How to install piles

Info

Publication number
JPS6054456B2
JPS6054456B2 JP7036881A JP7036881A JPS6054456B2 JP S6054456 B2 JPS6054456 B2 JP S6054456B2 JP 7036881 A JP7036881 A JP 7036881A JP 7036881 A JP7036881 A JP 7036881A JP S6054456 B2 JPS6054456 B2 JP S6054456B2
Authority
JP
Japan
Prior art keywords
tubular body
pile
hole
pipe
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7036881A
Other languages
Japanese (ja)
Other versions
JPS57187420A (en
Inventor
鯱男 増沢
一好 田村
登 菱沼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP7036881A priority Critical patent/JPS6054456B2/en
Publication of JPS57187420A publication Critical patent/JPS57187420A/en
Publication of JPS6054456B2 publication Critical patent/JPS6054456B2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

【発明の詳細な説明】 本発明は管状体から成る杭を地表面下に設置する方法に
関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for installing piles made of tubular bodies below the ground surface.

構造物を支持する基礎抗は、その頭部を地表面下に位置
させている。
The head of the foundation shaft that supports the structure is located below the ground surface.

このような杭の設置方法は、従来、杭を打撃により地中
に打ち込む次の方法によつてきた。すなわち、枕頭部が
地表面から比較的浅い位置に配設される場合は、枕頭部
が地表面かられずかの突出する程度まで抗を地中に打ち
込んだ後、該杭周辺の地盤を掘削し、次いで地表面下の
所定の位置で杭を切断して該位置から上方の部分を取り
去ることにより行、う。
Conventionally, such piles have been installed by the following method in which the piles are driven into the ground by hammering. In other words, if the head of the pile is installed at a relatively shallow position from the ground surface, the pile should be driven into the ground to the extent that the head of the pile slightly protrudes from the ground surface, and then the ground around the pile should be excavated. This is then done by cutting the pile at a predetermined location below the ground surface and removing the upper portion from that location.

また、地下室等を有する構造物ては、これを支持する杭
を、その頭部が地下室の床面より下方に位置するように
設置する必要がある。
In addition, for structures with basements, etc., the piles that support them need to be installed so that their heads are located below the floor of the basement.

この場合は、杭を、前記の方法と同様にして地中に打ち
込んだ後、枕頭部上に、いわゆるやつとこを置き、−こ
のやつとこに打撃力を加えることにより、さらに地中に
打ち込んで前記杭の頭部を地表面下の深い所定の位置に
到達させることにより行う。しかし、前記いずれの方法
によつても、杭は大打撃力によつて地中に打ち込まれる
ため、杭が抗Jとして本来的に必要な強度を具備するこ
との他に、前記打撃力に耐え得る構造のものであること
が必要である。したがつて、杭材が高価になるとともに
、前者の方法では、杭の切断により取り去つた部分は使
用しないので杭材料の損失を招く。7 さらに、杭打撃
による騒音や振動の発生により、特に市街地においては
、公害問題を惹起する原因のひとつになつている。
In this case, after the pile is driven into the ground in the same manner as described above, a so-called ``gut'' is placed on the head of the pillow, and by applying a striking force to this ``gut'', the pile can be driven further into the ground. This is done by letting the head of the pile reach a predetermined position deep below the ground surface. However, in any of the above methods, the pile is driven into the ground with a large impact force, so in addition to having the originally required strength as a J resistance, the pile must withstand the impact force. It is necessary that the structure is such that it can be obtained. Therefore, the pile material becomes expensive, and in the former method, the portion removed by cutting the pile is not used, resulting in loss of the pile material. 7 Furthermore, the noise and vibration generated by pile impact is one of the causes of pollution problems, especially in urban areas.

後者の方法は、これを特公昭55−5013訝公報に開
示されているような、安定液が満たされた孔内に管状体
から成る杭を挿入して、地中に杭を形成する工法に適用
すると、該管状体の上端部から管状体の内部に安定液が
流入するという問題がある。
The latter method is a method of forming piles underground by inserting a pile made of a tubular body into a hole filled with a stabilizing liquid, as disclosed in Japanese Patent Publication No. 55-5013. When applied, there is a problem that the stabilizing liquid flows into the interior of the tubular body from the upper end of the tubular body.

