置34を設けたことにより、これ
を伸縮させて引込み桁26の位置を調整すれば、ハンガ
ロープ4を屈曲させながら引込みジヤツキ22のピスト
ンロッド24を補剤桁5に対して正しく直交させること
ができるので、引込みジヤツキ22の動作を妨げること
がない。
Furthermore, since the corner bending adjustment device 34 is provided, by expanding and contracting this to adjust the position of the retracting girder 26, the piston rod 24 of the retracting jack 22 can be adjusted correctly with respect to the supplementary material girder 5 while bending the hanger rope 4. Since they can be orthogonal to each other, the operation of the retraction jack 22 is not hindered.

なお、本実施例においては、定着金具31を定着座金3
2と強化座金33とで構成することにより、強化座金3
3の内径をバンガケーブル4としつ(り嵌合するように
小径にすれば、押込みスリーブ28の小径円筒部2B&
を小径にしても、一般に鋼より軟かい合金製であるロー
プ4把持部におけるソケット6の上端面に押込みスリー
ブ28の下端が陥没したりすることがない。
In this embodiment, the fixing fitting 31 is replaced with the fixing washer 3.
2 and the reinforcing washer 33, the reinforcing washer 3
If the inner diameter of 3 is made small so that it fits snugly with the bunga cable 4, the small diameter cylindrical part 2B of the push-in sleeve 28
Even if the diameter is made small, the lower end of the push-in sleeve 28 will not sink into the upper end surface of the socket 6 in the gripping portion of the rope 4, which is generally made of an alloy softer than steel.

また、押込みスリーブ28の下端部を小径にすることに
ヨリ定着座金32の孔径な小さくすることができ、した
がって定着座金32と補鋼桁5との当り面を大きくする
ことができるので、定着効果が増大する。
In addition, by making the lower end of the push-in sleeve 28 smaller in diameter, the hole diameter of the fixing washer 32 can be made smaller, and therefore the contact surface between the fixing washer 32 and the reinforcing steel girder 5 can be increased, so that the fixing effect is increased. increases.

但し、強化座金33は必ずしもこれを設ける必要はな(
、定着金具31を着脱自在な定着座金32のみで形成し
てもよい。
However, it is not necessary to provide the reinforcing washer 33 (
, the fixing fitting 31 may be formed of only the fixing washer 32 which is detachable.

また、本実施例では押込みスリーブ28を半割状に形成
してハンガロープ4に対し着脱自在としたが、円筒状な
どに形成し’C1回の引込み作業ごとに着脱することな
くそのま\埋殺しにし又もよい。
In addition, in this embodiment, the push-in sleeve 28 is formed in a half-shape so that it can be attached and detached from the hanger rope 4, but if it is formed into a cylindrical shape or the like, it can be buried as it is without being attached or detached for each pulling operation. Nishimata is also good.

さらに、引込みジヤツキ24はこれを上下逆にしてピス
トンロッド240作用端を反力桁21側に枢着してもよ
い。
Further, the retraction jack 24 may be turned upside down and the working end of the piston rod 240 may be pivoted to the reaction force beam 21 side.

また、ハンガロープ4は本実施例のように1回に4本ず
つ引込むことなく、2本ずつ引込むようにしてもよい。
Furthermore, the hanger ropes 4 may be pulled in two at a time, instead of four at a time as in this embodiment.

