Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS598631B2 - Asphalt mat lifting and lowering equipment - Google Patents
[go: Go Back, main page]

JPS598631B2 - Asphalt mat lifting and lowering equipment - Google Patents

Asphalt mat lifting and lowering equipment

Info

Publication number
JPS598631B2
JPS598631B2 JP54126749A JP12674979A JPS598631B2 JP S598631 B2 JPS598631 B2 JP S598631B2 JP 54126749 A JP54126749 A JP 54126749A JP 12674979 A JP12674979 A JP 12674979A JP S598631 B2 JPS598631 B2 JP S598631B2
Authority
JP
Japan
Prior art keywords
asphalt mat
wire
hoisting
asphalt
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP54126749A
Other languages
Japanese (ja)
Other versions
JPS5652382A (en
Inventor
広見 刈谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IKENOTANI TAKAMITSU
Original Assignee
IKENOTANI TAKAMITSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IKENOTANI TAKAMITSU filed Critical IKENOTANI TAKAMITSU
Priority to JP54126749A priority Critical patent/JPS598631B2/en
Publication of JPS5652382A publication Critical patent/JPS5652382A/en
Publication of JPS598631B2 publication Critical patent/JPS598631B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Description

【発明の詳細な説明】 本発明に用いるアスファルトマットとは、芯材としてガ
ラス繊維布、麻類ロープ等を挿入したアスファルトを主
材としたマットであって、その形状は、用途により異る
が、一例としてあげると、幅5m、厚さ5cIIl、長
さ187rL、重量約10 0 0 0Kt(比重2.
2)のようなものであって、用途は、主に埋立護岸、土
砂吸出防止、土砂洗堀防止、ケーソン等の滑動防止、護
岸用テトラポット敷設時の沈下防止下敷、堤防の法面被
覆などに使用するものである。
Detailed Description of the Invention The asphalt mat used in the present invention is a mat whose main material is asphalt with glass fiber cloth, hemp rope, etc. inserted as a core material, and its shape varies depending on the use. As an example, the width is 5 m, the thickness is 5 cIIl, the length is 187 rL, and the weight is approximately 10,000 Kt (specific gravity: 2.
2), and its main uses include reclaimed revetments, prevention of earth and sand suction, prevention of earth and sand scouring, prevention of sliding of caissons, etc., underlay to prevent subsidence when laying tetrapods for seawalls, slope covering of embankments, etc. It is used for.

従来、これらのアスファルトマットを海岸等に敷設する
際に、その1側方のアスファルトマット吊具を一端のみ
で吊上げ、戻しするいわゆる片吊(例えば第1図の前方
または後方のワイヤーのみで吊る)や、また、これをほ
ぼ水平に近い角度で吊上げ(第1図参照)挺子機構によ
って横方向に同時に開放せしめるもの(特公昭52−1
8454号公報参照)があったが、これは、アスファル
ト吊ワイヤーを水中等で離脱せしめる場合、一方の主梁
の機構を操作後、他方の主梁機構を操作せしめねばなら
ないか、または両側に操作人員を配置せねばならない構
成となっているため、水中での移動であるために手間取
り敷設に時間がかかるし、また、この両側を一時に下降
せしめるためには、より複雑な機構となるであろうし、
上記公報にはその提案も示されていないし、その図面か
らも推考し得ないきころであって、もしこれを取付ける
とすれば、重量もかかりその操作は一層困難なものとな
ることは勿論、その価格も高価となる等多くの難点があ
る。
Conventionally, when laying these asphalt mats on the coast, etc., the asphalt mat hanging device on one side of the mat is lifted from only one end and then returned to a so-called single-hanging method (for example, hanging only from the front or rear wire in Figure 1). Or, it can be lifted at an almost horizontal angle (see Figure 1) and opened laterally at the same time using a lever mechanism (Special Publication Publication No. 52-1).
(Refer to Publication No. 8454), but when removing the asphalt suspension wire in water, etc., it is necessary to operate the mechanism of one main beam and then the mechanism of the other main beam, or the mechanism must be operated on both sides. Since the structure requires the deployment of personnel, it takes time and effort to install the structure because it is moved underwater, and a more complicated mechanism is required to lower both sides at once. wax,
There is no proposal for this in the above-mentioned publication, and it cannot be inferred from the drawings, and if it were to be installed, it would of course be heavy and even more difficult to operate. There are many disadvantages such as the high price.

また、片吊りの場合は勿論、両吊り(上記公報のもので
は)両者を一時に離脱でき得ないため、アスファルトマ
ットの破損のおそれもあって、きわめて不便なものであ
った。
Furthermore, since it is not possible to remove both suspensions at the same time, not only in the case of single suspension, but also in the case of both suspensions (in the case of the one in the above-mentioned publication), there is a risk of damage to the asphalt mat, which is extremely inconvenient.

本発明は、これを改善して、機構を単純化するとともに
、その操作を円滑容易とし、又その作動も確実、且つ、
迅速化し、価格も低廉ならしめたものである。
The present invention improves this by simplifying the mechanism, making its operation smooth and easy, and ensuring its operation.
It is faster and cheaper.