この管状体の内部における安定液の存在は、該管状体内
でその長手方向に沿つて垂錘を上下動させることにより
、管状体の下方の孔底地盤を圧密する際の前記垂錘の動
きの妨げとなる。また、前記管状体内にモルタルやコン
クリートを打設するには、安定液を該管状体内部から抜
いて行わねばならない。したがつて、本発明の目的は、
打撃力を全く使用しないで、杭を、その頭部が地表面下
の所定の箇所に位置するように地中に設置することにあ
り、特に、安定液が満たされた孔内に管状体から成る杭
を挿入した際における管状体内への安定液流入の阻止を
図りながら、地中に杭を形成することにある。
The presence of a stabilizing liquid inside the tubular body allows the movement of the plumbstone to be controlled when the plumbstone is moved up and down along its length within the tubular body, thereby consolidating the bottom of the hole below the tubular body. It becomes a hindrance. Further, in order to place mortar or concrete inside the tubular body, it is necessary to remove the stabilizing liquid from the inside of the tubular body. Therefore, the object of the present invention is to
The purpose of this is to install a pile into the ground without using any impact force so that its head is located at a predetermined point below the ground surface, and in particular to install a pile from a tubular body into a hole filled with a stabilizing liquid. The objective is to form a pile in the ground while preventing the stabilizing liquid from flowing into the tubular body when the pile is inserted.

本発明の方法は、杭長さを超える深さの孔を、安定液を
満たしながら地中に掘削し、次いで該孔内に両端開放の
管部材が上端部に液密的に取り付けられた杭を挿入し、
前記孔の壁と前記杭との間の間隙を固形物で充填した後
、前記管部材を撤去することから成る。
The method of the present invention involves drilling a hole in the ground with a depth exceeding the length of the pile while filling it with a stabilizing liquid, and then installing a pipe member with both ends open in the hole in a liquid-tight manner at the upper end of the pile. Insert
It consists of filling the gap between the wall of the hole and the pile with solid matter and then removing the tube member.

本発明が特徴とするところば、図示の実施例についての
以下の説明により、さらに明らかとなろう。
The features of the invention will become clearer from the following description of the illustrated embodiment.

先ず、第1図に示すように、地中に管状体10.から成
る杭の長さを超える深さの孔12を安定液を満たしなが
ら掘削する。
First, as shown in FIG. 1, a tubular body 10. A hole 12 with a depth exceeding the length of the pile consisting of is excavated while being filled with stabilizing liquid.

孔12の深さは、地表面下の杭頭部の位置、すなわち地
表面と該杭頭部との間の設定距離により決定される。図
示の例では、設定距離の値aと杭すなち管状体10の長
さ丁bとの和が孔12の深さとなる。次に、第2図に示
すように、両端開放の管部材14が上端部に液密的に取
り付けられた管状体10を、安定液が満たされた孔12
内に挿入する。
The depth of the hole 12 is determined by the position of the pile head below the ground surface, that is, the set distance between the ground surface and the pile head. In the illustrated example, the depth of the hole 12 is the sum of the set distance value a and the length b of the stake, that is, the tubular body 10. Next, as shown in FIG. 2, the tubular body 10, in which the tubular member 14 with both ends open is fluid-tightly attached to the upper end, is inserted into the hole 10 filled with the stabilizing liquid.
Insert inside.