以上の説明により明らかなように、本発明によれば長尺
吊橋の補剤桁架設用ハンガ引込み装置において、補剤桁
の下方に着脱自在に固定した反力桁と補剤桁上方に設け
た引込み桁とを引込みジヤツキで連結し、引込み桁と補
剤桁との挿通孔を通って垂下されたハンガロープの下端
部にソケットを固着し℃引込み時に補剤桁下方へ突出さ
せるとともに、押込みスリーブを引込み桁とソケットと
の間に位置させてハンガロープに嵌装し、かつ少なくと
も一部が押込みスリーブに対し着脱自在な定着金具を、
ハンガロープ引込み時に補剤桁とソケットとの間に位置
させて押込みスリーブに嵌装し、ハンガ引込み時には先
ず引込み桁と一体となつ℃下降する押込みスリーブとソ
ケットとを補剤桁の挿通孔へ押込み、しかるのち挿通孔
から突出したソケットと補剤桁との間に定着金具を介挿
して定着させるように構成することにより、ストローク
の小さい引込みジヤツキとハンガロープの保持具とを補
剤桁上方の低位置に設けることができるので、引込みジ
ヤツキが小形化されまた仮のハンガ引込み装置を設ける
必要がなくて設備費を大幅に節減することができるとと
もに、ケーブル周辺における作業が全くなくすべて低位
置での作業となるので、足場の架設作業や引込み装置の
移動作業が従来と比較して著しく容易になり、作業能率
の向上と労力の軽減を計ることができる。
As is clear from the above explanation, according to the present invention, in a hanger retracting device for constructing an auxiliary girder for a long suspension bridge, a reaction girder detachably fixed below the auxiliary girder and a reaction girder provided above the auxiliary girder are provided. The retractable girder is connected to the retractable girder using a retractable jack, and a socket is fixed to the lower end of the hanger rope that hangs down through the insertion hole between the retractable girder and the replenishment girder. A fixing fitting that is positioned between the retractable girder and the socket and fitted onto the hanger rope, and at least a portion of which is detachable from the push-in sleeve;
When retracting the hanger rope, it is positioned between the supplementary girder and the socket and fitted into the push-in sleeve, and when the hanger is retracted, the push-in sleeve and socket, which are integrated with the retractable girder and descend by ℃, are pushed into the insertion hole of the supplementary girder. Then, by inserting and fixing the fixing metal fitting between the socket protruding from the insertion hole and the replenishment girder, the small stroke retraction jack and the hanger rope holder can be moved to a low position above the replenishment girder. Since the retracting jack can be installed at a lower position, the retracting jack can be made smaller and there is no need to provide a temporary hanger retracting device, which can significantly reduce equipment costs.There is also no need to work around the cable, and all work can be done at a low position. Therefore, the work of erecting the scaffolding and the work of moving the retracting device are significantly easier than in the past, and it is possible to improve work efficiency and reduce labor.

また、補剤桁下方には反力桁があるだけであるから、橋
体の部材と干渉する虞がなく、移動作業が容易である。
Further, since there is only a reaction force girder below the supplementary material girder, there is no risk of interference with the members of the bridge body, and the movement work is easy.

さらに、引込み桁と補剤桁側とを伸縮自在に連結する角
折れ調整装置を設けたことにより、ハンガロープの引込
み時に補剤桁が傾斜して引込みジヤツキの軸芯が曲るの
を補正することができるので、引込みジヤツキの動作が
円滑に行なわれ引込み性能が著しく向上する。
Furthermore, by providing a corner bend adjustment device that telescopically connects the retracting girder and the supplementary material girder side, it is possible to correct the bending of the axis of the retracting jack due to the inclination of the supplementary material girder when the hanger rope is retracted. As a result, the retraction jack operates smoothly and the retraction performance is significantly improved.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は架設工事中の長大吊橋を示す概要正面図、第2
図a、bはそれぞれ従来の補剤桁架設用ハンガ引込み装
置の概要構成図、第3図ないし第7図は本発明に係る長
大吊橋の補剤桁架設用ハンガ引込み装置の実施例を示し
、第3図はその一部破断正面図、第4図は第3図のB視
測面図とCC断面図との合成図、第5図はケーブルロー
プ先端部の平面図および正面図、第6図aは押込みスリ
ーブ先端部の平面図、第6図すは強化座金の平面図、第
6図Cは定着座金の平面図、第7図は動作説明図である
。 3・・・・・・ケーブル、4・・・・・・ハンガローフ
、5・・・・・・補剤桁、6・・・・・・ソケット、2
1・・・・・・反力桁、22・・・・・・引込みジヤツ
キ、26・・・・・・引込み桁、27・・・・・・ロー
プ溝、28・・・・・・押込みスリーブ、29・・・・
・・ロープ溝、31・・・・・・定着金具、32・・・
・・・定着座金、33・・・・・・強化座金、34・・
・・・・角折れ調整装置。
Figure 1 is a schematic front view of a long suspension bridge under construction, Figure 2
Figures a and b are schematic configuration diagrams of conventional hanger retraction devices for erecting supplementary girders, and Figures 3 to 7 show embodiments of the hanger retracting device for erecting supplementary girders for long suspension bridges according to the present invention, Fig. 3 is a partially cutaway front view of the same, Fig. 4 is a composite view of the B observation surface view and CC sectional view of Fig. 3, Fig. 5 is a plan view and front view of the tip of the cable rope, Fig. 6 FIG. 6 is a plan view of the reinforcing washer, FIG. 6 C is a plan view of the fixing washer, and FIG. 7 is an explanatory view of the operation. 3... Cable, 4... Hanger loaf, 5... Auxiliary digit, 6... Socket, 2
1... Reaction force girder, 22... Retraction jack, 26... Retraction girder, 27... Rope groove, 28... Push sleeve , 29...
...Rope groove, 31... Fixture fitting, 32...
... Fixing washer, 33... Reinforced washer, 34...
...Corner bending adjustment device.