次に本発明の装置について、図面に示した実施例に基づ
いて説明すると、第1図は、旧来のアスファルトマット
吊り降し手段の一例を示す説明図であり、第2図以下が
本発明の実施例である。
Next, the apparatus of the present invention will be explained based on the embodiment shown in the drawings. FIG. 1 is an explanatory diagram showing an example of a conventional asphalt mat hanging means, and FIG. This is an example.

1は、前述したアスファルトマットであって、2は旧来
のもののマット吊りワイヤーであり、本発明の実施例で
は、Yの符号のものがこれに相当し、何れもアスファル
トマットに適宜の手段によって固着されている。
1 is the asphalt mat mentioned above, 2 is a conventional mat hanging wire, and in the embodiment of the present invention, the wire with the symbol Y corresponds to this, and both are fixed to the asphalt mat by appropriate means. has been done.

3は、アスファルト吊下げ用枠体であって、本発明にお
いては、主梁4と側梁5によりアスファルトマット1状
の長方形に構成され、その中央に中間梁6が適宜の手段
によって固定されている。
Reference numeral 3 denotes a frame for hanging asphalt, and in the present invention, it is constructed into a rectangular shape in the shape of an asphalt mat 1 by a main beam 4 and side beams 5, and an intermediate beam 6 is fixed to the center thereof by appropriate means. There is.

又7は両側主梁4,4間に亘り側梁5,5と平行して補
強的に取付けられた中間側梁である。
Further, reference numeral 7 denotes an intermediate side beam which is installed in parallel with the side beams 5, 5 between the main beams 4, 4 on both sides for reinforcement.

本発明は、このようにして構成されたアスファルトマッ
ト吊下げ用枠体3の両側主梁4,4の上方に軸受台8,
8・・・・・・を介して取付けた主梁部に上下巻軸9を
取付け、この軸の前記アスファルトマットに固定した吊
りワイヤーYの取付間隔にあわせた位置にアスファルト
マット巻上下ワイヤー13を鉛垂に巻揚げ、巻戻し得る
ように上下巻輪10,10・・・を回転自在に嵌合取付
け、この主梁部4,4の下方で、且つ、上部主梁部上下
巻輪10,10・・・に対応する位置に、アスファルト
マット吊ワイヤーYの支持部11として、実施例の第4
、第5図にみるような円形又は矩形の筐体11の、適宜
位置(図面では下部側方)にアスファルトマットに固着
した吊りワイヤーYの挿入孔12をあけ、且つ、その上
方より、前記主梁部に上下巻輪10,10・・・・・・
に巻回した巻上げ、巻下しワイヤー13の先端に嵌合部
材止具14を介して、アスファルトマット吊りワイヤー
の嵌合部材15がアスファルトマット吊り支持部11の
筐体11(7)孔部11′に嵌合し、これによってアス
ファルトマット吊りワイヤーYを支持するようにしてあ
る。
The present invention provides bearing stands 8 and
8... Attach the upper and lower winding shafts 9 to the main beams attached through the asphalt mats, and install the asphalt mat winding upper and lower wires 13 at positions on this shaft that match the installation intervals of the hanging wires Y fixed to the asphalt mat. The upper and lower winding rings 10, 10, etc. are rotatably fitted and attached so as to be able to be hoisted and unwound on a lead-like structure, and the upper and lower winding rings 10, 10, As the support part 11 of the asphalt mat hanging wire Y, the fourth part of the embodiment is placed at a position corresponding to 10...
, a circular or rectangular housing 11 as shown in FIG. Upper and lower winding rings 10, 10 on the beam part...
The fitting member 15 of the asphalt mat hanging wire is connected to the hole 11 of the casing 11 (7) of the asphalt mat hanging support part 11 via the fitting member stopper 14 on the tip of the winding and unwinding wire 13 wound around the asphalt mat hanging wire. ', thereby supporting the asphalt mat hanging wire Y.

しかして、その両側主梁部4,4の上方の上下巻軸9の
適所(図面では、両側端部)に、これを操作するストッ
パー操作ハンドルH,Hが、取付けられている。
Stopper operation handles H, H for operating the upper and lower winding shafts 9 are attached to appropriate positions (in the drawings, at both ends) above the main beams 4, 4 on both sides.

そして、このストッパー操作ハンドルHは、側梁5の端
部固着した型軸受台8′上に枢着され、且つ、軸受台中
には上下巻軸9の一端にはスプリングSを固着するとと
もに被嵌して貫通され、その外側には、側梁5に固定さ
れた軸受台8の外側に回転自在に取付けたストッパー輪
24のストッパ一孔24′と係合、離脱自在に取付けら
れており、ストッパー操作ハンドルHを上記ストッパ一
孔24′中に挿入することによりアスファルトマット支
持部の安定確保が保たれる。
The stopper operating handle H is pivotally mounted on a type bearing stand 8' fixed to the end of the side beam 5, and a spring S is fixed to one end of the upper and lower winding shafts 9 in the bearing stand. The stopper hole 24' of the stopper ring 24 rotatably attached to the outside of the bearing stand 8 fixed to the side beam 5 is attached to the outside thereof so that it can engage with and be detached from the stopper hole 24'. By inserting the operating handle H into the stopper hole 24', the stability of the asphalt mat support portion is maintained.