前記管状体の孔12内への挿入は、ウインチ(図・示せ
ず)に接続されたワイヤー16を管部材14にかけて管
状体10を吊り上げ、これを孔12内に降下させること
により行うことができる。これにより、管状体10の上
端部は、管部材14に打撃力を加えることなく、かつ管
状体10内に安定液が流入することなく地表面下の所定
の位置に配置される。第3図に示すように、管状体10
と管部材14とは、バッキング18を介してボルト20
およびナット22により分離可能に接合されている。管
部材14は鋼管から成り、該鋼管はその両端部に全周に
わたつて内方に張り出したフランジ部24,26を備え
、該フランジ部には複数のボルトノ孔28,30が設け
られている。また、管状体10はコンクリート管から成
り、その上端部には管部材14のフランジ部24,26
に設けられたボルト孔28,30に対向して設けられた
複数のめねじ孔32を有する銅鉄製のキャップ34が取
り付けられている。バッキング18には、ボルト孔30
に対向して孔36が穿設されている。ボルト20は両端
部にねじ部を有して成り、その一端部がボルト孔28,
30および孔36を経てめねじ孔32と螺合し、他端部
がフランジ部24上面でナット22と螺合している。し
たがつてナット22を締め付け、あるいは緩めることに
より、管部材14の管状体10への取り付け、取り外し
を簡単に行うことができる。
The tubular body can be inserted into the hole 12 by hanging a wire 16 connected to a winch (not shown) on the tube member 14, lifting the tubular body 10, and lowering it into the hole 12. . As a result, the upper end of the tubular body 10 is placed at a predetermined position below the ground surface without applying any impact force to the tubular member 14 and without any stabilizing liquid flowing into the tubular body 10. As shown in FIG.
and the pipe member 14 are connected to the bolt 20 via the backing 18.
and are separably joined by a nut 22. The pipe member 14 is made of a steel pipe, and the steel pipe is provided with flange portions 24 and 26 extending inwardly over the entire circumference at both ends thereof, and a plurality of bolt holes 28 and 30 are provided in the flange portion. . The tubular body 10 is made of a concrete pipe, and the upper end thereof has flange portions 24, 26 of the pipe member 14.
A copper-iron cap 34 is attached which has a plurality of female threaded holes 32 facing the bolt holes 28 and 30 provided therein. The backing 18 has bolt holes 30
A hole 36 is bored opposite to. The bolt 20 has threaded portions at both ends, one end of which is inserted into the bolt hole 28,
30 and a hole 36, and is screwed into the female threaded hole 32, and the other end is screwed into the nut 22 on the upper surface of the flange portion 24. Therefore, by tightening or loosening the nut 22, the tube member 14 can be easily attached to and detached from the tubular body 10.

またボルト20は、これをめねじ孔32との螺合を解く
ことにより、管状体10から切り離すことができる。ま
た、フランジ部24,26を補強するために、管部材1
4の内壁面とフランジ部24,26との双方に接してリ
ブ38,40が溶接されている。
Further, the bolt 20 can be separated from the tubular body 10 by unscrewing it from the female threaded hole 32. In addition, in order to reinforce the flange portions 24 and 26, the pipe member 1
Ribs 38 and 40 are welded in contact with both the inner wall surface of 4 and the flange portions 24 and 26.

第7図は、管状体10と管部材14とを溶接により接合
した例を示す。
FIG. 7 shows an example in which the tubular body 10 and the tube member 14 are joined by welding.

両端開放の鋼管から成る管部材14の下端部が、その周
囲に沿つて、コンクリート管から成る管状体10の上端
部に設けられたキャップ34に溶接されている。これに
より管状体10と管部材14との接合部における止水性
が確保される。また、管部材14は前記鋼管に代え、こ
れをコンクリート管とすることができる。この場合は該
コンクリート管の端部に管状体10におけると同様のキ
ャップを取り付けて溶接する。管状体10の上端部に、
管部材14を前記実施例のように取り付けることにより
、管状体10と管部材14との接合部、すなわち管状体
10の上端部から安定液が流入することはない。
The lower end of a tubular member 14 made of a steel pipe with both ends open is welded along its periphery to a cap 34 provided at the upper end of the tubular body 10 made of a concrete pipe. This ensures watertightness at the joint between the tubular body 10 and the tube member 14. Moreover, the pipe member 14 can be replaced with a concrete pipe instead of the steel pipe. In this case, a cap similar to that of the tubular body 10 is attached to the end of the concrete pipe and welded. At the upper end of the tubular body 10,
By attaching the tube member 14 as in the above embodiment, the stabilizing liquid will not flow from the joint between the tube member 10 and the tube member 14, that is, from the upper end of the tube member 10.