Claims (1)

【特許請求の範囲】 1 補剤桁上力に張架されたケーブルから垂下するハン
ガロープな補剤桁側へ引込んでケーブル補剤術とを引寄
せる補剤桁架設用ハンガ引込み装置において、前記ハン
ガロープの挿通孔を有する補剤術の下側に着脱自在に固
定された反力桁と、前記ハンガロープの挿通孔を備え前
記補剤術の上方にあって前記反力桁との間を着脱自在な
引込みジヤツキで連結された引込み桁と、前記ハンガロ
ープの下端に固着され前記引込みジヤツキによるハンガ
ロープ引込み時に前記補剤術の挿通孔から下方へ突出す
るソケットと、前記引込み桁とソケットとの間に位置し
て前記ハンガロープに嵌装された押込みスリーブと、°
前記ノ・ンガロープ引込み時に前記補剤術とソケットと
の間に位置して前記押込みスリーブに嵌挿され少なくと
も一部を着脱自在に形成された定着金具とを設けたこと
を特徴とする長大吊橋の補剤桁架設用・・ンガ引込み装
置。 2 補剤桁上力に張架されたケーブルから垂下するハン
ガロープな補剤桁側へ引込んでケーブルと補剤術とを引
寄せる補剤桁架設用ノ・ンガ引込み装置において、前記
ハンガロープの挿通孔を備え前記補剤術の下側に着脱自
在に固定された反力桁と、前記ハンガロープの挿通孔を
備え前記補剤術の上方にあって前記反力桁との間を着脱
自在な引込みジヤツキで連結された引込み桁と、前記ハ
ンガロープの下端に固着され前記引込みジヤツキによる
ハンガロープ引込み時に前記補剤術の挿通孔から下方へ
突出するソケットと、前記引込み桁とソケットとの間に
位置して前記ハンガロープに嵌装された押込みスリーブ
と、前記ハンガロープ引込み時に前記補剤術とソケット
との間に位置して前記押込みスリーブに嵌装され少なく
とも一部を着脱自在に形成された定着金具と、伸縮自在
に形成されて前記引込み桁と補剤桁側とを連結するノ・
ンガロープ角折れ調整装置とを設けたことを特徴とする
長大吊橋の補剤桁架設用ノ・ンガ引込み装置。
[Scope of Claims] 1. In a hanger retracting device for erecting a supplementary girder, which pulls a hanger rope hanging down from a cable stretched over a supplemental girder to the supplemental girder side to draw a cable supplementary girder, the hanger rope a reaction force girder removably fixed to the lower side of the adjuvant surgery having an insertion hole of A retractable spar connected by a retractable jack, a socket fixed to the lower end of the hanger rope and protruding downward from the insertion hole of the supplement when the hanger rope is retracted by the retractable jack, and a socket located between the retractable spar and the socket. a push-in sleeve fitted onto the hanger rope;
A long suspension bridge, characterized in that a fixing metal fitting is provided between the supplementary agent and the socket when the rope is pulled in, the fixing metal fitting is fitted into the pushing sleeve and formed at least in part to be detachable. For erecting supplementary girders...Nga pulling device. 2. In a replenishment girder installation no-ga pulling device that pulls a hanger rope hanging down from a cable stretched over a replenishment girder to the replenishment girder side to pull the cable and replenishment girder, the hanger rope insertion hole a reaction force girder detachably fixed to the lower side of the adjuvant, and a retractable jack provided above the adjuvant and removably connected between the reaction force girder and the reaction force girder, which is provided with an insertion hole for the hanger rope. a retractable girder connected with a push-in sleeve fitted to the hanger rope; a fixing fitting positioned between the adjuvant and the socket when the hanger rope is pulled in and fitted into the push-in sleeve and formed at least partially removably; A hole is formed in the hole and connects the retracting girder and the supplementary material girder side.
A rope pulling device for constructing supplementary girders of a long suspension bridge, characterized by being equipped with a rope angle bending adjustment device.
JP21313481A 1981-12-29 1981-12-29 Hanger retraction device for constructing stiffening girders on long suspension bridges Expired JPS595721B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21313481A JPS595721B2 (en) 1981-12-29 1981-12-29 Hanger retraction device for constructing stiffening girders on long suspension bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21313481A JPS595721B2 (en) 1981-12-29 1981-12-29 Hanger retraction device for constructing stiffening girders on long suspension bridges

