JPS603567B2 - Construction method of embankment body with horizontal top surface - Google Patents
[go: Go Back, main page]

JPS603567B2 - Construction method of embankment body with horizontal top surface - Google Patents

Construction method of embankment body with horizontal top surface

Info

Publication number
JPS603567B2
JPS603567B2 JP14474581A JP14474581A JPS603567B2 JP S603567 B2 JPS603567 B2 JP S603567B2 JP 14474581 A JP14474581 A JP 14474581A JP 14474581 A JP14474581 A JP 14474581A JP S603567 B2 JPS603567 B2 JP S603567B2
Authority
JP
Japan
Prior art keywords
sand
horizontal
concrete
embankment body
top surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14474581A
Other languages
Japanese (ja)
Other versions
JPS5781513A (en
Inventor
正明 平田
伸正 森井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GOYO KENSETSU
Original Assignee
GOYO KENSETSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GOYO KENSETSU filed Critical GOYO KENSETSU
Priority to JP14474581A priority Critical patent/JPS603567B2/en
Publication of JPS5781513A publication Critical patent/JPS5781513A/en
Publication of JPS603567B2 publication Critical patent/JPS603567B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】 本発明は夫端面が水平な堤体の築造方法に関するもので
ある。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing an embankment body with horizontal end faces.

上記堤体の従来の築造技術においては天端面が水平な蓋
コンクリート版を除いたものを造函ャ−ドで製作し、仮
設鋼板等によって蓋をした後ケーソン堤体の曳航裾付作
業を行った後、土砂運搬船を堤体に横付けしてグラブバ
ケット等の輸送機械により中詰土砂をケーソン堤体上方
から隔壁内部に投入する方法が探られている。
In the conventional construction technique for the above-mentioned levee body, the dam body excluding the concrete cover with a horizontal top surface is manufactured using a boxyard, and after being covered with a temporary steel plate, etc., the caisson levee body is towed and hemmed. After that, a method is being explored in which an earth and sand carrier is brought alongside the embankment body and the packed earth is introduced into the bulkhead from above the caisson embankment using transport equipment such as grab buckets.

しかし上記従釆技術は、造函ャードで製作したケーソン
を現地まで曳航する際、その頂部に仮設仮蓋を取り付け
るものであるが、その耐圧強度、耐漏水に不安がある。
However, with the above-mentioned bundling technology, a temporary cover is attached to the top of the caisson made from a box yard when it is towed to the site, but there are concerns about its pressure resistance and water leakage resistance.

一方、この不安に対しては鉄筋コンクリートの恒久的天
井をケーソンと一体として作り付けるのが望ましいが、
従来は中詰の際に天井がじやまになることから蓋付きケ
ーソンは使用されなかった。従って水平な蓋コンクリー
ト版は、中詰工終了後場所打鉄筋コンクリートとして施
工せざるを得なかつた。
On the other hand, to address this concern, it is desirable to build a permanent ceiling made of reinforced concrete as an integral part of the caisson.
Previously, caissons with lids were not used because the ceiling would become obstructed when filling. Therefore, the horizontal concrete cover slab had to be constructed as cast-in-place reinforced concrete after the filling work was completed.

然しながら上部夫端面が水平な蓋コンクリート版の施工
は海上作業となるため作業中にシケが来たりすると作業
を中止しなければならなかったりして、海象条件によっ
て制限を受け工期が大幅に変ることや、又陸地とは異な
る悪条件下のもとで行う型枠組立作業及び現場打ちコン
クリート作業そのものの問題や、現場打ちコンクリート
の養生等の品質の良いコンクリートを得るための施工管
理が充分に行えず、このため荒海では施工工程計画が非
常に制約を受けるなどの欠点があった。
However, since the construction of the concrete cover slab with a horizontal upper end surface requires offshore work, if the work gets wet during the work, the work has to be stopped, and the construction period is subject to restrictions depending on sea conditions and can vary significantly. In addition, there are problems with the formwork assembly work and on-site concrete work itself, which are carried out under adverse conditions different from those on land, and with sufficient construction management to obtain high-quality concrete, such as curing of cast-on-site concrete. However, this had the disadvantage that construction schedule planning was severely restricted in rough seas.