したがつて、例えば、管状体10を孔12内へ挿入した
後、孔底地盤を圧密するために管状体10の下方に配置
されたシューブロック(図示せず)を、管状体10内で
重錘を落下させて、前記地盤に貫入させる場合でも、安
定液で前記重錘の落下運動が阻害されることはない。さ
らに、孔12内に挿入された管状体10にモルタルやコ
ンクリートを打設する場合でも、管状体10内の安定液
を抜いてから施工する必要がない。また、管部材14に
は打撃力を全く作用しないので、管部材14の断面形状
は、管状体10の吊上げに耐え得る強度のものとするこ
とができる。
Therefore, for example, after inserting the tubular body 10 into the hole 12, a shoe block (not shown) disposed below the tubular body 10 is placed under a heavy weight inside the tubular body 10 in order to consolidate the bottom ground of the hole. Even when the weight is dropped and penetrates the ground, the falling movement of the weight is not inhibited by the stabilizing liquid. Furthermore, even when pouring mortar or concrete into the tubular body 10 inserted into the hole 12, there is no need to drain the stabilizing liquid inside the tubular body 10 before starting the work. Moreover, since no impact force is applied to the tube member 14, the cross-sectional shape of the tube member 14 can be made strong enough to withstand lifting of the tubular body 10.

したがつて管部材14の材料を節約することが可能とな
る。次に、管状体10の孔12内への挿入が完了した後
、孔12の壁と管状体10および必要に応じて管部材1
4との間の間隙を固形物で充填する。
Therefore, it is possible to save the material of the tube member 14. Next, after the insertion of the tubular body 10 into the hole 12 is completed, the wall of the hole 12 and the tubular body 10 and, if necessary, the tube member 1
Fill the gap between 4 and 4 with solid matter.

この固形物による前記間隙の充填は、前記安定液に固化
剤を投入して固化させ、あるいは安定液との置換により
土砂、モルタル、コンクリート等,で充填して行うこと
ができる。その後、管部材14の周囲の地盤を掘削し、
管部材を撤去する。
The gap can be filled with the solid material by adding a solidifying agent to the stabilizing liquid and solidifying it, or by replacing the stabilizing liquid with earth and sand, mortar, concrete, etc. After that, the ground around the pipe member 14 is excavated,
Remove the pipe members.

この場合、第3図に示す例によれば、前記地盤の掘削以
前でも、管状体10と管部材14とを接合しているボル
ト20およびナット22を地表面で取り外すことにより
、管部材14の撤去が可能である。第7図の例では、管
部材14を溶断し、またはこれを取り壊して撤去する。
前者の例では撒去した管部材14をさらに他の管状体に
転用することができる。本発明によれば、打撃力を全く
要することなく、かつ経済的に、頭部を地表面下の所定
の箇所に位置させた杭の設置を行うことができる。
In this case, according to the example shown in FIG. 3, the bolts 20 and nuts 22 connecting the tubular body 10 and the pipe member 14 can be removed at the ground surface even before the ground is excavated. Removal is possible. In the example shown in FIG. 7, the pipe member 14 is melted or demolished and removed.
In the former example, the removed tubular member 14 can be further used for another tubular body. According to the present invention, it is possible to economically install a pile with the head located at a predetermined location below the ground surface without requiring any impact force.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は地中に掘削された孔の縦断面図、第2図は杭を
孔内に挿入している状態を示す縦断面図、第3図は孔、
管状体および管部材の部分縦断面図、第4図は第3図に
示した杭の平面図、第5図は第3図の線1−1に沿つて
得た横断面図、第6図は第3図の線■−■に沿つて得た
横断図、第7図は孔、管状体および管部材の部分断面図
である。 10・・・・・・管状体、12・・・・・・孔、14・
・・・・・管部材、18・・・・・・バッキング、20
・・・・・・ボルト、22・・・・・ナット、24,2
6・・・・・・フランジ部、28,30・・・・・・ボ
ルト孔、32・・・・・・めねじ孔、34・・・・・キ
ャップ。
Figure 1 is a vertical cross-sectional view of a hole drilled underground, Figure 2 is a vertical cross-sectional view showing the state in which a pile is inserted into the hole, and Figure 3 is a vertical cross-sectional view of a hole drilled into the ground.
4 is a plan view of the pile shown in FIG. 3; FIG. 5 is a cross-sectional view taken along line 1-1 in FIG. 3; FIG. 3 is a cross-sectional view taken along the line ■--■ in FIG. 3, and FIG. 7 is a partial cross-sectional view of the bore, the tubular body, and the tube member. 10... Tubular body, 12... Hole, 14.
... Pipe member, 18 ... Backing, 20
...Bolt, 22...Nut, 24,2
6...Flange part, 28, 30...Bolt hole, 32...Female screw hole, 34...Cap.