Publications (2)

Publication Number Publication Date
JPS58117107A JPS58117107A (en) 1983-07-12
JPS595721B2 true JPS595721B2 (en) 1984-02-07

Family

ID=16634134

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21313481A Expired JPS595721B2 (en) 1981-12-29 1981-12-29 Hanger retraction device for constructing stiffening girders on long suspension bridges

Country Status (1)

Country Link
JP (1) JPS595721B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6725559B2 (en) * 2018-02-21 2020-07-22 日本橋梁株式会社 Hanging material replacement device and hanging material replacement method using the same
JP2025158735A (en) * 2024-04-05 2025-10-17 株式会社Ihiインフラシステム Hanging material replacement method and hanging material replacement device

Also Published As

Publication number Publication date
JPS58117107A (en) 1983-07-12

Similar Documents

Publication Publication Date Title
US6161359A (en) Shoring
KR102038877B1 (en) Pile frame and its installation method
US20090173577A1 (en) Working platform
CN109989700A (en) A kind of ladder and construction method for the mobile operation of interior painting
JPS595721B2 (en) Hanger retraction device for constructing stiffening girders on long suspension bridges
CN210460704U (en) A clamping device and steel bow member installation platform truck for steel bow member
JPH10316366A (en) Luffing jib assembling method
CN211470602U (en) Amplitude-variable type beam erecting crane
CN116717285A (en) Multiple arch fixtures and new arch trolleys
JP7596705B2 (en) Crane, crane assembly method and disassembly method
CN203403717U (en) Tower body erecting and descending mechanism of tower crane
JP2007290790A (en) Crane
CN214836045U (en) Ladder hanging device for template
CN1472408A (en) Construction Method of Integral Forming of Horizontal Sliding Structure of Cylindrical Reticulated Shell Support
CN109678063B (en) Tower crane climbing system with function of preventing climbing cross beam from swinging and rotating
CN117027369B (en) Corner formwork umbrella supports for the core tube's oblique tapering structure and their application method
CN115681711B (en) Single-rod lifting device for large depth-to-diameter ratio manhole desilting robot
CN216406300U (en) Foldable rain shelter
CN115681712B (en) Three-rod detachable lifting device for desilting manholes with large depth-to-diameter ratio
CN218124155U (en) Draw gear for laying indoor high-place cable
CN213143791U (en) Telescopic scaffold for building construction
JPS5824988Y2 (en) Long gantry device for pile driver, etc.
CN224085852U (en) Portable safety rope fixing device
CN217712556U (en) Foldable hydraulic pressure of vertical overhauls platform
CN223481658U (en) Bridge pier body template with outer cat ladder and operation platform integrated design