本発明の夫端面が水平な堤体の築造方法は、上記の要望
を満たし現地海上施工を大幅に省力化せしめたものであ
って、夫端面が水平な蓋コンクリート版を堤体ケーソン
と一体として、ほぼ閉鎖箱状に造函ャードで堤体を建造
する工程と、進水、曳航、裾付の後、堤体に予め設けた
注入口から水と砂との懸濁液を注入する工程とより成る
ことを特徴とする。以下図面によって本発明の実施例を
説明する。
The method of constructing an embankment body with a horizontal end face according to the present invention satisfies the above-mentioned requirements and greatly saves labor for on-site offshore construction, and the method is such that a concrete lid plate with a horizontal end face is integrated with the embankment caisson. , a process of constructing an embankment body using a box yard in the shape of a nearly closed box, and a process of injecting a suspension of water and sand through an injection port previously provided in the embankment body after launching, towing, and skirting. It is characterized by consisting of: Embodiments of the present invention will be described below with reference to the drawings.

本発明においては第1図に示すように堤体1を水平蓋コ
ンクリート版2まで堤体ケーソンと一体構造として造函
ャード内で建造し進水の後、現地に曳航する。乾船渠内
で造函する場合には、上部構造物をも渠内造函として同
時に作ってしまうので出渠の際吃水が深くなり過ぎる場
合もあり、その場合は第1図に示す如くフロー夕−(浮
力タンク)3を用いる。又起重機船の補助吊上げ方法を
これに換えて用いても良い。第2図に示すように堤体裾
付予定位置に予め準備された基礎栗石均し面4上にケー
ソンを裾付けた後、直ちに中詰作業を開始する。
In the present invention, as shown in FIG. 1, the embankment body 1 is built as an integral structure with the embankment caisson up to the horizontal cover concrete slab 2 in a box yard, and after being launched, it is towed to the site. When a box is built inside a dry dock, the superstructure is also built at the same time as a box built inside the dry dock, so the drainage may become too deep when leaving the dock. - (buoyancy tank) 3 is used. Alternatively, the auxiliary lifting method of a hoist ship may be used instead. As shown in FIG. 2, after the caisson is hemmed on the basic stone leveling surface 4 prepared in advance at the planned location for hemming the embankment body, the filling work is immediately started.

第1図、第2図に示すように予め中詰土砂5を海底に仮
鷹さしておく。前記水平蓋コンクリート版2の孔6には
矩尺鋼管(ガス管)7を中語砂の注入口、或は余水排出
口として埋込むのが好ましい。
As shown in FIGS. 1 and 2, filling soil 5 is temporarily placed on the seabed in advance. It is preferable to embed a rectangular steel pipe (gas pipe) 7 in the hole 6 of the horizontal lid concrete slab 2 as an inlet for Chinese sand or a drain for draining water.

中言吉砂の管路輸送は通常のポンプ式7麦漠船と同様に
容積舎砂率10%程度の水と砂の懸濁液として圧送する
方法を探る。
For transporting the Chugonyoshi sand through pipes, we are exploring a method of pumping it as a suspension of water and sand with a volumetric sand ratio of about 10%, similar to a normal pump-type 7-barrel ship.

本発明においては第2図に示すように管路系として最初
に台船8から吊下げられた水中サンドポンプ9により、
海底に仮置きされた中詰土砂5を吸引し、台船8上の小
型ブースターボンプ10で昇圧し、フレキシブル耐圧ホ
ース11を通じて水平蓋コンクリート版2の下側の孔6
からケーソン内部に注入し、余水は水平蓋コンクリート
版2に設けた孔6からホース12を介して排水せしめる
。本発明の他の実施例においては第3図に示すように台
船8として土運船8′を用い±蓮船8′を水平堤体1に
横付けして、この土運船8′の船胸内に直接カッター付
きサンドポンプ9を吊入れ、ジェット射水により加水し
ながらスラリーとして取り出す方式が、より便利である
In the present invention, as shown in FIG. 2, a submersible sand pump 9 suspended from a barge 8 as a pipeline system
Filled earth and sand 5 temporarily placed on the seabed is sucked up, pressurized by a small booster pump 10 on a barge 8, and then passed through a flexible pressure hose 11 to a hole 6 on the lower side of the horizontal lid concrete slab 2.
The remaining water is injected into the caisson from the hole 6 in the horizontal cover concrete plate 2 and drained through the hose 12. In another embodiment of the present invention, as shown in FIG. 3, an earth carrier 8' is used as the barge 8. It is more convenient to suspend the sand pump 9 with a cutter directly into the chest and extract the slurry while adding water by jetting water.