(第6図A ,B参照)。(See Figures 6A and B).

なお、上下巻軸9の端部は端部軸受台8′を貫通して前
記ストッパー輪24に固定されるとともに端部軸受台8
′の内側に一端を固定されたスプリングSが上下巻軸9
の端部に固着されるとともに被低されており、スプリン
グSの他端は端部軸受台8′とは、フリーに接触するよ
うにしてあり、且つ、この張力は常に向って右側に働く
ようにしてあるので、上下巻軸9は常にストッパー輪2
4側に引張られて、上下巻軸の作動を正確に行うこさが
できる。
The ends of the upper and lower winding shafts 9 pass through the end bearing pedestal 8' and are fixed to the stopper ring 24.
A spring S whose one end is fixed inside the upper and lower winding shafts 9
The other end of the spring S is in free contact with the end bearing stand 8', and this tension always acts on the right side. Therefore, the upper and lower winding shafts 9 are always connected to the stopper ring 2.
By being pulled to the 4th side, the upper and lower winding shafts can be operated accurately.

また、上下巻軸9の作動は、ストッパー輪24に固定さ
れた上下巻軸操作用ハンドルH′を回転するものであり
、この回転により主梁4,4上のアスファルトマット吊
りワイヤーY対応位置に取付けた上下巻輪[0を回転せ
しめるものである。
In addition, the operation of the upper and lower winding shafts 9 involves rotating the upper and lower winding shaft operating handles H' fixed to the stopper wheels 24, and this rotation causes the asphalt mat suspension wires to move to positions corresponding to the asphalt mat hanging wires Y on the main beams 4, 4. It rotates the attached upper and lower winding rings [0].

そして、アスファルトマット吊ワイヤーYを本吊下げ用
枠体3に取付けたま5移動せしめるときは、先述した様
に第4図Aの位置に上下巻軸9を巻下げた位置で、端部
軸受台8′のストッパー操作ハンドルHをストッパー軸
24のストッパ一孔24′に嵌合すれば、上下軸9はそ
の位置に確保され従って、アスファルトマット吊ワイヤ
ーYは本吊具枠体3に確保され移動が安定して行われ目
的地に本吊り具枠体が到達しアスファルトマットがその
目的位置に安置されたときは、上記ストッパー操作ハン
ドルHをストッパー輪24のストッパ一孔24′より外
しストッパー輪24に固定された上下巻軸操作用ハンド
ルH′を前と逆に回転すれば、これに固定された上下軸
9が回転し、従って上下輪10を時計方向に回転せしめ
、これによってアスファルトマット巻上下ワイヤーを巻
上げて第5図Aの位置にアスファルト吊り支持部11よ
り嵌合部材15を引上げアスファルト吊りワイヤーYを
本吊枠3より開放してアスファルトマット1を目的地に
安置することができるものである。
When the asphalt mat hanging wire Y is attached to the main suspension frame 3 and moved 5, the upper and lower winding shafts 9 are lowered to the position shown in FIG. When the stopper operating handle H 8' is fitted into the stopper hole 24' of the stopper shaft 24, the vertical shaft 9 is secured in that position, and the asphalt mat hanging wire Y is secured to the main hanging tool frame 3 and moved. When this has been carried out stably and the main hanging tool frame has reached its destination and the asphalt mat has been placed in its destination position, remove the stopper operation handle H from the stopper hole 24' of the stopper wheel 24 and remove the stopper operation handle H from the stopper hole 24' of the stopper wheel 24. When the handle H' for operating the upper and lower winding shafts fixed to the upper and lower winding shafts is rotated in the opposite direction, the upper and lower shafts 9 fixed thereto rotate, thereby rotating the upper and lower wheels 10 clockwise. The asphalt mat 1 can be placed at the destination by winding up the wire, pulling up the fitting member 15 from the asphalt hanging support part 11 to the position shown in FIG. be.

さらに本願の発明においては、アスファルトマット吊枠
体3両側主梁4,4の中間梁6に両側主梁部4,4に設
けた主梁部上下軸9,9と平行して中間梁軸受台16,
16・・・・・・を設け、これに中間梁上巻軸17を回
転自在に取付け、これに両側の主梁4,4に設けた主梁
部上下巻軸9,9上の上下巻輪10,10に対応して、
中間梁上の巻輪18,18・・・・・・(第3図参照)
を回転自在に取付け、これら両者に連結ワイヤー19,
19・・・・・・を第3図Cにみられるように巻回しす
る。
Furthermore, in the invention of the present application, an intermediate beam bearing stand is provided in the intermediate beam 6 of the asphalt mat suspension frame 3 on both side main beams 4, 4 in parallel with the main beam vertical axes 9, 9 provided on both side main beams 4, 4. 16,
16..., to which the intermediate beam upper winding shaft 17 is rotatably attached, and to this the upper and lower winding wheels 10 on the main beam upper and lower winding shafts 9, 9 provided on the main beams 4, 4 on both sides. ,10,
Winding rings 18, 18 on the intermediate beam (see Figure 3)
are attached rotatably, and connecting wires 19,
19... is wound as shown in Figure 3C.