Claims (1)

【特許請求の範囲】 1 管状体から成る杭を地表面下に設置する方法であつ
て、杭長さを超える深さの孔を安定液を満たしながら地
中に掘削すること、次いで両端開放の管部材が上端部に
液密的に取り付けられた管状体を前記孔内に挿入するこ
と、前記孔の壁と前記杭との間の間隙を固形物で充填し
た後、前記管部材を撤去することから成る、杭の設置方
法。 2 前記管部材と前記管状体とは、パッキングを介して
分離可能に接合されている、特許請求の範囲第1項の方
法。 3 前記管部材は鋼管から成り、該鋼管はその両端部に
全周にわたつて内方へ張り出した、複数のボルト孔を有
するフランジ部を備え、前記管状体はコンクリート管か
ら成り、該コンクリート管は、その上端部に取り付けら
れ、前記ボルト孔に対向して設けられた複数のめねじ孔
を有する鋼鉄製のキャップを備え、前記管部材と前記管
状体とは、ボルト、ナットにより接合されている、特許
請求の範囲第1項または第2項の方法。 4 前記管部材と管状体とは溶接により接合されている
、特許請求の範囲第1項の方法。
[Claims] 1. A method of installing a pile made of a tubular body under the ground surface, which involves drilling a hole in the ground with a depth exceeding the length of the pile while filling it with a stabilizing liquid, and then opening it at both ends. Inserting a tubular body with a tubular member liquid-tightly attached to the upper end into the hole, and removing the tubular member after filling the gap between the wall of the hole and the pile with a solid substance. A method of installing piles, consisting of: 2. The method according to claim 1, wherein the tube member and the tubular body are separably joined via a packing. 3. The pipe member is made of a steel pipe, the steel pipe is provided with a flange portion having a plurality of bolt holes extending inwardly over the entire circumference at both ends thereof, and the tubular body is made of a concrete pipe, has a steel cap attached to its upper end and having a plurality of female screw holes provided opposite to the bolt holes, and the pipe member and the tubular body are connected by bolts and nuts. The method according to claim 1 or 2, wherein 4. The method according to claim 1, wherein the tube member and the tubular body are joined by welding.
JP7036881A 1981-05-11 1981-05-11 How to install piles Expired JPS6054456B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7036881A JPS6054456B2 (en) 1981-05-11 1981-05-11 How to install piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7036881A JPS6054456B2 (en) 1981-05-11 1981-05-11 How to install piles

Publications (2)

Publication Number Publication Date
JPS57187420A JPS57187420A (en) 1982-11-18
JPS6054456B2 true JPS6054456B2 (en) 1985-11-30

Family

ID=13429421

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7036881A Expired JPS6054456B2 (en) 1981-05-11 1981-05-11 How to install piles

Country Status (1)

Country Link
JP (1) JPS6054456B2 (en)

Also Published As

Publication number Publication date
JPS57187420A (en) 1982-11-18

Similar Documents

Publication Publication Date Title
US3638433A (en) Method and apparatus for forming structures in the ground
US5904447A (en) Drive device used for soil stabilization
CN107653878A (en) Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction
GB2067233A (en) A method of constructing a collector well
JP3361879B2 (en) Construction method of pile with drain layer and construction device used for it
JP2000170149A (en) Forming method for underground pile and equipment therefor
JP6616180B2 (en) Construction method of foundation pile with reinforced pile head
JPH08209686A (en) Pile head processing tool and pile head processing construction method for cast-in-place pile
JPS6054456B2 (en) How to install piles
JP3144767B2 (en) Underground pile forming method and apparatus
JP3219993B2 (en) Piling method in pit structure
JP4474965B2 (en) Leg fixing method for building
JP2000120066A (en) Construction method of steel pipe pile
JP4475845B2 (en) Pile construction method
JPS6116811B2 (en)
JP3325550B2 (en) Pile construction equipment and pile construction method
JP3170625B2 (en) Hiring pile and method of constructing foundation using it
JPH05346019A (en) Construction method of cast-in-place pile which does not receive negative frictional force
JPH0121288B2 (en)
JP2592068B2 (en) Construction method of continuous underground wall
JPS6156734B2 (en)
JPS6220334B2 (en)
JPS6129786Y2 (en)
JPH0129932B2 (en)
JPS6214188Y2 (en)