この中詰方法では、スラリー中の含砂率の変動は、幅広
く許容できる。又余水を還流せしめるようにすれば余水
によって海水を汚染するおそれがない。又水平蓋コンク
リート版には検査孔(図示せず)を適宜配置で設けてお
けば、棒状検査器具を用いて砂の充填状況がわかり、又
この孔から砂の中詰作業の後、砂の不足する部分にセメ
ントモルタルを注入することもできる。
In this filling method, variations in sand content in the slurry can be tolerated over a wide range. Furthermore, if the surplus water is allowed to flow back, there is no risk of the surplus water contaminating the seawater. In addition, if inspection holes (not shown) are provided in the horizontal lid concrete slab at appropriate locations, the sand filling status can be checked using a rod-shaped inspection tool, and the sand can be checked through these holes after sand filling work. Cement mortar can also be injected into the missing areas.

前記実施例では中詰材料として砂のみをあげたが他の材
料として砂より粒径が大きい様等でも適用できる。又、
前記実施例においては注入口は側壁に、又排出口は水平
蓋コンクリート版に設けたがこれは側壁、水平蓋コンク
リ−ト版の何れに設えてもよい。本発明によれば、従来
のように水平天井コンクリート板の現場打ち作業を省略
することができ、又、造函ャード内で行きとどいた施工
管理のもとで水平蓋コンクリート版を一体として製作す
るので、満足した強度の水平蓋コンクリート版を得るこ
とができる。
In the above embodiments, only sand was used as the filling material, but other materials having a particle size larger than sand may also be used. or,
In the embodiment described above, the inlet was provided in the side wall and the outlet was provided in the horizontal cover concrete slab, but these may be provided in either the side wall or the horizontal cover concrete slab. According to the present invention, it is possible to omit the conventional on-site pouring work for horizontal ceiling concrete plates, and the horizontal cover concrete plate can be manufactured as one piece under thorough construction management within the box yard. Therefore, a horizontal lid concrete plate with satisfactory strength can be obtained.

又造函ャードからの曳航に際しても水平蓋コンクリート
版が予め製作されているので、海水の流入等の心配がな
いので、現場付近に造函ャードがなくて遠方のャードよ
り曳航しなければならないときには好都合である。
In addition, even when towing from a box yard, since the horizontal cover concrete slab is pre-fabricated, there is no need to worry about seawater flowing in, which is convenient when there is no box yard near the site and the boat must be towed from a distant yard. It is.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の堤体の施工段階における説明図、第2
図は本発明方法説明図、第3図は本発明の他の実施例説
明図である。 1・・・・・・堤体、2・・・・・・水平蓋コンクリー
ト版、3..・..・フローター、4・…・・基礎栗石
均し面、5….・.中詰士砂、6・・・・・・水平蓋コ
ンクリート版の孔、7・・・・・・矩尺鋼管、8・・・
・・・台船、9・・・・・・水中サンドポンプ、10…
…小型ブースターボンプ、11……フレキシブル耐圧ホ
ース、12・・・・・・ホース、8′・・・・・・士運
船。 キー図 オ2図 す3図
Figure 1 is an explanatory diagram at the construction stage of the embankment body of the present invention, Figure 2
The figure is an explanatory diagram of the method of the present invention, and FIG. 3 is an explanatory diagram of another embodiment of the present invention. 1... Embankment body, 2... Horizontal lid concrete plate, 3. ..・.. ..・Floater, 4... Basic chestnut stone leveling surface, 5....・.. Filler sand, 6...Horizontal lid concrete plate hole, 7...Rectangular steel pipe, 8...
... Barge, 9... Submersible sand pump, 10...
...Small booster pump, 11...Flexible pressure-resistant hose, 12...Hose, 8'...Manga ship. Key figure O2 figure S3 figure