そして、この場合側梁5,5や中間梁6,6・・・から
クラッチ輪2L22を輪孔23と、クラッチ輪取付軸2
0に設けた突起20′とを摺動自在に取付け、これらク
ラッチ輪21 ,22の外周溝に前記連結ワイヤー19
を巻回するものである(第7図参照)。
In this case, the clutch wheel 2L22 is connected to the ring hole 23 from the side beams 5, 5 and the intermediate beams 6, 6... to the clutch wheel mounting shaft 2.
The connecting wire 19 is slidably attached to the protrusion 20' provided on the clutch wheels 21 and 22.
(See Figure 7).

即ち、本発明では敷設しようとするアスファルトマット
を長手方向の一側から吊上げたり吊下げることが出来る
ものでこれは第7図のAの様にクラッチ輪21,22を
上記のように結合せしめて作動させれば両側共同時に吊
上げたり、吊下げることが出来るし、Bの様にクラッチ
輪2L22を離脱せしめて作動せしめればその一側のみ
を各別に作動出来るものである。
That is, in the present invention, the asphalt mat to be laid can be lifted up or suspended from one side in the longitudinal direction, and this is done by connecting the clutch wheels 21 and 22 as shown above as shown in A in Fig. 7. If actuated, both sides can be lifted or suspended at the same time, and if actuated with clutch wheel 2L22 disengaged as shown in B, only one side can be actuated separately.

なお第7図Cはクラッチ輪2L22の平面図である。Note that FIG. 7C is a plan view of the clutch wheel 2L22.

なお図面中25は、主梁4,4のアスファルトマット吊
りワイヤーと中間梁上の巻輪間を連結するワイヤー19
のクルミを防止し、且つ、これを保護するプラスチック
材等からなるワイヤー受ガイド管である。
In addition, 25 in the drawing is a wire 19 that connects the asphalt mat suspension wire of the main beams 4 and 4 and the winding ring on the intermediate beam.
This is a wire receiving guide tube made of plastic material that prevents and protects the wire from walnuts.

又26(第2図)は、クレーン等による枠体吊りワイヤ
ーである。
Further, 26 (Fig. 2) is a wire for suspending the frame by a crane or the like.

また、第2図第3図にみるように、中間梁上に設けた中
間梁上巻軸17の端部には中間梁端部軸受台8“が設け
られ、これにもストッパ一孔24′付ストッパー輪24
並びに、ツパー操作ハンドルH及び上下巻軸操作ハンド
ルH′が設けられている。
Further, as shown in FIGS. 2 and 3, an intermediate beam end bearing stand 8'' is provided at the end of the intermediate beam upper winding shaft 17 provided on the intermediate beam, and this also has a stopper hole 24'. Stopper ring 24
Additionally, a puller operating handle H and an upper and lower winding shaft operating handle H' are provided.

次に、本装置の操作について説明すると、まず本発明の
アスファルト吊上げ、吊降し枠体3をクレーン等により
工事現場等において製作されたアスファルトマット1の
両側辺部に取付けられているアスファルトマット吊りワ
イヤーYに合わせて第4図A,Bにみるように、アスフ
ァルトマット吊下げ枠体3の両側主梁4,4に設けた各
アスファルトマット吊ワイヤー支持体11の近くに吊下
げ各支持部即ち筐体11のアスファルトマット吊ワイヤ
ー挿入口12に上記アスファルトマット吊ワイヤーを挿
入し、主梁上下輪10を上下巻軸操作用ハンドルH′を
操作して巻上下ワイヤー13を下降せしめると、このワ
イヤーの下方に止具14を介して取付けたアスファルト
マット吊ワイヤーの止着嵌合部材15が下降し、前記ア
スファルトマット吊ワイヤーYの取付輪に嵌合する。
Next, to explain the operation of this device, first, the asphalt lifting/hanging frame 3 of the present invention is attached to an asphalt mat hanging frame 3 attached to both sides of an asphalt mat 1 manufactured at a construction site etc. by a crane or the like. As shown in FIGS. 4A and 4B, along with the wire Y, the asphalt mat suspension wire supports 11 are suspended near the asphalt mat suspension wire supports 11 provided on both main beams 4, 4 of the asphalt mat suspension frame 3, i.e. Insert the asphalt mat suspension wire into the asphalt mat suspension wire insertion opening 12 of the casing 11, and lower the winding wire 13 by operating the handle H' for operating the upper and lower winding shafts of the main beam upper and lower wheels 10. The fixing fitting member 15 of the asphalt mat hanging wire Y, which is attached to the lower part of the asphalt mat hanging wire Y via a stopper 14, is lowered and fitted into the attachment ring of the asphalt mat hanging wire Y.

各アスファルトマット吊りワイヤーYが上記アスファル
トマット支持部に嵌合されたときに、上述したように、
端部軸受台8′上のストッパー操作用ハンドルHを操作
して、ストッパー輪24のストッパ一孔24′に嵌合し
て固定し、アスファルトマット吊枠体3をクレーン等に
より枠体吊ロープ26によって吊上げると、第4図At
Bにみるようにアスファルトマットの重量によって緊張
された吊ワイヤーYは、上記巻上下ワイヤー13下方に
取付けたアスファルトマットの止着嵌合部材15とアス
ファルトマット支持部の筐体11中において強固に結合
し、アスファルトマット全体をほぼ水平に吊下げること
が出来る。
As described above, when each asphalt mat hanging wire Y is fitted into the asphalt mat support part,
Operate the stopper operating handle H on the end bearing stand 8' to fit and fix the stopper into the stopper hole 24' of the stopper ring 24, and then lift the asphalt mat hanging frame 3 to the frame hanging rope 26 using a crane or the like. When lifted by
As shown in B, the hanging wire Y tensioned by the weight of the asphalt mat is firmly connected to the fixing fitting member 15 of the asphalt mat attached below the winding up/down wire 13 in the casing 11 of the asphalt mat support part. The entire asphalt mat can be hung almost horizontally.

次いで本アスファルトマットを敷設すべき個所にクレー
ン等により木枠体を移動せしめ、目的個所において本枠
体端部適所に設けた上下巻軸操作用操作ハンドルH′を
もって上下巻輪10を操作しアスファルトマット巻上下
ワイヤー13を時計方向に巻揚げ操作すると、第5図A
,Bにみるように、アスファルトマット吊ワイヤー支持
体11中の巻上下ワイヤー13下方に取付けた各アスフ
ァルトマット止着嵌合部材15が支持部の筐体11より
抜け出すと共に、アスファルトマットの自重によって、
同支持体11中より離脱して目的個所に敷設出来るもの
である。
Next, the wooden frame is moved by a crane or the like to the location where the asphalt mat is to be laid, and at the target location, the upper and lower winding wheels 10 are operated using the operating handle H' for operating the upper and lower winding shafts provided at appropriate positions at the ends of the main frame, and the asphalt mat is laid. When the mat winding upper and lower wires 13 are hoisted clockwise, Fig. 5A
, B, each asphalt mat fastening fitting member 15 attached below the winding up and down wire 13 in the asphalt mat hanging wire support 11 comes out of the support housing 11, and due to the asphalt mat's own weight,
It can be detached from the support 11 and laid at the desired location.

即ち堤防等の法面保護等の場合は、中間梁6上に取付け
た中間梁上巻輪18と、両側主梁4,4上の上下巻輪1
0とに巻回された連結ワイヤー19を第1図にみるクラ
ッチ機構を作動して、即ちクラッチ輪21 ,22を離
脱せしめてから法面上方部のアスファルトマット吊具Y
は、そのまNとして他側の上下巻軸操作用ハンドルHを
操作して土下巻輪を第5図にみるような時計方向に回転
すれば、これに巻回されたアスファルトマット巻上下ワ
イヤー13を引き上げその下端に取付けた嵌合部材15
をアスファルトマット支持部11の筐体11より引き上
げ、アスファルトマット吊ワイヤーYは同マットの自重
によりアスファルトマット吊下用枠体3より離脱するの
で、クレーン等により法面上方の位置定めをしてから静
かに、その下方位置より下しつつ敷設し、上方位置が定
置したとき上記と同様の仕様でアスファルトマット吊ワ
イヤーYを本枠体3より外せば目的位置に正確、且つ、
容易にアスファルトマットを敷設することができる。
That is, in the case of slope protection of embankments, etc., the intermediate beam upper winding ring 18 installed on the intermediate beam 6 and the upper and lower winding rings 1 on both main beams 4, 4 are used.
After operating the clutch mechanism shown in FIG.
If you turn N as it is and operate the handle H for operating the upper and lower winding shafts on the other side to rotate the soil winding ring clockwise as shown in Fig. 5, the asphalt mat winding upper and lower wires 13 wound around it can be removed. The fitting member 15 is pulled up and attached to its lower end.
is pulled up from the casing 11 of the asphalt mat support part 11, and the asphalt mat hanging wire Y will separate from the asphalt mat hanging frame 3 due to the mat's own weight, so it must be positioned above the slope using a crane or the like. Gently lay it down from the lower position, and when the upper position is fixed, remove the asphalt mat hanging wire Y from the main frame 3 with the same specifications as above, and the asphalt mat will be placed exactly at the desired position.
Asphalt mats can be easily laid.