Claims (1)

【特許請求の範囲】[Claims] 1 水平な蓋コンクリート版を堤体ケーソンと一体とし
て、ほぼ閉鎖箱状に造函ヤードで提体を建造する工程と
、進水、曳航、据付の後、提体に予め設けた注入口から
水と砂との懸濁液を注入する工程とより成ることを特徴
とする天端面が水平な堤体の築造方法。
1 The process of constructing a dam in a box yard by assembling the horizontal concrete slab with the dam body caisson in an almost closed box shape, and after launching, towing, and installing, water is poured into the dam from a pre-installed injection port. A method for constructing an embankment body with a horizontal top surface, the method comprising the step of injecting a suspension of sand and sand.
JP14474581A 1981-09-16 1981-09-16 Construction method of embankment body with horizontal top surface Expired JPS603567B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14474581A JPS603567B2 (en) 1981-09-16 1981-09-16 Construction method of embankment body with horizontal top surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14474581A JPS603567B2 (en) 1981-09-16 1981-09-16 Construction method of embankment body with horizontal top surface

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2505179A Division JPS5911005B2 (en) 1979-03-06 1979-03-06 Slope embankment construction method

Publications (2)

Publication Number Publication Date
JPS5781513A JPS5781513A (en) 1982-05-21
JPS603567B2 true JPS603567B2 (en) 1985-01-29

Family

ID=15369370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14474581A Expired JPS603567B2 (en) 1981-09-16 1981-09-16 Construction method of embankment body with horizontal top surface

Country Status (1)

Country Link
JP (1) JPS603567B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6131515A (en) * 1984-07-20 1986-02-14 Mitsubishi Heavy Ind Ltd Method of installing hull type caisson

Also Published As

Publication number Publication date
JPS5781513A (en) 1982-05-21

Similar Documents

Publication Publication Date Title
CN102561371B (en) Steel caisson enclosure structure at island-tunnel combination part and construction method thereof
CN109780325A (en) A kind of water factory's water intaking tunnel submarine pipeline installation method
WO2015135471A1 (en) Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same
CN113585302A (en) Construction method of bottom-sealing-free concrete double-wall steel cofferdam for deep water bare rock geology
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
JP2024149470A (en) Floating/hoisting integrated pile foundation scour prevention structure, manufacturing and construction method
CN109707002A (en) Large-scale water intake is accurately positioned sinking mounting device and method
CN102561454B (en) Water intake method utilizing pipe jacking vertically
JP3065927B2 (en) Dry work method and work box used for it
CN214574099U (en) "Single pile-negative pressure barrel-transition section" offshore wind power infrastructure
JP2000130065A (en) Shaft construction method
JP3533525B2 (en) Submarine tunnel construction method and box joining device
JPS603567B2 (en) Construction method of embankment body with horizontal top surface
JP2000290936A (en) Construction method of pier footing and caisson for pier footing construction
GB1367881A (en) Hydraulic engineering installations
CN111691481A (en) Immersed tube construction process for laying sewage interception main pipe
CN207143965U (en) Steel plate concrete combined type anti-floating water sealing structure
JP3209502B2 (en) Water intake / discharge equipment underwater construction method
JPH09242081A (en) Dry work method and work box used therefor
JPS5911005B2 (en) Slope embankment construction method
JP2022144881A (en) Installation guide member for immersed tunnel and method for constructing immersed tunnel
JPH10121476A (en) Underwater concrete casting method and apparatus
JP3040944U (en) Portable floating water tank
JP7709166B2 (en) Consolidation and settlement method for bottom ground
JP2667489B2 (en) Method and apparatus for forming bottom plate of casing shaft