即ち上記の使用例はアスファルトマットを本装置を一側
方のみを各別に作動せしめて敷設する例であるが、下記
のように両側を同時に作動せしめて使用することもきわ
めて簡単にできるものである。
That is, in the above usage example, an asphalt mat is laid by operating this device on only one side separately, but it is also extremely easy to use it by operating both sides simultaneously as shown below. .

次に本願上記の構成からなる本発明の実施について述べ
ると、アスファルトマット吊下げ用枠体3に敷設しよう
とするアスファルトマット1を取付けるには、前記の場
合と全く同様の操作で取付け、これをそのま\敷設しよ
うとする目的個所にクレーン等によって吊ワイヤー26
をもって移動させ、今回は、中間梁6上の中間梁上巻輪
18と両側主梁4,4上の上下巻輪10とに巻回された
連結チェーン19を第7図にみるクラッチ機構を作動し
て、即ちクラッチ輪2L22を係合固着せしめてからそ
の端部軸受台8“に設けた上下巻軸操作用ハンドルHを
操作して両側主梁4,4の上下巻輪10,10・・・・
・・を第5図にみるような時計方向に回転すればこれに
巻回されたアスファルト巻上下ワイヤー13を引き上げ
て、その下端に取付けた嵌合部材15をアスファルトマ
ット吊支持部11の筐体11より引き上げ、アスファル
トマット吊ワイヤーYは、同マットの自重によってアス
ファルトマット吊下用枠体3より同時に離脱するので、
人手を要しないで目的場所にほぼ水平に正確迅速に敷設
でき得るものである。
Next, to describe the implementation of the present invention having the above-mentioned configuration, in order to attach the asphalt mat 1 to be laid on the asphalt mat hanging frame 3, attach it by the same operation as in the above case, and then Just hang the wire 26 by crane, etc. at the target location where you are going to lay it.
This time, the clutch mechanism shown in FIG. 7 is actuated to move the connecting chain 19 wound around the intermediate beam upper winding ring 18 on the intermediate beam 6 and the upper and lower winding rings 10 on both main beams 4, 4. That is, after the clutch ring 2L22 is engaged and fixed, the upper and lower winding shaft operating handles H provided on the end bearing stand 8'' are operated to operate the upper and lower winding wheels 10, 10 of the main beams 4, 4 on both sides.・
... is rotated in the clockwise direction as shown in FIG. 11, and the asphalt mat hanging wire Y separates from the asphalt mat hanging frame 3 at the same time due to the weight of the mat.
It can be laid almost horizontally and accurately and quickly at a target location without requiring any human labor.

以上のように、この発明によると、きわめて簡単な機構
によりアスファルトマットをその吊下げ用枠体によりほ
ぼ水平に吊下げ、これを目的地に移動せしめて、この枠
体に取付けたアスファルトマットをその枠体3の一側に
設けた上下巻軸操作用ハンドルHを操作するのみで、ア
スファルトマットを、取付枠体3より一挙に離脱せしめ
、ほぼ水平に敷設できるもので、従来この種敷設機で実
施不可能であった1個所操作によるアスファルトマット
の吊ワイヤー離脱を可能とし、そのため海岸や、河川等
の波浪の影響下でも一人の潜水夫の操作で一挙に敷設で
き、本発明により敷設時間の短縮とその作業の容易、確
実性が期待し得るし、またアスファルトマットの同時離
脱によってその捻曲破損を防止出来、且つ、その機構の
単純化による価格の低廉化も達成できた優れた発明であ
る。
As described above, according to the present invention, the asphalt mat is suspended almost horizontally by the hanging frame using an extremely simple mechanism, and this is moved to the destination, and the asphalt mat attached to the frame is By simply operating the handle H for operating the upper and lower winding shafts provided on one side of the frame 3, the asphalt mat can be removed from the mounting frame 3 at once and laid almost horizontally, unlike conventional laying machines of this type. The asphalt mat can be detached from the suspension wire by a single operation, which was previously impossible. Therefore, even on the coast or under the influence of waves in rivers, it can be laid all at once by a single diver, and the present invention reduces the installation time. It is an excellent invention that can be expected to shorten the asphalt mat easily and reliably, and also to prevent the asphalt mat from twisting and breaking by simultaneously releasing it, and to reduce the price by simplifying the mechanism. be.

また上述したようにその目的に応じて1側方のアスファ
ルトマット吊ワイヤーYのみを初めに離脱せしめ、片吊
りの型で希望する作業をも可能とするもので、1機をも
って2種の作業が選択可能である利点をも有する発明で
ある。
In addition, as mentioned above, depending on the purpose, only the asphalt mat hanging wire Y on one side can be removed first, making it possible to perform the desired work with a single-hanging type, so one machine can perform two types of work. This invention also has the advantage of being selectable.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は、旧来のアスファルトマットの片吊の説明図、
第2図は、本発明の実施例を示す説明図、第3図は本発
明の吊枠との関係を示す実施説明図で、Aは平面図、B
は側面図、Cは右側面図、第4図は要部の拡大図で、ア
スファルトマットを取付けた場合の説明図、第5図は同
アスファルトマットを離脱せしめたときの説明図、第6
図は操作ハンドルのストッパ一部の説明図で、Aは側面
図、Bは正面図、第γ図は本発明のクラッチ部即ち1側
操作と、両側同時操作の場合の説明図である。 1・・・・・・アスファルトマット、2・・・・・・旧
来のアスファルト吊ワイヤー、3・・・・・・アスファ
ルト吊用枠体、4・・・・・・主梁、5・・・・・・側
梁、6・・・・・・中間梁、7・・・・・・中間側梁、
8・・・・・・軸受台、8′・・・・・・端部軸受台、
8“・・・・・・中間梁端部軸受台、9・・・・・・上
下巻軸、10・・・・・・土下巻輪、11・・・・・・
アスファルトマット吊支持部、11・・・・・・筐体、
11′・・・・・・筐体孔部、12・・・・・・アスフ
ァルトマット吊ワイヤー挿入孔、13・・・・・・アス
ファルトマット巻上下ワイヤー、14・・・・・・嵌合
部材取付具、15・・・・・・嵌合部材、16・・・・
・・中間梁軸受台、17・・・・・・中間梁上巻軸、1
8・・・・・・中間梁上巻輪、19・・・・・・連結ワ
イヤー、20・・・・・・クラッチ輪取付軸、21 ,
22・・・・・・クラッチ輪、23・・・・・・輪孔、
24・・・・・・ストッパー輪、24′・・・−・・ス
トッパ一孔、25・・・・・・ワイヤー受ガイド管、2
6・・・・・・枠体吊ワイヤー、Y・・・・・・アスフ
ァルト吊ワイヤー、H・・・・・・ストッパー操作ハン
ドル、H′・・・・・・上下巻軸操作用ハンドル。
Figure 1 is an explanatory diagram of the traditional asphalt mat hanging on one side.
FIG. 2 is an explanatory diagram showing an embodiment of the present invention, and FIG. 3 is an explanatory diagram showing the relationship between the present invention and the hanging frame, where A is a plan view and B is a plan view.
is a side view, C is a right side view, Figure 4 is an enlarged view of the main part, and is an explanatory diagram when the asphalt mat is installed. Figure 5 is an explanatory diagram when the asphalt mat is removed.
The figures are explanatory diagrams of a part of the stopper of the operating handle, A is a side view, B is a front view, and Fig. γ is an explanatory diagram of the clutch portion of the present invention, that is, when one side is operated and when both sides are operated simultaneously. 1... Asphalt mat, 2... Old asphalt hanging wire, 3... Asphalt hanging frame, 4... Main beam, 5... ...Side beam, 6...Middle beam, 7...Middle side beam,
8... Bearing stand, 8'... End bearing stand,
8"...Intermediate beam end bearing stand, 9...Upper and lower winding shaft, 10...Underground winding ring, 11...
Asphalt mat hanging support part, 11... Housing,
11'... Housing hole, 12... Asphalt mat hanging wire insertion hole, 13... Asphalt mat winding upper and lower wire, 14... Fitting member Mounting tool, 15...Mating member, 16...
...Middle beam bearing stand, 17...Middle beam upper winding shaft, 1
8... Intermediate beam upper winding ring, 19... Connecting wire, 20... Clutch wheel mounting shaft, 21,
22...Clutch ring, 23...Ring hole,
24...Stopper ring, 24'...--Stopper hole, 25...Wire receiving guide tube, 2
6... Frame suspension wire, Y... Asphalt suspension wire, H... Stopper operation handle, H'... Handle for operating the upper and lower winding shafts.

Claims (1)

【特許請求の範囲】[Claims] 1 アスファルトマット吊下げ用枠体の両側適所に設け
た梁部上方にアスファルトマットに取付けたアスファル
トマット吊ワイヤーの間隔に合わせた位置にこの吊ワイ
ヤーを鉛直に巻揚げ、戻し装置を取付けるとともに、そ
の梁部下方にアスファルトマット吊ワイヤーの支持部を
設け、この支持部の上方は、上記巻揚げ、戻し装置に連
結し、下方部は、この支持部に設けたアスファルトマッ
ト吊ワイヤー挿入孔を介して該アスファルトマット吊ワ
イヤーを挾持するようにーし、これら各巻揚げ、戻し装
置を関連せしめるとともに、その梁部端側に設けた上下
巻軸操作用ハンドル『の操作により同時に作動せしめる
ようにし、また、前記枠体両側梁部中間に設けた梁部に
上記両側の各巻揚げ、戻し装置を連結するワイヤーを巻
回し、且つその適所に両側の巻揚げ、戻し装置との関連
を断・続する機構を設置し、この中間梁部の適所にワイ
ヤー巻揚げ、戻し装置のストッパー操作ハンドルHを取
付け、両側の巻揚げ、戻し装置を接続せしめた場合には
、これを操作することにより、全巻揚げ、戻し装置を鉛
直方向に移動せしめて、アスファルトマットを同時に吊
降すようにし、また両側の巻揚げ、戻し装置との関連を
切断したときは、両側の巻揚げ、戻し装置を各別に巻降
し得るようにしたことを特徴とするアスファルトマット
吊揚げ、吊降し装置。
1. The asphalt mat hanging wires are vertically hoisted at positions matching the spacing of the asphalt mat hanging wires attached to the asphalt mat above the beams provided at appropriate positions on both sides of the asphalt mat hanging frame, and a return device is installed, and the A support part for the asphalt mat suspension wire is provided below the beam, the upper part of this support part is connected to the above hoisting and returning device, and the lower part is connected to the asphalt mat suspension wire insertion hole provided in this support part. The asphalt mat hanging wire is held between the wires, and the hoisting and returning devices are connected to each other, and are operated simultaneously by operating a handle for operating the upper and lower winding shafts provided on the end side of the beam, and A wire connecting each of the hoisting and returning devices on both sides is wound around a beam provided in the middle of the beams on both sides of the frame, and a mechanism is provided at an appropriate position to disconnect and connect the wire with the hoisting and returning devices on both sides. When the stopper operation handle H of the wire hoisting/returning device is attached to the appropriate place on this intermediate beam, and the hoisting/returning devices on both sides are connected, by operating this, the entire hoisting/returning operation can be performed. When the device is moved vertically to suspend asphalt mats at the same time, and when the connection with the hoisting and unwinding devices on both sides is disconnected, the hoisting and unwinding devices on both sides can be unwinded separately. An asphalt mat lifting and lowering device characterized by:
JP54126749A 1979-10-03 1979-10-03 Asphalt mat lifting and lowering equipment Expired JPS598631B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP54126749A JPS598631B2 (en) 1979-10-03 1979-10-03 Asphalt mat lifting and lowering equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP54126749A JPS598631B2 (en) 1979-10-03 1979-10-03 Asphalt mat lifting and lowering equipment

Publications (2)

Publication Number Publication Date
JPS5652382A JPS5652382A (en) 1981-05-11
JPS598631B2 true JPS598631B2 (en) 1984-02-25

Family

ID=14942951

Family Applications (1)

Application Number Title Priority Date Filing Date
JP54126749A Expired JPS598631B2 (en) 1979-10-03 1979-10-03 Asphalt mat lifting and lowering equipment

Country Status (1)

Country Link
JP (1) JPS598631B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10611664B2 (en) 2014-07-31 2020-04-07 Corning Incorporated Thermally strengthened architectural glass and related systems and methods
US11097974B2 (en) 2014-07-31 2021-08-24 Corning Incorporated Thermally strengthened consumer electronic glass and related systems and methods

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009137682A (en) * 2007-12-05 2009-06-25 Nippon Kaijo Koji Kk Suspending frame device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS594201B2 (en) * 1975-08-04 1984-01-28 新日本製鐵株式会社 Kouhan no Seizou Hohou
JPS5815430Y2 (en) * 1978-03-25 1983-03-28 杉山 蔀 Hanging equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10611664B2 (en) 2014-07-31 2020-04-07 Corning Incorporated Thermally strengthened architectural glass and related systems and methods
US11097974B2 (en) 2014-07-31 2021-08-24 Corning Incorporated Thermally strengthened consumer electronic glass and related systems and methods

Also Published As

Publication number Publication date
JPS5652382A (en) 1981-05-11

Similar Documents

Publication Publication Date Title
AU607649B2 (en) Method of mounting a lift and lift obtained
CN108930324A (en) A kind of town road drain pipe construction equipment and method
KR20110006018A (en) Manhole Cover Switch
JPS598631B2 (en) Asphalt mat lifting and lowering equipment
CN205955166U (en) Hanging flower basket couple formula prevents weighing down anti -shaking device
JP3069315B2 (en) Work method and device for leaderless auger
JP5479943B2 (en) Hammer grab
US3352433A (en) Pole setting apparatus
CN217838191U (en) Hoisting support for assisting in cleaning water tank
JP3163874U (en) Earth and sand drilling equipment
JP3737182B2 (en) Flat plate loading method and apparatus
JP3712293B2 (en) Loading measuring device and remote loading flat plate loading device
JPH0640215Y2 (en) Lifting device for pipes
CN220603757U (en) Optical fiber paying-off supporting device
CN220334733U (en) Auxiliary assembly is used in underground pipeline exploration
CN212050249U (en) Earthwork transportation equipment suitable for sinking portal construction
CN210260661U (en) Inclinometer cable winding device
CN202124878U (en) Crane for excavated earth of excavation pile
CN215924150U (en) A mechanical soil guide device for artificially digging piles in guide holes
CN210457264U (en) Cable lifting device for improving cable laying efficiency of deep well tunnel
JP6942911B2 (en) Underground pile withdrawal pile holder and underground pile withdrawal method using the holder
JPH0519377Y2 (en)
JP2521457Y2 (en) Lower support of climbing crane
CN210710492U (en) Lifting device for anti-floating anchor rod
JPH02243497A (en) Second rope system for crane